Are YOU building the right system? Validation is the process by which the fitness-for-purpose of a new system or operational concept being developed is established. In practice, validation can be defined as the process of answering a question like ‘Are we building the right system?’. The answer is then provided to stakeholders to support their decision-making activity. Therefore the validation process is structured in order to satisfy the information needs of relevant stakeholders about performances of systems/concepts. Deep Blue offers support in the definition of these validation processes and in carrying out the validation activities. To structure them we refer to the framework defined by the European Operational Concept Validation Methodology (E-OCVM) developed by EUROCONTROL. DEEP BLUE, A SUPPORT FOR YOUR VALIDATION ACTIVITIES Deep Blue is a research and consultancy company located in Rome, and created by a group of senior researchers from major Italian Universities and Research Centres. It is a multidisciplinary team of specialists in human factors, validation, interaction design, dissemination, and safety. The main area of activity of the company is the analysis and evaluation of interactive complex systems, with particular focus on the interactions, integration and allocation of functions between the human, procedural and equipment components of the systems. Currently the company is working on a number of related issues including: - Evaluation of dependability of interactive systems, - Evaluation and Validation of air traffic concepts and systems, - Human Factors training, - Dissemination of research results in the aviation and air traffic control domains. OUR EXPERIENCE WITH VALIDATION AND E-OCVM We have a significant experience in working with the E-OCVM, both at the theoretical level and in its practical application to R&D projects. Within CAATS I and CAATS II, Deep Blue studied how the different cases (e.g. safety, human factor, environment, business)should interact and how their results should be integrated in the framework of an overall EOCVM based validation. Some of the experiences from the integration of safety validation results from multiple R&D projects are reported in [Leo, 07]. The experience of Deep Blue in supporting R&D projects in their validation activity date back to the beginning of the E-OCVM. Deep Blue was consultant of ENAV for the Mediterranean Free Flight project, where it defined the validation strategy and plan of the project, supported the execution of the validation exercises, integrated their results, and provided the final output of the project validation work. A comprehensive description of the validation work and of the main lessons learnt is available in [Pas, 07]. In ASAS Validation and Human Factor and in NUP II and NUP II +, Deep Blue was consultant of EUROCONTROL Bretigny, and in charge of the work related to Validation, that concerned: the production of an E-OCVM based Validation Strategy and Plan for the EUROCONTROL ASAS validation activity; the production of a preliminary Validation summary report for ASAS R&D projects, with a roadmap for the future ASAS validation activities. The work included also the support to the validation teams of NUP II and NUP II+,through a set of workshops and integration activities for the production of the final validation report. OUR VALIDATION SERVICES - Surveys - Activity and Work Analysis - Stakeholder Analysis - Validation Strategy and Plan - Simulation and Trials - Scientific Dissemination [Leo, 07]Projects Leone M., Pasqui A. ContributioAnalysis n of Multiple R&DofProjNew ects to Safety Analysis of New Operati onal Concepts-- Probl ems and Perspecti ves Perspectives In Proceedings of the EUROCONTROL Annual Safety R&D Oct. 2007. le R&D toni Safety Operational Concepts Problems and In Proceedings of Semi thenar,EUROCONT [Pas, 07] Pasqui n i A., Leone M., Vi c kery K., Wagemans H. Val i d ati o n Management i n an ATM Research Proj e ct Ai r Traffi c Control Quarterl y , Vol . 15/2, Ai r Traffi c Control Insti t ute, 2007.Abstracts at: www.dbl u e.i t /publ i c /mai n/publicati2007.A ons/en ns H. Validation Management in an ATM Research Project Air Traffic Control Quarterly, Vol.15/2, Air Traffic Control Institute, More recently Deep Blue was subcontracted by ENAV for the definition of a Validation Strategy and Plan based on the E-OCVM for the BLUE MED Feasibility Study. Deep Blue is also leading Validation in several, large scale, international R&D projects in the aeronautic domain. In most of these projects Deep Blue is using a modified version of the E-OCVM adapted to the specific characteristic of the aeronautic context. At the moment, Deep Blue is responsible for the planning and management of the validation activities, in the following EU projects (IP): - Airborne integrated systems for safety improvement, flight hazard protection and all weather operation (Flysafe). IP of the VI EU Framework Programme leaded by Thales, to develop and integrate new on-board systems for improving the safety of flight. - System Engineering for Security and Dependability (Serenity). IP of the VI EU Framework Programme leaded by Engineering, to identify and collect patterns for security and dependability of systems. - All Condition Operations and Innovative Cockpit Infrastructure (ALICIA). IP of the VII EU Framework Programme leaded by Westland Helicopters, to develop an All Conditions Operations capability to reduce weather-related delays and hazards. - Security Engineering for lifelong Evolvable Systems (SEES). IP of the VII EU Framework Programme leaded by University of Trento, for identifying new design paradigms for evolving systems. TROL Annual Safety R&D Seminar, Oct. 2007. .Abstracts at: www.dblue.it/public/main/publications/en HOW WE CAN SUPPORT YOUR VALIDATION RELATED ACTIVITY There is a wide range of validation related activities that are required by the SESAR Joint Undertaking in which Deep Blue could provide support to your R&D projects.These include: - definition of validation plans, that fit with the overall validation view of SESAR at the programme level; - specification of these plans with the identification of the validation exercises that are needed to collect the required information; - support to the validation activities and facilitation of the interactions between the different validation team; - evaluation of a concept maturity level using the SESAR suggested evaluation methodology (developed within EUROCONTROL and integrated by CAATS II); - definition of transition criteria (across different levels of maturity) for the concept you are investigating in your project; - definition of safety and human factor cases, and their integration in the framework of an overall, E-OCVM based, validation activity. OUR CONTACTS AND WEB SITE We will be happy to discuss with you to investigate the opportunity of a support in these and other Validation related activities for your R&D projects. For any information you can contact Linda Napoletano at the address: [email protected]. For more information about our past and current projects on the subject and to browse the related publications you can visit: www.dblue.it
© Copyright 2026 Paperzz