CONSTRUCTIONREPORT COMPILED BY CONSTRUCTION ENGINEER BY COUNTY Period Covered in Report May 01, 2017 to May 31, 2017 Table of Contents Report of Construction Engineer 3 Projects Completed - Final Estimate Not Processed 4 Projects Under Construction 57 Contracts Awarded - NTP Not Processed 162 ODOT Residency Directory 167 Construction Status Report Page 2 Activity for Month of May 2017 Number of Contracts Contract Amount Amount Paid Contracts Finaled 32 83,347,206.67 82,676,699.89 Contracts Completed 22 47,982,097.14 46,507,186.01 NTP Issued 12 19,889,920.12 0.00 Contracts Awarded 11 18,046,248.87 0.00 0 0.00 0.00 Contracts Let Status of Construction Projects as of May 31, 2017 Number of Contracts Contract Amount Amount Paid Contracts Completed, Final Estimate Not Paid 315 1,405,320,767.25 1,403,017,897.36 Contracts Under Construction 413 1,767,622,647.91 996,314,395.34 28 47,709,489.66 0.00 756 3,220,652,904.82 2,399,332,292.70 Contracts Awarded, NTP Not Processed Active Contracts Construction Status Report Page 3 County: Commissioner District: Adair 1 Contracts Completed - Final Estimate Not Processed Contract: 130355 US-59 16928(09) NHPPY-101N(023)SS Contractor: MJE, LLC Engineer: Edwards, Carl Contract Amount: $8,354,463.63 Letting Date: 10/17/2013 Residency: SALLISAW 01200 Completion Date: Final Est Sub: Contract: 140310 US-59 Residency: 28971(05) SALLISAW NHPPY-201N(010) Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $440,044.60 Letting Date: 10/16/2014 01200 Contract: 150347 CO.RD. 28653(04) STP-201D(016)CI Contractor: RRY SERVICES, LLC Engineer: Edwards, Carl Contract Amount: $1,063,114.55 Letting Date: 11/19/2015 01200 Residency: SALLISAW Contract: 160068 CO.RD. Residency: 31048(04) STP-201C(019)CI SALLISAW Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $580,838.25 Letting Date: 02/18/2016 01200 08/31/2016 BRIDGE AND APPROACHES COUNTY ROAD (D0774): OVER TRIBUTARY TO BARON FORK, 2.6 MILES EAST OF US-59 NEAR STILWELL. PROJECT LENGTH = 0.352 MILE. Completion Date: Final Est Sub: 01200 11/09/2015 05/08/2017 WIDENING AND RESURFACE (ASPHALT) US-59: FROM 0.10 MILE NORTH OF SH-51W, EXTEND NORTH. PROJECT LENGTH = 0.350 MILE. Completion Date: Final Est Sub: Contract: 150348 CO.RD. Residency: 29372(04) STP-201C(017)CI SALLISAW Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Edwards, Carl Contract Amount: $966,415.37 Letting Date: 01/21/2016 County: GRADE AND DRAIN US-59: BEGIN 2.0 MILES NORTH OF US-62, EXTEND NORTH OVER GRAND RIVER. PROJECT LENGTH = 4.949 MILES. 09/21/2016 BRIDGE AND APPROACHES COUNTY ROAD (BUNCH ROAD/D4660): OVER UNNAMED CREEK, 4.0 MILES SOUTH OF SH-100 NEAR STILWELL. PROJECT LENGTH = 0.160 MILE Completion Date: Final Est Sub: 12/21/2016 GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-463): FROM SH-51, EXTEND SOUTH NEAR STILLWELL. PROJECT LENGTH = 2.516 MILES. Completion Date: Final Est Sub: 12/10/2016 Commissioner District: Alfalfa 6 Contracts Completed - Final Estimate Not Processed Contract: 120010 US-64 Residency: 24062(04) SSP-102C(100)SS BUFFALO Contractor: L & M CONTRACTORS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $3,008,884.66 Letting Date: 02/16/2012 06100 Construction Status Report GRADE, DRAIN, SURFACE, AND BRIDGE US-64: FROM 0.5 MILE WEST OF SH-58, EXTEND EAST. SH-58: FROM 0.7 MILE SOUTH OF US-64, EXTEND NORTH. PROJECT LENGTH = 0.899 MILE. Completion Date: Final Est Sub: 08/28/2014 05/31/2017 Page 4 Contract: 120221 SH-11 Residency: 21710(04) BRFY-102B(076) BUFFALO Contractor: L & M CONTRACTORS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $3,729,206.58 Letting Date: 09/20/2012 06100 Contract: 130203 US-64 Residency: 26493(04) STPY-102C(144) BUFFALO Contractor: L & M CONTRACTORS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $2,355,443.81 Letting Date: 09/19/2013 06100 BRIDGE AND APPROACHES SH-11: OVER UNNAMED CREEKS, 3.8 MILES AND 4.7 MILES EAST OF US-64. PROJECT LENGTH = 1.531 MILES Completion Date: Final Est Sub: 01/19/2016 BRIDGE AND APPROACHES US-64: OVER EAST CLAY CREEK, 1.0 MILE EAST OF SH-8. PROJECT LENGTH = 0.264 MILES Completion Date: Final Est Sub: 03/03/2016 Contract: 150044 CO.RD. Residency: 24833(04) 06009 CIRB-102C(127)RB CIRCUIT ENGR. DISTR. # 8 Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: CED8 Contract Amount: $3,785,769.76 Letting Date: 02/19/2015 GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-08): FROM SH-58 IN BYRON, EXTEND EAST. PROJECT LENGTH = 6.130 MILES. Contract: 150120 CO.RD. Residency: 24833(08) 06009 CIRB -202C(028)RB CIRCUIT ENGR. DISTR. # 8 Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: CED8 Contract Amount: $2,538,812.50 Letting Date: 04/16/2015 GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-08): FROM 6.0 MILES EAST OF SH-58, EXTEND EAST. PROJECT LENGTH = 3.969 MILES. Contract: 150183 CO.RD. Residency: 24832(09) 06009 CIRB-102C(130)RB CIRCUIT ENGR. DISTR. # 8 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED8 Contract Amount: $3,480,032.48 Letting Date: 05/21/2015 GRADE, DRAIN, AND SURFACE - DIVISION VI COUNTY ROAD (NS-255): FROM 0.25 MILE NORTH OF SH-45 IN CARMEN, EXTEND NORTH. PROJECT LENGTH = 5.030 MILES. Contract: 160001 SH-38 Residency: 28146(04) 06100 SSR-102C(031)SR/SSR-202C* BUFFALO Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Embree, Jerry (Acting) Contract Amount: $2,526,460.00 Letting Date: 01/21/2016 RESURFACE (ASPHALT) SH-38: FROM THE US-64 JUNCTION, EXTEND NORTH IN JET. PROJECT LENGTH = 14.760. Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 09/20/2016 09/20/2016 09/20/2016 04/06/2017 *(030)SR County: Commissioner District: Atoka 2 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 5 Contract: 150225 US-75 Residency: 29134(04) STP-203N(005)SS MADILL Contractor: GLOVER & ASSOCIATES, INC. Engineer: January, Trenton (Acting) Contract Amount: $2,279,662.48 Letting Date: 07/23/2015 02300 Completion Date: Final Est Sub: Contract: 150349 CO.RD. Residency: 28605(04) 02013 CIRB-203C(039)RB CIRCUIT ENGR. DISTR. # 3 Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION Engineer: CED3 Contract Amount: $2,832,256.58 Letting Date: 11/19/2015 Contract: 160003 US-69 24333(06) STP-203C(057)SS Contractor: PBX CORPORATION Engineer: January, Trenton (Acting) Contract Amount: $432,907.40 Letting Date: 01/21/2016 County: Residency: MADILL WIDEN AND RESURFACE US-75: FROM US-69, EXTEND WEST IN ATOKA. PROJECT LENGTH = 1.845 MILES 02300 05/11/2017 GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (EW-191): FROM 5.0 MILES WEST OF US-69, EXTEND EAST NEAR CANEY. CO., INC JV PROJECT LENGTH = 4.856 MILES. Completion Date: Final Est Sub: 10/21/2016 JOINT SEAL/REPAIR US-69/SH-38/SH-131: AT MULTIPLE LOCATIONS IN DIVISION II. Completion Date: Final Est Sub: 11/11/2016 05/09/2017 Commissioner District: Beckham 5 Contracts Completed - Final Estimate Not Processed Contract: 130149 SH-30 Residency: 23243(04) STPY-105C(124)SS/STPY-10* CLINTON Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Davis, Shawn Contract Amount: $9,666,421.56 Letting Date: 06/19/2014 05100 GRADE, DRAIN, SURFACE, BRIDGE AND APPROACHES SH-30: OVER THE NORTH FORK OF THE RED RIVER, 5.0 MILES NORTH OF I-40. PROJECT LENGTH = 1.310 MILES. Completion Date: Final Est Sub: 02/02/2017 *5C(183) RESURFACE (P.C. CONCRETE) I-40B/SH-34: Contract: 140349 I-40B Residency: 28136(04) 05200 FROM THE EASTERN JUNCTION IN ELK CITY, SSR-105A(199)SR ALTUS EXTEND EAST. PROJECT LENGTH = 1.113 Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV MILES. Engineer: Sirmons, Karl Contract Amount: $5,443,969.28 Completion Date: 07/06/2016 Letting Date: 09/18/2014 Final Est Sub: Contract: 150004 SH-152 Residency: 29275(04) NHPP-205N(028)SS CLINTON Contractor: M.J. HUGHES CONSTRUCTION, INC. Engineer: Davis, Shawn Contract Amount: $1,696,815.65 Letting Date: 01/22/2015 05100 Construction Status Report BRIDGE REHABILITATION SH-152: OVER I-40, 1.5 MILES EAST OF US-283. PROJECT LENGTH =0.084 MILE. Completion Date: Final Est Sub: 05/16/2016 01/13/2017 Page 6 Contract: 160005 I-40 30396(04) SBR-205N(048)SB Contractor: OBC, INC. Engineer: Davis, Shawn Contract Amount: $1,394,451.13 Letting Date: 01/21/2016 Residency: CLINTON 05100 Completion Date: Final Est Sub: Contract: 160075 I-40 Residency: 31111(04) ACSTP-205B(051)3P ALTUS Contractor: IOWA CIVIL CONTRACTING, INC. Engineer: Sirmons, Karl Contract Amount: $1,937,721.53 Letting Date: 03/17/2016 05200 Contract: 160164 CT.ST. 24134(07) SSP-220F(039)SS Contractor: GARY A. CRAIN, INC. Engineer: Davis, Shawn Contract Amount: $97,634.30 Letting Date: 04/21/2016 05100 Residency: CLINTON County: Completion Date: Final Est Sub: 05002 04/24/2017 BRIDGE WATER PROOF SEAL U.S. HIGHWAYS/STATE HIGHWAYS/CITY STREETS: AT MULTIPLE LOCATIONS IN DIVISION V. 04/30/2017 BRIDGE PAINTING I-40/US-60/RANDALL STREET: AT MULTIPLE LOCATIONS IN DIVISION V. Completion Date: Final Est Sub: Residency: 05005 CIRCUIT ENGR. DISTR. # 7 12/02/2016 PAVEMENT REHABILITATION I-40: FROM 1.18 MILES EAST OF SH-6 EXT EAST NEAR ELK CITY. SH-6: FROM 0.1 MILE SOUTH OF I-40, EXT N NEAR ELK CITY. PROJECT LENGTH = 6.72 MILES. Completion Date: Final Est Sub: Contract: 160191 I-40 Residency: 31669(05) STP-NBIP(491)3B TETRA TECH Contractor: POSEIDON CONSTRUCTION, INC. Engineer: TETR Contract Amount: $334,998.00 Letting Date: 05/19/2016 Contract: 160308 CO. RD. 30047(04) STP-205C(060)CI Contractor: K & R BUILDERS, INC. Engineer: CED7 Contract Amount: $199,833.20 Letting Date: 09/15/2016 BRIDGE REHABILITATION COUNTY ROAD (MERRITT ROAD): OVER I-40, 2.28 MILES EAST OF I-40B IN ELK CITY. PROJECT LENGTH = 0.134 MILE. 05/17/2017 BRIDGE AND APPROACHES COUNTY ROAD (EW-127): OVER TRIBUTARY TO SAND CREEK, 3.2 MILES WEST OF US-283 NEAR SAYRE. PROJECT LENGTH = 0.085 MILE. Completion Date: Final Est Sub: 03/30/2017 05/30/2017 Commissioner District: Blaine 5 Contracts Completed - Final Estimate Not Processed Contract: 140275 CO.RD. Residency: 28692(04) 05005 CIRB-206D(002)RB CIRCUIT ENGR. DISTR. # 7 Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: CED7 Contract Amount: $3,258,391.60 Letting Date: 09/18/2014 Construction Status Report GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-250): FROM 2.5 MILES EAST OF THE US-270/SH-58 JUNCTION, EXTEND SOUTH. PROJECT LENGTH = 3.990 MILES. Completion Date: Final Est Sub: 05/10/2016 Page 7 Contract: 150407 SH-3 Residency: 26997(04) SSP-206N(027)SS CLINTON Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Davis, Shawn Contract Amount: $2,534,247.04 Letting Date: 11/19/2015 05100 BRIDGE AND APPROACHES SH-3: OVER UNNAMED CREEK, 10.8 MILES EAST OF US-270 NEAR WATONGA. PROJECT LENGTH = 0.378 MILE. Completion Date: Final Est Sub: 01/17/2017 RESURFACE (P.C. CONCRETE) SH-51: FROM Contract: 160236 SH-51 Residency: 28139(04) 05100 1.09 MILES EAST OF THE SH-58 SOUTH SSR-106C(122)SR CLINTON JUNCTION, EXTEND EAST NEAR CANTON. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV PROJECT LENGTH = 4.950 MILES. Engineer: Davis, Shawn Contract Amount: $2,626,298.62 Completion Date: 11/04/2016 Letting Date: 06/16/2016 Final Est Sub: County: Commissioner District: Bryan 2 Contracts Completed - Final Estimate Not Processed Contract: 110371 US-69 Residency: 28101(04) NHG-013N(144)(145)TR MADILL Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: January, Trenton (Acting) Contract Amount: $2,001,222.50 Letting Date: 08/18/2011 02300 SAFETY IMPROVEMENT (CABLE BARRIER AND GUARDRAIL) US-69: FROM THE OKLAHOMA/TEXAS STATE LINE, EXTEND NORTH. Completion Date: Final Est Sub: 11/08/2012 Contract: 130177 US-70 Residency: 18847(08) 02300 NHPPY-207N(010)(011) MADILL Contractor: DONDLINGER & SONS CONSTRUCTION CO., INC. Engineer: January, Trenton (Acting) Contract Amount: $23,314,990.09 Letting Date: 06/20/2013 GRADE, DRAIN, SURFACE, AND BRIDGE US-70 (DURANT BYPASS): FROM SH-78, EXTEND EAST. PROJECT LENGTH = 4.447 MILES. Contract: 150284 US-70 Residency: 31489(04) MADILL HSIPG-207N(030)TR Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: January, Trenton (Acting) Contract Amount: $613,701.00 Letting Date: 09/17/2015 02300 SAFETY IMPROVEMENT (GUARDRAIL AND CABLE BARRIER) US-70: FROM 5.6 MILES EAST OF SH-78, EXTEND EAST NEAR DURANT. PROJECT LENGTH = 13.500 MILES. Contract: 150320 SH-78 Residency: 31823(04) ERSTP-207C(031)ER MADILL Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: January, Trenton (Acting) Contract Amount: $1,223,625.28 Letting Date: 07/15/2015 02300 Completion Date: Final Est Sub: Completion Date: Final Est Sub: Construction Status Report 12/07/2015 07/12/2016 EMERGENCY RELIEF SH-78: NORTH OF THE RED RIVER, NEAR YUBA. PROJECT LENGTH = 0.036 MILE. Completion Date: Final Est Sub: 08/15/2015 Page 8 Contract: 150354 CO.RD. Residency: 29958(04) 02013 CIRB-207C(032)RB CIRCUIT ENGR. DISTR. # 3 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $834,148.00 Letting Date: 11/19/2015 RESURFACE (ASPHALT) COUNTY RD(EW-209): FROM NS-375, EXTEND EAST NEAR DURANT. COUNTY RD(NS-377): FROM OLD US-70, EXT SOUTH NEAR DURANT. PROJECT LENGTH = 3.500 MILES. Contract: 160008 US-69 31975(04) SSR-207N(050)(049)SR/SBR* Contractor: OVERLAND CORPORATION Engineer: January, Trenton (Acting) Contract Amount: $5,141,344.06 Letting Date: 02/18/2016 RESURFACE (ASPHALT) AND BRIDGE REHABILITATION US-69: FROM 3.0 MILES S OF W MAIN STREET, EXT N IN DURANT. US-69: OVER MINERAL BAYOU CR, 1.2 MI N OF THE US-70 BYPASS. PROJECT LENGTH = 7.100 MILES. Residency: MADILL 02300 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 06/16/2016 10/31/2016 05/09/2017 *-207N(046)SB Contract: 160213 SH-22 Residency: 28829(04) SSP-207C(054)SS MADILL Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: January, Trenton (Acting) Contract Amount: $3,473,896.56 Letting Date: 06/16/2016 02300 Contract: 160242 US-70 Residency: 31990(04) SSR-207N(047)(048)SR MADILL Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: January, Trenton (Acting) Contract Amount: $2,622,204.00 Letting Date: 07/21/2016 02300 Contract: 160404 SH-22 Residency: 32871(04) E-SAP-207C(068) MADILL Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Engineer: January, Trenton (Acting) Contract Amount: $269,522.50 Letting Date: 09/09/2016 02300 Completion Date: Final Est Sub: 04/18/2017 RESURFACE (ASPHALT) US-70: FROM 8.0 MILES EAST OF THE SH-78 JUNCTION, EXTEND EAST NEAR BOKCHITO. PROJECT LENGTH = 6.080 MILES. Completion Date: Final Est Sub: Contract: 170005 CO. RD. Residency: 29953(04) 02013 STP-207D(029)CI CIRCUIT ENGR. DISTR. # 3 Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $268,608.25 Letting Date: 01/19/2017 County: BRIDGE REHABILITATION SH-22: OVER BLUE RIVER, 3.3 MILES EAST OF THE JOHNSON COUNTY LINE NEAR CADDO. PROJECT LENGTH = 0.283 MILE. 11/21/2016 BRIDGE REPAIR SH-22: REPAIR VEHICLE IMPACT DAMAGE OVER US-69/US-75 IN THE TOWN OF CADDO. Completion Date: Final Est Sub: 10/21/2016 05/08/2017 BRIDGE AND APPROACHES COUNTY ROAD (EW-200): OVER STRAIGHT CREEK, 3.5 MILES EAST OF SH-22 NEAR CADDO. PROJECT LENGTH = 0.082 MILE Completion Date: Final Est Sub: 05/25/2017 Commissioner District: Caddo 7 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 9 Contract: 140352 CO.RD. 28389(04) CIRB-108C(299)CB Contractor: SEWELL BROS., INC. Engineer: Knight, Reese Contract Amount: $1,770,241.28 Letting Date: 11/20/2014 Residency: ANADARKO BRIDGE AND APPROACHES COUNTY ROAD (EW-134): OVER THE WASHITA RIVER, 1.5 MILES WEST OF ANADARKO. PROJECT LENGTH = 0.436 MILE. Completion Date: Final Est Sub: Contract: 160185 US-281 Residency: 31345(04) SSR-208B(043)SR ANADARKO Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Knight, Reese Contract Amount: $1,161,708.50 Letting Date: 04/21/2016 County: 07300 07300 12/01/2016 05/02/2017 RESURFACE (ASPHALT) US-281: FROM 0.32 MILES NORTH OF THE SH-37 JUNCTION, EXTEND NORTH IN HINTON. PROJECT LENGTH = 3.170 MILES Completion Date: Final Est Sub: 04/26/2017 Commissioner District: Canadian 4 Contracts Completed - Final Estimate Not Processed Contract: 100511 I-40 Residency: 21008(04) SEC1702Y-109A(130)HP/IMY* EL RENO Contractor: ALLEN CONTRACTING, INC. Engineer: Harlin, Chris Contract Amount: $33,963,202.80 Letting Date: 09/16/2010 04200 GRADE, DRAIN, SURFACE, AND BRIDGE I-40: AT MORGAN ROAD INTERCHANGE IN OKLAHOMA CITY. PROJECT LENGTH = 2.037 MILES. Completion Date: Final Est Sub: 01/29/2014 *-40-4(433)139 RECONSTRUCT - ADDED LANES, BRIDGE AND Contract: 130003 I-40 Residency: 24424(07) 04200 APPROACHES I-40: FROM MILE MARKER 136, IMY-040-4(436)/IMY-040-4* EL RENO EXTEND EAST TO MILE MARKER 140. SH-4 Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JVROAD): OVER I-40. PROJECT (MUSTANG LENGTH = 4.664 MILES. Engineer: Harlin, Chris Contract Amount: $48,167,910.63 Completion Date: 06/10/2016 Letting Date: 01/17/2013 Final Est Sub: *(435)138/SBR-109N(182)SB Contract: 140353 I-40 Residency: 26359(04) NHPPIY-4000-(002)(003)SS EL RENO Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Harlin, Chris Contract Amount: $24,818,323.48 Letting Date: 11/20/2014 04200 Contract: 150125 I-40B Residency: 28311(04) SBR-109A(180)SB EL RENO Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Harlin, Chris Contract Amount: $2,211,272.52 Letting Date: 04/16/2015 04200 BRIDGE AND APPROACHES I-40: OVER THE SOUTH CANADIAN RIVER, 1.1 MILES EAST OF THE CADDO COUNTY LINE. PROJECT LENGTH = 1.385 MILES. Completion Date: Final Est Sub: Construction Status Report 11/01/2016 BRIDGE REHABILITATION I-40B: OVER THE I-40 JUNCTION IN EL RENO. PROJECT LENGTH = 0.424 MILE. Completion Date: Final Est Sub: 11/10/2016 Page 10 Contract: 150157 I-40 24238(05) SSP-209F(029)SS Contractor: GARY A. CRAIN, INC. Engineer: Hubbard, Tom Contract Amount: $276,659.28 Letting Date: 05/21/2015 Residency: EDMOND 04400 Completion Date: Final Est Sub: Contract: 160214 I-35 Residency: 24239(17) STP-209F(047)SS EL RENO Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Engineer: Harlin, Chris Contract Amount: $374,638.60 Letting Date: 06/16/2016 County: BRIDGE WATER PROOF SEAL - DIVISION IV I-40/I-44/I-235/US-60/US-64/US-77/US-177/US-41 2/SH-4/SH-11/ SH-132: AT MULTIPLE LOCATIONS IN DIVISION IV. 04200 08/24/2016 JOINT SEAL/REPAIR I-35/I-40/MANNING ROAD: AT MULTIPLE LOCATIONS IN DIVISION IV. Completion Date: Final Est Sub: 01/18/2017 Commissioner District: Carter 7 Contracts Completed - Final Estimate Not Processed Contract: 130005 SH-53 Residency: 23291(04) 07200 STPY-110C(157) ARDMORE Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Fuhrmann, Chris Contract Amount: $6,604,900.00 Letting Date: 01/17/2013 GRADE, DRAIN, SURFACE, AND BRIDGE SH-53: FROM 5.5 MILES EAST OF SH-76, EXTEND EAST. PROJECT LENGTH = 1.46 MILES. Contract: 150006 I-35 27985(04) SSP-210N(022)SS Contractor: OVERLAND CORPORATION Engineer: Fuhrmann, Chris Contract Amount: $7,457,617.63 Letting Date: 01/22/2015 Residency: ARDMORE BRIDGE REHABILITATION I-35: OVER US-70 AND BNSF RAILROAD IN ARDMORE, 7.2 AND 7.5 MILES NORTH OF THE LOVE COUNTY LINE. PROJECT LENGTH = 0.954 MILE. Contract: 160012 SH-07 29178(04) SSR-210N(005)SR Contractor: OVERLAND CORPORATION Engineer: Roberts, Colton Contract Amount: $318,877.00 Letting Date: 01/21/2016 Residency: DUNCAN County: 07200 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 07100 12/14/2016 03/06/2017 12/15/2016 RESURFACE (ASPHALT) SH-7: FROM 2.20 MILES EAST OF THE STEPHENS COUNTY LINE, EXTEND EAST NEAR RATLIFF CITY. PROJECT LENGTH = 0.850 MILE. Completion Date: Final Est Sub: 05/01/2017 05/15/2017 Commissioner District: Cherokee 1 Contracts Completed - Final Estimate Not Processed Contract: 130264 CO.RD. Residency: 22151(04) CIRB-111C(081)RB SALLISAW Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Edwards, Carl Contract Amount: $2,882,800.90 Letting Date: 09/19/2013 01200 Construction Status Report GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD: OVER THE ILLINOIS RIVER 0.2 MILE SOUTHEAST OF SH-10. PROJECT LENGTH = 0.506 MILE. Completion Date: Final Est Sub: 05/20/2016 Page 11 Contract: 130265 CO.RD. Residency: 24824(04) CIRB-111C(119)RB MUSKOGEE Contractor: GLOVER & ASSOCIATES, INC. Engineer: Hagerman, Jeremy Contract Amount: $3,559,547.93 Letting Date: 08/22/2013 County: 01100 GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (NS-441): BEGIN 3.8 MILES SOUTH AND 2.3 MILES WEST OF SH-51/SH-80 JUNCTION, EXTEND NORTH OVER RATTLESNAKE CREEK TRIBUTARY. PROJECT LENGTH = 1.338 MILES. Completion Date: Final Est Sub: 05/14/2016 Commissioner District: Choctaw 2 Contracts Completed - Final Estimate Not Processed Contract: 150256 CO.RD. Residency: 02013 25145(04) CIRCUIT ENGR. DISTR. # 3 STP-112D(083)CI Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $471,622.90 Letting Date: 08/20/2015 BRIDGE AND APPROACHES COUNTY ROAD (NS-403): OVER POINTER CREEK, 1.3 MILES SOUTH OF US-70 NEAR BOSWELL. PROJECT LENGTH = 0.255 MILE. Contract: 150346 CO.RD. Residency: 25143(04) 02013 STP-112D(081)CI CIRCUIT ENGR. DISTR. # 3 Contractor: T. MCDONALD CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $699,464.00 Letting Date: 01/21/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-436.5): OVER UNNAMED CREEK, 1.9 MILES SOUTH OF US-70 NEAR FORT TOWSON. PROJECT LENGTH = 0.189 MILE. Contract: 150358 CO.RD. Residency: 31226(04) 02013 CIRB-212D(015)RB CIRCUIT ENGR. DISTR. # 3 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $818,173.65 Letting Date: 11/19/2015 RESURFACE (ASPHALT) COUNTY ROAD (NS-422): FROM 2.7 MILES SOUTH OF SH-271A, EXTEND NORTH NEAR HUGO. PROJECT LENGTH = 3.153 MILES. County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 03/12/2016 04/05/2017 10/14/2016 11/30/2016 Commissioner District: Cleveland 3 Contracts Completed - Final Estimate Not Processed Contract: 120009 CT.ST. Residency: 03004 24282(04) JACOBS ENGINEERING STP-114A(197)AG/HSIPY* Contractor: MARKWELL PAVING COMPANY, INC. Engineer: JACOBS Contract Amount: $1,982,395.61 Letting Date: 02/16/2012 INTERSECTION MODIFICATION AND TRAFFIC SIGNALS CITY STREETS: AT THE INTERSECTION OF US-77H AND ROBINSON AVENUE, IN THE CITY OF NORMAN. PROJECT LENGTH = 0.779 MILES. Completion Date: Final Est Sub: 09/23/2014 05/25/2017 *-114A(243)TR Contract: 120201 CT.ST. Residency: 25648(04) 03001 STP-114B(222)AG ENGR. SERV. & TESTING Contractor: ALLEN CONTRACTING, INC. Engineer: EST Contract Amount: $8,891,822.53 Letting Date: 06/21/2012 Construction Status Report GRADE, DRAIN, SURFACE, AND BRIDGE CITY STREET (WESTERN AVENUE): FROM S.W. 164TH STREET, EXTEND NORTH IN OKLAHOMA CITY. PROJECT LENGTH = 2.002 MILES. Completion Date: Final Est Sub: 11/04/2014 Page 12 Contract: 140089 SH-09 Residency: 20266(04) 03004 SSP-114N(099)SS JACOBS ENGINEERING Contractor: ALLEN CONTRACTING, INC. Engineer: JACOBS Contract Amount: $9,587,991.29 Letting Date: 02/20/2014 GRADE, DRAIN, SURFACE, AND BRIDGE SH-9: FROM JUST WEST OF 24TH AVE. S.E., EXTEND EAST IN NORMAN. PROJECT LENGTH = 1.506 MILES. Completion Date: Final Est Sub: 09/10/2015 GRADE, DRAIN, SURFACE, AND SIGNALS Contract: 140090 CT.ST. Residency: 29261(04) 03010 CITY STREET (CEDAR LANE RD): BEGIN AT STP-214C(011)AG ATKINS 12TH AVE SE IN NORMAN, EXTEND EAST. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV PROJECT LENGTH = 1.580 MILES. Engineer: ATKINS Contract Amount: $7,746,686.57 Completion Date: 02/26/2016 Letting Date: 03/20/2014 Final Est Sub: GRADE, DRAIN, AND SURFACE US-77: FROM Contract: 140356 US-77 Residency: 20997(07) 03200 4.05 MILES NORTH OF SH-39, EXTEND STPY-114C(114)SS PURCELL NORTH. PROJECT LENGTH = 2.448 MILES. Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) Engineer: Reed, Lucas Contract Amount: $10,950,160.10 Completion Date: 09/01/2016 Letting Date: 11/20/2014 Final Est Sub: Contract: 150251 I-35 22973(13) SSP-262F(027)SS Contractor: GARY A. CRAIN, INC. Engineer: Reed, Lucas Contract Amount: $203,597.05 Letting Date: 09/17/2015 Residency: PURCELL Contract: 150361 CT.ST. 31510(04) STPG-214B(041)(040)/STPG* Contractor: TRAFFIC SIGNALS, INC. Engineer: CEC Contract Amount: $549,976.55 Letting Date: 01/21/2016 Residency: CEC CORP. 03200 BRIDGE WATER PROOF SEAL I-35/SH-3W/SH-17A/INDIAN HILL ROAD/MAIN STREET: AT MULTIPLE LOCATIONS IN DIVISION III. Completion Date: Final Est Sub: 03003 03/10/2017 TRAFFIC SIGNALS CITY STREETS (ROBINSON ST/ROCK CREEK RD/MAIN ST): AT MULTIPLE LOCATIONS IN DIVISION III. Completion Date: Final Est Sub: 05/12/2017 *-214A(039)AG Contract: 160014 US-77 Residency: 20997(18) 03200 ACSTP-214C(044)SS PURCELL Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Reed, Lucas Contract Amount: $3,132,428.72 Letting Date: 01/21/2016 BRIDGE AND APPROACHES US-77: OVER CHOTEAU CREEK, 2.9 MILES NORTH OF THE SH-39 JUNCTION NEAR LEXINGTON. PROJECT LENGTH = 0.246 MILE. Completion Date: Final Est Sub: 11/22/2016 RESURFACE (P.C. CONCRETE) SH-37: FROM Contract: 160015 SH-37 Residency: 29704(04) 03200 SANTA FE AVE, EXTEND EAST 3.0 MILES TO SSR-214B(037)SR PURCELL BRYANT AVENUE IN MOORE. PROJECT Contractor: CHESTER BROSS CONSTRUCTION COMPANY/C.B. EQUIPMENT, INC. = 3.000 MILES LENGTH Engineer: Reed, Lucas Contract Amount: $1,133,762.46 Completion Date: 11/02/2016 Letting Date: 01/21/2016 Final Est Sub: Construction Status Report Page 13 Contract: 160016 CT.ST. Residency: 30478(04) STPG-214F(043)AG PURCELL Contractor: RUDY CONSTRUCTION CO. Engineer: Reed, Lucas Contract Amount: $179,347.30 Letting Date: 01/21/2016 03200 Contract: 160193 SH-77H Residency: 32404(04) HSIP-214C(065)TR PURCELL Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Reed, Lucas Contract Amount: $200,230.75 Letting Date: 05/19/2016 03200 Contract: 160357 CT. ST. Residency: 30480(04) STPG-214B(064)AG CEC CORP. Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: CEC Contract Amount: $526,000.00 Letting Date: 10/20/2016 03003 County: STRIPING AND PAVEMENT MARKING CITY STREETS: AT MULTIPLE LOCATIONS IN DIVISION III. Completion Date: Final Est Sub: 12/08/2016 TRAFFIC SIGNALS SH-77H: AT THE INTERSECTION OF INDIAN HILLS ROAD, IN THE CITY OF NORMAN. Completion Date: Final Est Sub: 12/16/2016 TRAFFIC SIGNALS CITY STREETS: AT MULTIPLE LOCATIONS IN THE CITY OF NORMAN. Completion Date: Final Est Sub: 04/26/2017 Commissioner District: Coal 3 Contracts Completed - Final Estimate Not Processed Contract: 150227 CO.RD. Residency: 24944(04) STP-115C(076)CI ADA Contractor: GLOVER & ASSOCIATES, INC. Engineer: Russell, Julie Contract Amount: $1,288,968.64 Letting Date: 07/23/2015 County: 03100 GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-382): FROM EW-167, EXTEND NORTH NEAR COALGATE. PROJECT LENGTH = 1.003 MILES Completion Date: Final Est Sub: 02/10/2016 Commissioner District: Comanche 7 Contracts Completed - Final Estimate Not Processed Contract: 130360 SH-17 Residency: 07300 23297(04) ANADARKO STPY-116C(134) Contractor: INTERSTATE HIGHWAY CONSTRUCTION, INC. Engineer: Knight, Reese Contract Amount: $3,833,093.62 Letting Date: 10/17/2013 BRIDGE AND APPROACHES SH-17: OVER WHISKEY CREEK, 0.50 MILE WEST OF THE SH-65 JUNCTION. PROJECT LENGTH = 0.586 MILE. Contract: 130409 I-44 Residency: 27165(04) SSP-216N(025)SB DUNCAN Contractor: ALLEN CONTRACTING, INC. Engineer: Roberts, Colton Contract Amount: $5,496,321.02 Letting Date: 11/21/2013 BRIDGE AND APPROACHES I-44: MULTIPLE LOCATIONS AT TRI-LEVEL INTERCHANGE IN LAWTON. PROJECT LENGTH = 0.460 MILE. 07100 Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/13/2016 01/04/2016 Page 14 County: Commissioner District: Cotton 7 Contracts Completed - Final Estimate Not Processed GRADE, DRAIN, AND SURFACE I-44: BEGIN Contract: 130362 I-44 Residency: 23292(04) 07100 AT THE STATE LINE, EXTEND NORTH TO NHPPIY-0044-1(098)000 DUNCAN US-70. PROJECT LENGTH = 4.948 MILES. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV Engineer: Roberts, Colton Contract Amount: $9,496,678.77 Completion Date: 07/31/2016 Letting Date: 10/17/2013 Final Est Sub: County: Commissioner District: Craig 8 Contracts Completed - Final Estimate Not Processed Contract: 110420 SH-66 Residency: 24183(04) STPY-118C(096)SS CLAREMORE Contractor: BECCO CONTRACTORS, INC. Engineer: Tyler, Jennifer Contract Amount: $7,425,911.85 Letting Date: 10/20/2011 08300 Contract: 110421 US-60 Residency: 24220(04) BRFY-018N(050) CLAREMORE Contractor: B & B BRIDGE COMPANY, LLC Engineer: Tyler, Jennifer Contract Amount: $3,181,543.16 Letting Date: 09/15/2011 08300 Contract: 130344 SH-66 Residency: 24121(04) STPY-118C(093) CLAREMORE Contractor: PARAGON CONTRACTORS, LLC Engineer: Tyler, Jennifer Contract Amount: $2,718,817.00 Letting Date: 09/19/2013 08300 Contract: 140196 US-59 Residency: 24120(04) CLAREMORE STPY-118C(090) Contractor: GLOVER & ASSOCIATES, INC. Engineer: Tyler, Jennifer Contract Amount: $1,577,178.70 Letting Date: 06/19/2014 08300 Contract: 140259 US-59 Residency: 23126(04) STPY-118B(067)SS CLAREMORE Contractor: B & B BRIDGE COMPANY, LLC Engineer: Tyler, Jennifer Contract Amount: $5,352,913.29 Letting Date: 09/18/2014 08300 WIDEN AND RESURFACE SH-66: FROM 1.25 MILES EAST OF THE ROGERS COUNTY LINE, EXTEND NORTHEAST. PROJECT LENGTH = 5.621 MILES. Completion Date: Final Est Sub: BRIDGE AND APPROACHES US-60: OVER BIG CABIN CREEK, 3.7 MILES EAST OF THE SH-66 JUNCTION. PROJECT LENGTH = 0.207 MILES. Completion Date: Final Est Sub: 06/12/2013 05/15/2017 BRIDGE AND APPROACHES SH-66: FROM 0.43 MILE SOUTHWEST OF THE CRAIG COUNTY LINE, EXTEND NORTHEAST. PROJECT LENGTH = 0.912 MILE. Completion Date: Final Est Sub: 10/08/2014 03/16/2017 BRIDGE AND APPROACHES US-59: OVER AN UNNAMED CREEK, 0.9 MILES WEST OF THE OTTAWA COUNTY LINE. PROJECT LENGTH =0.293 MILES Completion Date: Final Est Sub: Construction Status Report 06/30/2015 02/29/2016 BRIDGE AND APPROACHES US-59: OVER RUSSELL CREEK AND ELM CREEK, 1.30 MILES SOUTH OF THE KANSAS STATE LINE. PROJECT LENGTH = 1.561 MILES. Completion Date: Final Est Sub: 12/30/2016 Page 15 County: Commissioner District: Creek 8 Contracts Completed - Final Estimate Not Processed Contract: 140289 SH-16 Residency: 21908(04) 08400 STPY-119C(119)SS SAND SPRINGS Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: Williams, Mark J. Contract Amount: $3,793,643.00 Letting Date: 09/18/2014 GRADE, DRAIN, SURFACE, AND BRIDGE SH-16: OVER SKULL CREEK 5.7 MILES EAST OF SH-48. PROJECT LENGTH = 0.728 MILE. Contract: 140290 MULT Residency: 08007 30851(04) CRAIG & KEITHLINE, INC. HSIPG-219F(027)TR Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: C&KI Contract Amount: $1,420,026.35 Letting Date: 11/20/2014 SAFETY IMPROVEMENT (GUARDRAIL) US HIGHWAYS/STATE HIGHWAYS: VARIOUS LOCATIONS IN DIVISION VIII. Contract: 140318 CO.RD. Residency: 29217(04) STP-119D(005)CI ATKINS Contractor: HUB CONSTRUCTION, INC. Engineer: ATKINS Contract Amount: $883,310.10 Letting Date: 11/20/2014 BRIDGE AND APPROACHES COUNTY ROAD (EW-81.5/8TH STREET): OVER SAND CREEK, 0.5 MILE EAST OF BRISTOW. PROJECT LENGTH = 0.169 MILE. 08010 Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/06/2016 09/21/2016 04/03/2017 Contract: 150190 US-75A Residency: 27090(04) 08400 NHPP-219N(036)SS SAND SPRINGS Contractor: M.J. HUGHES CONSTRUCTION, INC. Engineer: Williams, Mark J. Contract Amount: $1,875,233.80 Letting Date: 06/18/2015 BRIDGE REHABILITATION - DIVISION VIII US-75A: OVER ROCK CREEK, 0.30 MILE SOUTH OF THE SH-117 JUNCTION IN SAPULPA. PROJECT LENGTH = 0.064 MILE. Contract: 150364 CO.RD. 26553(04) STP-119D(193)CI Contractor: K & R BUILDERS, INC. Engineer: JACOBS Contract Amount: $555,575.05 Letting Date: 11/19/2015 BRIDGE AND APPROACHES COUNTY ROAD (MILLS ROAD/NS-363): OVER DRY CREEK, 0.9 MILE SOUTH OF WEST 51ST STREET (EW-64) NEAR OILTON. PROJECT LENGTH = 0.193 MILE. Residency: 08004 JACOBS ENGINEERING Completion Date: Final Est Sub: Contract: 160364 IS-44 Residency: 32657(04) SAP-219N(051) TETRA TECH Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: TETR Contract Amount: $52,512.00 Letting Date: 10/20/2016 County: Completion Date: Final Est Sub: 08002 09/12/2016 04/04/2017 10/03/2016 05/12/2017 BRIDGE REPAIR I-44: REPAIR VEHICLE IMPACT DAMAGE OVER SH-66, 1.2 MILES SOUTHWEST OF THE I-244 INTERCHANGE IN TULSA. Completion Date: Final Est Sub: 04/03/2017 Commissioner District: Custer 5 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 16 Contract: 120092 US-183 Residency: 09278(04) NHY-009N(019)SS CLINTON Contractor: CORNELL CONSTRUCTION COMPANY, INC. Engineer: Davis, Shawn Contract Amount: $7,762,288.72 Letting Date: 02/16/2012 05100 Contract: 130308 CT.ST. Residency: 19669(04) STP-120B(070)TC CLINTON Contractor: TOM HUDSON PAVING, INC. Engineer: Davis, Shawn Contract Amount: $1,991,350.29 Letting Date: 09/19/2013 05100 Contract: 140092 I-40 Residency: 26490(04) NHPPIY-0040-3(082)SS/NHP* CLINTON Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Davis, Shawn Contract Amount: $16,738,134.68 Letting Date: 02/20/2014 05100 GRADE, DRAIN, AND SURFACE US-183: FROM THE WASHITA RIVER, EXTEND NORTH. PROJECT LENGTH = 3.411 MILES. Completion Date: Final Est Sub: 01/16/2017 GRADE, DRAIN, AND SURFACE CITY STREET (CHAPMAN AVENUE): FROM 28TH STREET, EXTEND EAST IN CLINTON. PROJECT LENGTH = 0.723 MILE. Completion Date: Final Est Sub: 08/14/2015 GRADE, DRAIN, SURFACE, AND BRIDGE I-40/WASHINGTON AVENUE: ON I-40, FROM MILE MARKER 76.6 TO 83.9; ON WASHINGTON AVENUE, OVER I-40 IN WEATHERFORD. PROJECT LENGTH = 7.714 MILES. Completion Date: Final Est Sub: 12/22/2015 *PIY-0040-3(085) Contract: 150052 I-40 Residency: 26490(05) SSP-220N(028)SS CLINTON Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Davis, Shawn Contract Amount: $1,418,680.20 Letting Date: 02/19/2015 05100 Contract: 150192 SH-44 Residency: 29276(04) SBR-220C(027)SB CLINTON Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Davis, Shawn Contract Amount: $997,305.28 Letting Date: 06/18/2015 05100 Contract: 160318 I-40 Residency: 31700(04) NHPPI-NBIP-(505)3B TETRA TECH Contractor: SOUTHERN ROAD & BRIDGE, LLC Engineer: TETR Contract Amount: $262,148.80 Letting Date: 09/15/2016 05002 County: RESURFACE (ASPHALT) I-40: FROM MILE MARKER 83.9 TO MILE MARKER 86.3. PROJECT LENGTH = 2.350. Completion Date: Final Est Sub: 12/03/2015 BRIDGE REHABILITATION - DIVISION V SH-44: OVER OAK CREEK, 4.7 MILES NORTH OF THE I-40 JUNCTION. PROJECT LENGTH = 0.175 MILE. Completion Date: Final Est Sub: 06/03/2016 09/21/2016 BRIDGE PAINTING I-40: OVER I-40B, 2.8 MILES EAST OF US-183 NEAR CLINTON. Completion Date: Final Est Sub: 04/25/2017 Commissioner District: Delaware 8 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 17 Contract: 110422 SH-10 Residency: 10441(04) BRFY-021C(256) GARVER, LLC. Contractor: JENSEN CONSTRUCTION COMPANY Engineer: GARV Contract Amount: $15,741,148.27 Letting Date: 08/16/2012 08011 Contract: 150193 US-412 Residency: 26506(04) NHPP-221N(020)SS CLAREMORE Contractor: PARAGON CONTRACTORS, LLC Engineer: Tyler, Jennifer Contract Amount: $978,879.00 Letting Date: 06/18/2015 08300 BRIDGE AND APPROACHES SH-10: OVER ELK RIVER, 1.35 MILES SOUTH OF THE OTTAWA COUNTY LINE. PROJECT LENGTH = 0.892 MILE. Completion Date: Final Est Sub: 10/14/2015 05/12/2017 WIDEN AND RESURFACE - DIVISION VIII US-412: FROM THE ARKANSAS STATE LINE, EXTEND WEST. PROJECT LENGTH = 0.065 MILE. Completion Date: Final Est Sub: 02/19/2016 Contract: 160166 US-59 Residency: 24151(07) 08300 SSP-221B(031)RW CLAREMORE Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC Engineer: Tyler, Jennifer Contract Amount: $24,030.00 Letting Date: 04/21/2016 RIGHT-OF-WAY CLEARANCE US-59: FROM 2.92 MILES NORTH OF SH-20, EXTEND NORTH NEAR JAY. PROJECT LENGTH = 1.001 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED. BOTH BID EXPRESS AND WRITTEN BIDS WILL BE ACCEPTABLE. Contract: 160187 SH-116 Residency: 29827(04) 08300 SBR-221C(027)SB CLAREMORE Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: Tyler, Jennifer Contract Amount: $843,859.80 Letting Date: 04/21/2016 BRIDGE REHABILITATION SH-116: OVER CLOUD CREEK, 2.8 MILES EAST OF US-59 NEAR COLCORD. PROJECT LENGTH = 0.117 MILE. Contract: 160194 US-59 Residency: 28842(04) 08004 STP-121E(155)EH JACOBS ENGINEERING Contractor: CROSSLAND HEAVY CONTRACTORS INC. Engineer: JACOBS Contract Amount: $865,014.99 Letting Date: 05/19/2016 GRADE, DRAIN, AND SURFACE US-59: FROM 4TH STREET, EXTEND NORTH IN GROVE. SH-25/3RD ST: FROM THE US-59 JCT, EXTEND EAST IN GROVE. PROJECT LENGTH = 0.140 MILE. Contract: 160344 CO. RD. Residency: 32598(04) 08004 ACERSTP-221C(032)ER JACOBS ENGINEERING Contractor: B & B BRIDGE COMPANY, LLC Engineer: JACOBS Contract Amount: $794,425.57 Letting Date: 09/15/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-33): OVER WHITEWATER CREEK, 0.7 MILE EAST OF US-59 NEAR GROVE. PROJECT LENGTH = 0.213 MILE. County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/14/2017 05/22/2017 05/15/2017 05/31/2017 04/28/2017 Commissioner District: Dewey 5 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 18 Contract: 150089 US-270 Residency: 17671(32) NHPP-017N(225)SS CLINTON Contractor: CORNELL CONSTRUCTION COMPANY, INC. Engineer: Davis, Shawn Contract Amount: $8,009,586.69 Letting Date: 03/19/2015 County: 05100 GRADE, DRAIN, AND SURFACE US-270: FROM 1.7 MILES SOUTHEAST OF SH-51, EXTEND SOUTHEAST. PROJECT LENGTH = 3.920 MILES. Completion Date: Final Est Sub: 03/15/2017 Commissioner District: Ellis 6 Contracts Completed - Final Estimate Not Processed Contract: 150161 CO.RD. Residency: 06009 29337(04) CIRCUIT ENGR. DISTR. # 8 ACSTP-223C(008)CI Contractor: J & R SAND COMPANY, INC. Engineer: CED8 Contract Amount: $1,364,767.02 Letting Date: 05/21/2015 RESURFACE (ASPHALT) - DIVISION VI COUNTY ROADS (NS-173/NS-174/NS-175/EW-66/EW-67): ON MULTIPLE COUNTY ROADS, 5.5 MILES SOUTH OF THE US-283/US-60. PROJECT LENGTH = 3.371 MILES. Contract: 160022 CO.RD. Residency: 28456(08) 06009 CIRB-123C(086)RB CIRCUIT ENGR. DISTR. # 8 Contractor: CORNELL CONSTRUCTION COMPANY, INC. Engineer: CED8 Contract Amount: $3,287,536.91 Letting Date: 01/21/2016 GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-190): FROM 6.5 MILES NORTH OF US-60, EXTEND NORTH NEAR GAGE. PROJECT LENGTH = 5.009 MILES. Contract: 160085 US-283 Residency: 29489(04) STP-223B(009)3P BUFFALO Contractor: J & R SAND COMPANY, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $983,382.25 Letting Date: 05/19/2016 RESURFACE (ASPHALT) US-283: FROM 2.25 MILES SOUTH OF THE HARPER COUNTY LINE, EXTEND NORTH NEAR LAVERN. PROJECT LENGTH = 4.190 MILES. County: 06100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 06/08/2016 04/12/2017 12/27/2016 Commissioner District: Garfield 4 Contracts Completed - Final Estimate Not Processed Contract: 140320 US-64 Residency: 30788(04) HSIPG-224N(009)TR ENID Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Hoover, Jacob Contract Amount: $675,136.54 Letting Date: 01/22/2015 04300 Contract: 150090 CO.RD. Residency: 24868(04) 04009 CIRB-124C(113)RB CIRCUIT ENGR. DISTR. # 8 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED8 Contract Amount: $5,120,090.80 Letting Date: 03/19/2015 Construction Status Report SAFETY IMPROVEMENT (CABLE BARRIER) US-64: FROM 78TH STREET IN ENID, EXTEND EAST. PROJECT LENGTH = 4.490 MILES. Completion Date: Final Est Sub: 01/21/2016 05/08/2017 GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-40): FROM 78TH ST (NS-294) IN BRECKINRIDGE, EXTEND EAST. PROJECT LENGTH = 5.984 MILES. Completion Date: Final Est Sub: 09/20/2016 Page 19 Contract: 150366 CO.RD. 28423(04) STP-224D(026)CI Contractor: H & H BRIDGE COMPANY Engineer: CED8 Contract Amount: $723,946.33 Letting Date: 11/19/2015 Residency: 04009 CIRCUIT ENGR. DISTR. # 8 Completion Date: Final Est Sub: Contract: 160217 SH-74 Residency: 29636(04) SSR-224C(038)SR ENID Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Hoover, Jacob Contract Amount: $1,436,650.00 Letting Date: 06/16/2016 County: BRIDGE AND APPROACHES COUNTY ROAD (REED ROAD/EW-54): OVER TURKEY CREEK, 2.4 MILES EAST OF SH-132 NEAR WAUKOMIS. PROJECT LENGTH = 0.426 MILES 04300 04/17/2017 RESURFACE (ASPHALT) SH-74: FROM THE RAILROAD SOUTH OF THE SH-164 JUNCTION, EXTEND NORTH NEAR COVINGTON. PROJECT LENGTH = 6.742 MILES Completion Date: Final Est Sub: 04/25/2017 Commissioner District: Garvin 3 Contracts Completed - Final Estimate Not Processed Contract: 120312 SH-17A Residency: 28179(04) SBR-125C(198)SB ADA Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Russell, Julie Contract Amount: $2,912,741.15 Letting Date: 09/20/2012 03100 Contract: 130267 SH-19 Residency: 21786(04) SSP-125B(112)SS ADA Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Russell, Julie Contract Amount: $5,971,477.23 Letting Date: 08/22/2013 03100 Contract: 140261 I-35 Residency: 28183(04) ATKINS SBR-125N(200)SB Contractor: BRIDGECO CONTRACTORS, INC. Engineer: ATKINS Contract Amount: $1,654,283.48 Letting Date: 08/21/2014 03010 Contract: 150091 US-77 27061(04) STP-125C(209)SS Contractor: OBC, INC. Engineer: Reed, Lucas Contract Amount: $2,601,501.30 Letting Date: 03/19/2015 03200 Residency: PURCELL BRIDGE REHABILITATION SH-17A: OVER THE WASHITA RIVER, 0.87 MILES EAST OF I-35. Completion Date: Final Est Sub: GRADE, DRAIN, SURFACE, AND BRIDGE SH-19: OVER WASHITA RIVER, 1.72 MILES EAST OF US-77, EXTEND EAST. PROJECT LENGTH = 0.681 MILE. Completion Date: Final Est Sub: 12/12/2014 BRIDGE REHABILITATION I-35: OVER RED BRANCH CREEK, 1.0 MILE NORTH OF SH-29. Completion Date: Final Est Sub: 03/15/2016 04/13/2017 BRIDGE AND APPROACHES US-77: OVER OWL CREEK, 0.50 MILE SOUTH OF SH-145. PROJECT LENGTH = 0.284 MILE. Completion Date: Final Est Sub: Construction Status Report 08/31/2015 12/08/2016 Page 20 Contract: 150092 SH-76 Residency: 27997(04) STP-225C(041)SS PURCELL Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Reed, Lucas Contract Amount: $8,120,772.36 Letting Date: 05/21/2015 03200 Contract: 150162 SH-74 Residency: 27062(04) STP-225C(042)SS PURCELL Contractor: MUNOZ CONSTRUCTION, INC. Engineer: Reed, Lucas Contract Amount: $1,256,215.90 Letting Date: 05/21/2015 03200 BRIDGE AND APPROACHES - DIVISION III SH-76: OVER THE WASHITA RIVER, 9.4 MILES NORTH OF THE STEPHENS COUNTY LINE NEAR LINDSAY. PROJECT LENGTH = 0.625 MILE. Completion Date: Final Est Sub: 05/12/2017 BRIDGE AND APPROACHES - DIVISION III SH-74: OVER BEEF CREEK, 0.10 MILE SOUTH OF SH-19 IN MAYESVILLE. PROJECT LENGTH = 0.065 MILE. Completion Date: Final Est Sub: 07/14/2016 Contract: 160024 CO.RD. Residency: 30298(04) 03200 STP-225C(050)CI PURCELL Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Reed, Lucas Contract Amount: $1,157,300.00 Letting Date: 02/18/2016 RESURFACE (ASPHALT) COUNTY ROAD (INDIAN MERIDIAN RD/NS-323): FROM SH-29, EXTEND NORTH NEAR PAULS VALLEY. PROJECT LENGTH = 5.011 MILES. Contract: 160025 SH-19 30557(04) STP-225B(056)3P Contractor: SEAL MASTERS, INC. Engineer: Russell, Julie Contract Amount: $387,516.05 Letting Date: 01/21/2016 Residency: ADA RESURFACE (ASPHALT) SH-19: FROM US-177, EXTEND EAST IN STRATFORD. PROJECT LENGTH = 1.040 MILES. Contract: 160136 SH-29 29805(05) SSR-225B(058)SR Contractor: OVERLAND CORPORATION Engineer: Reed, Lucas Contract Amount: $885,702.10 Letting Date: 03/17/2016 Residency: PURCELL County: 03100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 03200 10/10/2016 11/18/2016 RESURFACE (ASPHALT) SH-29: FROM 3.3 MILES EAST OF THE STEPHENS COUNTY LINE, EXTEND EAST NEAR ELMORE CITY. PROJECT LENGTH = 6.11 MILES. Completion Date: Final Est Sub: 12/20/2016 Commissioner District: Grady 7 Contracts Completed - Final Estimate Not Processed GRADE, DRAIN, AND SURFACE - DIVISION VII Contract: 150163 CO.RD. Residency: 24945(04) 07003 COUNTY ROAD (SARA ROAD): FROM 0.50 CIRB-126C(131)RB CEC CORP. MILE NORTH OF I-44 NEAR NEWCASTLE, Contractor: SHELL CONSTRUCTION CO., INC/MARKWELL PAVING CO., INCEXTEND (JV) NORTH. PROJECT LENGTH = 4.042 MILES. Engineer: CEC Contract Amount: $4,393,434.16 Completion Date: 11/18/2016 Letting Date: 06/18/2015 Final Est Sub: Construction Status Report Page 21 Contract: 150260 US-62 Residency: 31034(04) SSP-226B(016) ANADARKO Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Knight, Reese Contract Amount: $3,977,101.30 Letting Date: 08/20/2015 County: 07300 RESURFACE (ASPHALT) US-62: FROM 3.0 MILES EAST OF THE SH-39 JUNCTION, EXTEND EAST NEAR CHICKASHA. PROJECT LENGTH = 7.540 MILES. Completion Date: Final Est Sub: 02/07/2017 Commissioner District: Grant 4 Contracts Completed - Final Estimate Not Processed Contract: 140237 SH-11 Residency: 24429(04) ENID STPY-127B(135)(136) Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Hoover, Jacob Contract Amount: $9,950,140.63 Letting Date: 07/24/2014 04300 SHOULDER IMPROVEMENT, RESURFACE (ASPHALT), AND BRIDGE SH-11: FROM 6.43 MILES EAST OF THE ALFALFA COUNTY LINE, EXTEND EAST. PROJECT LENGTH = 6.978 MILES. Completion Date: Final Est Sub: 01/31/2017 Contract: 150094 CO.RD. Residency: 28419(04) 04009 CIRB-127C(187)RB CIRCUIT ENGR. DISTR. # 8 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED8 Contract Amount: $3,821,180.30 Letting Date: 03/19/2015 GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-09): FROM 0.60 MILE EAST OF SH-132, EXTEND EAST. PROJECT LENGTH = 5.615 MILES. Contract: 150095 US-81 Residency: 29142(04) SBR-227B(001)(013)SB ENID Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: Hoover, Jacob Contract Amount: $2,487,956.55 Letting Date: 03/19/2015 BRIDGE REHABILITATION US-81: OVER POND CREEK 3.8 MILES NORTH OF US-60, AND OVER OSAGE CREEK 4.4 MILES NORTH OF US-60. PROJECT LENGTH = 0.252 MILE. 04300 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 09/20/2016 09/26/2016 Contract: 150195 CO.RD. Residency: 28413(04) 04009 STP-227C(016)CI CIRCUIT ENGR. DISTR. # 8 Contractor: L & M CONTRACTORS, INC. Engineer: CED8 Contract Amount: $574,754.21 Letting Date: 06/18/2015 BRIDGE AND APPROACHES - DIVISION IV COUNTY ROAD (NS-296): OVER UNNAMED CREEK, 6.5 MILES NORTH OF SH-11 IN MEDFORD. PROJECT LENGTH = 0.236 MILE. Contract: 150334 CO.RD. 28360(04) STP-227D(019)CI Contractor: H & H BRIDGE COMPANY Engineer: CED8 Contract Amount: $734,320.78 Letting Date: 10/15/2015 BRIDGE AND APPROACHES COUNTY ROAD (NS-280): OVER SAND CREEK, 1.0 MILE EAST AND 2.9 MILES SOUTH OF SH-11 NEAR HAWLEY. PROJECT LENGTH = 0.293 MILE. Residency: 04009 CIRCUIT ENGR. DISTR. # 8 Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: 06/30/2016 04/12/2017 09/20/2016 Page 22 Contract: 150369 CO.RD. 28412(04) STP-227D(015)CI Contractor: SEWELL BROS., INC. Engineer: CED8 Contract Amount: $426,810.75 Letting Date: 11/19/2015 County: Residency: 04009 CIRCUIT ENGR. DISTR. # 8 BRIDGE AND APPROACHES COUNTY ROAD(HARPER ROAD): OVER POLECAT CREEK, 4.8 MILES WEST OF SH-74 NEAR MEDFORD. PROJECT LENGTH = 0.337 MILE. Completion Date: Final Est Sub: 08/10/2016 Commissioner District: Greer 5 Contracts Completed - Final Estimate Not Processed Contract: 150294 CO.RD. Residency: 05005 30028(04) CIRCUIT ENGR. DISTR. # 7 STP-228C(005)CI Contractor: KLAVER CONSTRUCTION COMPANY, INC. Engineer: CED7 Contract Amount: $318,158.28 Letting Date: 09/17/2015 County: BRIDGE AND APPROACHES COUNTY ROAD (EW-155): OVER TURKEY CREEK, 4.9 MILES WEST OF SH-34 NEAR RUSSELL. PROJECT LENGTH = 0.095 MILE. Completion Date: Final Est Sub: 11/01/2016 05/24/2017 Commissioner District: Harmon 5 Contracts Completed - Final Estimate Not Processed Contract: 150295 CO.RD. Residency: 24950(04) 05005 CIRB-129D(040)RB CIRCUIT ENGR. DISTR. # 7 Contractor: CASWELL CONTRACTING, INC. Engineer: CED7 Contract Amount: $1,035,392.75 Letting Date: 09/17/2015 County: GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-158/EW-160): EW-158 FROM SH-30, EXTEND WEST. EW-160 AT NS-170, 1.0 MI W AND 1.0 MI N OF HOLLIS. PROJECT LENGTH = 1.271 MILES. Completion Date: Final Est Sub: 10/13/2016 05/24/2017 Commissioner District: Harper 6 Contracts Completed - Final Estimate Not Processed Contract: 140099 SH-149 Residency: 10448(04) STPY-030C(105) GUYMON Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: Michael, Charles Contract Amount: $3,198,694.24 Letting Date: 05/15/2014 06200 Contract: 150134 US-64 23274(12) SSP-230C(016)SS Contractor: JLT CONTRACTING, LLC Engineer: Embree, Jerry (Acting) Contract Amount: $121,280.77 Letting Date: 04/16/2015 06100 Residency: BUFFALO BRIDGE AND APPROACHES SH-149: OVER BEAVER RIVER, 2.44 MILES EAST OF US-283. PROJECT LENGTH = 0.436 MILE. Completion Date: Final Est Sub: BRIDGE WATER PROOF SEAL US-64/US-281/SH-3/SH-11: AT MULTIPLE LOCATIONS IN DIVISION VI. Completion Date: Final Est Sub: Construction Status Report 12/06/2016 03/24/2017 Page 23 Contract: 150335 CO.RD. 24964(04) CIRB-130C(125)RB Contractor: SEWELL BROS., INC. Engineer: CED8 Contract Amount: $1,799,216.98 Letting Date: 10/15/2015 County: Residency: 06009 CIRCUIT ENGR. DISTR. # 8 BRIDGE AND APPROACHES COUNTY ROAD (NS-190): OVER BUFFALO CREEK, 1.3 MILES NORTH OF US-64 NEAR BUFFALO. PROJECT LENGTH = 0.378 MILE. Completion Date: Final Est Sub: 09/27/2016 Commissioner District: Haskell 1 Contracts Completed - Final Estimate Not Processed Contract: 130318 CO.RD. Residency: 28411(04) SALLISAW CIRB-131C(114)RB Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $2,531,601.14 Letting Date: 09/19/2013 01200 Contract: 140170 US-62 Residency: 30737(04) HSIPG-231F(011)TR CEC CORP. Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: CEC Contract Amount: $2,163,244.25 Letting Date: 05/15/2014 01003 Contract: 140322 I-40 30962(05) STPY-231F(014)3B Contractor: PBX CORPORATION Engineer: Hagerman, Jeremy Contract Amount: $250,457.10 Letting Date: 10/16/2014 01100 County: Residency: MUSKOGEE GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (EW-127): FROM 2.8 MILES WEST OF SH-2, EXTEND EAST. PROJECT LENGTH = 2.640 MILES. Completion Date: Final Est Sub: 12/17/2015 05/05/2017 SAFETY IMPROVEMENT (GUARDRAIL AND CABLE BARRIER) US-62/US-64B/US-69/SH-9/SH-10/SH-16: VARIOUS LOCATIONS IN DIVISION I. Completion Date: Final Est Sub: 02/18/2016 JOINT SEAL/REPAIR I-40/US-69/SH-9/SH-10: AT MULTIPLE LOCATIONS IN DIVISION I. Completion Date: Final Est Sub: 05/18/2016 05/11/2017 Commissioner District: Hughes 3 Contracts Completed - Final Estimate Not Processed Contract: 160091 CO.RD. 30016(04) ACSTP-232D(049)CI Contractor: K & R BUILDERS, INC. Engineer: Helton, Matthew Contract Amount: $448,583.84 Letting Date: 02/18/2016 County: Residency: WEWOKA 03300 BRIDGE AND APPROACHES COUNTY ROAD (EW-122): OVER LITTLE WEWOKA CREEK, 2.5 MILES WEST OF SH-27 NEAR WETUMKA. PROJECT LENGTH = 0.150 MILE. Completion Date: Final Est Sub: 12/20/2016 05/16/2017 Commissioner District: Jackson 5 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 24 Contract: 150197 CO.RD. Residency: 24970(04) 05005 CIRB-133C(095)RB CIRCUIT ENGR. DISTR. # 7 Contractor: KLAVER CONSTRUCTION COMPANY, INC. Engineer: CED7 Contract Amount: $4,150,099.34 Letting Date: 06/18/2015 GRADE, DRAIN, SURFACE, AND BRIDGE DIVISION V COUNTY ROAD (NS-210): FROM SH-5, EXTEND NORTH NEAR ALTUS. PROJECT LENGTH = 4.013 MILES. Contract: 160198 US-62 Residency: 29526(06) STP-NBIP(499)SS TETRA TECH Contractor: NORTH STAR PAINTING CO., INC. Engineer: TETR Contract Amount: $842,124.50 Letting Date: 05/19/2016 BRIDGE PAINTING US-62: OVER NORTH FORK OF THE RED RIVER, AT THE TILLMAN COUNTY LINE. 05002 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/26/2017 03/02/2017 Contract: 160220 CO.RD. Residency: 30081(04) 05005 STP-233C(026)CI CIRCUIT ENGR. DISTR. # 7 Contractor: T & G CONSTRUCTION, INC. Engineer: CED7 Contract Amount: $637,339.48 Letting Date: 06/16/2016 RESURFACE (ASPHALT) COUNTY ROAD (EW-159): FROM US-283, EXTEND EAST NEAR ALTUS. PROJECT LENGTH = 3.008 MILES. Contract: 170024 SH-19 Residency: 29644(04) SSR-233C(030)SR ALTUS Contractor: CASWELL CONTRACTING, INC. Engineer: Sirmons, Karl Contract Amount: $362,212.71 Letting Date: 01/19/2017 RESURFACE (ASPHALT) SH-19: FROM US-283/SH-6, EXTEND EAST IN THE TOWN OF BLAIR. PROJECT LENGTH = 1.60 MILES. County: 05200 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 02/24/2017 05/30/2017 05/05/2017 Commissioner District: Jefferson 7 Contracts Completed - Final Estimate Not Processed Contract: 150319 SH-89 Residency: 28801(04) 07100 STP-234C(016)SS DUNCAN Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC. Engineer: Roberts, Colton Contract Amount: $3,883,018.36 Letting Date: 08/20/2015 BRIDGE AND APPROACHES SH-89: OVER POST OAK CREEK, 9.90 MILES NORTH OF THE SH-32 JUNCTION NEAR CORNISH. PROJECT LENGTH = 0.605 MILE. Contract: 160031 US-81 29507(04) SSR-234N(034)SR Contractor: OVERLAND CORPORATION Engineer: Roberts, Colton Contract Amount: $1,648,393.75 Letting Date: 01/21/2016 RESURFACE (ASPHALT) US-81: FROM 9.6 MILES NORTH OF THE TEXAS STATE LINE, EXTEND NORTH IN RYAN. PROJECT LENGTH = 5.500 MILES. County: Residency: DUNCAN 07100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/24/2017 03/17/2017 Commissioner District: Johnston 3 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 25 Contract: 140239 CO.RD. Residency: 27846(04) STP-135C(129)CI ADA Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Russell, Julie Contract Amount: $2,220,342.40 Letting Date: 07/24/2014 03100 Contract: 150098 SH-22 27058(04) STP-135C(135)SS Contractor: L & N BRIDGE, LLC Engineer: Russell, Julie Contract Amount: $2,489,951.32 Letting Date: 03/19/2015 03100 Residency: ADA RESURFACE (ASPHALT) COUNTY ROAD (NS-363/WILEY ROAD): BEGIN AT SH-7, EXTEND SOUTH. PROJECT LENGTH = 6.007 MILES. Completion Date: Final Est Sub: 05/17/2016 BRIDGE AND APPROACHES SH-22: OVER BUTCHER PEN CREEK, 4.3 MILES WEST OF SH-78. PROJECT LENGTH = 0.321 MILE Completion Date: Final Est Sub: 05/23/2016 Contract: 150250 SH-22 Residency: 23285(06) 03001 SSP-235F(019)SS ENGR. SERV. & TESTING Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Engineer: EST Contract Amount: $738,017.33 Letting Date: 07/23/2015 JOINT SEAL/REPAIR SH-22/SH-59/SH-66/SH-102: AT MULTIPLE LOCATIONS IN DIVISION III. Contract: 150321 SH-99 27142(04) STP-235B(023)SS Contractor: OVERLAND CORPORATION Engineer: EST Contract Amount: $8,366,343.52 Letting Date: 08/20/2015 BRIDGE AND APPROACHES SH-99: OVER THE WASHITA RIVER, 1.2 MILES SOUTH OF SH-22 NEAR TISHOMINGO. PROJECT LENGTH = 0.400 MILE. Residency: 03001 ENGR. SERV. & TESTING Contract: 160288 CO.RD. Residency: 31237(04) CIRB-235D(031)RB ADA Contractor: HUB CONSTRUCTION, INC. Engineer: Russell, Julie Contract Amount: $523,770.40 Letting Date: 08/18/2016 County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 03100 08/25/2016 05/09/2017 08/12/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-179): OVER WALNUT BRANCH CREEK, 0.2 MILES WEST OF SH-48 NEAR BROMIDE. PROJECT LENGTH = 0.170 MILE Completion Date: Final Est Sub: 04/15/2017 Commissioner District: Kay 4 Contracts Completed - Final Estimate Not Processed Contract: 130141 I-35 Residency: 26265(04) HSIPIG-0035-4(234)215TR PERRY Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Zachary, Ted Contract Amount: $934,329.37 Letting Date: 03/21/2013 04100 Construction Status Report SAFETY IMPROVEMENT (CABLE BARRIER) I-35: FROM US-60, EXTEND NORTH. PROJECT LENGTH = 5.418 MILES. Completion Date: Final Est Sub: 07/15/2014 02/10/2016 Page 26 Contract: 150408 SH-156 29492(04) SBR-236N(029)SB Contractor: FRONTIER BRIDGE, INC. Engineer: Zachary, Ted Contract Amount: $1,871,124.42 Letting Date: 11/19/2015 Residency: PERRY 04100 BRIDGE REHABILITATION SH-156: OVER US-60, 11.7 MILES EAST OF I-35 NEAR PONCA CITY. PROJECT LENGTH = 0.226 MILE. Completion Date: Final Est Sub: 01/26/2017 Contract: 160222 I-40 Residency: 24239(06) 04001 SSP-NBIP(501)SS ENGR. SERV. & TESTING Contractor: OLYMPUS PAINTING CONTRACTORS, INC. Engineer: EST Contract Amount: $455,004.00 Letting Date: 06/16/2016 BRIDGE PAINTING I-40/US-60: AT MULTIPLE LOCATIONS IN DIVISION IV. Contract: 160376 IS-35 Residency: 32660(04) HSIPIG-3500-(046)TR PERRY Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Zachary, Ted Contract Amount: $298,711.46 Letting Date: 10/20/2016 STRIPING AND PAVEMENT MARKING I-35/I-40: AT MULTIPLE LOCATIONS IN DIVISION IV. County: 04100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 05/03/2017 04/18/2017 05/24/2017 Commissioner District: Kiowa 5 Contracts Completed - Final Estimate Not Processed Contract: 140324 CO.RD. Residency: 25094(04) 05005 CIRB-138D(149)RB CIRCUIT ENGR. DISTR. # 7 Contractor: CORNELL CONSTRUCTION COMPANY, INC. Engineer: CED7 Contract Amount: $3,754,008.18 Letting Date: 10/16/2014 GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (EW-160): FROM 4.0 MILES WEST OF US-183, EXTEND EAST. PROJECT LENGTH = 4.058 MILES. Contract: 140361 SH-9 Residency: 20806(04) ALTUS SSP-138B(062)SS Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Sirmons, Karl Contract Amount: $10,459,957.22 Letting Date: 11/20/2014 GRADE, DRAIN, SURFACE, AND BRIDGE SH-9: OVER BIG ELK CREEK AND LITTLE ELK CREEK OVERFLOW, 12.0, 12.4, AND 12.7 MILES EAST OF THE GREER COUNTY LINE. PROJECT LENGTH = 1.733 MILES. 05200 Contract: 150262 CO.RD. Residency: 28713(04) 05005 STP-238D(027)CI CIRCUIT ENGR. DISTR. # 7 Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC. Engineer: CED7 Contract Amount: $3,396,616.71 Letting Date: 08/20/2015 Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/04/2017 01/11/2017 GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (EW-143): FROM SH-54, EXTEND EAST NEAR GOTEBO. PROJECT LENGTH = 3.015 MILES. Completion Date: Final Est Sub: 12/05/2016 Page 27 Contract: 150374 SH-9 Residency: 29629(04) SSR-238C(019)SR/SSR-238B* ALTUS Contractor: CASWELL CONTRACTING, INC. Engineer: Sirmons, Karl Contract Amount: $1,234,258.51 Letting Date: 11/19/2015 05200 RESURFACE (ASPHALT) SH-9/SH-9B/SH-115: AT MULTIPLE LOCATIONS IN HOBART AND MT. VIEW. PROJECT LENGTH = 2.930 MILES. Completion Date: Final Est Sub: 01/17/2017 *(030)SR County: Commissioner District: Latimer 2 Contracts Completed - Final Estimate Not Processed Contract: 130241 SH-1 Residency: 21735(04) HEAVENER SSP-139C(055)SS Contractor: C-GAWF CONSTRUCTION, INC. Engineer: Huddleston, David Contract Amount: $5,398,403.99 Letting Date: 07/25/2013 02200 Contract: 150042 US-270 28917(04) SBR-239B(003)(016)SB Contractor: OBC, INC. Engineer: Huddleston, David Contract Amount: $3,237,608.59 Letting Date: 01/22/2015 02200 Residency: HEAVENER GRADE, DRAIN, SURFACE, AND BRIDGE SH-1: FROM 0.50 MILE WEST OF THE LATIMER/LEFLORE COUNTY LINE, EXTEND WEST. PROJECT LENGTH = 0.973 MILE. Completion Date: Final Est Sub: 01/04/2017 BRIDGE REHABILITATION US-270: OVER GAINES CREEK, 4.7 MI E OF THE PITTSBURG C/L, AND OVER FOURCHE MALINE CREEK, 4.0 MI E OF SH-2 N JCT. Completion Date: Final Est Sub: 02/16/2017 Contract: 150140 CO.RD. Residency: 28611(04) 02013 CIRB-239C(021)RB CIRCUIT ENGR. DISTR. # 3 Contractor: JOB CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $2,349,687.38 Letting Date: 04/16/2015 WIDEN AND RESURFACE COUNTY ROAD (CRAVENS RD): FROM SH-82, EXTEND WEST. PROJECT LENGTH = 3.503 MILES. Contract: 150168 CO.RD. Residency: 29982(04) 02013 STP-239D(018)CI CIRCUIT ENGR. DISTR. # 3 Contractor: GLOVER & ASSOCIATES, INC. Engineer: CED3 Contract Amount: $532,344.97 Letting Date: 05/21/2015 BRIDGE AND APPROACHES - DIVISION II COUNTY ROAD (MOUNTAIN STATION ROAD): OVER UNNAMED CREEK, 0.2 MILE WEST AND 0.5 MILE SOUTH OF LIMESTONE. PROJECT LENGTH = 0.179 MILE. Contract: 160138 CO.RD. Residency: 28612(04) 02013 CIRB-239C(017)RB CIRCUIT ENGR. DISTR. # 3 Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $583,264.67 Letting Date: 03/17/2016 BRIDGE AND APPROACHES COUNTY ROAD (HIGH BRIDGE ROAD/EW-143): OVER BEAVER CREEK, 4.5 MILES WEST OF SH-2 NEAR WILBURTON. PROJECT LENGTH = 0.138 MILE Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/11/2016 02/03/2017 12/23/2016 Page 28 Contract: 160201 SH-82 Residency: 28826(04) STP-239C(022)SS HEAVENER Contractor: T. MCDONALD CONSTRUCTION, INC. Engineer: Huddleston, David Contract Amount: $739,110.95 Letting Date: 05/19/2016 County: 02200 BRIDGE AND APPROACHES SH-82: OVER WEST FORK CREEK, 0.08 MILES NORTHWEST OF THE LEFLORE COUNTY LINE. PROJECT LENGTH = 0.044 MILE Completion Date: Final Est Sub: 04/14/2017 Commissioner District: Le Flore 2 Contracts Completed - Final Estimate Not Processed Contract: 140240 US-271 27571(04) STPY-240C(021) Contractor: OBC, INC. Engineer: Huddleston, David Contract Amount: $3,439,314.10 Letting Date: 07/24/2014 Residency: HEAVENER 02200 BRIDGE REHABILITATION US-271: OVER JACKSON CREEK AND ROCK CREEK, 2.5 AND 3.5 MILES NORTH OF THE PUSHMATAHA COUNTY LINE. Completion Date: Final Est Sub: 01/04/2017 Contract: 140327 CO.RD. Residency: 25097(04) 02013 CIRB-140D(161)RB CIRCUIT ENGR. DISTR. # 3 Contractor: C-GAWF CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $1,565,254.87 Letting Date: 10/16/2014 BRIDGE AND APPROACHES COUNTY ROAD (NS-457.5): OVER BRAZIL CREEK, 4.0 MILES SOUTH OF SH-31. PROJECT LENGTH = 0.406 MILE. Contract: 150016 SH-63 29588(04) STP-240C(018)SS Contractor: OBC, INC. Engineer: Huddleston, David Contract Amount: $3,820,024.48 Letting Date: 01/22/2015 BRIDGE REHABILITATION SH-63: OVER BUZZARD CREEK, UNNAMED CREEK, AND BIRNEY CREEK, 4.85 MILES EAST OF TALIHINA. Residency: HEAVENER 02200 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 08/26/2015 01/05/2017 04/19/2017 Contract: 150169 CO.RD. Residency: 28616(04) 02013 CIRCUIT ENGR. DISTR. # 3 CIRB-240D(037)RB Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: CED3 Contract Amount: $1,041,921.80 Letting Date: 05/21/2015 BRIDGE AND APPROACHES - DIVISION II COUNTY ROAD (E1546): OVER BIG CREEK, 0.60 MILE EAST OF HICKS. PROJECT LENGTH = 0.134 MILE. Contract: 150375 CO.RD. Residency: 26897(04) 02013 STP-140C(185)CI CIRCUIT ENGR. DISTR. # 3 Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $614,772.75 Letting Date: 01/21/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-148) : OVER UNNAMED CREEK, 0.1 MILE WEST OF NS-465 NEAR REICHERT. PROJECT LENGTH = .064 MILE. Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: 02/10/2016 03/24/2017 07/12/2016 Page 29 Contract: 150376 CO.RD. Residency: 29934(04) 02013 STP-240C(042)CI CIRCUIT ENGR. DISTR. # 3 Contractor: JOB CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $1,495,558.54 Letting Date: 02/18/2016 RESURFACE (ASPHALT) COUNTY RD (OLD SH-112/NS-475): ON OLD SH-112, FROM NS-472 AND EW-134.5 EXTEND EAST, THEN NORTH ON NS-475 NEAR POTEAU. PROJECT LENGTH = 8.000 MILES Contract: 160097 CO.RD. Residency: 29933(04) 02013 STP-240D(039)CI CIRCUIT ENGR. DISTR. # 3 Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $346,681.62 Letting Date: 03/17/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-126): OVER A TRIBUTARY TO BUCK CREEK, 0.50 MILE WEST OF SH-31 JUNCTION NEAR BOKOSHE. PROJECT LENGTH = 0.119 MILE. Contract: 170063 US-59 Residency: 32797(04) HSIPG-207F(063)TR/HSIPG-* MADILL Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: January, Trenton (Acting) Contract Amount: $166,416.00 Letting Date: 02/16/2017 SAFETY IMPROVEMENT (RUMBLE STRIP AND PAVEMENT MARKING) US-59/US-70/US-70 BYPASS/US-270: AT MULTIPLE LOCATIONS IN DIVISION II. 02300 Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 02/21/2017 08/22/2016 05/03/2017 *261B(070)TR County: Commissioner District: Lincoln 3 Contracts Completed - Final Estimate Not Processed Contract: 130323 US-177 Residency: 24180(04) 03001 STPY-141B(166)SS ENGR. SERV. & TESTING Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: EST Contract Amount: $15,999,153.37 Letting Date: 09/19/2013 WIDEN, RESURFACE, AND BRIDGE US-177: FROM 0.74 MILE NORTH OF SH-66, EXTEND NORTH. PROJECT LENGTH = 7.255 MILES. Contract: 140363 CO.RD. Residency: 30019(04) WEWOKA STP-241D(025)CI Contractor: MERIDIAN CONTRACTING, INC. Engineer: Helton, Matthew Contract Amount: $841,327.50 Letting Date: 11/20/2014 03300 BRIDGE AND APPROACHES COUNTY ROAD (EW-93): OVER THE DEEP FORK OF THE CANADIAN RIVER, 2.0 MILES SOUTH AND 2.0 MILES WEST OF CHANDLER. PROJECT LENGTH = 0.170 MILE. Contract: 160139 SH-66 29802(04) SSR-241C(029)SR Contractor: THE QUAPAW COMPANY Engineer: Helton, Matthew Contract Amount: $870,234.40 Letting Date: 03/17/2016 03300 Residency: WEWOKA Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/29/2015 03/10/2017 RESURFACE (ASPHALT) SH-66: FROM THE SH-18 JUNCTION, EXTEND EAST IN CHANDLER. PROJECT LENGTH = 3.470 MILES. Completion Date: Final Est Sub: Construction Status Report 11/10/2015 02/24/2017 05/15/2017 Page 30 Contract: 160141 US-62 31822(04) STP-241C(035)(036)3P Contractor: THE QUAPAW COMPANY Engineer: Helton, Matthew Contract Amount: $1,772,793.92 Letting Date: 03/17/2016 Residency: WEWOKA Contract: 160169 CO.RD. 30020(04) ACSTP-241D(046)CI Contractor: H & H BRIDGE COMPANY Engineer: O&OE Contract Amount: $926,846.70 Letting Date: 04/21/2016 Residency: 03006 OLLAR & OLLAR ENGINEERING County: 03300 RESURFACE (ASPHALT) US-62: FROM 0.2 MILES EAST OF SH-18, EXTEND EAST NEAR MEEKER. PROJECT LENGTH = 9.800 MILES. Completion Date: Final Est Sub: 03/23/2017 BRIDGE AND APPROACHES COUNTY ROAD (NS-338): OVER DEEP FORK RIVER, 0.8 MILE SOUTH OF SH-66 NEAR WELLSTON. PROJECT LENGTH = 0.189 MILE. Completion Date: Final Est Sub: 03/22/2017 Commissioner District: Logan 4 Contracts Completed - Final Estimate Not Processed Contract: 150417 I-35 Residency: 31813(04) SSP-3500(027)(028)(029)SS STILLWATER Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY Engineer: Buchanan, Seth Contract Amount: $9,779,234.00 Letting Date: 11/19/2015 County: 04500 RESURFACE (ASPHALT) I-35: FROM 0.75 MILE NORTH OF US-77 IN GUTHRIE, EXTEND NORTH. PROJECT LENGTH = 16.370 MILES. Completion Date: Final Est Sub: 12/27/2016 Commissioner District: Love 7 Contracts Completed - Final Estimate Not Processed Contract: 130191 I-35 Residency: 28584(07) 07200 SSP-243N(002)SS ARDMORE Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Fuhrmann, Chris Contract Amount: $7,484,000.00 Letting Date: 05/16/2013 GRADE, DRAIN, SURFACE, AND BRIDGE I-35: NORTH HALF OF INTERCHANGE AT WINSTAR BOULEVARD (PHASE 2). PROJECT LENGTH = 0.996 MILE. Contract: 140152 CO.RD. 25091(04) CIRB-143C(088)RB Contractor: OVERLAND CORPORATION Engineer: Fuhrmann, Chris Contract Amount: $4,663,483.55 Letting Date: 04/17/2014 GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (OSWALT ROAD): FROM NS-324, EXTEND EAST. PROJECT LENGTH = 4.688 MILES. Residency: ARDMORE Contract: 160350 IS-35 Residency: 32664(04) HSIPG-210N(054)TR ARDMORE Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Fuhrmann, Chris Contract Amount: $170,543.28 Letting Date: 10/20/2016 07200 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 07200 Construction Status Report 09/08/2016 04/25/2017 01/20/2017 03/24/2017 STRIPING AND PAVEMENT MARKING I-35: FROM THE TEXAS STATE LINE, EXTEND NORTH. Completion Date: Final Est Sub: 03/23/2017 05/15/2017 Page 31 County: Commissioner District: Major 6 Contracts Completed - Final Estimate Not Processed Contract: 130280 US-412 Residency: 10067(08) 06100 NHPPY-247N(002)SS BUFFALO Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY Engineer: Embree, Jerry (Acting) Contract Amount: $8,309,834.13 Letting Date: 08/22/2013 GRADE, DRAIN, AND SURFACE US-412/SH-15: FROM THE WOODWARD COUNTY LINE, EXTEND EAST. PROJECT LENGTH = 2.150 MILES. Contract: 140243 CO.RD. Residency: 06009 28353(04) CIRCUIT ENGR. DISTR. # 8 STP-247D(011)CI Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: CED8 Contract Amount: $732,865.60 Letting Date: 07/24/2014 BRIDGE AND APPROACHES COUNTY ROAD (NS-228): OVER CUDDY CREEK, 5.1 MILES NORTH OF US-412, AND 3.5 MILES WEST OF US-281. PROJECT LENGTH = 0.197 MILE. County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/12/2017 09/27/2016 Commissioner District: Marshall 2 Contracts Completed - Final Estimate Not Processed Contract: 150182 CO.RD. 29990(04) CIRB-248D(021)(022)RB Contractor: OVERLAND CORPORATION Engineer: CED3 Contract Amount: $1,944,925.99 Letting Date: 05/21/2015 Residency: 02013 CIRCUIT ENGR. DISTR. # 3 Completion Date: Final Est Sub: Contract: 150338 CO.RD. Residency: 25105(04) 02013 CIRB-148C(065)RB CIRCUIT ENGR. DISTR. # 3 Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION Engineer: CED3 Contract Amount: $3,208,254.91 Letting Date: 10/15/2015 County: RESURFACE (ASPHALT) - DIVISION II COUNTY ROAD (MCMILLIAN RD): FROM SH-32 NEAR LEBANON, EXTEND NORTH. PROJECT LENGTH = 8.900 MILE. 04/12/2016 03/10/2017 GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-200/LINN ROAD): BEGIN 5.0 MILES EAST OF SH-99, EXTEND EAST AND SOUTH CO., JV PROJECT LENGTH = 4.956 NEARINC MADILL. MILES. Completion Date: Final Est Sub: 07/28/2016 Commissioner District: Mayes 8 Contracts Completed - Final Estimate Not Processed Contract: 130328 SH-28 Residency: 08004 21909(04) JACOBS ENGINEERING STPY-149C(076) Contractor: BECCO CONTRACTORS, INC. Engineer: JACOBS Contract Amount: $6,469,597.75 Letting Date: 09/19/2013 Construction Status Report BRIDGE AND APPROACHES SH-28: OVER ROCK CREEK, 4.5 MILES EAST OF US-69. PROJECT LENGTH = 1.281 MILES. Completion Date: Final Est Sub: 10/20/2015 Page 32 Contract: 130329 SH-82 Residency: 21911(04) STPY-149C(082)SS TETRA TECH Contractor: JENSEN CONSTRUCTION COMPANY Engineer: TETR Contract Amount: $8,935,954.19 Letting Date: 09/19/2013 08002 BRIDGE AND APPROACHES SH-82: OVER GRAND RIVER, 2.7 MILES NORTH OF SH-20. PROJECT LENGTH = 0.911 MILE. Completion Date: Final Est Sub: 09/23/2016 Contract: 140106 CO.RD. Residency: 27813(04) 08004 CIRB-249D(011)RB JACOBS ENGINEERING Contractor: MERIDIAN CONTRACTING, INC. Engineer: JACOBS Contract Amount: $648,002.00 Letting Date: 02/20/2014 BRIDGE AND APPROACHES COUNTY ROAD (EW-60): OVER MURPHY CREEK, 5.8 MILES EAST OF US-412/US-69. PROJECT LENGTH = 0.110 MILES Contract: 150184 US-69 Residency: 30589(04) SBR-249N(022)SB CLAREMORE Contractor: BECCO CONTRACTORS, INC. Engineer: Tyler, Jennifer Contract Amount: $3,171,500.00 Letting Date: 06/18/2015 08300 BRIDGE REHABILITATION - DIVISION VIII US-69: OVER THE UNION PACIFIC RAILROAD, 4.9 MILES NORTH OF SH-20. PROJECT LENGTH = 0.167 MILE. Contract: 160171 CO.RD. Residency: 30102(04) CIRB-249D(027)RB CEC CORP. Contractor: BECCO CONTRACTORS, INC. Engineer: CEC Contract Amount: $1,185,482.01 Letting Date: 04/21/2016 08003 County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/22/2015 12/30/2016 RESURFACE (ASPHALT) COUNTY ROAD (EW-59/OLD SH-33): FROM US-69, EXTEND WEST NEAR CHOUTEAU. PROJECT LENGTH = 5.433 MILES. Completion Date: Final Est Sub: 01/20/2017 Commissioner District: McClain 3 Contracts Completed - Final Estimate Not Processed Contract: 150206 I-35 Residency: 31325(04) 03018 HSIPIG-3500(007) BENCHMARK CONSTR. SERVS., Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: BCS Contract Amount: $234,479.25 Letting Date: 06/18/2015 Contract: 150413 US-77 Residency: 29565(04) SSP-244N(028)SS PURCELL Contractor: M.J. HUGHES CONSTRUCTION, INC. Engineer: Reed, Lucas Contract Amount: $1,627,067.06 Letting Date: 11/19/2015 03200 Construction Status Report SAFETY IMPROVEMENT (CABLE BARRIER) DIVISION III I-35: FROM MILE MARKER 98.5 TO LLC MILE MARKER 99.5, AND FROM MILE MARKER 104.5 TO MILE MARKER 105.5 IN GOLDSBY. Completion Date: Final Est Sub: 09/16/2016 05/31/2017 BRIDGE REHABILITATION US-77: OVER WALNUT CREEK, 0.1 MILE NORTH OF THE US-77/SH-39 JUNCTION IN PURCELL. Completion Date: Final Est Sub: 09/30/2016 Page 33 Contract: 160099 SH-76 Residency: 30565(04) ACSTP-244C(047)3P PURCELL Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Reed, Lucas Contract Amount: $1,761,984.60 Letting Date: 03/17/2016 County: 03200 RESURFACE (ASPHALT) SH-76: FROM 6.74 MILES NORTH OF THE GARVIN COUNTY LINE, EXTEND NORTH NEAR DIBBLE. PROJECT LENGTH = 7.050 MILES. Completion Date: Final Est Sub: 01/31/2017 Commissioner District: McCurtain 2 Contracts Completed - Final Estimate Not Processed Contract: 150143 CO.RD. Residency: 02013 29963(04) CIRCUIT ENGR. DISTR. # 3 CIRB-245C(031)RB Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $3,116,984.71 Letting Date: 04/16/2015 RESURFACE (ASPHALT) COUNTY ROAD (NS-472/GOODWATER ROAD): ON NS-472, FROM SH-3 EXTEND NORTH, THEN EAST ON GOODWATER ROAD. PROJECT LENGTH = 8.000 MILES. Contract: 160037 CO.RD. Residency: 25469(04) 02013 CIRB-145C(173)RB CIRCUIT ENGR. DISTR. # 3 Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: CED3 Contract Amount: $4,007,243.53 Letting Date: 01/21/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-456): OVER LITTLE RIVER, 2.0 MILES NORTH OF US-70 NEAR GARVIN. PROJECT LENGTH = 0.558 MILE. Contract: 160038 CO.RD. Residency: 29909(06) 02013 STP-245C(034)CI CIRCUIT ENGR. DISTR. # 3 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $1,389,751.17 Letting Date: 02/18/2016 RESURFACE (ASPHALT) COUNTY ROAD (OLD SH-98): FROM 3.5 MILES NORTHWEST OF US-70, EXTEND NORTHEAST NEAR VALIANT. PROJECT LENGTH = 4.000 MILES. County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 05/06/2016 02/06/2017 09/16/2016 Commissioner District: McIntosh 1 Contracts Completed - Final Estimate Not Processed Contract: 120345 I-40 Residency: 28958(04) IMG-040-6(375)262TR/* SALLISAW Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Edwards, Carl Contract Amount: $2,661,618.14 Letting Date: 09/20/2012 01200 SAFETY IMPROVEMENT (CABLE BARRIER) I-40: FROM MILE MARKER 256, EXTEND EAST. PROJECT LENGTH = 15.45 MILES Completion Date: Final Est Sub: 10/22/2015 *HSSIPIG-040-6(378)256TR Contract: 140104 SH-09 Residency: 21730(04) STPY-146C(062) MUSKOGEE Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Hagerman, Jeremy Contract Amount: $5,852,647.85 Letting Date: 02/20/2014 01100 Construction Status Report BRIDGE AND APPROACHES SH-9: OVER UNION PACIFIC RAILROAD, 0.4 MILE SOUTHEAST OF US-69B. PROJECT LENGTH = 0.690 MILE. Completion Date: Final Est Sub: 12/07/2016 Page 34 Contract: 140300 US-69 Residency: 30787(04) HSIPG-246N(011)TR CEC CORP. Contractor: GLOVER & ASSOCIATES, INC. Engineer: CEC Contract Amount: $3,780,404.96 Letting Date: 11/20/2014 01003 Contract: 150221 I-40 28286(04) SBR-146N(134)SB Contractor: PBX CORPORATION Engineer: Edwards, Carl Contract Amount: $625,648.66 Letting Date: 06/18/2015 01200 Residency: SALLISAW SAFETY IMPROVEMENTS (CABLE BARRIER) US-69: BEGIN AT THE MUSKOGEE COUNTY LINE, EXTEND SOUTH. PROJECT LENGTH = 14.100 MILES. Completion Date: Final Est Sub: BRIDGE REHABILITATION - DIVISION I I-40: OVER PIERCE ROAD, 9.31 MILES EAST OF THE OKMULGEE COUNTY LINE. Completion Date: Final Est Sub: Contract: 150380 US-69 Residency: 27948(04) SBR-246F(019)SB SALLISAW Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Edwards, Carl Contract Amount: $899,063.76 Letting Date: 11/19/2015 01200 Contract: 150381 US-69B Residency: 28288(05) SBR-246N(020)SB/SBR-146N* SALLISAW Contractor: GIBSON & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $1,774,684.85 Letting Date: 11/19/2015 01200 01/28/2017 02/03/2016 05/03/2017 BRIDGE REHABILITATION US-69/LOTAHWATAH ROAD: MULTIPLE LOCATIONS IN DIVISION I. Completion Date: Final Est Sub: 01/25/2017 BRIDGE REHABILITATION US-69B: OVER US-69, 3.18 MILES AND 6.33 MILES NORTH OF THE PITTSBURG COUNTY LINE IN EUFAULA. Completion Date: Final Est Sub: 03/03/2017 *(135)SB Contract: 160040 SH-09 Residency: 28281(05) SSR-146C(133)SR/SSR-246C* MUSKOGEE Contractor: GLOVER & ASSOCIATES, INC. Engineer: Hagerman, Jeremy Contract Amount: $2,748,023.80 Letting Date: 01/21/2016 01100 RESURFACE (ASPHALT) SH-9: FROM 7.0 MILES EAST OF THE HUGHES COUNTY LINE, EXTEND EAST NEAR EUFAULA. PROJECT LENGTH = 16.476 MILES. Completion Date: Final Est Sub: 02/07/2017 *(016)SR Contract: 160041 I-40 28286(05) SBR-246N(002)SB Contractor: C3 CONSTRUCTION, INC. Engineer: Edwards, Carl Contract Amount: $775,848.57 Letting Date: 01/21/2016 County: Residency: SALLISAW 01200 BRIDGE REHABILITATION I-40: OVER SH-150, 5.8 MILES WEST OF US-69 NEAR CHECOTAH. Completion Date: Final Est Sub: 03/03/2017 Commissioner District: Murray 7 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 35 Contract: 130392 CO.RD. Residency: 25418(04) 07018 CIRB-150D(074)RB BENCHMARK CONSTR. SERVS., Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: BCS Contract Amount: $7,479,000.00 Letting Date: 02/20/2014 GRADE, DRAIN, SURFACE, AND BRIDGE COUNTY ROAD (EW-175): OVER B.N.S.F. LLC RAILROAD AND DRY SANDY CREEK, 2.0 MILES SOUTH OF DAVIS. PROJECT LENGTH = 5.324 MILES. Contract: 150208 I-35 Residency: 31558(04) 07018 HSIPIG-3500(010)TR BENCHMARK CONSTR. SERVS., Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: BCS Contract Amount: $1,386,375.12 Letting Date: 06/18/2015 SAFETY IMPROVEMENT (CABLE BARRIER) DIVISION VII I-35: FROM MILE MARKER 44, LLC EXTEND NORTH NEAR TURNER FALLS. PROJECT LENGTH = 7.08 MILES. County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 11/21/2016 10/03/2016 Commissioner District: Muskogee 1 Contracts Completed - Final Estimate Not Processed Contract: 140366 US-69 Residency: 29786(04) SBR-251N(028)SB MUSKOGEE Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Hagerman, Jeremy Contract Amount: $1,410,133.68 Letting Date: 11/20/2014 01100 Contract: 150300 US-64 Residency: 31666(04) STP-251F(040)3B SALLISAW Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Edwards, Carl Contract Amount: $580,543.10 Letting Date: 09/17/2015 01200 BRIDGE REHABILITATION US-69: OVER THE ARKANSAS RIVER, 3.4 MILES NORTH OF US-62. Completion Date: Final Est Sub: 01/25/2016 05/11/2017 JOINT SEAL/REPAIR US-64/SH-9/SH-16/SH-51/SH-82: AT MULTIPLE LOCATIONS IN DIVISION I. Completion Date: Final Est Sub: 08/03/2016 05/30/2017 Contract: 150383 CO.RD. Residency: 29375(04) 01017 CIRCUIT ENGR. DISTR. # 2 CIRB-251D(041)RB Contractor: MCGUIRE BROTHERS CONSTRUCTION, INC. Engineer: CE2 Contract Amount: $440,125.15 Letting Date: 11/19/2015 BRIDGE AND APPROACHES COUNTY ROAD (EW-095): OVER BUTLER CREEK, 1.4 MILES EAST OF US-69 NEAR SUMMIT. PROJECT LENGTH = 0.226 MILE. Contract: 160145 CO.RD. Residency: 27425(04) 01017 CIRB-251D(053)RB CIRCUIT ENGR. DISTR. # 2 Contractor: BRIDGECO CONTRACTORS, INC. Engineer: CE2 Contract Amount: $810,844.82 Letting Date: 03/17/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-110): OVER SOUTH FORK CREEK, 3.0 MLES EAST OF SH-2 NEAR WEBBERS FALLS. PROJECT LENGTH = 0.359 MILE Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: 06/16/2016 12/29/2016 Page 36 Contract: 160172 CO.RD. 28518(04) CIRB-251D(052)RB Contractor: H & H BRIDGE COMPANY Engineer: CE2 Contract Amount: $478,028.79 Letting Date: 04/21/2016 Residency: 01017 CIRCUIT ENGR. DISTR. # 2 Contract: 160173 US-64 30649(04) NHPP-251N(055)SS Contractor: NOVA PAINTINGS, LLC Engineer: EST Contract Amount: $385,288.00 Letting Date: 04/21/2016 Residency: 01001 ENGR. SERV. & TESTING Completion Date: Final Est Sub: 01100 11/30/2016 BRIDGE PAINTING US-64: OVER THE UNION PACIFIC RAILROAD, 0.2 MILE SOUTH OF THE US-165 JUNCTION IN MUSKOGEE. Completion Date: Final Est Sub: Contract: 160374 CO. RD. Residency: 31784(04) SAP-251N(063) MUSKOGEE Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Engineer: Hagerman, Jeremy Contract Amount: $89,840.00 Letting Date: 10/20/2016 County: BRIDGE AND APPROACHES COUNTY RD (NS-436): OVER SOUTH FORK CREEK, 6.0 MILES NORTH OF THE SH-2 JUNCTION NEAR PORUM. PROJECT LENGTH = 0.208 MILE 02/03/2017 BRIDGE REPAIR COUNTY ROAD (EW-96): VEHICLE IMPACT DAMAGE OVER US-69, 5.0 MILES NORTH OF THE MCINTOSH COUNTY LINE. Completion Date: Final Est Sub: 02/28/2017 Commissioner District: Nowata 8 Contracts Completed - Final Estimate Not Processed Contract: 090566 US-169 Residency: 09488(04) 08300 NHY-030N(011) CLAREMORE Contractor: DONDLINGER & SONS CONSTRUCTION CO., INC. Engineer: Tyler, Jennifer Contract Amount: $12,216,022.60 Letting Date: 10/15/2009 GRADE, DRAIN, SURFACE AND BRIDGE US-169: FROM TALALA, EXTEND NORTH TO THE NOWATA COUNTY LINE. PROJECT LENGTH = 5.246 MILES. Contract: 110441 US-169 Residency: 23129(04) BRFY-153N(147) CLAREMORE Contractor: BECCO CONTRACTORS, INC. Engineer: Tyler, Jennifer Contract Amount: $3,277,995.45 Letting Date: 09/15/2011 BRIDGE REHABILITATION US-169: OVER CALIFORNIA CREEK, 3.5 MILES NORTH OF THE US-60 JUNCTION. PROJECT LENGTH = 0.275 MILE. Contract: 150385 CO.RD. 28556(04) STP-253D(030)CI/STP-174D* Contractor: RRY SERVICES, LLC Engineer: C&KI Contract Amount: $1,242,029.25 Letting Date: 11/19/2015 08300 Residency: 08007 CRAIG & KEITHLINE, INC. Completion Date: Final Est Sub: Completion Date: Final Est Sub: 09/05/2012 01/12/2017 07/19/2013 BRIDGE AND APPROACHES COUNTY RD (NS-411): OVER OPPOSUM CR, 2.1 MI S OF KANSAS S/L. COUNTY RD (NS-401): OVER UNNAMED CR, 1.9 MI S OF KANSAS S/L. PROJECT LENGTH = 0.428 MILE Completion Date: Final Est Sub: 02/10/2017 *(049)CI Construction Status Report Page 37 Contract: 160102 CO.RD. Residency: 27814(04) 08007 CIRB-253C(031)RB CRAIG & KEITHLINE, INC. Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: C&KI Contract Amount: $1,569,465.40 Letting Date: 02/18/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-406): OVER CURL CREEK, 1.5 MILES SOUTH OF US-60 NEAR NOWATA. PROJECT LENGTH = 0.672 MILE. Contract: 160103 CO.RD. 27817(04) CIRB-153D(204)RB Contractor: H & H BRIDGE COMPANY Engineer: C&KI Contract Amount: $559,927.17 Letting Date: 02/18/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-409): OVER OPOSSUM CREEK, 1.5 MILES SOUTH OF THE KANSAS STATE LINE NEAR NOWATA. PROJECT LENGTH = 0.249 MILE. County: Residency: 08007 CRAIG & KEITHLINE, INC. Completion Date: Final Est Sub: Completion Date: Final Est Sub: 02/10/2017 11/15/2016 04/26/2017 Commissioner District: Okfuskee 3 Contracts Completed - Final Estimate Not Processed Contract: 130283 CO.RD. Residency: 25425(04) CIRB-154C(120)RB WEWOKA Contractor: BECCO CONTRACTORS, INC. Engineer: Helton, Matthew Contract Amount: $3,611,768.88 Letting Date: 08/22/2013 03300 Contract: 160253 CO.RD. Residency: 30673(04) CIRB-254C(034)RB WEWOKA Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Helton, Matthew Contract Amount: $1,387,223.17 Letting Date: 07/21/2016 03300 County: GRADE, DRAIN, AND SURFACE COUNTY RD (EW-96/MICAWBER RD): BEGIN 10.0 MI W OF SH-48 AND 1.0 MI S OF THE OKFUSKEE C/L, EXTEND EAST. PROJECT LENGTH = 4.015 MILES. Completion Date: Final Est Sub: 05/04/2016 RESURFACE (ASPHALT) COUNTY ROAD (NS-377): FROM SH-56, EXTEND NORTH IN OKEMAH. PROJECT LENGTH = 4.661 MILES. Completion Date: Final Est Sub: 12/01/2016 Commissioner District: Oklahoma 4 Contracts Completed - Final Estimate Not Processed GRADE, DRAIN, SURFACE, BRIDGE, AND Contract: 090501 I-40 Residency: 04200 17428(22) RAILROAD I-40: FROM EAST OF WESTERN EL RENO OKCY-XTWN(003)TI AVENUE, EXTEND EAST. PROJECT LENGTH = Contractor: ALLEN CONTR., INC./SHERWOOD CONST. CO, INC./MANHATTAN & 1.072RD. MILES. Engineer: Harlin, Chris Contract Amount: $63,211,594.70 Completion Date: 08/22/2014 Letting Date: 07/23/2009 Final Est Sub: 04/10/2017 Contract: 120279 I-40 Residency: 17428(80) OKCY-XTWN(070) EL RENO Contractor: ALLEN CONTRACTING, INC. Engineer: Harlin, Chris Contract Amount: $8,269,050.20 Letting Date: 06/20/2013 04200 Construction Status Report GRADE, DRAIN, SURFACE, AND BRIDGE I-40: FROM PENNSYLVANIA AVENUE EXTEND EAST TO WESTERN AVENUE. PROJECT LENGTH = 0.924 MILE. Completion Date: Final Est Sub: 07/24/2014 05/11/2017 Page 38 Contract: 130249 I-40 Residency: 17428(59) 04600 OKCY-XTWN(047)SS OKLAHOMA CITY Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Howell, Terry Contract Amount: $26,470,991.89 Letting Date: 09/19/2013 GRADE, DRAIN, SURFACE, AND BRIDGE I-40: MULTIPLE RAMPS AND BRIDGES AT THE I-35/I-235 JUNCTION. PROJECT LENGTH = 1.530 MILES. Contract: 140059 CT.ST. Residency: 29309(04) 04600 STP-255A(087)AG OKLAHOMA CITY Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Howell, Terry Contract Amount: $3,041,862.75 Letting Date: 03/20/2014 SAFETY IMPROVEMENT (I.T.S.) CITY STREET (2ND STREET/EDMOND ROAD): INTELLIGENT TRANSPORTATION CORRIDOR FROM SANTA FE AVENUE TO SAINTS BOULEVARD IN EDMOND. PROJECT LENGTH = 5.453 MILES. Contract: 140271 I-44 30423(04) NHPPIY-0044-1(130) Contractor: RESTEK, INC. Engineer: Harlin, Chris Contract Amount: $2,598,314.45 Letting Date: 08/21/2014 BRIDGE REHABILITATION I-44: ON THE BELLE ISLE BRIDGES AND RAMPS BETWEEN WESTERN AVE AND PENNSYLVANIA AVE IN OKLAHOMA CITY. Residency: EL RENO 04200 Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: Contract: 140332 SH-74 Residency: 14964(04) STPY-055C(861)SS EDMOND Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Hubbard, Tom Contract Amount: $32,403,535.17 Letting Date: 10/16/2014 04400 10/19/2016 04/24/2017 03/29/2016 04/17/2017 GRADE, DRAIN, SURFACE, AND BRIDGE SH-74: FROM MEMORIAL ROAD, EXTEND NORTH. PROJECT LENGTH = 3.181 MILES. Completion Date: Final Est Sub: 10/26/2016 GRADE, DRAIN, SURFACE, AND BRIDGE CITY Contract: 150026 CT.ST. Residency: 17428(60) 04600 STREET (OKC BOULEVARD): E.K. GAYLORD OKC-XTWN(048)(006)SS OKLAHOMA CITY BLVD. FROM RENO AVE., EXTEND SOUTH. Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC.OKC (JV)BOULEVARD AND 3RD ST. FROM B.N.S.F. RAILROAD, EXTEND EAST TO Engineer: Howell, Terry NORTHBOUND I-35. PROJECT LENGTH = Contract Amount: $40,611,253.81 1.184 MILES. Completion Date: 02/02/2017 Letting Date: 01/22/2015 Final Est Sub: Contract: 150108 CT.ST. Residency: 17827(05) STP-155A(878)AG EDMOND Contractor: SCHWARZ PAVING CO., INC. Engineer: Hubbard, Tom Contract Amount: $3,043,565.50 Letting Date: 03/19/2015 04400 Contract: 150109 CT.ST. Residency: 04001 19312(05) ENGR. SERV. & TESTING STP-155A(439)AG Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION Engineer: EST Contract Amount: $11,730,824.57 Letting Date: 05/21/2015 Construction Status Report INTERSECTION MODIFICATION CITY STREETS: AT THE INTERSECTION OF MACARTHUR AVENUE AND N.W. 50TH STREET IN WARR ACRES. PROJECT LENGTH = 0.223 MILE. Completion Date: Final Est Sub: 12/09/2016 05/04/2017 GRADE, DRAIN, SURFACE, AND BRIDGE DIVISION IV CITY STREETS: ON MERIDIAN AVE, FROM SW 29TH TO THE OKLAHOMA CO., INC JV RIVER IN OKLAHOMA CITY. PROJECT LENGTH = 1.253 MILES. Completion Date: Final Est Sub: 05/31/2017 Page 39 INTERSECTION MODIFICATION AND TRAFFIC Contract: 150111 US-77 Residency: 25547(04) 04400 SIGNAL US-77 (BROADWAY EXTENSION): AT STP-155A(646)AG EDMOND THE INTERSECTION OF 33RD STREET IN Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC.EDMOND. (JV) PROJECT LENGTH = 0.678 MILE. Engineer: Hubbard, Tom Contract Amount: $5,144,114.00 Completion Date: 02/03/2017 Letting Date: 03/19/2015 Final Est Sub: Contract: 150249 I-44 Residency: 31623(04) SSP-4400(007)SS EL RENO Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Harlin, Chris Contract Amount: $13,479,630.70 Letting Date: 05/20/2015 04200 BRIDGE REHABILITATION I-44: BRIDGE REHABILITATION ON BELLE ISLE BRIDGES, 1.0 MILE WEST OF I-235. Completion Date: Final Est Sub: 04/11/2016 Contract: 150339 I-35 Residency: 21034(05) 04600 HSIPG-3500(013)IT OKLAHOMA CITY Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC Engineer: Howell, Terry Contract Amount: $1,339,751.30 Letting Date: 10/15/2015 SAFETY IMPROVEMENT (ITS) I-35/I-235: AT MULTIPLE LOCATIONS IN OKLAHOMA CITY. Contract: 150390 SH-66 Residency: 29137(04) 04600 SBR-255A(017)SS/SBR-255N* OKLAHOMA CITY Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Howell, Terry Contract Amount: $1,397,464.33 Letting Date: 11/19/2015 BRIDGE REHABILITATION SH-66: SH-66 WESTBOUND RAMP OVER SH-3 IN OKC. NW 10TH ST: OVER I-44, 0.10 MILE EAST OF PORTLAND AVE IN OKC. PROJECT LENGTH = 0.062 MILE. Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/18/2017 07/31/2016 *(019)SB Contract: 150421 I-240 Residency: 31818(04) 04600 SSP-2400(003)SS/SSP-4000* OKLAHOMA CITY Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY Engineer: Howell, Terry Contract Amount: $8,899,400.00 Letting Date: 11/19/2015 RESURFACE (ASPHALT) I-40/I-240: AT MULTIPLE LOCATIONS IN OKLAHOMA CITY. PROJECT LENGTH = 14.653 MILES. Completion Date: Final Est Sub: 10/03/2016 *(020)(021)SS Contract: 160048 I-40 23310(07) NHPPI-4000-(019)RW Contractor: MARK WILDS Engineer: Howell, Terry Contract Amount: $49,300.00 Letting Date: 01/21/2016 Residency: 04600 OKLAHOMA CITY Contract: 160052 CT.ST. 31499(04) STP-255B(349)AG Contractor: ATLAS PAVING COMPANY Engineer: Howell, Terry Contract Amount: $704,479.30 Letting Date: 01/21/2016 Residency: 04600 OKLAHOMA CITY RIGHT-OF-WAY CLEARANCE I-40: FROM 2.3 MILES EAST OF I-35, EXTEND EAST IN DEL CITY. PROJECT LENGTH = 0.830 MILEPREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED. BOTH BID EXPRESS AND WRITTEN BIDS WILL BE ACCEPTABLE. Completion Date: Final Est Sub: Construction Status Report 03/13/2017 RESURFACE (ASPHALT) CITY STREET (NORTH ROCKWELL AVENUE): FROM WEST RENO AVENUE, EXTEND NORTH. PROJECT LENGTH = 1.032 MILES Completion Date: Final Est Sub: 10/06/2016 Page 40 Contract: 160105 I-40 30282(06) STP-NBIP(496)3B Contractor: JK INDUSTRIES, INC. Engineer: TETR Contract Amount: $845,756.00 Letting Date: 03/17/2016 Residency: TETRA TECH Contract: 160146 CT.ST. 30424(04) SSP-255A(351)SS/SBR-255N* Contractor: PBX CORPORATION Engineer: Howell, Terry Contract Amount: $2,598,687.09 Letting Date: 03/17/2016 Residency: 04600 OKLAHOMA CITY 04002 BRIDGE PAINTING I-40/US-62/SH-33/SH-152: AT MULTIPLE LOCATIONS IN DIVISION IV. Completion Date: Final Est Sub: 02/02/2017 BRIDGE REHABILITATION LINCOLN BLVD: OVER DEEP FORK CREEK, 0.1 MI S OF I-44 IN OKC. I-240: OVER WESTMINSTER ROAD, 2.9 MILES W OF I-40 IN OKC. Completion Date: Final Est Sub: 04/06/2017 *(361)SB Contract: 160148 I-35 Residency: 31023(04) SSP-255F(378)SS PERRY Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Zachary, Ted Contract Amount: $1,555,819.00 Letting Date: 06/16/2016 04100 Contract: 160205 I-35 32384(04) HSIPIG-255H(366)TR Contractor: JLT CONTRACTING, LLC Engineer: Harlin, Chris Contract Amount: $275,254.00 Letting Date: 06/16/2016 04200 County: Residency: EL RENO PAVEMENT REHABILITATION I-35/US-77/SH-74/SH-132/SH-152: AT MULTIPLE LOCATIONS IN DIVISION IV. Completion Date: Final Est Sub: 03/08/2017 SAFETY IMPROVEMENT (IMPACT ATTENUATORS) I-35/I-40/I-44/I-240: AT MULTIPLE LOCATIONS IN DIVISION IV. Completion Date: Final Est Sub: 12/24/2016 Commissioner District: Okmulgee 1 Contracts Completed - Final Estimate Not Processed PAVEMENT REHABILITATION AND BRIDGE Contract: 110492 I-40 Residency: 20908(05) 01100 PAINTING I-40: FROM US-75 EXTEND EAST. MUSKOGEE IMY-0040-6(370)233/IMY-* PROJECT LENGTH = 6.347 MILES. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV Engineer: Hagerman, Jeremy Contract Amount: $24,494,383.94 Completion Date: 01/31/2014 Letting Date: 10/20/2011 Final Est Sub: 04/18/2017 PAVEMENT REHABILITATION - DIVISION I Contract: 150175 I-40 Residency: 27970(04) 01100 I-40/US-75B: ON I-40, FROM MILE MARKER NHPPI-4000-(005)SS/HSIPI* MUSKOGEE 237.41 EXTEND EAST, AND ON US-75B, FROM Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV NORTHEAST IN HENRYETTA. I-40 EXTEND PROJECT LENGTH = 7.020 MILES. Engineer: Hagerman, Jeremy Contract Amount: $15,602,123.20 Completion Date: 02/01/2017 Letting Date: 05/21/2015 Final Est Sub: *G-0040-6(380)238TR Construction Status Report Page 41 Contract: 160106 US-75 Residency: 29164(04) ACNHPP-256N(012)3P MUSKOGEE Contractor: IOWA CIVIL CONTRACTING, INC. Engineer: Hagerman, Jeremy Contract Amount: $1,553,249.79 Letting Date: 03/17/2016 County: 01100 PAVEMENT REHABILITATION (P.C. CONCRETE) US-75: FROM THE SH-16 JCT, EXTEND NORTH NEAR WINCHESTER. PROJECT LENGTH = 7.835 MILES. Completion Date: Final Est Sub: 01/05/2017 Commissioner District: Osage 8 Contracts Completed - Final Estimate Not Processed Contract: 130395 US-60 Residency: 08400 24287(04) SAND SPRINGS NHPPY-257N(020)SS Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Williams, Mark J. Contract Amount: $36,982,702.17 Letting Date: 11/21/2013 GRADE, DRAIN, SURFACE, AND BRIDGE US-60: FROM 2.0 MILES EAST OF SH-99, EXTEND EAST. PROJECT LENGTH = 5.821 MILES. Contract: 150185 SH-18 29765(04) SBR-257B(041)SB Contractor: PBX CORPORATION Engineer: Williams, Mark J. Contract Amount: $695,185.20 Letting Date: 05/21/2015 BRIDGE REHABILITATION - DIVISION VIII SH-18: OVER LITTLE CHIEF CREEK, 2.5 MILES SOUTH OF US-60 NEAR BURBANK. Residency: 08400 SAND SPRINGS Completion Date: Final Est Sub: Completion Date: Final Est Sub: 01/30/2017 05/31/2017 Contract: 150239 US-60 Residency: 27088(04) 08400 NHPP-257N(034)SS SAND SPRINGS Contractor: A. M. COHRON & SON, INC. Engineer: Williams, Mark J. Contract Amount: $2,789,326.82 Letting Date: 07/23/2015 BRIDGE REHABILITATION US-60: OVER CLEAR CREEK, 1.5 MILES WEST OF SH-99 NEAR PAWHUSKA. PROJECT LENGTH = 0.110 MILE. Contract: 160392 US-60 Residency: 32801(04) 08020 POE AND ASSOCIATES HSIPG-258F(029)TR Contractor: DIRECT TRAFFIC CONTROL INC. Engineer: ZPAA Contract Amount: $83,697.14 Letting Date: 10/20/2016 SAFETY IMPROVEMENT (RUMBLE STRIP AND PAVEMENT MARKING) US-59/US-60/SH-99: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 20.00 MILES County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 05/16/2017 05/11/2017 Commissioner District: Ottawa 8 Contracts Completed - Final Estimate Not Processed Contract: 120435 US-60 Residency: 23157(04) BRFY-158B(104) CLAREMORE Contractor: B & B BRIDGE COMPANY, LLC Engineer: Tyler, Jennifer Contract Amount: $1,799,981.12 Letting Date: 11/15/2012 08300 Construction Status Report BRIDGE REHABILITATION US-60: OVER US-59 7.5 MILES NORTHWEST OF THE DELAWARE COUNTY LINE. PROJECT LENGTH = 0.148 MILES. Completion Date: Final Est Sub: 06/30/2015 Page 42 Contract: 130335 SH-10 Residency: 21918(04) 08007 STPY-158C(077) CRAIG & KEITHLINE, INC. Contractor: B & B BRIDGE COMPANY, LLC Engineer: C&KI Contract Amount: $3,307,070.67 Letting Date: 09/19/2013 BRIDGE AND APPROACHES SH-10: OVER SYCAMORE CREEK, 8.3 MILES NORTH OF THE DELAWARE COUNTY LINE. PROJECT LENGTH = 0.487 MILES Contract: 130396 CO.RD. Residency: 25092(04) STP-158C(147)CI GARVER, LLC. Contractor: A. M. COHRON & SON, INC. Engineer: GARV Contract Amount: $4,796,045.57 Letting Date: 11/21/2013 BRIDGE AND APPROACHES COUNTY ROAD (EW-6): OVER NEOSHO RIVER, 2.3 MILES EAST OF THE CRAIG COUNTY LINE. PROJECT LENGTH = 0.593 MILE. 08011 Contract: 150240 CO.RD. Residency: 29417(04) 08004 STP-258D(017)CI JACOBS ENGINEERING Contractor: B & B BRIDGE COMPANY, LLC Engineer: JACOBS Contract Amount: $609,343.06 Letting Date: 11/19/2015 County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/29/2016 12/01/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-456): OVER HUDSON CREEK, 1.6 MILES SOUTH OF THE WILL ROGERS TURNPIKE NEAR MIAMI. PROJECT LENGTH = 0.192 MILE. Completion Date: Final Est Sub: 12/27/2016 Commissioner District: Pawnee 8 Contracts Completed - Final Estimate Not Processed Contract: 130377 SH-18 20895(04) STPY-159B(036) Contractor: OBC, INC. Engineer: Williams, Mark J. Contract Amount: $13,224,284.02 Letting Date: 10/17/2013 Residency: 08400 SAND SPRINGS BRIDGE AND APPROACHES SH-18: OVER ARKANSAS RIVER, FROM EAST EDGE OF THE TOWN OF RALSTON, EXTEND EAST AND NORTH. PROJECT LENGTH = 0.946 MILE. Completion Date: Final Est Sub: 09/12/2016 Contract: 150322 US-64 Residency: 30320(04) 08400 NHPP-259N(015)SS SAND SPRINGS Contractor: M.J. HUGHES CONSTRUCTION, INC. Engineer: Williams, Mark J. Contract Amount: $3,463,503.96 Letting Date: 09/17/2015 RETAINING AND SOUND WALLS US-64: BEGIN 1.0 MILE EAST OF THE US-64/US-412 JUNCTION, EXTEND EAST NEAR WESTPORT. PROJECT LENGTH = 0.247 MILE Contract: 160110 CO.RD. 29928(04) CIRB-259D(027)RB Contractor: K & R BUILDERS, INC. Engineer: JACOBS Contract Amount: $668,869.25 Letting Date: 02/18/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-359): OVER A TRIBUTARY TO KENNY CREEK, 2.0 MILES SOUTH OF US-412 NEAR JENNINGS. PROJECT LENGTH = 0.132 MILE County: Residency: 08004 JACOBS ENGINEERING Completion Date: Final Est Sub: Completion Date: Final Est Sub: 03/29/2017 01/18/2017 Commissioner District: Payne 4 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 43 GRADE, DRAIN, AND SURFACE COUNTY Contract: 150241 CO.RD. Residency: 22169(09) 04500 ROAD (NS-330/COUNTRY CLUB ROAD): FROM CIRB-160D(183)RB STILLWATER 1.3 MILES NORTH OF SH-51 IN STILLWATER, Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC.EXTEND (JV) NORTH. PROJECT LENGTH = 0.994 MILE. Engineer: Buchanan, Seth Contract Amount: $3,951,766.42 Completion Date: 12/19/2016 Letting Date: 07/23/2015 Final Est Sub: 03/27/2017 Contract: 150393 CT.ST. Residency: 31415(04) STP-260B(019)MS STILLWATER Contractor: ALLEN CONTRACTING, INC. Engineer: Buchanan, Seth Contract Amount: $5,329,157.92 Letting Date: 11/19/2015 County: 04500 GRADE, DRAIN, SURFACE, AND BRIDGE CITY STREET: ON WESTERN RD, FROM HALL OF FAME AVE EXT N, AND ON HALL OF FAME AVE, FROM VIRGINIA AVE EXT E IN STILLWATER. PROJECT LENGTH = 0.691 MILE. Completion Date: Final Est Sub: 05/03/2017 Commissioner District: Pittsburg 2 Contracts Completed - Final Estimate Not Processed Contract: 150213 CT.ST. 28995(04) PLHD-261N(013)DC Contractor: L & N BRIDGE, LLC Engineer: Plymate, Larry Contract Amount: $6,324,152.87 Letting Date: 06/18/2015 Residency: MCALESTER 02400 INTERCHANGE - DIVISION II CITY STREET (C-TREE ROAD): AT THE US-69 INTERCHANGE, IN SAVANNA. PROJECT LENGTH = 0.255 MILE. Completion Date: Final Est Sub: 05/24/2017 Contract: 150242 CO.RD. Residency: 22949(04) 02013 STP-161C(164)CI CIRCUIT ENGR. DISTR. # 3 Contractor: BRIDGECO CONTRACTORS, INC. Engineer: CED3 Contract Amount: $756,403.28 Letting Date: 07/23/2015 BRIDGE AND APPROACHES COUNTY ROAD (NS-399.5); OVER BULL CREEK, 1.0 MILE SOUTH AND 3.0 MILES EAST OF SCIPIO. PROJECT LENGTH = 0.245 MILE. Contract: 150394 CO.RD. Residency: 22491(04) 02013 STP-161D(155)CI CIRCUIT ENGR. DISTR. # 3 Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $372,190.50 Letting Date: 01/21/2016 BRIDGE AND APPROACHES COUNTY ROAD (NS-418): OVER UNNAMED CREEK, 5.0 MILES NORTH OF THE PUSHMATAHA COUNTY LINE NEAR HARTSHORNE. PROJECT LENGTH = 0.161 MILE. Contract: 150398 CO.RD. Residency: 29994(04) 02013 CIRB-261C(040)(041)RB CIRCUIT ENGR. DISTR. # 3 Contractor: JOB CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $1,761,627.82 Letting Date: 11/19/2015 RESURFACE (ASPHALT) COUNTY RD(TANNEHILL RD): FROM INDIAN NATION TPK, EXT WEST. COUNTY RD(SCIPIO RD): FROM TANNEHILL RD, EXT NORTH. PROJECT LENGTH = 8.353 MILES. Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 07/12/2016 06/14/2016 08/11/2016 Page 44 Contract: 160056 SH-09 Residency: 24333(13) STP-NBIP(493)SS TETRA TECH Contractor: ELITE INDUSTRIAL PAINTING, INC. Engineer: TETR Contract Amount: $697,314.00 Letting Date: 01/21/2016 02002 Contract: 160176 SH-09 Residency: 30409(04) STP-261C(058)SS MCALESTER Contractor: T. MCDONALD CONSTRUCTION, INC. Engineer: Plymate, Larry Contract Amount: $1,349,928.35 Letting Date: 04/21/2016 02400 Completion Date: Final Est Sub: 07/25/2016 02/06/2017 INTERSECTION MODIFICATION SH-9: AT THE INTERSECTION OF SH-9A, NEAR EUFAULA. PROJECT LENGTH = 0.639 MILE. Completion Date: Final Est Sub: Contract: 160297 CO.RD. Residency: 22538(04) 02013 STP-161D(157)CI CIRCUIT ENGR. DISTR. # 3 Contractor: HUB CONSTRUCTION, INC. Engineer: CED3 Contract Amount: $346,958.00 Letting Date: 08/18/2016 County: BRIDGE PAINTING SH-9: OVER LONGTOWN CREEK, 3.3 MI EAST OF THE MCINTOSH C/L. SH-31: OVER BLUE CREEK, 13.05 MI EAST OF THE US-270 JCT. 05/05/2017 BRIDGE AND APPROACHES COUNTY ROAD (D1645): OVER BUCK CREEK, 1.1 MILES SOUTHEAST OF THE INDIAN NATION TURNPIKE NEAR PITTSBURG. PROJECT LENGTH = 0.152 MILE. Completion Date: Final Est Sub: 05/30/2017 Commissioner District: Pontotoc 3 Contracts Completed - Final Estimate Not Processed Contract: 120294 CO.RD. Residency: 27268(04) BRF-162C(205)CI ADA Contractor: HUB CONSTRUCTION, INC. Engineer: Russell, Julie Contract Amount: $759,293.10 Letting Date: 09/20/2012 03100 BRIDGE AND APPROACHES COUNTY ROAD (NS-344.5): OVER SANDY CREEK, 1.0 MILE SOUTH OF VANOSS. PROJECT LENGTH = 0.349 MILE. Completion Date: Final Est Sub: 09/05/2014 PAVEMENT REHABILITATION (PC CONCRETE) Contract: 130165 SH-01 Residency: 29906(04) 03100 SH-1: FROM WEST 4TH STREET IN ADA, ADA MC-262N(014) EXTEND NORTH. PROJECT LENGTH = 0.36 Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., MILE.INC JV Engineer: Russell, Julie Contract Amount: $1,067,618.82 Completion Date: 03/04/2014 Letting Date: 04/18/2013 Final Est Sub: RESURFACE (CONCRETE) SH-3W: FROM Contract: 140276 SH-3W Residency: 29702(04) 03100 SH-59, EXTEND NORTH. PROJECT LENGTH = SSR-262B(024)SR ADA 2.533 MILES. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV Engineer: Russell, Julie Contract Amount: $3,177,536.87 Completion Date: 07/31/2016 Letting Date: 08/21/2014 Final Est Sub: Construction Status Report Page 45 Contract: 140373 SH-19 Residency: 27988(04) STPY-262B(025)SS ADA Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Russell, Julie Contract Amount: $5,793,312.49 Letting Date: 11/20/2014 03100 Contract: 140374 SH-19 Residency: 30834(04) MC-262B(021) ADA Contractor: SCHIRALLI CONSTRUCTION CORP. Engineer: Russell, Julie Contract Amount: $617,671.80 Letting Date: 03/19/2015 03100 BRIDGE AND APPROACHES SH-19: OVER BIG SANDY CREEK, 1.0 MILE EAST OF SH-3W. PROJECT LENGTH = 0.241 MILE. Completion Date: Final Est Sub: 05/25/2016 INTERSECTION MODIFICATION SH-19: AT THE INTERSECTION OF RANGELINE ROAD, 1.0 MILE WEST OF JUNCTION SH-19/SH-3 IN ADA. PROJECT LENGTH = 0.588 MILE. Completion Date: Final Est Sub: 10/06/2016 Contract: 150072 CO.RD. Residency: 27267(04) 03100 STP-162C(204)CI ADA Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC. Engineer: Russell, Julie Contract Amount: $2,583,219.33 Letting Date: 02/19/2015 BRIDGE AND APPROACHES COUNTY ROAD (NS-364): OVER CLEAR BOGGY CREEK, 2.0 MILES SOUTH OF SH-3. PROJECT LENGTH = 0.695 MILE. Contract: 150177 SH-3 31575(04) MC-262N(028) Contractor: PBX CORPORATION Engineer: Russell, Julie Contract Amount: $202,912.56 Letting Date: 05/21/2015 BRIDGE REPAIR - DIVISION III SH-3: OVER BNSF RAILROAD, 0.4 MILE SOUTHEAST OF SH-1 IN ADA. PROJECT LENGTH = 0.065 MILE. Residency: ADA Completion Date: Final Est Sub: Contract: 150306 SH-1 Residency: 31589(04) SAP-262C(029) ADA Contractor: TRAFFIC & LIGHTING SYSTEMS, LLC Engineer: Russell, Julie Contract Amount: $101,522.00 Letting Date: 10/15/2015 County: 03100 Completion Date: Final Est Sub: 03100 07/25/2016 11/12/2015 05/11/2017 TRAFFIC SIGNALS SH-1: AT THE INTERSECTION OF 33RD STREET IN ADA. Completion Date: Final Est Sub: 05/12/2016 01/30/2017 Commissioner District: Pottawatomie 3 Contracts Completed - Final Estimate Not Processed Contract: 120242 CT.ST. Residency: 22908(05) STPY-163A(356)SG WEWOKA Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Helton, Matthew Contract Amount: $10,314,639.29 Letting Date: 11/15/2012 03300 Construction Status Report GRADE, DRAIN, AND SURFACE CITY STREET (KICKAPOO STREET): FROM WEST KICKAPOO SPUR STREET, EXTEND NORTH TO WEST MACARTHUR STREET IN THE CITY OF SHAWNEE. PROJECT LENGTH = 1.245 MILES. Completion Date: Final Est Sub: 08/25/2016 Page 46 Contract: 130144 SH-3W 20309(04) STPY-162B(092)IP Contractor: OBC, INC. Engineer: Russell, Julie Contract Amount: $11,411,300.49 Letting Date: 03/21/2013 Residency: ADA 03100 BRIDGE AND APPROACHES SH-3W: OVER CANADIAN RIVER, 1.07 MILES NORTH OF US-177. PROJECT LENGTH = 0.750 MILE. Completion Date: Final Est Sub: Contract: 150073 CT.ST. Residency: 18865(04) STP-163B(075)UR WEWOKA Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Helton, Matthew Contract Amount: $3,725,847.39 Letting Date: 02/19/2015 03300 Contract: 150074 SH-102 Residency: 21788(04) STP-163C(165)SS WEWOKA Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Helton, Matthew Contract Amount: $11,209,225.00 Letting Date: 02/19/2015 03300 04/09/2015 RECONSTRUCT - ADD LANES CITY STREET (GORDON COOPER DRIVE): FROM BOB COUCH DRIVE, EXTEND NORTH TO BENSON PARK STREET IN TECUMSEH. PROJECT LENGTH = 1.106 MILES. Completion Date: Final Est Sub: 07/14/2016 WIDEN AND RESURFACE SH-102: FROM 3.06 MILES NORTH OF SH-9, EXTEND NORTH. PROJECT LENGTH = 4.596 MILES. Completion Date: Final Est Sub: 03/13/2017 Contract: 150307 I-40 Residency: 31662(04) 03001 STP-263F(029)3B ENGR. SERV. & TESTING Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Engineer: EST Contract Amount: $1,044,891.95 Letting Date: 09/17/2015 JOINT SEAL/REPAIR I-40/US-177/SH-19/SH-74/SH-99/SH-270: AT MULTIPLE LOCATIONS IN DIVISION III. Contract: 160210 CO.RD. 30029(04) CIRB-263D(040)RB Contractor: CP3 ENTERPRISES, INC. Engineer: Helton, Matthew Contract Amount: $305,220.24 Letting Date: 05/19/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER MARCUM CREEK, 3.5 MILES WEST OF THE SEMINOLE COUNTY LINE NEAR MAUD. PROJECT LENGTH = 0.198 MILE. Residency: WEWOKA Completion Date: Final Est Sub: Contract: 160331 US-177 Residency: 32430(04) HSIPG-263N(037)TR ADA Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Russell, Julie Contract Amount: $101,440.00 Letting Date: 09/15/2016 County: 03300 Completion Date: Final Est Sub: 03100 10/21/2016 05/08/2017 01/19/2017 05/16/2017 TRAFFIC SIGNALS US-177/SH-270: AT THE INTERSECTION OF 45TH STREET AND HARDESTY ROAD IN THE CITY OF SHAWNEE. Completion Date: Final Est Sub: 02/28/2017 Commissioner District: Pushmataha 2 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 47 Contract: 150399 CO.RD. Residency: 29968(04) 02013 CIRB-264C(034)RB CIRCUIT ENGR. DISTR. # 3 Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: CED3 Contract Amount: $2,271,812.50 Letting Date: 11/19/2015 County: RESURFACE (ASPHALT) COUNTY ROAD(NS-409): FROM 3.5 MILES NORTH OF SH-3, EXTEND NORTH NEAR ANTLERS. PROJECT LENGTH = 4.605 MILES. Completion Date: Final Est Sub: 08/11/2016 Commissioner District: Roger Mills 5 Contracts Completed - Final Estimate Not Processed Contract: 150078 SH-33 Residency: 24359(04) CLINTON STP-165C(087)(090)SS Contractor: MUNOZ CONSTRUCTION, INC. Engineer: Davis, Shawn Contract Amount: $2,768,821.45 Letting Date: 02/19/2015 05100 Contract: 160332 US-283 Residency: 31699(04) STP-265B(015)3B CLINTON Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Engineer: Davis, Shawn Contract Amount: $337,024.70 Letting Date: 09/15/2016 05100 County: BRIDGE AND APPROACHES SH-33: OVER TURKEY CREEK AND LITTLE TURKEY CREEK, 1.2 MILES AND 2.6 MILES EAST OF SH-30. PROJECT LENGTH = 0.740 MILE. Completion Date: Final Est Sub: 12/20/2016 JOINT SEAL/REPAIR US-283: OVER WASHITA RIVER, 0.9 MILE NORTH OF THE SH-47 JUNCTION NEAR CHEYENNE. Completion Date: Final Est Sub: 03/24/2017 Commissioner District: Rogers 8 Contracts Completed - Final Estimate Not Processed Contract: 130008 I-44 Residency: 21898(04) IMY-0044-2(437) CLAREMORE Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Tyler, Jennifer Contract Amount: $15,022,863.20 Letting Date: 01/17/2013 08300 Contract: 130059 SH-66 Residency: 21920(04) STPY-166C(155) CLAREMORE Contractor: B & B BRIDGE COMPANY, LLC Engineer: Tyler, Jennifer Contract Amount: $3,356,595.92 Letting Date: 01/17/2013 08300 Contract: 130290 SH-66 Residency: 23160(04) SSP-166N(179)SS CLAREMORE Contractor: BECCO CONTRACTORS, INC. Engineer: Tyler, Jennifer Contract Amount: $626,681.31 Letting Date: 08/22/2013 08300 BRIDGE AND APPROACHES I-44: OVER 177TH EAST AVENUE (LYNN LANE), IN CATOOSA. PROJECT LENGTH = 0.586 MILE. Completion Date: Final Est Sub: BRIDGE AND APPROACHES SH-66: OVER PRYOR CREEK, 0.9 MILE NORTHEAST OF SH-28. PROJECT LENGTH = 0.537 MILES. Completion Date: Final Est Sub: Construction Status Report 05/18/2016 09/08/2015 05/16/2017 GRADE, DRAIN, AND SURFACE SH-66: UNDER SH-266 (ADD TURN LANE). PROJECT LENGTH = 0.236 MILE. Completion Date: Final Est Sub: 08/05/2014 Page 48 Contract: 140307 SH-266 Residency: 24957(04) STPY-166C(208) CLAREMORE Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Tyler, Jennifer Contract Amount: $3,522,167.49 Letting Date: 09/18/2014 08300 Completion Date: Final Est Sub: Contract: 150406 CO.RD. Residency: 27811(04) 08011 STP-266D(039)(040)CI GARVER, LLC. Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: GARV Contract Amount: $2,105,223.85 Letting Date: 11/19/2015 County: BRIDGE AND APPROACHES SH-266: OVER VERDIGRIS OVERFLOW, 5.9 MILES EAST OF THE TULSA COUNTY LINE. PROJECT LENGTH = 0.184 MILES 08/31/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-41): OVER DOG CREEK, 1.2 MI E OF SH-66. COUNTY ROAD (NS-420): OVER UNNAMED CREEK, 2.2 MI N OF I-44. PROJECT LENGTH = 0.446 MILE. Completion Date: Final Est Sub: 03/08/2017 Commissioner District: Seminole 3 Contracts Completed - Final Estimate Not Processed Contract: 150411 SH-99A 28926(04) SSP-267C(050)SS Contractor: SEWELL BROS., INC. Engineer: Helton, Matthew Contract Amount: $2,109,249.80 Letting Date: 11/19/2015 Residency: WEWOKA Contract: 160238 CO.RD. 30043(04) CIRB-267D(054)RB Contractor: K & R BUILDERS, INC. Engineer: Helton, Matthew Contract Amount: $472,683.20 Letting Date: 06/16/2016 Residency: WEWOKA County: 03300 BRIDGE AND APPROACHES SH-99A: OVER EAST GAR CREEK, 6.52 MILES EAST OF SH-99A NEAR SEMINOLE. PROJECT LENGTH = 0.266 MILE. Completion Date: Final Est Sub: 03300 05/15/2017 BRIDGE AND APPROACHES COUNTY ROAD (EW-137): OVER MUD CREEK, 0.8 MILES EAST OF SH-9A NEAR KONAWA. PROJECT LENGTH = 0.150 MILE Completion Date: Final Est Sub: 05/30/2017 Commissioner District: Sequoyah 1 Contracts Completed - Final Estimate Not Processed Contract: 120357 SH-100 Residency: 12531(04) STPY-068C(238) SALLISAW Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Edwards, Carl Contract Amount: $11,931,291.82 Letting Date: 09/20/2012 01200 WIDEN, RESURFACE, AND BRIDGE SH-100: FROM THE CITY OF GORE, EXTEND NORTH. PROJECT LENGTH = 6.180 MILES Completion Date: Final Est Sub: 11/30/2015 PAVEMENT REHABILITATION (P.C. Contract: 140185 I-40 Residency: 27112(04) 01200 CONCRETE) I-40: BEGIN AT MILEPOST 303, NHPPIY-268N(010) SALLISAW EXTEND EAST. PROJECT LENGTH = 5.031 Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV MILES. Engineer: Edwards, Carl Contract Amount: $10,488,903.77 Completion Date: 08/31/2016 Letting Date: 05/15/2014 Final Est Sub: Construction Status Report Page 49 Contract: 150118 I-40 Residency: 28277(05) SSR-168N(214)SR SALLISAW Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC Engineer: Edwards, Carl Contract Amount: $675,594.34 Letting Date: 03/19/2015 01200 Contract: 160440 I-40 Residency: 32974(04) EMC-4000(045) SALLISAW Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Edwards, Carl Contract Amount: $144,325.00 Letting Date: 09/29/2016 01200 County: PAVEMENT REHABILITATION (CONCRETE) I-40: FROM MILE MARKER 298, EXTEND EAST TO MILE MARKER 303. PROJECT LENGTH = 5.633 MILES. Completion Date: Final Est Sub: 08/26/2016 BRIDGE REPAIR I-40: WESTBOUND OVER BIG SALLISAW CREEK, 14.4 MILES EAST OF THE MUSKOGEE COUNTY LINE. Completion Date: Final Est Sub: 10/16/2016 05/30/2017 Commissioner District: Stephens 7 Contracts Completed - Final Estimate Not Processed Contract: 150311 SH-53 Residency: 27045(04) 07100 STP-269C(016)SS DUNCAN Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Roberts, Colton Contract Amount: $3,572,991.51 Letting Date: 09/17/2015 BRIDGE AND APPROACHES SH-53: OVER NEGRO CREEK, 5.84 MILES WEST OF SH-89 IN LOCO. PROJECT LENGTH = 0.710 MILE. Contract: 160208 CO.RD. 28450(04) STP-269D(039)CI Contractor: K & R BUILDERS, INC. Engineer: Roberts, Colton Contract Amount: $523,626.76 Letting Date: 05/19/2016 BRIDGE AND APPROACHES COUNTY ROAD (EW-187): OVER COW CREEK, 0.7 MILES EAST OF US-81 NEAR COMANCHE. PROJECT LENGTH = 0.298 MILE County: Residency: DUNCAN 07100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/24/2017 04/11/2017 Commissioner District: Texas 6 Contracts Completed - Final Estimate Not Processed Contract: 160399 US-54 Residency: 32800(04) HSIPG-270N(023)TR GUYMON Contractor: DIRECT TRAFFIC CONTROL INC. Engineer: Michael, Charles Contract Amount: $33,375.00 Letting Date: 10/20/2016 County: 06200 SAFETY IMPROVEMENT (RUMBLE STRIP AND PAVEMENT MARKING) US-54: FROM 4.9 MILES NORTHEAST OF THE US-64 JUNCTION, EXTEND NORTHEAST NEAR HOOKER. Completion Date: Final Est Sub: 03/08/2017 05/30/2017 Commissioner District: Tulsa 8 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 50 Contract: 100617 I-44 Residency: 06374(44) IMY-0044-2(396)225 TULSA Contractor: BECCO CONTRACTORS, INC. Engineer: Arnold, Bruce Contract Amount: $32,439,488.87 Letting Date: 11/18/2010 08100 Contract: 110205 I-244 Residency: 26604(04) IM-TIGR(497)SS TULSA Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Arnold, Bruce Contract Amount: $63,637,567.76 Letting Date: 02/17/2011 08100 Contract: 110526 SH-51 Residency: 27633(04) SBR-172A(515)SB/SBR-272A* TULSA Contractor: BECCO CONTRACTORS, INC. Engineer: Arnold, Bruce Contract Amount: $2,680,788.96 Letting Date: 01/19/2012 08100 GRADE, DRAIN, SURFACE, AND BRIDGE I-44: FROM RIVERSIDE DRIVE TO EAST OF PEORIA AVENUE IN THE CITY OF TULSA. PROJECT LENGTH = 1.215 MILES. Completion Date: Final Est Sub: 03/04/2013 BRIDGE AND APPROACHES I-244: OVER THE ARKANSAS RIVER, IN THE CITY OF TULSA. PROJECT LENGTH = 0.968 MILE. Completion Date: Final Est Sub: 07/13/2016 04/21/2017 BRIDGE REHABILITATION SH-51: OVER PITTSBURG AVE 0.5 MI E OF HARVARD AVE, AND OVER MK&T RAILROAD 0.7 MI E OF YALE AVE IN THE CITY OF TULSA. PROJECT LENGTH = 0.051 MILES Completion Date: Final Est Sub: 03/27/2013 *(005)SB Contract: 120230 I-244 Residency: 29191(04) HSIPIG-0244-1(009)000TR TULSA Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Arnold, Bruce Contract Amount: $1,124,670.55 Letting Date: 07/19/2012 08100 SAFETY IMPROVEMENT (CABLE BARRIER) I-244: BEGIN AT MILE MARKER 0, EXTEND NORTH. SH-11: FROM HARVARD AVENUE OVERPASS, EXTEND SOUTHEAST. Completion Date: Final Est Sub: 07/03/2013 Contract: 120265 CO.RD. Residency: 15860(04) 08014 BRO-172D(598)CO BENHAM (AKA - LEIDOS) Contractor: B & B BRIDGE COMPANY, LLC Engineer: BENH Contract Amount: $325,782.00 Letting Date: 07/19/2012 BRIDGE AND APPROACHES COUNTY ROAD (NS-397/HARVARD AVENUE): OVER BIRD CREEK TRIBUTARY 2.8 MILES SOUTH AND 1.0 MILE WEST OF THE US-75/SH-20 JUNCTION. PROJECT LENGTH = 0.099 MILE. Contract: 120363 US-75 Residency: 24300(04) NHY-014N(071) TULSA Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Arnold, Bruce Contract Amount: $5,400,126.08 Letting Date: 09/20/2012 08100 INTERCHANGE US-75: AT 116TH STREET NORTH. PROJECT LENGTH = 0.365 MILES. Contract: 120422 US-75 Residency: 23170(04) SSP-272N(021)SS TULSA Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Arnold, Bruce Contract Amount: $1,537,397.99 Letting Date: 11/15/2012 08100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: Construction Status Report 03/13/2013 01/06/2014 SAFETY IMPROVEMENT (GUARDRAIL AND CABLE BARRIER) US-75/US-169/SH-51: US-75 FROM 131ST TO 81ST; US-169 FROM 56TH TO I-244; AND SH-51 FROM GARNET STREET TO 15TH. Completion Date: Final Est Sub: 02/18/2014 Page 51 Contract: 130146 I-244 Residency: 26604(08) NHPPIY-244-2(505) TULSA Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Arnold, Bruce Contract Amount: $38,609,796.04 Letting Date: 02/21/2013 08100 Contract: 140280 US-75 Residency: 23170(06) SSP-272F(067)SS CEC CORP. Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: CEC Contract Amount: $786,801.03 Letting Date: 08/21/2014 08003 Contract: 140376 US-169 Residency: 27939(04) NHPP-272N(077)SS TULSA Contractor: BECCO CONTRACTORS, INC. Engineer: Arnold, Bruce Contract Amount: $32,753,940.32 Letting Date: 03/19/2015 08100 Contract: 150039 I-244 Residency: 27145(04) NHPPI-0244-2(502)SS TULSA Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Arnold, Bruce Contract Amount: $20,029,682.58 Letting Date: 01/22/2015 08100 Contract: 150219 US-75 Residency: 30592(04) SBR-272N(114)SB/SSP-272N* TULSA Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Arnold, Bruce Contract Amount: $7,094,095.90 Letting Date: 06/18/2015 08100 BRIDGE AND APPROACHES I-244: OVER ARKANSAS RIVER (EASTBOUND ONLY). PROJECT LENGTH = 1.024 MILES. Completion Date: Final Est Sub: 08/26/2016 SAFETY IMPROVEMENT (SIGNING) INTERSTATE / STATE HIGHWAYS / CITY STREETS: AT MULTIPLE LOCATIONS IN DIVISION VIII. Completion Date: Final Est Sub: 02/08/2016 BRIDGE AND APPROACHES US-169: OVER BIRD CREEK, BIRD CREEK OVERFLOW, AND N. 56TH STREET, 5.0 MILES NORTH OF I-244. PROJECT LENGTH = 1.211 MILES. Completion Date: Final Est Sub: 02/28/2017 PAVEMENT REHABILITATION (P.C. CONCRETE) I-244: FROM THE US-75 INTERCHANGE IN TULSA, EXTEND EAST TO DELAWARE AVENUE. PROJECT LENGTH = 1.746 MILES. Completion Date: Final Est Sub: 10/26/2016 PAVEMENT AND BRIDGE REHABILITATION DIVISION VIII US-75: FROM SH-20, EXTEND NORTH NEAR COLLINSVILLE. PROJECT LENGTH = 2.881 MILES. Completion Date: Final Est Sub: 03/21/2017 *(123)SS Contract: 150245 SH-11 Residency: 24365(07) STP-172B(368)SS/STP-272B* TULSA Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Arnold, Bruce Contract Amount: $4,322,275.23 Letting Date: 07/23/2015 08100 BRIDGE AND APPROACHES SH-11: OVER FLAT ROCK CREEK AND DELAWARE CREEK, 15.2 MILES AND 11.0 MILES SOUTH OF THE WASHINGTON COUNTY LINE. PROJECT LENGTH = 0.324 MILE. Completion Date: Final Est Sub: 02/14/2017 *(094)SS Contract: 150247 CT.ST. 28869(04) NHPPI-2440(005)SS/STP-27* Contractor: PBX CORPORATION Engineer: Arnold, Bruce Contract Amount: $4,819,267.84 Letting Date: 07/23/2015 Residency: TULSA 08100 BRIDGE REHABILITATION GILCREASE EXPRESSWAY: OVER I-244, BNSF RAILROAD, AND 49TH W AVE IN TULSA. PROJECT LENGTH = 0.355 MILE. Completion Date: Final Est Sub: 10/04/2016 *2C(103)SS Construction Status Report Page 52 Contract: 160062 I-244 Residency: 28861(09) ACNHPPI-2440-(008)SS TETRA TECH Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: TETR Contract Amount: $1,549,621.31 Letting Date: 01/21/2016 08002 Contract: 160122 SH-51 Residency: 28287(04) SSR-172A(519)SR TULSA Contractor: PARAGON CONTRACTORS, LLC Engineer: Arnold, Bruce Contract Amount: $4,323,323.00 Letting Date: 02/18/2016 08100 Contract: 160152 I-44 20315(09) SSP-4400(017)SS Contractor: J.E. DIRT WURX, LLC Engineer: Tyler, Jennifer Contract Amount: $97,750.00 Letting Date: 03/17/2016 08300 Residency: CLAREMORE RETAINING AND SOUND WALLS I-244: FROM 0.1 MILES NORTH OF WEST 23RD STREET, EXTEND SOUTH IN TULSA. PROJECT LENGTH = 0.172 MILE. Completion Date: Final Est Sub: 01/18/2017 RESURFACE (ASPHALT) SH-51: FROM I-44, EXTEND EAST NEAR BROKEN ARROW. PROJECT LENGTH = 6.390 MILES Completion Date: Final Est Sub: 12/16/2016 RIGHT-OF-WAY CLEARANCE I-44: FROM 0.5 MILES EAST OF THE 163RD EAST AVENUE INTERCHANGE, EXTEND EAST IN TULSA AND CATOOSA. PROJECT LENGTH = 1.05 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED. BOTH BID EXPRESS AND WRITTEN BIDS WILL BE ACCEPTABLE. Completion Date: 04/21/2017 Final Est Sub: Contract: 160264 SH-51 Residency: 31735(04) ERSTP-272C(128)ER CEC CORP. Contractor: EARTH SMART CONSTRUCTION INC. Engineer: CEC Contract Amount: $1,358,659.20 Letting Date: 07/21/2016 08003 PAVEMENT REHABILITATION SH-51: LANDSLIDE REPAIR 2.9 MILES EAST OF SH-151, EXTEND EAST NEAR SAND SPRINGS. PROJECT LENGTH = 0.208 MILE. Completion Date: Final Est Sub: 02/21/2017 Contract: 160299 I-244 Residency: 23170(08) 08001 SSP-272F(179)SS ENGR. SERV. & TESTING Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: EST Contract Amount: $465,408.13 Letting Date: 08/18/2016 SAFETY IMPROVEMENT (GUARDRAIL) I-244: FROM US-75, EXTEND EAST IN THE CITY OF TULSA. PROJECT LENGTH = 5.46 MILES Contract: 160304 US-64 Residency: 31939(04) 08400 SSP-272N(137)SS SAND SPRINGS Contractor: BECCO CONTRACTORS, INC. Engineer: Williams, Mark J. Contract Amount: $2,039,000.00 Letting Date: 08/18/2016 RESURFACE (ASPHALT) US-64: FROM 4.3 MILES EAST OF SH-151, EXTEND EAST NEAR SAND SPRINGS. PROJECT LENGTH = 4.960 MILES. Contract: 160402 IS-44 Residency: 32674(04) 08020 HSIPG-272F(197)TR POE AND ASSOCIATES Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: ZPAA Contract Amount: $181,288.62 Letting Date: 10/20/2016 STRIPING AND PAVEMENT MARKING I-44/US-75/SH-51: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 13.25 MILES Construction Status Report Completion Date: Final Est Sub: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 05/24/2017 05/25/2017 04/12/2017 Page 53 County: Commissioner District: Wagoner 1 Contracts Completed - Final Estimate Not Processed Contract: 140377 CO.RD. Residency: 28963(04) 01017 STP-173C(178)CI CIRCUIT ENGR. DISTR. # 2 Contractor: PARAGON CONTRACTORS, LLC Engineer: CE2 Contract Amount: $715,562.48 Letting Date: 11/20/2014 GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-75): FROM 0.5 MILE WEST OF US-72, EXTEND EAST. PROJECT LENGTH =0.506 MILE. Contract: 160123 SH-51B Residency: 29754(04) MUSKOGEE STP-273C(014)3P Contractor: GLOVER & ASSOCIATES, INC. Engineer: Hagerman, Jeremy Contract Amount: $1,083,186.42 Letting Date: 02/18/2016 01100 RESURFACE (ASPHALT) SH-51B: FROM THE SH-72 JUNCTION, EXTEND EAST NEAR COWETA. PROJECT LENGTH = 6.248 MILES Contract: 160157 US-69 Residency: 29515(04) SBR-273N(012)SB MUSKOGEE Contractor: M.J. HUGHES CONSTRUCTION, INC. Engineer: Hagerman, Jeremy Contract Amount: $849,428.00 Letting Date: 03/17/2016 01100 Contract: 160403 SH-51 Residency: 32796(04) HSIPG-273F(038)TR MUSKOGEE Contractor: DIRECT TRAFFIC CONTROL INC. Engineer: Hagerman, Jeremy Contract Amount: $78,279.45 Letting Date: 10/20/2016 01100 County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/07/2015 09/23/2016 BRIDGE REHABILITATION US-69: OVER THE UNION PACIFIC RAILROAD, 1.50 MILES NORTH OF SH-51 IN WAGONER. Completion Date: Final Est Sub: 12/13/2016 SAFETY IMPROVEMENT (RUMBLE STRIP AND PAVEMENT MARKING) SH-51: FROM 0.33 MILES EAST OF THE SH-16 JUNCTION, EXTEND EAST NEAR WAGONER. PROJECT LENGTH = 9.070 MILES Completion Date: Final Est Sub: 02/28/2017 Commissioner District: Washington 8 Contracts Completed - Final Estimate Not Processed Contract: 160125 US-75 Residency: 08400 30535(04) SAND SPRINGS NHPP-274N(015)3P Contractor: PARAGON CONTRACTORS, LLC Engineer: Williams, Mark J. Contract Amount: $1,233,233.00 Letting Date: 02/18/2016 County: RESURFACE (ASPHALT) US-75: FROM 5.93 MILES SOUTH OF US-60, EXTEND NORTH NEAR BARTLESVILLE. PROJECT LENGTH = 2.070 MILES Completion Date: Final Est Sub: 03/30/2017 Commissioner District: Washita 5 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 54 Contract: 150081 SH-55 26479(04) STP-175C(106)SS Contractor: SEWELL BROS., INC. Engineer: CEC Contract Amount: $2,987,735.76 Letting Date: 02/19/2015 Residency: CEC CORP. 05003 BRIDGE AND APPROACHES SH-55: OVER BIG ELK CREEK AND BIG ELK OVERFLOW, 5.1 MILES AND 5.2 MILES EAST OF THE BECKHAM COUNTY LINE. PROJECT LENGTH = 0.331 MILE. Completion Date: Final Est Sub: 08/11/2016 Contract: 150316 SH-152 Residency: 26478(04) 05100 STP-175C(103)SS CLINTON Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Davis, Shawn Contract Amount: $3,700,781.87 Letting Date: 09/17/2015 BRIDGE AND APPROACHES SH-152: OVER FARMRAIL RAILROAD, 13.5 MILES EAST OF THE BECKHAM COUNTY LINE IN DILL CITY. PROJECT LENGTH = 0.516 MILE. Contract: 160126 SH-152 Residency: 29649(04) ACSTP-275C(030)3P CLINTON Contractor: CASWELL CONTRACTING, INC. Engineer: Davis, Shawn Contract Amount: $1,672,420.74 Letting Date: 03/17/2016 RESURFACE (ASPHALT) SH-152: FROM 0.1 MILE EAST OF THE US-183 JUNCTION, EXTEND EAST IN CORDELL. PROJECT LENGTH = 7.670 MILES. County: 05100 Completion Date: Final Est Sub: Completion Date: Final Est Sub: 10/12/2016 02/17/2017 Commissioner District: Woods 6 Contracts Completed - Final Estimate Not Processed Contract: 130407 US-64 Residency: 27010(04) 06100 SSP-176B(195)SS BUFFALO Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Embree, Jerry (Acting) Contract Amount: $5,045,921.32 Letting Date: 11/21/2013 BRIDGE AND APPROACHES US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50. PROJECT LENGTH = 1.012 MILES. Contract: 140220 US-281 Residency: 27002(06) SSP-276B(008)SS BUFFALO Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Embree, Jerry (Acting) Contract Amount: $403,167.02 Letting Date: 06/19/2014 06100 GUARDRAIL US-281: FROM US-64, EXTEND NORTH. PROJECT LENGTH = 14.00 MILES. Contract: 140378 US-281 Residency: 30269(04) STP-276B(006)TR BUFFALO Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $174,776.13 Letting Date: 11/20/2014 06100 County: Completion Date: Final Est Sub: Completion Date: Final Est Sub: 04/14/2017 04/07/2015 TRAFFIC SIGNALS US-281: AT US-64 IN ALVA. Completion Date: Final Est Sub: 07/30/2015 Commissioner District: Woodward 6 Contracts Completed - Final Estimate Not Processed Construction Status Report Page 55 Contract: 150276 SH-15 Residency: 30957(04) SSR-277N(016)SR BUFFALO Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Embree, Jerry (Acting) Contract Amount: $996,940.97 Letting Date: 07/23/2015 06100 Construction Status Report WIDEN AND RESURFACE SH-15: FROM 2.9 MILES WEST OF US-270 NORTH IN WOODWARD, EXTEND EAST. PROJECT LENGTH = 0.716 MILE Completion Date: Final Est Sub: 11/28/2016 Page 56 County: Adair 1 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 150043 Residency: 16928(16) US-59 01200 US-59: FROM 2.0 MILES NORTH OF US-62, EXTEND NORTH. PROJECT LENGTH = 4.949 NHPP-101N(050)SS SALLISAW MILES. Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY Engineer: Adjusted: Edwards, Carl Contract Amount: ( $17,475,683.31 $17,475,683.33) Contract Time: ( 365 365 ) Letting Date: 02/19/2015 Contract Date: 03/16/2015 W/O Issued Adjusted: 04/14/2015 W/O Effective: Amount Paid: 07/06/2015 86 % ( 86 %) Work Started: Time Passed: 07/06/2015 99 % ( 99 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160405 01200 28652(04) COUNTY RO Residency: (NS-466): OVER SALLISAW CREEK, 3.8 MILES SOUTH OF SH-100 NEAR STILLWELL. SALLISAW CIRB-201D(022)RB PROJECT LENGTH = 0.208 MILE Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Edwards, Carl Contract Amount: ( $619,500.64 $619,500.64) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 01/23/2017 W/O Issued Adjusted: 12/19/2016 W/O Effective: Amount Paid: 01/23/2017 13 % ( 13 %) Work Started: Time Passed: 01/23/2017 30 % ( 30 %) County: Alfalfa 6 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 140266 Residency: 06100 24124(04) US-64 US-64: BEGIN AT THE WOODS COUNTY LINE, EXTEND EAST. PROJECT LENGTH = 4.513 BUFFALO STPY-102C(116)SS MILES. Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $8,930,111.47 $8,961,127.21) Contract Time: ( 200 200 ) Letting Date: 09/18/2014 Contract Date: 10/22/2014 W/O Issued Adjusted: 11/03/2014 W/O Effective: Amount Paid: 02/02/2015 95 % ( 94 %) Work Started: Time Passed: 12/01/2014 98 % ( 98 %) Construction Status Report Page 57 Contract: 160002 29465(04) SH-08 SBR-202C(027)SB Contractor: L & M CONTRACTORS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $789,897.30 Contract Time: 150 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 04/05/2016 W/O Effective: 06/06/2016 Work Started: 05/24/2016 Residency: BUFFALO 06100 BRIDGE REHABILITATION SH-8: OVER STINK CREEK, 3.0 MILES WEST OF SH-58 NEAR BURLINGTON. PROJECT LENGTH = 0.112 MILE Adjusted: ( $806,308.35) ( 150 ) Amount Paid: Time Passed: Adjusted: 102 % ( 100 %) 89 % ( 89 %) BRIDGE AND APPROACHES SH-58: OVER Residency: Contract: 160069 28032(04) SH-58 06100 MEDICINE LODGE RIVER OVERFLOW, 1.1 MILES EAST OF THE SH-8 JUNCTION NEAR ACSTP-202C(029)SS BUFFALO CHEROKEE. PROJECT LENGTH = 0.225 MILE. Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Adjusted: Engineer: Embree, Jerry (Acting) Contract Amount: ( $2,697,204.35 $2,701,747.95) Contract Time: ( 220 224 ) Letting Date: 02/18/2016 Contract Date: 03/21/2016 W/O Issued Adjusted: 04/19/2016 W/O Effective: Amount Paid: 09/06/2016 92 % ( 92 %) Work Started: Time Passed: 06/13/2016 106 % ( 104 %) Contract: 160161 27006(04) US-64 ACSTP-202C(003)SS Contractor: SEWELL BROS., INC. Engineer: Hoover, Jacob Contract Amount: $3,621,486.88 Contract Time: 340 Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued 05/18/2016 W/O Effective: 09/06/2016 Work Started: 09/06/2016 Contract: 160212 28033(04) SH-38 ACSTP-202C(032)SS Contractor: OBC, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $2,768,806.58 Contract Time: 210 Letting Date: 08/18/2016 Contract Date: 09/14/2016 W/O Issued 09/15/2016 W/O Effective: 10/17/2016 Work Started: 10/17/2016 Residency: ENID 04300 BRIDGE AND APPROACHES US-64: OVER WAGON CREEK, 0.9 MILE WEST OF THE GRANT COUNTY LINE. PROJECT LENGTH = 0.624 MILE. Adjusted: ( $3,715,536.88) ( 362 ) Amount Paid: Time Passed: Residency: BUFFALO 06100 Adjusted: 53 % ( 52 %) 57 % ( 54 %) BRIDGE AND APPROACHES SH-38: OVER SALT FORK OF ARKANSAS RIVER, 8.8 MILES NORTH OF THE US-64 JUNCTION NEAR JET. PROJECT LENGTH = 0.359 MILE. Adjusted: ( $2,768,806.58) ( 224 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 70 % ( 70 %) 99 % ( 92 %) Page 58 Contract: 160347 29442(04) SH-8B STP-202C(035)SS Contractor: FRONTIER BRIDGE, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $2,011,850.58 Contract Time: 150 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued 11/29/2016 W/O Effective: 01/09/2017 Work Started: 01/03/2017 Residency: BUFFALO 06100 BRIDGE AND APPROACHES SH-8B: OVER EAGLE CHIEF CREEK, 0.8 MILE WEST OF THE SH-8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.295 MILE. Adjusted: ( $2,059,696.56) ( 161 ) Amount Paid: Time Passed: Adjusted: 68 % ( 66 %) 81 % ( 75 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 160406 28351(04) CO. RD. 06009 (NS-264): OVER COTTONWOOD CREEK, 3.0 MILES SOUTH OF SH-11 NEAR CHEROKEE. STP-202C(009)CI CIRCUIT ENGR. DISTR. # 8 PROJECT LENGTH = 0.303 MILE Contractor: SEWELL BROS., INC. Adjusted: Engineer: CED8 Contract Amount: ( $651,437.01 $651,437.01) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 6%( 6 %) Work Started: Time Passed: 05/08/2017 3%( 3 %) Contract: 170112 27943(04) SH-8 STP-202C(033) Contractor: L & M CONTRACTORS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $2,388,858.65 Contract Time: 300 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued 04/25/2017 W/O Effective: 09/05/2017 Work Started: 05/15/2017 Residency: BUFFALO 06100 BRIDGE AND APPROACHES SH-8: OVER DRIFTWOOD CREEK, 0.9 MILES NORTH OF THE SH-11 JUNCTION NEAR BURLINGTON. PROJECT LENGTH = 0.251 MILE Adjusted: ( $2,388,858.65) ( 300 ) Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) RESURFACE (ASPHALT) SH-58: FROM 7.0 Contract: 170113 Residency: 29027(04) SH-58 06100 MILES SOUTH OF THE KANSAS STATE LINE, EXTEND NORTH NEAR BYRON. PROJECT STPY-202C(001)3P BUFFALO LENGTH = 7.00 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $1,014,298.25 $1,014,298.25) Contract Time: ( ) Letting Date: 03/16/2017 Contract Date: 04/14/2017 Fixed Completion Date: 10/31/2017 W/O Issued Adjusted: 04/18/2017 W/O Effective: Amount Paid: 0%( 0 %) Work Started: Time Passed: 05/16/2017 0%( 0 %) County: Atoka 2 Commissioner District: Contracts Under Construction Construction Status Report Page 59 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170001 Residency: 29947(04) CO. RD. 02013 (EW-194/MT. CARMEL ROAD): OVER DAVIS CREEK, 1.4 MILES EAST OF US-69 NEAR CIRB-203D(038)RB CIRCUIT ENGR. DISTR. # 3 CANEY. PROJECT LENGTH = 0.165 MILE. Contractor: HUB CONSTRUCTION, INC. Engineer: Adjusted: CED3 Contract Amount: ( $600,656.46 $605,120.46) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 03/21/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 05/08/2017 0%( 0 %) Contract: 170002 32009(04) SH-7 SSR-203C(062)SR Contractor: OVERLAND CORPORATION Engineer: January, Trenton (Acting) Contract Amount: $733,183.20 Contract Time: 30 Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued 02/17/2017 W/O Effective: 06/05/2017 Work Started: 05/23/2017 County: Beaver Residency: MADILL 02300 RESURFACE (ASPHALT) SH-7: FROM THE JOHNSTON COUNTY LINE, EXTEND EAST. PROJECT LENGTH = 5.790 MILES Adjusted: ( $733,183.20) ( ) 30 Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) 6 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES US-270: OVER Residency: Contract: 160275 06200 27007(04) US-270 AURORA CREEK, 5.1 MILES SOUTH OF THE US-64 JUNCTION NEAR BEAVER. PROJECT GUYMON ACSTP-204C(020)SS LENGTH = 0.056 MILE Contractor: KLAVER CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Michael, Charles Contract Amount: ( $1,723,293.05 $1,723,293.05) Contract Time: ( 210 210 ) Letting Date: 08/18/2016 Contract Date: 09/14/2016 W/O Issued Adjusted: 12/13/2016 W/O Effective: Amount Paid: 01/03/2017 24 % ( 24 %) Work Started: Time Passed: 01/03/2017 35 % ( 35 %) RESURFACE (ASPHALT) US-270: FROM 12.00 Contract: 170003 Residency: 32749(04) US-270 06200 MILES WEST OF THE HARPER COUNTY LINE, EXTEND EAST NEAR SLAPOUT. PROJECT SSR-204N(022)SR GUYMON LENGTH = 4.700 MILES Contractor: J & R SAND COMPANY, INC. Engineer: Adjusted: Michael, Charles Contract Amount: ( $1,287,937.00 $1,287,937.00) Contract Time: ( ) Letting Date: 01/19/2017 Contract Date: 02/15/2017 Fixed Completion Date: 10/01/2017 W/O Issued Adjusted: 02/17/2017 W/O Effective: Amount Paid: 9%( 9 %) Work Started: Time Passed: 05/09/2017 7%( 3 %) Construction Status Report Page 60 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170150 Residency: 24836(04) CO. RD. 06200 (NS-165): OVER BEAVER RIVER, 4.4 MILES SOUTH OF US-64 NEAR BUFFALO. PROJECT CIRB-104C(060)RB GUYMON LENGTH = 0.906 MILE Contractor: SEWELL BROS., INC. Engineer: Adjusted: Michael, Charles Contract Amount: ( $4,673,802.35 $4,673,802.35) Contract Time: ( 240 240 ) Letting Date: 04/20/2017 Contract Date: 05/16/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Beckham 5 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 150083 24840(04) CO.RD. 05005 COUNTY ROAD (NS-198/EW-106): ON NS-198 FROM 1.8 MILES NORTH OF SH-6, EXTEND CIRB-105C(158)RB CIRCUIT ENGR. DISTR. # 7 NORTH THEN EAST ON EW-106 NEAR ELK Contractor: CASWELL CONTRACTING, INC. CITY. PROJECT LENGTH = 7.490 MILES. Engineer: Adjusted: CED7 Contract Amount: ( $6,676,566.30 $7,278,959.39) Contract Time: ( 230 289 ) Letting Date: 07/23/2015 Contract Date: 08/26/2015 W/O Issued Adjusted: 09/02/2015 W/O Effective: Amount Paid: 12/07/2015 100 % ( 92 %) Work Started: Time Passed: 10/26/2015 126 % ( 100 %) Contract: 160076 32208(04) I-40B STP-205B(057)SS Contractor: K & R BUILDERS, INC. Engineer: Davis, Shawn Contract Amount: $289,981.73 Contract Time: 45 Letting Date: 02/18/2016 Contract Date: 03/21/2016 W/O Issued 03/23/2016 W/O Effective: 09/06/2016 Work Started: 09/07/2016 Residency: CLINTON 05100 BRIDGE REPAIR I-40B: OVER WEST ELK CREEK, 4.0 MILES EAST OF THE I-40 JUNCTION IN ELK CITY. Adjusted: ( $292,481.73) ( ) 50 Amount Paid: Time Passed: Adjusted: 96 % ( 95 %) 131 % ( 118 %) RESURFACE (ASPHALT) AND BRIDGE REPAIR Contract: 160160 Residency: 24354(04) I-40 05100 I-40: FROM 0.3 MILE EAST OF SH-30, EXTEND EAST NEAR SAYRE. PROJECT LENGTH = ACNHPPI-4000(022)(028)SS CLINTON 9.395 MILES. Contractor: CORNELL CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Davis, Shawn Contract Amount: ( $11,066,589.87 $11,066,589.87) Contract Time: ( 230 230 ) Letting Date: 05/19/2016 Contract Date: 06/24/2016 W/O Issued Adjusted: 06/29/2016 W/O Effective: Amount Paid: 10/03/2016 99 % ( 99 %) Work Started: Time Passed: 10/03/2016 90 % ( 90 %) Construction Status Report Page 61 GRADE, DRAIN, SURFACE AND BRIDGE Contract: 170004 Residency: 24839(04) CO. RD. 05005 COUNTY ROAD (RED HILLS ROAD/EW-117): FROM SH-30, EXTEND EAST NEAR MAYFIELD. CIRB-105C(157)RB CIRCUIT ENGR. DISTR. # 7 PROJECT LENGTH = 6.830 MILES Contractor: CASWELL CONTRACTING, INC. Engineer: Adjusted: CED7 Contract Amount: ( $6,804,603.73 $6,804,603.73) Contract Time: ( 270 270 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) RESURFACE (ASPHALT) AND BRIDGE Residency: Contract: 170061 27023(04) I-40 05100 REHABILITATION I-40: FROM SH-34 SOUTH, EXTEND EAST NEAR ELK CITY. PROJECT SSP-4000(041)SS/SBR-4000* CLINTON LENGTH = 6.853 MILES Contractor: CORNELL CONSTRUCTION COMPANY, INC. Adjusted: Engineer: Davis, Shawn Contract Amount: ( $9,629,728.25 $9,629,728.25) Contract Time: ( 240 240 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 03/21/2017 W/O Effective: Amount Paid: 06/05/2017 3%( 3 %) Work Started: Time Passed: 0%( 0 %) *(038)SB County: Blaine 5 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 160277 05005 31659(04) CO. RD. (EW-76): OVER OTTER CREEK, 7.1 MILES EAST OF SH-8 NEAR WATONGA. PROJECT CIRCUIT ENGR. DISTR. # 7 STP-206C(038)CI LENGTH = 0.132 MILE. Contractor: D. M. DOZERS, INC. Engineer: Adjusted: CED7 Contract Amount: ( $251,612.80 $251,612.80) Contract Time: ( ) 90 90 Letting Date: 09/15/2016 Contract Date: 10/13/2046 W/O Issued Adjusted: 10/20/2016 W/O Effective: Amount Paid: 02/16/2017 100 % ( 100 %) Work Started: Time Passed: 01/03/2017 72 % ( 72 %) County: Bryan 2 Commissioner District: Contracts Under Construction Construction Status Report Page 62 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160007 Residency: 24800(04) CO.RD. 02013 (CARPENTERS BLUFF RD/NS-371.5): OVER THE RED RIVER, 0.8 MILE SOUTH OF EW-224 CIRB-107C(134)RB CIRCUIT ENGR. DISTR. # 3 RD (KEMP RD) NEAR HENDRIX. PROJECT Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. LENGTH = 0.837 MILE. Engineer: Adjusted: CED3 Contract Amount: ( $6,928,519.12 $6,967,193.25) Contract Time: ( 290 290 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/03/2016 W/O Effective: Amount Paid: 06/06/2016 91 % ( 91 %) Work Started: Time Passed: 07/19/2016 90 % ( 90 %) Contract: 160241 29562(04) US-70 SBR-207N(026)(045)SB Contractor: L & N BRIDGE, LLC Engineer: January, Trenton (Acting) Contract Amount: $2,997,357.19 Contract Time: 345 Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued 08/25/2016 W/O Effective: 12/05/2016 Work Started: 12/06/2016 Contract: 160309 24333(08) US-69 STP-207F(062)SS/STP-245G* Contractor: B & B CONSTRUCTION SERVICE Engineer: Moy, Ryan Contract Amount: $1,359,240.10 Contract Time: 120 Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued 11/30/2016 W/O Effective: 02/16/2017 Work Started: 02/06/2017 *(042)3B Residency: MADILL 02300 BRIDGE REHABILITATION US-70: OVER ROCK CREEK AND SULPHUR CREEK, 2.4 MILES WEST AND 4.6 MILES EAST OF SH-22 NEAR BOKCHITO. Adjusted: ( $2,997,357.19) ( 345 ) Amount Paid: Time Passed: Residency: 02100 ANTLERS J.T., INC. Adjusted: ( $1,508,190.10) ( 150 ) Adjusted: 47 % ( 47 %) 42 % ( 42 %) JOINT SEAL/REPAIR US-69/US-70/US-259/US-270/US-271/SH-2/SH-3: AT MULTIPLE LOCATIONS IN DIVISION II. Amount Paid: Time Passed: Adjusted: 83 % ( 75 %) 58 % ( 47 %) BRIDGE PAINTING US-69/US-270/SH-78/SH-83: Contract: 160310 Residency: 24333(14) US-69 02002 AT MULTIPLE LOCATIONS IN DIVISION II. STP-NBIP(507)SS/STP-NBIP* TETRA TECH Contractor: ELITE INDUSTRIAL PAINTING, INC. Engineer: Adjusted: TETR Contract Amount: ( $717,430.10 $717,430.10) Contract Time: ( 140 140 ) Letting Date: 09/15/2016 Contract Date: 10/28/2016 W/O Issued Adjusted: 01/09/2017 W/O Effective: Amount Paid: 09/01/2017 3%( 3 %) Work Started: Time Passed: 04/05/2017 19 % ( 19 %) *(504)3B Construction Status Report Page 63 Contract: 160311 27912(04) SH-78 ACSTP-207B(053)SS Contractor: C3 CONSTRUCTION, INC. Engineer: January, Trenton (Acting) Contract Amount: $1,589,905.31 Contract Time: Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued 10/20/2016 W/O Effective: Work Started: 05/18/2017 Residency: MADILL 02300 BRIDGE REHABILITATION SH-78: OVER CHUCKWA CREEK, 0.9 MILE NORTH OF THE US-70 JUNCTION IN DURANT. Adjusted: ( $1,589,905.31) ( ) Fixed Completion Date: 08/15/2017 Adjusted: Amount Paid: 0%( 0 %) Time Passed: 0%( 0 %) GRADE, DRAIN, AND SURFACE CITY STREET Residency: Contract: 160348 32112(04) CT. ST. 02300 (HILLCREST AVENUE/OLD EAST MAIN): FROM THE INTERSECTION OF US-70 BYPASS, NHPP-207N(064)SS/SSP-207* MADILL EXTEND WEST NEAR DURANT. PROJECT Contractor: OVERLAND CORPORATION LENGTH = 0.891 MILE. Adjusted: Engineer: January, Trenton (Acting) Contract Amount: ( $3,447,653.96 $3,447,653.96) Contract Time: ( 150 150 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 01/09/2017 43 % ( 43 %) Work Started: Time Passed: 01/09/2017 62 % ( 62 %) *N(066)SS BRIDGE AND APPROACHES COUNTY ROAD Contract: 170006 Residency: 31305(04) CO. RD. 02013 (NS-3710/BRYAN ROAD): OVER LITTLE BLUE RIVER, 1.2 MILES SOUTH OF SH-78 NEAR CIRB-207C(055)RB CIRCUIT ENGR. DISTR. # 3 DURANT. PROJECT LENGTH = 0.227 MILE. Contractor: HUB CONSTRUCTION, INC. Engineer: Adjusted: CED3 Contract Amount: ( $648,551.78 $648,551.78) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/17/2017 W/O Issued Adjusted: 02/21/2017 W/O Effective: Amount Paid: 06/05/2017 27 % ( 27 %) Work Started: Time Passed: 03/17/2017 24 % ( 24 %) Contract: 170007 31328(04) SH-78 SSR-207C(067)(070)SR Contractor: OVERLAND CORPORATION Engineer: January, Trenton (Acting) Contract Amount: $2,383,318.00 Contract Time: 75 Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued 02/17/2017 W/O Effective: 06/05/2017 Work Started: Residency: MADILL 02300 RESURFACE (ASPHALT) SH-78: FROM THE RED RIVER, EXTEND NORTH NEAR THE TEXAS STATE LINE. PROJECT LENGTH = 15.58 MILES Adjusted: ( $2,383,318.00) ( ) 75 Amount Paid: Time Passed: Construction Status Report Adjusted: 0%( 0 %) 0%( 0 %) Page 64 BRIDGE REPAIR SH-78: OVER THE RED Contract: 170191 Residency: 33175(04) SH-78 02300 RIVER, ON THE TEXAS STATE LINE NEAR KEMP. E-MC-207C-(076) MADILL Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Adjusted: January, Trenton (Acting) Contract Amount: ( $272,322.00 $272,322.00) Contract Time: ( ) 60 60 Letting Date: 04/20/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/21/2017 W/O Effective: Amount Paid: 04/24/2017 54 % ( 54 %) Work Started: Time Passed: 04/25/2017 30 % ( 30 %) County: Caddo 7 Commissioner District: Contracts Under Construction GRADE, DRAIN, AND SURFACE COUNTY Residency: Contract: 160078 24802(04) CO.RD. 07300 ROAD (EW-131): FROM US-281, EXTEND WEST NEAR ANADARKO. PROJECT LENGTH CIRB-108C(182)RB ANADARKO = 5.236 MILES. Contractor: T & G CONSTRUCTION, INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $5,459,545.81 $5,487,787.21) Contract Time: ( 210 312 ) Letting Date: 02/18/2016 Contract Date: 03/17/2016 W/O Issued Adjusted: 03/23/2016 W/O Effective: Amount Paid: 07/05/2016 98 % ( 98 %) Work Started: Time Passed: 05/06/2016 151 % ( 102 %) GRADE, DRAIN, AND SURFACE SH-152: FROM Residency: Contract: 160278 07300 01817(09) SH-152 0.4 MILES WEST OF THE SH-146 JUNCTION, EXTEND EAST NEAR BINGER. PROJECT ANADARKO ACSTP-208C(041)SS LENGTH = 2.46 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $9,214,596.05 $9,214,596.05) Contract Time: ( 400 400 ) Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued Adjusted: 09/23/2016 W/O Effective: Amount Paid: 01/03/2017 21 % ( 21 %) Work Started: Time Passed: 11/21/2016 36 % ( 36 %) BRIDGE AND APPROACHES SH-58: OVER Contract: 160407 Residency: 28998(04) SH-58 05100 DEER CREEK, 0.4 MILES NORTH OF I-40 NEAR HYDRO. PROJECT LENGTH = 0.499 MILE STP-208C(047)SS CLINTON Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Davis, Shawn Contract Amount: ( $3,871,743.86 $3,871,743.86) Contract Time: ( 210 210 ) Letting Date: 11/17/2016 Contract Date: 12/14/2016 W/O Issued Adjusted: 12/16/2016 W/O Effective: Amount Paid: 03/06/2017 27 % ( 27 %) Work Started: Time Passed: 03/27/2017 18 % ( 18 %) Construction Status Report Page 65 RESURFACE (ASPHALT) US-62: FROM 0.86 Contract: 170008 Residency: 32836(04) US-62 07300 MILES SOUTH OF SH-19, EXTEND EAST IN APACHE. PROJECT LENGTH = 1.410 MILES SSR-208B(054)SR ANADARKO Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $499,746.60 $499,746.60) Contract Time: ( ) 30 30 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 03/31/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 170059 28425(04) CO. RD. 07300 (EW-114): OVER SUGAR CREEK, 0.5 MILES EAST OF US-281/SH-8 IN LOOKEBA. PROJECT STP-208C(055)CI ANADARKO LENGTH = 0.217 MILE Contractor: K & R BUILDERS, INC. Adjusted: Engineer: Knight, Reese Contract Amount: ( $679,231.15 $679,231.15) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued Adjusted: 02/16/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 170064 Residency: 24803(04) CO. RD. 07300 COUNTY ROAD (NS-267): OVER LITTLE WASHITA RIVER, 0.4 MILES SOUTH OF THE CIRB-108C(184)RB ANADARKO SH-19 JUNCTION NEAR CYRIL. PROJECT Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. LENGTH = 2.728 MILES Engineer: Adjusted: Knight, Reese Contract Amount: ( $4,333,849.70 $4,333,849.70) Contract Time: ( ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 Fixed Completion Date: 10/31/2017 W/O Issued Adjusted: 03/21/2017 W/O Effective: Amount Paid: 0%( 0 %) Work Started: Time Passed: 05/15/2017 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170149 Residency: 30454(04) CO. RD. 07300 (NS-273): OVER STINKING CREEK, 3.9 MILES SOUTH OF SH-152 NEAR BINGER. PROJECT CIRB-208C(056)RB ANADARKO LENGTH = 0.155 MILE Contractor: K & R BUILDERS, INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $539,444.26 $539,444.26) Contract Time: ( ) 90 90 Letting Date: 04/20/2017 Contract Date: 05/11/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Canadian 4 Commissioner District: Contracts Under Construction Construction Status Report Page 66 GRADE, DRAIN, SURFACE, AND BRIDGE - Contract: 150180 Residency: 29257(04) I-40 04200 DIVISION IV I-40: AT RADIO ROAD IN EL RENO, 2.0 MILES EAST OF US-81. PROJECT NHPPIY-0040-4(441) EL RENO LENGTH = 0.444 MILE. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Harlin, Chris Contract Amount: ( $16,901,090.73 $17,506,713.44) Contract Time: ( 365 385 ) Letting Date: 05/21/2015 Contract Date: 06/10/2015 W/O Issued Adjusted: 06/15/2015 W/O Effective: Amount Paid: 11/02/2015 92 % ( 89 %) Work Started: Time Passed: 11/02/2015 84 % ( 79 %) BRIDGE REHABILITATION Residency: Contract: 160011 29494(04) I-40 04200 I-40/I-44/I-240/CIMMARON ROAD/NW 16TH STREET/SUNNYLANE ROAD: AT MULTIPLE SSP-255N(373)SS/SBR-255N* EL RENO LOCATIONS IN DIVISION IV. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: Harlin, Chris Contract Amount: ( $4,363,694.67 $4,387,331.30) Contract Time: ( 380 380 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/02/2016 W/O Effective: Amount Paid: 06/06/2016 100 % ( 100 %) Work Started: Time Passed: 05/09/2016 85 % ( 85 %) *(362)SB/SBR-209N(037)SB GRADE, DRAIN, AND SURFACE COUNTY Contract: 160079 Residency: 30439(04) CO.RD. 04200 ROAD (BANNER RD/NS-289): FROM RENO AVENUE, EXTEND NORTH NEAR EL RENO. ACSTP-209C(038)CI EL RENO PROJECT LENGTH = 0.596 MILE. Contractor: SCHWARZ PAVING CO., INC. Engineer: Adjusted: Harlin, Chris Contract Amount: ( $1,231,014.10 $1,231,014.10) Contract Time: ( ) 60 92 Letting Date: 02/18/2016 Contract Date: 03/17/2016 W/O Issued Adjusted: 03/23/2016 W/O Effective: Amount Paid: 07/05/2016 95 % ( 95 %) Work Started: Time Passed: 07/05/2016 178 % ( 116 %) TRAFFIC SIGNAL, SIGNING, AND PAVEMENT Contract: 170116 Residency: 33076(04) SH-4 04200 MARKING SH-4: AT THE INTERSECTION OF BRITTON ROAD, IN THE CITY OF OKLAHOMA HSIPG-209C(059)TR EL RENO CITY. PROJECT LENGTH = 0.100 MILE Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: Harlin, Chris Contract Amount: ( $43,937.05 $43,937.05) Contract Time: ( ) 10 10 Letting Date: 03/16/2017 Contract Date: 04/25/2017 W/O Issued Adjusted: 04/26/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Carter 7 Commissioner District: Contracts Under Construction Construction Status Report Page 67 BRIDGE AND APPROACHES US-177: OVER Contract: 140256 Residency: 28035(04) US-177 07200 THE WASHITA RIVER, 3.2 MILES NORTH OF SH-199. PROJECT LENGTH = 1.011 MILES. SSP-210B(021)SS ARDMORE Contractor: DONDLINGER & SONS CONSTRUCTION CO., INC. Engineer: Adjusted: Fuhrmann, Chris Contract Amount: ( $6,598,483.00 $6,608,891.50) Contract Time: ( 300 300 ) Letting Date: 08/21/2014 Contract Date: 09/22/2014 W/O Issued Adjusted: 10/02/2014 W/O Effective: Amount Paid: 01/05/2015 90 % ( 90 %) Work Started: Time Passed: 01/05/2015 153 % ( 153 %) Contract: 160162 24335(07) US-53 SSP-210F(049)SS Contractor: GARY A. CRAIN, INC. Engineer: Fuhrmann, Chris Contract Amount: $37,477.80 Contract Time: 30 Letting Date: 04/21/2016 Contract Date: 05/16/2016 W/O Issued 05/20/2016 W/O Effective: 09/06/2016 Work Started: 08/15/2016 Residency: ARDMORE 07200 BRIDGE WATER PROOF SEAL US-70/US-77/US-177/SH-5/SH-53: AT MULTIPLE LOCATIONS IN DIVISION VII. Adjusted: ( $37,477.80) ( ) 30 Amount Paid: Time Passed: Adjusted: 97 % ( 97 %) 100 % ( 100 %) BRIDGE PAINTING I-35/US-70: AT MULTIPLE Contract: 160215 Residency: 24336(06) I-35 07001 LOCATIONS IN DIVISION VII. SSP-NBIP(500)SS ENGR. SERV. & TESTING Contractor: POSEIDON CONSTRUCTION, INC. Engineer: Adjusted: EST Contract Amount: ( $753,500.00 $753,500.00) Contract Time: ( 150 150 ) Letting Date: 06/16/2016 Contract Date: 07/27/2016 W/O Issued Adjusted: 10/25/2016 W/O Effective: Amount Paid: 11/07/2016 96 % ( 96 %) Work Started: Time Passed: 02/11/2017 89 % ( 89 %) BRIDGE REHABILITATION US-70: OVER Contract: 170117 Residency: 32794(04) US-70 07200 WILSON CREEK, 2.4 MILES EAST OF THE SH-77S INTERSECTION NEAR ARDMORE. SBR-210N(055)SB ARDMORE Contractor: T. MCDONALD CONSTRUCTION, INC. Engineer: Adjusted: Fuhrmann, Chris Contract Amount: ( $314,541.00 $314,541.00) Contract Time: ( ) 60 60 Letting Date: 03/16/2017 Contract Date: 04/19/2017 W/O Issued Adjusted: 04/20/2017 W/O Effective: Amount Paid: 05/15/2017 0%( 0 %) Work Started: Time Passed: 05/15/2017 0%( 0 %) County: Cherokee 1 Commissioner District: Contracts Under Construction Construction Status Report Page 68 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 130359 Residency: 10006(12) SH-51 01100 SH-51: BEGIN 7.8 MILES EAST OF THE US-69 JCT, EXTEND EAST OVER GRAND RIVER. STPY-011B(377)SS MUSKOGEE PROJECT LENGTH = 2.120 MILES. Contractor: JENSEN CONSTRUCTION COMPANY Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $16,887,802.75 $16,887,802.75) Contract Time: ( 380 390 ) Letting Date: 01/23/2014 Contract Date: 02/19/2014 W/O Issued Adjusted: 02/25/2014 W/O Effective: Amount Paid: 06/02/2014 94 % ( 94 %) Work Started: Time Passed: 09/05/2014 111 % ( 108 %) BRIDGE AND APPROACHES SH-82: OVER Residency: Contract: 140166 23139(04) SH-82 01100 FOURTEEN MILE CREEK AND THOMPSON BRANCH CREEK, 9.7 AND 9.9 MILES NORTH STPY-111C(093) MUSKOGEE OF US-62. PROJECT LENGTH = 1.708 MILES. Contractor: SHERWOOD CONSTRUCTION CO., INC. Adjusted: Engineer: Hagerman, Jeremy Contract Amount: ( $7,207,745.51 $7,457,569.79) Contract Time: ( 400 400 ) Letting Date: 05/15/2014 Contract Date: 06/10/2014 W/O Issued Adjusted: 06/12/2014 W/O Effective: Amount Paid: 10/06/2014 99 % ( 95 %) Work Started: Time Passed: 10/20/2014 108 % ( 108 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160192 Residency: 29371(04) CO.RD. 01100 (EW-687): OVER BLACKBIRD CREEK, 0.8 MILES WEST OF SH-82 NEAR TAHLEQUAH. STP-211D(025)CI MUSKOGEE PROJECT LENGTH = 0.204 MILE Contractor: RRY SERVICES, LLC Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $671,281.98 $671,281.98) Contract Time: ( 120 120 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/24/2016 W/O Effective: Amount Paid: 12/05/2016 91 % ( 91 %) Work Started: Time Passed: 10/20/2016 113 % ( 113 %) Contract: 160243 27038(04) SH-51 ACSTP-211B(023)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $2,398,511.37 Contract Time: 130 Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued 08/24/2016 W/O Effective: 12/05/2016 Work Started: 12/05/2016 Residency: SALLISAW 01200 BRIDGE AND APPROACHES SH-51: OVER PECAN CREEK, 6.6 MILES EAST OF SH-80 NEAR TAHLEQUAH. PROJECT LENGTH = 0.438 MILE Adjusted: ( $2,398,511.37) ( 130 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 0%( 0 %) 0%( 0 %) Page 69 Contract: 160279 23138(04) SH-51 ACSTP-111B(090)SS Contractor: OBC, INC. Engineer: Hagerman, Jeremy Contract Amount: $6,737,488.16 Contract Time: 330 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued 11/29/2016 W/O Effective: 03/06/2017 Work Started: 01/05/2017 Residency: MUSKOGEE 01100 BRIDGE AND APPROACHES SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF THE WAGONER COUNTY LINE. PROJECT LENGTH = 0.870 MILE. Adjusted: ( $6,737,488.16) ( 330 ) Amount Paid: Time Passed: Adjusted: 36 % ( 36 %) 26 % ( 26 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160312 29394(04) CO. RD. 01017 COUNTY ROAD (BARRINGTON HOLLOW ROAD/NS-4400): OVER CLEAR CREEK, 3.2 MI CIRB-211D(024)RB CIRCUIT ENGR. DISTR. # 2 AND 3.5 MI SOUTH OF THE MAYES COUNTY Contractor: RRY SERVICES, LLC LINE. PROJECT LENGTH = 3.037 MILES Adjusted: Engineer: CE2 Contract Amount: ( $2,525,585.84 $2,525,585.84) Contract Time: ( 210 210 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 40 % ( 40 %) Work Started: Time Passed: 01/31/2017 37 % ( 37 %) Contract: 160351 31680(04) US-62 HISPG-211B(018)TR Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $434,626.34 Contract Time: 60 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued 11/29/2016 W/O Effective: 01/09/2017 Work Started: 01/09/2017 County: Choctaw Residency: SALLISAW 01200 Adjusted: ( $434,626.34) ( ) 60 SAFETY IMPROVEMENT (CABLE BARRIER AND GUARDRAIL) US-62: FROM 4.2 MILES EAST OF THE SH-10 JUNCTION, EXTEND EAST NEAR ELDON. PROJECT LENGTH = 1.470 MILES Amount Paid: Time Passed: Adjusted: 74 % ( 74 %) 97 % ( 97 %) 2 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES COUNTY ROAD Contract: 160013 Residency: 25144(04) CO.RD. 02013 (NS-422): OVER HORSE CREEK, 2.4 MILES NORTH OF US-271 NEAR HUGO. PROJECT STP-112D(082)CI CIRCUIT ENGR. DISTR. # 3 LENGTH = 0.227 MILE Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: CED3 Contract Amount: ( $830,447.39 $830,447.39) Contract Time: ( 120 120 ) Letting Date: 03/17/2016 Contract Date: 04/12/2016 W/O Issued Adjusted: 04/25/2016 W/O Effective: Amount Paid: 08/01/2016 93 % ( 93 %) Work Started: Time Passed: 05/10/2016 100 % ( 100 %) Construction Status Report Page 70 RESURFACE (ASPHALT) COUNTY ROAD Contract: 170010 Residency: 31229(04) CO. RD. 02013 (NS-436): FROM US-70, EXTEND NORTH IN FORT TOWSON. PROJECT LENGTH = 3.00 CIRB-212C(028)RB CIRCUIT ENGR. DISTR. # 3 MILES. Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: CED3 Contract Amount: ( $1,283,916.23 $1,283,916.23) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 29 % ( 29 %) Work Started: Time Passed: 03/27/2017 35 % ( 35 %) RESURFACE (ASPHALT) US-70: FROM 0.38 Residency: Contract: 170065 29717(04) US-70 02100 MILES EAST OF THE SH-93 JUNCTION, EXTEND EAST NEAR HUGO. PROJECT NHPPY-212N(011)3P ANTLERS LENGTH = 2.39 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Adjusted: Engineer: Moy, Ryan Contract Amount: ( $1,114,650.20 $1,114,650.20) Contract Time: ( ) 30 30 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170066 Residency: 29967(04) CO. RD. 02013 (NS-436.75/TRAM ROAD): OVER UNNAMED CREEK, 1.2 MILES NORTH OF US-70 NEAR CIRB-212D(036)RB CIRCUIT ENGR. DISTR. # 3 FORT TOWSON. PROJECT LENGTH = 0.104 Contractor: HUB CONSTRUCTION, INC. MILE Engineer: Adjusted: CED3 Contract Amount: ( $281,281.50 $281,281.50) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/24/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170152 Residency: 31220(04) CO. RD. 02013 (NS-437): OVER SCS CHANNEL, 4.3 MILES NORTH OF THE RED RIVER NEAR THE TEXAS CIRB-212D(038)RB CIRCUIT ENGR. DISTR. # 3 STATE LINE. PROJECT LENGTH = 0.053 MILE Contractor: HUB CONSTRUCTION, INC. Engineer: Adjusted: CED3 Contract Amount: ( $207,438.33 $207,438.33) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/11/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Cimarron 6 Commissioner District: Contracts Under Construction Construction Status Report Page 71 BRIDGE AND APPROACHES US-56: OVER Contract: 160352 Residency: 28658(04) US-56 06200 BEAVER RIVER, 8.5 MILES SOUTHWEST OF THE US-385 JUNCTION NEAR BOISE CITY. NHPP-213N(019)SS GUYMON PROJECT LENGTH = 0.236 MILE Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: Adjusted: Michael, Charles Contract Amount: ( $3,958,345.68 $3,958,345.68) Contract Time: ( 240 240 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 12/19/2016 W/O Effective: Amount Paid: 03/06/2017 24 % ( 24 %) Work Started: Time Passed: 03/06/2017 26 % ( 26 %) WEIGH STATION US-56: BOISE CITY WEIGH Residency: Contract: 170011 31688(04) US-56 06002 STATION, 0.7 MILES WEST OF US-287. BSAP-213N(015)FM TETRA TECH Contractor: UNIFIED SERVICES OF TEXAS, INC. Adjusted: Engineer: TETR Contract Amount: ( $2,942,104.22 $2,942,104.22) Contract Time: ( 270 270 ) Letting Date: 01/19/2017 Contract Date: 03/02/2017 W/O Issued Adjusted: 03/16/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 05/22/2017 0%( 0 %) SAFETY IMPROVEMENT (RUMBLE STRIP AND Contract: 170067 Residency: 32663(04) US-64 06100 PAVEMENT MARKING) US-64/US-412/SH-3: AT MULTIPLE LOCATIONS IN DIVISION VI. HSIPG-213N(018)(020)MS/H* BUFFALO Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $725,873.63 $725,873.63) Contract Time: ( ) 60 60 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 05/16/2017 0%( 0 %) *SIPG-270N(024)(025)MS County: Cleveland 3 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE I-35: Contract: 120328 Residency: 09031(08) I-35 03200 SINGLE POINT URBAN INTERCHANGE (SPUI) AT MAIN STREET IN THE CITY OF NORMAN. IM-NHIY-0035-2(289)109 PURCELL PROJECT LENGTH = 1.491 MILES. Contractor: ALLEN CONTRACTING, INC./ MANHATTAN ROAD & BRIDGE (JV) Engineer: Adjusted: Reed, Lucas Contract Amount: ( $28,887,284.36 $32,064,596.15) Contract Time: ( 500 644 ) Letting Date: 10/18/2012 Contract Date: 11/19/2013 W/O Issued Adjusted: 11/26/2012 W/O Effective: Amount Paid: 01/07/2013 107 % ( 97 %) Work Started: Time Passed: 01/07/2013 132 % ( 102 %) Construction Status Report Page 72 GRADE, DRAIN, SURFACE, AND BRIDGE I-35: Contract: 130208 Residency: 09031(11) I-35 03200 INTERCHANGE AT SH-9E (SOUTH HALF ONLY). PROJECT LENGTH = 0.828 MILE. NHPPIY-0035-2(326) PURCELL Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $11,633,998.55 $12,208,367.47) Contract Time: ( 375 437 ) Letting Date: 08/22/2013 Contract Date: 09/17/2013 W/O Issued Adjusted: 09/19/2013 W/O Effective: Amount Paid: 11/18/2013 101 % ( 96 %) Work Started: Time Passed: 11/17/2013 96 % ( 82 %) GRADE, DRAIN, SURFACE, AND BRIDGE I-35: Residency: Contract: 140287 09031(05) I-35 03200 INTERCHANGE AT SH-9 AND LINDSEY STREET IN NORMAN. PROJECT LENGTH = NHPPIY-0035-2(176)(304) PURCELL 1.036 MILES. Contractor: SHERWOOD CONSTRUCTION CO., INC. Adjusted: Engineer: Reed, Lucas Contract Amount: ( $71,124,697.35 $71,458,927.96) Contract Time: ( 920 920 ) Letting Date: 11/20/2014 Contract Date: 12/19/2014 W/O Issued Adjusted: 12/30/2014 W/O Effective: Amount Paid: 03/02/2015 92 % ( 92 %) Work Started: Time Passed: 03/02/2015 88 % ( 88 %) GRADE, DRAIN, SURFACE, AND BRIDGE - Contract: 150159 Residency: 20266(07) SH-09 03010 DIVISION III SH-9: FROM 36TH AVE IN NORMAN, EXTEND EAST. PROJECT LENGTH STP-114B(108)SS ATKINS = 3.056 MILES. Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Adjusted: ATKINS Contract Amount: ( $18,944,484.44 $18,984,171.85) Contract Time: ( 470 474 ) Letting Date: 05/21/2015 Contract Date: 06/18/2015 W/O Issued Adjusted: 06/24/2015 W/O Effective: Amount Paid: 10/05/2015 97 % ( 97 %) Work Started: Time Passed: 09/08/2015 96 % ( 95 %) GRADE, DRAIN, SURFACE, AND BRIDGE CITY Contract: 160128 Residency: 29293(04) CT.ST. 03010 STREET (LINDSEY STREET): FROM SW 24TH AVENUE, EXTEND EAST IN THE CITY OF STP-214B(042)(063)AG ATKINS NORMAN. PROJECT LENGTH = 1.247 MILES. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: ATKINS Contract Amount: ( $26,817,149.43 $26,934,865.43) Contract Time: ( 540 540 ) Letting Date: 04/21/2016 Contract Date: 05/10/2016 W/O Issued Adjusted: 05/11/2016 W/O Effective: Amount Paid: 07/05/2016 55 % ( 54 %) Work Started: Time Passed: 07/05/2016 58 % ( 58 %) Construction Status Report Page 73 WIDEN, RESURFACE, AND BRIDGE SH-39: Contract: 160163 Residency: 24112(04) SH-39 03200 FROM 2.0 MILES EAST OF US-77, EXTEND EAST NEAR LEXINGTON. PROJECT LENGTH = ACSTP-114B(185)SS PURCELL 5.325 MILES Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $9,699,000.00 $9,699,000.00) Contract Time: ( 350 350 ) Letting Date: 06/16/2016 Contract Date: 07/28/2016 W/O Issued Adjusted: 08/02/2016 W/O Effective: Amount Paid: 11/07/2016 44 % ( 44 %) Work Started: Time Passed: 11/02/2016 56 % ( 56 %) SAFETY IMPROVEMENT (FIBER OPTIC CABLE) Residency: Contract: 160313 24285(04) CT. ST. 03018 CITY STREET (BOYD STREET): FROM BERRY ROAD, EXTEND EAST TO CLASSEN STPG-114C(200)AG BENCHMARK CONSTR. SERVS., LLC BOULEVARD IN THE CITY OF NORMAN. Contractor: MIDSTATE TRAFFIC CONTROL, INC. Adjusted: Engineer: BCS Contract Amount: ( $568,772.33 $580,977.33) Contract Time: ( 120 120 ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 10/20/2016 W/O Effective: Amount Paid: 02/16/2017 89 % ( 87 %) Work Started: Time Passed: 01/30/2017 77 % ( 77 %) Contract: 160314 31566(04) CT. ST. STPG-214B(075)AG Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: BCS Contract Amount: $202,624.30 Contract Time: 60 Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued 10/17/2016 W/O Effective: 02/16/2017 Work Started: 02/22/2017 TRAFFIC SIGNALS CITY STREET (PORTLAND Residency: 03018 AVENUE): AT THE INTERSECTION OF SW 119TH STREET IN OKLAHOMA CITY. BENCHMARK CONSTR. SERVS., LLC LLC Adjusted: ( $219,190.73) ( ) 60 Amount Paid: Time Passed: Adjusted: 40 % ( 37 %) 102 % ( 102 %) GRADE, DRAIN, SURFACE, AND BRIDGE CITY Contract: 160354 Residency: 26835(04) CT. ST. 03018 STREET (FRANKLIN ROAD): OVER LITTLE RIVER, 0.9 MILES EAST OF NORTH FLOOD STP-114C(254)AG BENCHMARK CONSTR. SERVS., LLC AVENUE IN THE CITY OF NORMAN. PROJECT Contractor: FRONTIER BRIDGE, INC. LENGTH = 0.378 MILE Engineer: Adjusted: BCS Contract Amount: ( $2,126,191.87 $2,126,191.87) Contract Time: ( 180 180 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 57 % ( 57 %) Work Started: Time Passed: 01/16/2017 52 % ( 52 %) Construction Status Report Page 74 TRAFFIC SIGNALS CITY STREETS: AT Contract: 160356 Residency: 29008(04) CT. ST. 03004 MULTIPLE LOCATIONS IN THE CITY OF NORMAN. STPG-214A(073)AG JACOBS ENGINEERING Contractor: TRAFFIC SIGNALS, INC. Engineer: Adjusted: JACOBS Contract Amount: ( $382,200.00 $382,200.00) Contract Time: ( ) 90 90 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 26 % ( 26 %) Work Started: Time Passed: 04/14/2017 71 % ( 71 %) INTERSECTION MODIFICATION AND TRAFFIC Residency: Contract: 160358 30501(04) CT. ST. 03004 SIGNAL CITY STREET (36TH AVENUE NW): AT THE INTERSECTION OF HAVENBROOK STP-214B(077)AG JACOBS ENGINEERING STREET IN THE CITY OF NORMAN. PROJECT Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. LENGTH = 0.188 MILE Adjusted: Engineer: JACOBS Contract Amount: ( $1,105,800.00 $1,131,822.40) Contract Time: ( 120 125 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 42 % ( 41 %) Work Started: Time Passed: 03/06/2017 55 % ( 53 %) TRAFFIC SIGNALS CITY STREET (48TH Contract: 160359 Residency: 30658(04) CT. ST. 03003 AVENUE NW): AT THE INTERSECTION OF ROBINSON STREET IN THE CITY OF NORMAN. STPG-214B(076)AG CEC CORP. Contractor: TRAFFIC SIGNALS, INC. Engineer: Adjusted: CEC Contract Amount: ( $324,739.98 $324,739.98) Contract Time: ( ) 90 90 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 52 % ( 52 %) Work Started: Time Passed: 03/06/2017 64 % ( 64 %) TRAFFIC SIGNALS CITY STREET (MAIN Contract: 160360 Residency: 31508(04) CT. ST. 03003 STREET): FROM 24TH AVENUE WEST, EXTEND EAST IN THE CITY OF NORMAN. STPG-214A(074)AG CEC CORP. Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Adjusted: CEC Contract Amount: ( $293,862.00 $293,862.00) Contract Time: ( ) 90 90 Letting Date: 10/20/2016 Contract Date: 11/17/2016 W/O Issued Adjusted: 11/21/2016 W/O Effective: Amount Paid: 03/06/2017 83 % ( 83 %) Work Started: Time Passed: 03/06/2017 50 % ( 50 %) Construction Status Report Page 75 STRIPING AND PAVEMENT MARKING CITY Contract: 160361 32452(04) CITY STRE Residency: 03200 STREETS: AT MULTIPLE LOCATIONS IN THE CITY OF NORMAN. STPG-214F(072)AG PURCELL Contractor: DIRECT TRAFFIC CONTROL INC. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $112,635.75 $112,635.75) Contract Time: ( ) 30 30 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 100 % ( 100 %) Work Started: Time Passed: 03/13/2017 87 % ( 87 %) RESURFACE (ASPHALT) CITY STREETS Residency: Contract: 160408 28903(04) CT. ST. 03200 (LINDSEY ST/CONSTITUTION ST/IMHOFF RD): AT MULTIPLE LOCATIONS IN THE CITY OF STP-214C(004)AG PURCELL NORMAN. PROJECT LENGTH = 2.313 MILES. Contractor: MARKWELL PAVING COMPANY, INC. Adjusted: Engineer: Reed, Lucas Contract Amount: ( $965,827.37 $965,827.37) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 4%( 4 %) Work Started: Time Passed: 05/08/2017 7%( 7 %) RESURFACE (ASPHALT) US-77: FROM SH-9, Contract: 170068 Residency: 30569(04) US-77 03200 EXTEND NORTH THEN WEST AND NORTHWEST IN THE CITY OF NORMAN. STPY-214N(078)3P PURCELL PROJECT LENGTH = 9.72 MILES Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $1,279,020.33 $1,279,020.33) Contract Time: ( ) 50 50 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/31/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 05/15/2017 0%( 0 %) BRIDGE REHABILITATION SH-39: OVER Contract: 170069 Residency: 30579(04) SH-39 03200 WILLOW CREEK, 1.67 MILES EAST OF US-77 NEAR LEXINGTON. PROJECT LENGTH = 0.106 SBR-214A(079)SB PURCELL MILE Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $921,247.96 $921,247.96) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 03/13/2017 0%( 0 %) County: Coal 3 Commissioner District: Contracts Under Construction Construction Status Report Page 76 BRIDGE AND APPROACHES US-75: OVER Contract: 150129 Residency: 20317(04) US-75 03100 COAL CREEK, 2.2 MILES NORTH OF THE ATOKA COUNTY LINE. PROJECT LENGTH = NHPP-215N(014)SS ADA 0.208 MILE. Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $2,005,154.27 $2,091,446.72) Contract Time: ( 180 211 ) Letting Date: 04/16/2015 Contract Date: 05/13/2015 W/O Issued Adjusted: 05/18/2015 W/O Effective: Amount Paid: 09/01/2015 103 % ( 98 %) Work Started: Time Passed: 06/29/2015 141 % ( 120 %) BRIDGE AND APPROACHES US-75: OVER Residency: Contract: 150130 27998(04) US-75 03100 ROCK CREEK, 7.09 MILES NORTH OF SH-3. PROJECT LENGTH = 0.416 MILE. STP-215B(015)SS ADA Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC. Adjusted: Engineer: Russell, Julie Contract Amount: ( $2,529,033.82 $2,554,153.82) Contract Time: ( 180 180 ) Letting Date: 04/16/2015 Contract Date: 05/13/2015 W/O Issued Adjusted: 05/19/2015 W/O Effective: Amount Paid: 09/01/2015 91 % ( 90 %) Work Started: Time Passed: 07/27/2015 123 % ( 123 %) Contract: 150330 29541(04) SH-43 STP-215C(017)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Russell, Julie Contract Amount: $2,151,445.69 Contract Time: 210 Letting Date: 10/15/2015 Contract Date: 11/20/2015 W/O Issued 11/25/2015 W/O Effective: 03/07/2016 Work Started: 06/24/2016 Contract: 160017 28201(04) US-75 SSR-115B(105)SR Contractor: GLOVER & ASSOCIATES, INC. Engineer: Russell, Julie Contract Amount: $3,600,028.59 Contract Time: 90 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 03/04/2016 W/O Effective: 06/06/2016 Work Started: 12/07/2016 Residency: ADA 03100 BRIDGE REHABILITATION SH-43: OVER MUDDY BOGGY CREEK AND MUDDY BOGGY O'FLOW, 1.53 MILES EAST OF US-75 NEAR COALGATE. PROJECT LENGTH = 0.311 MILE Adjusted: ( $2,151,445.69) ( 210 ) Amount Paid: Time Passed: Residency: ADA 03100 Adjusted: 45 % ( 45 %) 189 % ( 189 %) RESURFACE (ASPHALT) US-75: FROM SH-3, EXTEND NORTH NEAR COALGATE. PROJECT LENGTH = 6.92 MILES Adjusted: ( $3,600,028.59) ( ) 90 Amount Paid: Time Passed: Construction Status Report Adjusted: 0%( 0 %) 218 % ( 218 %) Page 77 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170070 Residency: 30010(04) CO. RD. 03100 (OLD SH-3): OVER ROCK CREEK, 0.8 MILES SOUTHEAST OF THE PONTOTOC COUNTY STP-215D(021)CI ADA LINE NEAR STONEWALL. PROJECT LENGTH = Contractor: C3 CONSTRUCTION, INC. 0.311 MILE Engineer: Adjusted: Russell, Julie Contract Amount: ( $543,761.81 $543,761.81) Contract Time: ( ) 90 90 Letting Date: 02/16/2017 Contract Date: 03/22/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) GRADE, DRAIN, AND SURFACE COUNTY Residency: Contract: 170119 24944(08) CO. RD. 03100 ROAD (NS-382/POLK ROAD): FROM 4.2 MILES NORTH OF SH-31, EXTEND NORTH NEAR CIRB-215C(024)RB ADA COALGATE. PROJECT LENGTH = 1.561 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Adjusted: Engineer: Russell, Julie Contract Amount: ( $1,746,298.20 $1,746,298.20) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/11/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Comanche 7 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 140014 07300 21717(04) US-277 US-277: FROM US-62, EXTEND EAST. PROJECT LENGTH = 4.398 MILES. ANADARKO STPY-116C(117)SS Contractor: T & G CONSTRUCTION, INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $14,964,530.44 $15,136,891.48) Contract Time: ( 270 362 ) Letting Date: 09/18/2014 Contract Date: 10/27/2014 W/O Issued Adjusted: 12/22/2014 W/O Effective: Amount Paid: 02/02/2015 91 % ( 90 %) Work Started: Time Passed: 02/02/2015 134 % ( 100 %) Contract: 160441 32503(04) I-44 SSP-4400(026)SS Contractor: C3 CONSTRUCTION, INC. Engineer: Roberts, Colton Contract Amount: $451,671.21 Contract Time: 60 Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued 01/03/2017 W/O Effective: 03/06/2017 Work Started: Residency: DUNCAN 07100 FENCING I-44: FROM SH-7, EXTEND NORTH IN THE CITY OF LAWTON. Adjusted: ( $451,671.21) ( ) 60 Amount Paid: Time Passed: Construction Status Report Adjusted: 0%( 0 %) 0%( 0 %) Page 78 INTERSECTION MODIFICATION US-62: AT THE Contract: 170013 Residency: 28834(11) US-62 07300 INTERSECTION OF EDGEWATER BOULEVARD AND CHERRY ROAD, NEAR FORT SILL. HSIP-216B(063)SS ANADARKO PROJECT LENGTH = 0.639 MILE Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $219,098.24 $219,098.24) Contract Time: ( ) 30 30 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/25/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) RESURFACE (ASPHALT) SH-36: FROM THE Residency: Contract: 170014 30540(04) SH-36 07100 TILLMAN COUNTY LINE, EXTEND NORTHEAST NEAR CHATTANOOGA. PROJECT LENGTH = SSR-216B(064)SR DUNCAN 5.34 MILES. Contractor: MARKWELL PAVING COMPANY, INC. Adjusted: Engineer: Roberts, Colton Contract Amount: ( $1,461,600.24 $1,461,600.24) Contract Time: ( ) 60 60 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170071 Residency: 28426(04) CO. RD. 07018 (EW-168/BISHOP ROAD): OVER NUMU CREEK, 0.2 MILES EAST OF I-44 NEAR LAWTON. CIRB-216D(062)RB BENCHMARK CONSTR. SERVS., LLC PROJECT LENGTH = 0.224 MILE Contractor: SEWELL BROS., INC. Engineer: Adjusted: BCS Contract Amount: ( $797,529.03 $797,529.03) Contract Time: ( ) 90 90 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Contract: 170072 30523(04) SH-7 NHPPY-216N(065)3P Contractor: T & G CONSTRUCTION, INC. Engineer: Roberts, Colton Contract Amount: $893,071.73 Contract Time: 60 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued 03/25/2017 W/O Effective: 07/03/2017 Work Started: County: Cotton Residency: DUNCAN 07100 RESURFACE (ASPHALT) SH-7 (EASTBOUND LANES ONLY): FROM SH-65, EXTEND EAST NEAR LAWTON. PROJECT LENGTH = 4.10 MILES Adjusted: ( $893,071.73) ( ) 60 Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) 7 Commissioner District: Contracts Under Construction Construction Status Report Page 79 BRIDGE AND APPROACHES COUNTY ROAD Contract: 150008 Residency: 29338(04) CO.RD. 07100 (NS-265): OVER THE TRIBUTARY OF EAST CACHE CREEK, 1.5 MILES NORTH OF SH-5. STP-217D(012)CI DUNCAN PROJECT LENGTH = 0.066 MILE Contractor: MUNOZ CONSTRUCTION, INC. Engineer: Adjusted: Roberts, Colton Contract Amount: ( $235,827.50 $235,827.50) Contract Time: ( ) 90 90 Letting Date: 01/22/2015 Contract Date: 02/23/2015 W/O Issued Adjusted: 02/26/2015 W/O Effective: Amount Paid: 06/01/2015 95 % ( 95 %) Work Started: Time Passed: 06/01/2015 76 % ( 76 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 160018 28410(04) CO.RD. 07100 (EW-185): OVER WEST CACHE CREEK, 1.4 MILES WEST OF I-44 NEAR WALTERS. CIRB-117D(091)RB DUNCAN PROJECT LENGTH = 0.250 MILE Contractor: BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: Roberts, Colton Contract Amount: ( $536,047.60 $536,047.60) Contract Time: ( ) 90 90 Letting Date: 01/21/2016 Contract Date: 02/10/2016 W/O Issued Adjusted: 02/16/2016 W/O Effective: Amount Paid: 06/06/2016 94 % ( 94 %) Work Started: Time Passed: 03/01/2016 61 % ( 61 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160084 Residency: 24859(04) CO.RD. 07100 COUNTY ROAD (NS-270): FROM 6.0 MILES SOUTH OF SH-53, EXTEND NORTH NEAR CIRB-117C(064)RB DUNCAN TEMPLE. PROJECT LENGTH = 6.000 MILES. Contractor: T & G CONSTRUCTION, INC. Engineer: Adjusted: Roberts, Colton Contract Amount: ( $5,925,768.83 $5,931,768.83) Contract Time: ( 180 180 ) Letting Date: 02/18/2016 Contract Date: 03/16/2016 W/O Issued Adjusted: 03/23/2016 W/O Effective: Amount Paid: 09/06/2016 37 % ( 37 %) Work Started: Time Passed: 09/06/2016 112 % ( 112 %) BRIDGE AND APPROACHES US-277: OVER Contract: 160315 Residency: 28036(04) US-277 07100 DEEP RED CREEK AND OVERFLOWS, 0.7 MI, 1.0 MI AND 1.2 MI SOUTH OF THE H.E. BAILEY ACSTP-217C(029)SS DUNCAN TURNPIKE NEAR RANDLETT. PROJECT Contractor: OVERLAND CORPORATION LENGTH = 1.124 MILES. Engineer: Adjusted: Roberts, Colton Contract Amount: ( $7,787,208.07 $7,787,208.07) Contract Time: ( 300 300 ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 10/19/2016 W/O Effective: Amount Paid: 04/03/2017 9%( 9 %) Work Started: Time Passed: 04/10/2017 8%( 8 %) Construction Status Report Page 80 BRIDGE AND APPROACHES COUNTY ROADS Contract: 160409 29900(04) COUNTY RO Residency: 07100 (EW-179/NS-269): OVER BEAVER CR, 2.8 MI E OF SH-65 AND OVER GOODEN CR, 6.2 MI N OF STP-217D(032)CI/STP-217C* DUNCAN SH-53 NEAR WALTERS. PROJECT LENGTH = Contractor: K & R BUILDERS, INC. 2.32 MILES Engineer: Adjusted: Roberts, Colton Contract Amount: ( $1,196,103.11 $1,196,103.11) Contract Time: ( 210 210 ) Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 12/21/2016 W/O Effective: Amount Paid: 03/06/2017 33 % ( 33 %) Work Started: Time Passed: 03/14/2017 25 % ( 25 %) (033)CI County: Craig 8 Commissioner District: Contracts Under Construction Contract: 150160 24115(04) US-59 STP-118B(080)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Tyler, Jennifer Contract Amount: $5,040,025.51 Contract Time: 245 Letting Date: 05/21/2015 Contract Date: 06/15/2015 W/O Issued 09/01/2015 W/O Effective: 10/12/2015 Work Started: 10/19/2015 Residency: CLAREMORE 08300 BRIDGE AND APPROACHES - DIVISION VIII US-59: OVER UNION PACIFIC RAILROAD, 1.1 MILES NORTH OF SH-10 NEAR WELCH. PROJECT LENGTH = 0.871 MILE. Adjusted: ( $5,040,025.51) ( 245 ) Amount Paid: Time Passed: Adjusted: 70 % ( 70 %) 181 % ( 181 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 150229 29405(04) CO.RD. 08011 (NS-439/EW-24): OVER ELM CREEK, 2 MI N OF US-69 ON NS-439, AND 1.8 MI W OF SH-2 ON STP-218D(040)CI/STP-218C* GARVER, LLC. EW-24 NEAR VINITA. PROJECT LENGTH = Contractor: RRY SERVICES, LLC 0.388 MILE. Engineer: Adjusted: GARV Contract Amount: ( $2,151,974.59 $2,300,566.07) Contract Time: ( 270 285 ) Letting Date: 11/19/2015 Contract Date: 12/22/2015 W/O Issued Adjusted: 01/07/2016 W/O Effective: Amount Paid: 04/04/2016 99 % ( 92 %) Work Started: Time Passed: 04/14/2016 108 % ( 102 %) *(041)CI Contract: 150258 27089(04) SH-82 STP-218C(037)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Tyler, Jennifer Contract Amount: $3,723,826.73 Contract Time: 245 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 03/02/2016 W/O Effective: 06/06/2016 Work Started: 06/23/2016 Residency: CLAREMORE 08300 BRIDGE AND APPROACHES SH-82: OVER LOCUST CREEK, 6.5 MILES NORTH OF THE MAYES COUNTY LINE NEAR VINITA. PROJECT LENGTH = 0.711 MILE. Adjusted: ( $3,723,826.73) ( 245 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 55 % ( 55 %) 97 % ( 97 %) Page 81 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160362 Residency: 30441(04) CO. RD. 08011 (NS-428): OVER LIGHTNING CREEK, 0.1 MILES SOUTH OF US-60 NEAR VINITA. PROJECT CIRB-218C(049)RB GARVER, LLC. LENGTH = 0.132 MILE Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: GARV Contract Amount: ( $474,877.35 $474,877.35) Contract Time: ( 120 120 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 40 % ( 40 %) Work Started: Time Passed: 03/06/2017 34 % ( 34 %) County: Creek 8 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES US-75A: OVER Residency: Contract: 160245 27075(04) US-75A 08400 BNSF RAILROAD, 1.9 MILES NORTH OF THE OKMULGEE COUNTY LINE NEAR MOUNDS. ACSTP-219C(033)SS SAND SPRINGS PROJECT LENGTH = 0.667 MILE. Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Williams, Mark J. Contract Amount: ( $8,084,675.09 $8,084,675.09) Contract Time: ( 370 370 ) Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued Adjusted: 10/17/2016 W/O Effective: Amount Paid: 06/05/2017 7%( 7 %) Work Started: Time Passed: 0%( 0 %) Contract: 160246 29327(04) US-75 STP-219B(042)IG Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: ATKINS Contract Amount: $631,654.59 Contract Time: 150 Letting Date: 07/21/2016 Contract Date: 08/09/2016 W/O Issued 08/11/2016 W/O Effective: 12/05/2016 Work Started: 11/14/2016 Residency: 08010 ATKINS LLC Adjusted: ( $641,780.59) ( 150 ) TRAFFIC SIGNALS AND PAVEMENT MARKING US-75 ALT/SH-97: FROM LINE AVENUE, EXTEND SOUTH IN SAPULPA. Amount Paid: Time Passed: Adjusted: 70 % ( 68 %) 80 % ( 80 %) BRIDGE AND APPROACHES SH-51: OVER Contract: 160280 Residency: 27071(04) SH-51 08400 CIMARRON RIVER, 3.5 MILES EAST OF THE SH-99 JUNCTION NEAR MANNFORD. ACSTP-219B(047)SS SAND SPRINGS PROJECT LENGTH = 1.021 MILE. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Williams, Mark J. Contract Amount: ( $7,356,355.59 $7,357,730.59) Contract Time: ( 280 280 ) Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued Adjusted: 09/22/2016 W/O Effective: Amount Paid: 01/03/2017 75 % ( 75 %) Work Started: Time Passed: 10/17/2016 68 % ( 68 %) Construction Status Report Page 82 Contract: 160281 30747(04) CT.ST. STP-219C(043)IG Contractor: APAC-CENTRAL, INC. Engineer: ATKINS Contract Amount: $750,648.40 Contract Time: 120 Letting Date: 08/18/2016 Contract Date: 09/14/2016 W/O Issued 09/15/2016 W/O Effective: 01/03/2017 Work Started: 01/03/2017 Residency: ATKINS 08010 GRADE, DRAIN, AND SURFACE CITY STREET (BRYAN AVENUE): FROM HAWTHORNE STREET, EXTEND EAST IN SAPULPA. PROJECT LENGTH = 0.183 MILE Adjusted: ( $750,648.40) ( 120 ) Amount Paid: Time Passed: Adjusted: 67 % ( 67 %) 80 % ( 80 %) BRIDGE AND APPROACHES SH-16: OVER Residency: Contract: 160316 28858(04) SH-16 08400 CHICKEN CREEK, 8.2 MILES AND 8.5 MILES EAST OF THE SH-48 JUNCTION NEAR ACSTP-219C(050)SS SAND SPRINGS BRISTOW. PROJECT LENGTH = 0.878 MILE. Contractor: MANHATTAN ROAD & BRIDGE COMPANY Adjusted: Engineer: Williams, Mark J. Contract Amount: ( $4,598,147.42 $4,598,147.42) Contract Time: ( 250 250 ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 10/19/2016 W/O Effective: Amount Paid: 02/16/2017 51 % ( 51 %) Work Started: Time Passed: 11/07/2016 66 % ( 66 %) GRADE, DRAIN, AND SURFACE COUNTY Contract: 160363 Residency: 22350(08) CO. RD. 08010 ROAD (WEST 81ST STREET SOUTH): FROM SH-97, EXTEND EAST IN SAPULPA. PROJECT CIRB-119C(192)RB ATKINS LENGTH = 1.590 MILES Contractor: PARAGON CONTRACTORS, LLC Engineer: Adjusted: ATKINS Contract Amount: ( $5,418,418.00 $5,418,418.00) Contract Time: ( 270 270 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/30/2016 W/O Effective: Amount Paid: 03/06/2017 33 % ( 33 %) Work Started: Time Passed: 02/06/2017 29 % ( 29 %) Contract: 170015 30518(04) SH-48 SSR-219B(053)SR Contractor: APAC-CENTRAL, INC. Engineer: Williams, Mark J. Contract Amount: $1,972,304.65 Contract Time: 75 Letting Date: 01/19/2017 Contract Date: 02/27/2017 W/O Issued 03/29/2017 W/O Effective: 06/05/2017 Work Started: 05/08/2017 County: Custer Residency: 08400 SAND SPRINGS RESURFACE (ASPHALT) SH-48: FROM THE SH-51 JUNCTION, EXTEND NORTH NEAR MANNFORD. PROJECT LENGTH = 6.990 MILES Adjusted: ( $1,972,304.65) ( ) 75 Amount Paid: Time Passed: Adjusted: 3%( 3 %) 7%( 7 %) 5 Commissioner District: Contracts Under Construction Construction Status Report Page 83 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 140091 Residency: 24863(04) CO.RD. 05005 COUNTY ROAD (EW-99): FROM US-183, EXTEND EAST. PROJECT LENGTH = 4.908 CIRB-120C(158)RB CIRCUIT ENGR. DISTR. # 7 MILES. Contractor: SEWELL BROS., INC. Engineer: Adjusted: CED7 Contract Amount: ( $4,678,008.55 $4,703,116.47) Contract Time: ( 190 271 ) Letting Date: 06/19/2014 Contract Date: 07/18/2014 W/O Issued Adjusted: 07/25/2014 W/O Effective: Amount Paid: 10/06/2014 96 % ( 96 %) Work Started: Time Passed: 10/06/2014 149 % ( 105 %) RESURFACE AND BRIDGE REHABILITATION Residency: Contract: 150051 24427(05) I-40 05100 I-40: FROM MILE MARKER 68.7 TO MILE MARKER 76.6. PROJECT LENGTH = 7.899 NHPPI-0040-3(072)SS CLINTON MILES. Contractor: HASKELL LEMON CONSTRUCTION CO. Adjusted: Engineer: Davis, Shawn Contract Amount: ( $10,440,306.71 $10,577,586.71) Contract Time: ( 150 178 ) Letting Date: 02/19/2015 Contract Date: 03/16/2015 W/O Issued Adjusted: 03/23/2015 W/O Effective: Amount Paid: 07/06/2015 93 % ( 92 %) Work Started: Time Passed: 08/03/2015 177 % ( 149 %) GRADE, DRAIN, SURFACE, AND TRAFFIC Contract: 160317 Residency: 27911(06) CT. ST. 05100 SIGNAL CITY STREETS (MAIN STREET/WASHINGTON AVENUE): FROM 1.0 ACSTP-220B(040)SS CLINTON MILE EAST OF SH-54, EXTEND EAST IN Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) WEATHERFORD. PROJECT LENGTH = 0.391 Engineer: Adjusted: Davis, Shawn MILE. Contract Amount: ( $4,985,476.71 $4,985,476.71) Contract Time: ( 280 280 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 6%( 6 %) Work Started: Time Passed: 05/10/2017 3%( 3 %) County: Delaware 8 Commissioner District: Contracts Under Construction RIGHT-OF-WAY CLEARANCE US-59: FROM Contract: 160165 Residency: 24150(08) US-59 08300 0.69 MILES SOUTH OF SH-127, EXTEND NORTH NEAR GROVE. PROJECT LENGTH = SSP-221B(030)RW CLAREMORE 4.950 MILES PREQUALIFICATION FOR THIS Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC PROJECT HAS BEEN WAIVED. BOTH BID Engineer: Adjusted: Tyler, Jennifer EXPRESS AND WRITTEN BIDS WILL BE ACCEPTABLE. Contract Amount: ( $202,424.00 $202,424.00) Contract Time: ( 180 180 ) Letting Date: 04/21/2016 Contract Date: 05/19/2016 W/O Issued Adjusted: 06/01/2016 W/O Effective: Amount Paid: 06/20/2016 83 % ( 83 %) Work Started: Time Passed: 06/20/2016 91 % ( 91 %) Construction Status Report Page 84 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170016 Residency: 28532(04) CO. RD. 08002 (NS-462/CHEROKEE STREET): OVER WOLF CREEK, 1.94 MILES NORTH OF SH-10/SH-25 IN STP-221D(001)CI TETRA TECH GROVE. PROJECT LENGTH = 0.369 MILE. Contractor: RRY SERVICES, LLC Engineer: Adjusted: TETR Contract Amount: ( $1,043,964.78 $1,043,964.78) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Dewey 5 Commissioner District: Contracts Under Construction GRADE, DRAIN, AND BRIDGE US-183: OVER Residency: Contract: 160247 06377(20) US-183 05100 THE CANADIAN RIVER, 6.6 MILES SOUTH OF SH-51 NEAR SEILING. PROJECT LENGTH = ACNHPP-222N(024)SS CLINTON 0.359 MILE. Contractor: SEWELL BROS., INC. Engineer: Adjusted: Davis, Shawn Contract Amount: ( $5,409,157.10 $5,409,157.10) Contract Time: ( 270 275 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/24/2016 W/O Effective: Amount Paid: 12/05/2016 67 % ( 67 %) Work Started: Time Passed: 11/07/2016 66 % ( 64 %) GRADE, DRAIN, AND SURFACE US-270/SH-3: Residency: Contract: 160365 05100 17671(38) US-270 FROM 1.8 MILES SOUTHEAST OF THE US-60 JUNCTION, EXTEND SOUTHEAST NEAR CLINTON NHPP-222N(023)SS SEILING. PROJECT LENGTH = 3.920 MILES. Contractor: J & R SAND COMPANY, INC. Engineer: Adjusted: Davis, Shawn Contract Amount: ( $6,170,376.91 $6,204,317.71) Contract Time: ( 270 270 ) Letting Date: 10/20/2016 Contract Date: 11/17/2016 W/O Issued Adjusted: 11/18/2016 W/O Effective: Amount Paid: 03/06/2017 38 % ( 37 %) Work Started: Time Passed: 01/30/2017 36 % ( 36 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160411 30026(04) COUNTY RO Residency: 05005 (EW-64): OVER UNNAMED CREEK, 3.6 MILES WEST OF THE BLAINE COUNTY LINE. STP-222D(022)CI CIRCUIT ENGR. DISTR. # 7 PROJECT LENGTH = 0.123 MILE Contractor: KLAVER CONSTRUCTION COMPANY, INC. Engineer: Adjusted: CED7 Contract Amount: ( $282,269.04 $282,269.04) Contract Time: ( ) 60 60 Letting Date: 11/17/2016 Contract Date: 01/01/1 W/O Issued Adjusted: 01/30/2017 W/O Effective: Amount Paid: 04/03/2017 89 % ( 89 %) Work Started: Time Passed: 02/17/2017 98 % ( 98 %) Construction Status Report Page 85 RESURFACE (ASPHALT) US-183: FROM 0.19 Contract: 170074 Residency: 28129(04) US-183 05100 MILES SOUTH OF THE SH-47 WEST JUNCTION, EXTEND NORTH NEAR PUTNAM. NHPPY-122N(083)(084)3P CLINTON PROJECT LENGTH = 14.83 MILES Contractor: HIGHWAY CONTRACTORS, INC. Engineer: Adjusted: Davis, Shawn Contract Amount: ( $3,569,836.41 $3,569,836.41) Contract Time: ( 221 221 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 10/15/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Ellis 6 Commissioner District: Contracts Under Construction Contract: 160366 32686(04) US-60 STP-223F(010)3B Contractor: RESTEK, INC. Engineer: Michael, Charles Contract Amount: $267,735.19 Contract Time: 90 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued 01/04/2017 W/O Effective: 03/06/2017 Work Started: 03/06/2017 County: Garfield Residency: GUYMON 06200 JOINT SEAL/REPAIR US-54/US-60/US-412/SH-3/SH-15/SH-136: AT MULTIPLE LOCATIONS IN DIVISION VI. Adjusted: ( $267,735.19) ( ) 90 Amount Paid: Time Passed: Adjusted: 32 % ( 32 %) 43 % ( 43 %) 4 Commissioner District: Contracts Under Construction RESURFACE (ASPHALT) SH-164: FROM THE Contract: 160216 Residency: 29144(04) SH-164 04300 SH-74 JUNCTION, EXTEND EAST NEAR COVINGTON. PROJECT LENGTH = 7.500 MILES SSR-224C(002)SR ENID Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Hoover, Jacob Contract Amount: ( $1,672,180.00 $1,672,180.00) Contract Time: ( ) 90 90 Letting Date: 06/16/2016 Contract Date: 07/19/2016 W/O Issued Adjusted: 07/25/2016 W/O Effective: Amount Paid: 11/07/2016 83 % ( 83 %) Work Started: Time Passed: 10/28/2016 122 % ( 122 %) Construction Status Report Page 86 GRADE, DRAIN, SURFACE, AND EROSION Contract: 160273 Residency: 23087(04) CT.ST. 04300 CONTROL CITY STREET (WILLOW ROAD): FROM 0.1 MILE EAST OF OAKWOOD ROAD, STP-124B(080)UR/STP-124E* ENID EXTEND EAST IN ENID. PROJECT LENGTH = Contractor: THE CUMMINS CONSTRUCTION CO., INC. 0.839 MILE. Engineer: Adjusted: Hoover, Jacob Contract Amount: ( $3,876,074.28 $3,876,074.28) Contract Time: ( 300 300 ) Letting Date: 07/21/2016 Contract Date: 08/08/2016 W/O Issued Adjusted: 10/19/2016 W/O Effective: Amount Paid: 02/21/2017 16 % ( 16 %) Work Started: Time Passed: 02/13/2017 23 % ( 23 %) *(146)EH GRADE, DRAIN, AND SURFACE COUNTY Residency: Contract: 170156 24868(08) CO. RD. 04009 ROAD (EW-40): FROM SH-15, EXTEND WEST NEAR GARBER. PROJECT LENGTH = 3.977 CIRB-224C(051)RB CIRCUIT ENGR. DISTR. # 8 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Adjusted: Engineer: CED8 Contract Amount: ( $2,997,839.45 $2,997,839.45) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/16/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170169 Residency: 28428(04) CO. RD. 04009 (EW-51): OVER SKELETON CREEK, 6.9 MILES EAST OF US-81 NEAR WAUKOMIS. PROJECT ACSTP-224D(048)CI CIRCUIT ENGR. DISTR. # 8 LENGTH = 0.274 MILE Contractor: K & R BUILDERS, INC. Engineer: Adjusted: CED8 Contract Amount: ( $776,040.90 $776,040.90) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/11/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Garvin 3 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 150053 Residency: 24869(04) CO.RD. 03100 COUNTY ROAD (NS-334): FROM SH-19, EXTEND NORTH. PROJECT LENGTH = 5.415 CIRB-125C(164)RB ADA MILES. Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $5,770,624.59 $5,813,562.40) Contract Time: ( 210 255 ) Letting Date: 02/19/2015 Contract Date: 03/16/2015 W/O Issued Adjusted: 03/24/2015 W/O Effective: Amount Paid: 09/01/2015 93 % ( 93 %) Work Started: Time Passed: 05/01/2015 121 % ( 100 %) Construction Status Report Page 87 BRIDGE AND APPROACHES I-35: OVER Contract: 150333 Residency: 28940(04) I-35 03200 WASHITA RIVER, 3.3 MILES NORTH OF SH-19. PROJECT LENGTH = 0.312 MILE. NHPPI-3500(020)SS PURCELL Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Reed, Lucas Contract Amount: ( $10,431,981.00 $10,594,963.45) Contract Time: ( 360 502 ) Letting Date: 11/19/2015 Contract Date: 12/16/2015 W/O Issued Adjusted: 12/22/2015 W/O Effective: Amount Paid: 04/04/2016 85 % ( 83 %) Work Started: Time Passed: 02/15/2016 126 % ( 90 %) BRIDGE REHABILITATION COUNTY ROAD Residency: Contract: 160023 29607(04) CO.RD. 03003 (RUPPE ROAD): OVER I-35, 4.74 MILES NORTH OF SH-7 NEAR WYNNEWOOD. PROJECT SBR-225N(046)SB CEC CORP. LENGTH = 0.135 MILE. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: CEC Contract Amount: ( $1,712,460.83 $1,726,060.83) Contract Time: ( 135 135 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/03/2016 W/O Effective: Amount Paid: 06/06/2016 98 % ( 97 %) Work Started: Time Passed: 07/25/2016 112 % ( 112 %) Contract: 160134 29615(04) I-35 SBR-225N(059)SB Contractor: OBC, INC. Engineer: Russell, Julie Contract Amount: $3,089,697.62 Contract Time: 300 Letting Date: 03/17/2016 Contract Date: 04/13/2016 W/O Issued 04/25/2016 W/O Effective: 08/01/2016 Work Started: 06/13/2016 Residency: ADA 03100 BRIDGE REHABILITATION I-35: OVER UNNAMED CREEK, 0.4 MILE SOUTH OF SH-29 NEAR WYNNEWOOD. PROJECT LENGTH = 0.258 MILE. Adjusted: ( $3,089,697.62) ( 406 ) Amount Paid: Time Passed: Adjusted: 81 % ( 81 %) 102 % ( 75 %) RESURFACE (ASPHALT) I-35: FROM THE Contract: 160167 Residency: 31838(04) I-35 03200 WASHITA RIVER, EXTEND NORTH NEAR PAOLI. PROJECT LENGTH = 7.450 MILES ACNHPPI-3500(030)SS PURCELL Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $2,560,657.15 $2,560,657.15) Contract Time: ( ) 45 45 Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued Adjusted: 05/18/2016 W/O Effective: Amount Paid: 10/01/2016 93 % ( 93 %) Work Started: Time Passed: 09/19/2016 251 % ( 251 %) Construction Status Report Page 88 Contract: 160195 28000(04) SH-74 ACSTP-225C(049)SS Contractor: TREAS CONSTRUCTION, INC. Engineer: Reed, Lucas Contract Amount: $5,197,304.30 Contract Time: 250 Letting Date: 08/18/2016 Contract Date: 09/12/2016 W/O Issued 09/14/2016 W/O Effective: 01/03/2017 Work Started: 02/20/2017 Contract: 160282 28942(04) SH-74 STP-225C(063)SS Contractor: TREAS CONSTRUCTION, INC. Engineer: EST Contract Amount: $854,448.59 Contract Time: 120 Letting Date: 08/18/2016 Contract Date: 09/12/2016 W/O Issued 09/14/2016 W/O Effective: 01/03/2017 Work Started: 01/03/2017 Residency: PURCELL BRIDGE AND APPROACHES SH-74: OVER WASHITA RIVER, 1.41 MILES NORTH OF SH-19 NEAR MAYSVILLE. PROJECT LENGTH = 0.864 MILE 03200 Adjusted: ( $5,197,304.30) ( 250 ) Amount Paid: Time Passed: Residency: 03001 ENGR. SERV. & TESTING Adjusted: ( $854,448.59) ( 120 ) Adjusted: 38 % ( 38 %) 26 % ( 26 %) BRIDGE AND APPROACHES SH-74: OVER UNNAMED CREEKS, 3.19 MILES AND 3.28 MILES NORTH OF THE CARTER COUNTY LINE NEAR ELMORE. PROJECT LENGTH = 0.076 MILE Amount Paid: Time Passed: Adjusted: 67 % ( 67 %) 62 % ( 62 %) BRIDGE AND APPROACHES SH-19: OVER Contract: 160412 Residency: 28929(04) SH-19 03100 BEEF CREEK, 0.6 MILES EAST OF THE SH-74 JUNCTION NEAR MAYSVILLE. PROJECT STP-225C(066)SS ADA LENGTH = 0.057 MILE Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $1,315,000.00 $1,315,000.00) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 12/27/2016 W/O Effective: Amount Paid: 03/06/2017 41 % ( 41 %) Work Started: Time Passed: 02/07/2017 65 % ( 65 %) RESURFACE (ASPHALT) SH-17A: FROM I-35, Contract: 170017 Residency: 30566(04) SH-17A 03100 EXTEND EAST NEAR WYNNEWOOD. PROJECT LENGTH = 3.171 MILES. SSR-225C(065)SR ADA Contractor: SEAL MASTERS, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $668,333.55 $668,333.55) Contract Time: ( ) 25 25 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Construction Status Report Page 89 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170076 Residency: 27869(04) CO. RD. 03021 (NS-323): OVER OWL CREEK, 1.6 MILES SOUTH OF THE MCCLAIN COUNTY LINE NEAR STP-125D(193)CI OLSSON ASSOCIATES PAOLI. PROJECT LENGTH = 0.179 MILE Contractor: K & R BUILDERS, INC. Engineer: Adjusted: ZOA Contract Amount: ( $616,314.74 $616,314.74) Contract Time: ( ) 90 90 Letting Date: 02/16/2017 Contract Date: 03/14/2017 W/O Issued Adjusted: 03/16/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE REHABILITATION SH-17A: OVER I-35, Residency: Contract: 170077 29110(04) SH-17A 03100 3.1 MILES WEST OF US-77 NEAR WYNNEWOOD. PROJECT LENGTH = 0.159 NHPPI-225N(001)SS ADA MILE Contractor: M.J. HUGHES CONSTRUCTION, INC. Adjusted: Engineer: Russell, Julie Contract Amount: ( $2,161,373.46 $2,161,373.46) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/20/2017 W/O Issued Adjusted: 03/31/2017 W/O Effective: Amount Paid: 04/24/2017 17 % ( 17 %) Work Started: Time Passed: 04/17/2017 19 % ( 19 %) Contract: 170079 29564(04) I-35 NHPPIY-225N-(045) Contractor: OBC, INC. Engineer: CEC Contract Amount: $2,276,522.83 Contract Time: 420 Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued 03/17/2017 W/O Effective: 04/24/2017 Work Started: 04/24/2017 Residency: CEC CORP. 03003 BRIDGE REHABILITATION I-35: OVER RUSH CREEK, 0.6 MILES SOUTH OF SH-19 IN PAULS VALLEY. PROJECT LENGTH = 0.541 MILE Adjusted: ( $2,276,522.83) ( 420 ) Amount Paid: Time Passed: Adjusted: 7%( 7 %) 5%( 5 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170121 Residency: 25658(04) CO. RD. 03200 (NS-310/EASTERN AVENUE): OVER PANTHER CREEK, 5.0 MILES NORTH OF SH-29 NEAR CIRB-125D(165)RB PURCELL ELMORE CITY. PROJECT LENGTH = 0.089 Contractor: BRIDGECO CONTRACTORS, INC. MILE Engineer: Adjusted: Reed, Lucas Contract Amount: ( $369,443.51 $369,443.51) Contract Time: ( ) 90 90 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/24/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Construction Status Report Page 90 RESURFACE (ASPHALT) SH-19: FROM 0.6 Contract: 170122 Residency: 31826(04) SH-19 03100 MILES WEST OF I-35, EXTEND EAST IN PAULS VALLEY. PROJECT LENGTH = 2.84 MILES STPY-225B(067)3P ADA Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $1,013,103.95 $1,013,103.95) Contract Time: ( ) 30 30 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/25/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Grady 7 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES SH-19: OVER Residency: Contract: 140292 28038(04) SH-19 07300 WASHITA RIVER AND WASHITA RIVER O'FLOW 1.5 MILES NORTHWEST OF THE STPY-226C(014) ANADARKO GARVIN COUNTY LINE. PROJECT LENGTH = Contractor: SHERWOOD CONSTRUCTION CO., INC. 0.946 MILE. Engineer: Adjusted: Knight, Reese Contract Amount: ( $7,368,368.15 $7,368,368.15) Contract Time: ( 460 430 ) Letting Date: 09/18/2014 Contract Date: 10/17/2014 W/O Issued Adjusted: 10/23/2014 W/O Effective: Amount Paid: 02/02/2015 92 % ( 92 %) Work Started: Time Passed: 05/04/2015 101 % ( 108 %) Contract: 160027 30384(04) US-62 SBR-226N(030)SB Contractor: RESTEK, INC. Engineer: Knight, Reese Contract Amount: $2,483,740.96 Contract Time: 180 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 05/06/2016 W/O Effective: 06/06/2016 Work Started: 06/06/2016 Contract: 160086 20302(04) SH-39 ACSTP-126B(066)SS Contractor: MUNOZ CONSTRUCTION, INC. Engineer: CEC Contract Amount: $8,867,757.41 Contract Time: 290 Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued 05/19/2016 W/O Effective: 09/06/2016 Work Started: 07/25/2016 Residency: ANADARKO 07300 BRIDGE REHABILITATION US-62: OVER UNION PACIFIC RAILROAD, 0.2 MILE EAST OF US-81. PROJECT LENGTH = 0.204 MILE. Adjusted: ( $2,483,740.96) ( 180 ) Amount Paid: Time Passed: Residency: CEC CORP. 07003 Adjusted: 54 % ( 54 %) 135 % ( 135 %) GRADE, DRAIN, SURFACE, AND BRIDGE SH-39: FROM 3.6 MILES EAST OF US-62, EXTEND EAST NEAR CHICKASHA. PROJECT LENGTH = 2.973 MILES. Adjusted: ( $8,867,757.41) ( 290 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 60 % ( 60 %) 93 % ( 93 %) Page 91 JOINT SEAL/REPAIR US-81: OVER UNION Contract: 160319 Residency: 31701(04) US-81 07300 PACIFIC RAILROAD, 0.4 MILES NORTH OF THE SH-37 JUNCTION IN MINCO. NHPP-226N(038)3B ANADARKO Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Adjusted: Knight, Reese Contract Amount: ( $611,380.00 $611,380.00) Contract Time: ( ) 70 70 Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued Adjusted: 12/13/2016 W/O Effective: Amount Paid: 02/16/2017 85 % ( 85 %) Work Started: Time Passed: 01/09/2017 84 % ( 84 %) RESURFACE (ASPHALT) SH-37: FROM Residency: Contract: 170080 30520(04) SH-37 07300 FRISCOE ROAD 3.0 MILES WEST OF SH-4, EXTEND EAST IN TUTTLE. PROJECT LENGTH STPY-226C(048)3P ANADARKO = 6.00 MILES Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Adjusted: Engineer: Knight, Reese Contract Amount: ( $2,022,644.00 $2,022,644.00) Contract Time: ( ) 60 60 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/10/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) TRAFFIC SIGNALS SH-37: AT THE Contract: 170081 Residency: 32880(04) SH-37 07300 INTERSECTION OF SARA ROAD, IN TUTTLE. HSIP-226B(047)TR ANADARKO Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Adjusted: Knight, Reese Contract Amount: ( $160,307.34 $160,307.34) Contract Time: ( ) 45 45 Letting Date: 02/16/2017 Contract Date: 03/22/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 05/30/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Grant 4 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE AND BRIDGE Contract: 160088 Residency: 24946(05) CO.RD. 04009 COUNTY ROAD (NS-301/NS-303/EW-21/EW-22): ON NS-301, FROM EW-20 EXTEND SOUTH CIRB-127C(138)RB CIRCUIT ENGR. DISTR. # 8 THEN EAST NEAR LAMONT. PROJECT Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC. LENGTH = 4.887 MILES Engineer: Adjusted: CED8 Contract Amount: ( $3,207,175.48 $3,207,175.48) Contract Time: ( 120 120 ) Letting Date: 02/18/2016 Contract Date: 03/21/2016 W/O Issued Adjusted: 03/25/2016 W/O Effective: Amount Paid: 09/06/2016 85 % ( 85 %) Work Started: Time Passed: 09/06/2016 123 % ( 123 %) Construction Status Report Page 92 SHOULDER IMPROVEMENT, RESURFACE Contract: 160413 Residency: 24163(04) SH-11 04300 (ASPHALT), AND BRIDGE SH-11: FROM 7.9 MILES WEST OF US-81, EXTEND EAST NEAR STP-127B(107)(108)(109)* ENID MEDFORD. PROJECT LENGTH = 7.660 MILES. Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Adjusted: Hoover, Jacob Contract Amount: ( $12,986,834.47 $13,019,507.41) Contract Time: ( 440 440 ) Letting Date: 11/17/2016 Contract Date: 12/13/2016 W/O Issued Adjusted: 12/30/2016 W/O Effective: Amount Paid: 03/06/2017 20 % ( 20 %) Work Started: Time Passed: 02/06/2017 20 % ( 20 %) (110)SS BRIDGE AND APPROACHES COUNTY ROAD Contract: 160414 27282(04) COUNTY RO Residency: 04009 (EW-16): OVER SAND CREEK, 1.4 MILES EAST OF THE SH-132 JUNCTION NEAR MEDFORD. STP-127D(172)CI CIRCUIT ENGR. DISTR. # 8 PROJECT LENGTH = 0.194 MILE Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: CED8 Contract Amount: ( $804,365.53 $804,365.53) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/19/2016 W/O Effective: Amount Paid: 03/06/2017 32 % ( 32 %) Work Started: Time Passed: 03/06/2017 43 % ( 43 %) GRADE, DRAIN, AND SURFACE COUNTY Contract: 170082 Residency: 28419(05) CO. RD. 04009 ROAD (EW-08): FROM THE ALFALFA COUNTY LINE, EXTEND EAST NEAR WAKITA. PROJECT CIRB-127C(188)RB CIRCUIT ENGR. DISTR. # 8 LENGTH = 3.969 MILES Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Adjusted: CED8 Contract Amount: ( $2,121,376.86 $2,121,376.86) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 03/31/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Greer 5 Commissioner District: Contracts Under Construction Contract: 140357 24207(04) SH-34 STPY-128C(069)SS Contractor: SEWELL BROS., INC. Engineer: ATKINS Contract Amount: $5,935,580.20 Contract Time: 220 Letting Date: 11/20/2014 Contract Date: 12/23/2014 W/O Issued 01/05/2015 W/O Effective: 03/02/2015 Work Started: 03/02/2015 Residency: ATKINS 05010 BRIDGE AND APPROACHES SH-34: OVER THE SALT FORK OF THE RED RIVER, 1.2 MILES SOUTH OF US-283. PROJECT LENGTH = 0.861 MILE. Adjusted: ( $5,976,240.59) ( 270 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 109 % ( 108 %) 122 % ( 99 %) Page 93 GRADE, DRAIN, SURFACE AND BRIDGE Contract: 150231 Residency: 24948(04) CO.RD. 05005 COUNTY ROAD (EW-144): FROM 1.0 MILE WEST OF SH-6, EXTEND EAST. PROJECT CIRB-128D(074)RB CIRCUIT ENGR. DISTR. # 7 LENGTH = 4.230 MILES. Contractor: KLAVER CONSTRUCTION COMPANY, INC. Engineer: Adjusted: CED7 Contract Amount: ( $3,746,408.29 $3,811,408.29) Contract Time: ( 180 204 ) Letting Date: 07/23/2015 Contract Date: 08/20/2015 W/O Issued Adjusted: 10/15/2015 W/O Effective: Amount Paid: 12/07/2015 93 % ( 91 %) Work Started: Time Passed: 12/07/2015 146 % ( 128 %) GRADE, DRAIN, AND SURFACE SH-6: FROM Residency: Contract: 150370 15023(07) SH-6 05200 1.0 MILE SOUTH OF SH-9 EXTEND NORTH IN GRANITE. PROJECT LENGTH = 2.248 MILES. ACSTP-128B(008)SS ALTUS Contractor: CASWELL CONTRACTING, INC/TOM HUDSON PAVING, INC. (JV) Adjusted: Engineer: Sirmons, Karl Contract Amount: ( $9,529,011.54 $9,784,831.14) Contract Time: ( 300 300 ) Letting Date: 11/19/2015 Contract Date: 12/22/2015 W/O Issued Adjusted: 01/04/2016 W/O Effective: Amount Paid: 03/14/2016 74 % ( 72 %) Work Started: Time Passed: 03/14/2016 104 % ( 104 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160367 Residency: 30685(04) CO. RD. 05005 (NS-196): OVER LAKE CREEK, 5.3 MILES NORTH OF SH-9 NEAR GRANITE. PROJECT STP-228D(009)CI CIRCUIT ENGR. DISTR. # 7 LENGTH = 0.133 MILE Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: CED7 Contract Amount: ( $304,575.50 $304,575.50) Contract Time: ( ) 60 60 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 97 % ( 97 %) Work Started: Time Passed: 12/21/2016 107 % ( 107 %) County: Harmon 5 Commissioner District: Contracts Under Construction Contract: 170018 27542(04) SH-30 SSR-129C(045)SR Contractor: OVERLAND CORPORATION Engineer: Sirmons, Karl Contract Amount: $1,447,467.50 Contract Time: Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued 02/17/2017 W/O Effective: Work Started: Residency: ALTUS 05200 RESURFACE (ASPHALT) SH-30: FROM THE US-62 JUNCTION, EXTEND NORTH IN HOLLIS. PROJECT LENGTH = 8.00 MILES Adjusted: ( $1,447,467.50) ( ) Fixed Completion Date: 10/31/2017 Adjusted: Amount Paid: 0%( 0 %) Time Passed: 0%( 0 %) Construction Status Report Page 94 County: Harper 6 Commissioner District: Contracts Under Construction Contract: 150135 26494(04) SH-34 STP-130B(141)SS Contractor: SEWELL BROS., INC. Engineer: Embree, Jerry (Acting) Contract Amount: $4,640,850.10 Contract Time: 190 Letting Date: 04/16/2015 Contract Date: 05/15/2015 W/O Issued 05/21/2015 W/O Effective: 08/03/2015 Work Started: 08/03/2015 Residency: BUFFALO 06100 BRIDGE AND APPROACHES SH-34: OVER BUFFALO CREEK, 5.9 MILES SOUTH OF US-64. PROJECT LENGTH = 0.671 MILE. Adjusted: ( $4,647,019.35) ( 190 ) Amount Paid: Time Passed: Adjusted: 93 % ( 93 %) 111 % ( 111 %) GRADE, DRAIN, AND SURFACE COUNTY Residency: Contract: 160089 29347(04) CO.RD. 06009 ROAD (NS-183): FROM 4.0 MILES NORTH OF US-64, EXTEND NORTH NEAR BUFFALO. STP-230C(020)CI CIRCUIT ENGR. DISTR. # 8 PROJECT LENGTH = 3.057 MILES Contractor: J & R SAND COMPANY, INC. Engineer: Adjusted: CED8 Contract Amount: ( $2,847,700.07 $2,847,700.07) Contract Time: ( 150 150 ) Letting Date: 02/18/2016 Contract Date: 03/24/2016 W/O Issued Adjusted: 04/01/2016 W/O Effective: Amount Paid: 07/15/2016 99 % ( 99 %) Work Started: Time Passed: 07/15/2016 90 % ( 90 %) Contract: 160368 29444(04) US-64 STP-230B(023)SS Contractor: K & R BUILDERS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $1,199,277.14 Contract Time: 180 Letting Date: 10/20/2016 Contract Date: 11/17/2016 W/O Issued 11/21/2016 W/O Effective: 03/06/2017 Work Started: 03/06/2017 Residency: BUFFALO 06100 BRIDGE AND APPROACHES US-64: OVER UNNAMED CREEK, 0.1 MILES WEST OF THE US-183 JUNCTION NEAR BUFFALO. PROJECT LENGTH = 0.183 MILE Adjusted: ( $1,199,277.14) ( 180 ) Amount Paid: Time Passed: Adjusted: 27 % ( 27 %) 31 % ( 31 %) JOINT SEAL/REPAIR US-270/SH-58: AT Contract: 170019 Residency: 31670(04) US-270 06100 MULTIPLE LOCATIONS IN DIVISION VI. STP-230F(018)3B BUFFALO Contractor: PBX CORPORATION Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $289,491.50 $289,491.50) Contract Time: ( ) 80 80 Letting Date: 01/19/2017 Contract Date: 02/21/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 57 % ( 57 %) Work Started: Time Passed: 04/17/2017 33 % ( 33 %) Construction Status Report Page 95 County: Haskell 1 Commissioner District: Contracts Under Construction Contract: 140358 27046(04) SH-2 STP-231B(005)SS Contractor: OBC, INC. Engineer: Edwards, Carl Contract Amount: $4,515,264.45 Contract Time: 240 Letting Date: 02/19/2015 Contract Date: 03/16/2015 W/O Issued 03/23/2015 W/O Effective: 09/01/2015 Work Started: 07/29/2015 Contract: 150097 23105(11) US-69 SSP-231C(016)SS Contractor: GARY A. CRAIN, INC. Engineer: Edwards, Carl Contract Amount: $64,615.50 Contract Time: 60 Letting Date: 03/19/2015 Contract Date: 04/20/2015 W/O Issued 04/23/2015 W/O Effective: 08/03/2015 Work Started: 08/18/2015 Residency: SALLISAW 01200 BRIDGE AND APPROACHES SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF SH-31. PROJECT LENGTH = 0.921 MILE Adjusted: ( $4,515,264.45) ( 240 ) Amount Paid: Time Passed: Residency: SALLISAW 01200 Adjusted: 88 % ( 88 %) 150 % ( 150 %) BRIDGE WATER PROOF SEAL US-69/SH-9/SH-53: AT MULTIPLE LOCATIONS IN DIVISION I. Adjusted: ( $64,615.50) ( ) 60 Amount Paid: Time Passed: Adjusted: 87 % ( 87 %) 62 % ( 62 %) BRIDGE REHABILITATION SH-9: OVER SAN Residency: Contract: 160248 30511(04) SH-9 01200 BOIS CREEK 0.8 MILES EAST OF SH-26 NEAR STIGLER. ACSTP-231B(024)SS SALLISAW Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Engineer: Adjusted: Edwards, Carl Contract Amount: ( $726,282.26 $726,282.26) Contract Time: ( ) 90 90 Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 09/14/2016 W/O Effective: Amount Paid: 03/06/2017 0%( 0 %) Work Started: Time Passed: 03/06/2017 0%( 0 %) BRIDGE AND APPROACHES SH-82: OVER OWL Contract: 160415 Residency: 27102(04) SH-82 01200 CREEK, 5.6 MILES NORTH OF THE SH-31 JUNCTION NEAR STIGLER. PROJECT LENGTH STP-231C(031)SS SALLISAW = 0.340 MILE Contractor: T. MCDONALD CONSTRUCTION, INC. Engineer: Adjusted: Edwards, Carl Contract Amount: ( $2,321,260.60 $2,321,260.60) Contract Time: ( 180 180 ) Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 12/27/2016 W/O Effective: Amount Paid: 03/06/2017 55 % ( 55 %) Work Started: Time Passed: 01/10/2017 43 % ( 43 %) Construction Status Report Page 96 RESURFACE (ASPHALT) SH-9: FROM 5.48 Contract: 170020 Residency: 31375(04) SH-9 01200 MILES EAST OF SH-2, EXTEND EAST NEAR STIGLER. PROJECT LENGTH = 3.062 MILES SSR-231B(028)SR SALLISAW Contractor: JOB CONSTRUCTION CO., INC. Engineer: Adjusted: Edwards, Carl Contract Amount: ( $1,261,310.00 $1,261,310.00) Contract Time: ( ) 30 30 Letting Date: 01/19/2017 Contract Date: 02/21/2017 W/O Issued Adjusted: 02/23/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Contract: 170083 30417(04) SH-31 STPY-231C(029)(030)3P Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $1,427,769.80 Contract Time: 60 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued 04/25/2017 W/O Effective: 07/05/2017 Work Started: County: Residency: SALLISAW 01200 RESURFACE (ASPHALT) SH-31: FROM SH-2 EXTEND EAST, NEAR KINTA. SH-82: FROM 1.3 MI SOUTH OF THE SH-31 JCT, EXTEND NORTH. PROJECT LENGTH = 7.157 MILES Adjusted: ( $1,427,769.80) ( ) 60 Amount Paid: Time Passed: Hughes Adjusted: 0%( 0 %) 0%( 0 %) 3 Commissioner District: Contracts Under Construction Contract: 130123 29431(04) SH-48 STPY-232C(009)(010)3P Contractor: GLOVER & ASSOCIATES, INC. Engineer: Russell, Julie Contract Amount: $2,382,259.62 Contract Time: 75 Letting Date: 02/21/2013 Contract Date: 03/15/2013 W/O Issued 06/25/2013 W/O Effective: 07/08/2013 Work Started: 07/08/2013 Residency: ADA 03100 RESURFACE (ASPHALT) SH-48: BEGIN AT SH-1 IN ATWOOD, EXTEND NORTH. PROJECT LENGTH = 12.06 MILES. Adjusted: ( $2,433,683.18) ( ) 75 Amount Paid: Time Passed: Adjusted: 99 % ( 97 %) 125 % ( 125 %) BRIDGE AND APPROACHES SH-9: OVER Contract: 160029 Residency: 27059(04) SH-09 03300 WEWOKA CREEK, 3.2 MILES EAST OF US-75 NEAR WETUMKA. PROJECT LENGTH = 0.747 ACSTP-232C(036)SS WEWOKA MILE. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $5,224,907.40 $5,230,406.80) Contract Time: ( 250 253 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/02/2016 W/O Effective: Amount Paid: 06/06/2016 92 % ( 92 %) Work Started: Time Passed: 03/21/2016 99 % ( 98 %) Construction Status Report Page 97 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160090 Residency: 28575(04) CO.RD. 03300 COUNTY ROAD (EW-126): FROM 3.0 MILES WEST OF US-75, EXTEND EAST NEAR STP-232C(041)CI WEWOKA HOLDENVILLE. PROJECT LENGTH = 2.879 Contractor: GLOVER & ASSOCIATES, INC. MILES Engineer: Adjusted: Helton, Matthew Contract Amount: ( $3,220,801.19 $3,220,801.19) Contract Time: ( 220 220 ) Letting Date: 02/18/2016 Contract Date: 03/21/2016 W/O Issued Adjusted: 03/24/2016 W/O Effective: Amount Paid: 07/05/2016 19 % ( 19 %) Work Started: Time Passed: 09/06/2016 56 % ( 56 %) BRIDGE AND APPROACHES SH-9: OVER Residency: Contract: 160285 28921(04) SH-9 03300 UNNAMED CREEK, 1.2 MILES WEST OF US-75, NEAR WETUMKA. PROJECT LENGTH = 0.187 ACSTP-232C(050)SS WEWOKA MILE. Contractor: T. MCDONALD CONSTRUCTION, INC. Adjusted: Engineer: Helton, Matthew Contract Amount: ( $1,727,399.83 $1,750,789.83) Contract Time: ( 150 150 ) Letting Date: 08/18/2016 Contract Date: 09/21/2016 W/O Issued Adjusted: 09/26/2016 W/O Effective: Amount Paid: 01/03/2017 77 % ( 76 %) Work Started: Time Passed: 10/19/2016 76 % ( 76 %) RESURFACE (ASPHALT) US-270: FROM 0.25 Contract: 170023 Residency: 29804(04) US-270 03100 MILE WEST OF US-75, EXTEND EAST IN CALVIN. PROJECT LENGTH = 10.730 MILES. SSR-232B(051)(052)SR ADA Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $2,002,093.65 $2,002,093.65) Contract Time: ( ) 60 60 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Jackson 5 Commissioner District: Contracts Under Construction WIDEN, RESURFACE, AND BRIDGE US-283: Contract: 150136 Residency: 24379(07) US-283 05200 FROM 0.1 MILE SOUTH OF SH-5 EAST, EXTEND NORTH NEAR ALTUS. PROJECT STP-133B(087)SS ALTUS LENGTH = 6.099 MILES. Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Sirmons, Karl Contract Amount: ( $9,934,218.57 $10,359,847.95) Contract Time: ( 275 275 ) Letting Date: 10/15/2015 Contract Date: 11/13/2015 W/O Issued Adjusted: 11/17/2015 W/O Effective: Amount Paid: 03/07/2016 63 % ( 60 %) Work Started: Time Passed: 03/14/2016 112 % ( 112 %) Construction Status Report Page 98 Contract: 160199 29528(04) US-62 ACNHPP-233N(029)SS Contractor: OBC, INC. Engineer: Sirmons, Karl Contract Amount: $5,691,317.95 Contract Time: 270 Letting Date: 05/19/2016 Contract Date: 06/14/2016 W/O Issued 06/15/2016 W/O Effective: 10/03/2016 Work Started: 09/06/2016 Residency: ALTUS 05200 BRIDGE AND APPROACHES US-62: OVER SALT FORK OF THE RED RIVER, 0.6 MILE EAST OF THE SH-6 JUNCTION NEAR ALTUS. PROJECT LENGTH = 0.416 MILE. Adjusted: ( $5,691,317.95) ( 270 ) Amount Paid: Time Passed: Adjusted: 99 % ( 99 %) 83 % ( 83 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160249 28723(04) CO.RD. 05005 COUNTY ROAD (NS-210): FROM 4.0 MILES NORTH OF SH-5, EXTEND NORTH NEAR CIRB-233C(008)RB CIRCUIT ENGR. DISTR. # 7 ALTUS. PROJECT LENGTH = 4.975 MILES. Contractor: K & R BUILDERS, INC. Adjusted: Engineer: CED7 Contract Amount: ( $4,263,186.50 $4,277,366.50) Contract Time: ( 220 223 ) Letting Date: 07/21/2016 Contract Date: 01/01/1 W/O Issued Adjusted: 09/09/2016 W/O Effective: Amount Paid: 12/05/2016 28 % ( 27 %) Work Started: Time Passed: 12/05/2016 53 % ( 52 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160286 Residency: 30061(04) CO.RD. 05005 (NS-209): OVER UNNAMED CREEK, 5.6 MILES SOUTH OF US-62 NEAR ALTUS. PROJECT STP-233D(028)CI CIRCUIT ENGR. DISTR. # 7 LENGTH = 0.180 MILE. Contractor: SEWELL BROS., INC. Engineer: Adjusted: CED7 Contract Amount: ( $529,250.20 $529,250.20) Contract Time: ( 110 110 ) Letting Date: 08/18/2016 Contract Date: 09/21/2016 W/O Issued Adjusted: 09/23/2016 W/O Effective: Amount Paid: 01/03/2017 88 % ( 88 %) Work Started: Time Passed: 11/14/2016 99 % ( 99 %) County: Jefferson 7 Commissioner District: Contracts Under Construction Contract: 150199 28800(04) US-81 NHPP-234N(015)SS Contractor: OBC, INC. Engineer: Roberts, Colton Contract Amount: $2,516,112.74 Contract Time: 180 Letting Date: 06/18/2015 Contract Date: 07/15/2015 W/O Issued 07/17/2015 W/O Effective: 02/16/2016 Work Started: 02/16/2016 Residency: DUNCAN 07100 BRIDGE AND APPROACHES - DIVISION VII US-81: OVER FLAT CREEK, 7.88 MILES NORTH OF THE TEXAS STATE LINE. PROJECT LENGTH = 0.208 MILE. Adjusted: ( $2,516,112.74) ( 180 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 100 % ( 100 %) 98 % ( 98 %) Page 99 Contract: 170025 30539(04) US-81 SSR-234N(040)SR Contractor: OVERLAND CORPORATION Engineer: Roberts, Colton Contract Amount: $1,267,427.60 Contract Time: 75 Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued 02/17/2017 W/O Effective: 06/05/2017 Work Started: 03/13/2017 Contract: 170084 29566(04) US-81 NHPPY-234N(041)/NHPPY-23* Contractor: FRONTIER BRIDGE, INC. Engineer: ATKINS Contract Amount: $3,849,793.25 Contract Time: 280 Letting Date: 03/16/2017 Contract Date: 04/14/2017 W/O Issued 04/18/2017 W/O Effective: 09/05/2017 Work Started: *4N(043)SS Contract: 170123 27977(04) SH-79 STP-234B(014)SS Contractor: FRONTIER BRIDGE, INC. Engineer: Roberts, Colton Contract Amount: $11,164,064.48 Contract Time: 360 Letting Date: 03/16/2017 Contract Date: 04/14/2017 W/O Issued 04/18/2017 W/O Effective: 09/05/2017 Work Started: Residency: DUNCAN 07100 RESURFACE (ASPHALT) US-81: FROM THE US-70 JUNCTION, EXTEND NORTH IN WAURIKA. PROJECT LENGTH = 5.00 MILES Adjusted: ( $1,267,427.60) ( ) 75 Amount Paid: Time Passed: Residency: ATKINS 07010 Adjusted: 92 % ( 92 %) 35 % ( 35 %) BRIDGE AND APPROACHES US-81: OVER UNNAMED CREEK AND HACKBERRY CREEK, 1.7 MILES AND 4.1 MILES NORTH OF SH-32 NEAR RYAN. PROJECT LENGTH = 0.411 MILE Adjusted: ( $3,849,793.25) ( 280 ) Amount Paid: Time Passed: Residency: DUNCAN 07100 Adjusted: 0%( 0 %) 0%( 0 %) BRIDGE AND APPROACHES SH-79: OVER THE RED RIVER, 0.5 MILES NORTH OF THE TEXAS STATE LINE. PROJECT LENGTH = 1.189 MILES Adjusted: ( $11,164,064.48) ( 360 ) Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170124 Residency: 28449(04) CO. RD. 07001 (NS-299): OVER TRIBUTARY TO BAKER CREEK, 0.3 MILES NORTH OF SH-32 NEAR STP-234D(042)CI ENGR. SERV. & TESTING GRADY. PROJECT LENGTH = 0.202 MILE Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: EST Contract Amount: ( $572,789.33 $572,789.33) Contract Time: ( ) 90 90 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/24/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Johnston 3 Commissioner District: Contracts Under Construction Construction Status Report Page 100 Contract: 160250 23268(04) SH-99 ACSTP-135B(086)SS Contractor: OVERLAND CORPORATION Engineer: Russell, Julie Contract Amount: $11,018,314.20 Contract Time: 330 Letting Date: 07/21/2016 Contract Date: 01/01/1 W/O Issued 08/25/2016 W/O Effective: 02/20/2017 Work Started: 02/20/2017 Contract: 160287 29603(04) SH-1 SBR-235C(017)SB Contractor: C3 CONSTRUCTION, INC. Engineer: Russell, Julie Contract Amount: $2,483,537.37 Contract Time: 210 Letting Date: 08/18/2016 Contract Date: 09/21/2016 W/O Issued 09/26/2016 W/O Effective: 03/06/2017 Work Started: 10/18/2016 Residency: ADA 03100 GRADE, DRAIN, SURFACE, AND BRIDGE SH-99: FROM 5.64 MILES NORTH OF SH-22, EXTEND NORTH NEAR TISHOMINGO. PROJECT LENGTH = 4.375 MILES. Adjusted: ( $11,018,314.20) ( 330 ) Amount Paid: Time Passed: Residency: ADA 03100 Adjusted: ( $2,541,365.29) ( 216 ) Adjusted: 8%( 8 %) 16 % ( 16 %) BRIDGE REHABILITATION SH-1: OVER WASHITA RIVER AND OVERFLOW, 4.18 MILES AND 4.44 MILES NORTH OF THE MARSHALL COUNTY LINE. PROJECT LENGTH = 0.511 MILE. Amount Paid: Time Passed: Adjusted: 81 % ( 79 %) 95 % ( 93 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160369 Residency: 28574(04) CO. RD. 03100 (GREASY BEND ROAD): OVER THE WASHITA RIVER, 1.4 MILES EAST OF THE CARTER STP-235C(020)CI ADA COUNTY LINE. PROJECT LENGTH = 0.478 MILE Contractor: OBC, INC. Engineer: Adjusted: Russell, Julie Contract Amount: ( $4,352,723.36 $4,352,723.36) Contract Time: ( 365 365 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 14 % ( 14 %) Work Started: Time Passed: 03/06/2017 18 % ( 18 %) GRADE, DRAIN, SURFACE, BRIDGE, AND Contract: 170157 Residency: 17543(04) CO. RD. 03100 EROSION CONTROL. COUNTY ROAD (GREASY BEND ROAD): OVER WASHITA RIVER, 5.0 CIRB-135C(020)RB ADA MILES EAST OF THE CARTER COUNTY LINE Contractor: OVERLAND CORPORATION NEAR MANNSVILLE. PROJECT LENGTH = Engineer: Adjusted: Russell, Julie 0.820 MILE Contract Amount: ( $2,557,873.81 $2,557,873.81) Contract Time: ( 210 210 ) Letting Date: 04/20/2017 Contract Date: 05/16/2017 W/O Issued Adjusted: 05/19/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Kay 4 Commissioner District: Contracts Under Construction Construction Status Report Page 101 BRIDGE AND APPROACHES COUNTY ROAD Contract: 140042 Residency: 29354(04) CO.RD. 04100 (EW-18/HUBBARD ROAD): OVER CHIKASKIA RIVER, 2.3 MILES EAST OF US-177. PROJECT CIRB-236C(004)RB PERRY LENGTH = 0.18 MILE. Contractor: B & B BRIDGE COMPANY, LLC Engineer: Adjusted: Zachary, Ted Contract Amount: ( $983,705.20 $987,944.75) Contract Time: ( 120 121 ) Letting Date: 01/23/2014 Contract Date: 02/14/2014 W/O Issued Adjusted: 04/10/2014 W/O Effective: Amount Paid: 06/02/2014 96 % ( 95 %) Work Started: Time Passed: 06/02/2014 142 % ( 140 %) BRIDGE AND APPROACHES I-35: UNDER Residency: Contract: 150139 27100(04) I-35 04100 HUBBARD ROAD, 11.0 MILES NORTH OF THE NOBLE COUNTY LINE. PROJECT LENGTH = NHPPI-236N(025)SS PERRY 0.225 MILE. Contractor: MANHATTAN ROAD & BRIDGE COMPANY Adjusted: Engineer: Zachary, Ted Contract Amount: ( $2,241,581.98 $2,339,563.46) Contract Time: ( 180 180 ) Letting Date: 04/16/2015 Contract Date: 05/13/2015 W/O Issued Adjusted: 05/19/2015 W/O Effective: Amount Paid: 09/01/2015 104 % ( 99 %) Work Started: Time Passed: 01/04/2016 88 % ( 88 %) GRADE, DRAIN, AND SURFACE I-35: OVER Contract: 150373 Residency: 24226(06) I-35 04100 ABANDONED RAILROAD, 2.58 MILES SOUTH OF SH-11 NEAR BLACKWELL. PROJECT NHPPI-236N(024)SS PERRY LENGTH = 0.094 MILE. Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Engineer: Adjusted: Zachary, Ted Contract Amount: ( $2,486,494.24 $2,781,585.37) Contract Time: ( 180 180 ) Letting Date: 11/19/2015 Contract Date: 12/16/2015 W/O Issued Adjusted: 01/14/2016 W/O Effective: Amount Paid: 05/02/2016 109 % ( 98 %) Work Started: Time Passed: 05/02/2016 71 % ( 71 %) Contract: 160289 27891(04) SH-15 ACNHPPI-3500-(035)(039)* Contractor: OBC, INC. Engineer: Zachary, Ted Contract Amount: $8,809,330.54 Contract Time: 420 Letting Date: 08/18/2016 Contract Date: 09/14/2016 W/O Issued 09/15/2016 W/O Effective: 01/03/2017 Work Started: 01/03/2017 *(038)SS Residency: PERRY 04100 Adjusted: ( $8,809,330.54) ( 420 ) BRIDGE AND APPROACHES SH-15/FOUNTAIN RD/BENDER RD: OVER I-35, 28.1 MI, 20.1 MI AND 1.0 MI SOUTH OF US-177 NEAR BILLINGS, TONKAWA AND BRAMAN. PROJECT LENGTH = 0.675 MILE Amount Paid: Time Passed: Construction Status Report Adjusted: 35 % ( 35 %) 25 % ( 25 %) Page 102 Contract: 160370 32691(04) US-60 STP-NBIP(511)3B Contractor: SOUTHEAST BRIDGE FL CORP Engineer: ATKINS Contract Amount: $336,260.00 Contract Time: 90 Letting Date: 10/20/2016 Contract Date: 11/30/2016 W/O Issued 12/27/2016 W/O Effective: 03/06/2017 Work Started: 05/13/2017 Residency: ATKINS 04010 BRIDGE PAINTING US-60/CITY STREET (ANDERSON ROAD): AT MULTIPLE LOCATIONS IN DIVISION IV. Adjusted: ( $336,260.00) ( ) 90 Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) RESURFACE (ASPHALT) COUNTY ROAD Contract: 160416 30442(04) COUNTY RO Residency: 04009 (HUBBARD ROAD/EW-18): FROM US-177, EXTEND WEST NEAR BLACKWELL. PROJECT STP-236C(042)CI CIRCUIT ENGR. DISTR. # 8 LENGTH = 3.315 MILES Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC. Adjusted: Engineer: CED8 Contract Amount: ( $1,329,167.65 $1,329,167.65) Contract Time: ( ) 90 90 Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 12/27/2016 W/O Effective: Amount Paid: 03/06/2017 44 % ( 44 %) Work Started: Time Passed: 03/06/2017 54 % ( 54 %) EROSION CONTROL COUNTY ROAD Contract: 160417 32051(04) COUNTY RO Residency: 04003 (HUBBARD ROAD/EW-18): OVER CHIKASKIA RIVER OVERFLOW, 2.9 MILES EAST OF US-177 ACERSTP-236C(030)ER CEC CORP. NEAR BLACKWELL. Contractor: BREWER CONSTRUCTION OKLAHOMA, LLC Engineer: Adjusted: CEC Contract Amount: ( $324,362.80 $324,362.80) Contract Time: ( ) 60 60 Letting Date: 11/17/2016 Contract Date: 12/15/2016 W/O Issued Adjusted: 12/16/2016 W/O Effective: Amount Paid: 01/23/2017 75 % ( 75 %) Work Started: Time Passed: 01/23/2017 43 % ( 43 %) County: Kingfisher 4 Commissioner District: Contracts Under Construction Contract: 160200 21858(04) SH-51 ACSTP-137C(051)SS/ACSTP-* Contractor: MUNOZ CONSTRUCTION, INC. Engineer: Hoover, Jacob Contract Amount: $6,606,846.50 Contract Time: 390 Letting Date: 05/19/2016 Contract Date: 06/21/2016 W/O Issued 06/23/2016 W/O Effective: 10/03/2016 Work Started: 10/18/2016 *242C(045)SS Residency: ENID 04300 Adjusted: ( $6,846,852.50) ( 390 ) BRIDGE AND APPROACHES SH-51: OVER SKELETON CREEK AND BRIDGE CREEK, 6.0 MILES WEST AND 3.8 MILES EAST OF SH-74 NEAR HENNESSEY. PROJECT LENGTH = 0.912 MILE. Amount Paid: Time Passed: Construction Status Report Adjusted: 24 % ( 23 %) 47 % ( 47 %) Page 103 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160223 Residency: 30461(04) CO.RD. 04009 (NS-274): OVER KINGFISHER CREEK, 0.9 MILE SOUTH OF SH-3 NEAR KINGFISHER. STP-237C(032)CI CIRCUIT ENGR. DISTR. # 8 PROJECT LENGTH = 0.189 MILE. Contractor: K & R BUILDERS, INC. Engineer: Adjusted: CED8 Contract Amount: ( $858,178.58 $873,410.90) Contract Time: ( 120 120 ) Letting Date: 06/16/2016 Contract Date: 07/26/2016 W/O Issued Adjusted: 07/28/2016 W/O Effective: Amount Paid: 11/07/2016 93 % ( 91 %) Work Started: Time Passed: 11/01/2016 109 % ( 109 %) BRIDGE AND APPROACHES SH-33: OVER Residency: Contract: 160418 29490(04) SH-33 04300 FOREMAN CREEK, 10.2 MILES EAST OF THE US-81 JUNCTION NEAR KINGFISHER. STP-237B(033)SS ENID PROJECT LENGTH = 0.067 MILE. Contractor: RDNJ, INC. DBA A-TECH PAVING Adjusted: Engineer: Hoover, Jacob Contract Amount: ( $1,000,076.68 $1,000,076.68) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 01/03/2017 W/O Effective: Amount Paid: 03/27/2017 23 % ( 23 %) Work Started: Time Passed: 03/27/2017 31 % ( 31 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170170 Residency: 28435(04) CO. RD. 04009 (EW-84): OVER WINTER CAMP CREEK/DEAD INDIAN CREEK, 5.3 MILES WEST OF ACSTP-237C(004)CI CIRCUIT ENGR. DISTR. # 8 US-81/SH-3 NEAR OKARCHE. PROJECT Contractor: K & R BUILDERS, INC. LENGTH = 0.246 MILE Engineer: Adjusted: CED8 Contract Amount: ( $906,755.72 $906,755.72) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/11/2017 W/O Issued Adjusted: 05/12/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) GRADE, DRAIN, AND SURFACE COUNTY Contract: 170171 Residency: 31185(04) CO. RD. 04100 ROAD (EW-73): FROM US-81, EXTEND EAST NEAR DOVER. PROJECT LENGTH = 3.375 ACSTP-237C(036)CI PERRY MILES Contractor: DUIT CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Zachary, Ted Contract Amount: ( $2,147,559.76 $2,147,559.76) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/11/2017 W/O Issued Adjusted: 05/12/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Kiowa 5 Commissioner District: Contracts Under Construction Construction Status Report Page 104 Contract: 140204 23244(04) SH-54 STPY-138C(108)SS Contractor: SEWELL BROS., INC. Engineer: Sirmons, Karl Contract Amount: $6,417,215.53 Contract Time: 270 Letting Date: 06/19/2014 Contract Date: 07/18/2014 W/O Issued 07/24/2014 W/O Effective: 11/03/2014 Work Started: 08/25/2014 Contract: 160224 27021(04) SH-19 ACSTP-238C(031)SS/ACSTP-* Contractor: TREAS CONSTRUCTION, INC. Engineer: Sirmons, Karl Contract Amount: $2,624,740.48 Contract Time: 150 Letting Date: 08/18/2016 Contract Date: 09/12/2016 W/O Issued 09/14/2016 W/O Effective: 01/03/2017 Work Started: 10/24/2016 *138C(161)SS Contract: 160320 28999(04) SH-44 ACSTP-238C(037)SS/STP-27* Contractor: K & R BUILDERS, INC. Engineer: ATKINS Contract Amount: $3,321,240.72 Contract Time: 270 Letting Date: 09/15/2016 Contract Date: 10/17/2016 W/O Issued 11/30/2016 W/O Effective: 02/16/2017 Work Started: 02/20/2017 *5C(035)SS Contract: 170085 29648(04) US-62 NHPPY-238N(026)3P Contractor: T & G CONSTRUCTION, INC. Engineer: Sirmons, Karl Contract Amount: $504,346.55 Contract Time: Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued 03/24/2017 W/O Effective: Work Started: County: Latimer Residency: ALTUS 05200 Adjusted: ( $6,443,401.88) ( 355 ) BRIDGE AND APPROACHES SH-54: OVER RAINY MOUNTAIN CREEK AND TWO UNNAMED CREEKS, 6.0 MILES, 6.4 MILES, AND 6.8 MILES SOUTH OF SH-9. PROJECT LENGTH = 1.092 MILES. Amount Paid: Time Passed: Residency: ALTUS 05200 Adjusted: ( $2,693,221.50) ( 150 ) BRIDGE AND APPROACHES SH-19: OVER UNNAMED CREEK AND PECAN CREEK, 0.3 MILE AND 2.8 MILES EAST OF THE SH-115 JUNCTION NEAR COOPERTON. PROJECT LENGTH = 0.557 MILE. Amount Paid: Time Passed: Residency: ATKINS 05010 Adjusted: ( $3,321,240.72) ( 270 ) 05200 Adjusted: 92 % ( 90 %) 109 % ( 109 %) BRIDGE AND APPROACHES SH-44: OVER ELK CREEK, ELK CREEK O'FLOW, AND DRY ELK CREEK, 7.6 MI, 7.8 MI AND 11.4 MILES NORTH OF SH-9 NEAR SENTINEL. PROJECT LENGTH = 0.410 MILE Amount Paid: Time Passed: Residency: ALTUS Adjusted: 95 % ( 94 %) 131 % ( 100 %) Adjusted: 57 % ( 57 %) 30 % ( 30 %) RESURFACE (ASPHALT) US-62: FROM 3.22 MILES EAST OF THE TILLMAN COUNTY LINE, EXTEND EAST NEAR SNYDER. PROJECT LENGTH = 2.28 MILES Adjusted: ( $504,346.55) ( ) Fixed Completion Date: 10/31/2017 Adjusted: Amount Paid: 0%( 0 %) Time Passed: 0%( 0 %) 2 Commissioner District: Contracts Under Construction Construction Status Report Page 105 GRADE, DRAIN, AND SURFACE COUNTY Contract: 170026 Residency: 31231(04) CO. RD. 02013 ROAD (DRUMB ROAD): FROM THE PITTSBURG COUNTY LINE, EXTEND NORTHEAST NEAR STP-239C(026)CI CIRCUIT ENGR. DISTR. # 3 WILBURTON. PROJECT LENGTH = 1.174 Contractor: GLOVER & ASSOCIATES, INC. MILES. Engineer: Adjusted: CED3 Contract Amount: ( $1,055,044.90 $1,055,044.90) Contract Time: ( 150 150 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Le Flore 2 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES & BRIDGE Residency: Contract: 150205 27029(04) US-59 02200 REHABILITATION US-259/US-59/SH-63: AT MULTIPLE BRIDGE LOCATIONS IN DIVISION II. STP-240C(31)(29)SS/SBR-2* HEAVENER PROJECT LENGTH = 0.889 MILE. Contractor: C-GAWF CONSTRUCTION, INC. Engineer: Adjusted: Huddleston, David Contract Amount: ( $12,483,862.80 $12,506,290.36) Contract Time: ( 800 800 ) Letting Date: 07/23/2015 Contract Date: 08/26/2015 W/O Issued Adjusted: 09/04/2015 W/O Effective: Amount Paid: 11/02/2015 47 % ( 47 %) Work Started: Time Passed: 10/05/2015 53 % ( 53 %) *45C(4)SB/SBR-240N(22)SB/NHPP-240N(32)SS RESURFACE (ASPHALT) SH-112: FROM THE Residency: Contract: 160168 02200 31849(04) SH-112 SH-120 JUNCTION, EXTEND NORTH NEAR POCOLA. PROJECT LENGTH = 5.470 MILES. HEAVENER ACSTP-240C(046)SS Contractor: JOB CONSTRUCTION CO., INC. Engineer: Adjusted: Huddleston, David Contract Amount: ( $1,825,368.14 $1,835,004.14) Contract Time: ( ) 45 45 Letting Date: 04/21/2016 Contract Date: 05/10/2016 W/O Issued Adjusted: 05/11/2016 W/O Effective: Amount Paid: 09/06/2016 88 % ( 88 %) Work Started: Time Passed: 09/06/2016 164 % ( 164 %) BRIDGE AND APPROACHES AND BRIDGE Contract: 160225 Residency: 27024(04) US-59 02200 REHABILITATION US-59: OVER SHAWNEE CR, SHAWNEE CR OVERFLOW, CEDAR CR AND ACNHPP-240N(047)SS/ACNHP* HEAVENER CEDAR CR OVERFLOW, 2.6 AND 5.6 MI NW OF Contractor: C-GAWF CONSTRUCTION, INC. US-259 NEAR PAGE. PROJECT LENGTH = Engineer: Adjusted: Huddleston, David 0.603 MILE Contract Amount: ( $6,387,542.40 $6,387,542.40) Contract Time: ( 500 500 ) Letting Date: 06/16/2016 Contract Date: 07/28/2016 W/O Issued Adjusted: 08/02/2016 W/O Effective: Amount Paid: 10/03/2016 58 % ( 58 %) Work Started: Time Passed: 10/03/2016 37 % ( 37 %) *P-140N(171)SS Construction Status Report Page 106 County: Lincoln 3 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160188 24228(10) SH-62 03002 SH-102: FROM 0.2 MI NORTH OF US-62, EXT NORTH NEAR MIDWAY. US-62: FROM 3.65 MI ACSTP-141C(232)(168)(171* TETRA TECH WEST OF SH-102, EXT EAST NEAR MIDWAY. Contractor: HASKELL LEMON CONSTRUCTION CO. PROJECT LENGTH = 6.370 MILES. Engineer: Adjusted: TETR Contract Amount: ( $22,560,549.77 $23,647,800.93) Contract Time: ( 550 550 ) Letting Date: 04/21/2016 Contract Date: 05/09/2016 W/O Issued Adjusted: 05/11/2016 W/O Effective: Amount Paid: 09/06/2016 48 % ( 46 %) Work Started: Time Passed: 08/01/2016 52 % ( 52 %) *(224)SS BRIDGE AND APPROACHES SH-105: OVER Residency: Contract: 160251 27060(04) SH-105 03300 HEADQUARTERS CREEK, 1.0 MILE EAST OF US-177 NEAR TRYON. PROJECT LENGTH = ACSTP-241C(044)SS WEWOKA 0.131 MILE. Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $1,758,457.36 $1,773,057.36) Contract Time: ( 210 212 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/25/2016 W/O Effective: Amount Paid: 12/05/2016 70 % ( 69 %) Work Started: Time Passed: 11/16/2016 62 % ( 61 %) BRIDGE AND APPROACHES US-177: OVER Residency: Contract: 160321 03300 28941(04) US-177 BRUSH CREEK, 0.7 MILE NORTH OF THE POTTAWATOMIE COUNTY LINE NEAR WEWOKA ACSTP-241B(043)SS MEEKER. PROJECT LENGTH = 0.076 MILE. Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $1,887,337.58 $1,909,211.58) Contract Time: ( 180 180 ) Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued Adjusted: 10/17/2016 W/O Effective: Amount Paid: 02/16/2017 34 % ( 34 %) Work Started: Time Passed: 02/13/2017 39 % ( 39 %) GRADE,DRAIN, SURFACE, AND BRIDGE Contract: 160372 Residency: 28573(04) CO. RD. 03001 COUNTY ROAD (PARKLAND ROAD/EW-81): FROM SH-18, EXTEND EAST NEAR STP-241C(032)CI ENGR. SERV. & TESTING CHANDLER. PROJECT LENGTH = 1.995 MILES Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Adjusted: EST Contract Amount: ( $2,753,400.01 $2,753,400.01) Contract Time: ( 180 180 ) Letting Date: 10/20/2016 Contract Date: 11/17/2015 W/O Issued Adjusted: 11/18/2016 W/O Effective: Amount Paid: 03/06/2017 28 % ( 28 %) Work Started: Time Passed: 03/06/2017 35 % ( 35 %) Construction Status Report Page 107 BRIDGE REHABILITATION SH-18B: OVER Contract: 160420 Residency: 29570(04) SH-18B 03001 QUAPAW CREEK, 3.3 MILES EAST OF THE SH-18 JUNCTION NEAR CHANDLER. PROJECT STP-241C(045)SS ENGR. SERV. & TESTING LENGTH = 0.177 MILE. Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: EST Contract Amount: ( $1,051,142.26 $1,051,142.26) Contract Time: ( 120 115 ) Letting Date: 11/17/2016 Contract Date: 12/15/2016 W/O Issued Adjusted: 12/16/2016 W/O Effective: Amount Paid: 03/06/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE REHABILITATION SH-102: OVER Residency: Contract: 170086 29540(04) SH-102 03010 CAPTAIN CREEK, 0.3 MILES NORTH OF THE TURNER TURNPIKE NEAR WELLSTON. STP-241C(049)SS ATKINS PROJECT LENGTH = 0.128 MILE Contractor: HASKELL LEMON CONSTRUCTION CO. Adjusted: Engineer: ATKINS Contract Amount: ( $1,011,235.28 $1,011,235.28) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/10/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Logan 4 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES SH-33: OVER Residency: Contract: 160290 04500 21860(04) SH-33 COTTONWOOD CREEK AND BNSF RAILROAD, 0.2 MILE WEST OF SH-77 IN GUTHRIE. STILLWATER ACSTP-242C(046)SS PROJECT LENGTH = 0.794 MILE. Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Buchanan, Seth Contract Amount: ( $17,235,548.53 $17,251,613.53) Contract Time: ( 560 560 ) Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued Adjusted: 10/17/2016 W/O Effective: Amount Paid: 02/16/2017 26 % ( 26 %) Work Started: Time Passed: 01/30/2017 16 % ( 16 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160439 32379(04) COUNTY RO Residency: 04003 (EW-84/SEWARD ROAD): OVER COTTONWOOD CREEK, 4.3 MILES WEST OF ACERSTP-242C(056)ER CEC CORP. US-77 NEAR GUTHRIE. PROJECT LENGTH = Contractor: BRIDGECO CONTRACTORS, INC. 0.249 MILE. Engineer: Adjusted: CEC Contract Amount: ( $1,025,064.43 $1,025,064.43) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/15/2016 W/O Issued Adjusted: 12/16/2016 W/O Effective: Amount Paid: 01/23/2017 69 % ( 69 %) Work Started: Time Passed: 01/23/2017 78 % ( 78 %) Construction Status Report Page 108 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170027 Residency: 18265(04) CO. RD. 04500 (EW-69/W. 92ND STREET): OVER BEAVER CREEK, 0.6 MILES WEST OF THE PAYNE STP-142D(045)CI STILLWATER COUNTY LINE. PROJECT LENGTH = 0.302 MILE Contractor: K & R BUILDERS, INC. Engineer: Adjusted: Buchanan, Seth Contract Amount: ( $1,015,190.95 $1,015,190.95) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued Adjusted: 02/16/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) RESURFACE (ASPHALT) COUNTY ROAD Residency: Contract: 170087 28727(04) CO. RD. 04500 (SIMPSON ROAD/EW-86): FROM COLTRANE ROAD (NS-312), EXTEND WEST NEAR STP-242C(062)CI STILLWATER GUTHRIE. PROJECT LENGTH = 1.491 MILES Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY Adjusted: Engineer: Buchanan, Seth Contract Amount: ( $543,195.50 $543,195.50) Contract Time: ( ) 30 30 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/24/2017 W/O Effective: Amount Paid: 07/10/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) RESURFACE (ASPHALT) SH-74C: FROM 5.41 Contract: 170088 Residency: 30634(04) SH-74C 04500 MILES EAST OF SH-74, EXTEND SOUTHEAST NEAR CRESCENT. PROJECT LENGTH = 6.180 STPY-242C(053)3P STILLWATER MILES Contractor: T.J. CAMPBELL CONSTRUCTION COMPANY Engineer: Adjusted: Buchanan, Seth Contract Amount: ( $790,816.00 $790,816.00) Contract Time: ( ) 60 60 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 05/17/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Love 7 Commissioner District: Contracts Under Construction Contract: 150017 25909(26) I-35 SAP-243N(009)(008)FM Contractor: OVERLAND CORPORATION Engineer: TETR Contract Amount: $9,621,309.21 Contract Time: 365 Letting Date: 02/19/2015 Contract Date: 03/13/2015 W/O Issued 03/16/2015 W/O Effective: 07/14/2015 Work Started: 07/13/2015 Residency: TETRA TECH 07002 Adjusted: ( $9,699,690.51) ( 388 ) GRADE, DRAIN, SURFACE, AND SITE PLAN I-35: TRUCK WEIGH STATION FROM 12.0 MILES NORTH OF THE TEXAS STATE LINE, EXTEND NORTH. PROJECT LENGTH = 1.195 MILES. Amount Paid: Time Passed: Construction Status Report Adjusted: 88 % ( 88 %) 123 % ( 116 %) Page 109 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 150337 Residency: 10147(04) SH-32 07200 SH-32: BEGIN 0.41 MILES WEST OF SH-96, EXTEND EAST NEAR BURNEYVILLE. PROJECT STP-043C(141)SS ARDMORE LENGTH = 4.303 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Fuhrmann, Chris Contract Amount: ( $13,594,551.91 $13,594,551.91) Contract Time: ( 330 330 ) Letting Date: 10/15/2015 Contract Date: 11/13/2015 W/O Issued Adjusted: 11/30/2015 W/O Effective: Amount Paid: 03/07/2016 90 % ( 90 %) Work Started: Time Passed: 03/07/2016 98 % ( 98 %) Contract: 160036 10147(05) SH-32 ACSTP-143C(063)SS Contractor: OVERLAND CORPORATION Engineer: Fuhrmann, Chris Contract Amount: $7,876,548.52 Contract Time: 300 Letting Date: 03/17/2016 Contract Date: 04/14/2016 W/O Issued 04/25/2016 W/O Effective: 09/06/2016 Work Started: 08/15/2016 Contract: 160098 26502(04) SH-32 ACSTP-143C(093)SS Contractor: OVERLAND CORPORATION Engineer: Fuhrmann, Chris Contract Amount: $11,463,969.39 Contract Time: 460 Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued 08/24/2016 W/O Effective: 11/07/2016 Work Started: 11/07/2016 Residency: ARDMORE 07200 GRADE, DRAIN, SURFACE, AND BRIDGE SH-32: FROM 3.9 MILES WEST OF I-35, EXTEND EAST NEAR MARIETTA. PROJECT LENGTH = 3.842 MILES Adjusted: ( $7,876,548.52) ( 300 ) Amount Paid: Time Passed: Residency: ARDMORE 07200 Adjusted: ( $11,479,739.39) ( 460 ) Adjusted: 36 % ( 36 %) 71 % ( 71 %) GRADE, DRAIN, SURFACE, AND BRIDGE SH-32: OVER MUD CREEK AND MUD CREEK OVERFLOWS, 0.6 MILE EAST OF SH-89 NEAR COURTNEY. PROJECT LENGTH = 1.287 MILES. Amount Paid: Time Passed: Adjusted: 34 % ( 33 %) 33 % ( 33 %) BRIDGE AND APPROACHES US-77: OVER Contract: 170028 Residency: 27047(04) US-77 07200 CLOUDS BRANCH CREEK, 3.7 MILES SOUTH OF THE SH-32 JUNCTION NEAR MARIETTA. STP-243C(021)SS ARDMORE PROJECT LENGTH = 0.043 MILE. Contractor: SILVER STAR CONSTRUCTION COMPANY, INC. Engineer: Adjusted: Fuhrmann, Chris Contract Amount: ( $1,038,300.00 $1,038,300.00) Contract Time: ( 150 150 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 05/01/2017 0%( 0 %) County: McClain 3 Commissioner District: Contracts Under Construction Construction Status Report Page 110 Contract: 150236 27936(04) SH-76 STP-244C(024)SS Contractor: MUNOZ CONSTRUCTION, INC. Engineer: JACOBS Contract Amount: $3,928,057.70 Contract Time: 240 Letting Date: 07/23/2015 Contract Date: 08/20/2015 W/O Issued 08/24/2015 W/O Effective: 12/07/2015 Work Started: 10/19/2015 Residency: 03004 JACOBS ENGINEERING BRIDGE AND APPROACHES SH-76: OVER NORTH FORK WALNUT CREEK, 2.87 MILES NORTH OF US-62 NEAR BLANCHARD. PROJECT LENGTH = 0.818 MILE Adjusted: ( $3,928,057.70) ( 240 ) Amount Paid: Time Passed: Adjusted: 91 % ( 91 %) 97 % ( 97 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 150367 23264(04) SH-76 03018 SH-76: FROM SH-19, EXTEND NORTH IN LINDSAY. PROJECT LENGTH = 3.312 MILES. ACSTP-125B(137)SS BENCHMARK CONSTR. SERVS., LLC Contractor: HASKELL LEMON CONSTRUCTION CO. Adjusted: Engineer: BCS Contract Amount: ( $7,999,978.49 $8,048,146.24) Contract Time: ( 300 305 ) Letting Date: 11/19/2015 Contract Date: 12/16/2015 W/O Issued Adjusted: 01/28/2016 W/O Effective: Amount Paid: 03/07/2016 90 % ( 89 %) Work Started: Time Passed: 01/16/2016 112 % ( 110 %) Contract: 160142 01964(06) SH-76 ACSTP-144C(001)SS Contractor: MUNOZ CONSTRUCTION, INC. Engineer: JACOBS Contract Amount: $6,557,900.51 Contract Time: 290 Letting Date: 03/17/2016 Contract Date: 04/15/2016 W/O Issued 04/25/2016 W/O Effective: 09/06/2016 Work Started: 06/06/2016 Contract: 160143 31378(04) I-35 SBR-244N(048)SB Contractor: C3 CONSTRUCTION, INC. Engineer: Reed, Lucas Contract Amount: $2,198,254.42 Contract Time: 300 Letting Date: 04/21/2016 Contract Date: 05/16/2016 W/O Issued 05/20/2016 W/O Effective: 09/06/2016 Work Started: 09/06/2016 Residency: 03004 JACOBS ENGINEERING GRADE, DRAIN, SURFACE, AND BRIDGE SH-76: FROM 0.1 MILE SOUTH OF SH-74B, EXTEND NORTH NEAR BLANCHARD. PROJECT LENGTH = 2.162 MILES. Adjusted: ( $6,557,900.51) ( 290 ) Amount Paid: Time Passed: Residency: PURCELL 03200 Adjusted: 91 % ( 91 %) 105 % ( 105 %) BRIDGE REHABILITATION I-35: OVER SH-74, 2.1 MILES NORTH OF SH-39 IN PURCELL. PROJECT LENGTH = 0.090 MILE. Adjusted: ( $2,198,254.42) ( 300 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 56 % ( 56 %) 82 % ( 82 %) Page 111 RESURFACE (ASPHALT) SH-39: FROM 75 FEET Contract: 160227 Residency: 32477(04) SH-39 03200 WEST OF THE SH-59 SOUTH JUNCTION, EXTEND EAST NEAR PURCELL. PROJECT MC-244B(051) PURCELL LENGTH = 5.86 MILES Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Adjusted: Reed, Lucas Contract Amount: ( $643,576.30 $643,576.30) Contract Time: ( ) 21 21 Letting Date: 06/16/2016 Contract Date: 07/27/2016 W/O Issued Adjusted: 07/28/2016 W/O Effective: Amount Paid: 11/07/2016 97 % ( 97 %) Work Started: Time Passed: 11/15/2016 124 % ( 124 %) BRIDGE REHABILITATION SH-74: OVER I-35, Residency: Contract: 160322 29572(04) SH-74 03200 1.1 MILES SOUTH OF SH-39 IN PURCELL. PROJECT LENGTH = 0.133 MILE NHPPI-244N(029)SS PURCELL Contractor: MANHATTAN ROAD & BRIDGE COMPANY Adjusted: Engineer: Reed, Lucas Contract Amount: ( $2,368,082.90 $2,368,082.90) Contract Time: ( 240 240 ) Letting Date: 09/15/2016 Contract Date: 10/11/2016 W/O Issued Adjusted: 10/12/2016 W/O Effective: Amount Paid: 02/16/2017 97 % ( 97 %) Work Started: Time Passed: 11/07/2016 75 % ( 75 %) SAFETY IMPROVEMENT (SIDEWALKS, Contract: 170029 Residency: 31570(04) CT. ST. 03200 LIGHTING AND LANDSCAPE) CITY STREET (GREEN AVENUE): FROM WASHINGTON STP-244E(054)UR PURCELL AVENUE, EXTEND NORTH IN PURCELL. Contractor: TRI-CITY SEAL CO., INC. PROJECT LENGTH = 1.065 MILES Engineer: Adjusted: Reed, Lucas Contract Amount: ( $1,972,840.23 $1,972,840.23) Contract Time: ( 240 240 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 8%( 8 %) Work Started: Time Passed: 04/03/2017 16 % ( 16 %) County: McCurtain 2 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 130408 Residency: 17427(04) US-70 02100 US-70: FROM 6.2 MILES EAST OF US-259, EXTEND EAST. PROJECT LENGTH = 3.296 NHPPY-245N(018) ANTLERS MILES. Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Moy, Ryan Contract Amount: ( $16,135,411.34 $16,585,625.18) Contract Time: ( 330 420 ) Letting Date: 11/21/2013 Contract Date: 12/20/2013 W/O Issued Adjusted: 01/02/2014 W/O Effective: Amount Paid: 03/03/2014 97 % ( 94 %) Work Started: Time Passed: 03/03/2014 127 % ( 100 %) Construction Status Report Page 112 Contract: 150021 27908(07) US-70 NHPP-245N(022)SS/HSIPG-2* Contractor: L & N BRIDGE, LLC Engineer: Moy, Ryan Contract Amount: $12,392,055.21 Contract Time: 400 Letting Date: 08/20/2015 Contract Date: 09/22/2015 W/O Issued 09/28/2015 W/O Effective: 01/04/2016 Work Started: 01/04/2016 45N(030)TR Residency: ANTLERS 02100 Adjusted: ( $12,392,055.21) ( 400 ) BRIDGE AND APPROACHES AND GUARDRAIL US-70: OVER LITTLE RIVER AND LITTLE RIVER OVERFLOW, 5.8 MI NE OF US-259 AND FROM SH-37, EXTEND N NEAR BROKEN BOW. PROJECT LENGTH = 7.00 MILES. Amount Paid: Time Passed: Adjusted: 83 % ( 83 %) 88 % ( 88 %) GRADE, DRAIN, SURFACE, AND BRIDGE SH-3: Residency: Contract: 150299 24184(04) SH-3 02100 FROM 10.54 MILES EAST OF THE PUSHMATAHA COUNTY LINE,EXTEND EAST. STP-145B(150)SS ANTLERS PROJECT LENGTH = 5.665 MILES. Contractor: THE CUMMINS CONSTRUCTION CO., INC. Adjusted: Engineer: Moy, Ryan Contract Amount: ( $14,789,543.93 $14,789,543.93) Contract Time: ( 400 400 ) Letting Date: 11/19/2015 Contract Date: 12/22/2015 W/O Issued Adjusted: 01/11/2016 W/O Effective: Amount Paid: 05/02/2016 47 % ( 47 %) Work Started: Time Passed: 02/22/2016 65 % ( 65 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160228 Residency: 18853(04) US-70 02100 US-70: FROM 6.7 MILES EAST OF THE SH-109 JUNCTION, EXTEND EAST NEAR VALIANT. ACNHPP-245N(037)SS ANTLERS PROJECT LENGTH = 2.718 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Moy, Ryan Contract Amount: ( $11,577,983.09 $11,577,983.09) Contract Time: ( 295 295 ) Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued Adjusted: 09/22/2016 W/O Effective: Amount Paid: 01/03/2017 12 % ( 12 %) Work Started: Time Passed: 01/03/2017 15 % ( 15 %) RIGHT-OF-WAY CLEARANCE US-70: FROM 2.5 Contract: 170030 Residency: 18859(11) US-70 02100 MILES EAST OF THE CHOCTAW COUNTY LINE, EXTEND EAST NEAR VALIANT. PROJECT SSP-245N(048)RW ANTLERS LENGTH = 4.60 MILES PREQUALIFICATION Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC FOR THIS PROJECT HAS BEEN WAIVED. Engineer: Adjusted: Moy, Ryan BOTH BID EXPRESS AND WRITTEN BIDS WILL BE ACCEPTABLE. Contract Amount: ( $122,222.00 $122,222.00) Contract Time: ( 180 180 ) Letting Date: 01/19/2017 Contract Date: 12/14/2017 W/O Issued Adjusted: 02/16/2017 W/O Effective: Amount Paid: 03/06/2017 43 % ( 43 %) Work Started: Time Passed: 04/14/2017 6%( 6 %) County: McIntosh 1 Commissioner District: Contracts Under Construction Construction Status Report Page 113 GRADE, DRAIN, AND SURFACE COUNTY Contract: 140242 Residency: 30256(04) CO.RD. 01100 ROAD (MC-4626C/TEXANNA RD): BEGIN 4.0 MI EAST AND 1.0 MI SOUTH OF THE STP-246C(009)CI MUSKOGEE US-69/SH-150 JCT, EXTEND SOUTH AND Contractor: GLOVER & ASSOCIATES, INC. EAST. PROJECT LENGTH = 2.898 MILES. Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $2,689,316.85 $2,689,316.85) Contract Time: ( ) Letting Date: 08/21/2014 Contract Date: 09/22/2014 Fixed Completion Date: 04/30/2015 W/O Issued Adjusted: 09/25/2014 W/O Effective: Amount Paid: 93 % ( 93 %) Work Started: Time Passed: 01/29/2015 259 % ( 76 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160039 25103(04) CO.RD. 01017 COUNTY ROAD (EW-103/NS-423): FROM OLD US-69, EXTEND EAST THEN NORTH NEAR CIRB-146C(101)RB CIRCUIT ENGR. DISTR. # 2 CHECOTAH. PROJECT LENGTH = 3.638 MILES Contractor: GLOVER & ASSOCIATES, INC. Adjusted: Engineer: CE2 Contract Amount: ( $2,212,168.11 $2,212,168.11) Contract Time: ( ) 90 90 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 05/17/2016 W/O Effective: Amount Paid: 06/06/2016 83 % ( 83 %) Work Started: Time Passed: 07/13/2016 201 % ( 201 %) Contract: 160170 26289(04) I-40 ACNHPPI-4000(029)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: JACOBS Contract Amount: $13,056,622.86 Contract Time: 210 Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued 05/20/2016 W/O Effective: 06/27/2016 Work Started: 07/11/2016 Residency: 01004 JACOBS ENGINEERING RESURFACE (ASPHALT) I-40: FROM THE OKMULGEE COUNTY LINE, EXTEND EAST NEAR CHECOTAH. PROJECT LENGTH = 7.971 MILES. Adjusted: ( $13,056,622.86) ( 232 ) Amount Paid: Time Passed: Adjusted: 78 % ( 78 %) 138 % ( 125 %) RESURFACE (ASPHALT) US-266: FROM THE Contract: 170031 Residency: 29750(06) US-266 01200 OKMULGEE COUNTY LINE, EXTEND EAST NEAR LAKE EUFAULA. PROJECT LENGTH = SSR-246C(024)(025)SR SALLISAW 13.798 MILES Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Edwards, Carl Contract Amount: ( $1,985,106.23 $1,985,106.23) Contract Time: ( ) 60 60 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/25/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Major 6 Commissioner District: Contracts Under Construction Construction Status Report Page 114 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 140128 Residency: 17358(10) US-412 06100 US-412: FROM 0.1 MILE EAST OF US-281, EXTEND EAST. PROJECT LENGTH = 4.109 NHPPY-147N(148) BUFFALO MILES. Contractor: J & R SAND COMPANY, INC. Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $13,606,502.62 $13,716,127.62) Contract Time: ( 450 450 ) Letting Date: 03/20/2014 Contract Date: 04/11/2014 W/O Issued Adjusted: 04/17/2014 W/O Effective: Amount Paid: 08/04/2014 92 % ( 92 %) Work Started: Time Passed: 08/04/2014 85 % ( 85 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160229 28346(04) CO.RD. 06009 COUNTY ROAD (NS-256): FROM 2.9 MILES NORTH OF US-412, EXTEND NORTH NEAR STP-247C(016)CI CIRCUIT ENGR. DISTR. # 8 CLEO SPRINGS. PROJECT LENGTH = 0.246 Contractor: SEWELL BROS., INC. MILE Adjusted: Engineer: CED8 Contract Amount: ( $945,731.86 $945,731.86) Contract Time: ( 120 120 ) Letting Date: 06/16/2016 Contract Date: 07/27/2016 W/O Issued Adjusted: 07/28/2016 W/O Effective: Amount Paid: 11/07/2016 98 % ( 98 %) Work Started: Time Passed: 10/10/2016 95 % ( 95 %) BRIDGE REHABILITATION SH-8: OVER SAND Contract: 160421 Residency: 28161(04) SH-8 06018 CREEK, 1.6 MILES EAST OF THE US-60 JUNCTION NEAR FAIRVIEW. PROJECT SBR-147C(166)SB BENCHMARK CONSTR. SERVS., LLC LENGTH = 0.125 MILE Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: BCS Contract Amount: ( $1,149,015.19 $1,149,015.19) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/19/2016 W/O Effective: Amount Paid: 03/06/2017 34 % ( 34 %) Work Started: Time Passed: 03/08/2017 42 % ( 42 %) Contract: 170128 29446(04) US-60 STP-247B(017) Contractor: FRONTIER BRIDGE, INC. Engineer: ZOA Contract Amount: $5,360,055.79 Contract Time: 290 Letting Date: 03/16/2017 Contract Date: 04/14/2017 W/O Issued 04/18/2017 W/O Effective: 09/05/2017 Work Started: County: Mayes Residency: 06021 OLSSON ASSOCIATES BRIDGE AND APPROACHES US-60: OVER THE NORTH CANADIAN RIVER, 2.2 MILES NORTH OFUS-270 NEAR SEILING. PROJECT LENGTH = 0.851 MILE Adjusted: ( $5,360,055.79) ( 290 ) Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) 8 Commissioner District: Contracts Under Construction Construction Status Report Page 115 BRIDGE REHABILITATION US-412: OVER THE Contract: 160042 Residency: 29073(04) US-412 08300 UNION PACIFIC RAILROAD, 0.2 MILES WEST OF US-69 NEAR CHOUTEAU. PROJECT SBR-249N(001)SB CLAREMORE LENGTH = 0.134 MILE Contractor: BECCO CONTRACTORS, INC. Engineer: Adjusted: Tyler, Jennifer Contract Amount: ( $2,664,000.00 $2,664,000.00) Contract Time: ( 180 180 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 05/02/2016 W/O Effective: Amount Paid: 06/06/2016 93 % ( 93 %) Work Started: Time Passed: 06/06/2016 163 % ( 163 %) Contract: 170032 30516(04) US-69 SSR-249N(026)SR Contractor: APAC-CENTRAL, INC. Engineer: Tyler, Jennifer Contract Amount: $1,361,195.40 Contract Time: 60 Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued 02/16/2017 W/O Effective: 06/05/2017 Work Started: 03/21/2017 Residency: CLAREMORE 08300 RESURFACE (ASPHALT) US-69: FROM 0.88 MILE NORTH OF SH-20, EXTEND NORTH NEAR PRYOR. PROJECT LENGTH = 7.990 MILES. Adjusted: ( $1,361,195.40) ( ) 60 Amount Paid: Time Passed: Adjusted: 100 % ( 100 %) 63 % ( 63 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170089 Residency: 30485(04) CO. RD. 08003 (NS-426): OVER CHOUTEAU CREEK TRIBUTARY, 3.6 MILES SOUTH OF SH-20 NEAR STP-249C(036)CI CEC CORP. PRYOR. PROJECT LENGTH = 0.180 MILE Contractor: B & B BRIDGE COMPANY, LLC Engineer: Adjusted: CEC Contract Amount: ( $574,581.56 $574,581.56) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 04/05/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Muskogee 1 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES COUNTY ROAD Contract: 140365 Residency: 25419(04) CO.RD. 01017 (EW-83.5): OVER GRAND RIVER, 0.5 MILE NORTH AND 0.6 MILE WEST OF FORT GIBSON. CIRB-151C(181)RB CIRCUIT ENGR. DISTR. # 2 PROJECT LENGTH = 0.529 MILE. Contractor: C-GAWF CONSTRUCTION, INC. Engineer: Adjusted: CE2 Contract Amount: ( $6,155,741.74 $6,200,446.11) Contract Time: ( 300 320 ) Letting Date: 11/20/2014 Contract Date: 12/23/2014 W/O Issued Adjusted: 02/04/2015 W/O Effective: Amount Paid: 04/27/2015 100 % ( 99 %) Work Started: Time Passed: 04/27/2015 95 % ( 89 %) Construction Status Report Page 116 BRIDGE REHABILITATION US-64: OVER Contract: 160044 Residency: 30583(04) US-64 01100 SH-165 IN MUSKOGEE. SBR-251N(050)SB MUSKOGEE Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $1,818,806.71 $1,973,819.93) Contract Time: ( 180 180 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 05/20/2016 W/O Effective: Amount Paid: 06/06/2016 90 % ( 83 %) Work Started: Time Passed: 07/07/2016 146 % ( 146 %) BRIDGE REHABILITATION US-62: OVER Residency: Contract: 160203 28954(04) US-62 01100 CLOUD CREEK, 1.5 MILES EAST OF THE SH-16 JUNCTION NEAR MUSKOGEE. PROJECT ACSTP-251B(029)SS MUSKOGEE LENGTH = 0.237 MILE. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: Hagerman, Jeremy Contract Amount: ( $1,845,070.21 $1,950,112.41) Contract Time: ( 180 180 ) Letting Date: 05/19/2016 Contract Date: 06/24/2016 W/O Issued Adjusted: 06/29/2016 W/O Effective: Amount Paid: 10/03/2016 82 % ( 78 %) Work Started: Time Passed: 10/03/2016 97 % ( 97 %) Contract: 160292 31245(04) US-62 ACNHPP-251N(051)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Hagerman, Jeremy Contract Amount: $1,501,985.14 Contract Time: 45 Letting Date: 08/18/2016 Contract Date: 09/21/2016 W/O Issued 09/26/2016 W/O Effective: 03/06/2017 Work Started: 03/08/2017 Contract: 160323 27956(04) US-62 ACSTP-251B(058)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Hagerman, Jeremy Contract Amount: $5,221,126.20 Contract Time: 210 Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued 10/19/2016 W/O Effective: 02/16/2017 Work Started: 02/16/2017 Residency: MUSKOGEE 01100 RESURFACE (ASPHALT) US-62: FROM 2.98 MILES WEST OF US-69, EXTEND EAST IN MUSKOGEE. PROJECT LENGTH = 2.948 MILES Adjusted: ( $1,501,985.14) ( ) 45 Amount Paid: Time Passed: Residency: MUSKOGEE 01100 Adjusted: ( $5,221,126.20) ( 210 ) GRADE, DRAIN, SURFACE, AND INTERSECTION MODIFICATION US-62/SH-10: FROM 2.2 MILES EAST OF THE MUSKOGEE TURNPIKE (SH-165), EXTEND EAST IN FORT GIBSON. PROJECT LENGTH = 4.408 MILES. Amount Paid: Time Passed: Construction Status Report Adjusted: 90 % ( 90 %) 76 % ( 76 %) Adjusted: 13 % ( 13 %) 23 % ( 23 %) Page 117 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160324 Residency: 31162(04) CO. RD. 01017 (EW-094): OVER CLOUD CREEK, 1.2 MILES EAST OF US-62 NEAR BOYNTON. PROJECT CIRB-251C(062)RB CIRCUIT ENGR. DISTR. # 2 LENGTH = 0.216 MILE Contractor: H & H BRIDGE COMPANY Engineer: Adjusted: CE2 Contract Amount: ( $535,256.00 $535,256.00) Contract Time: ( ) 90 90 Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued Adjusted: 12/09/2016 W/O Effective: Amount Paid: 02/16/2017 96 % ( 96 %) Work Started: Time Passed: 12/21/2016 100 % ( 100 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 160373 28505(04) CO. RD. 01017 (EW-870): OVER CLOUD CREEK, 1.8 MILES EAST OF THE US-64 JUNCTION NEAR CIRB-251C(064)RB CIRCUIT ENGR. DISTR. # 2 HASKELL. PROJECT LENGTH = 0.235 MILE. Contractor: RRY SERVICES, LLC Adjusted: Engineer: CE2 Contract Amount: ( $1,447,171.12 $1,447,171.12) Contract Time: ( 145 145 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 05/01/2017 5%( 5 %) Work Started: Time Passed: 05/01/2017 10 % ( 10 %) BRIDGE REHABILITATION SH-10: OVER Contract: 170033 Residency: 31339(04) SH-10 01100 MANARD BAYOU CREEK, 2.9 MILES EAST OF THE US-62 INTERSECTION NEAR FORT SBR-251C(068)SB MUSKOGEE GIBSON. Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $1,627,734.55 $1,627,734.55) Contract Time: ( 120 120 ) Letting Date: 03/16/2017 Contract Date: 04/25/2017 W/O Issued Adjusted: 04/26/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Contract: 170129 26976(04) US-64 SSP-251F(069)SS Contractor: GARY A. CRAIN, INC. Engineer: Hagerman, Jeremy Contract Amount: $82,294.60 Contract Time: 60 Letting Date: 03/16/2017 Contract Date: 04/20/2017 W/O Issued 04/21/2017 W/O Effective: 08/07/2017 Work Started: Residency: MUSKOGEE 01100 BRIDGE WATER PROOF SEAL US-64/US-266/SH-9/SH-10/SH-51/SH-82: AT MULTIPLE LOCATIONS IN DIVISION I. Adjusted: ( $82,294.60) ( ) 60 Amount Paid: Time Passed: Construction Status Report Adjusted: 0%( 0 %) 0%( 0 %) Page 118 Contract: 170130 26977(04) SH-2 NHPPI-NBIP-(508)SS/STP-N* Contractor: JK INDUSTRIES, INC. Engineer: TETR Contract Amount: $188,640.00 Contract Time: 50 Letting Date: 03/16/2017 Contract Date: 04/14/2017 W/O Issued 04/18/2017 W/O Effective: 08/07/2017 Work Started: 05/08/2017 *BIP(509)SS County: Residency: TETRA TECH 01002 BRIDGE PAINTING SH-2/SH-100:SH-2,OVER GEORGES FORK CREEK 0.8 MI S OF US-266. SH-100, OVER I-40 1.1 MI E OF THE MUSKOGEE TURNPIKE. Adjusted: ( $188,640.00) ( ) 50 Amount Paid: Time Passed: Noble Adjusted: 0%( 0 %) 0%( 0 %) 4 Commissioner District: Contracts Under Construction GRADE, DRAIN, AND SURFACE COUNTY Residency: Contract: 160045 25422(05) CO.RD. 04009 ROAD (NS-312): FROM US-412, EXTEND NORTH NEAR PERRY. COUNTY ROAD (EW-40): CIRB-152C(163)RB CIRCUIT ENGR. DISTR. # 8 FROM NS-312, EXTEND WEST NEAR PERRY. Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC. PROJECT LENGTH = 5.505 MILES Engineer: Adjusted: CED8 Contract Amount: ( $3,417,573.84 $3,417,573.84) Contract Time: ( 180 180 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/04/2016 W/O Effective: Amount Paid: 06/06/2016 95 % ( 95 %) Work Started: Time Passed: 04/11/2016 106 % ( 106 %) Contract: 160204 24238(06) US-64 SSP-252F(022)SS Contractor: GARY A. CRAIN, INC. Engineer: Zachary, Ted Contract Amount: $183,948.95 Contract Time: 60 Letting Date: 05/19/2016 Contract Date: 06/24/2016 W/O Issued 06/29/2016 W/O Effective: 10/03/2016 Work Started: 09/19/2016 Contract: 160375 30645(04) IS-35 SBR-3500(047)SB Contractor: FRONTIER BRIDGE, INC. Engineer: Zachary, Ted Contract Amount: $3,038,074.98 Contract Time: 255 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued 11/29/2016 W/O Effective: 03/06/2017 Work Started: 03/06/2017 Residency: PERRY 04100 BRIDGE WATERPROOF SEAL US-60/US-64/US-81/SH-11/SH-18/SH-33/SH-51/S H-74: AT MULTIPLE LOCATIONS IN DIVISION IV. Adjusted: ( $183,948.95) ( ) 60 Amount Paid: Time Passed: Residency: PERRY 04100 Adjusted: 71 % ( 71 %) 37 % ( 37 %) BRIDGE REHABILITATION I-35: OVER COW CREEK, 1.6 MILES SOUTH OF US-77 NEAR PERRY. PROJECT LENGTH = 0.176 MILE. Adjusted: ( $3,038,074.98) ( 255 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 41 % ( 41 %) 14 % ( 14 %) Page 119 BRIDGE AND APPROACHES SH-86: OVER Contract: 160422 Residency: 26421(04) SH-86 04100 COW CREEK, 0.5 MILE EAST OF US-77 IN THE CITY OF PERRY. PROJECT LENGTH = 0.099 STP-152B(172)SS PERRY MILE. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: Zachary, Ted Contract Amount: ( $1,586,933.20 $1,586,933.20) Contract Time: ( 150 157 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 01/12/2017 W/O Effective: Amount Paid: 03/06/2017 57 % ( 57 %) Work Started: Time Passed: 03/13/2017 28 % ( 27 %) RESURFACE (ASPHALT) SH-164: FROM THE Residency: Contract: 170034 29145(04) SH-164 04100 GARFIELD COUNTY LINE, EXTEND EAST NEAR LUCIEN. PROJECT LENGTH = 5.020 SSR-252C(001)SR PERRY MILES Contractor: EVANS & ASSOCIATES CONSTRUCTION CO., INC. Adjusted: Engineer: Zachary, Ted Contract Amount: ( $915,057.00 $915,057.00) Contract Time: ( ) 90 90 Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued Adjusted: 02/17/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Nowata 8 Commissioner District: Contracts Under Construction Contract: 150302 24269(04) US-60 NHPP-153N(153)SS Contractor: BECCO CONTRACTORS, INC. Engineer: C&KI Contract Amount: $12,585,000.00 Contract Time: 325 Letting Date: 04/21/2016 Contract Date: 05/09/2016 W/O Issued 05/11/2016 W/O Effective: 09/06/2016 Work Started: 09/06/2016 Residency: 08007 CRAIG & KEITHLINE, INC. GRADE, DRAIN, AND SURFACE US-60: FROM THE WASHINGTON COUNTY LINE, EXTEND EAST NEAR NOWATA. PROJECT LENGTH = 4.900 MILES Adjusted: ( $12,585,000.00) ( 325 ) Amount Paid: Time Passed: Adjusted: 29 % ( 29 %) 59 % ( 59 %) BRIDGE AND APPROACHES US-169: OVER Contract: 160325 Residency: 24750(04) US-169 08007 OPOSSUM CREEK AND HICKORY CREEK, 3.4 MILES AND 7.4 MILES SOUTH OF THE KANSAS ACNHPP-253N(036)(037)SS CRAIG & KEITHLINE, INC. STATE LINE. PROJECT LENGTH = 1.739 Contractor: B & B BRIDGE COMPANY, LLC MILES. Engineer: Adjusted: C&KI Contract Amount: ( $11,558,127.59 $11,585,223.23) Contract Time: ( 365 368 ) Letting Date: 09/15/2016 Contract Date: 10/12/2016 W/O Issued Adjusted: 11/16/2016 W/O Effective: Amount Paid: 02/16/2017 32 % ( 32 %) Work Started: Time Passed: 12/06/2016 27 % ( 27 %) Construction Status Report Page 120 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160378 Residency: 27815(04) CO. RD. 08007 (NS-406): OVER PURGATORY CREEK, 3.8 MILES SOUTH OF US-60 NEAR BARTLESVILLE. CIRB-153C(203)RB CRAIG & KEITHLINE, INC. PROJECT LENGTH = 0.330 MILE Contractor: B & B BRIDGE COMPANY, LLC Engineer: Adjusted: C&KI Contract Amount: ( $713,144.03 $713,144.03) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 04/05/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Okfuskee 3 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES SH-48: OVER I-40, Residency: Contract: 160424 27055(04) SH-48 03300 1.8 MILES SOUTH OF THE SH-56 JUNCTION NEAR OKEMAH. PROJECT LENGTH = 0.290 NHPPI-4000-(032)SS WEWOKA MILE. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $5,778,393.15 $5,815,302.31) Contract Time: ( 200 200 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/20/2016 W/O Effective: Amount Paid: 03/06/2017 25 % ( 25 %) Work Started: Time Passed: 03/06/2017 30 % ( 30 %) Contract: 170133 33100(04) I-40 MC-4000(054) Contractor: GLOVER & ASSOCIATES, INC. Engineer: Helton, Matthew Contract Amount: $207,900.00 Contract Time: 60 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued 04/24/2017 W/O Effective: 08/07/2017 Work Started: County: Oklahoma Residency: WEWOKA 03300 Adjusted: ( $207,900.00) ( ) 60 PAVEMENT REHABILITATION (P.C. CONCRETE) I-40: WESTBOUND LANES FROM 5.0 MILES EAST OF SH-27, EXTEND EAST NEAR OKEMAH. PROJECT LENGTH = 4.82 MILES Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) 4 Commissioner District: Contracts Under Construction Construction Status Report Page 121 SAFETY IMPROVEMENT (DYNAMIC MESSAGE Contract: 150340 Residency: 25909(48) I-35 04200 SIGN AND CCTV PROJECT) I-35/I-40/I-44/US-69/US-271: AT MULTIPLE HSIPG-255F(180)IT EL RENO LOCATIONS ON THE OKLAHOMA STATE LINE. Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Adjusted: Harlin, Chris Contract Amount: ( $3,771,714.50 $3,771,714.50) Contract Time: ( 210 210 ) Letting Date: 05/19/2016 Contract Date: 06/21/2016 W/O Issued Adjusted: 06/23/2016 W/O Effective: Amount Paid: 10/24/2016 76 % ( 76 %) Work Started: Time Passed: 10/24/2016 76 % ( 76 %) GRADE, DRAIN, AND SURFACE I-240: FROM Residency: Contract: 160046 09032(20) I-240 04600 SANTA FE AVENUE, EXTEND EAST IN OKLAHOMA CITY. PROJECT LENGTH = 0.484 ACNHPPI-2400-(004)SS OKLAHOMA CITY MILE. Contractor: ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) Adjusted: Engineer: Howell, Terry Contract Amount: ( $11,958,193.19 $11,958,193.19) Contract Time: ( 400 419 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/03/2016 W/O Effective: Amount Paid: 06/06/2016 94 % ( 94 %) Work Started: Time Passed: 05/16/2016 91 % ( 87 %) Contract: 160147 30277(04) CT.ST. STP-255C(343)AG Contractor: ALLEN CONTRACTING, INC. Engineer: Hubbard, Tom Contract Amount: $11,798,388.72 Contract Time: 310 Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued 05/18/2016 W/O Effective: 08/01/2016 Work Started: 06/13/2016 Contract: 160189 09033(16) I-235 ACNHPPI-2350-(004)(005)SS Contractor: ALLEN CONTRACTING, INC. Engineer: Hubbard, Tom Contract Amount: $80,999,877.96 Contract Time: 850 Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued 05/18/2016 W/O Effective: 01/02/2017 Work Started: 01/02/2017 Residency: EDMOND 04400 Adjusted: ( $11,798,388.72) ( 310 ) GRADE, DRAIN, SURFACE, AND TRAFFIC SIGNAL CITY STREET (COVELL ROAD): AT THE INTERSECTION OF SOONER ROAD IN THE CITY OF EDMOND. PROJECT LENGTH = 1.032 MILES. Amount Paid: Time Passed: Residency: EDMOND 04400 Adjusted: 95 % ( 95 %) 95 % ( 95 %) GRADE, DRAIN, SURFACE AND BRIDGE I-235: FROM THE NW 36TH STREET INTERCHANGE, EXTEND NORTH IN OKLAHOMA CITY. PROJECT LENGTH = 1.718 MILES. Adjusted: ( $80,999,877.96) ( 850 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 24 % ( 24 %) 14 % ( 14 %) Page 122 Contract: 160271 30730(05) I-35 HSIPG-255F(342)TR Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: Hoover, Jacob Contract Amount: $972,200.00 Contract Time: 180 Letting Date: 07/21/2016 Contract Date: 08/09/2016 W/O Issued 08/11/2016 W/O Effective: 12/05/2016 Work Started: 02/15/2017 Residency: 04300 ENID LLC Adjusted: ( $972,200.00) ( 180 ) TRAFFIC SIGNALS INTERSTATE/US HIGHWAYS/STATE HIGHWAYS/CITY STREETS: BACKPLATE REPLACEMENT AT MULTIPLE LOCATIONS STATEWIDE. Amount Paid: Time Passed: Adjusted: 34 % ( 34 %) 49 % ( 49 %) GRADE, DRAIN, SURFACE, AND BRIDGE CITY Residency: Contract: 160379 24364(04) CT. ST. 04600 STREETS (SE 15TH STREET): FROM 0.2 MILES WEST OF WESTMINISTER ROAD, STP-155B(614)AG OKLAHOMA CITY EXTEND EAST IN MIDWEST CITY AND Contractor: SCHWARZ PAVING CO., INC. CHOCTAW. PROJECT LENGTH = 1.405 MILES Adjusted: Engineer: Howell, Terry Contract Amount: ( $8,844,680.81 $8,844,680.81) Contract Time: ( 475 475 ) Letting Date: 10/20/2016 Contract Date: 11/17/2016 W/O Issued Adjusted: 11/21/2016 W/O Effective: Amount Paid: 03/06/2017 31 % ( 31 %) Work Started: Time Passed: 01/23/2017 20 % ( 20 %) BRIDGE REHABILITATION CITY STREETS (NW Contract: 160382 Residency: 29143(06) CT. ST. 04200 12TH ST/NW 23RD ST/NW 36TH ST/SCOTT ST): AT MULTIPLE LOCATIONS IN OKLAHOMA SSP-4000(033)SS EL RENO CITY. PROJECT LENGTH = 0.104 MILE Contractor: GIBSON & ASSOCIATES, INC. Engineer: Adjusted: Harlin, Chris Contract Amount: ( $3,775,580.53 $3,775,580.53) Contract Time: ( 240 240 ) Letting Date: 10/20/2016 Contract Date: 11/17/2016 W/O Issued Adjusted: 11/21/2016 W/O Effective: Amount Paid: 04/03/2017 15 % ( 15 %) Work Started: Time Passed: 04/03/2017 17 % ( 17 %) Contract: 160384 29843(08) IS-35 SSP-3500(043)SS Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: Buchanan, Seth Contract Amount: $284,131.69 Contract Time: 100 Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued 02/16/2017 W/O Effective: 03/20/2017 Work Started: 03/20/2017 Residency: 04500 STILLWATER LLC Adjusted: ( $284,131.69) ( 100 ) INTERSECTION MODIFICATION AND TRAFFIC SIGNAL I-35: AT THE INTERSECTION OF WATERLOO ROAD NEAR THE CITY OF EDMOND. PROJECT LENGTH = 0.052 MILE Amount Paid: Time Passed: Construction Status Report Adjusted: 40 % ( 40 %) 38 % ( 38 %) Page 123 BRIDGE REHABILITATION SH-152: OVER Contract: 160385 Residency: 30635(04) SH-152 04600 PORTLAND AVENUE, 0.6 MI NW, 0.6 MI W, AND 1.1 MI NW OF THE I-44 INTERCHANGE IN SBR-255N(416)SB OKLAHOMA CITY OKLAHOMA CITY. Contractor: RESTEK, INC. Engineer: Adjusted: Howell, Terry Contract Amount: ( $966,416.19 $966,416.19) Contract Time: ( 110 110 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 04/03/2017 14 % ( 14 %) Work Started: Time Passed: 04/03/2017 25 % ( 25 %) PEDESTRIAN IMPROVEMENTS (SIDEWALKS) Residency: Contract: 160387 31440(04) CT. ST. 04200 CITY STREETS (NW 50TH STREET): FROM MERIDIAN AVENUE, EXTEND WEST IN THE TAP-255B(333)AG EL RENO CITY OF WARR ACRES. PROJECT LENGTH = Contractor: SCHIRALLI CONSTRUCTION CORP. 0.913 MILE PREQUALIFICATION FOR THIS Adjusted: Engineer: Harlin, Chris PROJECT HAS BEEN WAIVED. BOTH BID EXPRESS AND WRITTEN BIDS WILL BE Contract Amount: ( $227,731.94 $227,731.94) ACCEPTED. Contract Time: ( 100 100 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 33 % ( 33 %) Work Started: Time Passed: 03/06/2017 60 % ( 60 %) RESURFACE (ASPHALT) AND PEDESTRIAN Contract: 160388 Residency: 31476(04) CT. ST. 04600 IMPROVEMENTS CITY STREET (SE 15TH STREET): FROM MIDWEST BOULEVARD, STP-255B(337)AG OKLAHOMA CITY EXTEND WEST IN MIDWEST CITY. PROJECT Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV LENGTH = 1.560 MILES. Engineer: Adjusted: Howell, Terry Contract Amount: ( $2,344,841.28 $2,373,306.04) Contract Time: ( 180 180 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 34 % ( 33 %) Work Started: Time Passed: 02/20/2017 42 % ( 42 %) Contract: 160389 31817(04) IS-44 SSP-4400(012)SS Contractor: PBX CORPORATION Engineer: Harlin, Chris Contract Amount: $3,756,828.25 Contract Time: 150 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued 11/29/2016 W/O Effective: 05/01/2017 Work Started: 03/13/2017 Residency: EL RENO 04200 BRIDGE REHABILITATION I-44/I-44 RAMPS: OVER NORTHWEST EXPRESSWAY AND CLASSEN BOULEVARD, AT MULTIPLE LOCATIONS IN OKLAHOMA CITY. Adjusted: ( $3,756,828.25) ( 150 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 85 % ( 85 %) 38 % ( 38 %) Page 124 GRADE, DRAIN, AND SURFACE I-240/I-35: Contract: 160425 Residency: 09032(17) I-240/I-3 04600 FROM SHIELDS BOULEVARD, EXTEND EAST ON I-240 THEN SOUTH ON I-35 IN OKLAHOMA NHPPI-0240-1(358)004SS OKLAHOMA CITY CITY. PROJECT LENGTH = 0.962 MILE. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV Engineer: Adjusted: Howell, Terry Contract Amount: ( $10,629,506.29 $10,629,506.29) Contract Time: ( 380 380 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/20/2016 W/O Effective: Amount Paid: 05/01/2017 1%( 1 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160426 29335(04) COUNTY RO Residency: 04003 (LUTHER ROAD/NS-326): OVER WEST FORK OF WILDHORSE CREEK, 2.45 MILES SOUTH STP-255C(403)AG CEC CORP. OF I-44 IN LUTHER. PROJECT LENGTH = 0.079 Contractor: BRIDGECO CONTRACTORS, INC. MILE Adjusted: Engineer: CEC Contract Amount: ( $599,138.70 $599,138.70) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/19/2016 W/O Effective: Amount Paid: 03/06/2017 68 % ( 68 %) Work Started: Time Passed: 03/06/2017 38 % ( 38 %) PAVEMENT REHABILITATION I-35: FROM NE Contract: 160427 Residency: 31008(04) I-35/I-40 04400 122ND ST, EXTEND NORTH IN THE CITY OF EDMOND. I-40: FROM MERIDIAN AVE, SSP-3500(049)SS/SSP-4000* EDMOND EXTEND EAST IN OKLAHOMA CITY. PROJECT Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV LENGTH = 6.41 MILES Engineer: Adjusted: Hubbard, Tom Contract Amount: ( $9,960,682.12 $9,960,682.12) Contract Time: ( 360 360 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/20/2016 W/O Effective: Amount Paid: 04/03/2017 3%( 3 %) Work Started: Time Passed: 04/03/2017 6%( 6 %) (042)SS WIDEN, RESURFACE, AND BRIDGE SH-66: Contract: 170035 Residency: 24357(04) SH-66 04400 FROM THE LINCOLN COUNTY LINE, EXTEND WEST IN LUTHER. PROJECT LENGTH = 2.286 STPY-155C(611) EDMOND MILES Contractor: HASKELL LEMON CONSTRUCTION CO. Engineer: Adjusted: Hubbard, Tom Contract Amount: ( $4,046,765.06 $4,046,765.06) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Construction Status Report Page 125 BRIDGE REHABILITATION I-240: OVER Contract: 170036 Residency: 27971(04) IS-240 04600 CROOKED OAK CREEK, 0.8 MILE EAST OF THE I-35 INTERCHANGE IN OKLAHOMA CITY. NHPPI-2400-(002)SS OKLAHOMA CITY PROJECT LENGTH = 0.025 MILE. Contractor: REDLANDS CONTRACTING, LLC Engineer: Adjusted: Howell, Terry Contract Amount: ( $345,584.80 $345,584.80) Contract Time: ( ) 90 90 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 170037 28621(04) CO. RD. 04400 (HIWASSEE ROAD): OVER TRIBUTARY TO THE NORTH CANADIAN RIVER, 0.8 MI SOUTH OF STP-155C(879)AG EDMOND WILSHIRE BLVD NEAR JONES. PROJECT Contractor: KLAVER CONSTRUCTION COMPANY, INC. LENGTH = 0.345 MILE Adjusted: Engineer: Hubbard, Tom Contract Amount: ( $534,270.08 $534,270.08) Contract Time: ( ) 90 90 Letting Date: 02/16/2017 Contract Date: 03/14/2017 W/O Issued Adjusted: 04/14/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE REHABILITATION CITY STREET Contract: 170038 Residency: 31526(04) CT. ST. 04400 (RENO AVENUE): OVER CHERRY CREEK, 0.3 MILES EAST OF SUNNYLANE ROAD IN THE STP-255D(419)AG EDMOND CITY OF DEL CITY. PROJECT LENGTH = 0.056 Contractor: M.J. HUGHES CONSTRUCTION, INC. MILE Engineer: Adjusted: Hubbard, Tom Contract Amount: ( $914,777.72 $914,777.72) Contract Time: ( 160 160 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/24/2017 W/O Effective: Amount Paid: 07/10/2017 9%( 9 %) Work Started: Time Passed: 05/01/2017 6%( 6 %) SAFETY IMPROVEMENT (SIGNING) I-35: FROM Contract: 170039 Residency: 32876(04) IS-35 04600 THE TEXAS STATE LINE, EXTEND NORTH. I-40: FROM THE TEXAS STATE LINE, EXTEND HSIPIG-299I(132)TR OKLAHOMA CITY EAST. Contractor: DIRECT TRAFFIC CONTROL INC. Engineer: Adjusted: Howell, Terry Contract Amount: ( $536,000.00 $536,000.00) Contract Time: ( ) 60 60 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 13 % ( 13 %) Work Started: Time Passed: 04/03/2017 47 % ( 47 %) Construction Status Report Page 126 STRIPING AND PAVEMENT MARKING I-40: Contract: 170135 Residency: 33097(04) I-40 04600 FROM THE EASTBOUND RAMP, EXTEND TO NORTHBOUND I-235 IN OKLAHOMA CITY. NHPPIG-4000(053) OKLAHOMA CITY PROJECT LENGTH = 0.020 Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: Howell, Terry Contract Amount: ( $65,234.00 $65,234.00) Contract Time: ( ) 10 10 Letting Date: 03/16/2017 Contract Date: 04/25/2017 W/O Issued Adjusted: 04/26/2017 W/O Effective: Amount Paid: 07/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) BRIDGE REPAIR CITY STREET (OKLAHOMA Residency: Contract: 170136 33099(04) CT. ST. 04600 CITY BLVD/OLD I-40): REPAIR VEHICLE IMPACT DAMAGE OVER PENN. AVE, 0.2 MI N SAP-255I(425) OKLAHOMA CITY OF I-40 IN OKC. Contractor: PBX CORPORATION Adjusted: Engineer: Howell, Terry Contract Amount: ( $121,142.00 $121,142.00) Contract Time: ( ) 30 30 Letting Date: 03/16/2017 Contract Date: 04/20/2017 W/O Issued Adjusted: 04/21/2017 W/O Effective: Amount Paid: 05/15/2017 0%( 0 %) Work Started: Time Passed: 05/15/2017 0%( 0 %) County: Okmulgee 1 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 150265 01100 21740(04) US-75 US-75: FROM 7.0 MILES NORTH OF I-40, EXTEND NORTH NEAR OKMULGEE. PROJECT MUSKOGEE NHPP-256N(024)SS LENGTH = 2.538 MILES. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $29,671,928.47 $30,142,272.00) Contract Time: ( 580 580 ) Letting Date: 08/20/2015 Contract Date: 09/16/2015 W/O Issued Adjusted: 09/18/2015 W/O Effective: Amount Paid: 01/04/2016 95 % ( 94 %) Work Started: Time Passed: 01/04/2016 70 % ( 70 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160254 Residency: 11399(04) CO.RD. 01003 COUNTY ROAD (EW-0945): FROM 0.7 MILES EAST OF THE CREEK COUNTY LINE, EXTEND STP-056C(199)CI CEC CORP. EAST NEAR OKMULGEE. PROJECT LENGTH = Contractor: HASKELL LEMON CONSTRUCTION CO. 0.502 MILE Engineer: Adjusted: CEC Contract Amount: ( $3,363,594.72 $3,363,594.72) Contract Time: ( 270 270 ) Letting Date: 07/21/2016 Contract Date: 08/08/2016 W/O Issued Adjusted: 08/09/2016 W/O Effective: Amount Paid: 12/05/2016 87 % ( 87 %) Work Started: Time Passed: 10/05/2016 62 % ( 62 %) Construction Status Report Page 127 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160255 Residency: 24369(04) US-75A 01003 US-75A: FROM 1.1 MILES NORTH OF THE SH-16 JUNCTION, EXTEND NORTH IN BEGGS. ACSTP-156C(136)SS CEC CORP. PROJECT LENGTH = 7.511 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: CEC Contract Amount: ( $16,214,688.52 $16,214,688.52) Contract Time: ( 360 360 ) Letting Date: 07/21/2016 Contract Date: 08/08/2016 W/O Issued Adjusted: 08/09/2016 W/O Effective: Amount Paid: 12/05/2016 13 % ( 13 %) Work Started: Time Passed: 12/05/2016 29 % ( 29 %) Contract: 160294 27098(04) US-62 ACSTP-256C(025)SS Contractor: TREAS CONSTRUCTION, INC. Engineer: Hagerman, Jeremy Contract Amount: $1,467,383.90 Contract Time: 180 Letting Date: 08/18/2016 Contract Date: 09/12/2016 W/O Issued 09/14/2016 W/O Effective: 01/03/2017 Work Started: 10/10/2016 Residency: MUSKOGEE 01100 BRIDGE AND APPROACHES US-62: OVER GRAVE CREEK TRIBUTARY, 2.4 MILES EAST OF THE SH-52 JUNCTION NEAR MORRIS. PROJECT LENGTH = 0.246 MILE. Adjusted: ( $1,472,383.90) ( 180 ) Amount Paid: Time Passed: Adjusted: 88 % ( 87 %) 85 % ( 85 %) TRAFFIC SIGNALS US-75: AT THE Contract: 160295 Residency: 27109(05) US-75 01100 INTERSECTION OF 6TH, 8TH AND 13TH STREET, IN THE CITY OF OKMULGEE. SSP-256N(032)SS MUSKOGEE Contractor: MIDSTATE TRAFFIC CONTROL, INC. Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $150,772.50 $150,772.50) Contract Time: ( ) 30 30 Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued Adjusted: 09/23/2016 W/O Effective: Amount Paid: 01/03/2017 98 % ( 98 %) Work Started: Time Passed: 01/03/2017 93 % ( 93 %) Contract: 160327 31694(04) I-40 STP-256G(033)3B Contractor: KEYSTONE SERVICES, INC. Engineer: Hagerman, Jeremy Contract Amount: $508,526.60 Contract Time: 120 Letting Date: 09/15/2016 Contract Date: 10/18/2016 W/O Issued 10/20/2016 W/O Effective: 04/03/2017 Work Started: 04/03/2017 Residency: MUSKOGEE 01100 JOINT SEAL/REPAIR I-40/SH-64D: AT MULTIPLE LOCATIONS IN DIVISION I. Adjusted: ( $508,526.60) ( 120 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 7%( 7 %) 0%( 0 %) Page 128 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160428 22666(04) COUNTY RO Residency: 01100 (EW-101): OVER HONEY CREEK, 5.11 MILES WEST OF US-75 NEAR OKMULGEE. PROJECT STP-156D(111)CI MUSKOGEE LENGTH = 0.194 MILE Contractor: BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $550,356.58 $550,356.58) Contract Time: ( ) 90 90 Letting Date: 11/17/2016 Contract Date: 12/15/2016 W/O Issued Adjusted: 12/16/2016 W/O Effective: Amount Paid: 01/23/2017 59 % ( 59 %) Work Started: Time Passed: 01/23/2017 78 % ( 78 %) County: Osage 8 Commissioner District: Contracts Under Construction BRIDGE REHABILITATION SH-18: OVER Residency: Contract: 160256 27086(04) SH-18 08400 SOLOMON CREEK, 4.2 MILES SOUTH OF US-60 NEAR FAIRFAX. PROJECT LENGTH = ACSTP-257B(033)SS SAND SPRINGS 0.219 MILE. Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: Adjusted: Williams, Mark J. Contract Amount: ( $1,179,477.28 $1,216,377.28) Contract Time: ( 150 150 ) Letting Date: 07/21/2016 Contract Date: 08/23/2016 W/O Issued Adjusted: 09/26/2016 W/O Effective: Amount Paid: 12/05/2016 92 % ( 89 %) Work Started: Time Passed: 12/05/2016 97 % ( 97 %) Contract: 170041 27996(04) US-60 NHPP-257N(053)SS Contractor: B & B BRIDGE COMPANY, LLC Engineer: Williams, Mark J. Contract Amount: $424,986.92 Contract Time: 60 Letting Date: 01/19/2017 Contract Date: 03/16/2017 W/O Issued 04/05/2017 W/O Effective: 06/05/2017 Work Started: County: Ottawa Residency: 08400 SAND SPRINGS BRIDGE REPAIR US-60: OVER UNNAMED CREEK, 2.0 MILES EAST OF THE SH-18 JUNCTION NEAR BURBANK. Adjusted: ( $424,986.92) ( ) 60 Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) 8 Commissioner District: Contracts Under Construction Construction Status Report Page 129 BRIDGE AND APPROACHES SH-10: OVER Contract: 160257 Residency: 27074(04) SH-10 08300 COUNCIL HOLLOW CREEK, 4.2 MILES NORTH OF THE DELAWARE COUNTY LINE. PROJECT ACSTP-258C(023)SS CLAREMORE LENGTH = 0.832 MILE. Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: Adjusted: Tyler, Jennifer Contract Amount: ( $4,272,537.25 $4,274,409.25) Contract Time: ( 240 240 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/24/2016 W/O Effective: Amount Paid: 02/16/2017 21 % ( 21 %) Work Started: Time Passed: 02/06/2017 28 % ( 28 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 160391 29894(04) CO. RD. 08011 (EW-023): OVER HICKORY CREEK, 1.4 MILES EAST OF SH-125 NEAR AFTON. PROJECT CIRB-258D(026)RB GARVER, LLC. LENGTH = 0.151 MILE Contractor: RRY SERVICES, LLC Adjusted: Engineer: GARV Contract Amount: ( $1,173,450.89 $1,173,450.89) Contract Time: ( 120 120 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 15 % ( 15 %) Work Started: Time Passed: 02/14/2017 41 % ( 41 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160429 28596(04) COUNTY RO Residency: 08011 (NS-467.5): OVER TRIBUTARY OF WARREN BRANCH, 2.1 MILES NORTH OF SH-10C NEAR STP-258C(027)CI GARVER, LLC. PEORIA. PROJECT LENGTH = 0.113 MILE. Contractor: B & B BRIDGE COMPANY, LLC Engineer: Adjusted: GARV Contract Amount: ( $670,679.47 $670,679.47) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 01/04/2017 W/O Effective: Amount Paid: 03/06/2017 55 % ( 55 %) Work Started: Time Passed: 02/23/2017 43 % ( 43 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160430 28597(04) COUNTY RO Residency: 08011 (EW-004): OVER ELM CREEK, 3.4 MILES WEST OF US-69 NEAR MIAMI. PROJECT LENGTH = STP-258D(028)CI GARVER, LLC. 0.200 MILE Contractor: H & H BRIDGE COMPANY Engineer: Adjusted: GARV Contract Amount: ( $865,290.37 $865,290.37) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/14/2016 W/O Issued Adjusted: 01/12/2017 W/O Effective: Amount Paid: 04/03/2017 5%( 5 %) Work Started: Time Passed: 03/29/2017 3%( 3 %) Construction Status Report Page 130 Contract: 170043 30517(04) US-69 SSR-258N(024)SR Contractor: PARAGON CONTRACTORS, LLC Engineer: Tyler, Jennifer Contract Amount: $598,895.00 Contract Time: 75 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued 03/29/2017 W/O Effective: 06/05/2017 Work Started: Contract: 170044 32544(04) SH-10 SSR-258C(025)SR Contractor: APAC-CENTRAL, INC. Engineer: Tyler, Jennifer Contract Amount: $928,218.30 Contract Time: 45 Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued 02/16/2017 W/O Effective: 06/05/2017 Work Started: 04/18/2017 Residency: CLAREMORE 08300 Adjusted: ( $598,895.00) ( ) 75 RESURFACE (ASPHALT) US-69NW/US-69NE: FROM THE SH-10 JCT, EXTEND NORTH IN MIAMI. SH-10: FROM 0.25 MILES WEST OF US-69 EXTEND EAST IN MIAMI. PROJECT LENGTH = 5.28 MILES Amount Paid: Time Passed: Residency: CLAREMORE 08300 Adjusted: 0%( 0 %) 0%( 0 %) RESURFACE (ASPHALT) SH-10: FROM 0.1 MILES SOUTH OF US-60, EXTEND SOUTH NEAR WYANDOTTE. PROJECT LENGTH = 5.280 MILES Adjusted: ( $928,218.30) ( ) 45 Amount Paid: Time Passed: Adjusted: 91 % ( 91 %) 38 % ( 38 %) RESURFACE (ASPHALT) COUNTY ROADS Contract: 170091 Residency: 32845(04) CO. RD. 08001 (EW-210/EW-230/NS-4590/NS-4600): ON MULTIPLE COUNTY ROADS SOUTH OF US-60 CIRB-258D(037)(038)(039)* ENGR. SERV. & TESTING NEAR FAIRLAND. PROJECT LENGTH = 11.267 Contractor: APAC-CENTRAL, INC. MILES Engineer: Adjusted: EST Contract Amount: ( $1,570,936.20 $1,570,936.20) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/20/2017 W/O Issued Adjusted: 03/21/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) *(040)RB County: Pawnee 8 Commissioner District: Contracts Under Construction SAFETY IMPROVEMENT (GUARDRAIL) Contract: 160296 Residency: 32484(04) US-64 08001 US-64/US-412: FROM THE SH-48 JUNCTION, EXTEND EAST NEAR WESTPORT. HSIPG-259N(031)TR ENGR. SERV. & TESTING Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: EST Contract Amount: ( $2,145,339.76 $2,145,339.76) Contract Time: ( 150 150 ) Letting Date: 08/18/2016 Contract Date: 09/19/2016 W/O Issued Adjusted: 09/22/2016 W/O Effective: Amount Paid: 01/03/2017 100 % ( 100 %) Work Started: Time Passed: 10/24/2016 95 % ( 95 %) Construction Status Report Page 131 Contract: 160431 28877(04) US-64 ACSTP-259B(030)SS Contractor: BECCO CONTRACTORS, INC. Engineer: Williams, Mark J. Contract Amount: $4,254,900.00 Contract Time: 260 Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued 12/20/2016 W/O Effective: 03/06/2017 Work Started: 03/06/2017 Residency: 08400 SAND SPRINGS BRIDGE REHABILITATION US-64: OVER COWSKIN CREEK, 1.0 MILE NORTH OF THE US-412 JUNCTION NEAR CLEVELAND. PROJECT LENGTH = 0.194 MILE Adjusted: ( $4,254,900.00) ( 260 ) Amount Paid: Time Passed: Adjusted: 18 % ( 18 %) 17 % ( 17 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160432 29924(04) COUNTY RO Residency: 08001 (NS-3460): OVER TRIBUTARY TO MUD CREEK, 3.6 MILES NORTH OF SH-15 NEAR PAWNEE. STP-259D(033)CI ENGR. SERV. & TESTING PROJECT LENGTH = 0.217 MILE Contractor: EARTH SMART CONSTRUCTION INC. Adjusted: Engineer: EST Contract Amount: ( $893,634.25 $893,634.25) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 01/03/2017 W/O Effective: Amount Paid: 04/03/2017 24 % ( 24 %) Work Started: Time Passed: 04/03/2017 20 % ( 20 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170162 Residency: 23259(04) CO. RD. 08001 (NS-357): OVER LAGOON CREEK, 0.5 MILES NORTH OF THE PAYNE COUNTY LINE NEAR CIRB-159D(063)RB ENGR. SERV. & TESTING JENNINGS. PROJECT LENGTH = 0.133 MILE Contractor: H & H BRIDGE COMPANY Engineer: Adjusted: EST Contract Amount: ( $694,556.47 $694,556.47) Contract Time: ( 120 120 ) Letting Date: 04/20/2017 Contract Date: 05/16/2017 W/O Issued Adjusted: 05/26/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Payne 4 Commissioner District: Contracts Under Construction Contract: 160149 27932(04) SH-51 STP-260B(022(024)SS Contractor: BECCO CONTRACTORS, INC. Engineer: Buchanan, Seth Contract Amount: $1,818,200.00 Contract Time: 210 Letting Date: 03/17/2016 Contract Date: 04/13/2016 W/O Issued 04/22/2016 W/O Effective: 09/06/2016 Work Started: 09/06/2016 Residency: STILLWATER 04500 Adjusted: ( $1,864,468.75) ( 244 ) BRIDGE REHABILITATION SH-51: OVER WEST AND EAST BRUSH CREEKS AND OVER SALT CREEK, 2.1 MI E OF US-177 AND 1.6 MI E OF SH-18 NEAR STILLWATER. PROJECT LENGTH = 0.533 MILE. Amount Paid: Time Passed: Construction Status Report Adjusted: 40 % ( 39 %) 118 % ( 101 %) Page 132 BRIDGE AND APPROACHES SH-51 (6TH Contract: 160231 Residency: 26369(04) SH-51 04500 AVENUE): OVER BOOMER CREEK, 0.02 MILE WEST OF THE US-177 (PERKINS ROAD) SSP-160B(190)SS STILLWATER INTERSECTION IN STILLWATER. PROJECT Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV LENGTH = 0.353 MILE. Engineer: Adjusted: Buchanan, Seth Contract Amount: ( $7,354,181.48 $7,392,743.89) Contract Time: ( ) Letting Date: 06/16/2016 Contract Date: 07/19/2016 Fixed Completion Date: 09/30/2016 W/O Issued Adjusted: 08/19/2016 W/O Effective: Amount Paid: 29 % ( 29 %) Work Started: Time Passed: 09/19/2016 240 % ( 59 %) GRADE, DRAIN, AND SURFACE CITY STREET Residency: Contract: 160345 31595(04) CT. ST. 04500 (WESTERN ROAD): FROM MCELROY ROAD, EXTEND NORTH IN STILLWATER. PROJECT STP-260B(027)MS STILLWATER LENGTH = 1.170 MILES. Contractor: ALLEN CONTRACTING, INC. Adjusted: Engineer: Buchanan, Seth Contract Amount: ( $3,884,716.00 $3,901,137.43) Contract Time: ( ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 Fixed Completion Date: 08/01/2017 W/O Issued Adjusted: 10/19/2016 W/O Effective: Amount Paid: 69 % ( 69 %) Work Started: Time Passed: 11/14/2016 183 % ( 68 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170092 Residency: 27804(04) CO. RD. 04500 (EW-67/E 68TH STREET): OVER STILLWATER CREEK, 5.8 MILES EAST OF US-177 NEAR STP-160C(204)CI STILLWATER STILLWATER. PROJECT LENGTH = 0.188 MILE Contractor: K & R BUILDERS, INC. Engineer: Adjusted: Buchanan, Seth Contract Amount: ( $866,635.83 $866,635.83) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/14/2017 W/O Issued Adjusted: 03/16/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Pittsburg 2 Commissioner District: Contracts Under Construction Contract: 160111 29854(04) SH-31 ACSTP-261C(037)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Plymate, Larry Contract Amount: $3,254,491.15 Contract Time: 120 Letting Date: 03/17/2016 Contract Date: 04/15/2016 W/O Issued 04/25/2016 W/O Effective: 08/01/2016 Work Started: 08/01/2016 Residency: MCALESTER 02400 RESURFACE (ASPHALT) SH-31: FROM 3.0 MILES EAST OF THE SH-31A JUNCTION, EXTEND NORTHEAST NEAR MCALESTER. PROJECT LENGTH = 5.000 MILES Adjusted: ( $3,254,491.15) ( 120 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 85 % ( 85 %) 216 % ( 216 %) Page 133 Contract: 160115 31063(04) US-69 ACNHPP-261N(057)SS/ACSTP* Contractor: GLOVER & ASSOCIATES, INC. Engineer: Plymate, Larry Contract Amount: $7,737,114.40 Contract Time: 230 Letting Date: 02/18/2016 Contract Date: 03/22/2016 W/O Issued 03/25/2016 W/O Effective: 07/05/2016 Work Started: 07/05/2016 *-261B(055)3P/NHPP-261N(056)3P Residency: MCALESTER 02400 Adjusted: ( $7,752,114.40) ( 230 ) RESURFACE (ASPHALT) US-69: FROM 1.40 MI N OF SH-63 JCT, EXT N NEAR MCALESTER. US-270: FROM 3.75 MI E OF US-69B JCT, EXT E NEAR MCALESTER. PROJECT LENGTH = 14.95 MILES. Amount Paid: Time Passed: Adjusted: 90 % ( 90 %) 129 % ( 129 %) BRIDGE AND APPROACHES SH-71: OVER Residency: Contract: 160206 26348(04) SH-71 02400 UNNAMED CREEK, 3.0 MILES NORTH OF SH-31 NEAR QUINTON. PROJECT LENGTH = ACSTP-161C(226)SS MCALESTER 0.110 MILE Contractor: BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: Plymate, Larry Contract Amount: ( $1,054,966.67 $1,054,966.67) Contract Time: ( 100 100 ) Letting Date: 05/19/2016 Contract Date: 06/21/2016 W/O Issued Adjusted: 06/23/2016 W/O Effective: Amount Paid: 10/03/2016 97 % ( 97 %) Work Started: Time Passed: 08/22/2016 108 % ( 108 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160329 Residency: 14999(04) US-69 02400 US-69: FROM PEACEABLE ROAD (EW-145), EXTEND NORTH IN MCALESTER. PROJECT ACNHPP-013N(017)SS MCALESTER LENGTH = 0.846 MILE. Contractor: KOSS CONSTRUCTION COMPANY & SUBSIDIARY Engineer: Adjusted: Plymate, Larry Contract Amount: ( $13,420,172.08 $13,458,664.35) Contract Time: ( 385 387 ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 12/12/2016 W/O Effective: Amount Paid: 02/16/2017 17 % ( 17 %) Work Started: Time Passed: 02/13/2017 20 % ( 20 %) Contract: 160395 31332(04) US-69 NHPP-261N(062)3P Contractor: GLOVER & ASSOCIATES, INC. Engineer: Plymate, Larry Contract Amount: $486,229.00 Contract Time: 10 Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued 12/20/2016 W/O Effective: 08/15/2017 Work Started: Residency: MCALESTER 02400 RESURFACE (ASPHALT) US-69: FROM THE US-69B INTERCHANGE, EXTEND NORTH IN MCALESTER. PROJECT LENGTH = 2.32 MILES. Adjusted: ( $486,229.00) ( ) 10 Amount Paid: Time Passed: Construction Status Report Adjusted: 0%( 0 %) 0%( 0 %) Page 134 Contract: 170060 32563(05) US-270 HSIP-261N(065)(064)TR Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: Plymate, Larry Contract Amount: $732,268.72 Contract Time: 90 Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued 02/16/2017 W/O Effective: 06/05/2017 Work Started: Residency: 02400 MCALESTER LLC Adjusted: ( $732,268.72) ( ) 90 TRAFFIC SIGNALS US-270: FROM 'A' STREET, EXTEND EAST IN THE CITY OF MCALESTER. PROJECT LENGTH = 1.628 MILES Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) RESURFACE (ASPHALT) US-69: FROM 2.3 Residency: Contract: 170093 31973(04) US-69 02400 MILES SOUTH OF THE US-69B JUNCTION, EXTEND NORTH IN MCALESTER. PROJECT NHPPY-261N(068)3P MCALESTER LENGTH = 2.160 MILES Contractor: JOB CONSTRUCTION CO., INC. Adjusted: Engineer: Plymate, Larry Contract Amount: ( $819,602.08 $819,602.08) Contract Time: ( ) 45 45 Letting Date: 02/16/2017 Contract Date: 03/14/2017 W/O Issued Adjusted: 03/16/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Pottawatomie 3 Commissioner District: Contracts Under Construction Contract: 160177 22973(14) I-35 SSP-263F(039)SS Contractor: GARY A. CRAIN, INC. Engineer: Russell, Julie Contract Amount: $46,206.80 Contract Time: 40 Letting Date: 04/21/2016 Contract Date: 05/16/2016 W/O Issued 05/20/2016 W/O Effective: 09/06/2016 Work Started: 07/25/2016 Residency: ADA 03100 BRIDGE WATER PROOF SEAL I-35/SH-22/SH-66/SH-76/SH-102: AT MULTIPLE LOCATIONS IN DIVISION III. Adjusted: ( $46,206.80) ( ) 40 Amount Paid: Time Passed: Adjusted: 87 % ( 87 %) 18 % ( 18 %) BRIDGE AND APPROACHES I-40: OVER Contract: 160433 Residency: 28928(04) I-40 03300 COUNTY ROAD (OLD TOWN TRAIL): 0.5 MILES WEST OF US-177 NEAR SHAWNEE. PROJECT NHPPI-4000-(035)SS WEWOKA LENGTH = 0.364 MILE Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Helton, Matthew Contract Amount: ( $7,097,309.01 $7,097,309.01) Contract Time: ( 400 400 ) Letting Date: 11/17/2016 Contract Date: 12/14/2016 W/O Issued Adjusted: 12/16/2016 W/O Effective: Amount Paid: 03/06/2017 26 % ( 26 %) Work Started: Time Passed: 03/06/2017 12 % ( 12 %) Construction Status Report Page 135 RESURFACE (ASPHALT) SH-9A: FROM SH-9, Contract: 170139 Residency: 29711(04) SH-9A 03300 EXTEND NORTH IN EARLSBORO. PROJECT LENGTH = 8.650 MILES STPY-263C(042)(043)3P WEWOKA Contractor: MARKWELL PAVING COMPANY, INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $1,322,626.76 $1,322,626.76) Contract Time: ( ) 35 35 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/24/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Pushmataha 2 Commissioner District: Contracts Under Construction GRADE, DRAIN, AND SURFACE - DIVISION II Residency: Contract: 150214 24332(04) SH-93 02100 SH-93: FROM THE CHOCTAW COUNTY LINE, EXTEND NORTH. PROJECT LENGTH = 2.791 STP-164C(116)SS ANTLERS MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Moy, Ryan Contract Amount: ( $8,957,819.74 $8,957,819.74) Contract Time: ( 300 300 ) Letting Date: 06/18/2015 Contract Date: 07/15/2015 W/O Issued Adjusted: 07/24/2015 W/O Effective: Amount Paid: 11/02/2015 96 % ( 96 %) Work Started: Time Passed: 11/02/2015 100 % ( 100 %) Contract: 160180 23144(11) US-70 SSP-264F(044)SS Contractor: GARY A. CRAIN, INC. Engineer: January, Trenton (Acting) Contract Amount: $73,732.90 Contract Time: 90 Letting Date: 04/21/2016 Contract Date: 05/16/2016 W/O Issued 05/19/2016 W/O Effective: 09/06/2016 Work Started: 11/14/2016 Residency: MADILL 02300 BRIDGE WATER PROOF SEAL US-70/SH-1/SH-3/SH-9A/SH-78: AT MULTIPLE LOCATIONS IN DIVISION II. Adjusted: ( $73,732.90) ( ) 90 Amount Paid: Time Passed: Adjusted: 53 % ( 53 %) 102 % ( 102 %) BRIDGE AND APPROACHES US-271: OVER Contract: 160298 Residency: 26346(04) US-271 02100 KIAMICHI RIVER, 1.3 MILES NORTH OF THE SH-3 JUNCTION NEAR ANTLERS. PROJECT ACSTP-164B(153)SS ANTLERS LENGTH = 0.908 MILE Contractor: L & N BRIDGE, LLC Engineer: Adjusted: Moy, Ryan Contract Amount: ( $6,036,484.89 $6,036,484.89) Contract Time: ( 225 225 ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 10/19/2016 W/O Effective: Amount Paid: 02/16/2017 27 % ( 27 %) Work Started: Time Passed: 02/16/2017 21 % ( 21 %) Construction Status Report Page 136 WIDEN, RESURFACE, AND BRIDGE COUNTY Contract: 170094 Residency: 31216(04) CO. RD. 02013 ROAD (AIRPORT ROAD/EW-195): FROM US-271, EXTEND WEST NEAR ANTLERS. STP-264C(056)CI CIRCUIT ENGR. DISTR. # 3 PROJECT LENGTH = 1.991 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: CED3 Contract Amount: ( $746,520.04 $746,520.04) Contract Time: ( 120 120 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Roger Mills 5 Commissioner District: Contracts Under Construction RESURFACE (ASPHALT) COUNTY ROAD Residency: Contract: 170045 30691(04) CO. RD. 05005 (NS-182/EW-093): FROM SH-47, EXTEND NORTH ON NS-182 THEN WEST ON EW-093 STP-265C(016)CI CIRCUIT ENGR. DISTR. # 7 NEAR CHEYENNE. PROJECT LENGTH = 3.030 Contractor: CASWELL CONTRACTING, INC. MILES. Engineer: Adjusted: CED7 Contract Amount: ( $968,210.81 $968,210.81) Contract Time: ( ) 60 60 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 05/18/2017 0%( 0 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 170095 25477(04) CO. RD. 05005 COUNTY ROAD (NS-197/EW-97/NS-200/EW-96): FROM SH-34, EXTEND WEST AND SOUTH TO CIRB-165C(099)RB CIRCUIT ENGR. DISTR. # 7 THE EW-98/NS-197 JCT NEAR HAMMON. Contractor: CASWELL CONTRACTING, INC. PROJECT LENGTH = 7.79 MILES Engineer: Adjusted: CED7 Contract Amount: ( $6,283,092.30 $6,283,092.30) Contract Time: ( 270 270 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Rogers 8 Commissioner District: Contracts Under Construction Construction Status Report Page 137 Contract: 150244 27167(04) SH-20 STP-266A(001)SS Contractor: BECCO CONTRACTORS, INC. Engineer: Tyler, Jennifer Contract Amount: $3,087,000.00 Contract Time: 160 Letting Date: 09/17/2015 Contract Date: 10/22/2015 W/O Issued 10/28/2015 W/O Effective: 02/01/2016 Work Started: 02/01/2016 Residency: CLAREMORE 08300 INTERSECTION MODIFICATION SH-20: AT THE INTERSECTION OF SOUTHHAVEN RD/CLUBHOUSE RD IN CLAREMORE. PROJECT LENGTH = 0.664 MILE Adjusted: ( $3,087,000.00) ( 160 ) Amount Paid: Time Passed: Adjusted: 86 % ( 86 %) 117 % ( 117 %) BRIDGE AND APPROACHES COUNTY ROAD Residency: Contract: 160116 25480(04) CO.RD. 08011 (NS-423/EW-52): OVER CHOUTEAU CREEK, ON NS-423, 3.5 MI SOUTH OF SH-20, AND ON CIRB-166C(212)RB GARVER, LLC. EW-52, 1.2 MI EAST OF NS-423. PROJECT Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC LENGTH = 0.509 MILE. Adjusted: Engineer: GARV Contract Amount: ( $1,751,341.40 $1,792,770.04) Contract Time: ( 130 195 ) Letting Date: 02/18/2016 Contract Date: 03/21/2016 W/O Issued Adjusted: 03/24/2016 W/O Effective: Amount Paid: 09/06/2016 99 % ( 96 %) Work Started: Time Passed: 09/06/2016 143 % ( 95 %) GRADE, DRAIN, AND SURFACE CITY STREET Contract: 160181 Residency: 26988(04) CT.ST. 08300 (NORTH 193RD EAST AVENUE): FROM SH-266, EXTEND NORTH NEAR CATOOSA. PROJECT STP-166C(244)CI CLAREMORE LENGTH = 0.584 MILE. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Tyler, Jennifer Contract Amount: ( $3,970,132.62 $5,502,127.62) Contract Time: ( 210 250 ) Letting Date: 04/21/2016 Contract Date: 05/10/2016 W/O Issued Adjusted: 05/11/2016 W/O Effective: Amount Paid: 09/06/2016 116 % ( 83 %) Work Started: Time Passed: 09/06/2016 104 % ( 88 %) BRIDGE REHABILITATION US-412: OVER Contract: 160232 Residency: 24846(04) US-412 08300 VERDIGRIS RIVER, 7.5 MILES EAST OF I-44 NEAR INOLA. PROJECT LENGTH = 0.237 MILE ACNHPP-166N(207)SS CLAREMORE Contractor: JENSEN CONSTRUCTION COMPANY Engineer: Adjusted: Tyler, Jennifer Contract Amount: ( $14,700,627.94 $14,700,627.94) Contract Time: ( 405 405 ) Letting Date: 08/18/2016 Contract Date: 09/21/2016 W/O Issued Adjusted: 09/22/2016 W/O Effective: Amount Paid: 01/03/2017 54 % ( 54 %) Work Started: Time Passed: 10/05/2016 49 % ( 49 %) Construction Status Report Page 138 Contract: 160259 22144(04) CT.ST. STP-166B(164)IG Contractor: PARAGON CONTRACTORS, LLC Engineer: GARV Contract Amount: $2,343,181.49 Contract Time: 270 Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued 09/22/2016 W/O Effective: 01/03/2017 Work Started: 12/06/2016 Residency: GARVER, LLC. 08011 GRADE, DRAIN, AND SURFACE CITY STREET (PINE STREET): FROM NORTH 193RD AVENUE, EXTEND EAST IN CATOOSA. PROJECT LENGTH = 0.631 MILE. Adjusted: ( $2,348,021.49) ( 270 ) Amount Paid: Time Passed: Adjusted: 28 % ( 28 %) 37 % ( 37 %) BRIDGE REHABILITATION COUNTY ROAD Residency: Contract: 160396 32517(04) CO. RD. 08300 (OLD US-169): OVER FOUR MILE CREEK, 0.2 MILE WEST OF US-169 NEAR OOLOGAH. SBR-266D(044)SB CLAREMORE PROJECT LENGTH = 0.030 MILE. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: Tyler, Jennifer Contract Amount: ( $361,737.56 $361,737.56) Contract Time: ( 140 140 ) Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 03/06/2017 95 % ( 95 %) Work Started: Time Passed: 01/27/2017 33 % ( 33 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 170046 Residency: 30711(04) CO. RD. 08003 (EW-46): OVER TRIBUTARY TO SEMINOLE CREEK, 0.4 MILE WEST OF THE MAYES STP-266C(047)CI CEC CORP. COUNTY LINE. PROJECT LENGTH = 0.160 Contractor: RRY SERVICES, LLC MILE. Engineer: Adjusted: CEC Contract Amount: ( $415,933.94 $415,933.94) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 6%( 6 %) Work Started: Time Passed: 04/17/2017 7%( 7 %) RESURFACE (CONCRETE) SH-167: FROM 0.32 Contract: 170096 Residency: 30534(04) SH-167 08300 MILES NORTH OF I-44, EXTEND NORTH IN CATOOSA. PROJECT LENGTH = 4.320 MILES STPY-266C(041)3P CLAREMORE Contractor: IOWA CIVIL CONTRACTING, INC. Engineer: Adjusted: Tyler, Jennifer Contract Amount: ( $2,385,727.54 $2,385,727.54) Contract Time: ( ) 90 90 Letting Date: 02/16/2017 Contract Date: 03/14/2017 W/O Issued Adjusted: 03/29/2017 W/O Effective: Amount Paid: 07/03/2017 38 % ( 38 %) Work Started: Time Passed: 04/10/2017 28 % ( 28 %) County: Seminole 3 Commissioner District: Contracts Under Construction Construction Status Report Page 139 GRADE, DRAIN, AND SURFACE COUNTY Contract: 160117 Residency: 30039(04) CO.RD. 03300 ROAD (MARKET ROAD/NS-360): FROM SH-9, EXTEND NORTH NEAR SEMINOLE. PROJECT STP-267C(044)CI WEWOKA LENGTH = 1.056 MILES. Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $1,167,119.73 $1,234,266.20) Contract Time: ( 120 145 ) Letting Date: 02/18/2016 Contract Date: 03/16/2016 W/O Issued Adjusted: 03/22/2016 W/O Effective: Amount Paid: 07/05/2016 48 % ( 45 %) Work Started: Time Passed: 09/01/2016 168 % ( 139 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160211 28495(04) CO.RD. 03300 COUNTY ROAD (EW-127): FROM US-270, EXTEND EAST NEAR WEWOKA. PROJECT CIRB-267C(055)RB WEWOKA LENGTH = 2.049 MILES. Contractor: KLAVER CONSTRUCTION COMPANY, INC. Adjusted: Engineer: Helton, Matthew Contract Amount: ( $641,271.32 $641,271.32) Contract Time: ( 100 102 ) Letting Date: 05/19/2016 Contract Date: 06/17/2016 W/O Issued Adjusted: 07/29/2016 W/O Effective: Amount Paid: 10/03/2016 69 % ( 69 %) Work Started: Time Passed: 11/14/2016 101 % ( 99 %) GRADE, DRAIN, AND SURFACE COUNTY Contract: 170097 Residency: 30039(08) CO. RD. 03300 ROAD (NS-360/MARKET ROAD): FROM 1.1 MILES NORTH OF SH-9, EXTEND NORTH NEAR CIRB-267C(053)RB WEWOKA SEMINOLE. PROJECT LENGTH = 2.963 MILES Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $2,508,689.16 $2,508,689.16) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) RESURFACE (ASPHALT) SH-9A: FROM THE Contract: 170098 Residency: 31314(04) SH-9A 03300 SH-59 JUNCTION, EXTEND SOUTH NEAR MAUD. PROJECT LENGTH = 2.66 MILES STPY-267C(058)3P WEWOKA Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Helton, Matthew Contract Amount: ( $418,879.60 $418,879.60) Contract Time: ( ) 25 25 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 05/16/2017 0%( 0 %) Construction Status Report Page 140 SAFETY IMPROVEMENT (RUMBLE STRIP AND Contract: 170100 Residency: 32798(04) US-77 03100 PAVEMENT MARKING) US-77/US-270/SH-9/SH-78: AT MULTIPLE HSIPG-267F(057)TR/HSIPG-* ADA LOCATIONS IN DIVISION III. Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: Russell, Julie Contract Amount: ( $143,206.00 $143,206.00) Contract Time: ( ) 30 30 Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/24/2017 W/O Effective: Amount Paid: 07/03/2017 69 % ( 69 %) Work Started: Time Passed: 05/01/2017 17 % ( 17 %) *235C(032)TR RESURFACE (ASPHALT) SH-3E/SH-9A: SH-3E, Residency: Contract: 170110 28205(04) SH-9A 03300 FROM THE SH-9 JCT, EXT NORTHWEST IN SEMINOLE. SH-9A, FROM THE SH-39 JCT, EXT SSR-167C(184)SR/SSR-267C* WEWOKA NORTH IN KONAWA. PROJECT LENGTH = Contractor: THE CUMMINS CONSTRUCTION CO., INC. 9.280 MILES. Adjusted: Engineer: Helton, Matthew Contract Amount: ( $1,488,678.75 $1,488,678.75) Contract Time: ( ) 60 60 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/27/2017 W/O Effective: Amount Paid: 06/05/2017 22 % ( 22 %) Work Started: Time Passed: 05/08/2017 12 % ( 12 %) *(056)SR County: Sequoyah 1 Commissioner District: Contracts Under Construction Contract: 140116 09242(06) US-64 STPY-068C(231)SS Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $5,579,176.11 Contract Time: 230 Letting Date: 07/24/2014 Contract Date: 08/12/2014 W/O Issued 08/14/2014 W/O Effective: 12/01/2014 Work Started: 11/11/2014 Residency: SALLISAW 01200 BRIDGE AND APPROACHES US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW. PROJECT LENGTH = 1.320 MILES. Adjusted: ( $5,629,175.91) ( 244 ) Amount Paid: Time Passed: Adjusted: 78 % ( 78 %) 217 % ( 204 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 150402 Residency: 25434(04) CO.RD. 01200 COUNTY ROAD (NS-462): OVER BRUSHY CREEK, 6.5 MILES NORTH OF SH-64 NEAR CIRB-168C(190)RB SALLISAW SALLISAW. PROJECT LENGTH = 0.464 MILE Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Edwards, Carl Contract Amount: ( $2,499,565.09 $2,499,565.09) Contract Time: ( 120 120 ) Letting Date: 11/19/2015 Contract Date: 12/22/2015 W/O Issued Adjusted: 12/30/2015 W/O Effective: Amount Paid: 03/07/2016 69 % ( 69 %) Work Started: Time Passed: 03/07/2016 236 % ( 236 %) Construction Status Report Page 141 Contract: 160154 27954(05) US-64 STP-268C(031)SS/STP-268B* Contractor: B & B CONSTRUCTION SERVICE Engineer: Edwards, Carl Contract Amount: $340,048.60 Contract Time: 120 Letting Date: 03/17/2016 Contract Date: 04/19/2016 W/O Issued 04/25/2016 W/O Effective: 09/06/2016 Work Started: 09/06/2016 *(032)SS Contract: 160159 23107(12) US-59 NHPP-268N(038)RW Contractor: J.E. DIRT WURX, LLC Engineer: Edwards, Carl Contract Amount: $170,000.00 Contract Time: 180 Letting Date: 03/17/2016 Contract Date: 05/06/2016 W/O Issued 05/09/2016 W/O Effective: 05/31/2016 Work Started: 05/31/2016 Residency: 01200 SALLISAW J.T., INC. Adjusted: ( $340,048.60) ( 120 ) JOINT SEAL/REPAIR US-64: OVER GENERAL OVERFLOW, 0.9 MILES AND 3.4 MILES WEST OF THE ARKANSAS STATE LINE NEAR ROLAND. Amount Paid: Time Passed: Residency: SALLISAW 01200 Adjusted: 89 % ( 89 %) 86 % ( 86 %) RIGHT-OF-WAY CLEARANCE US-59: FROM US-64, EXTEND NORTH IN SALLISAW. PROJECT LENGTH = 3.459 MILES. Adjusted: ( $170,000.00) ( 180 ) Amount Paid: Time Passed: Adjusted: 66 % ( 66 %) 23 % ( 23 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160207 Residency: 28515(04) CO.RD. 01200 COUNTY ROAD (EW-112): FROM 0.1 MILES SOUTH OF US-64, EXTEND SOUTHEAST THEN CIRB-268C(037)RB SALLISAW EAST NEAR MULDROW. PROJECT LENGTH = Contractor: TREAS CONSTRUCTION, INC. 3.995 MILES Engineer: Adjusted: Edwards, Carl Contract Amount: ( $2,947,508.69 $2,947,508.69) Contract Time: ( 225 225 ) Letting Date: 05/19/2016 Contract Date: 06/24/2016 W/O Issued Adjusted: 06/29/2016 W/O Effective: Amount Paid: 10/03/2016 69 % ( 69 %) Work Started: Time Passed: 08/22/2016 84 % ( 84 %) BRIDGE PAINTING US-64: OVER NEGRO Contract: 160260 Residency: 31695(04) US-64 01001 CREEK 4.6 MI EAST OF SH-82 JCT AND OVER GENERAL O'FLOW 3.5 MI AND 6.0 MI EAST OF STP-NBIP(503)3B/STP-NBIP* ENGR. SERV. & TESTING THE I-40 JCT. Contractor: POSEIDON CONSTRUCTION, INC. Engineer: Adjusted: EST Contract Amount: ( $325,993.40 $325,993.40) Contract Time: ( ) 90 90 Letting Date: 09/15/2016 Contract Date: 10/17/2016 W/O Issued Adjusted: 12/12/2016 W/O Effective: Amount Paid: 02/16/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) *(494)(495)SS Construction Status Report Page 142 GRADE, DRAIN, AND SURFACE COUNTY Contract: 160398 Residency: 32223(04) CO. RD. 01002 ROAD (INDIAN ROAD): FROM 1.1 MILES NORTHEAST OF THE SH-10A JUNCTION, ERSTP-268C(025)ER TETRA TECH EXTEND EAST NEAR TENKILLER STATE Contractor: GLOVER & ASSOCIATES, INC. PARK. PROJECT LENGTH = 0.227 MILE Engineer: Adjusted: TETR Contract Amount: ( $748,033.36 $748,033.36) Contract Time: ( ) 45 45 Letting Date: 10/20/2016 Contract Date: 11/23/2016 W/O Issued Adjusted: 11/29/2016 W/O Effective: Amount Paid: 01/09/2017 74 % ( 74 %) Work Started: Time Passed: 01/09/2017 171 % ( 171 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160434 29376(04) COUNTY RO Residency: 01200 (EW-1107): OVER LITTLE SKIN BAYOU CREEK, 0.9 MILES WEST OF SH-64B NEAR MULDROW. STP-268D(040)CI SALLISAW PROJECT LENGTH = 0.327 MILE Contractor: H & H BRIDGE COMPANY Adjusted: Engineer: Edwards, Carl Contract Amount: ( $732,998.87 $732,998.87) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/14/2016 W/O Issued Adjusted: 03/03/2017 W/O Effective: Amount Paid: 04/10/2017 23 % ( 23 %) Work Started: Time Passed: 04/10/2017 17 % ( 17 %) Contract: 170049 30502(04) US-64 SSR-268C(039)SR Contractor: GLOVER & ASSOCIATES, INC. Engineer: Edwards, Carl Contract Amount: $505,270.70 Contract Time: 60 Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued 02/24/2017 W/O Effective: 06/05/2017 Work Started: County: Residency: SALLISAW 01200 SHOULDER REHABILITATION (ASPHALT) US-64/SH-10: FROM THE SH-100 JUNCTION, EXTEND EAST NEAR GORE. PROJECT LENGTH = 9.784 MILES. Adjusted: ( $505,270.70) ( ) 60 Amount Paid: Time Passed: Stephens Adjusted: 0%( 0 %) 0%( 0 %) 7 Commissioner District: Contracts Under Construction Contract: 150310 20316(23) US-81 NHPP-269N(020)SS Contractor: OVERLAND CORPORATION Engineer: Roberts, Colton Contract Amount: $15,567,066.97 Contract Time: 365 Letting Date: 09/17/2015 Contract Date: 10/21/2015 W/O Issued 10/27/2015 W/O Effective: 02/01/2016 Work Started: 02/16/2016 Residency: DUNCAN 07100 Adjusted: ( $15,688,836.83) ( 374 ) GRADE, DRAIN, SURFACE, AND BRIDGE US-81: FROM 0.2 MILE SOUTH OF SEMINOLE ROAD, EXTEND NORTHWEST TO SH-7 (DUNCAN BYPASS) IN DUNCAN. PROJECT LENGTH = 1.608 MILES. Amount Paid: Time Passed: Construction Status Report Adjusted: 94 % ( 94 %) 98 % ( 96 %) Page 143 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160155 Residency: 28366(04) CO.RD. 07100 (NS-279/DEWITT ROAD): OVER LITTLE BEAVER CREEK, 0.7 MILES SOUTH OF THE STP-NBIL(192)CI DUNCAN GRADY COUNTY LINE NEAR MARLOW. Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. PROJECT LENGTH = 0.264 MILE Engineer: Adjusted: Roberts, Colton Contract Amount: ( $937,479.14 $937,479.14) Contract Time: ( 120 120 ) Letting Date: 03/17/2016 Contract Date: 04/19/2016 W/O Issued Adjusted: 04/22/2016 W/O Effective: Amount Paid: 09/06/2016 98 % ( 98 %) Work Started: Time Passed: 09/06/2016 103 % ( 103 %) RIGHT-OF-WAY CLEARANCE SH-29: FROM 2.6 Residency: Contract: 160190 24412(11) SH-29 07100 MILES EAST OF US-81, EXTEND EAST NEAR MARLOW. PROJECT LENGTH = 7.990 MILES STP-269B(040)RW DUNCAN PREQUALIFICATION FOR THIS PROJECT HAS Contractor: ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC BEEN WAIVED. BOTH BID EXPRESS AND Adjusted: Engineer: Roberts, Colton WRITTEN BIDS WILL BE ACCEPTABLE. Contract Amount: ( $52,035.56 $52,035.56) Contract Time: ( 180 180 ) Letting Date: 04/21/2016 Contract Date: 05/19/2016 W/O Issued Adjusted: 05/31/2016 W/O Effective: Amount Paid: 06/13/2016 50 % ( 50 %) Work Started: Time Passed: 12/12/2016 18 % ( 18 %) Contract: 160261 20316(04) US-81 ACNHPP-011N(100)SS Contractor: OVERLAND CORPORATION Engineer: Roberts, Colton Contract Amount: $14,336,306.11 Contract Time: 420 Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued 08/24/2016 W/O Effective: 12/05/2016 Work Started: 12/05/2016 Residency: DUNCAN 07100 GRADE, DRAIN, SURFACE, AND BRIDGE US-81: FROM CHEROKEE ROAD, EXTEND NORTH NEAR DUNCAN. PROJECT LENGTH = 1.123 MILES. Adjusted: ( $14,337,638.11) ( 420 ) Amount Paid: Time Passed: Adjusted: 26 % ( 26 %) 33 % ( 33 %) BRIDGE REHABILITATION SH-7: OVER 7TH Contract: 160262 Residency: 32402(04) SH-7 07100 STREET AND UNION PACIFIC RAILROAD, 0.7 MILE EAST OF THE US-81 JUNCTION IN SBR-269N(038)SB DUNCAN DUNCAN. Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Engineer: Adjusted: Roberts, Colton Contract Amount: ( $2,431,662.08 $2,435,710.08) Contract Time: ( 230 230 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 11/21/2016 W/O Effective: Amount Paid: 12/05/2016 20 % ( 20 %) Work Started: Time Passed: 02/23/2017 43 % ( 43 %) Construction Status Report Page 144 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160435 28444(04) COUNTY RO Residency: 07100 (NS-304): OVER WILDHORSE CREEK, 1.7 MILES NORTH OF SH-7 NEAR VELMA. STP-269C(041)CI DUNCAN PROJECT LENGTH = 0.207 MILE Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: Roberts, Colton Contract Amount: ( $1,180,099.91 $1,180,099.91) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/20/2016 W/O Effective: Amount Paid: 03/06/2017 46 % ( 46 %) Work Started: Time Passed: 03/23/2017 52 % ( 52 %) County: Texas 6 Commissioner District: Contracts Under Construction GRADE, DRAIN, AND SURFACE COUNTY Residency: Contract: 160118 28465(06) CO.RD. 06200 ROAD (EW-10): FROM 3.0 MILES EAST OF SH-136, EXTEND EAST NEAR GUYMON. CIRB-270C(021)RB GUYMON PROJECT LENGTH = 3.030 MILES. Contractor: J & R SAND COMPANY, INC. Engineer: Adjusted: Michael, Charles Contract Amount: ( $1,991,180.31 $1,992,060.31) Contract Time: ( 120 120 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/24/2016 W/O Effective: Amount Paid: 02/06/2017 94 % ( 94 %) Work Started: Time Passed: 02/06/2017 68 % ( 68 %) BRIDGE AND APPROACHES US-54: OVER Residency: Contract: 160233 06200 29447(04) US-54 PONY CREEK, 10.8 MILES NORTHEAST OF THE SH-3 JUNCTION NEAR GUYMON. GUYMON ACNHPP-008N(087)SS PROJECT LENGTH = 0.055 MILE. Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: Adjusted: Michael, Charles Contract Amount: ( $1,354,334.20 $1,369,329.20) Contract Time: ( 120 143 ) Letting Date: 06/16/2016 Contract Date: 07/28/2016 W/O Issued Adjusted: 10/10/2016 W/O Effective: Amount Paid: 11/07/2016 98 % ( 97 %) Work Started: Time Passed: 11/07/2016 136 % ( 114 %) BRIDGE AND APPROACHES SH-95: OVER Contract: 160239 Residency: 29448(04) SH-95 06200 GOFF CREEK, 7.1 MILES NORTH OF THE US-64 JUNCTION NEAR EVA. PROJECT ACSTP-270C(022)SS GUYMON LENGTH = 0.203 MILE. Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Engineer: Adjusted: Michael, Charles Contract Amount: ( $2,462,399.16 $2,462,399.16) Contract Time: ( 180 183 ) Letting Date: 06/16/2016 Contract Date: 07/26/2016 W/O Issued Adjusted: 09/26/2016 W/O Effective: Amount Paid: 11/07/2016 68 % ( 68 %) Work Started: Time Passed: 11/07/2016 86 % ( 85 %) Construction Status Report Page 145 SAFETY IMPROVEMENT (RUMBLE STRIP AND Contract: 170102 Residency: 32663(08) US-270 06100 PAVEMENT MARKING) US-270/US-412/SH-3: AT MULTIPLE LOCATIONS IN DIVISION VI. HSIPG-270N(026)(027)MS/H* BUFFALO Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $885,499.15 $885,499.15) Contract Time: ( ) 60 60 Letting Date: 02/16/2017 Contract Date: 03/20/2017 W/O Issued Adjusted: 03/21/2017 W/O Effective: Amount Paid: 07/03/2017 0%( 0 %) Work Started: Time Passed: 05/18/2017 0%( 0 %) *SIPG-204N(021)MS/HSIPG-230N(025)MS RESURFACE (ASPHALT) SH-95/SH-136: SH-95 Contract: 170111 Residency: 30528(04) SH-95 06200 FROM 8.1 MILES N OF US-64 NEAR SURREY HILLS. SH-136 FROM 8.8 MILES N OF US-64 SSR-270C(028)SR GUYMON NEAR GUYMON. PROJECT LENGTH = 16.300 Contractor: VENTURE CORPORATION DBA V. C. O. PAVING MILES Engineer: Adjusted: Michael, Charles Contract Amount: ( $1,799,898.00 $1,799,898.00) Contract Time: ( ) Letting Date: 01/19/2017 Contract Date: 02/14/2017 Fixed Completion Date: 10/01/2017 W/O Issued Adjusted: 03/17/2017 W/O Effective: Amount Paid: 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Tillman 5 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160182 Residency: 05005 25486(04) CO.RD. COUNTY ROAD (EW-173): FROM 5.2 MILES EAST OF US-183, EXTEND EAST NEAR CIRCUIT ENGR. DISTR. # 7 CIRB-171C(127)RB MANITOU. PROJECT LENGTH = 5.742 MILES Contractor: SEWELL BROS., INC. Engineer: Adjusted: CED7 Contract Amount: ( $5,983,257.10 $5,983,257.10) Contract Time: ( 270 270 ) Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued Adjusted: 05/19/2016 W/O Effective: Amount Paid: 08/01/2016 85 % ( 85 %) Work Started: Time Passed: 06/20/2016 106 % ( 106 %) GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160263 Residency: 28689(04) CO.RD. 05005 COUNTY ROAD (EW-173/BASELINE ROAD): FROM 12.0 MILES EAST OF US-183, EXTEND CIRB-271C(002)RB CIRCUIT ENGR. DISTR. # 7 EAST NEAR MANITOU. PROJECT LENGTH = Contractor: T & G CONSTRUCTION, INC. 4.371 MILES Engineer: Adjusted: CED7 Contract Amount: ( $4,488,839.75 $4,488,839.75) Contract Time: ( 270 270 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/24/2016 W/O Effective: Amount Paid: 12/05/2016 27 % ( 27 %) Work Started: Time Passed: 12/05/2016 32 % ( 32 %) Construction Status Report Page 146 Contract: 170052 30403(04) SH-5 SSR-271B(054)SR Contractor: OVERLAND CORPORATION Engineer: Sirmons, Karl Contract Amount: $3,585,473.00 Contract Time: Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued 02/17/2017 W/O Effective: Work Started: County: Residency: ALTUS 05200 RESURFACE (ASPHALT) SH-5: FROM 0.42 MILES EAST OF THE US-183 JUNCTION, EXTEND EAST IN FREDERICK. PROJECT LENGTH = 15.81 MILES Adjusted: ( $3,585,473.00) ( ) Fixed Completion Date: 10/31/2017 Adjusted: Amount Paid: 0%( 0 %) Time Passed: 0%( 0 %) Tulsa 8 Commissioner District: Contracts Under Construction SAFETY IMPROVEMENT (CABLE BARRIER) Residency: Contract: 130350 30270(04) US-75 08011 US-75: FROM 6.0 MILES SOUTH OF THE WASHINGTON COUNTY LINE, EXTEND HSIPG-272N(044)TR/HSIPG-* GARVER, LLC. NORTH. PROJECT LENGTH = 22.50 MILES. Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: GARV Contract Amount: ( $3,945,413.26 $4,821,036.52) Contract Time: ( 240 240 ) Letting Date: 09/19/2013 Contract Date: 10/29/2013 W/O Issued Adjusted: 11/01/2013 W/O Effective: Amount Paid: 02/17/2014 117 % ( 96 %) Work Started: Time Passed: 02/17/2014 144 % ( 144 %) *274N(004)TR PAVEMENT AND BRIDGE REHABILITATION Residency: Contract: 140304 26300(06) I-244 08100 I-244: BEGIN 1.5 MILES EAST OF US-75, EXTEND EAST. PROJECT LENGTH = 2.939 NHPPIY-0244-2(501)(504)(* TULSA MILES. Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $36,170,934.33 $36,486,544.19) Contract Time: ( 440 440 ) Letting Date: 10/16/2014 Contract Date: 11/12/2014 W/O Issued Adjusted: 11/20/2014 W/O Effective: Amount Paid: 03/02/2015 98 % ( 97 %) Work Started: Time Passed: 03/02/2015 90 % ( 90 %) *507) Contract: 150117 30914(04) I-44 SSP-4400(002)SS/SSP-272N* Contractor: APAC-CENTRAL, INC. Engineer: Arnold, Bruce Contract Amount: $5,195,474.88 Contract Time: 120 Letting Date: 03/19/2015 Contract Date: 04/20/2015 W/O Issued 04/30/2015 W/O Effective: 05/29/2015 Work Started: 05/29/2015 *(106)(107)(108)SS Residency: TULSA 08100 RESURFACE (UTBWC) I-44/I-244/US-169/SH-51: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 6.959 MILES. Adjusted: ( $5,195,474.88) ( 120 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 143 % ( 143 %) 306 % ( 306 %) Page 147 BRIDGE REHABILITATION CITY STREETS: AT Contract: 150270 Residency: 28862(04) CT.ST. 08100 BOSTON AVE, MAIN STREET, AND CHEYENNE AVE, EACH OVER I-444 IN TULSA. NHPPI-4440(001)SS TULSA Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $4,065,649.75 $4,065,649.75) Contract Time: ( 300 300 ) Letting Date: 08/20/2015 Contract Date: 09/16/2015 W/O Issued Adjusted: 09/18/2015 W/O Effective: Amount Paid: 01/04/2016 104 % ( 104 %) Work Started: Time Passed: 01/04/2016 135 % ( 135 %) BRIDGE REHABILITATION US-64: OVER 161ST Residency: Contract: 150272 28883(04) US-64 08400 W. AVE AND 193RD W. AVE, 4.6 MI SOUTHEAST OF THE OSAGE COUNTY LINE IN NHPP-272N(094)SS SAND SPRINGS SAND SPRINGS. PROJECT LENGTH = 2.201 Contractor: SHERWOOD CONSTRUCTION CO., INC. MILES. Adjusted: Engineer: Williams, Mark J. Contract Amount: ( $5,894,292.84 $5,907,609.29) Contract Time: ( 315 315 ) Letting Date: 08/20/2015 Contract Date: 09/16/2015 W/O Issued Adjusted: 09/18/2015 W/O Effective: Amount Paid: 01/04/2016 88 % ( 88 %) Work Started: Time Passed: 01/04/2016 105 % ( 105 %) Contract: 150273 30318(05) MULT SSP-272F(124)SS Contractor: JLT CONTRACTING, LLC Engineer: C&KI Contract Amount: $435,114.15 Contract Time: 45 Letting Date: 08/20/2015 Contract Date: 09/21/2015 W/O Issued 09/23/2015 W/O Effective: 10/12/2015 Work Started: 11/09/2015 Residency: 08007 CRAIG & KEITHLINE, INC. BRIDGE WATER PROOF SEAL I-44/I-244/I-444/US-60/US-69/SH-28/SH-51/SH-66 /LEWIS AVE: AT MULTIPLE LOCATIONS IN DIVISION VIII. Adjusted: ( $435,114.15) ( ) 45 Amount Paid: Time Passed: Adjusted: 93 % ( 93 %) 271 % ( 271 %) BRIDGE AND APPROACHES SH-266: FROM Contract: 150312 Residency: 27053(04) SH-26 08100 0.3 MILES EAST OF US-169, EXTEND EAST NEAR CATOOSA. PROJECT LENGTH = 2.528 STP-272A(093)SS TULSA Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $23,466,001.38 $23,466,001.38) Contract Time: ( 450 450 ) Letting Date: 09/17/2015 Contract Date: 10/21/2015 W/O Issued Adjusted: 10/29/2015 W/O Effective: Amount Paid: 12/01/2015 95 % ( 95 %) Work Started: Time Passed: 12/01/2015 97 % ( 97 %) Construction Status Report Page 148 Contract: 150345 23170(07) I-44 HSIPG-272C(122)IT Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: TETR Contract Amount: $2,726,955.40 Contract Time: 300 Letting Date: 10/15/2015 Contract Date: 11/20/2015 W/O Issued 11/30/2015 W/O Effective: 04/04/2016 Work Started: 04/04/2016 Contract: 160063 28867(04) CT.ST. STP-272C(097)SS/NHPP-272* Contractor: BECCO CONTRACTORS, INC. Engineer: ATKINS Contract Amount: $3,086,000.00 Contract Time: 200 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 03/02/2016 W/O Effective: 06/06/2016 Work Started: 06/06/2016 *A(125)SS Contract: 160156 28861(04) I-244 ACNHPPI-2440(010)SS Contractor: BECCO CONTRACTORS, INC. Engineer: TETR Contract Amount: $18,810,000.00 Contract Time: 580 Letting Date: 04/21/2016 Contract Date: 05/06/2016 W/O Issued 05/09/2016 W/O Effective: 05/31/2016 Work Started: 05/23/2016 Residency: 08002 TETRA TECH LLC Adjusted: ( $2,816,299.52) ( 330 ) SAFETY IMPROVEMENT (ITS) I-44/I-244/US-75/US-169/SH-51: AT MULTIPLE LOCATIONS IN DIVISION VIII. Amount Paid: Time Passed: Residency: ATKINS 08010 Adjusted: 97 % ( 94 %) 109 % ( 99 %) BRIDGE REHABILITATION CITY STREETS: ON SHERIDAN AVE, OVER SH-11 3.0 MILES WEST OF US-75, AND ON 69TH E. AVE, OVER SH-11 IN TULSA. PROJECT LENGTH = 0.120 MILE. Adjusted: ( $3,088,750.00) ( 200 ) Amount Paid: Time Passed: Residency: TETRA TECH 08002 Adjusted: ( $18,811,925.00) ( 580 ) Adjusted: 90 % ( 90 %) 143 % ( 143 %) BRIDGE REHABILITATION I-244 RAMP/23RD STREET: OVER I-244 AND THE BNSF RAILROAD, 1.2 MILES SOUTH OF THE US-75 INTERCHANGE IN TULSA. PROJECT LENGTH = 0.548 MILE. Amount Paid: Time Passed: Adjusted: 58 % ( 58 %) 62 % ( 62 %) GRADE, DRAIN, SURFACE, AND TRAFFIC Contract: 160234 Residency: 29323(04) CT.ST. 08010 SIGNALS CITY STREET (111TH STREET): AT THE INTERSECTION OF MINGO ROAD IN THE STP-272B(175)IG ATKINS CITY OF BIXBY. PROJECT LENGTH = 0.350 Contractor: TRI-STAR CONSTRUCTION ARKANSAS, LLC MILE. Engineer: Adjusted: ATKINS Contract Amount: ( $1,287,134.01 $1,337,121.65) Contract Time: ( 180 180 ) Letting Date: 06/16/2016 Contract Date: 07/19/2016 W/O Issued Adjusted: 07/25/2016 W/O Effective: Amount Paid: 11/07/2016 78 % ( 75 %) Work Started: Time Passed: 12/15/2016 54 % ( 54 %) Construction Status Report Page 149 Contract: 160270 30730(04) I-44 HSIPG-272F(084)TR Contractor: TRAFFIC & LIGHTING SYSTEMS, Engineer: CEC Contract Amount: $580,550.00 Contract Time: 120 Letting Date: 07/21/2016 Contract Date: 08/09/2016 W/O Issued 08/11/2016 W/O Effective: 12/05/2016 Work Started: 12/05/2016 Residency: 08003 CEC CORP. LLC Adjusted: ( $580,550.00) ( 120 ) TRAFFIC SIGNALS INTERSTATE/US HIGHWAYS/STATE HIGHWAYS/CITY STREETS: BACKPLATE REPLACEMENT AT MULTIPLE LOCATIONS STATEWIDE. Amount Paid: Time Passed: Adjusted: 84 % ( 84 %) 77 % ( 77 %) BRIDGE AND APPROACHES US-75: OVER Residency: Contract: 160300 28848(04) US-75 08004 NORTH DUCK CREEK, 4.7 MILES SOUTH OF SH-67 NEAR THE TOWN OF MOUNDS. ACNHPP-272N(148)SS JACOBS ENGINEERING PROJECT LENGTH = 0.211 MILE. Contractor: MANHATTAN ROAD & BRIDGE COMPANY Adjusted: Engineer: JACOBS Contract Amount: ( $3,693,425.16 $3,693,425.16) Contract Time: ( 300 300 ) Letting Date: 08/18/2016 Contract Date: 09/14/2016 W/O Issued Adjusted: 09/15/2016 W/O Effective: Amount Paid: 02/06/2017 67 % ( 67 %) Work Started: Time Passed: 11/14/2016 61 % ( 61 %) BRIDGE REHABILITATION US-75: OVER Contract: 160301 Residency: 28849(04) US-75 08002 POLECAT CREEK, 0.4 MILES NORTH OF THE CREEK TURNPIKE IN JENKS. PROJECT ACNHPP-272N(185)SS TETRA TECH LENGTH = 0.088 MILE Contractor: LOGOS CONSTRUCTION CO., LLC Engineer: Adjusted: TETR Contract Amount: ( $686,896.02 $686,896.02) Contract Time: ( 120 120 ) Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued Adjusted: 09/23/2016 W/O Effective: Amount Paid: 01/03/2017 53 % ( 53 %) Work Started: Time Passed: 11/16/2016 49 % ( 49 %) Contract: 160302 28873(04) CT.ST. ACNHPP-030N(076)SS Contractor: PBX CORPORATION Engineer: Arnold, Bruce Contract Amount: $1,815,047.30 Contract Time: 120 Letting Date: 08/18/2016 Contract Date: 09/16/2016 W/O Issued 09/20/2016 W/O Effective: 01/03/2017 Work Started: 12/08/2016 Residency: TULSA 08100 BRIDGE REHABILITATION CITY STREET (EAST 36TH STREET): OVER US-169, 3.5 MILES NORTH OF I-244 IN THE CITY OF TULSA. PROJECT LENGTH = 0.142 MILE. Adjusted: ( $1,824,797.30) ( 120 ) Amount Paid: Time Passed: Construction Status Report Adjusted: 90 % ( 89 %) 95 % ( 95 %) Page 150 BRIDGE REHABILITATION I-444/CINCINNATI Contract: 160303 Residency: 31881(04) I-444 08100 AVENUE: AT MULTIPLE LOCATIONS IN THE CITY OF TULSA. ACNHPPI-4440(006)SS TULSA Contractor: WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $6,982,546.64 $6,982,546.64) Contract Time: ( 365 365 ) Letting Date: 08/18/2016 Contract Date: 09/19/2016 W/O Issued Adjusted: 09/28/2016 W/O Effective: Amount Paid: 01/03/2017 13 % ( 13 %) Work Started: Time Passed: 01/03/2017 30 % ( 30 %) Contract: 160305 31939(05) US-75 SSP-272N(138)SS Contractor: BECCO CONTRACTORS, INC. Engineer: Arnold, Bruce Contract Amount: $4,670,000.00 Contract Time: 110 Letting Date: 08/18/2016 Contract Date: 09/19/2016 W/O Issued 09/22/2016 W/O Effective: 03/31/2017 Work Started: 03/31/2017 Residency: TULSA 08100 RESURFACE (ASPHALT) US-75: FROM 2.0 MILES NORTH OF THE I-44 INTERCHANGE, EXTEND SOUTH IN TULSA. PROJECT LENGTH = 5.325 MILES. Adjusted: ( $4,670,000.00) ( 110 ) Amount Paid: Time Passed: Adjusted: 54 % ( 54 %) 34 % ( 34 %) GRADE, DRAIN, SURFACE, AND BRIDGE I-44: Contract: 160333 Residency: 21899(04) I-44 08100 FROM 1.0 MILE EAST OF THE I-244 INTERCHANGE, EXTEND WEST IN THE CITY ACNHPPI-4400-(438)SS TULSA OF TULSA. PROJECT LENGTH = 1.155 MILES. Contractor: SHERWOOD CONSTRUCTION CO., INC. Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $29,559,681.69 $29,576,474.84) Contract Time: ( 430 430 ) Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 10/20/2016 W/O Effective: Amount Paid: 02/16/2017 29 % ( 29 %) Work Started: Time Passed: 02/13/2017 17 % ( 17 %) BRIDGE PAINTING I-244/I-444/SH-51: AT Contract: 160337 Residency: 08010 30318(06) I-244 MULTIPLE LOCATIONS IN THE CITY OF TULSA. ATKINS SSP-NBIP(506)SS Contractor: ELITE INDUSTRIAL PAINTING, INC. Engineer: Adjusted: ATKINS Contract Amount: ( $1,566,487.00 $1,566,487.00) Contract Time: ( 150 150 ) Letting Date: 09/15/2016 Contract Date: 10/28/2016 W/O Issued Adjusted: 11/08/2016 W/O Effective: Amount Paid: 02/16/2017 79 % ( 79 %) Work Started: Time Passed: 02/25/2017 53 % ( 53 %) Construction Status Report Page 151 Contract: 160339 31943(04) I-244 SSP-272F(182)SS Contractor: KEYSTONE SERVICES, INC. Engineer: BKL Contract Amount: $188,945.30 Contract Time: 120 Letting Date: 09/15/2016 Contract Date: 10/20/2016 W/O Issued 10/25/2016 W/O Effective: 02/16/2017 Work Started: 03/06/2017 Contract: 170053 28872(04) IS-44 ACNHPPI-4400-(016)(014)(* Contractor: BECCO CONTRACTORS, INC. Engineer: Arnold, Bruce Contract Amount: $5,833,000.00 Contract Time: 240 Letting Date: 01/19/2017 Contract Date: 02/21/2017 W/O Issued 02/24/2017 W/O Effective: 06/05/2017 Work Started: *015)SS Residency: 08019 BKL, INCORPORATED BRIDGE WATER PROOF SEAL INTERSTATE/US-HIGHWAYS/STATE HIGHWAYS: AT MULTIPLE LOCATIONS IN DIVISION VIII. Adjusted: ( $188,945.30) ( 120 ) Amount Paid: Time Passed: Residency: TULSA 08100 Adjusted: ( $5,833,000.00) ( 240 ) Adjusted: 65 % ( 65 %) 52 % ( 52 %) BRIDGE REHABILITATION I-44/GILCREASE EXPWY RAMP: OVER I-244, CITY ST, CNTY RD, TSU RR AND BNSF RR, AT MULTIPLE LOCATIONS IN TULSA. PROJECT LENGTH = 0.170 MILE Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) BRIDGE REHABILITATION CITY STREETS Contract: 170054 Residency: 29071(04) CT. ST. 08100 (HARVARD AVE/PITTSBURG AVE/YALE AVE/ MEMORIAL DR): OVER I-244 IN THE CITY OF NHPPIY-2440-(014)(013) TULSA TULSA. PROJECT LENGTH = 0.121 MILE Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $8,097,436.74 $8,097,436.74) Contract Time: ( 360 360 ) Letting Date: 01/19/2017 Contract Date: 02/15/2017 W/O Issued Adjusted: 02/17/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) GRADE, DRAIN, SURFACE, AND TRAFFIC Contract: 170103 Residency: 25211(04) CT. ST. 08010 SIGNALS CITY STREET (W MAIN STREET/W. 96TH STREET): FROM US-75, EXTEND EAST STP-172B(399(398)(456)IG ATKINS IN THE CITY OF JENKS. PROJECT LENGTH = Contractor: NABHOLZ CONSTRUCTION CORPORATION 2.218 MILES Engineer: Adjusted: ATKINS Contract Amount: ( $10,544,739.61 $10,544,739.61) Contract Time: ( 310 310 ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Construction Status Report Page 152 Contract: 170106 29826(04) US-64 SBR-272A(201)SB Contractor: PBX CORPORATION Engineer: Arnold, Bruce Contract Amount: $1,851,494.87 Contract Time: 150 Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued 05/16/2017 W/O Effective: 07/03/2017 Work Started: Residency: TULSA 08100 Adjusted: ( $1,851,494.87) ( 150 ) BRIDGE REHABILITATION US-64/SH-51: OVER YALE AVENUE AND 31ST STREET, 1.6 MILES NORTHWEST OF THE I-44 INTERCHANGE IN THE CITY OF TULSA. PROJECT LENGTH = 0.132 MILE Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) BRIDGE REHABILITATION SH-11: OVER US-75, Residency: Contract: 170107 30594(04) SH-11 08100 3.5 MILES NORTH OF THE I-244 INTERCHANGE IN THE CITY OF TULSA. PROJECT LENGTH = SBR-272N(186)SB TULSA 0.161 MILE Contractor: SHERWOOD CONSTRUCTION CO., INC. Adjusted: Engineer: Arnold, Bruce Contract Amount: ( $1,750,485.40 $1,750,485.40) Contract Time: ( 180 180 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 03/20/2017 W/O Effective: Amount Paid: 09/05/2017 4%( 4 %) Work Started: Time Passed: 05/08/2017 5%( 5 %) Contract: 170141 27937(04) US-64 STP-272C(202) Contractor: GLOVER & ASSOCIATES, INC. Engineer: CEC Contract Amount: $3,901,904.47 Contract Time: 210 Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued 04/24/2017 W/O Effective: 09/05/2017 Work Started: Residency: CEC CORP. 08003 BRIDGE AND APPROACHES US-64: OVER SNAKE CREEK, 4.8 MILES SOUTH AND EAST OF THE SH-67 JUNCTION IN BIXBY. PROJECT LENGTH = 0.823 MILE Adjusted: ( $3,901,904.47) ( 210 ) Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) BRIDGE REHABILITATION CITY STREETS: Contract: 170142 Residency: 28865(04) CT. ST. 08100 OVER I-444 AND US-75, AT MULTIPLE LOCATIONS IN THE CITY OF TULSA. PROJECT ACNHPPI-4440-(002)(003)S* TULSA LENGTH = 0.240 MILES Contractor: BECCO CONTRACTORS, INC. Engineer: Adjusted: Arnold, Bruce Contract Amount: ( $9,256,000.00 $9,256,000.00) Contract Time: ( 350 350 ) Letting Date: 03/16/2017 Contract Date: 04/19/2017 W/O Issued Adjusted: 04/21/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) *S/NHPPI-4440-(004)SS/ACNHPP-272N(149)SS County: Wagoner 1 Commissioner District: Contracts Under Construction Construction Status Report Page 153 Contract: 160067 28905(04) CT.ST. STPY-173C(177)MS Contractor: PARAGON CONTRACTORS, LLC Engineer: GARV Contract Amount: $2,811,811.00 Contract Time: 165 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 03/22/2016 W/O Effective: 06/06/2016 Work Started: 06/06/2016 Residency: GARVER, LLC. 01011 Adjusted: ( $2,871,311.80) ( 196 ) GRADE, DRAIN, AND SURFACE CITY STREETS: ON 257TH E AVE, FROM SH-51 EXTEND NORTH THEN EAST ON 101ST STREET IN COWETA. PROJECT LENGTH = 0.817 MILE. Amount Paid: Time Passed: Adjusted: 48 % ( 47 %) 162 % ( 137 %) GRADE, DRAIN, SURFACE, AND BRIDGE Residency: Contract: 160209 28506(04) CO.RD. 01003 COUNTY ROAD (NS-414): FROM 0.9 MILES SOUTH OF US-412, EXTEND NORTH IN FAIR CIRB-273C(024)RB CEC CORP. OAKS. PROJECT LENGTH = 0.364 MILE Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Adjusted: Engineer: CEC Contract Amount: ( $2,008,145.87 $2,008,145.87) Contract Time: ( 150 150 ) Letting Date: 05/19/2016 Contract Date: 06/24/2016 W/O Issued Adjusted: 06/29/2016 W/O Effective: Amount Paid: 11/07/2016 91 % ( 91 %) Work Started: Time Passed: 09/07/2016 113 % ( 113 %) GRADE, DRAIN, AND SURFACE COUNTY Contract: 160267 Residency: 25488(04) CO.RD. 01004 ROAD (ELEVATOR ROAD/EW-730/NS-4220): FROM SH-51, EXTEND WEST THEN NORTH CIRB-173C(145)RB/CIRB-27* JACOBS ENGINEERING NEAR COWETA. PROJECT LENGTH = 8.347 Contractor: MCGUIRE BROTHERS CONSTRUCTION, INC. MILES Engineer: Adjusted: JACOBS Contract Amount: ( $6,487,576.35 $6,487,576.35) Contract Time: ( 180 180 ) Letting Date: 07/21/2016 Contract Date: 08/09/2016 W/O Issued Adjusted: 08/11/2016 W/O Effective: Amount Paid: 12/05/2016 22 % ( 22 %) Work Started: Time Passed: 12/05/2016 71 % ( 71 %) *3C(030)RB GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160268 Residency: 25489(04) CO.RD. 01011 COUNTY ROAD (INDIAN ROAD/161ST STREET SOUTH): FROM 2.0 MILES WEST OF SH-72, CIRB-173C(146)RB GARVER, LLC. EXTEND EAST NEAR COWETA. PROJECT Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC LENGTH = 1.542 MILES. Engineer: Adjusted: GARV Contract Amount: ( $2,887,499.15 $2,894,180.15) Contract Time: ( 175 196 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/24/2016 W/O Effective: Amount Paid: 12/05/2016 61 % ( 61 %) Work Started: Time Passed: 10/24/2016 91 % ( 82 %) Construction Status Report Page 154 Contract: 160306 24366(04) SH-16 ACSTP-273C(025)SS Contractor: BECCO CONTRACTORS, INC. Engineer: Hagerman, Jeremy Contract Amount: $14,277,000.00 Contract Time: 320 Letting Date: 01/19/2017 Contract Date: 02/21/2017 W/O Issued 02/24/2017 W/O Effective: 06/05/2017 Work Started: Residency: MUSKOGEE 01100 GRADE, DRAIN, SURFACE, AND BRIDGE SH-16: FROM 0.1 MILE NORTH OF THE SH-51 JUNCTION, EXTEND SOUTH NEAR WAGONER. PROJECT LENGTH = 6.050 MILES. Adjusted: ( $14,277,000.00) ( 320 ) Amount Paid: Time Passed: Adjusted: 0%( 0 %) 0%( 0 %) BRIDGE REHABILITATION US-64: OVER Residency: Contract: 170055 29513(04) US-64 01010 MOUNTAIN CREEK, 0.4 MILES SOUTHEAST OF THE TULSA COUNTY LINE NEAR BIXBY. SBR-273C(037)SB ATKINS Contractor: BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION Adjusted: Engineer: ATKINS Contract Amount: ( $336,315.00 $336,315.00) Contract Time: ( ) 90 90 Letting Date: 01/19/2017 Contract Date: 03/02/2017 W/O Issued Adjusted: 03/03/2017 W/O Effective: Amount Paid: 06/05/2017 9%( 9 %) Work Started: Time Passed: 04/06/2017 19 % ( 19 %) RESURFACE (ASPHALT) SH-51B: FROM THE Contract: 170108 Residency: 29754(05) SH-51B 01100 SH-104 JUNCTION, EXTEND EAST NEAR PORTER. PROJECT LENGTH = 4.477 MILES STPY-273C(015)3P MUSKOGEE Contractor: GLOVER & ASSOCIATES, INC. Engineer: Adjusted: Hagerman, Jeremy Contract Amount: ( $762,411.53 $762,411.53) Contract Time: ( ) Letting Date: 02/16/2017 Contract Date: 03/21/2017 Fixed Completion Date: 10/31/2017 W/O Issued Adjusted: 03/25/2017 W/O Effective: Amount Paid: 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Washington 8 Commissioner District: Contracts Under Construction BRIDGE REHABILITATION US-75: OVER Contract: 160269 Residency: 27077(04) US-75 08400 TURKEY CREEK, 1.3 MILES NORTH OF US-60 IN BARTLESVILLE. PROJECT LENGTH = 0.213 NHPP-274N(016)SS SAND SPRINGS MILE. Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Engineer: Adjusted: Williams, Mark J. Contract Amount: ( $1,857,945.35 $1,861,905.35) Contract Time: ( 180 180 ) Letting Date: 07/21/2016 Contract Date: 08/18/2016 W/O Issued Adjusted: 08/25/2016 W/O Effective: Amount Paid: 02/16/2017 53 % ( 53 %) Work Started: Time Passed: 02/16/2017 42 % ( 42 %) Construction Status Report Page 155 BRIDGE AND APPROACHES COUNTY ROAD Contract: 160436 23549(04) COUNTY RO Residency: 08007 (NS-401): OVER LIMESTONE DRAW, 4.4 MILES NORTH OF US-60 NEAR DEWEY. PROJECT STP-174C(043)CI CRAIG & KEITHLINE, INC. LENGTH = 0.188 MILE Contractor: H & H BRIDGE COMPANY Engineer: Adjusted: C&KI Contract Amount: ( $536,789.41 $536,789.41) Contract Time: ( 120 120 ) Letting Date: 11/17/2016 Contract Date: 12/20/2016 W/O Issued Adjusted: 01/12/2017 W/O Effective: Amount Paid: 03/06/2017 82 % ( 82 %) Work Started: Time Passed: 03/03/2017 46 % ( 46 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160437 30615(04) COUNTY RO Residency: 08007 (NS-394): OVER TRIBUTARY TO CANEY RIVER, 1.1 MILES SOUTH OF EW-24 NEAR CIRB-274D(017)RB CRAIG & KEITHLINE, INC. BARTLESVILLE. PROJECT LENGTH = 0.212 Contractor: H & H BRIDGE COMPANY MILE Adjusted: Engineer: C&KI Contract Amount: ( $705,462.91 $705,462.91) Contract Time: ( 110 110 ) Letting Date: 11/17/2016 Contract Date: 12/14/2016 W/O Issued Adjusted: 01/12/2017 W/O Effective: Amount Paid: 04/03/2017 46 % ( 46 %) Work Started: Time Passed: 03/30/2017 28 % ( 28 %) County: Washita 5 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES SH-115: OVER Residency: Contract: 140283 05200 26998(04) SH-115 GYP CREEK, 3.0 MILES SOUTH OF SH-152. PROJECT LENGTH = 0.062 MILE. ALTUS STPY-275C(002) Contractor: MANHATTAN ROAD & BRIDGE COMPANY Engineer: Adjusted: Sirmons, Karl Contract Amount: ( $924,578.85 $941,307.27) Contract Time: ( ) 90 90 Letting Date: 08/21/2014 Contract Date: 09/22/2014 W/O Issued Adjusted: 09/25/2014 W/O Effective: Amount Paid: 03/02/2015 97 % ( 95 %) Work Started: Time Passed: 02/24/2015 68 % ( 68 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 150317 Residency: 30067(04) CO.RD. 05005 (NS-210): OVER TRAIL CREEK, 1.1 MILES NORTH OF SH-55 NEAR SENTINEL. PROJECT STP-275D(018)CI CIRCUIT ENGR. DISTR. # 7 LENGTH = 0.189 MILE. Contractor: K & R BUILDERS, INC. Engineer: Adjusted: CED7 Contract Amount: ( $469,461.46 $473,661.46) Contract Time: ( 110 112 ) Letting Date: 09/17/2015 Contract Date: 10/21/2015 W/O Issued Adjusted: 10/27/2015 W/O Effective: Amount Paid: 02/01/2016 98 % ( 97 %) Work Started: Time Passed: 11/18/2015 100 % ( 98 %) Construction Status Report Page 156 Contract: 160065 29237(04) SH-54 SBR-275C(005)SB Contractor: K & R BUILDERS, INC. Engineer: ATKINS Contract Amount: $824,463.54 Contract Time: 100 Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued 03/04/2016 W/O Effective: 06/06/2016 Work Started: 06/03/2016 Residency: ATKINS 05010 BRIDGE REHABILITATION SH-54: OVER OAK CREEK, 2.1 MILES SOUTH OF SH-55 NEAR GOTEBO. Adjusted: ( $867,319.66) ( 100 ) Amount Paid: Time Passed: Adjusted: 94 % ( 89 %) 74 % ( 74 %) BRIDGE AND APPROACHES SH-152: OVER Residency: Contract: 160183 29524(04) SH-152 05100 TAYLOR CREEK, 1.5 MILES WEST OF THE CADDO COUNTY LINE. PROJECT LENGTH = ACSTP-275C(032)SS CLINTON 0.217 MILE. Contractor: SEWELL BROS., INC. Adjusted: Engineer: Davis, Shawn Contract Amount: ( $1,179,669.64 $1,349,443.39) Contract Time: ( 120 120 ) Letting Date: 04/21/2016 Contract Date: 05/13/2016 W/O Issued Adjusted: 05/19/2016 W/O Effective: Amount Paid: 09/06/2016 111 % ( 97 %) Work Started: Time Passed: 06/06/2016 68 % ( 68 %) BRIDGE REHABILITATION COUNTY ROAD Contract: 160438 31783(04) COUNTY RO Residency: 05100 (CANUTE ROAD): OVER I-40, 5.0 MILES EAST OF THE BECKHAM COUNTY LINE IN CANUTE. SBR-4000(036)SB CLINTON PROJECT LENGTH = 0.127 MILE Contractor: FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Engineer: Adjusted: Davis, Shawn Contract Amount: ( $1,458,401.62 $1,458,401.62) Contract Time: ( 180 180 ) Letting Date: 11/17/2016 Contract Date: 12/16/2016 W/O Issued Adjusted: 12/20/2016 W/O Effective: Amount Paid: 04/03/2017 15 % ( 15 %) Work Started: Time Passed: 05/08/2017 16 % ( 16 %) BRIDGE AND APPROACHES SH-152: OVER Contract: 170056 Residency: 26480(04) SH-152 05100 TRAIL CREEK, 4.2 MILES EAST OF THE BECKHAM COUNTY LINE. PROJECT LENGTH = STPY-175C(109) CLINTON 0.342 MILE Contractor: K & R BUILDERS, INC. Engineer: Adjusted: Davis, Shawn Contract Amount: ( $1,770,139.98 $1,770,139.98) Contract Time: ( 100 100 ) Letting Date: 01/19/2017 Contract Date: 02/14/2017 W/O Issued Adjusted: 02/16/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Construction Status Report Page 157 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 170115 Residency: 24352(04) SH-152 05200 SH-152: FROM SH-6, EXTEND EAST NEAR ELK CITY. PROJECT LENGTH = 3.758 MILES SSP-105C(147)SS ALTUS Contractor: CASWELL CONTRACTING, INC. Engineer: Adjusted: Sirmons, Karl Contract Amount: ( $4,227,399.73 $4,227,399.73) Contract Time: ( 200 200 ) Letting Date: 03/16/2017 Contract Date: 04/21/2017 W/O Issued Adjusted: 04/25/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Woods 6 Commissioner District: Contracts Under Construction BRIDGE AND APPROACHES US-64: OVER Residency: Contract: 150318 26495(04) US-64 06100 HOUSTON CREEK AND UNNAMED CREEK, 0.1 MILE WEST AND 0.1 MILE EAST OF US-50. STP-176B(163)SS BUFFALO PROJECT LENGTH = 0.977 MILE. Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $4,887,586.41 $4,939,896.29) Contract Time: ( 370 370 ) Letting Date: 09/17/2015 Contract Date: 10/21/2015 W/O Issued Adjusted: 11/09/2015 W/O Effective: Amount Paid: 02/01/2016 101 % ( 100 %) Work Started: Time Passed: 02/01/2016 100 % ( 100 %) Contract: 160127 29463(04) SH-50 SBR-276C(015)SB Contractor: K & R BUILDERS, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $989,550.33 Contract Time: 120 Letting Date: 02/18/2016 Contract Date: 03/21/2016 W/O Issued 03/25/2016 W/O Effective: 09/06/2016 Work Started: 10/04/2016 Residency: BUFFALO 06100 BRIDGE REHABILITATION SH-50: OVER HOUSTON CREEK, 0.6 MILE SOUTH OF US-64 NEAR FREEDOM. PROJECT LENGTH = 0.188 MILE. Adjusted: ( $1,041,090.33) ( ) 90 Amount Paid: Time Passed: Adjusted: 103 % ( 98 %) 73 % ( 97 %) BRIDGE AND APPROACHES COUNTY ROAD Contract: 160342 Residency: 28347(04) CO. RD. 06009 (NS-241): OVER LITTLE EAGLE CHIEF CREEK, 2.0 MILES SOUTH OF US-64 NEAR ALVA. ACSTP-276D(020)CI CIRCUIT ENGR. DISTR. # 8 PROJECT LENGTH = 0.199 MILE Contractor: SEWELL BROS., INC. Engineer: Adjusted: CED8 Contract Amount: ( $441,715.90 $441,715.90) Contract Time: ( ) 90 90 Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued Adjusted: 10/19/2016 W/O Effective: Amount Paid: 02/16/2017 77 % ( 77 %) Work Started: Time Passed: 01/09/2017 100 % ( 100 %) Construction Status Report Page 158 GRADE, DRAIN, AND SURFACE COUNTY Contract: 170109 Residency: 30492(04) CO. RD. 06009 ROAD (NS-237): FROM 5 MILES NORTH OF US-64, EXTEND NORTH NEAR ALVA. PROJECT STP-276C(025)CI CIRCUIT ENGR. DISTR. # 8 LENGTH = 2.964 MILES Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Engineer: Adjusted: CED8 Contract Amount: ( $2,444,095.65 $2,444,095.65) Contract Time: ( 150 150 ) Letting Date: 02/16/2017 Contract Date: 03/16/2017 W/O Issued Adjusted: 03/31/2017 W/O Effective: Amount Paid: 09/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) County: Woodward 6 Commissioner District: Contracts Under Construction GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 140347 Residency: 06100 24159(07) SH-15 SH-15: FROM 2.1 MILES EAST OF THE ELLIS COUNTY LINE, EXTEND EAST. PROJECT BUFFALO SSP-277N(008)SS/SSP-177N* LENGTH = 5.434 MILES. Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $13,321,579.97 $13,540,736.49) Contract Time: ( 275 333 ) Letting Date: 10/16/2014 Contract Date: 11/20/2014 W/O Issued Adjusted: 01/20/2015 W/O Effective: Amount Paid: 02/02/2015 95 % ( 94 %) Work Started: Time Passed: 02/12/2015 136 % ( 112 %) *(085)SS BRIDGE REHABILITATION SH-50: OVER THE Contract: 150150 Residency: 06100 29119(04) SH-50 NORTH CANADIAN RIVER AND NORTH CANADIAN RIVER OVERFLOW, 5.3 MILES AND BUFFALO SBR-277C(004)(024)SB 5.4 MILES NORTH OF US-183. PROJECT Contractor: BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC. LENGTH = 0.383 MILE. Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $4,285,208.95 $4,285,208.95) Contract Time: ( 330 330 ) Letting Date: 04/16/2015 Contract Date: 05/13/2015 W/O Issued Adjusted: 05/18/2015 W/O Effective: Amount Paid: 09/01/2015 99 % ( 99 %) Work Started: Time Passed: 08/10/2015 90 % ( 90 %) SAFETY IMPROVEMENTS (GUARDRAIL) Contract: 150217 Residency: 27005(06) US-412 06100 US-412/SH-50: AT MULTIPLE LOCATIONS IN DIVISION VI. HSIPG-277F(026) BUFFALO Contractor: ACTION SAFETY SUPPLY CO., LLC Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $245,642.50 $245,642.50) Contract Time: ( ) 30 82 Letting Date: 08/20/2015 Contract Date: 09/24/2015 W/O Issued Adjusted: 09/29/2015 W/O Effective: Amount Paid: 01/04/2016 89 % ( 89 %) Work Started: Time Passed: 01/04/2016 333 % ( 122 %) Construction Status Report Page 159 GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 150274 Residency: 17457(16) US-18 06100 US-183: FROM 5.0 MILES SOUTHEAST OF THE SH-50 JUNCTION, EXTEND SOUTHEAST NEAR NHPP-277N(010)SS/NHPP-17* BUFFALO MUTUAL. PROJECT LENGTH = 5.643 MILES Contractor: THE CUMMINS CONSTRUCTION CO., INC. Engineer: Adjusted: Embree, Jerry (Acting) Contract Amount: ( $19,773,696.37 $19,773,696.37) Contract Time: ( 525 525 ) Letting Date: 08/20/2015 Contract Date: 09/22/2015 W/O Issued Adjusted: 11/06/2015 W/O Effective: Amount Paid: 12/07/2015 60 % ( 60 %) Work Started: Time Passed: 12/15/2015 76 % ( 76 %) *N(060)SS GRADE, DRAIN, SURFACE, AND BRIDGE Contract: 160066 Residency: 27406(04) CO.RD. 06009 COUNTY ROAD (NS-221/NS-223): FROM THE US-412 JUNCTION, EXTEND NORTH NEAR CIRB-177C(112)RB CIRCUIT ENGR. DISTR. # 8 MOORELAND. PROJECT LENGTH = 6.639 Contractor: THE CUMMINS CONSTRUCTION CO., INC. MILES Engineer: Adjusted: CED8 Contract Amount: ( $5,559,949.55 $5,559,949.55) Contract Time: ( 210 210 ) Letting Date: 01/21/2016 Contract Date: 02/25/2016 W/O Issued Adjusted: 03/01/2016 W/O Effective: Amount Paid: 06/06/2016 89 % ( 89 %) Work Started: Time Passed: 06/06/2016 98 % ( 98 %) Contract: 160307 27924(04) SH-34 ACSTP-277B(032)SS Contractor: SEWELL BROS., INC. Engineer: Embree, Jerry (Acting) Contract Amount: $2,177,003.94 Contract Time: 220 Letting Date: 08/18/2016 Contract Date: 09/21/2016 W/O Issued 09/26/2016 W/O Effective: 01/03/2017 Work Started: 01/03/2017 Contract: 160343 28825(04) SH-34 ACSTP-277B(034)SS Contractor: SEWELL BROS., INC. Engineer: Embree, Jerry (Acting) Contract Amount: $5,717,619.96 Contract Time: 420 Letting Date: 09/15/2016 Contract Date: 10/13/2016 W/O Issued 10/19/2016 W/O Effective: 02/16/2017 Work Started: 02/13/2017 Residency: BUFFALO 06100 BRIDGE AND APPROACHES SH - 34: OVER INDIAN CREEK, 2.3 MILES SOUTH OF THE US-183 JUNCTION NEAR WOODWARD. PROJECT LENGTH = 0.199 MILE. Adjusted: ( $2,178,923.94) ( 220 ) Amount Paid: Time Passed: Residency: BUFFALO 06100 Adjusted: ( $5,728,293.09) ( 422 ) BRIDGE AND APPROACHES SH-34: OVER SOUTH AND NORTH PERSIMMON CREEK, 4.9 MILES AND 7.6 MILES NORTH OF THE DEWEY COUNTY LINE. PROJECT LENGTH = 0.601 MILE. Amount Paid: Time Passed: Construction Status Report Adjusted: 58 % ( 58 %) 50 % ( 50 %) Adjusted: 23 % ( 23 %) 16 % ( 16 %) Page 160 BRIDGE AND APPROACHES COUNTY ROAD Contract: 170057 Residency: 30493(04) CO. RD. 06009 (EW-21): OVER TRADERS CREEK, 3.5 MILES EAST OF THE HARPER COUNTY LINE. STP-277C(033)CI CIRCUIT ENGR. DISTR. # 8 PROJECT LENGTH = 0.331 MILE. Contractor: SEWELL BROS., INC. Engineer: Adjusted: CED8 Contract Amount: ( $1,000,551.35 $1,000,551.35) Contract Time: ( 120 120 ) Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued Adjusted: 02/24/2017 W/O Effective: Amount Paid: 06/05/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Contract: 170058 30526(04) SH-34 SSR-277B(037)SR Contractor: CASWELL CONTRACTING, INC. Engineer: Embree, Jerry (Acting) Contract Amount: $632,093.93 Contract Time: Letting Date: 01/19/2017 Contract Date: 02/23/2017 W/O Issued 02/24/2017 W/O Effective: Work Started: Residency: BUFFALO 06100 RESURFACE (ASPHALT) SH-34: FROM 2.70 MILES NORTH OF THE DEWEY COUNTY LINE EXTEND NORTH NEAR WOODWARD. PROJECT LENGTH = 5.80 MILES. Adjusted: ( $632,093.93) ( ) Fixed Completion Date: 10/01/2017 Adjusted: Amount Paid: 0%( 0 %) Time Passed: 0%( 0 %) RESURFACE (ASPHALT) COUNTY ROAD Contract: 170148 Residency: 31126(04) CO. RD. 06009 (EW-51): FROM SH-34, EXTEND EAST NEAR SHARON. PROJECT LENGTH = 2.004 MILES STP-277C(038)CI CIRCUIT ENGR. DISTR. # 8 Contractor: HIGHWAY CONTRACTORS, INC. Engineer: Adjusted: CED8 Contract Amount: ( $888,273.39 $888,273.39) Contract Time: ( ) 90 90 Letting Date: 03/16/2017 Contract Date: 04/25/2017 W/O Issued Adjusted: 04/26/2017 W/O Effective: Amount Paid: 08/07/2017 0%( 0 %) Work Started: Time Passed: 0%( 0 %) Construction Status Report Page 161 County: Carter 7 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 27019(04) 170151 I-35 Contractor: GARY A. CRAIN, INC. Contract Amount: $41,817.28 Letting Date: 04/20/2020 SSP-210F(056)SS Residency: ARDMORE Contract: 33068(04) 170177 SH-199 Contractor: WINDING ROAD CONSTRUCTION, INC. Contract Amount: Residency: $984,871.64 Letting Date: 05/18/2020 ARDMORE County: Cimarron 07200 BRIDGE WATER PROOF SEAL I-35/US-177: AT MULTIPLE LOCATIONS IN DIVISION VII. SSR-210N(058)SR 07200 PAVEMENT REHABILITATION (P.C. CONCRETE) SH-199: FROM SAM NOBLE PARKWAY, EXTEND SOUTH IN ARDMORE. PROJECT LENGTH = 0.665 MILE 6 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 23273(04) 170118 US-385 Contractor: BRIDGES, INC. DBA SCUDDER BRIDGE CO. Contract Amount: Residency: $4,075,876.50 06200 Letting Date: 03/16/2017 GUYMON County: Cleveland STP-113C(034) BRIDGE AND APPROACHES US-385: OVER BEAVER RIVER, 2.8 MILES SOUTH OF THE US-412 JUNCTION NEAR BOISE CITY. PROJECT LENGTH = 0.274 MILE 3 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 30184(04) 170153 CT. ST. Contractor: PBX CORPORATION Contract Amount: $214,784.43 Letting Date: 04/20/2020 MC-3500(057) Residency: PURCELL 03200 BRIDGE REPAIR (GROUTING) CITY STREET (SHIELDS AVENUE): OVER I-35 AND I-35 FRONTAGE ROAD, 2.5 MILES SOUTHEAST OF I-240 IN THE CITY OF MOORE. Contract: 170178 CT ST STP-114E(299)EH/STPG-114* 28810(04) *A(141)AG Contractor: RUDY CONSTRUCTION CO. ENHANCEMENT (STREETSCAPE) CITY STREET Contract Amount: Residency: $3,052,446.98 03018 (MAIN STREET): FROM JONES AVENUE, EXTEND Letting Date: 05/18/2020 BENCHMARK CONSTR. SERVS.,SOUTHWEST LLC IN THE CITY OF NORMAN. County: Creek 8 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 30538(04) 170073 SH-51 Contractor: IOWA CIVIL CONTRACTING, INC. Contract Amount: Residency: $2,503,117.29 Letting Date: 02/16/2017 SAND SPRINGS STPY-219B(049)3P 08400 Construction Status Report PAVEMENT REHABILITATION (A.C. AND P.C.) SH-51: FROM 2.7 MILES SOUTHWEST OF THE SH-48 JUNCTION, EXTEND NORTHEAST NEAR MANNFORD. PROJECT LENGTH = 4.550 MILES Page 162 County: Custer 5 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 24134(08) 170155 SH-44 Contractor: GARY A. CRAIN, INC. Contract Amount: $101,839.55 Letting Date: 04/20/2020 SSP-220F(047)SS Residency: ALTUS Contract: 170189 SH-47 33153(04) Contractor: HIGHWAY CONTRACTORS, INC. Contract Amount: Residency: $2,152,075.40 Letting Date: 05/18/2020 CLINTON County: Garfield 05200 BRIDGE WATER PROOF SEAL SH-3/SH-9/SH-30/SH-44/SH-54/SH-55/SH-152/MERRIT T ROAD: AT MULTIPLE LOCATIONS IN DIVISION V. MC-220C(051) 05100 RESURFACE (ASPHALT) SH-47: FROM US-183, EXTEND EAST NEAR THOMAS. PROJECT LENGTH = 12.62 MILES 4 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 29203(04) 170075 SH-45 Contractor: BETTIS ASPHALT AND CONSTRUCTION, INC. Contract Amount: Residency: $772,030.00 04300 Letting Date: 04/20/2020 ENID County: Le Flore STPY-224C(044)(045)3P/ST* *PY-227B(021)3P PAVEMENT REHABILITATION SH-11/SH-45/SH-132: SH-11, FROM THE ALFALFA C/L, EXT EAST. SH-45, FROM US-81 EXT WEST. SH-132, FROM US-60 EXT SOUTH. PROJECT LENGTH = 15.685 MILES 2 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 23144(13) 170158 US-270 Contractor: GARY A. CRAIN, INC. Contract Amount: Residency: $47,343.60 Letting Date: 04/20/2020 HEAVENER County: Logan SSP-240F(051)SS 02200 BRIDGE WATER PROOF SEAL US-270/US-271/SH-63: AT MULTIPLE LOCATIONS IN DIVISION II. 4 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 32640(04) 170179 CO. RD. Contractor: SCHWARZ PAVING CO., INC. Contract Amount: Residency: $3,779,648.60 Letting Date: 05/18/2020 ATKINS County: McClain CIRB-242B(054)RB 04010 GRADE, DRAIN, AND SURFACE COUNTY ROAD (COLTRANE ROAD): FROM 1.0 MILE NORTH OF THE OKLAHOMA COUNTY LINE EXTEND NORTH NEAR EDMOND. PROJECT LENGTH = 2.083 MILES 3 Commissioner District: Contracts Awarded - NTP Not Processed Construction Status Report Page 163 Contract: 25448(04) 170180 CO. RD. Contractor: MARKWELL PAVING COMPANY, INC. Contract Amount: Residency: $3,195,501.45 Letting Date: 05/18/2020 GARVER, LLC. County: McCurtain CIRB-144C(129)RB 03011 GRADE, DRAIN, AND SURFACE COUNTY ROAD (WAYNE RD/HOPPING AVE): FROM THE US-71 JCT, EXT. EAST ON WAYNE RD THEN SOUTH ON HOPPING AVE NEAR WAYNE. PROJECT LENGTH = 5.15 MILES 2 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 25828(04) 170172 CO. RD. Contractor: C3 CONSTRUCTION, INC. Contract Amount: Residency: $1,075,678.93 02013 Letting Date: 05/18/2020 CIRCUIT ENGR. DISTR. # 3 ACSTP-145D(179)CI Contract: 29961(04) 170173 CO. RD. Contractor: TREAS CONSTRUCTION, INC. Contract Amount: Residency: $681,709.83 02013 Letting Date: 05/18/2020 CIRCUIT ENGR. DISTR. # 3 ACSTP-245D(049)CI County: Murray BRIDGE AND APPROACHES COUNTY ROAD (EW-174): OVER BIG EAGLE CREEK, 1.1 MILES WEST OF US-259 NEAR SMITHVILLE. PROJECT LENGTH = 0.217 MILE BRIDGE AND APPROACHES COUNTY ROAD (NS-4506): OVER CYPRESS CREEK, 3.8 MILES NORTH OF SH-3 NEAR BROKEN BOW. PROJECT LENGTH = 0.177 MILE 7 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 32969(04) 170160 I-35 Contractor: LOGOS CONSTRUCTION CO., LLC Contract Amount: Residency: $42,682.40 Letting Date: 04/20/2020 ARDMORE County: Nowata SAP-3500(058) 07200 BRIDGE REPAIR I-35: REPAIR VEHICLE IMPACT DAMAGE OVER US-77, 1.7 MILES NORTH OF THE CARTER COUNTY LINE NEAR THE CITY OF DAVIS. 8 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 170131 CO. RD. 27816(04) Contractor: REECE CONSTRUCTION CO., INC. Contract Amount: Residency: $798,639.62 08007 Letting Date: 04/20/2017 CRAIG & KEITHLINE, INC. County: Oklahoma STP-153D(201)CI BRIDGE AND APPROACHES COUNTY ROAD (NS-406): OVER OPOSSUM CREEK, 2.6 MILES SOUTH OF THE KANSAS STATE LINE. PROJECT LENGTH = 0.406 MILE 4 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 28767(04) 170176 CT. ST. Contractor: MANHATTAN ROAD & BRIDGE COMPANY Contract Amount: Residency: $7,800,000.00 Letting Date: 04/20/2020 EL RENO CIRB-155C(917)CO 04200 Construction Status Report GRADE, DRAIN, SURFACE, AND BRIDGE CITY STREET (NORTH MACARTHUR BOULEVARD): FROM 3.0 MILES NORTH OF THE KILPATRICK TURNPIKE, EXTEND NORTH IN EDMOND. PROJECT LENGTH = 1.875 MILES Page 164 Contract: 31436(04) 170181 CT. ST. Contractor: PARATHON CONST. LLC Contract Amount: $644,640.18 Letting Date: 05/18/2020 TAP-255D(329)AG Residency: 04600 OKLAHOMA CITY Contract: 32963(04) 170182 I-40 Contractor: B & B CONSTRUCTION SERVICE J.T., INC. Contract Amount: Residency: $22,601.30 04600 Letting Date: 05/18/2020 OKLAHOMA CITY County: Okmulgee PEDESTRIAN IMPROVEMENTS (TRAIL CONSTRUCTION) CITY STREET (SE 29TH STREET TRAIL): FROM SOONER ROAD, EXTEND EAST IN MIDWEST CITY. PROJECT LENGTH = 1.050 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED. BOTH BID EXPRESS AND WRITTEN BIDS WILL BE ACCEPTED. SAP-4000(055) BRIDGE REPAIR I-40: REPAIR VEHICLE IMPACT DAMAGE OVER CHOCTAW ROAD IN OKLAHOMA CITY. 1 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 30126(04) 170040 CT. ST. Contractor: PARADIGM CONSTRUCTION & ENGINEERING, INC Contract Amount: Residency: $1,310,188.90 01100 Letting Date: 04/20/2020 MUSKOGEE County: Osage STP-256C(029)UR BRIDGE AND APPROACHES CITY STREET (MUSKOGEE AVENUE): OVER OKMULGEE CREEK, 0.1 MILES AND 0.3 MILES NORTH OF SH-56 IN THE CITY OF OKMULGEE. PROJECT LENGTH = 0.238 MILE 8 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 33151(04) 170183 SH-20 Contractor: MIDSTATE TRAFFIC CONTROL, INC. Contract Amount: Residency: $64,523.50 Letting Date: 05/18/2020 SAND SPRINGS County: Pontotoc HSIP-257C(057)TR 08400 SAFETY IMPROVEMENT (SCHOOL SIGNS) SH-20/SH-99: SH-20, FROM THE SH-99 INTERSECTION, EXT WEST. SH-99, FROM THE SH-20 INTERSECTION, EXT NORTH IN HOMINY. 3 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 30187(04) 170167 CT. ST. Contractor: LOGOS CONSTRUCTION CO., LLC Contract Amount: Residency: $151,766.09 Letting Date: 04/20/2020 PURCELL County: Pushmataha MC-262N(015) 03200 BRIDGE REPAIR CITY STREET (OAK AVENUE/KERR LAB ROAD): OVER SH-3, 1.0 MILE AND 2.0 MILES SOUTHEAST OF SH-1 IN THE CITY OF ADA. 2 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 30432(04) 170186 SH-2 Contractor: TREAS CONSTRUCTION, INC. Contract Amount: Residency: $1,697,217.59 Letting Date: 05/18/2020 ANTLERS SBR-264C(049)SB 02100 Construction Status Report BRIDGE REHABILITATION SH-2: OVER BUCK CREEK, 7.6 MILES NORTH OF THE SH-3 JUNCTION NEAR MOYERS. Page 165 County: Tulsa 8 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 32486(04) 160400 US-75 Contractor: MIDSTATE TRAFFIC CONTROL, INC. Contract Amount: Residency: $1,402,717.40 08020 Letting Date: 05/18/2020 POE AND ASSOCIATES HSIPG-272N(165)(164)TR Contract: 170144 US-169 31672(04) Contractor: APAC-CENTRAL, INC. Contract Amount: Residency: $5,915,032.62 Letting Date: 03/16/2017 TULSA NHPP-272A(126)3B/SSP-272* County: Washington SAFETY IMPROVEMENT (CABLE BARRIER) US-75: FROM SH-11, EXTEND SOUTH IN THE CITIES OF TULSA AND GLENPOOL. PROJECT LENGTH = 6.300 MILES *N(203)SS/STP-272A(174)3B 08100 RESURFACE (ASPHALT) AND JOINT SEAL REPAIR US-169: AT MULTIPLE LOCATIONS IN DIVISION VIII. PROJECT LENGTH = 6.789 MILES 8 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 23775(04) 170187 CO. RD. Contractor: B & B BRIDGE COMPANY, LLC Contract Amount: Residency: $560,334.26 08004 Letting Date: 05/18/2020 JACOBS ENGINEERING County: Woods CIRB-174D(050)RB BRIDGE AND APPROACHES COUNTY ROAD (NS-400): OVER UNNAMED CREEK, 1.5 MILES SOUTH OF THE KANSAS STATE LINE NEAR COPAN. PROJECT LENGTH = 0.217 MILE 6 Commissioner District: Contracts Awarded - NTP Not Processed Contract: 31764(04) 170147 SH-34 Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Contract Amount: Residency: $2,357,020.00 06100 Letting Date: 03/16/2017 BUFFALO STPY-276C(024)3P/STPY-17* Contract: 170188 CO. RD. 28458(04) Contractor: VENTURE CORPORATION DBA V. C. O. PAVING Contract Amount: Residency: $2,263,384.32 06009 Letting Date: 05/18/2020 CIRCUIT ENGR. DISTR. # 8 CIRB-276C(027)RB Construction Status Report *6C(192)3P RESURFACE (ASPHALT) SH-34: FROM THE US-64 JUNCTION, EXTEND NORTH NEAR FREEDOM. PROJECT LENGTH = 10.420 MILES BRIDGE AND APPROACHES COUNTY ROAD (NS-2300): OVER UNNAMED CREEK, 2.8 MILES NORTH OF US-64 NEAR ALVA. PROJECT LENGTH = 1.022 MILES Page 166 Resident Directory Residency: 0X001 - ENGR. SERV. & TESTING Engineer: EST Ph: (405)307-8378 Ph: (405)606-8600 Ph: (405)753-4200 Ph: (405) 810-8254 Residency: 0X005 - CIRCUIT ENGR. DISTR. # 7 Engineer: CED7 Ph: (580)323-8685 Residency: 0X006 - OLLAR & OLLAR ENGINEERING Engineer: O&OE Ph: 405-364-0281 Residency: 0X007 - CRAIG & KEITHLINE, INC. Engineer: C&KI Ph: (918)743-6611 Residency: 0X008 - BRAWLEY ENGINEERING CORP. Engineer: BEC Ph: (918)420-5500 Residency: 0X009 - CIRCUIT ENGR. DISTR. # 8 Engineer: CED8 Engineer: CED3 TULSA, OK Ph: Ph: Engineer: CE2 Ph: HUGO, OK OKLAHOMA CITY, OK (405)753-4142 Fx: (405)603-7608 Fx: OKLAHOMA CITY OKLAHOMA CITY (918) 682-2125 73114 10001 N. BROADWAY EXTENSION 73601 PO BOX 337 - 1779 MARSHALL RD. 73070 PO BOX 5997 74136 6940 S. UTICA AVE. 74501 521 S SECOND STREET 73717 909 WEST LAKES DRIVE 73072 350 DAVID L. BOREN BOULEVARD, SUITE 1510 74136 6450 S. LEWIS 74119 1350 SOUTH BOULDER, STE 600 74743 203 PEPSI COLA AVE 73114 9400 NORTH BROADWAY, SUITE 300 73120 9636 N MAY ST STE 200 73162 9500 WESTGATE RD, STE 100 74402 PO BOX 2366 Fx: Fx: Residency: 0X017 - CIRCUIT ENGR. DISTR. # 2 4555 W. MEMORIAL RD. Fx: (405)478-5353 Residency: 0X016 - MKEC (AKA - KONERU) Engineer: MKEC ALVA, OK TULSA, OK Ph: 73142 Fx: Fx: (580)326-9191 [email protected] (918)743-6680 MCALESTER, OK (918)250-5922 Residency: 0X015 - FOSTER CM GROUP Engineer: FCM Fx: Ph: Residency: 0X014 - BENHAM (AKA - LEIDOS) Engineer: BENH TULSA, OK NORMAN, OK Ph: 119 N. ROBINSON AVE. - SUITE 700 (405) 810-2980 NORMAN, OK Fx: Residency: 0X013 - CIRCUIT ENGR. DISTR. # 3 73102 Fx: (405)321-2480 (918)587-7283 3201 S. BERRY ROAD [email protected] (405)384-4589 CLINTON, OK Ph: Ph: 73072 Fx: Fx: Residency: 0X012 - DEWBERRY Engineer: DEWB Fx: Ph: Residency: 0X011 - GARVER, LLC. Engineer: GARV Fx: (580)430-5078 Residency: 0X010 - ATKINS Engineer: ATKINS (405)608-8601 OKLAHOMA CITY, OK Residency: 0X004 - JACOBS ENGINEERING Engineer: JACOBS Fx: OKLAHOMA CITY, OK Residency: 0X003 - CEC CORP. Engineer: CEC (405)329-1914 OKLAHOMA CITY, OK Residency: 0X002 - TETRA TECH Engineer: TETR NORMAN, OK Fx: MUSKOGEE Fx: Construction Status Report Page 167 Residency: 0X018 - BENCHMARK CONSTR. SERVS., LLC Engineer: BCS Ph: Fx: 918-835-9588 Fx: 9186658800 Fx: TULSA, OK Residency: 0X019 - BKL, INCORPORATED Engineer: BKL Ph: TULSA, OK Residency: 0X020 - POE AND ASSOCIATES Engineer: ZPAA Ph: OKLAHOMA CITY, OK Residency: 0X021 - OLSSON ASSOCIATES Engineer: ZOA Ph: 4052426601 Residency: 0X022 - SMITH ROBERTS BALDISCHWILER, LLC Engineer: ZSRB Engineer: Edwards, Carl Ph: (918) 682-9471 Fx: Ph: (918) 775-2751 Fx: Ph: (918) 682-9471 Fx: Engineer: Moy, Ryan Ph: (580) 298-3081 Fx: (918) 653-7896 (580) 795-3675 Ph: Fx: Ph: (580) 298-3371 Fx: Ph: (580) 332-2094 Fx: (580) 298-6152 (580) 332-2566 PURCELL, OK Ph: (405) 527-5569 Fx: (405) 527-6576 WEWOKA, OK Residency: 03300 - WEWOKA Ph: (405) 257-3325 Ph: (580) 332-1526 Fx: Ph: (580) 336-7374 Fx: Fx: (405) 257-5003 ADA, OK Residency: 03700 - DIV. 3 BRIDGE 1623 E. 6TH STREET 74146 4606 S GARNETT RD, STE 600 73116 201 NW 63RD STREET, SUITE 130 73104 100 NE 5TH ST 74401 2800 S. 32ND - US-69 3 MI. S OF US-62 [email protected] 74955 (580) 336-7373 Construction Status Report P.O. BOX 449 - 113 MCGEE DRIVE [email protected] 74401 2800 S. 32ND - US-69 3 MI. S US-62 74523 P. O. BOX DRAWER 628 - US-271 2 MI. S. TOWN [email protected] 74937 P.O. BOX 835 - N. HIGHWAY 59 [email protected] 73446 [email protected] 74502 [email protected] 74523 [email protected] 74820 [email protected] 73080 [email protected] 74884 [email protected] P. O. BOX 297 - HWY. BLDG. S. MADILL P.O. BOX 3269 - US-270 E. MCALESTER P.O. BOX DRAWER 628 - US-271 2 MI. S TOWN P.O. BOX 157 - 3 MI. NW ADA ON SH-3W P.O. BOX 468 - SH-74 2 MI. SW OF PURCELL P.O. BOX 918 - 1.5 MI. N. WEWOKA ON SH-56 74820 P.O. BOX 549 - 3 MI. N.W. OF ADA ON SH-3W 73077 P.O. BOX 548 - US-77 1/4 M. E. OF I-35 (580) 332-0261 PERRY, OK Residency: 04100 - PERRY Engineer: Zachary, Ted (918) 429-0807 ADA, OK Residency: 03200 - PURCELL Engineer: Vacant (580) 795-7461 ANTLERS, OK Residency: 03100 - ADA Engineer: Helton, Matthew Fx: (918) 423-5443 Residency: 02700 - DIV. 2 BRIDGE Engineer: Reed, Lucas (918) 653-4532 MCALESTER, OK Residency: 02400 - MCALESTER Engineer: Russell, Julie Fx: MADILL, OK Engineer: January, Trenton (Acting) Ph: Engineer: Nabors, Monte (580) 298-6152 HEAVENER, OK Ph: 74120 (918) 682-2597 ANTLERS, OK Residency: 02300 - MADILL Engineer: Plymate, Larry (918) 776-0285 MUSKOGEE, OK Residency: 02200 - HEAVENER Engineer: Huddleston, David (918) 682-2597 SALLISAW, OK Residency: 02100 - ANTLERS 3430 MAC DONNELL DR. Fx: MUSKOGEE, OK Residency: 01700 - DIV. 1 BRIDGE Engineer: Vacant OKLAHOMA CITY, OK 4058407094 Residency: 01200 - SALLISAW 73069 Fx: Ph: Residency: 01100 - MUSKOGEE Engineer: Hagerman, Jeremy NORMAN 580-665-5178 [email protected] Page 168 Yukon, OK Residency: 04200 - EL RENO Engineer: Harlin, Chris Ph: (405) 350-2331 Fx: Ph: (580) 234-3223 Fx: Ph: (405) 475-2860 Fx: ENID, OK Residency: 04300 - ENID Engineer: Hoover, Jacob Ph: (405) 372-5644 Ph: (405) 522-5575 Ph: (580) 336-7340 Fx: Ph: (580) 323-0702 Fx: Ph: (580) 482-3191 Fx: Engineer: Sirmons, Karl Ph: (580) 323-1431 Fx: Ph: (580) 735-2537 (580) 338-3545 Ph: (580) 735-2561 Fx: Ph: (580) 255-7609 Fx: Ph: (580) 223-1351 Fx: Ph: (405) 247-2462 Fx: Ph: (580) 255-7586 Ph: (918) 836-7116 (580) 226-8146 (405) 247-2057 Fx: Ph: (918) 266-1160 Fx: Fx: (580) 255-5064 TULSA, OK (918) 832-0383 CLAREMORE, OK Residency: 08300 - CLAREMORE Engineer: Tyler, Jennifer (580) 252-6178 DUNCAN, OK Residency: 08100 - TULSA Engineer: Arnold, Bruce (580) 735-2248 ANADARKO, OK Residency: 07700 - DIV. 7 BRIDGE Engineer: Lawson, Bryce Fx: (580) 338-5685 ARDMORE, OK Residency: 07300 - ANADARKO Engineer: Knight, Reese (580) 735-2024 DUNCAN, OK Residency: 07200 - ARDMORE Engineer: Fuhrmann, Chris (580) 323-1430 BUFFALO, OK Residency: 07100 - DUNCAN Engineer: Roberts, Colton Fx: Ph: Residency: 06700 - DIV. 6 BRIDGE Engineer: Roesner, Wayne (580) 482-0792 GUYMON, OK Residency: 06200 - GUYMON Engineer: Michael, Charles (580) 323-3551 BUFFALO, OK Residency: 06100 - BUFFALO Engineer: Embree, Jerry (Acting) (580) 336-7350 CLINTON, OK Residency: 05700 - DIV. 5 BRIDGE Engineer: Clanton, Mike Fx: ALTUS, OK Residency: 05200 - ALTUS 73099 15100 NW 36th St. [email protected] 73701 410 KREMLIN [email protected] 73013 4105 E. MEMORIAL RD. [email protected] 74075 3613 N. HUSBAND [email protected] 73149 701 S.E. 82nd St. [email protected] CLINTON, OK Residency: 05100 - CLINTON Engineer: Davis, Shawn (405) 377-8321 PERRY, OK Residency: 04700 - DIV. 4 BRIDGE Engineer: Mitchell, Matt Fx: OKLAHOMA CITY, OK Residency: 04600 - OKLAHOMA CITY Engineer: Howell, Terry (405) 478-1126 STILLWATER, OK Residency: 04500 - STILLWATER Engineer: Buchanan, Seth (580) 237-3328 EDMOND, OK Residency: 04400 - EDMOND Engineer: Hubbard, Tom (405) 350-2199 (918) 343-1203 Construction Status Report 73077 [email protected] 73601 [email protected] 73521 P.O. BOX 471 - US-77 1/4 MI. E I-35 P.O. BOX 818 - US-183 1 MI S. OF I-40 608 S. JACKSON ST [email protected] 73601 [email protected] 73834 [email protected] 73942 P.O. BOX 1449 - US-183 1 MI. S. I-40 P. O. BOX 190 - US-64 1 MI. W US-183 P.O. BOX 348 - 504 S. CRUMLEY [email protected] 73834 [email protected] 73534 [email protected] 73402 [email protected] 73005 P.O. BOX 190 - US-64 1 MI. W US-183 P.O. BOX 1107 - 2205 S. US-81 BYPASS P. O. BOX 1826 - 525 INTERSTATE DR. P.O. BOX 220 - 211 W MAIN ST. [email protected] 73533 [email protected] 74116 P.O. BOX 460 - 2205 S. US-81 BYPASS 4002 N. MINGO VAL. EXPWY. [email protected] 74018 [email protected] 25825-B S. HWY. 66 - 729 S. MORETZ Page 169 SAND SPRINGS, OK Residency: 08400 - SAND SPRINGS Engineer: Williams, Mark J. Ph: (918) 245-9531 Fx: Ph: (918) 838-9933 Fx: TULSA, OK Residency: 08700 - DIV. 8 BRIDGE Engineer: Casillas, Matt (918) 245-0953 (918) 832-9074 Construction Status Report 74063 110 E. 41ST (PRATTVILLE) [email protected] 74101 [email protected] P.O. BOX 660 - 4002 N. MINGO VAL. EXPWY. Page 170
© Copyright 2026 Paperzz