Chapter 4 Modeling Basic Operations & Inputs 1 Outline detailed operations Model 04-01 Model 04-02 Model 04-03 Model 04-04 general usage of ARENA 2 A Sequence of Related Models Model 4-1: a sealed electronic assembly and test system more features, Model 4-2: additional features in scheduling, failure, and states of resources Model 4-3: more advanced animation Model 4-4: advanced features in moving – stations, routes, and animation 3 An Electronic Assembly/Test System Part A EXPO(5) Process A Tria(1,4,8) Scrapped Part A TRIA(1,3,4) 20% Rework Part B WEIB (2.5, 5.3) EXPO(45) 9% Sealer 80% Salvaged & Shipped Part B Process B 91% Batches of 4 EXPO(30), de- Tria(3,5,10) batch on arrival Shipped 4 An Electronic Assembly/Test System Part A EXPO(5) Process A Tria(1,4,8) Scrapped Part A TRIA(1,3,4) 20% Rework Part B WEIB (2.5, 5.3) EXPO(45) 9% Sealer 80% Salvaged & Shipped Part B Process B 91% Batches of 4 EXPO(30), de- Tria(3,5,10) batch on arrival Shipped processes type-dependent unreliable system create batches service times chance create entities of 4 the entities & to determine number of racks statistics de-batch later 5 Model 04-01 ignore details the 2-minute traveling times the working hours of stations schedule of the re-workers failure of the sealer the number of racks used 6 Remarks for Model 04-01 two types of entities entity-dependent service time: an attributes of an entity: a local variable of the entity time in system: marking the time entering the system chance: conditional routes type dependent statistics: record mechanism 7 Model 04.02 8 New Features of Model 04-02: Refinements of Model 04-01 run length 10 days, 16 hours per day two 8 hr shifts / day 1 re-worker in the first shift 2 re-workers in the second shift sealer may break down life time expo(120) repair time expo(4) statistics of the status of sealer: on and off statistics of the rework queue (distribution of # of racks) each rack possible to hold 10 items 9 Schedule of the Rework Station run length: Setup menu variable resource define schedule of re-workers (Schedule module) modify the # of hours per day to suit the schedule associate the schedule with the (resource of the) re-work station option on resource when a service is interrupted: ignore, wait, preempt 10 Failure of Resource failure of the sealer define a failure (Failure module in Advanced Processes) associate the failure with a resource the treatment of incomplete work at a failure same as schedule: ignore, wait, and preempt 11 Collect Statistics statistics time in system: customer average sealer: rack: state dependent, time average number of rack needed, time average 12 Collect Statistics to get time-in-system statistics of a type of entities (customer-average statistics) use Record module record exit time - creation time compile statistics to get time-persistent statistics of a collection of values of variables or a collection of states of resources use Statistics module (in Advance Process Template) may need to self-define categories 13 Statistics for Racks and for Sealers time-persistent statistics – Statistic module statistics on sealer status fraction of idle, failed, and busy time of sealer statistic type: frequency (not time-persistent) statistics on number of racks needed fractions statistic of time for different number of racks used type: frequency (not time-persistent) 14 Instantaneous Utilization and Scheduled Utilization for a resource, let B(t) = # of units of the resource busy at t M(t) = # of units of the resource available at t instantaneous utilization T B( s) 0 M ( s ) ds T scheduled utilization T 0 B( s) / Tds T 0 M ( s) / Tds 15 T 0 B( s)ds T 0 M ( s )ds Model 04.03 16 New Features of Model 04-03: Refinements of Model 04-02 animation length of queues and points of queues changing creating entity pictures new one: copy, edit, and assign entity picture adding resource pictures creating adding resource picture from animation tool bar variable plots 17 Model 04.04 18 New Features of Model 04-04: Refinements of Model 04-03 saving connection links by station and route modules stations: module for program and icon for animation route: module for program and link for animation possible to have multiple station icons in animation for one location two station icons between one route link in animation changing an entity picture: by an Assignment Module 19
© Copyright 2026 Paperzz