Revisions to the Total Coliform Rule (RTCR) AWWA Alabama-Mississippi Section ADEM Regulation Update May 30, 2013 George Cox (334) 271-7778 [email protected] adem.alabama.gov 1 Overview • • • • • • • • Important Dates Monitoring Requirements MCL Public Notification Assessments Treatment Technique Violation Analytical Methods Monitoring Plans 2 Important Dates • • • • Proposed Rule July 14, 2010 Published in FR February 13, 2013 Compliance Date is April 1, 2016 ADEM will implement early once regulations are in place – early next year 3 Monitoring Requirements • Routine Monitoring – No Changes to Monthly Monitoring Requirements – Elimination of the Five Sample Requirement • Repeat Monitoring – No Changes to Repeat Monitoring Requirements In Most Instances – State Has Greater Flexibility to Allow Alternate Sites 4 Maximum Contaminant Levels (MCL) • E. coli – TC positive with E. coli positive in repeat Sample – E. coli positive with TC positive in repeat Sample – E. coli positive and failure to take all repeat samples – TC positive and failure to test for E. coli in repeat samples 5 Maximum Contaminant Levels (MCL) • Total Coliform – Eliminates Maximum Contaminant Level (MCL) for Total Coliform – Requires Assessment instead of a MCL Violation 6 Assessments • Level One Triggers – Systems collecting 40 or more Samples per month, 5% of Samples are Total Coliform Positive – Systems collecting fewer than 40 Samples per month, More than one Total Coliform Positive – System Fails to Collect Every Repeat Sample After a Total Coliform Positive 7 Assessments • Level Two Triggers – E Coli MCL Violation – Second Level One Trigger in a Twelve Month Period 8 Assessments • Level One Requirements – Complete and Submit as soon as Practical – Submit a Maximum of 30 Days – Include • • • • Sanitary defects detected Corrective actions completed Timetable for corrective actions not completed May note no sanitary defects detected 9 Assessments • Level Two Requirements – All Level One requirements – Conducted by State Approved Party • Inadequate Assessment – Submit a revised Assessment not Exceed 30 Days • Corrective Actions – Notify the State when each Corrective Action Completed 10 Treatment Technique Violation • Fails to Conduct an Assessment within required the Timeframe • Fails to Complete Corrective Actions within required the Timeframe 11 Public Notification • 24 Hour PN – E. coli MCL Violation – Includes failure to conduct repeats after E. coli positive sample • 30 Day PN – Treatment Technique Violation – Failure to conduct assessment or corrective action 12 Public Notification • 12 Month PN: – Monitoring Violation – Reporting Violation • 30 Day Notification for Total Coliform eliminated. 13 Analytical Methods • Eliminates All Fecal Coliform Methods • All testing for Total Coliform and E Coli Only 14 Monitoring Plans • Include Repeat Monitoring Locations • Submit Revised Plan to State 15 Questions? George Cox (334) 271-7778 [email protected] adem.alabama.gov 16
© Copyright 2026 Paperzz