Q1 - Midwest User Group

Ford Material Planning & Logistic
Supply Chain Management
Global MMOG/LE
Guidelines for Evidence Submission for MP&L Endorsement
Presented to QAD Midwest User Group
March 20, 2017
Presented by Gladyne Wiley-Lynch
Supplier Manufacturing Performance Group (SMPG)
Global MMOG – Guidelines for Evidence Submission
for MP&L Endorsement
Ford Material Planning & Logistics - SCM
MP&L Mission
Q1 Discipline
Q1 Requirements for Suppliers Shipping Globally to Ford
MMOG/LE guideline: What is MMOG?
Ford’s Commitment to MMOG
Risk Assessment and Management – IATF 16949
New Global Process for MP&L: Lead Region Concept
Q 1 Target Date
Q1 Pre-screening
Training, Eligibility, and Timing
Supplier Responsibility
Q1 Share-Point site
30 day business review
Best Practices for doing business as a Tier One
Lessons Learned – High Delivery Performance
Copyright © 2016 Ford Motor Company. All rights reserved.
Mission Statement
The mission of MP&L is to optimize the total global supply
chain through the synchronous flow of information, the
synchronous flow of material, and the coordination of the
overall process of production.
Copyright © 2016 Ford Motor Company. All rights reserved.
Q1
Q1 puts the discipline in place to achieve consistent
excellence and guides cooperation between Ford
and its suppliers for superior quality execution
Q1 means that the supplier facility achieve excellence
in these key areas:
Capable Systems (ISO 14001, TS-16949, MMOG)
Ongoing Performance
Site Action Plan
Customer Endorsement (STA, Plants, MP&L, and FCSD)
Continuous Improvement
The Q1 Award is given by Ford to suppliers who have a achieved the highest standards
of quality control … and delivery!
Copyright © 2016 Ford Motor Company. All rights served.
Q1 Requirements – Suppliers Shipping Globally
Suppliers shipping product to Ford plants, who are petitioning
to a Supplier Technical Assistant (STA) for Q1, MUST petition
to MP&L for the Ford global MP&L endorsement by following
the guidelines outlined in the Q1 MP&L Requirements
Checklist.
Copyright © 2016 Ford Motor Company. All rights reserved.
What is MMOG/LE?
•
•
•
•
•
•
Materials
Management
Operations
Guideline
Logistic
Evaluation
Copyright © 2016 Ford Motor Company. All rights reserved.
Understand MMOG Chapters Context
CHAPTER 1 - STRATEGY AND IMPROVEMENT
1.1 Vision & Strategy
1.2 Objectives
1.3 Measurement, Analysis, and Action Plans
1.4 Continual Improvement
1.5 Supply Chain Development
CHAPTER 2 - WORK ORGANIZATION
2.1 Organizational Processes
2.2 Operating Procedures and Work Instructions
2.3 Resource Planning
2.4 Work Environment & Human Resources
2.5 Risk Assessment and Management - New Requirement *
CHAPTER 3 – CAPACITY & PRODUCTION
PLANNING
3.1 Product Realization
3.2 Capacity Planning
3.3 Production Planning
3.4 Systems Integration
CHAPTER 4 – CUSTOMER INTERFACE
4.1 Communication
4.2 Packaging & Labeling
4.3 Shipping
4.4 Transportation
4.5 Customer Satisfaction & Feedback
CHAPTER 5 – PRODUCTION & PRODUCT CONTROL
5.1 Material Identification
5.2 Inventory
5.3 Engineering Change Control
5.4 Traceability
CHAPTER 6 – SUPPLIER INTERFACE
6.1 Supplier Selection
6.2 Supply Chain Management Agreement
6.3 Communication
6.4 Packaging & Labeling
6.5 Transportation
6.6 Material Receipt
6.7 Supplier Assessment
Copyright © 2016 Ford Motor Company. All rights reserved.
Scoring System ABC Classification Definition
Classifications
A
Ford requires Level A compliance
Best practice
B
Unstable or inconsistent
processes
C
Deficient in key
critical areas
Copyright © 2016 Ford Motor Company. All rights reserved.
8
Scoring System Weighted Scoring
 Enables suppliers to set
priorities for completing their
self-assessment
 Aids in establishing
corrective actions and
continual improvements
Copyright © 2016 Ford Motor Company. All rights reserved.
Scoring Summary Worksheets
A
1) Compliance to all F3 criteria
2) Non-compliance to fewer than 10 F2 criteria
3) A total score of 90% or higher
The organization is compliant in all key criteria and can demonstrate that the supply chain
management processes in use at the facility are best practice. Annual assessments are
carried out with the goal of ensuring sustainable and best practice processes. In support of
continual improvement, the development of an action plan should be considered in order to
eliminate any remaining unmet criteria.
B
1) Compliance to all F3 criteria
2) Non-compliance of 10 to 15 F2 criteria
3) A total score greater than or equal to 75% and
less than 90%
Although most of the fundamentals of supply chain management are demonstrated, the
organization is deficient in several areas that compromises the efficiency of internal
performance and may impact its ability to support the needs of the customer. An action plan
should be developed and implemented in a timeframe that meets the needs of the business
and its customer(s).
C
1) Non-compliance to any F3 criterion
2) Non-compliance to 16 or more F2 criteria
3) A total score less than 75%
The organization is deficient in one or more key areas of supply chain management. This
situation creates a high risk of disruption to customers and demonstrates a lack of efficiency
and control of internal processes within the existing supply chain strategy. Management
commitment will be required to create, prioritize and implement action plans in a timely
manner to avoid serious or prolonged issues with the customer.
Copyright © 2016 Ford Motor Company. All rights reserved.
Ford’s Commitment to MMOG/LE
Ford MP&L
adopted MMOG/LE
as a
Q1
endorsement
criteria in August
2001. Suppliers
must score a level
“A” on the
MMOG/LE
Assessment to
receive and
maintain the
MP&L’s
endorsement for
Q1.
Supplier
must
reassess
their
organization
Annually.
MMOG/LE is a global assessment
and should include all regions
supplied for production and
service.
When suppliers complete their
reassessment, GSDB online
must be updated with the
results between May 1st and July
31st, annually.
A missing, expired, or other
than Level A MMOG/LE
Classification in GSDB Online
will result in penalization in the
Q1 score (SIM will show the last
updated date).
Copyright © 2016 Ford Motor Company. All rights reserved.
Risk Assessment and Management
New Sub Chapter 2.5.1 & 2.5.2





Expands beyond 2.3.2 Contingency Planning in v3
New F3 criteria based in industry trends in this area
Criteria weighting may get further elevated in v5
2.3.2 Contingency Planning from v3 remains and is now 2.5.
Key Take-way: A Ford supplier is required to have a process in place for
managing risk for their complete enterprise to be considered a worldCopyright © 2016 Ford Motor Company. All rights reserved.
class supplier.
Risk Assessment & Management …continued
Supply Areas of Risk
Copyright © 2016 Ford Motor Company. All rights reserved.
Risk Assessment & Management …continued
Risk Management Approach Factors
Supply Chain Risk
Risk may occur to both production supply and corporate reputation
Copyright © 2016 Ford Motor Company. All rights reserved.
Supply Chain Risk l Plant Footprint
Mitigating Supply Chain Risk Protects Ford Plants
Copyright © 2016 Ford Motor Company. All rights reserved.
International Automotive Task Force
IATF 16949
 A new publication through AIAG
released October 3, 2016 that
supersedes and replaces the
current ISO/TS-16949.
 Defines the requirements of a quality
management system for
organization in the automotive
industry.
 Requires a supplier to also
consider how they manage risk
through risk based thinking from a
quality perspective.
 While MMOG 2.5 (Risk
Assessment and Management),
requires suppliers to consider best
practices in mitigating risk for
delivery.
 Suppliers will be required to
develop contingency plans that
include risk management principles
for their enterprise.




1. Identify
2. Prioritize
3. Manage
4. Develop a Risk Plan
 Failure to develop risk plans could
result in supplier loss of business
and preferred supplier status.
 What steps will you take to bring
your organization back to a state of
normalcy, if there is a disruption?
Credit: go.aiag.org/iatf-16949-transition-strategy-whitepaper
Copyright © 2016 Ford Motor Company. All rights reserved.
International Automotive Task Force
IATF 16949 …continued
Credit: go.aiag.org/iatf-16949-transition-strategy-whitepaper
Risk Identification
The causes for supply disruption are numerous and suppliers will ultimately be
held accountable for how they manage their operation and mitigate risk to
their customer and sub-suppliers.
There are essentially three ways a
supplier could start to manage risk:
1. Identify risk through supplier
mapping for all regional ship
points.
2. Perform a impact assessment
to identify problem points
3. Mitigate risk by continuously
monitoring to resolve issues
Copyright © 2016 Ford Motor Company. All rights reserved.
Risk Management Process Mapping
Copyright © 2016 Ford Motor Company. All rights reserved.
Supply Risk Management Needs
Our Ask Of The Industry…
 Heighten awareness throughout the value chain (lower
tiers)
 Improve transparency of full value chain (key
stakeholders)
 Move from monitor and react to risk mitigation
 Continued collaboration to minimize time-to-recovery
Copyright © 2016 Ford Motor Company. All rights reserved.
What steps are you taking?
Copyright © 2016 Ford Motor Company. All rights reserved.
Global MP&L Q1 Endorsement Process change
effective March 7, 2016
Q1 Petition Process
 A supplier or an STA Must alert lead
region of intent to submit a petition for
MP&L endorsement 90 to 100 days
before a suppliers Q1 Target date
expires.
 Q1 Pre-screening can only be
scheduled by the Ford
reviewer/MMOG Analyst.
 The FR/MMOG Analyst manages Q1
Pre- screening via WebEx.
 Lead region is where the
manufacturing location resides.
 Q1 Package is reviewed in 30 days
for compliance to MMOG and Ford
specific processes, systems and
applications.
Q1 Pre-screening
 Supplier MUST participate in a Q1 prescreening.
 The preference is for the Corporate
Delivery Champion (CDC), Supplier
Delivery Contact (SDC) and Material
Manager or a designated lead
representative to coordinate process.
 Supplier evidence MUST align to Q1
Readiness Submission Outline
(Q1RSO).
 The Ford representative validates
supplier readiness and determines
whether or not a supplier is approve for
a Q1 Share Point site:
 Supplier will upload evidence only
after a successful Q1-Pre-screening.
 Supplier will be provided with
instructions for accessing site, when
approved.
Copyright © 2016 Ford Motor Company. All rights served.
Q1 Requirements – Global MP&L Endorsement
Why Change?
 On-going issues with the quality of
the evidence submitted by
suppliers
 Turnaround time not acceptable for
approving petition request on a
global level
What Change?
 Adopted the Lead Region Concept
 Developed a Global Q1 Matrix –
Check list
 Restructured Q1 MMOG/Analyst
Role
 Q1 Pre-Screening Initiative
 Considers Q1 Target – in SIM
 Notification to MP&L 90-100
prior to Q1 Target for screening
 Adherence to a 30-Day rule for
processing Q1 MP&L request
 Q1 SharePoint site – Evidence
 Managed by SMPG
administrator and Ford
Reviewer
Copyright © 2016 Ford Motor Company. All rights reserved.
Lead Region
The old process…
Suppliers had to submit their petition to each region they
supplied.
Global Q1 requirements matrix
Now, the suppliers MANUFACTURING location determines the lead
region, and the lead region reviews the petition on behalf of the
global team.
Copyright © 2016 Ford Motor Company. All rights reserved.
Q1 Target Date
The STA target date is used to manage request
for MP&L Endorsement and balance work-flow.
A suppliers should only submit a request
for a Q1 Pre-screening within the 90-100 day guideline.
Copyright © 2016 Ford Motor Company. All rights reserved.
The Purpose of Q1 Pre-Screening
It is the intent of the Supplier Performance Management
Group (SMPG) to assist suppliers in becoming a Q1 supplier to
Ford.
The MP&L endorsement does not validate a suppliers QUALITY
system, but considers whether or not their DELIVERY
operations and internal systems support best in class Supply
Chain Management (SCM) practices for doing business with
Ford.
The SMPG team works to support a supplier in achieving
MP&L endorsement no later than 30 days from upload to a
secured Q1 SharePoint site.
Copyright © 2016 Ford Motor Company. All rights reserved.
30-Day Rule!
The Ford reviewer has 30 days to process a petition.
 With in this period, the Ford reviewer provides feedback in evidence and
makes recommendations for achieving compliance.
 By day 27, any revised documentation is considered for further review
(refer to Timing outline in Q1 Documents).
 If evidence satisfies MMOG guideline and Ford evidence requirements, supplier
will obtain the MP&L endorsement.
 If supplier evidence is non-compliant to meeting these expectations, supplier
resubmits evidence for open issues and starts a new 30 day review.
 The goal is to improve a suppliers first time through (FTT) success in achieving
Q1 MP&L endorsement.
 Prior to Q1 Initiative our FTT rate was 23%
 In 2016, FTT improved by 33% to 56% by including Q1 Pre-screening.
Copyright © 2016 Ford Motor Company. All rights reserved.
Q1 Eligibility guideline for MP&L Endorsement
There is no change in Eligibility requirements:
 Suppliers must meet the minimum delivery rating requirements:
 The six month weighted average (6MWA) for each active region
shall be greater than or equal to 81 (as displayed in SUPER-G).
 The three most recent monthly delivery ratings (two mature
months and the immature rating) shall all be greater than or equal
to 81 for all associated ship sites.
 At least one currently active ship site must have at least six months
of delivery ratings (for one or more regions shipping product).
 The Material Management Operations Guideline / Logistics
Evaluation (MMOG/LE) classification must be level "A".
 Suppliers must use the latest MMOG/LE version (v4 )dated
March 2014.
 Suppliers must utilize the Direct Data Link (DDL or eDDL) CMMS3
Copyright © 2016 Ford Motor Company. All rights reserved.
system.
Q1 Eligibility guideline for MP&L Endorsement…continued
Timing: sequence steps for contacting, scheduling, screening and review of
evidence
In February 2017, SMPG established [email protected] mailbox for
screening request and questions regarding MMOG and MP&L
Endorsement.
All evidence submissions will be measured for compliancy against the MMOG
standard, and evaluated based on how thoroughly a work instruction
captures the reasoning of assessment and “customer specific systems” as
outlined in the ‘Q1 MPL Requirements Checklist’.
Copyright © 2016 Ford Motor Company. All rights reserved.
Keys to successful petitioning - MP&L Endorsement
Training and Preparation
 Suppliers are more successful if they had formal MMOG/LE training via
Automotive Industry Action Group (AIAG) either in a class room session
or on-line (within one year of petitioning).
 Suppliers are more successful if they have attended Ford MPL and FCSD
Delivery Rating Training for Q1 prior to requesting MP&L endorsement.
 Suppliers are more successful if there is a dedicated team to support
evidence and data collection from all Supply Chain disciplines within their
organization.
The MP&L Endorsement will only be issued to suppliers who can
demonstrate that they have sustainability built into their MP&L processes,
and in alignment with the standards set forth by MMOG/LE guideline and
Ford “customer specific systems, application and processes”.
Copyright © 2016 Ford Motor Company. All rights reserved.
Supplier Responsibilities
32
Copyright © 2016 Ford Motor Company. All rights served.
What We Require from Our Suppliers
Suppliers are required to ship the right parts in the right
quantity in the right container to the right location at
the right time every time to support assembly and
manufacturing plant build schedules.
To ensure that this is accomplished, the Ford MP&L
organization
has
identified
several
key
practices/functions that we expect from all Ford
suppliers.
Copyright © 2016 Ford Motor Company. All rights served.
What We Require from Our Suppliers…continued
Operational Prerequisites
•100% ASN timeliness; at conveyance departure ( MMOG 4.3.2.4)
•100% EDI ASN accuracy ( MMOG 4.3.2.4)
•100% up-to-schedule shipping performance (MMOG 3.3.1.1)
•Zero off-lines or production losses due to supplier failure (MMOG 4.1.3)
•100% quality parts; zero shipping discrepancies (MMOG 4.3.1/4.3.2.3)
•Manufacturing flexibility for unexpected plant shortages/requirements (MMOG
2.3.1/3.3.2)
•Error-proof processes (MMOG 1.3.2)
•Daily shipments (MMOG 4.3.2)
•Accurate packaging and container management (MMOG 4.2.1/4.2.2)
•Electronic communication capability and execution (MMOG 3.4.1/4.1.2/6.3.2)
•Advance problem notification, quick resolution, & continuous improvements
(MMOG 1.4.2)
•Internal training procedure/process (MMOG 2.4.4/2.2.1)
•No supplier constraints (MMOG 3.2.1)
•Risk identification and mitigation (MMOG 2.5.1/2.5.2)
Copyright © 2016 Ford Motor Company. All rights served.
What We Require from Our Suppliers continued
Delivery Performance
Suppliers are responsible for having a clear understanding of Ford's
delivery requirements as outlined in the:
•MP&L Supplier Reference Guide
•Production & FCSD Supplier Delivery Performance Rating Manuals
•Ford CMMS3/IMS7 (e)DDL & SNC Training Manuals
•Materials Management Operating Guidelines / Logistics Evaluation (MMOG/LE)
•Global Terms and Conditions (GTC) Web Guides
•FCSD Network Locations (PDC) Supplier Handbook
Links to all production manuals are posted on MP&L-in-a Box
(https://comm.extsp.ford.com/sites/MPLB2B/Pages/MPLdefault.aspx), with the exception of the MMOG/LE selfassessment which must be purchased through AIAG at www.aiag.org.
Links to FCSD manuals are posted on Supplier Requirements Resource website:
(https://web.pslsupp.ford.com).
Copyright © 2016 Ford Motor Company. All rights served.
Q1
Q1 Endorsement
Implementation Timeline
(including new site)
-12 to -18
Months
-18 + Months
Buyer
requests/obtains
GSDB Site Code and
requests STA
Activation
Supplier Site STA
activated in SIM
Supplier
Site/Assigned Q1
Status Code “D”
Notify MP&L of the
new site
MMOG/LE
Awareness and
Training
CMMS3/(e)DDL
Training
Conducts Supplier
Site MSA
Enters Q1 MSA
Status in eQ1MSA
Start
Certificates/Asses
sments (ISO
14001/ISO/TS
16949/
MMOG/LE
STA Q1 Target
Date established
Production
History
Established Date
(PE date) entered
MP&L and PS&L
Delivery Rating
Training
-1 Month
-8 Months
-6 Months
-3 Months
Supplier works with
STA to meet Q1
Requirements
Evaluate Overall
Supplier Site PPM (6
Mature Months)
Receipts/Rejects
Supplier submits
MP&L Q1
Petition (90 days
prior to Q1 target
date)
Completes
MMOG/LE selfassessment
Enter MMOG/LE
Self-Assessment
results in GSDBOL
Ford’s MP&L Q1
Requirements
Training
Supplier Site has 6
months ship history
with all of 3 latest
months ratings 81 or
above and 6MWA 81
or above
MMOG/LE Level A
attainment and
entered in GSDBOL
Request (6 mos.)
Supplier Site MSA
Supplier notifies STA
with intention to
petition for Q1 Status
(this is normally 6
months after PE date
is reached)
Supplier prepares
MP&L Q1 Petition
Supplier submits
Request for
Customer
Endorsement to
(STA, Plant,
FCSD) or earlier
timing
Complete
Certificates/Asses
sments (ISO
14001/ISO/TS
16949)
MP&L Q1
Endorsement
granted/SIM
Maintain Site
Management Data
updated
Site Engineer
ensures
endorsement for
STA, MP&L,
FCSD (if
appropriate) and
plant (with oldest
date)
Runs Q1
Validation Report
(Q1VR) PP-SF083
Signs Q1
Validation Report,
Gives Q1 support
package to Site
Supervisor for
sign-off on
Validation Report
Purchasing
Manager and
Purchasing
Director approve
Q1 Letters. The
supplier site code
to ‘Y’ Q1
Achieved
Copyright © 2016 Ford Motor Company. All rights reserved.
Global Q1 Petition Process
STA Technical
Requirements
Q1 MP&L (Global)
Endorsement
Acceptance or
Denial *
MP&L Petition
Submission
(Global) MP&L
Requirements
MP&L Petition
Package
Preparation
 If request is denied, supplier resubmits revised documentation to Ford. The lead representative will
be responsible for uploading any additional information to support compliancy requirement.
37
Copyright © 2016 Ford Motor Company. All rights reserved.
MP&L Petition Submission
STOP
do not submit
documentation
Eligibility
requirement
s met
•Delivery
ratings
•MMOG/LE
level A
•Training
e(DDL)
Notification
to lead
region
90 - 100 days
prior to Q1
target date
established
in SIM
CAUTION
additional work may
be required
Attend Q1
documents
prescreening
Supplier
Performance
Specialist or
MMOG
Analyst will
setup
GO submit
documentation
Upload
documents to
MP&L Petition
Submission
SharePoint
Instructions
for upload
will be given
after prescreen
process is
complete
 All supporting documents for the Q1 Petition Package are located on the Q1 Documents page of MP&L-in-a-Box at
(https://comm.extsp.ford.com/sites/MPLB2B/Pages/Q1docs.aspx)

pre-screening
process will
not Q1
review
the Package
content of
documentation,
but validate
theofstructure
of the at
 The
All supporting
documents
for the
Petition
areyour
located
on the Q1 Documents
page
MP&L-in-a-Box
submission.
(https://comm.extsp.ford.com/sites/MPLB2B/Pages/Q1docs.aspx)
Copyright © 2016 Ford Motor Company. All rights reserved.
MP&L Petition Package Preparation
The intent of the Q1 MP&L Petition Review is to validate the organization
has sustainability built into their SCM processes to support their overall
business objectives, as well as to verify the organization has a
comprehensive knowledge of Ford’s MP&L and delivery requirements.
When completing the internal MMOG/LE assessment, the Assessor
should take into account a number of factors when deciding whether the
organization is compliant with a criterion:
• Is the process aligned with the organization’s overall business objectives?
• Is the process understood by all applicable personnel?
• Is the process being followed as documented?
• Are there measurable results?
• Does the output consistently deliver the required or expected outcome?
Suppliers are required to complete their own MMOG/LE
review in preparation for petitioning for the Ford MP&L
39
Endorsement.
MP&L Petition Package Preparation…continuation
Q1 Readiness Submission Outline (Q1SRO)
It is a supplier responsibility to ensure their
Q1 Package for MP&L endorsement is
organized and includes ALL applicable
administrative forms and evidence at time of
Q1 Pre-screening for each criterion to confirm
supplier readiness.
The lead representative MUST ensure
evidence supports their organization current
state and customer requirement for each
criteria; and evidence is within each
applicable criteria and respective sub-folder
before presenting to Ford Reviewer.
MP&L Petition Package Preparation…continuation
 The Global Q1 Petition Checklist section provides a list of
MMOG/LE criteria requiring objective evidence.
 Note all Ford requirements are listed, but suppliers must also
provide evidence that supports compliance to the MMOG
criteria.
The Ford Reviewer interprets evidence as:
1. Green
2. Yellow
3. Red
(complete),
(incomplete)
(non-Compliant).
A supplier is expected to provide a documented process which
communicates a detail work instruction tailored to their customers’ business
system or application.
ROBUST and supported by print screens, web link (s) and providing direction
on “how to process or access” a specific system or application.
Note: Instructions that are vague without sufficient detail can be classified as
missing information, non-compliant and/or not robust.
North Americas – Regional Metrics Tracking
Q1 Pre-Screening for North America- Operations
MP&L Endorsements in 2016
80
73
70
60
50
40
30
20
9
10
0
0
Jan
Feb
2
5
9
11
16
13
9
9
4
2
0
Mar
Apr
May
Jun
Completed Pre-Screenings
Jul
Aug
Cumulative
Sep
Oct
Nov
Dec
Forecast
 2016 Year-end analysis: 126 Q1 Pre-screening were scheduled since Q1 Pre-screening initiative. This count
takes into consideration suppliers with multiple screening appointments.
 57.9% of suppliers pre-screened completed process first time through (FTT) while 42.1% of suppliers
repeated process.
Copyright © 2016 Ford Motor Company. All rights reserved.
Lessons Learned
Best Practices for Maintaining High Delivery Performance
Train personnel to ensure that there is a clear understanding of all Ford’s MP&L requirements as outlined in:
•MP&L Supplier Reference Guide
•Supplier Delivery Performance Manual
•Materials Management Operations Guidelines
•Ford Global Terms & Conditions
At least 1 primary and 1 back-up employee should be formally trained on the Ford (e)DDL CMMS3 System and at least 1
employee trained on each shift.
Monitor (e)DDL daily as required and log all issues at the time of occurrence (e.g. via a Ford Daily Checklist).
•Maintain print screens to support that you are monitoring all key DDL screens (e.g. JBBW/JBBA, VABW/VABA, SVBW/SVBA) as required. These print screens can be
utilized in case a dispute is required.
•For additional information regarding CMMS3 supplier responsibilities, reference CMMS3 (eDDL/DDL) for Ford Production Suppliers Module 3: Daily Requirements
manual.
Monitor Ford (e)DDL CMMS3 and MP&L-in-a-Box bulletin boards daily for updated supplier information.
Monitor Month-to-Date ratings for the prior weeks shipments which are available each Sunday after 10 am in SUPER-G.
Suppliers should review the Month-to-Date rating and begin the initial stage of understanding the problems to prevent
reoccurrences throughout the month. Use the Month-To Date rating to Dispute The Delivery Rating.
Lessons Learned
Best Practices for Maintaining High Delivery Performance
Review Global Logistics Shipping Instructions (GSLI) website (https://web.mplb2b.ford.com/shipping/cgibin/index.cgi) regularly to verify if there are changes to your shipping instructions.
After transmitting an ASN:
•Verify that the 997 has been received
•Check the Ford (e)DDLL AJAW/AJAA (ASN Journal) to verify the ASN actually posted to (e)DDL.
•Review the Ford (e)DDL AJAW/AJAA (ASN Journal) and ADAW/ADAA (ASN History) screens for ASN Timeliness and ASN Accuracy errors.
•Review the Ford (e)DDL SVBW/SVBA screen to check for Cum Disagrees
Develop Key Performance Indicators (KPI’s) that identify and track material/delivery issues.
Ensure at least 3 or more people are aware of all key events (e.g. annual updates for Supplier Delivery Contact
(SDC), FBBA Contacts, MMOG, BTIA) and are alerted (e.g. through calendar notifications) when dates are
approaching.
Utilize MMOG/LE as a tool to identify opportunities to improve MP&L processes and develop action plans to close
the gaps.
Develop well documented work instructions that clearly integrate Ford’s MP&L requirements, including
information on how to access Ford’s manuals and documents.
Summary of Changes by Ford MP&L Global Team
 Global compliance by Ford Regions: FNA, FOE, FAP, and FSA.
 Global Matrix: Compares each regions MP&L requirement and distinguishes
unique processes indigenous to each location.
 Lead Region (manufacturing site):
 Suppliers petition where it’s manufacturing location resides
 Suppliers no longer petitions each region for endorsement. Single endorsement
covers all regional ship locations.
 Expressed Intent to petition: New suppliers and resubmissions
 Supplier or STA can submit a request on behalf of manufacturing site.
 Supplier is responsible for ensuring readiness before pre-screening.
 Target date alignment: 90-100 days prior to request for Q1 Pre-screening
 Timing should be a realistic date for achieving endorsement
 Ford Reviewer considers a suppliers Target date for prioritizing request and
balancing (work-flow) request.
 STA will be required to ensure Target date is established in SIM
 Supplier will need to confirm Target timing before petitioning
 Q1 Pre-screening: Scheduled via a WebEx meeting
 Q1 SharePoint Site:. The Q1SPS is a centralized location for suppliers to manage
their Q1 Petition submission (package) with in a secured environment based on their
Covisint (FSP) access and FSN ID.

The Q1 SharePoint site is establish by manufacturing location and used for information sharing
between Ford’s Global MP&L team and suppliers petitioning for MP&L Endorsement
Copyright © 2016 Ford Motor Company. All rights reserved.
As One Team Together – We Go Further
Q&A