Construction Report - Oklahoma Department of Transportation

CONSTRUCTIONREPORT
COMPILED BY
CONSTRUCTION ENGINEER
BY COUNTY
Period Covered in Report
May 01, 2017 to May 31, 2017
Table of Contents
Report of Construction Engineer
3
Projects Completed - Final Estimate Not Processed
4
Projects Under Construction
57
Contracts Awarded - NTP Not Processed
162
ODOT Residency Directory
167
Construction Status Report
Page 2
Activity for Month of May 2017
Number of
Contracts
Contract Amount
Amount Paid
Contracts Finaled
32
83,347,206.67
82,676,699.89
Contracts Completed
22
47,982,097.14
46,507,186.01
NTP Issued
12
19,889,920.12
0.00
Contracts Awarded
11
18,046,248.87
0.00
0
0.00
0.00
Contracts Let
Status of Construction Projects as of May 31, 2017
Number of
Contracts
Contract Amount
Amount Paid
Contracts Completed, Final Estimate Not Paid
315
1,405,320,767.25
1,403,017,897.36
Contracts Under Construction
413
1,767,622,647.91
996,314,395.34
28
47,709,489.66
0.00
756
3,220,652,904.82
2,399,332,292.70
Contracts Awarded, NTP Not Processed
Active Contracts
Construction Status Report
Page 3
County:
Commissioner District:
Adair
1
Contracts Completed - Final Estimate Not Processed
Contract: 130355 US-59
16928(09)
NHPPY-101N(023)SS
Contractor:
MJE, LLC
Engineer:
Edwards, Carl
Contract Amount:
$8,354,463.63
Letting Date:
10/17/2013
Residency:
SALLISAW
01200
Completion Date:
Final Est Sub:
Contract: 140310 US-59
Residency:
28971(05)
SALLISAW
NHPPY-201N(010)
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$440,044.60
Letting Date:
10/16/2014
01200
Contract: 150347 CO.RD.
28653(04)
STP-201D(016)CI
Contractor:
RRY SERVICES, LLC
Engineer:
Edwards, Carl
Contract Amount:
$1,063,114.55
Letting Date:
11/19/2015
01200
Residency:
SALLISAW
Contract: 160068 CO.RD.
Residency:
31048(04)
STP-201C(019)CI
SALLISAW
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$580,838.25
Letting Date:
02/18/2016
01200
08/31/2016
BRIDGE AND APPROACHES COUNTY ROAD
(D0774): OVER TRIBUTARY TO BARON FORK,
2.6 MILES EAST OF US-59 NEAR STILWELL.
PROJECT LENGTH = 0.352 MILE.
Completion Date:
Final Est Sub:
01200
11/09/2015
05/08/2017
WIDENING AND RESURFACE (ASPHALT)
US-59: FROM 0.10 MILE NORTH OF SH-51W,
EXTEND NORTH. PROJECT LENGTH = 0.350
MILE.
Completion Date:
Final Est Sub:
Contract: 150348 CO.RD.
Residency:
29372(04)
STP-201C(017)CI
SALLISAW
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Edwards, Carl
Contract Amount:
$966,415.37
Letting Date:
01/21/2016
County:
GRADE AND DRAIN US-59: BEGIN 2.0 MILES
NORTH OF US-62, EXTEND NORTH OVER
GRAND RIVER. PROJECT LENGTH = 4.949
MILES.
09/21/2016
BRIDGE AND APPROACHES COUNTY ROAD
(BUNCH ROAD/D4660): OVER UNNAMED
CREEK, 4.0 MILES SOUTH OF SH-100 NEAR
STILWELL. PROJECT LENGTH = 0.160 MILE
Completion Date:
Final Est Sub:
12/21/2016
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (NS-463): FROM SH-51, EXTEND SOUTH
NEAR STILLWELL. PROJECT LENGTH = 2.516
MILES.
Completion Date:
Final Est Sub:
12/10/2016
Commissioner District:
Alfalfa
6
Contracts Completed - Final Estimate Not Processed
Contract: 120010 US-64
Residency:
24062(04)
SSP-102C(100)SS
BUFFALO
Contractor:
L & M CONTRACTORS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$3,008,884.66
Letting Date:
02/16/2012
06100
Construction Status Report
GRADE, DRAIN, SURFACE, AND BRIDGE
US-64: FROM 0.5 MILE WEST OF SH-58,
EXTEND EAST. SH-58: FROM 0.7 MILE
SOUTH OF US-64, EXTEND NORTH. PROJECT
LENGTH = 0.899 MILE.
Completion Date:
Final Est Sub:
08/28/2014
05/31/2017
Page 4
Contract: 120221 SH-11
Residency:
21710(04)
BRFY-102B(076)
BUFFALO
Contractor:
L & M CONTRACTORS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$3,729,206.58
Letting Date:
09/20/2012
06100
Contract: 130203 US-64
Residency:
26493(04)
STPY-102C(144)
BUFFALO
Contractor:
L & M CONTRACTORS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$2,355,443.81
Letting Date:
09/19/2013
06100
BRIDGE AND APPROACHES SH-11: OVER
UNNAMED CREEKS, 3.8 MILES AND 4.7 MILES
EAST OF US-64. PROJECT LENGTH = 1.531
MILES
Completion Date:
Final Est Sub:
01/19/2016
BRIDGE AND APPROACHES US-64: OVER
EAST CLAY CREEK, 1.0 MILE EAST OF SH-8.
PROJECT LENGTH = 0.264 MILES
Completion Date:
Final Est Sub:
03/03/2016
Contract: 150044 CO.RD.
Residency:
24833(04)
06009
CIRB-102C(127)RB
CIRCUIT ENGR. DISTR. # 8
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
CED8
Contract Amount:
$3,785,769.76
Letting Date:
02/19/2015
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-08): FROM SH-58 IN BYRON,
EXTEND EAST. PROJECT LENGTH = 6.130
MILES.
Contract: 150120 CO.RD.
Residency:
24833(08)
06009
CIRB -202C(028)RB
CIRCUIT ENGR. DISTR. # 8
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
CED8
Contract Amount:
$2,538,812.50
Letting Date:
04/16/2015
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-08): FROM 6.0 MILES EAST OF
SH-58, EXTEND EAST. PROJECT LENGTH =
3.969 MILES.
Contract: 150183 CO.RD.
Residency:
24832(09)
06009
CIRB-102C(130)RB
CIRCUIT ENGR. DISTR. # 8
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED8
Contract Amount:
$3,480,032.48
Letting Date:
05/21/2015
GRADE, DRAIN, AND SURFACE - DIVISION VI
COUNTY ROAD (NS-255): FROM 0.25 MILE
NORTH OF SH-45 IN CARMEN, EXTEND
NORTH. PROJECT LENGTH = 5.030 MILES.
Contract: 160001 SH-38
Residency:
28146(04)
06100
SSR-102C(031)SR/SSR-202C*
BUFFALO
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$2,526,460.00
Letting Date:
01/21/2016
RESURFACE (ASPHALT) SH-38: FROM THE
US-64 JUNCTION, EXTEND NORTH IN JET.
PROJECT LENGTH = 14.760.
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
09/20/2016
09/20/2016
09/20/2016
04/06/2017
*(030)SR
County:
Commissioner District:
Atoka
2
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 5
Contract: 150225 US-75
Residency:
29134(04)
STP-203N(005)SS
MADILL
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$2,279,662.48
Letting Date:
07/23/2015
02300
Completion Date:
Final Est Sub:
Contract: 150349 CO.RD.
Residency:
28605(04)
02013
CIRB-203C(039)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION
Engineer:
CED3
Contract Amount:
$2,832,256.58
Letting Date:
11/19/2015
Contract: 160003 US-69
24333(06)
STP-203C(057)SS
Contractor:
PBX CORPORATION
Engineer:
January, Trenton (Acting)
Contract Amount:
$432,907.40
Letting Date:
01/21/2016
County:
Residency:
MADILL
WIDEN AND RESURFACE US-75: FROM
US-69, EXTEND WEST IN ATOKA. PROJECT
LENGTH = 1.845 MILES
02300
05/11/2017
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-191): FROM 5.0 MILES
WEST OF US-69, EXTEND EAST NEAR CANEY.
CO.,
INC JV
PROJECT
LENGTH = 4.856 MILES.
Completion Date:
Final Est Sub:
10/21/2016
JOINT SEAL/REPAIR US-69/SH-38/SH-131: AT
MULTIPLE LOCATIONS IN DIVISION II.
Completion Date:
Final Est Sub:
11/11/2016
05/09/2017
Commissioner District:
Beckham
5
Contracts Completed - Final Estimate Not Processed
Contract: 130149 SH-30
Residency:
23243(04)
STPY-105C(124)SS/STPY-10*
CLINTON
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Davis, Shawn
Contract Amount:
$9,666,421.56
Letting Date:
06/19/2014
05100
GRADE, DRAIN, SURFACE, BRIDGE AND
APPROACHES SH-30: OVER THE NORTH
FORK OF THE RED RIVER, 5.0 MILES NORTH
OF I-40. PROJECT LENGTH = 1.310 MILES.
Completion Date:
Final Est Sub:
02/02/2017
*5C(183)
RESURFACE (P.C. CONCRETE) I-40B/SH-34:
Contract: 140349 I-40B
Residency:
28136(04)
05200
FROM THE EASTERN JUNCTION IN ELK CITY,
SSR-105A(199)SR
ALTUS
EXTEND EAST. PROJECT LENGTH = 1.113
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
INC JV
MILES.
Engineer:
Sirmons, Karl
Contract Amount:
$5,443,969.28
Completion Date:
07/06/2016
Letting Date:
09/18/2014
Final Est Sub:
Contract: 150004 SH-152
Residency:
29275(04)
NHPP-205N(028)SS
CLINTON
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Davis, Shawn
Contract Amount:
$1,696,815.65
Letting Date:
01/22/2015
05100
Construction Status Report
BRIDGE REHABILITATION SH-152: OVER I-40,
1.5 MILES EAST OF US-283. PROJECT
LENGTH =0.084 MILE.
Completion Date:
Final Est Sub:
05/16/2016
01/13/2017
Page 6
Contract: 160005 I-40
30396(04)
SBR-205N(048)SB
Contractor:
OBC, INC.
Engineer:
Davis, Shawn
Contract Amount:
$1,394,451.13
Letting Date:
01/21/2016
Residency:
CLINTON
05100
Completion Date:
Final Est Sub:
Contract: 160075 I-40
Residency:
31111(04)
ACSTP-205B(051)3P
ALTUS
Contractor:
IOWA CIVIL CONTRACTING, INC.
Engineer:
Sirmons, Karl
Contract Amount:
$1,937,721.53
Letting Date:
03/17/2016
05200
Contract: 160164 CT.ST.
24134(07)
SSP-220F(039)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Davis, Shawn
Contract Amount:
$97,634.30
Letting Date:
04/21/2016
05100
Residency:
CLINTON
County:
Completion Date:
Final Est Sub:
05002
04/24/2017
BRIDGE WATER PROOF SEAL U.S.
HIGHWAYS/STATE HIGHWAYS/CITY
STREETS: AT MULTIPLE LOCATIONS IN
DIVISION V.
04/30/2017
BRIDGE PAINTING I-40/US-60/RANDALL
STREET: AT MULTIPLE LOCATIONS IN
DIVISION V.
Completion Date:
Final Est Sub:
Residency:
05005
CIRCUIT ENGR. DISTR. # 7
12/02/2016
PAVEMENT REHABILITATION I-40: FROM 1.18
MILES EAST OF SH-6 EXT EAST NEAR ELK
CITY. SH-6: FROM 0.1 MILE SOUTH OF I-40,
EXT N NEAR ELK CITY. PROJECT LENGTH =
6.72 MILES.
Completion Date:
Final Est Sub:
Contract: 160191 I-40
Residency:
31669(05)
STP-NBIP(491)3B
TETRA TECH
Contractor:
POSEIDON CONSTRUCTION, INC.
Engineer:
TETR
Contract Amount:
$334,998.00
Letting Date:
05/19/2016
Contract: 160308 CO. RD.
30047(04)
STP-205C(060)CI
Contractor:
K & R BUILDERS, INC.
Engineer:
CED7
Contract Amount:
$199,833.20
Letting Date:
09/15/2016
BRIDGE REHABILITATION COUNTY ROAD
(MERRITT ROAD): OVER I-40, 2.28 MILES EAST
OF I-40B IN ELK CITY. PROJECT LENGTH =
0.134 MILE.
05/17/2017
BRIDGE AND APPROACHES COUNTY ROAD
(EW-127): OVER TRIBUTARY TO SAND CREEK,
3.2 MILES WEST OF US-283 NEAR SAYRE.
PROJECT LENGTH = 0.085 MILE.
Completion Date:
Final Est Sub:
03/30/2017
05/30/2017
Commissioner District:
Blaine
5
Contracts Completed - Final Estimate Not Processed
Contract: 140275 CO.RD.
Residency:
28692(04)
05005
CIRB-206D(002)RB
CIRCUIT ENGR. DISTR. # 7
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
CED7
Contract Amount:
$3,258,391.60
Letting Date:
09/18/2014
Construction Status Report
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (NS-250): FROM 2.5 MILES EAST OF
THE US-270/SH-58 JUNCTION, EXTEND
SOUTH. PROJECT LENGTH = 3.990 MILES.
Completion Date:
Final Est Sub:
05/10/2016
Page 7
Contract: 150407 SH-3
Residency:
26997(04)
SSP-206N(027)SS
CLINTON
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Davis, Shawn
Contract Amount:
$2,534,247.04
Letting Date:
11/19/2015
05100
BRIDGE AND APPROACHES SH-3: OVER
UNNAMED CREEK, 10.8 MILES EAST OF
US-270 NEAR WATONGA. PROJECT LENGTH
= 0.378 MILE.
Completion Date:
Final Est Sub:
01/17/2017
RESURFACE (P.C. CONCRETE) SH-51: FROM
Contract: 160236 SH-51
Residency:
28139(04)
05100
1.09 MILES EAST OF THE SH-58 SOUTH
SSR-106C(122)SR
CLINTON
JUNCTION, EXTEND EAST NEAR CANTON.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
INC JV
PROJECT
LENGTH = 4.950 MILES.
Engineer:
Davis, Shawn
Contract Amount:
$2,626,298.62
Completion Date:
11/04/2016
Letting Date:
06/16/2016
Final Est Sub:
County:
Commissioner District:
Bryan
2
Contracts Completed - Final Estimate Not Processed
Contract: 110371 US-69
Residency:
28101(04)
NHG-013N(144)(145)TR
MADILL
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$2,001,222.50
Letting Date:
08/18/2011
02300
SAFETY IMPROVEMENT (CABLE BARRIER
AND GUARDRAIL) US-69: FROM THE
OKLAHOMA/TEXAS STATE LINE, EXTEND
NORTH.
Completion Date:
Final Est Sub:
11/08/2012
Contract: 130177 US-70
Residency:
18847(08)
02300
NHPPY-207N(010)(011)
MADILL
Contractor:
DONDLINGER & SONS CONSTRUCTION CO., INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$23,314,990.09
Letting Date:
06/20/2013
GRADE, DRAIN, SURFACE, AND BRIDGE
US-70 (DURANT BYPASS): FROM SH-78,
EXTEND EAST. PROJECT LENGTH = 4.447
MILES.
Contract: 150284 US-70
Residency:
31489(04)
MADILL
HSIPG-207N(030)TR
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$613,701.00
Letting Date:
09/17/2015
02300
SAFETY IMPROVEMENT (GUARDRAIL AND
CABLE BARRIER) US-70: FROM 5.6 MILES
EAST OF SH-78, EXTEND EAST NEAR
DURANT. PROJECT LENGTH = 13.500 MILES.
Contract: 150320 SH-78
Residency:
31823(04)
ERSTP-207C(031)ER
MADILL
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$1,223,625.28
Letting Date:
07/15/2015
02300
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Construction Status Report
12/07/2015
07/12/2016
EMERGENCY RELIEF SH-78: NORTH OF THE
RED RIVER, NEAR YUBA. PROJECT LENGTH
= 0.036 MILE.
Completion Date:
Final Est Sub:
08/15/2015
Page 8
Contract: 150354 CO.RD.
Residency:
29958(04)
02013
CIRB-207C(032)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$834,148.00
Letting Date:
11/19/2015
RESURFACE (ASPHALT) COUNTY
RD(EW-209): FROM NS-375, EXTEND EAST
NEAR DURANT. COUNTY RD(NS-377): FROM
OLD US-70, EXT SOUTH NEAR DURANT.
PROJECT LENGTH = 3.500 MILES.
Contract: 160008 US-69
31975(04)
SSR-207N(050)(049)SR/SBR*
Contractor:
OVERLAND CORPORATION
Engineer:
January, Trenton (Acting)
Contract Amount:
$5,141,344.06
Letting Date:
02/18/2016
RESURFACE (ASPHALT) AND BRIDGE
REHABILITATION US-69: FROM 3.0 MILES S
OF W MAIN STREET, EXT N IN DURANT.
US-69: OVER MINERAL BAYOU CR, 1.2 MI N
OF THE US-70 BYPASS. PROJECT LENGTH =
7.100 MILES.
Residency:
MADILL
02300
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
06/16/2016
10/31/2016
05/09/2017
*-207N(046)SB
Contract: 160213 SH-22
Residency:
28829(04)
SSP-207C(054)SS
MADILL
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
January, Trenton (Acting)
Contract Amount:
$3,473,896.56
Letting Date:
06/16/2016
02300
Contract: 160242 US-70
Residency:
31990(04)
SSR-207N(047)(048)SR
MADILL
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$2,622,204.00
Letting Date:
07/21/2016
02300
Contract: 160404 SH-22
Residency:
32871(04)
E-SAP-207C(068)
MADILL
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$269,522.50
Letting Date:
09/09/2016
02300
Completion Date:
Final Est Sub:
04/18/2017
RESURFACE (ASPHALT) US-70: FROM 8.0
MILES EAST OF THE SH-78 JUNCTION,
EXTEND EAST NEAR BOKCHITO. PROJECT
LENGTH = 6.080 MILES.
Completion Date:
Final Est Sub:
Contract: 170005 CO. RD.
Residency:
29953(04)
02013
STP-207D(029)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$268,608.25
Letting Date:
01/19/2017
County:
BRIDGE REHABILITATION SH-22: OVER BLUE
RIVER, 3.3 MILES EAST OF THE JOHNSON
COUNTY LINE NEAR CADDO. PROJECT
LENGTH = 0.283 MILE.
11/21/2016
BRIDGE REPAIR SH-22: REPAIR VEHICLE
IMPACT DAMAGE OVER US-69/US-75 IN THE
TOWN OF CADDO.
Completion Date:
Final Est Sub:
10/21/2016
05/08/2017
BRIDGE AND APPROACHES COUNTY ROAD
(EW-200): OVER STRAIGHT CREEK, 3.5 MILES
EAST OF SH-22 NEAR CADDO. PROJECT
LENGTH = 0.082 MILE
Completion Date:
Final Est Sub:
05/25/2017
Commissioner District:
Caddo
7
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 9
Contract: 140352 CO.RD.
28389(04)
CIRB-108C(299)CB
Contractor:
SEWELL BROS., INC.
Engineer:
Knight, Reese
Contract Amount:
$1,770,241.28
Letting Date:
11/20/2014
Residency:
ANADARKO
BRIDGE AND APPROACHES COUNTY ROAD
(EW-134): OVER THE WASHITA RIVER, 1.5
MILES WEST OF ANADARKO. PROJECT
LENGTH = 0.436 MILE.
Completion Date:
Final Est Sub:
Contract: 160185 US-281
Residency:
31345(04)
SSR-208B(043)SR
ANADARKO
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Knight, Reese
Contract Amount:
$1,161,708.50
Letting Date:
04/21/2016
County:
07300
07300
12/01/2016
05/02/2017
RESURFACE (ASPHALT) US-281: FROM 0.32
MILES NORTH OF THE SH-37 JUNCTION,
EXTEND NORTH IN HINTON. PROJECT
LENGTH = 3.170 MILES
Completion Date:
Final Est Sub:
04/26/2017
Commissioner District:
Canadian
4
Contracts Completed - Final Estimate Not Processed
Contract: 100511 I-40
Residency:
21008(04)
SEC1702Y-109A(130)HP/IMY*
EL RENO
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
Harlin, Chris
Contract Amount:
$33,963,202.80
Letting Date:
09/16/2010
04200
GRADE, DRAIN, SURFACE, AND BRIDGE I-40:
AT MORGAN ROAD INTERCHANGE IN
OKLAHOMA CITY. PROJECT LENGTH = 2.037
MILES.
Completion Date:
Final Est Sub:
01/29/2014
*-40-4(433)139
RECONSTRUCT - ADDED LANES, BRIDGE AND
Contract: 130003 I-40
Residency:
24424(07)
04200
APPROACHES I-40: FROM MILE MARKER 136,
IMY-040-4(436)/IMY-040-4*
EL RENO
EXTEND EAST TO MILE MARKER 140. SH-4
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
INC JVROAD): OVER I-40. PROJECT
(MUSTANG
LENGTH = 4.664 MILES.
Engineer:
Harlin, Chris
Contract Amount:
$48,167,910.63
Completion Date:
06/10/2016
Letting Date:
01/17/2013
Final Est Sub:
*(435)138/SBR-109N(182)SB
Contract: 140353 I-40
Residency:
26359(04)
NHPPIY-4000-(002)(003)SS
EL RENO
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Harlin, Chris
Contract Amount:
$24,818,323.48
Letting Date:
11/20/2014
04200
Contract: 150125 I-40B
Residency:
28311(04)
SBR-109A(180)SB
EL RENO
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Harlin, Chris
Contract Amount:
$2,211,272.52
Letting Date:
04/16/2015
04200
BRIDGE AND APPROACHES I-40: OVER THE
SOUTH CANADIAN RIVER, 1.1 MILES EAST OF
THE CADDO COUNTY LINE. PROJECT
LENGTH = 1.385 MILES.
Completion Date:
Final Est Sub:
Construction Status Report
11/01/2016
BRIDGE REHABILITATION I-40B: OVER THE
I-40 JUNCTION IN EL RENO. PROJECT
LENGTH = 0.424 MILE.
Completion Date:
Final Est Sub:
11/10/2016
Page 10
Contract: 150157 I-40
24238(05)
SSP-209F(029)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Hubbard, Tom
Contract Amount:
$276,659.28
Letting Date:
05/21/2015
Residency:
EDMOND
04400
Completion Date:
Final Est Sub:
Contract: 160214 I-35
Residency:
24239(17)
STP-209F(047)SS
EL RENO
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Harlin, Chris
Contract Amount:
$374,638.60
Letting Date:
06/16/2016
County:
BRIDGE WATER PROOF SEAL - DIVISION IV
I-40/I-44/I-235/US-60/US-64/US-77/US-177/US-41
2/SH-4/SH-11/ SH-132: AT MULTIPLE
LOCATIONS IN DIVISION IV.
04200
08/24/2016
JOINT SEAL/REPAIR I-35/I-40/MANNING ROAD:
AT MULTIPLE LOCATIONS IN DIVISION IV.
Completion Date:
Final Est Sub:
01/18/2017
Commissioner District:
Carter
7
Contracts Completed - Final Estimate Not Processed
Contract: 130005 SH-53
Residency:
23291(04)
07200
STPY-110C(157)
ARDMORE
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Fuhrmann, Chris
Contract Amount:
$6,604,900.00
Letting Date:
01/17/2013
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-53: FROM 5.5 MILES EAST OF SH-76,
EXTEND EAST. PROJECT LENGTH = 1.46
MILES.
Contract: 150006 I-35
27985(04)
SSP-210N(022)SS
Contractor:
OVERLAND CORPORATION
Engineer:
Fuhrmann, Chris
Contract Amount:
$7,457,617.63
Letting Date:
01/22/2015
Residency:
ARDMORE
BRIDGE REHABILITATION I-35: OVER US-70
AND BNSF RAILROAD IN ARDMORE, 7.2 AND
7.5 MILES NORTH OF THE LOVE COUNTY
LINE. PROJECT LENGTH = 0.954 MILE.
Contract: 160012 SH-07
29178(04)
SSR-210N(005)SR
Contractor:
OVERLAND CORPORATION
Engineer:
Roberts, Colton
Contract Amount:
$318,877.00
Letting Date:
01/21/2016
Residency:
DUNCAN
County:
07200
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
07100
12/14/2016
03/06/2017
12/15/2016
RESURFACE (ASPHALT) SH-7: FROM 2.20
MILES EAST OF THE STEPHENS COUNTY
LINE, EXTEND EAST NEAR RATLIFF CITY.
PROJECT LENGTH = 0.850 MILE.
Completion Date:
Final Est Sub:
05/01/2017
05/15/2017
Commissioner District:
Cherokee
1
Contracts Completed - Final Estimate Not Processed
Contract: 130264 CO.RD.
Residency:
22151(04)
CIRB-111C(081)RB
SALLISAW
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Edwards, Carl
Contract Amount:
$2,882,800.90
Letting Date:
09/19/2013
01200
Construction Status Report
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD: OVER THE ILLINOIS RIVER
0.2 MILE SOUTHEAST OF SH-10. PROJECT
LENGTH = 0.506 MILE.
Completion Date:
Final Est Sub:
05/20/2016
Page 11
Contract: 130265 CO.RD.
Residency:
24824(04)
CIRB-111C(119)RB
MUSKOGEE
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$3,559,547.93
Letting Date:
08/22/2013
County:
01100
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (NS-441): BEGIN 3.8 MILES
SOUTH AND 2.3 MILES WEST OF SH-51/SH-80
JUNCTION, EXTEND NORTH OVER
RATTLESNAKE CREEK TRIBUTARY.
PROJECT LENGTH = 1.338 MILES.
Completion Date:
Final Est Sub:
05/14/2016
Commissioner District:
Choctaw
2
Contracts Completed - Final Estimate Not Processed
Contract: 150256 CO.RD.
Residency:
02013
25145(04)
CIRCUIT ENGR. DISTR. # 3
STP-112D(083)CI
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$471,622.90
Letting Date:
08/20/2015
BRIDGE AND APPROACHES COUNTY ROAD
(NS-403): OVER POINTER CREEK, 1.3 MILES
SOUTH OF US-70 NEAR BOSWELL. PROJECT
LENGTH = 0.255 MILE.
Contract: 150346 CO.RD.
Residency:
25143(04)
02013
STP-112D(081)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
T. MCDONALD CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$699,464.00
Letting Date:
01/21/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-436.5): OVER UNNAMED CREEK, 1.9
MILES SOUTH OF US-70 NEAR FORT
TOWSON. PROJECT LENGTH = 0.189 MILE.
Contract: 150358 CO.RD.
Residency:
31226(04)
02013
CIRB-212D(015)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$818,173.65
Letting Date:
11/19/2015
RESURFACE (ASPHALT) COUNTY ROAD
(NS-422): FROM 2.7 MILES SOUTH OF
SH-271A, EXTEND NORTH NEAR HUGO.
PROJECT LENGTH = 3.153 MILES.
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
03/12/2016
04/05/2017
10/14/2016
11/30/2016
Commissioner District:
Cleveland
3
Contracts Completed - Final Estimate Not Processed
Contract: 120009 CT.ST.
Residency:
03004
24282(04)
JACOBS ENGINEERING
STP-114A(197)AG/HSIPY*
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
JACOBS
Contract Amount:
$1,982,395.61
Letting Date:
02/16/2012
INTERSECTION MODIFICATION AND TRAFFIC
SIGNALS CITY STREETS: AT THE
INTERSECTION OF US-77H AND ROBINSON
AVENUE, IN THE CITY OF NORMAN.
PROJECT LENGTH = 0.779 MILES.
Completion Date:
Final Est Sub:
09/23/2014
05/25/2017
*-114A(243)TR
Contract: 120201 CT.ST.
Residency:
25648(04)
03001
STP-114B(222)AG
ENGR. SERV. & TESTING
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
EST
Contract Amount:
$8,891,822.53
Letting Date:
06/21/2012
Construction Status Report
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (WESTERN AVENUE): FROM S.W.
164TH STREET, EXTEND NORTH IN
OKLAHOMA CITY. PROJECT LENGTH = 2.002
MILES.
Completion Date:
Final Est Sub:
11/04/2014
Page 12
Contract: 140089 SH-09
Residency:
20266(04)
03004
SSP-114N(099)SS
JACOBS ENGINEERING
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
JACOBS
Contract Amount:
$9,587,991.29
Letting Date:
02/20/2014
GRADE, DRAIN, SURFACE, AND BRIDGE SH-9:
FROM JUST WEST OF 24TH AVE. S.E.,
EXTEND EAST IN NORMAN. PROJECT
LENGTH = 1.506 MILES.
Completion Date:
Final Est Sub:
09/10/2015
GRADE, DRAIN, SURFACE, AND SIGNALS
Contract: 140090 CT.ST.
Residency:
29261(04)
03010
CITY STREET (CEDAR LANE RD): BEGIN AT
STP-214C(011)AG
ATKINS
12TH AVE SE IN NORMAN, EXTEND EAST.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
INC JV
PROJECT
LENGTH = 1.580 MILES.
Engineer:
ATKINS
Contract Amount:
$7,746,686.57
Completion Date:
02/26/2016
Letting Date:
03/20/2014
Final Est Sub:
GRADE, DRAIN, AND SURFACE US-77: FROM
Contract: 140356 US-77
Residency:
20997(07)
03200
4.05 MILES NORTH OF SH-39, EXTEND
STPY-114C(114)SS
PURCELL
NORTH. PROJECT LENGTH = 2.448 MILES.
Contractor:
ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Engineer:
Reed, Lucas
Contract Amount:
$10,950,160.10
Completion Date:
09/01/2016
Letting Date:
11/20/2014
Final Est Sub:
Contract: 150251 I-35
22973(13)
SSP-262F(027)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Reed, Lucas
Contract Amount:
$203,597.05
Letting Date:
09/17/2015
Residency:
PURCELL
Contract: 150361 CT.ST.
31510(04)
STPG-214B(041)(040)/STPG*
Contractor:
TRAFFIC SIGNALS, INC.
Engineer:
CEC
Contract Amount:
$549,976.55
Letting Date:
01/21/2016
Residency:
CEC CORP.
03200
BRIDGE WATER PROOF SEAL
I-35/SH-3W/SH-17A/INDIAN HILL ROAD/MAIN
STREET: AT MULTIPLE LOCATIONS IN
DIVISION III.
Completion Date:
Final Est Sub:
03003
03/10/2017
TRAFFIC SIGNALS CITY STREETS (ROBINSON
ST/ROCK CREEK RD/MAIN ST): AT MULTIPLE
LOCATIONS IN DIVISION III.
Completion Date:
Final Est Sub:
05/12/2017
*-214A(039)AG
Contract: 160014 US-77
Residency:
20997(18)
03200
ACSTP-214C(044)SS
PURCELL
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Reed, Lucas
Contract Amount:
$3,132,428.72
Letting Date:
01/21/2016
BRIDGE AND APPROACHES US-77: OVER
CHOTEAU CREEK, 2.9 MILES NORTH OF THE
SH-39 JUNCTION NEAR LEXINGTON.
PROJECT LENGTH = 0.246 MILE.
Completion Date:
Final Est Sub:
11/22/2016
RESURFACE (P.C. CONCRETE) SH-37: FROM
Contract: 160015 SH-37
Residency:
29704(04)
03200
SANTA FE AVE, EXTEND EAST 3.0 MILES TO
SSR-214B(037)SR
PURCELL
BRYANT AVENUE IN MOORE. PROJECT
Contractor:
CHESTER BROSS CONSTRUCTION COMPANY/C.B. EQUIPMENT,
INC. = 3.000 MILES
LENGTH
Engineer:
Reed, Lucas
Contract Amount:
$1,133,762.46
Completion Date:
11/02/2016
Letting Date:
01/21/2016
Final Est Sub:
Construction Status Report
Page 13
Contract: 160016 CT.ST.
Residency:
30478(04)
STPG-214F(043)AG
PURCELL
Contractor:
RUDY CONSTRUCTION CO.
Engineer:
Reed, Lucas
Contract Amount:
$179,347.30
Letting Date:
01/21/2016
03200
Contract: 160193 SH-77H
Residency:
32404(04)
HSIP-214C(065)TR
PURCELL
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Reed, Lucas
Contract Amount:
$200,230.75
Letting Date:
05/19/2016
03200
Contract: 160357 CT. ST.
Residency:
30480(04)
STPG-214B(064)AG
CEC CORP.
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
CEC
Contract Amount:
$526,000.00
Letting Date:
10/20/2016
03003
County:
STRIPING AND PAVEMENT MARKING CITY
STREETS: AT MULTIPLE LOCATIONS IN
DIVISION III.
Completion Date:
Final Est Sub:
12/08/2016
TRAFFIC SIGNALS SH-77H: AT THE
INTERSECTION OF INDIAN HILLS ROAD, IN
THE CITY OF NORMAN.
Completion Date:
Final Est Sub:
12/16/2016
TRAFFIC SIGNALS CITY STREETS: AT
MULTIPLE LOCATIONS IN THE CITY OF
NORMAN.
Completion Date:
Final Est Sub:
04/26/2017
Commissioner District:
Coal
3
Contracts Completed - Final Estimate Not Processed
Contract: 150227 CO.RD.
Residency:
24944(04)
STP-115C(076)CI
ADA
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Russell, Julie
Contract Amount:
$1,288,968.64
Letting Date:
07/23/2015
County:
03100
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (NS-382): FROM EW-167, EXTEND
NORTH NEAR COALGATE. PROJECT LENGTH
= 1.003 MILES
Completion Date:
Final Est Sub:
02/10/2016
Commissioner District:
Comanche
7
Contracts Completed - Final Estimate Not Processed
Contract: 130360 SH-17
Residency:
07300
23297(04)
ANADARKO
STPY-116C(134)
Contractor:
INTERSTATE HIGHWAY CONSTRUCTION, INC.
Engineer:
Knight, Reese
Contract Amount:
$3,833,093.62
Letting Date:
10/17/2013
BRIDGE AND APPROACHES SH-17: OVER
WHISKEY CREEK, 0.50 MILE WEST OF THE
SH-65 JUNCTION. PROJECT LENGTH = 0.586
MILE.
Contract: 130409 I-44
Residency:
27165(04)
SSP-216N(025)SB
DUNCAN
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
Roberts, Colton
Contract Amount:
$5,496,321.02
Letting Date:
11/21/2013
BRIDGE AND APPROACHES I-44: MULTIPLE
LOCATIONS AT TRI-LEVEL INTERCHANGE IN
LAWTON. PROJECT LENGTH = 0.460 MILE.
07100
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/13/2016
01/04/2016
Page 14
County:
Commissioner District:
Cotton
7
Contracts Completed - Final Estimate Not Processed
GRADE, DRAIN, AND SURFACE I-44: BEGIN
Contract: 130362 I-44
Residency:
23292(04)
07100
AT THE STATE LINE, EXTEND NORTH TO
NHPPIY-0044-1(098)000
DUNCAN
US-70. PROJECT LENGTH = 4.948 MILES.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Roberts, Colton
Contract Amount:
$9,496,678.77
Completion Date:
07/31/2016
Letting Date:
10/17/2013
Final Est Sub:
County:
Commissioner District:
Craig
8
Contracts Completed - Final Estimate Not Processed
Contract: 110420 SH-66
Residency:
24183(04)
STPY-118C(096)SS
CLAREMORE
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$7,425,911.85
Letting Date:
10/20/2011
08300
Contract: 110421 US-60
Residency:
24220(04)
BRFY-018N(050)
CLAREMORE
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$3,181,543.16
Letting Date:
09/15/2011
08300
Contract: 130344 SH-66
Residency:
24121(04)
STPY-118C(093)
CLAREMORE
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$2,718,817.00
Letting Date:
09/19/2013
08300
Contract: 140196 US-59
Residency:
24120(04)
CLAREMORE
STPY-118C(090)
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$1,577,178.70
Letting Date:
06/19/2014
08300
Contract: 140259 US-59
Residency:
23126(04)
STPY-118B(067)SS
CLAREMORE
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$5,352,913.29
Letting Date:
09/18/2014
08300
WIDEN AND RESURFACE SH-66: FROM 1.25
MILES EAST OF THE ROGERS COUNTY LINE,
EXTEND NORTHEAST. PROJECT LENGTH =
5.621 MILES.
Completion Date:
Final Est Sub:
BRIDGE AND APPROACHES US-60: OVER BIG
CABIN CREEK, 3.7 MILES EAST OF THE SH-66
JUNCTION. PROJECT LENGTH = 0.207 MILES.
Completion Date:
Final Est Sub:
06/12/2013
05/15/2017
BRIDGE AND APPROACHES SH-66: FROM
0.43 MILE SOUTHWEST OF THE CRAIG
COUNTY LINE, EXTEND NORTHEAST.
PROJECT LENGTH = 0.912 MILE.
Completion Date:
Final Est Sub:
10/08/2014
03/16/2017
BRIDGE AND APPROACHES US-59: OVER AN
UNNAMED CREEK, 0.9 MILES WEST OF THE
OTTAWA COUNTY LINE. PROJECT LENGTH
=0.293 MILES
Completion Date:
Final Est Sub:
Construction Status Report
06/30/2015
02/29/2016
BRIDGE AND APPROACHES US-59: OVER
RUSSELL CREEK AND ELM CREEK, 1.30
MILES SOUTH OF THE KANSAS STATE LINE.
PROJECT LENGTH = 1.561 MILES.
Completion Date:
Final Est Sub:
12/30/2016
Page 15
County:
Commissioner District:
Creek
8
Contracts Completed - Final Estimate Not Processed
Contract: 140289 SH-16
Residency:
21908(04)
08400
STPY-119C(119)SS
SAND SPRINGS
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Williams, Mark J.
Contract Amount:
$3,793,643.00
Letting Date:
09/18/2014
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-16: OVER SKULL CREEK 5.7 MILES EAST
OF SH-48. PROJECT LENGTH = 0.728 MILE.
Contract: 140290 MULT
Residency:
08007
30851(04)
CRAIG & KEITHLINE, INC.
HSIPG-219F(027)TR
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
C&KI
Contract Amount:
$1,420,026.35
Letting Date:
11/20/2014
SAFETY IMPROVEMENT (GUARDRAIL) US
HIGHWAYS/STATE HIGHWAYS: VARIOUS
LOCATIONS IN DIVISION VIII.
Contract: 140318 CO.RD.
Residency:
29217(04)
STP-119D(005)CI
ATKINS
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
ATKINS
Contract Amount:
$883,310.10
Letting Date:
11/20/2014
BRIDGE AND APPROACHES COUNTY ROAD
(EW-81.5/8TH STREET): OVER SAND CREEK,
0.5 MILE EAST OF BRISTOW. PROJECT
LENGTH = 0.169 MILE.
08010
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/06/2016
09/21/2016
04/03/2017
Contract: 150190 US-75A
Residency:
27090(04)
08400
NHPP-219N(036)SS
SAND SPRINGS
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$1,875,233.80
Letting Date:
06/18/2015
BRIDGE REHABILITATION - DIVISION VIII
US-75A: OVER ROCK CREEK, 0.30 MILE
SOUTH OF THE SH-117 JUNCTION IN
SAPULPA. PROJECT LENGTH = 0.064 MILE.
Contract: 150364 CO.RD.
26553(04)
STP-119D(193)CI
Contractor:
K & R BUILDERS, INC.
Engineer:
JACOBS
Contract Amount:
$555,575.05
Letting Date:
11/19/2015
BRIDGE AND APPROACHES COUNTY ROAD
(MILLS ROAD/NS-363): OVER DRY CREEK, 0.9
MILE SOUTH OF WEST 51ST STREET (EW-64)
NEAR OILTON. PROJECT LENGTH = 0.193
MILE.
Residency:
08004
JACOBS ENGINEERING
Completion Date:
Final Est Sub:
Contract: 160364 IS-44
Residency:
32657(04)
SAP-219N(051)
TETRA TECH
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
TETR
Contract Amount:
$52,512.00
Letting Date:
10/20/2016
County:
Completion Date:
Final Est Sub:
08002
09/12/2016
04/04/2017
10/03/2016
05/12/2017
BRIDGE REPAIR I-44: REPAIR VEHICLE
IMPACT DAMAGE OVER SH-66, 1.2 MILES
SOUTHWEST OF THE I-244 INTERCHANGE IN
TULSA.
Completion Date:
Final Est Sub:
04/03/2017
Commissioner District:
Custer
5
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 16
Contract: 120092 US-183
Residency:
09278(04)
NHY-009N(019)SS
CLINTON
Contractor:
CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Davis, Shawn
Contract Amount:
$7,762,288.72
Letting Date:
02/16/2012
05100
Contract: 130308 CT.ST.
Residency:
19669(04)
STP-120B(070)TC
CLINTON
Contractor:
TOM HUDSON PAVING, INC.
Engineer:
Davis, Shawn
Contract Amount:
$1,991,350.29
Letting Date:
09/19/2013
05100
Contract: 140092 I-40
Residency:
26490(04)
NHPPIY-0040-3(082)SS/NHP*
CLINTON
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Davis, Shawn
Contract Amount:
$16,738,134.68
Letting Date:
02/20/2014
05100
GRADE, DRAIN, AND SURFACE US-183:
FROM THE WASHITA RIVER, EXTEND NORTH.
PROJECT LENGTH = 3.411 MILES.
Completion Date:
Final Est Sub:
01/16/2017
GRADE, DRAIN, AND SURFACE CITY STREET
(CHAPMAN AVENUE): FROM 28TH STREET,
EXTEND EAST IN CLINTON. PROJECT
LENGTH = 0.723 MILE.
Completion Date:
Final Est Sub:
08/14/2015
GRADE, DRAIN, SURFACE, AND BRIDGE
I-40/WASHINGTON AVENUE: ON I-40, FROM
MILE MARKER 76.6 TO 83.9; ON WASHINGTON
AVENUE, OVER I-40 IN WEATHERFORD.
PROJECT LENGTH = 7.714 MILES.
Completion Date:
Final Est Sub:
12/22/2015
*PIY-0040-3(085)
Contract: 150052 I-40
Residency:
26490(05)
SSP-220N(028)SS
CLINTON
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Davis, Shawn
Contract Amount:
$1,418,680.20
Letting Date:
02/19/2015
05100
Contract: 150192 SH-44
Residency:
29276(04)
SBR-220C(027)SB
CLINTON
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Davis, Shawn
Contract Amount:
$997,305.28
Letting Date:
06/18/2015
05100
Contract: 160318 I-40
Residency:
31700(04)
NHPPI-NBIP-(505)3B
TETRA TECH
Contractor:
SOUTHERN ROAD & BRIDGE, LLC
Engineer:
TETR
Contract Amount:
$262,148.80
Letting Date:
09/15/2016
05002
County:
RESURFACE (ASPHALT) I-40: FROM MILE
MARKER 83.9 TO MILE MARKER 86.3.
PROJECT LENGTH = 2.350.
Completion Date:
Final Est Sub:
12/03/2015
BRIDGE REHABILITATION - DIVISION V SH-44:
OVER OAK CREEK, 4.7 MILES NORTH OF THE
I-40 JUNCTION. PROJECT LENGTH = 0.175
MILE.
Completion Date:
Final Est Sub:
06/03/2016
09/21/2016
BRIDGE PAINTING I-40: OVER I-40B, 2.8 MILES
EAST OF US-183 NEAR CLINTON.
Completion Date:
Final Est Sub:
04/25/2017
Commissioner District:
Delaware
8
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 17
Contract: 110422 SH-10
Residency:
10441(04)
BRFY-021C(256)
GARVER, LLC.
Contractor:
JENSEN CONSTRUCTION COMPANY
Engineer:
GARV
Contract Amount:
$15,741,148.27
Letting Date:
08/16/2012
08011
Contract: 150193 US-412
Residency:
26506(04)
NHPP-221N(020)SS
CLAREMORE
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$978,879.00
Letting Date:
06/18/2015
08300
BRIDGE AND APPROACHES SH-10: OVER
ELK RIVER, 1.35 MILES SOUTH OF THE
OTTAWA COUNTY LINE. PROJECT LENGTH =
0.892 MILE.
Completion Date:
Final Est Sub:
10/14/2015
05/12/2017
WIDEN AND RESURFACE - DIVISION VIII
US-412: FROM THE ARKANSAS STATE LINE,
EXTEND WEST. PROJECT LENGTH = 0.065
MILE.
Completion Date:
Final Est Sub:
02/19/2016
Contract: 160166 US-59
Residency:
24151(07)
08300
SSP-221B(031)RW
CLAREMORE
Contractor:
ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$24,030.00
Letting Date:
04/21/2016
RIGHT-OF-WAY CLEARANCE US-59: FROM
2.92 MILES NORTH OF SH-20, EXTEND NORTH
NEAR JAY. PROJECT LENGTH = 1.001 MILES
PREQUALIFICATION FOR THIS PROJECT HAS
BEEN WAIVED. BOTH BID EXPRESS AND
WRITTEN BIDS WILL BE ACCEPTABLE.
Contract: 160187 SH-116
Residency:
29827(04)
08300
SBR-221C(027)SB
CLAREMORE
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Tyler, Jennifer
Contract Amount:
$843,859.80
Letting Date:
04/21/2016
BRIDGE REHABILITATION SH-116: OVER
CLOUD CREEK, 2.8 MILES EAST OF US-59
NEAR COLCORD. PROJECT LENGTH = 0.117
MILE.
Contract: 160194 US-59
Residency:
28842(04)
08004
STP-121E(155)EH
JACOBS ENGINEERING
Contractor:
CROSSLAND HEAVY CONTRACTORS INC.
Engineer:
JACOBS
Contract Amount:
$865,014.99
Letting Date:
05/19/2016
GRADE, DRAIN, AND SURFACE US-59: FROM
4TH STREET, EXTEND NORTH IN GROVE.
SH-25/3RD ST: FROM THE US-59 JCT,
EXTEND EAST IN GROVE. PROJECT LENGTH
= 0.140 MILE.
Contract: 160344 CO. RD.
Residency:
32598(04)
08004
ACERSTP-221C(032)ER
JACOBS ENGINEERING
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
JACOBS
Contract Amount:
$794,425.57
Letting Date:
09/15/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-33): OVER WHITEWATER CREEK, 0.7
MILE EAST OF US-59 NEAR GROVE.
PROJECT LENGTH = 0.213 MILE.
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/14/2017
05/22/2017
05/15/2017
05/31/2017
04/28/2017
Commissioner District:
Dewey
5
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 18
Contract: 150089 US-270
Residency:
17671(32)
NHPP-017N(225)SS
CLINTON
Contractor:
CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Davis, Shawn
Contract Amount:
$8,009,586.69
Letting Date:
03/19/2015
County:
05100
GRADE, DRAIN, AND SURFACE US-270: FROM
1.7 MILES SOUTHEAST OF SH-51, EXTEND
SOUTHEAST. PROJECT LENGTH = 3.920
MILES.
Completion Date:
Final Est Sub:
03/15/2017
Commissioner District:
Ellis
6
Contracts Completed - Final Estimate Not Processed
Contract: 150161 CO.RD.
Residency:
06009
29337(04)
CIRCUIT ENGR. DISTR. # 8
ACSTP-223C(008)CI
Contractor:
J & R SAND COMPANY, INC.
Engineer:
CED8
Contract Amount:
$1,364,767.02
Letting Date:
05/21/2015
RESURFACE (ASPHALT) - DIVISION VI
COUNTY ROADS
(NS-173/NS-174/NS-175/EW-66/EW-67): ON
MULTIPLE COUNTY ROADS, 5.5 MILES SOUTH
OF THE US-283/US-60. PROJECT LENGTH =
3.371 MILES.
Contract: 160022 CO.RD.
Residency:
28456(08)
06009
CIRB-123C(086)RB
CIRCUIT ENGR. DISTR. # 8
Contractor:
CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
CED8
Contract Amount:
$3,287,536.91
Letting Date:
01/21/2016
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (NS-190): FROM 6.5 MILES NORTH OF
US-60, EXTEND NORTH NEAR GAGE.
PROJECT LENGTH = 5.009 MILES.
Contract: 160085 US-283
Residency:
29489(04)
STP-223B(009)3P
BUFFALO
Contractor:
J & R SAND COMPANY, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$983,382.25
Letting Date:
05/19/2016
RESURFACE (ASPHALT) US-283: FROM 2.25
MILES SOUTH OF THE HARPER COUNTY
LINE, EXTEND NORTH NEAR LAVERN.
PROJECT LENGTH = 4.190 MILES.
County:
06100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
06/08/2016
04/12/2017
12/27/2016
Commissioner District:
Garfield
4
Contracts Completed - Final Estimate Not Processed
Contract: 140320 US-64
Residency:
30788(04)
HSIPG-224N(009)TR
ENID
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Hoover, Jacob
Contract Amount:
$675,136.54
Letting Date:
01/22/2015
04300
Contract: 150090 CO.RD.
Residency:
24868(04)
04009
CIRB-124C(113)RB
CIRCUIT ENGR. DISTR. # 8
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED8
Contract Amount:
$5,120,090.80
Letting Date:
03/19/2015
Construction Status Report
SAFETY IMPROVEMENT (CABLE BARRIER)
US-64: FROM 78TH STREET IN ENID, EXTEND
EAST. PROJECT LENGTH = 4.490 MILES.
Completion Date:
Final Est Sub:
01/21/2016
05/08/2017
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-40): FROM 78TH ST (NS-294) IN
BRECKINRIDGE, EXTEND EAST. PROJECT
LENGTH = 5.984 MILES.
Completion Date:
Final Est Sub:
09/20/2016
Page 19
Contract: 150366 CO.RD.
28423(04)
STP-224D(026)CI
Contractor:
H & H BRIDGE COMPANY
Engineer:
CED8
Contract Amount:
$723,946.33
Letting Date:
11/19/2015
Residency:
04009
CIRCUIT ENGR. DISTR. # 8
Completion Date:
Final Est Sub:
Contract: 160217 SH-74
Residency:
29636(04)
SSR-224C(038)SR
ENID
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Hoover, Jacob
Contract Amount:
$1,436,650.00
Letting Date:
06/16/2016
County:
BRIDGE AND APPROACHES COUNTY ROAD
(REED ROAD/EW-54): OVER TURKEY CREEK,
2.4 MILES EAST OF SH-132 NEAR WAUKOMIS.
PROJECT LENGTH = 0.426 MILES
04300
04/17/2017
RESURFACE (ASPHALT) SH-74: FROM THE
RAILROAD SOUTH OF THE SH-164 JUNCTION,
EXTEND NORTH NEAR COVINGTON.
PROJECT LENGTH = 6.742 MILES
Completion Date:
Final Est Sub:
04/25/2017
Commissioner District:
Garvin
3
Contracts Completed - Final Estimate Not Processed
Contract: 120312 SH-17A
Residency:
28179(04)
SBR-125C(198)SB
ADA
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Russell, Julie
Contract Amount:
$2,912,741.15
Letting Date:
09/20/2012
03100
Contract: 130267 SH-19
Residency:
21786(04)
SSP-125B(112)SS
ADA
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Russell, Julie
Contract Amount:
$5,971,477.23
Letting Date:
08/22/2013
03100
Contract: 140261 I-35
Residency:
28183(04)
ATKINS
SBR-125N(200)SB
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
ATKINS
Contract Amount:
$1,654,283.48
Letting Date:
08/21/2014
03010
Contract: 150091 US-77
27061(04)
STP-125C(209)SS
Contractor:
OBC, INC.
Engineer:
Reed, Lucas
Contract Amount:
$2,601,501.30
Letting Date:
03/19/2015
03200
Residency:
PURCELL
BRIDGE REHABILITATION SH-17A: OVER THE
WASHITA RIVER, 0.87 MILES EAST OF I-35.
Completion Date:
Final Est Sub:
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-19: OVER WASHITA RIVER, 1.72 MILES
EAST OF US-77, EXTEND EAST. PROJECT
LENGTH = 0.681 MILE.
Completion Date:
Final Est Sub:
12/12/2014
BRIDGE REHABILITATION I-35: OVER RED
BRANCH CREEK, 1.0 MILE NORTH OF SH-29.
Completion Date:
Final Est Sub:
03/15/2016
04/13/2017
BRIDGE AND APPROACHES US-77: OVER
OWL CREEK, 0.50 MILE SOUTH OF SH-145.
PROJECT LENGTH = 0.284 MILE.
Completion Date:
Final Est Sub:
Construction Status Report
08/31/2015
12/08/2016
Page 20
Contract: 150092 SH-76
Residency:
27997(04)
STP-225C(041)SS
PURCELL
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Reed, Lucas
Contract Amount:
$8,120,772.36
Letting Date:
05/21/2015
03200
Contract: 150162 SH-74
Residency:
27062(04)
STP-225C(042)SS
PURCELL
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
Reed, Lucas
Contract Amount:
$1,256,215.90
Letting Date:
05/21/2015
03200
BRIDGE AND APPROACHES - DIVISION III
SH-76: OVER THE WASHITA RIVER, 9.4 MILES
NORTH OF THE STEPHENS COUNTY LINE
NEAR LINDSAY. PROJECT LENGTH = 0.625
MILE.
Completion Date:
Final Est Sub:
05/12/2017
BRIDGE AND APPROACHES - DIVISION III
SH-74: OVER BEEF CREEK, 0.10 MILE SOUTH
OF SH-19 IN MAYESVILLE. PROJECT LENGTH
= 0.065 MILE.
Completion Date:
Final Est Sub:
07/14/2016
Contract: 160024 CO.RD.
Residency:
30298(04)
03200
STP-225C(050)CI
PURCELL
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Reed, Lucas
Contract Amount:
$1,157,300.00
Letting Date:
02/18/2016
RESURFACE (ASPHALT) COUNTY ROAD
(INDIAN MERIDIAN RD/NS-323): FROM SH-29,
EXTEND NORTH NEAR PAULS VALLEY.
PROJECT LENGTH = 5.011 MILES.
Contract: 160025 SH-19
30557(04)
STP-225B(056)3P
Contractor:
SEAL MASTERS, INC.
Engineer:
Russell, Julie
Contract Amount:
$387,516.05
Letting Date:
01/21/2016
Residency:
ADA
RESURFACE (ASPHALT) SH-19: FROM
US-177, EXTEND EAST IN STRATFORD.
PROJECT LENGTH = 1.040 MILES.
Contract: 160136 SH-29
29805(05)
SSR-225B(058)SR
Contractor:
OVERLAND CORPORATION
Engineer:
Reed, Lucas
Contract Amount:
$885,702.10
Letting Date:
03/17/2016
Residency:
PURCELL
County:
03100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
03200
10/10/2016
11/18/2016
RESURFACE (ASPHALT) SH-29: FROM 3.3
MILES EAST OF THE STEPHENS COUNTY
LINE, EXTEND EAST NEAR ELMORE CITY.
PROJECT LENGTH = 6.11 MILES.
Completion Date:
Final Est Sub:
12/20/2016
Commissioner District:
Grady
7
Contracts Completed - Final Estimate Not Processed
GRADE, DRAIN, AND SURFACE - DIVISION VII
Contract: 150163 CO.RD.
Residency:
24945(04)
07003
COUNTY ROAD (SARA ROAD): FROM 0.50
CIRB-126C(131)RB
CEC CORP.
MILE NORTH OF I-44 NEAR NEWCASTLE,
Contractor:
SHELL CONSTRUCTION CO., INC/MARKWELL PAVING CO., INCEXTEND
(JV) NORTH. PROJECT LENGTH = 4.042
MILES.
Engineer:
CEC
Contract Amount:
$4,393,434.16
Completion Date:
11/18/2016
Letting Date:
06/18/2015
Final Est Sub:
Construction Status Report
Page 21
Contract: 150260 US-62
Residency:
31034(04)
SSP-226B(016)
ANADARKO
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Knight, Reese
Contract Amount:
$3,977,101.30
Letting Date:
08/20/2015
County:
07300
RESURFACE (ASPHALT) US-62: FROM 3.0
MILES EAST OF THE SH-39 JUNCTION,
EXTEND EAST NEAR CHICKASHA. PROJECT
LENGTH = 7.540 MILES.
Completion Date:
Final Est Sub:
02/07/2017
Commissioner District:
Grant
4
Contracts Completed - Final Estimate Not Processed
Contract: 140237 SH-11
Residency:
24429(04)
ENID
STPY-127B(135)(136)
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Hoover, Jacob
Contract Amount:
$9,950,140.63
Letting Date:
07/24/2014
04300
SHOULDER IMPROVEMENT, RESURFACE
(ASPHALT), AND BRIDGE SH-11: FROM 6.43
MILES EAST OF THE ALFALFA COUNTY LINE,
EXTEND EAST. PROJECT LENGTH = 6.978
MILES.
Completion Date:
Final Est Sub:
01/31/2017
Contract: 150094 CO.RD.
Residency:
28419(04)
04009
CIRB-127C(187)RB
CIRCUIT ENGR. DISTR. # 8
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED8
Contract Amount:
$3,821,180.30
Letting Date:
03/19/2015
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-09): FROM 0.60 MILE EAST OF
SH-132, EXTEND EAST. PROJECT LENGTH =
5.615 MILES.
Contract: 150095 US-81
Residency:
29142(04)
SBR-227B(001)(013)SB
ENID
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Hoover, Jacob
Contract Amount:
$2,487,956.55
Letting Date:
03/19/2015
BRIDGE REHABILITATION US-81: OVER POND
CREEK 3.8 MILES NORTH OF US-60, AND
OVER OSAGE CREEK 4.4 MILES NORTH OF
US-60. PROJECT LENGTH = 0.252 MILE.
04300
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
09/20/2016
09/26/2016
Contract: 150195 CO.RD.
Residency:
28413(04)
04009
STP-227C(016)CI
CIRCUIT ENGR. DISTR. # 8
Contractor:
L & M CONTRACTORS, INC.
Engineer:
CED8
Contract Amount:
$574,754.21
Letting Date:
06/18/2015
BRIDGE AND APPROACHES - DIVISION IV
COUNTY ROAD (NS-296): OVER UNNAMED
CREEK, 6.5 MILES NORTH OF SH-11 IN
MEDFORD. PROJECT LENGTH = 0.236 MILE.
Contract: 150334 CO.RD.
28360(04)
STP-227D(019)CI
Contractor:
H & H BRIDGE COMPANY
Engineer:
CED8
Contract Amount:
$734,320.78
Letting Date:
10/15/2015
BRIDGE AND APPROACHES COUNTY ROAD
(NS-280): OVER SAND CREEK, 1.0 MILE EAST
AND 2.9 MILES SOUTH OF SH-11 NEAR
HAWLEY. PROJECT LENGTH = 0.293 MILE.
Residency:
04009
CIRCUIT ENGR. DISTR. # 8
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
06/30/2016
04/12/2017
09/20/2016
Page 22
Contract: 150369 CO.RD.
28412(04)
STP-227D(015)CI
Contractor:
SEWELL BROS., INC.
Engineer:
CED8
Contract Amount:
$426,810.75
Letting Date:
11/19/2015
County:
Residency:
04009
CIRCUIT ENGR. DISTR. # 8
BRIDGE AND APPROACHES COUNTY
ROAD(HARPER ROAD): OVER POLECAT
CREEK, 4.8 MILES WEST OF SH-74 NEAR
MEDFORD. PROJECT LENGTH = 0.337 MILE.
Completion Date:
Final Est Sub:
08/10/2016
Commissioner District:
Greer
5
Contracts Completed - Final Estimate Not Processed
Contract: 150294 CO.RD.
Residency:
05005
30028(04)
CIRCUIT ENGR. DISTR. # 7
STP-228C(005)CI
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
CED7
Contract Amount:
$318,158.28
Letting Date:
09/17/2015
County:
BRIDGE AND APPROACHES COUNTY ROAD
(EW-155): OVER TURKEY CREEK, 4.9 MILES
WEST OF SH-34 NEAR RUSSELL. PROJECT
LENGTH = 0.095 MILE.
Completion Date:
Final Est Sub:
11/01/2016
05/24/2017
Commissioner District:
Harmon
5
Contracts Completed - Final Estimate Not Processed
Contract: 150295 CO.RD.
Residency:
24950(04)
05005
CIRB-129D(040)RB
CIRCUIT ENGR. DISTR. # 7
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
CED7
Contract Amount:
$1,035,392.75
Letting Date:
09/17/2015
County:
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-158/EW-160): EW-158 FROM
SH-30, EXTEND WEST. EW-160 AT NS-170, 1.0
MI W AND 1.0 MI N OF HOLLIS. PROJECT
LENGTH = 1.271 MILES.
Completion Date:
Final Est Sub:
10/13/2016
05/24/2017
Commissioner District:
Harper
6
Contracts Completed - Final Estimate Not Processed
Contract: 140099 SH-149
Residency:
10448(04)
STPY-030C(105)
GUYMON
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Michael, Charles
Contract Amount:
$3,198,694.24
Letting Date:
05/15/2014
06200
Contract: 150134 US-64
23274(12)
SSP-230C(016)SS
Contractor:
JLT CONTRACTING, LLC
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$121,280.77
Letting Date:
04/16/2015
06100
Residency:
BUFFALO
BRIDGE AND APPROACHES SH-149: OVER
BEAVER RIVER, 2.44 MILES EAST OF US-283.
PROJECT LENGTH = 0.436 MILE.
Completion Date:
Final Est Sub:
BRIDGE WATER PROOF SEAL
US-64/US-281/SH-3/SH-11: AT MULTIPLE
LOCATIONS IN DIVISION VI.
Completion Date:
Final Est Sub:
Construction Status Report
12/06/2016
03/24/2017
Page 23
Contract: 150335 CO.RD.
24964(04)
CIRB-130C(125)RB
Contractor:
SEWELL BROS., INC.
Engineer:
CED8
Contract Amount:
$1,799,216.98
Letting Date:
10/15/2015
County:
Residency:
06009
CIRCUIT ENGR. DISTR. # 8
BRIDGE AND APPROACHES COUNTY ROAD
(NS-190): OVER BUFFALO CREEK, 1.3 MILES
NORTH OF US-64 NEAR BUFFALO. PROJECT
LENGTH = 0.378 MILE.
Completion Date:
Final Est Sub:
09/27/2016
Commissioner District:
Haskell
1
Contracts Completed - Final Estimate Not Processed
Contract: 130318 CO.RD.
Residency:
28411(04)
SALLISAW
CIRB-131C(114)RB
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$2,531,601.14
Letting Date:
09/19/2013
01200
Contract: 140170 US-62
Residency:
30737(04)
HSIPG-231F(011)TR
CEC CORP.
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
CEC
Contract Amount:
$2,163,244.25
Letting Date:
05/15/2014
01003
Contract: 140322 I-40
30962(05)
STPY-231F(014)3B
Contractor:
PBX CORPORATION
Engineer:
Hagerman, Jeremy
Contract Amount:
$250,457.10
Letting Date:
10/16/2014
01100
County:
Residency:
MUSKOGEE
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-127): FROM 2.8 MILES
WEST OF SH-2, EXTEND EAST. PROJECT
LENGTH = 2.640 MILES.
Completion Date:
Final Est Sub:
12/17/2015
05/05/2017
SAFETY IMPROVEMENT (GUARDRAIL AND
CABLE BARRIER)
US-62/US-64B/US-69/SH-9/SH-10/SH-16:
VARIOUS LOCATIONS IN DIVISION I.
Completion Date:
Final Est Sub:
02/18/2016
JOINT SEAL/REPAIR I-40/US-69/SH-9/SH-10:
AT MULTIPLE LOCATIONS IN DIVISION I.
Completion Date:
Final Est Sub:
05/18/2016
05/11/2017
Commissioner District:
Hughes
3
Contracts Completed - Final Estimate Not Processed
Contract: 160091 CO.RD.
30016(04)
ACSTP-232D(049)CI
Contractor:
K & R BUILDERS, INC.
Engineer:
Helton, Matthew
Contract Amount:
$448,583.84
Letting Date:
02/18/2016
County:
Residency:
WEWOKA
03300
BRIDGE AND APPROACHES COUNTY ROAD
(EW-122): OVER LITTLE WEWOKA CREEK, 2.5
MILES WEST OF SH-27 NEAR WETUMKA.
PROJECT LENGTH = 0.150 MILE.
Completion Date:
Final Est Sub:
12/20/2016
05/16/2017
Commissioner District:
Jackson
5
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 24
Contract: 150197 CO.RD.
Residency:
24970(04)
05005
CIRB-133C(095)RB
CIRCUIT ENGR. DISTR. # 7
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
CED7
Contract Amount:
$4,150,099.34
Letting Date:
06/18/2015
GRADE, DRAIN, SURFACE, AND BRIDGE DIVISION V COUNTY ROAD (NS-210): FROM
SH-5, EXTEND NORTH NEAR ALTUS.
PROJECT LENGTH = 4.013 MILES.
Contract: 160198 US-62
Residency:
29526(06)
STP-NBIP(499)SS
TETRA TECH
Contractor:
NORTH STAR PAINTING CO., INC.
Engineer:
TETR
Contract Amount:
$842,124.50
Letting Date:
05/19/2016
BRIDGE PAINTING US-62: OVER NORTH FORK
OF THE RED RIVER, AT THE TILLMAN
COUNTY LINE.
05002
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/26/2017
03/02/2017
Contract: 160220 CO.RD.
Residency:
30081(04)
05005
STP-233C(026)CI
CIRCUIT ENGR. DISTR. # 7
Contractor:
T & G CONSTRUCTION, INC.
Engineer:
CED7
Contract Amount:
$637,339.48
Letting Date:
06/16/2016
RESURFACE (ASPHALT) COUNTY ROAD
(EW-159): FROM US-283, EXTEND EAST NEAR
ALTUS. PROJECT LENGTH = 3.008 MILES.
Contract: 170024 SH-19
Residency:
29644(04)
SSR-233C(030)SR
ALTUS
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
Sirmons, Karl
Contract Amount:
$362,212.71
Letting Date:
01/19/2017
RESURFACE (ASPHALT) SH-19: FROM
US-283/SH-6, EXTEND EAST IN THE TOWN OF
BLAIR. PROJECT LENGTH = 1.60 MILES.
County:
05200
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
02/24/2017
05/30/2017
05/05/2017
Commissioner District:
Jefferson
7
Contracts Completed - Final Estimate Not Processed
Contract: 150319 SH-89
Residency:
28801(04)
07100
STP-234C(016)SS
DUNCAN
Contractor:
BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Engineer:
Roberts, Colton
Contract Amount:
$3,883,018.36
Letting Date:
08/20/2015
BRIDGE AND APPROACHES SH-89: OVER
POST OAK CREEK, 9.90 MILES NORTH OF
THE SH-32 JUNCTION NEAR CORNISH.
PROJECT LENGTH = 0.605 MILE.
Contract: 160031 US-81
29507(04)
SSR-234N(034)SR
Contractor:
OVERLAND CORPORATION
Engineer:
Roberts, Colton
Contract Amount:
$1,648,393.75
Letting Date:
01/21/2016
RESURFACE (ASPHALT) US-81: FROM 9.6
MILES NORTH OF THE TEXAS STATE LINE,
EXTEND NORTH IN RYAN. PROJECT LENGTH
= 5.500 MILES.
County:
Residency:
DUNCAN
07100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/24/2017
03/17/2017
Commissioner District:
Johnston
3
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 25
Contract: 140239 CO.RD.
Residency:
27846(04)
STP-135C(129)CI
ADA
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Russell, Julie
Contract Amount:
$2,220,342.40
Letting Date:
07/24/2014
03100
Contract: 150098 SH-22
27058(04)
STP-135C(135)SS
Contractor:
L & N BRIDGE, LLC
Engineer:
Russell, Julie
Contract Amount:
$2,489,951.32
Letting Date:
03/19/2015
03100
Residency:
ADA
RESURFACE (ASPHALT) COUNTY ROAD
(NS-363/WILEY ROAD): BEGIN AT SH-7,
EXTEND SOUTH. PROJECT LENGTH = 6.007
MILES.
Completion Date:
Final Est Sub:
05/17/2016
BRIDGE AND APPROACHES SH-22: OVER
BUTCHER PEN CREEK, 4.3 MILES WEST OF
SH-78. PROJECT LENGTH = 0.321 MILE
Completion Date:
Final Est Sub:
05/23/2016
Contract: 150250 SH-22
Residency:
23285(06)
03001
SSP-235F(019)SS
ENGR. SERV. & TESTING
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
EST
Contract Amount:
$738,017.33
Letting Date:
07/23/2015
JOINT SEAL/REPAIR
SH-22/SH-59/SH-66/SH-102: AT MULTIPLE
LOCATIONS IN DIVISION III.
Contract: 150321 SH-99
27142(04)
STP-235B(023)SS
Contractor:
OVERLAND CORPORATION
Engineer:
EST
Contract Amount:
$8,366,343.52
Letting Date:
08/20/2015
BRIDGE AND APPROACHES SH-99: OVER
THE WASHITA RIVER, 1.2 MILES SOUTH OF
SH-22 NEAR TISHOMINGO. PROJECT
LENGTH = 0.400 MILE.
Residency:
03001
ENGR. SERV. & TESTING
Contract: 160288 CO.RD.
Residency:
31237(04)
CIRB-235D(031)RB
ADA
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
Russell, Julie
Contract Amount:
$523,770.40
Letting Date:
08/18/2016
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
03100
08/25/2016
05/09/2017
08/12/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-179): OVER WALNUT BRANCH CREEK,
0.2 MILES WEST OF SH-48 NEAR BROMIDE.
PROJECT LENGTH = 0.170 MILE
Completion Date:
Final Est Sub:
04/15/2017
Commissioner District:
Kay
4
Contracts Completed - Final Estimate Not Processed
Contract: 130141 I-35
Residency:
26265(04)
HSIPIG-0035-4(234)215TR
PERRY
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Zachary, Ted
Contract Amount:
$934,329.37
Letting Date:
03/21/2013
04100
Construction Status Report
SAFETY IMPROVEMENT (CABLE BARRIER)
I-35: FROM US-60, EXTEND NORTH.
PROJECT LENGTH = 5.418 MILES.
Completion Date:
Final Est Sub:
07/15/2014
02/10/2016
Page 26
Contract: 150408 SH-156
29492(04)
SBR-236N(029)SB
Contractor:
FRONTIER BRIDGE, INC.
Engineer:
Zachary, Ted
Contract Amount:
$1,871,124.42
Letting Date:
11/19/2015
Residency:
PERRY
04100
BRIDGE REHABILITATION SH-156: OVER
US-60, 11.7 MILES EAST OF I-35 NEAR PONCA
CITY. PROJECT LENGTH = 0.226 MILE.
Completion Date:
Final Est Sub:
01/26/2017
Contract: 160222 I-40
Residency:
24239(06)
04001
SSP-NBIP(501)SS
ENGR. SERV. & TESTING
Contractor:
OLYMPUS PAINTING CONTRACTORS, INC.
Engineer:
EST
Contract Amount:
$455,004.00
Letting Date:
06/16/2016
BRIDGE PAINTING I-40/US-60: AT MULTIPLE
LOCATIONS IN DIVISION IV.
Contract: 160376 IS-35
Residency:
32660(04)
HSIPIG-3500-(046)TR
PERRY
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Zachary, Ted
Contract Amount:
$298,711.46
Letting Date:
10/20/2016
STRIPING AND PAVEMENT MARKING I-35/I-40:
AT MULTIPLE LOCATIONS IN DIVISION IV.
County:
04100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
05/03/2017
04/18/2017
05/24/2017
Commissioner District:
Kiowa
5
Contracts Completed - Final Estimate Not Processed
Contract: 140324 CO.RD.
Residency:
25094(04)
05005
CIRB-138D(149)RB
CIRCUIT ENGR. DISTR. # 7
Contractor:
CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
CED7
Contract Amount:
$3,754,008.18
Letting Date:
10/16/2014
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-160): FROM 4.0 MILES
WEST OF US-183, EXTEND EAST. PROJECT
LENGTH = 4.058 MILES.
Contract: 140361 SH-9
Residency:
20806(04)
ALTUS
SSP-138B(062)SS
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Sirmons, Karl
Contract Amount:
$10,459,957.22
Letting Date:
11/20/2014
GRADE, DRAIN, SURFACE, AND BRIDGE SH-9:
OVER BIG ELK CREEK AND LITTLE ELK
CREEK OVERFLOW, 12.0, 12.4, AND 12.7
MILES EAST OF THE GREER COUNTY LINE.
PROJECT LENGTH = 1.733 MILES.
05200
Contract: 150262 CO.RD.
Residency:
28713(04)
05005
STP-238D(027)CI
CIRCUIT ENGR. DISTR. # 7
Contractor:
BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Engineer:
CED7
Contract Amount:
$3,396,616.71
Letting Date:
08/20/2015
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/04/2017
01/11/2017
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-143): FROM SH-54,
EXTEND EAST NEAR GOTEBO. PROJECT
LENGTH = 3.015 MILES.
Completion Date:
Final Est Sub:
12/05/2016
Page 27
Contract: 150374 SH-9
Residency:
29629(04)
SSR-238C(019)SR/SSR-238B*
ALTUS
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
Sirmons, Karl
Contract Amount:
$1,234,258.51
Letting Date:
11/19/2015
05200
RESURFACE (ASPHALT) SH-9/SH-9B/SH-115:
AT MULTIPLE LOCATIONS IN HOBART AND
MT. VIEW. PROJECT LENGTH = 2.930 MILES.
Completion Date:
Final Est Sub:
01/17/2017
*(030)SR
County:
Commissioner District:
Latimer
2
Contracts Completed - Final Estimate Not Processed
Contract: 130241 SH-1
Residency:
21735(04)
HEAVENER
SSP-139C(055)SS
Contractor:
C-GAWF CONSTRUCTION, INC.
Engineer:
Huddleston, David
Contract Amount:
$5,398,403.99
Letting Date:
07/25/2013
02200
Contract: 150042 US-270
28917(04)
SBR-239B(003)(016)SB
Contractor:
OBC, INC.
Engineer:
Huddleston, David
Contract Amount:
$3,237,608.59
Letting Date:
01/22/2015
02200
Residency:
HEAVENER
GRADE, DRAIN, SURFACE, AND BRIDGE SH-1:
FROM 0.50 MILE WEST OF THE
LATIMER/LEFLORE COUNTY LINE, EXTEND
WEST. PROJECT LENGTH = 0.973 MILE.
Completion Date:
Final Est Sub:
01/04/2017
BRIDGE REHABILITATION US-270: OVER
GAINES CREEK, 4.7 MI E OF THE PITTSBURG
C/L, AND OVER FOURCHE MALINE CREEK, 4.0
MI E OF SH-2 N JCT.
Completion Date:
Final Est Sub:
02/16/2017
Contract: 150140 CO.RD.
Residency:
28611(04)
02013
CIRB-239C(021)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
JOB CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$2,349,687.38
Letting Date:
04/16/2015
WIDEN AND RESURFACE COUNTY ROAD
(CRAVENS RD): FROM SH-82, EXTEND WEST.
PROJECT LENGTH = 3.503 MILES.
Contract: 150168 CO.RD.
Residency:
29982(04)
02013
STP-239D(018)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
CED3
Contract Amount:
$532,344.97
Letting Date:
05/21/2015
BRIDGE AND APPROACHES - DIVISION II
COUNTY ROAD (MOUNTAIN STATION ROAD):
OVER UNNAMED CREEK, 0.2 MILE WEST AND
0.5 MILE SOUTH OF LIMESTONE. PROJECT
LENGTH = 0.179 MILE.
Contract: 160138 CO.RD.
Residency:
28612(04)
02013
CIRB-239C(017)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$583,264.67
Letting Date:
03/17/2016
BRIDGE AND APPROACHES COUNTY ROAD
(HIGH BRIDGE ROAD/EW-143): OVER BEAVER
CREEK, 4.5 MILES WEST OF SH-2 NEAR
WILBURTON. PROJECT LENGTH = 0.138 MILE
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/11/2016
02/03/2017
12/23/2016
Page 28
Contract: 160201 SH-82
Residency:
28826(04)
STP-239C(022)SS
HEAVENER
Contractor:
T. MCDONALD CONSTRUCTION, INC.
Engineer:
Huddleston, David
Contract Amount:
$739,110.95
Letting Date:
05/19/2016
County:
02200
BRIDGE AND APPROACHES SH-82: OVER
WEST FORK CREEK, 0.08 MILES NORTHWEST
OF THE LEFLORE COUNTY LINE. PROJECT
LENGTH = 0.044 MILE
Completion Date:
Final Est Sub:
04/14/2017
Commissioner District:
Le Flore
2
Contracts Completed - Final Estimate Not Processed
Contract: 140240 US-271
27571(04)
STPY-240C(021)
Contractor:
OBC, INC.
Engineer:
Huddleston, David
Contract Amount:
$3,439,314.10
Letting Date:
07/24/2014
Residency:
HEAVENER
02200
BRIDGE REHABILITATION US-271: OVER
JACKSON CREEK AND ROCK CREEK, 2.5 AND
3.5 MILES NORTH OF THE PUSHMATAHA
COUNTY LINE.
Completion Date:
Final Est Sub:
01/04/2017
Contract: 140327 CO.RD.
Residency:
25097(04)
02013
CIRB-140D(161)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
C-GAWF CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$1,565,254.87
Letting Date:
10/16/2014
BRIDGE AND APPROACHES COUNTY ROAD
(NS-457.5): OVER BRAZIL CREEK, 4.0 MILES
SOUTH OF SH-31. PROJECT LENGTH = 0.406
MILE.
Contract: 150016 SH-63
29588(04)
STP-240C(018)SS
Contractor:
OBC, INC.
Engineer:
Huddleston, David
Contract Amount:
$3,820,024.48
Letting Date:
01/22/2015
BRIDGE REHABILITATION SH-63: OVER
BUZZARD CREEK, UNNAMED CREEK, AND
BIRNEY CREEK, 4.85 MILES EAST OF
TALIHINA.
Residency:
HEAVENER
02200
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
08/26/2015
01/05/2017
04/19/2017
Contract: 150169 CO.RD.
Residency:
28616(04)
02013
CIRCUIT ENGR. DISTR. # 3
CIRB-240D(037)RB
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
CED3
Contract Amount:
$1,041,921.80
Letting Date:
05/21/2015
BRIDGE AND APPROACHES - DIVISION II
COUNTY ROAD (E1546): OVER BIG CREEK,
0.60 MILE EAST OF HICKS. PROJECT LENGTH
= 0.134 MILE.
Contract: 150375 CO.RD.
Residency:
26897(04)
02013
STP-140C(185)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$614,772.75
Letting Date:
01/21/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-148) : OVER UNNAMED CREEK, 0.1 MILE
WEST OF NS-465 NEAR REICHERT. PROJECT
LENGTH = .064 MILE.
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
02/10/2016
03/24/2017
07/12/2016
Page 29
Contract: 150376 CO.RD.
Residency:
29934(04)
02013
STP-240C(042)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
JOB CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$1,495,558.54
Letting Date:
02/18/2016
RESURFACE (ASPHALT) COUNTY RD (OLD
SH-112/NS-475): ON OLD SH-112, FROM
NS-472 AND EW-134.5 EXTEND EAST, THEN
NORTH ON NS-475 NEAR POTEAU. PROJECT
LENGTH = 8.000 MILES
Contract: 160097 CO.RD.
Residency:
29933(04)
02013
STP-240D(039)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$346,681.62
Letting Date:
03/17/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-126): OVER A TRIBUTARY TO BUCK
CREEK, 0.50 MILE WEST OF SH-31 JUNCTION
NEAR BOKOSHE. PROJECT LENGTH = 0.119
MILE.
Contract: 170063 US-59
Residency:
32797(04)
HSIPG-207F(063)TR/HSIPG-*
MADILL
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
January, Trenton (Acting)
Contract Amount:
$166,416.00
Letting Date:
02/16/2017
SAFETY IMPROVEMENT (RUMBLE STRIP AND
PAVEMENT MARKING) US-59/US-70/US-70
BYPASS/US-270: AT MULTIPLE LOCATIONS IN
DIVISION II.
02300
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
02/21/2017
08/22/2016
05/03/2017
*261B(070)TR
County:
Commissioner District:
Lincoln
3
Contracts Completed - Final Estimate Not Processed
Contract: 130323 US-177
Residency:
24180(04)
03001
STPY-141B(166)SS
ENGR. SERV. & TESTING
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
EST
Contract Amount:
$15,999,153.37
Letting Date:
09/19/2013
WIDEN, RESURFACE, AND BRIDGE US-177:
FROM 0.74 MILE NORTH OF SH-66, EXTEND
NORTH. PROJECT LENGTH = 7.255 MILES.
Contract: 140363 CO.RD.
Residency:
30019(04)
WEWOKA
STP-241D(025)CI
Contractor:
MERIDIAN CONTRACTING, INC.
Engineer:
Helton, Matthew
Contract Amount:
$841,327.50
Letting Date:
11/20/2014
03300
BRIDGE AND APPROACHES COUNTY ROAD
(EW-93): OVER THE DEEP FORK OF THE
CANADIAN RIVER, 2.0 MILES SOUTH AND 2.0
MILES WEST OF CHANDLER. PROJECT
LENGTH = 0.170 MILE.
Contract: 160139 SH-66
29802(04)
SSR-241C(029)SR
Contractor:
THE QUAPAW COMPANY
Engineer:
Helton, Matthew
Contract Amount:
$870,234.40
Letting Date:
03/17/2016
03300
Residency:
WEWOKA
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/29/2015
03/10/2017
RESURFACE (ASPHALT) SH-66: FROM THE
SH-18 JUNCTION, EXTEND EAST IN
CHANDLER. PROJECT LENGTH = 3.470
MILES.
Completion Date:
Final Est Sub:
Construction Status Report
11/10/2015
02/24/2017
05/15/2017
Page 30
Contract: 160141 US-62
31822(04)
STP-241C(035)(036)3P
Contractor:
THE QUAPAW COMPANY
Engineer:
Helton, Matthew
Contract Amount:
$1,772,793.92
Letting Date:
03/17/2016
Residency:
WEWOKA
Contract: 160169 CO.RD.
30020(04)
ACSTP-241D(046)CI
Contractor:
H & H BRIDGE COMPANY
Engineer:
O&OE
Contract Amount:
$926,846.70
Letting Date:
04/21/2016
Residency:
03006
OLLAR & OLLAR ENGINEERING
County:
03300
RESURFACE (ASPHALT) US-62: FROM 0.2
MILES EAST OF SH-18, EXTEND EAST NEAR
MEEKER. PROJECT LENGTH = 9.800 MILES.
Completion Date:
Final Est Sub:
03/23/2017
BRIDGE AND APPROACHES COUNTY ROAD
(NS-338): OVER DEEP FORK RIVER, 0.8 MILE
SOUTH OF SH-66 NEAR WELLSTON.
PROJECT LENGTH = 0.189 MILE.
Completion Date:
Final Est Sub:
03/22/2017
Commissioner District:
Logan
4
Contracts Completed - Final Estimate Not Processed
Contract: 150417 I-35
Residency:
31813(04)
SSP-3500(027)(028)(029)SS
STILLWATER
Contractor:
T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Buchanan, Seth
Contract Amount:
$9,779,234.00
Letting Date:
11/19/2015
County:
04500
RESURFACE (ASPHALT) I-35: FROM 0.75 MILE
NORTH OF US-77 IN GUTHRIE, EXTEND
NORTH. PROJECT LENGTH = 16.370 MILES.
Completion Date:
Final Est Sub:
12/27/2016
Commissioner District:
Love
7
Contracts Completed - Final Estimate Not Processed
Contract: 130191 I-35
Residency:
28584(07)
07200
SSP-243N(002)SS
ARDMORE
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Fuhrmann, Chris
Contract Amount:
$7,484,000.00
Letting Date:
05/16/2013
GRADE, DRAIN, SURFACE, AND BRIDGE I-35:
NORTH HALF OF INTERCHANGE AT WINSTAR
BOULEVARD (PHASE 2). PROJECT LENGTH =
0.996 MILE.
Contract: 140152 CO.RD.
25091(04)
CIRB-143C(088)RB
Contractor:
OVERLAND CORPORATION
Engineer:
Fuhrmann, Chris
Contract Amount:
$4,663,483.55
Letting Date:
04/17/2014
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (OSWALT ROAD): FROM
NS-324, EXTEND EAST. PROJECT LENGTH =
4.688 MILES.
Residency:
ARDMORE
Contract: 160350 IS-35
Residency:
32664(04)
HSIPG-210N(054)TR
ARDMORE
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Fuhrmann, Chris
Contract Amount:
$170,543.28
Letting Date:
10/20/2016
07200
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
07200
Construction Status Report
09/08/2016
04/25/2017
01/20/2017
03/24/2017
STRIPING AND PAVEMENT MARKING I-35:
FROM THE TEXAS STATE LINE, EXTEND
NORTH.
Completion Date:
Final Est Sub:
03/23/2017
05/15/2017
Page 31
County:
Commissioner District:
Major
6
Contracts Completed - Final Estimate Not Processed
Contract: 130280 US-412
Residency:
10067(08)
06100
NHPPY-247N(002)SS
BUFFALO
Contractor:
KOSS CONSTRUCTION COMPANY & SUBSIDIARY
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$8,309,834.13
Letting Date:
08/22/2013
GRADE, DRAIN, AND SURFACE US-412/SH-15:
FROM THE WOODWARD COUNTY LINE,
EXTEND EAST. PROJECT LENGTH = 2.150
MILES.
Contract: 140243 CO.RD.
Residency:
06009
28353(04)
CIRCUIT ENGR. DISTR. # 8
STP-247D(011)CI
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
CED8
Contract Amount:
$732,865.60
Letting Date:
07/24/2014
BRIDGE AND APPROACHES COUNTY ROAD
(NS-228): OVER CUDDY CREEK, 5.1 MILES
NORTH OF US-412, AND 3.5 MILES WEST OF
US-281. PROJECT LENGTH = 0.197 MILE.
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/12/2017
09/27/2016
Commissioner District:
Marshall
2
Contracts Completed - Final Estimate Not Processed
Contract: 150182 CO.RD.
29990(04)
CIRB-248D(021)(022)RB
Contractor:
OVERLAND CORPORATION
Engineer:
CED3
Contract Amount:
$1,944,925.99
Letting Date:
05/21/2015
Residency:
02013
CIRCUIT ENGR. DISTR. # 3
Completion Date:
Final Est Sub:
Contract: 150338 CO.RD.
Residency:
25105(04)
02013
CIRB-148C(065)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION
Engineer:
CED3
Contract Amount:
$3,208,254.91
Letting Date:
10/15/2015
County:
RESURFACE (ASPHALT) - DIVISION II COUNTY
ROAD (MCMILLIAN RD): FROM SH-32 NEAR
LEBANON, EXTEND NORTH. PROJECT
LENGTH = 8.900 MILE.
04/12/2016
03/10/2017
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-200/LINN ROAD): BEGIN 5.0 MILES
EAST OF SH-99, EXTEND EAST AND SOUTH
CO.,
JV PROJECT LENGTH = 4.956
NEARINC
MADILL.
MILES.
Completion Date:
Final Est Sub:
07/28/2016
Commissioner District:
Mayes
8
Contracts Completed - Final Estimate Not Processed
Contract: 130328 SH-28
Residency:
08004
21909(04)
JACOBS ENGINEERING
STPY-149C(076)
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
JACOBS
Contract Amount:
$6,469,597.75
Letting Date:
09/19/2013
Construction Status Report
BRIDGE AND APPROACHES SH-28: OVER
ROCK CREEK, 4.5 MILES EAST OF US-69.
PROJECT LENGTH = 1.281 MILES.
Completion Date:
Final Est Sub:
10/20/2015
Page 32
Contract: 130329 SH-82
Residency:
21911(04)
STPY-149C(082)SS
TETRA TECH
Contractor:
JENSEN CONSTRUCTION COMPANY
Engineer:
TETR
Contract Amount:
$8,935,954.19
Letting Date:
09/19/2013
08002
BRIDGE AND APPROACHES SH-82: OVER
GRAND RIVER, 2.7 MILES NORTH OF SH-20.
PROJECT LENGTH = 0.911 MILE.
Completion Date:
Final Est Sub:
09/23/2016
Contract: 140106 CO.RD.
Residency:
27813(04)
08004
CIRB-249D(011)RB
JACOBS ENGINEERING
Contractor:
MERIDIAN CONTRACTING, INC.
Engineer:
JACOBS
Contract Amount:
$648,002.00
Letting Date:
02/20/2014
BRIDGE AND APPROACHES COUNTY ROAD
(EW-60): OVER MURPHY CREEK, 5.8 MILES
EAST OF US-412/US-69. PROJECT LENGTH =
0.110 MILES
Contract: 150184 US-69
Residency:
30589(04)
SBR-249N(022)SB
CLAREMORE
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$3,171,500.00
Letting Date:
06/18/2015
08300
BRIDGE REHABILITATION - DIVISION VIII
US-69: OVER THE UNION PACIFIC RAILROAD,
4.9 MILES NORTH OF SH-20. PROJECT
LENGTH = 0.167 MILE.
Contract: 160171 CO.RD.
Residency:
30102(04)
CIRB-249D(027)RB
CEC CORP.
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
CEC
Contract Amount:
$1,185,482.01
Letting Date:
04/21/2016
08003
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/22/2015
12/30/2016
RESURFACE (ASPHALT) COUNTY ROAD
(EW-59/OLD SH-33): FROM US-69, EXTEND
WEST NEAR CHOUTEAU. PROJECT LENGTH
= 5.433 MILES.
Completion Date:
Final Est Sub:
01/20/2017
Commissioner District:
McClain
3
Contracts Completed - Final Estimate Not Processed
Contract: 150206 I-35
Residency:
31325(04)
03018
HSIPIG-3500(007)
BENCHMARK CONSTR. SERVS.,
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
BCS
Contract Amount:
$234,479.25
Letting Date:
06/18/2015
Contract: 150413 US-77
Residency:
29565(04)
SSP-244N(028)SS
PURCELL
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Reed, Lucas
Contract Amount:
$1,627,067.06
Letting Date:
11/19/2015
03200
Construction Status Report
SAFETY IMPROVEMENT (CABLE BARRIER) DIVISION III I-35: FROM MILE MARKER 98.5 TO
LLC
MILE MARKER 99.5, AND FROM MILE MARKER
104.5 TO MILE MARKER 105.5 IN GOLDSBY.
Completion Date:
Final Est Sub:
09/16/2016
05/31/2017
BRIDGE REHABILITATION US-77: OVER
WALNUT CREEK, 0.1 MILE NORTH OF THE
US-77/SH-39 JUNCTION IN PURCELL.
Completion Date:
Final Est Sub:
09/30/2016
Page 33
Contract: 160099 SH-76
Residency:
30565(04)
ACSTP-244C(047)3P
PURCELL
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Reed, Lucas
Contract Amount:
$1,761,984.60
Letting Date:
03/17/2016
County:
03200
RESURFACE (ASPHALT) SH-76: FROM 6.74
MILES NORTH OF THE GARVIN COUNTY LINE,
EXTEND NORTH NEAR DIBBLE. PROJECT
LENGTH = 7.050 MILES.
Completion Date:
Final Est Sub:
01/31/2017
Commissioner District:
McCurtain
2
Contracts Completed - Final Estimate Not Processed
Contract: 150143 CO.RD.
Residency:
02013
29963(04)
CIRCUIT ENGR. DISTR. # 3
CIRB-245C(031)RB
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$3,116,984.71
Letting Date:
04/16/2015
RESURFACE (ASPHALT) COUNTY ROAD
(NS-472/GOODWATER ROAD): ON NS-472,
FROM SH-3 EXTEND NORTH, THEN EAST ON
GOODWATER ROAD. PROJECT LENGTH =
8.000 MILES.
Contract: 160037 CO.RD.
Residency:
25469(04)
02013
CIRB-145C(173)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
CED3
Contract Amount:
$4,007,243.53
Letting Date:
01/21/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-456): OVER LITTLE RIVER, 2.0 MILES
NORTH OF US-70 NEAR GARVIN. PROJECT
LENGTH = 0.558 MILE.
Contract: 160038 CO.RD.
Residency:
29909(06)
02013
STP-245C(034)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$1,389,751.17
Letting Date:
02/18/2016
RESURFACE (ASPHALT) COUNTY ROAD (OLD
SH-98): FROM 3.5 MILES NORTHWEST OF
US-70, EXTEND NORTHEAST NEAR VALIANT.
PROJECT LENGTH = 4.000 MILES.
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
05/06/2016
02/06/2017
09/16/2016
Commissioner District:
McIntosh
1
Contracts Completed - Final Estimate Not Processed
Contract: 120345 I-40
Residency:
28958(04)
IMG-040-6(375)262TR/*
SALLISAW
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Edwards, Carl
Contract Amount:
$2,661,618.14
Letting Date:
09/20/2012
01200
SAFETY IMPROVEMENT (CABLE BARRIER)
I-40: FROM MILE MARKER 256, EXTEND
EAST. PROJECT LENGTH = 15.45 MILES
Completion Date:
Final Est Sub:
10/22/2015
*HSSIPIG-040-6(378)256TR
Contract: 140104 SH-09
Residency:
21730(04)
STPY-146C(062)
MUSKOGEE
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Hagerman, Jeremy
Contract Amount:
$5,852,647.85
Letting Date:
02/20/2014
01100
Construction Status Report
BRIDGE AND APPROACHES SH-9: OVER
UNION PACIFIC RAILROAD, 0.4 MILE
SOUTHEAST OF US-69B. PROJECT LENGTH =
0.690 MILE.
Completion Date:
Final Est Sub:
12/07/2016
Page 34
Contract: 140300 US-69
Residency:
30787(04)
HSIPG-246N(011)TR
CEC CORP.
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
CEC
Contract Amount:
$3,780,404.96
Letting Date:
11/20/2014
01003
Contract: 150221 I-40
28286(04)
SBR-146N(134)SB
Contractor:
PBX CORPORATION
Engineer:
Edwards, Carl
Contract Amount:
$625,648.66
Letting Date:
06/18/2015
01200
Residency:
SALLISAW
SAFETY IMPROVEMENTS (CABLE BARRIER)
US-69: BEGIN AT THE MUSKOGEE COUNTY
LINE, EXTEND SOUTH. PROJECT LENGTH =
14.100 MILES.
Completion Date:
Final Est Sub:
BRIDGE REHABILITATION - DIVISION I I-40:
OVER PIERCE ROAD, 9.31 MILES EAST OF
THE OKMULGEE COUNTY LINE.
Completion Date:
Final Est Sub:
Contract: 150380 US-69
Residency:
27948(04)
SBR-246F(019)SB
SALLISAW
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Edwards, Carl
Contract Amount:
$899,063.76
Letting Date:
11/19/2015
01200
Contract: 150381 US-69B
Residency:
28288(05)
SBR-246N(020)SB/SBR-146N*
SALLISAW
Contractor:
GIBSON & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$1,774,684.85
Letting Date:
11/19/2015
01200
01/28/2017
02/03/2016
05/03/2017
BRIDGE REHABILITATION
US-69/LOTAHWATAH ROAD: MULTIPLE
LOCATIONS IN DIVISION I.
Completion Date:
Final Est Sub:
01/25/2017
BRIDGE REHABILITATION US-69B: OVER
US-69, 3.18 MILES AND 6.33 MILES NORTH OF
THE PITTSBURG COUNTY LINE IN EUFAULA.
Completion Date:
Final Est Sub:
03/03/2017
*(135)SB
Contract: 160040 SH-09
Residency:
28281(05)
SSR-146C(133)SR/SSR-246C*
MUSKOGEE
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$2,748,023.80
Letting Date:
01/21/2016
01100
RESURFACE (ASPHALT) SH-9: FROM 7.0
MILES EAST OF THE HUGHES COUNTY LINE,
EXTEND EAST NEAR EUFAULA. PROJECT
LENGTH = 16.476 MILES.
Completion Date:
Final Est Sub:
02/07/2017
*(016)SR
Contract: 160041 I-40
28286(05)
SBR-246N(002)SB
Contractor:
C3 CONSTRUCTION, INC.
Engineer:
Edwards, Carl
Contract Amount:
$775,848.57
Letting Date:
01/21/2016
County:
Residency:
SALLISAW
01200
BRIDGE REHABILITATION I-40: OVER SH-150,
5.8 MILES WEST OF US-69 NEAR CHECOTAH.
Completion Date:
Final Est Sub:
03/03/2017
Commissioner District:
Murray
7
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 35
Contract: 130392 CO.RD.
Residency:
25418(04)
07018
CIRB-150D(074)RB
BENCHMARK CONSTR. SERVS.,
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
BCS
Contract Amount:
$7,479,000.00
Letting Date:
02/20/2014
GRADE, DRAIN, SURFACE, AND BRIDGE
COUNTY ROAD (EW-175): OVER B.N.S.F.
LLC
RAILROAD AND DRY SANDY CREEK, 2.0
MILES SOUTH OF DAVIS. PROJECT LENGTH
= 5.324 MILES.
Contract: 150208 I-35
Residency:
31558(04)
07018
HSIPIG-3500(010)TR
BENCHMARK CONSTR. SERVS.,
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
BCS
Contract Amount:
$1,386,375.12
Letting Date:
06/18/2015
SAFETY IMPROVEMENT (CABLE BARRIER) DIVISION VII I-35: FROM MILE MARKER 44,
LLC
EXTEND NORTH NEAR TURNER FALLS.
PROJECT LENGTH = 7.08 MILES.
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
11/21/2016
10/03/2016
Commissioner District:
Muskogee
1
Contracts Completed - Final Estimate Not Processed
Contract: 140366 US-69
Residency:
29786(04)
SBR-251N(028)SB
MUSKOGEE
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Hagerman, Jeremy
Contract Amount:
$1,410,133.68
Letting Date:
11/20/2014
01100
Contract: 150300 US-64
Residency:
31666(04)
STP-251F(040)3B
SALLISAW
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Edwards, Carl
Contract Amount:
$580,543.10
Letting Date:
09/17/2015
01200
BRIDGE REHABILITATION US-69: OVER THE
ARKANSAS RIVER, 3.4 MILES NORTH OF
US-62.
Completion Date:
Final Est Sub:
01/25/2016
05/11/2017
JOINT SEAL/REPAIR
US-64/SH-9/SH-16/SH-51/SH-82: AT MULTIPLE
LOCATIONS IN DIVISION I.
Completion Date:
Final Est Sub:
08/03/2016
05/30/2017
Contract: 150383 CO.RD.
Residency:
29375(04)
01017
CIRCUIT ENGR. DISTR. # 2
CIRB-251D(041)RB
Contractor:
MCGUIRE BROTHERS CONSTRUCTION, INC.
Engineer:
CE2
Contract Amount:
$440,125.15
Letting Date:
11/19/2015
BRIDGE AND APPROACHES COUNTY ROAD
(EW-095): OVER BUTLER CREEK, 1.4 MILES
EAST OF US-69 NEAR SUMMIT. PROJECT
LENGTH = 0.226 MILE.
Contract: 160145 CO.RD.
Residency:
27425(04)
01017
CIRB-251D(053)RB
CIRCUIT ENGR. DISTR. # 2
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
CE2
Contract Amount:
$810,844.82
Letting Date:
03/17/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-110): OVER SOUTH FORK CREEK, 3.0
MLES EAST OF SH-2 NEAR WEBBERS FALLS.
PROJECT LENGTH = 0.359 MILE
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
06/16/2016
12/29/2016
Page 36
Contract: 160172 CO.RD.
28518(04)
CIRB-251D(052)RB
Contractor:
H & H BRIDGE COMPANY
Engineer:
CE2
Contract Amount:
$478,028.79
Letting Date:
04/21/2016
Residency:
01017
CIRCUIT ENGR. DISTR. # 2
Contract: 160173 US-64
30649(04)
NHPP-251N(055)SS
Contractor:
NOVA PAINTINGS, LLC
Engineer:
EST
Contract Amount:
$385,288.00
Letting Date:
04/21/2016
Residency:
01001
ENGR. SERV. & TESTING
Completion Date:
Final Est Sub:
01100
11/30/2016
BRIDGE PAINTING US-64: OVER THE UNION
PACIFIC RAILROAD, 0.2 MILE SOUTH OF THE
US-165 JUNCTION IN MUSKOGEE.
Completion Date:
Final Est Sub:
Contract: 160374 CO. RD.
Residency:
31784(04)
SAP-251N(063)
MUSKOGEE
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$89,840.00
Letting Date:
10/20/2016
County:
BRIDGE AND APPROACHES COUNTY RD
(NS-436): OVER SOUTH FORK CREEK, 6.0
MILES NORTH OF THE SH-2 JUNCTION NEAR
PORUM. PROJECT LENGTH = 0.208 MILE
02/03/2017
BRIDGE REPAIR COUNTY ROAD (EW-96):
VEHICLE IMPACT DAMAGE OVER US-69, 5.0
MILES NORTH OF THE MCINTOSH COUNTY
LINE.
Completion Date:
Final Est Sub:
02/28/2017
Commissioner District:
Nowata
8
Contracts Completed - Final Estimate Not Processed
Contract: 090566 US-169
Residency:
09488(04)
08300
NHY-030N(011)
CLAREMORE
Contractor:
DONDLINGER & SONS CONSTRUCTION CO., INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$12,216,022.60
Letting Date:
10/15/2009
GRADE, DRAIN, SURFACE AND BRIDGE
US-169: FROM TALALA, EXTEND NORTH TO
THE NOWATA COUNTY LINE. PROJECT
LENGTH = 5.246 MILES.
Contract: 110441 US-169
Residency:
23129(04)
BRFY-153N(147)
CLAREMORE
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$3,277,995.45
Letting Date:
09/15/2011
BRIDGE REHABILITATION US-169: OVER
CALIFORNIA CREEK, 3.5 MILES NORTH OF
THE US-60 JUNCTION. PROJECT LENGTH =
0.275 MILE.
Contract: 150385 CO.RD.
28556(04)
STP-253D(030)CI/STP-174D*
Contractor:
RRY SERVICES, LLC
Engineer:
C&KI
Contract Amount:
$1,242,029.25
Letting Date:
11/19/2015
08300
Residency:
08007
CRAIG & KEITHLINE, INC.
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
09/05/2012
01/12/2017
07/19/2013
BRIDGE AND APPROACHES COUNTY RD
(NS-411): OVER OPPOSUM CR, 2.1 MI S OF
KANSAS S/L. COUNTY RD (NS-401): OVER
UNNAMED CR, 1.9 MI S OF KANSAS S/L.
PROJECT LENGTH = 0.428 MILE
Completion Date:
Final Est Sub:
02/10/2017
*(049)CI
Construction Status Report
Page 37
Contract: 160102 CO.RD.
Residency:
27814(04)
08007
CIRB-253C(031)RB
CRAIG & KEITHLINE, INC.
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
C&KI
Contract Amount:
$1,569,465.40
Letting Date:
02/18/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-406): OVER CURL CREEK, 1.5 MILES
SOUTH OF US-60 NEAR NOWATA. PROJECT
LENGTH = 0.672 MILE.
Contract: 160103 CO.RD.
27817(04)
CIRB-153D(204)RB
Contractor:
H & H BRIDGE COMPANY
Engineer:
C&KI
Contract Amount:
$559,927.17
Letting Date:
02/18/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-409): OVER OPOSSUM CREEK, 1.5 MILES
SOUTH OF THE KANSAS STATE LINE NEAR
NOWATA. PROJECT LENGTH = 0.249 MILE.
County:
Residency:
08007
CRAIG & KEITHLINE, INC.
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
02/10/2017
11/15/2016
04/26/2017
Commissioner District:
Okfuskee
3
Contracts Completed - Final Estimate Not Processed
Contract: 130283 CO.RD.
Residency:
25425(04)
CIRB-154C(120)RB
WEWOKA
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Helton, Matthew
Contract Amount:
$3,611,768.88
Letting Date:
08/22/2013
03300
Contract: 160253 CO.RD.
Residency:
30673(04)
CIRB-254C(034)RB
WEWOKA
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Helton, Matthew
Contract Amount:
$1,387,223.17
Letting Date:
07/21/2016
03300
County:
GRADE, DRAIN, AND SURFACE COUNTY RD
(EW-96/MICAWBER RD): BEGIN 10.0 MI W OF
SH-48 AND 1.0 MI S OF THE OKFUSKEE C/L,
EXTEND EAST. PROJECT LENGTH = 4.015
MILES.
Completion Date:
Final Est Sub:
05/04/2016
RESURFACE (ASPHALT) COUNTY ROAD
(NS-377): FROM SH-56, EXTEND NORTH IN
OKEMAH. PROJECT LENGTH = 4.661 MILES.
Completion Date:
Final Est Sub:
12/01/2016
Commissioner District:
Oklahoma
4
Contracts Completed - Final Estimate Not Processed
GRADE, DRAIN, SURFACE, BRIDGE, AND
Contract: 090501 I-40
Residency:
04200
17428(22)
RAILROAD I-40: FROM EAST OF WESTERN
EL RENO
OKCY-XTWN(003)TI
AVENUE, EXTEND EAST. PROJECT LENGTH =
Contractor:
ALLEN CONTR., INC./SHERWOOD CONST. CO, INC./MANHATTAN
&
1.072RD.
MILES.
Engineer:
Harlin, Chris
Contract Amount:
$63,211,594.70
Completion Date:
08/22/2014
Letting Date:
07/23/2009
Final Est Sub:
04/10/2017
Contract: 120279 I-40
Residency:
17428(80)
OKCY-XTWN(070)
EL RENO
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
Harlin, Chris
Contract Amount:
$8,269,050.20
Letting Date:
06/20/2013
04200
Construction Status Report
GRADE, DRAIN, SURFACE, AND BRIDGE I-40:
FROM PENNSYLVANIA AVENUE EXTEND
EAST TO WESTERN AVENUE. PROJECT
LENGTH = 0.924 MILE.
Completion Date:
Final Est Sub:
07/24/2014
05/11/2017
Page 38
Contract: 130249 I-40
Residency:
17428(59)
04600
OKCY-XTWN(047)SS
OKLAHOMA CITY
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Howell, Terry
Contract Amount:
$26,470,991.89
Letting Date:
09/19/2013
GRADE, DRAIN, SURFACE, AND BRIDGE I-40:
MULTIPLE RAMPS AND BRIDGES AT THE
I-35/I-235 JUNCTION. PROJECT LENGTH =
1.530 MILES.
Contract: 140059 CT.ST.
Residency:
29309(04)
04600
STP-255A(087)AG
OKLAHOMA CITY
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Howell, Terry
Contract Amount:
$3,041,862.75
Letting Date:
03/20/2014
SAFETY IMPROVEMENT (I.T.S.) CITY STREET
(2ND STREET/EDMOND ROAD): INTELLIGENT
TRANSPORTATION CORRIDOR FROM SANTA
FE AVENUE TO SAINTS BOULEVARD IN
EDMOND. PROJECT LENGTH = 5.453 MILES.
Contract: 140271 I-44
30423(04)
NHPPIY-0044-1(130)
Contractor:
RESTEK, INC.
Engineer:
Harlin, Chris
Contract Amount:
$2,598,314.45
Letting Date:
08/21/2014
BRIDGE REHABILITATION I-44: ON THE BELLE
ISLE BRIDGES AND RAMPS BETWEEN
WESTERN AVE AND PENNSYLVANIA AVE IN
OKLAHOMA CITY.
Residency:
EL RENO
04200
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Contract: 140332 SH-74
Residency:
14964(04)
STPY-055C(861)SS
EDMOND
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Hubbard, Tom
Contract Amount:
$32,403,535.17
Letting Date:
10/16/2014
04400
10/19/2016
04/24/2017
03/29/2016
04/17/2017
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-74: FROM MEMORIAL ROAD, EXTEND
NORTH. PROJECT LENGTH = 3.181 MILES.
Completion Date:
Final Est Sub:
10/26/2016
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
Contract: 150026 CT.ST.
Residency:
17428(60)
04600
STREET (OKC BOULEVARD): E.K. GAYLORD
OKC-XTWN(048)(006)SS
OKLAHOMA CITY
BLVD. FROM RENO AVE., EXTEND SOUTH.
Contractor:
ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC.OKC
(JV)BOULEVARD AND 3RD ST. FROM
B.N.S.F. RAILROAD, EXTEND EAST TO
Engineer:
Howell, Terry
NORTHBOUND I-35. PROJECT LENGTH =
Contract Amount:
$40,611,253.81
1.184
MILES.
Completion
Date:
02/02/2017
Letting Date:
01/22/2015
Final Est Sub:
Contract: 150108 CT.ST.
Residency:
17827(05)
STP-155A(878)AG
EDMOND
Contractor:
SCHWARZ PAVING CO., INC.
Engineer:
Hubbard, Tom
Contract Amount:
$3,043,565.50
Letting Date:
03/19/2015
04400
Contract: 150109 CT.ST.
Residency:
04001
19312(05)
ENGR. SERV. & TESTING
STP-155A(439)AG
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION
Engineer:
EST
Contract Amount:
$11,730,824.57
Letting Date:
05/21/2015
Construction Status Report
INTERSECTION MODIFICATION CITY
STREETS: AT THE INTERSECTION OF
MACARTHUR AVENUE AND N.W. 50TH
STREET IN WARR ACRES. PROJECT LENGTH
= 0.223 MILE.
Completion Date:
Final Est Sub:
12/09/2016
05/04/2017
GRADE, DRAIN, SURFACE, AND BRIDGE DIVISION IV CITY STREETS: ON MERIDIAN
AVE, FROM SW 29TH TO THE OKLAHOMA
CO.,
INC
JV
RIVER
IN OKLAHOMA
CITY. PROJECT
LENGTH = 1.253 MILES.
Completion Date:
Final Est Sub:
05/31/2017
Page 39
INTERSECTION MODIFICATION AND TRAFFIC
Contract: 150111 US-77
Residency:
25547(04)
04400
SIGNAL US-77 (BROADWAY EXTENSION): AT
STP-155A(646)AG
EDMOND
THE INTERSECTION OF 33RD STREET IN
Contractor:
ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC.EDMOND.
(JV)
PROJECT LENGTH = 0.678 MILE.
Engineer:
Hubbard, Tom
Contract Amount:
$5,144,114.00
Completion Date:
02/03/2017
Letting Date:
03/19/2015
Final Est Sub:
Contract: 150249 I-44
Residency:
31623(04)
SSP-4400(007)SS
EL RENO
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Harlin, Chris
Contract Amount:
$13,479,630.70
Letting Date:
05/20/2015
04200
BRIDGE REHABILITATION I-44: BRIDGE
REHABILITATION ON BELLE ISLE BRIDGES,
1.0 MILE WEST OF I-235.
Completion Date:
Final Est Sub:
04/11/2016
Contract: 150339 I-35
Residency:
21034(05)
04600
HSIPG-3500(013)IT
OKLAHOMA CITY
Contractor:
TRAFFIC & LIGHTING SYSTEMS, LLC
Engineer:
Howell, Terry
Contract Amount:
$1,339,751.30
Letting Date:
10/15/2015
SAFETY IMPROVEMENT (ITS) I-35/I-235: AT
MULTIPLE LOCATIONS IN OKLAHOMA CITY.
Contract: 150390 SH-66
Residency:
29137(04)
04600
SBR-255A(017)SS/SBR-255N*
OKLAHOMA CITY
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Howell, Terry
Contract Amount:
$1,397,464.33
Letting Date:
11/19/2015
BRIDGE REHABILITATION SH-66: SH-66
WESTBOUND RAMP OVER SH-3 IN OKC. NW
10TH ST: OVER I-44, 0.10 MILE EAST OF
PORTLAND AVE IN OKC. PROJECT LENGTH =
0.062 MILE.
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/18/2017
07/31/2016
*(019)SB
Contract: 150421 I-240
Residency:
31818(04)
04600
SSP-2400(003)SS/SSP-4000*
OKLAHOMA CITY
Contractor:
T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Howell, Terry
Contract Amount:
$8,899,400.00
Letting Date:
11/19/2015
RESURFACE (ASPHALT) I-40/I-240: AT
MULTIPLE LOCATIONS IN OKLAHOMA CITY.
PROJECT LENGTH = 14.653 MILES.
Completion Date:
Final Est Sub:
10/03/2016
*(020)(021)SS
Contract: 160048 I-40
23310(07)
NHPPI-4000-(019)RW
Contractor:
MARK WILDS
Engineer:
Howell, Terry
Contract Amount:
$49,300.00
Letting Date:
01/21/2016
Residency:
04600
OKLAHOMA CITY
Contract: 160052 CT.ST.
31499(04)
STP-255B(349)AG
Contractor:
ATLAS PAVING COMPANY
Engineer:
Howell, Terry
Contract Amount:
$704,479.30
Letting Date:
01/21/2016
Residency:
04600
OKLAHOMA CITY
RIGHT-OF-WAY CLEARANCE I-40: FROM 2.3
MILES EAST OF I-35, EXTEND EAST IN DEL
CITY. PROJECT LENGTH = 0.830
MILEPREQUALIFICATION FOR THIS PROJECT
HAS BEEN WAIVED. BOTH BID EXPRESS AND
WRITTEN BIDS WILL BE ACCEPTABLE.
Completion Date:
Final Est Sub:
Construction Status Report
03/13/2017
RESURFACE (ASPHALT) CITY STREET
(NORTH ROCKWELL AVENUE): FROM WEST
RENO AVENUE, EXTEND NORTH. PROJECT
LENGTH = 1.032 MILES
Completion Date:
Final Est Sub:
10/06/2016
Page 40
Contract: 160105 I-40
30282(06)
STP-NBIP(496)3B
Contractor:
JK INDUSTRIES, INC.
Engineer:
TETR
Contract Amount:
$845,756.00
Letting Date:
03/17/2016
Residency:
TETRA TECH
Contract: 160146 CT.ST.
30424(04)
SSP-255A(351)SS/SBR-255N*
Contractor:
PBX CORPORATION
Engineer:
Howell, Terry
Contract Amount:
$2,598,687.09
Letting Date:
03/17/2016
Residency:
04600
OKLAHOMA CITY
04002
BRIDGE PAINTING I-40/US-62/SH-33/SH-152:
AT MULTIPLE LOCATIONS IN DIVISION IV.
Completion Date:
Final Est Sub:
02/02/2017
BRIDGE REHABILITATION LINCOLN BLVD:
OVER DEEP FORK CREEK, 0.1 MI S OF I-44 IN
OKC. I-240: OVER WESTMINSTER ROAD, 2.9
MILES W OF I-40 IN OKC.
Completion Date:
Final Est Sub:
04/06/2017
*(361)SB
Contract: 160148 I-35
Residency:
31023(04)
SSP-255F(378)SS
PERRY
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Zachary, Ted
Contract Amount:
$1,555,819.00
Letting Date:
06/16/2016
04100
Contract: 160205 I-35
32384(04)
HSIPIG-255H(366)TR
Contractor:
JLT CONTRACTING, LLC
Engineer:
Harlin, Chris
Contract Amount:
$275,254.00
Letting Date:
06/16/2016
04200
County:
Residency:
EL RENO
PAVEMENT REHABILITATION
I-35/US-77/SH-74/SH-132/SH-152: AT MULTIPLE
LOCATIONS IN DIVISION IV.
Completion Date:
Final Est Sub:
03/08/2017
SAFETY IMPROVEMENT (IMPACT
ATTENUATORS) I-35/I-40/I-44/I-240: AT
MULTIPLE LOCATIONS IN DIVISION IV.
Completion Date:
Final Est Sub:
12/24/2016
Commissioner District:
Okmulgee
1
Contracts Completed - Final Estimate Not Processed
PAVEMENT REHABILITATION AND BRIDGE
Contract: 110492 I-40
Residency:
20908(05)
01100
PAINTING I-40: FROM US-75 EXTEND EAST.
MUSKOGEE
IMY-0040-6(370)233/IMY-*
PROJECT LENGTH = 6.347 MILES.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Hagerman, Jeremy
Contract Amount:
$24,494,383.94
Completion Date:
01/31/2014
Letting Date:
10/20/2011
Final Est Sub:
04/18/2017
PAVEMENT REHABILITATION - DIVISION I
Contract: 150175 I-40
Residency:
27970(04)
01100
I-40/US-75B: ON I-40, FROM MILE MARKER
NHPPI-4000-(005)SS/HSIPI*
MUSKOGEE
237.41 EXTEND EAST, AND ON US-75B, FROM
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
INC JV NORTHEAST IN HENRYETTA.
I-40 EXTEND
PROJECT LENGTH = 7.020 MILES.
Engineer:
Hagerman, Jeremy
Contract Amount:
$15,602,123.20
Completion Date:
02/01/2017
Letting Date:
05/21/2015
Final Est Sub:
*G-0040-6(380)238TR
Construction Status Report
Page 41
Contract: 160106 US-75
Residency:
29164(04)
ACNHPP-256N(012)3P
MUSKOGEE
Contractor:
IOWA CIVIL CONTRACTING, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$1,553,249.79
Letting Date:
03/17/2016
County:
01100
PAVEMENT REHABILITATION (P.C.
CONCRETE) US-75: FROM THE SH-16 JCT,
EXTEND NORTH NEAR WINCHESTER.
PROJECT LENGTH = 7.835 MILES.
Completion Date:
Final Est Sub:
01/05/2017
Commissioner District:
Osage
8
Contracts Completed - Final Estimate Not Processed
Contract: 130395 US-60
Residency:
08400
24287(04)
SAND SPRINGS
NHPPY-257N(020)SS
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Williams, Mark J.
Contract Amount:
$36,982,702.17
Letting Date:
11/21/2013
GRADE, DRAIN, SURFACE, AND BRIDGE
US-60: FROM 2.0 MILES EAST OF SH-99,
EXTEND EAST. PROJECT LENGTH = 5.821
MILES.
Contract: 150185 SH-18
29765(04)
SBR-257B(041)SB
Contractor:
PBX CORPORATION
Engineer:
Williams, Mark J.
Contract Amount:
$695,185.20
Letting Date:
05/21/2015
BRIDGE REHABILITATION - DIVISION VIII
SH-18: OVER LITTLE CHIEF CREEK, 2.5 MILES
SOUTH OF US-60 NEAR BURBANK.
Residency:
08400
SAND SPRINGS
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
01/30/2017
05/31/2017
Contract: 150239 US-60
Residency:
27088(04)
08400
NHPP-257N(034)SS
SAND SPRINGS
Contractor:
A. M. COHRON & SON, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$2,789,326.82
Letting Date:
07/23/2015
BRIDGE REHABILITATION US-60: OVER
CLEAR CREEK, 1.5 MILES WEST OF SH-99
NEAR PAWHUSKA. PROJECT LENGTH = 0.110
MILE.
Contract: 160392 US-60
Residency:
32801(04)
08020
POE AND ASSOCIATES
HSIPG-258F(029)TR
Contractor:
DIRECT TRAFFIC CONTROL INC.
Engineer:
ZPAA
Contract Amount:
$83,697.14
Letting Date:
10/20/2016
SAFETY IMPROVEMENT (RUMBLE STRIP AND
PAVEMENT MARKING) US-59/US-60/SH-99: AT
MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 20.00 MILES
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
05/16/2017
05/11/2017
Commissioner District:
Ottawa
8
Contracts Completed - Final Estimate Not Processed
Contract: 120435 US-60
Residency:
23157(04)
BRFY-158B(104)
CLAREMORE
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$1,799,981.12
Letting Date:
11/15/2012
08300
Construction Status Report
BRIDGE REHABILITATION US-60: OVER US-59
7.5 MILES NORTHWEST OF THE DELAWARE
COUNTY LINE. PROJECT LENGTH = 0.148
MILES.
Completion Date:
Final Est Sub:
06/30/2015
Page 42
Contract: 130335 SH-10
Residency:
21918(04)
08007
STPY-158C(077)
CRAIG & KEITHLINE, INC.
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
C&KI
Contract Amount:
$3,307,070.67
Letting Date:
09/19/2013
BRIDGE AND APPROACHES SH-10: OVER
SYCAMORE CREEK, 8.3 MILES NORTH OF
THE DELAWARE COUNTY LINE. PROJECT
LENGTH = 0.487 MILES
Contract: 130396 CO.RD.
Residency:
25092(04)
STP-158C(147)CI
GARVER, LLC.
Contractor:
A. M. COHRON & SON, INC.
Engineer:
GARV
Contract Amount:
$4,796,045.57
Letting Date:
11/21/2013
BRIDGE AND APPROACHES COUNTY ROAD
(EW-6): OVER NEOSHO RIVER, 2.3 MILES
EAST OF THE CRAIG COUNTY LINE.
PROJECT LENGTH = 0.593 MILE.
08011
Contract: 150240 CO.RD.
Residency:
29417(04)
08004
STP-258D(017)CI
JACOBS ENGINEERING
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
JACOBS
Contract Amount:
$609,343.06
Letting Date:
11/19/2015
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/29/2016
12/01/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-456): OVER HUDSON CREEK, 1.6 MILES
SOUTH OF THE WILL ROGERS TURNPIKE
NEAR MIAMI. PROJECT LENGTH = 0.192 MILE.
Completion Date:
Final Est Sub:
12/27/2016
Commissioner District:
Pawnee
8
Contracts Completed - Final Estimate Not Processed
Contract: 130377 SH-18
20895(04)
STPY-159B(036)
Contractor:
OBC, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$13,224,284.02
Letting Date:
10/17/2013
Residency:
08400
SAND SPRINGS
BRIDGE AND APPROACHES SH-18: OVER
ARKANSAS RIVER, FROM EAST EDGE OF THE
TOWN OF RALSTON, EXTEND EAST AND
NORTH. PROJECT LENGTH = 0.946 MILE.
Completion Date:
Final Est Sub:
09/12/2016
Contract: 150322 US-64
Residency:
30320(04)
08400
NHPP-259N(015)SS
SAND SPRINGS
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$3,463,503.96
Letting Date:
09/17/2015
RETAINING AND SOUND WALLS US-64:
BEGIN 1.0 MILE EAST OF THE US-64/US-412
JUNCTION, EXTEND EAST NEAR WESTPORT.
PROJECT LENGTH = 0.247 MILE
Contract: 160110 CO.RD.
29928(04)
CIRB-259D(027)RB
Contractor:
K & R BUILDERS, INC.
Engineer:
JACOBS
Contract Amount:
$668,869.25
Letting Date:
02/18/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-359): OVER A TRIBUTARY TO KENNY
CREEK, 2.0 MILES SOUTH OF US-412 NEAR
JENNINGS. PROJECT LENGTH = 0.132 MILE
County:
Residency:
08004
JACOBS ENGINEERING
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
03/29/2017
01/18/2017
Commissioner District:
Payne
4
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 43
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 150241 CO.RD.
Residency:
22169(09)
04500
ROAD (NS-330/COUNTRY CLUB ROAD): FROM
CIRB-160D(183)RB
STILLWATER
1.3 MILES NORTH OF SH-51 IN STILLWATER,
Contractor:
ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC.EXTEND
(JV) NORTH. PROJECT LENGTH = 0.994
MILE.
Engineer:
Buchanan, Seth
Contract Amount:
$3,951,766.42
Completion Date:
12/19/2016
Letting Date:
07/23/2015
Final Est Sub:
03/27/2017
Contract: 150393 CT.ST.
Residency:
31415(04)
STP-260B(019)MS
STILLWATER
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
Buchanan, Seth
Contract Amount:
$5,329,157.92
Letting Date:
11/19/2015
County:
04500
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET: ON WESTERN RD, FROM HALL OF
FAME AVE EXT N, AND ON HALL OF FAME
AVE, FROM VIRGINIA AVE EXT E IN
STILLWATER. PROJECT LENGTH = 0.691
MILE.
Completion Date:
Final Est Sub:
05/03/2017
Commissioner District:
Pittsburg
2
Contracts Completed - Final Estimate Not Processed
Contract: 150213 CT.ST.
28995(04)
PLHD-261N(013)DC
Contractor:
L & N BRIDGE, LLC
Engineer:
Plymate, Larry
Contract Amount:
$6,324,152.87
Letting Date:
06/18/2015
Residency:
MCALESTER
02400
INTERCHANGE - DIVISION II CITY STREET
(C-TREE ROAD): AT THE US-69
INTERCHANGE, IN SAVANNA. PROJECT
LENGTH = 0.255 MILE.
Completion Date:
Final Est Sub:
05/24/2017
Contract: 150242 CO.RD.
Residency:
22949(04)
02013
STP-161C(164)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
CED3
Contract Amount:
$756,403.28
Letting Date:
07/23/2015
BRIDGE AND APPROACHES COUNTY ROAD
(NS-399.5); OVER BULL CREEK, 1.0 MILE
SOUTH AND 3.0 MILES EAST OF SCIPIO.
PROJECT LENGTH = 0.245 MILE.
Contract: 150394 CO.RD.
Residency:
22491(04)
02013
STP-161D(155)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$372,190.50
Letting Date:
01/21/2016
BRIDGE AND APPROACHES COUNTY ROAD
(NS-418): OVER UNNAMED CREEK, 5.0 MILES
NORTH OF THE PUSHMATAHA COUNTY LINE
NEAR HARTSHORNE. PROJECT LENGTH =
0.161 MILE.
Contract: 150398 CO.RD.
Residency:
29994(04)
02013
CIRB-261C(040)(041)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
JOB CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$1,761,627.82
Letting Date:
11/19/2015
RESURFACE (ASPHALT) COUNTY
RD(TANNEHILL RD): FROM INDIAN NATION
TPK, EXT WEST. COUNTY RD(SCIPIO RD):
FROM TANNEHILL RD, EXT NORTH. PROJECT
LENGTH = 8.353 MILES.
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
07/12/2016
06/14/2016
08/11/2016
Page 44
Contract: 160056 SH-09
Residency:
24333(13)
STP-NBIP(493)SS
TETRA TECH
Contractor:
ELITE INDUSTRIAL PAINTING, INC.
Engineer:
TETR
Contract Amount:
$697,314.00
Letting Date:
01/21/2016
02002
Contract: 160176 SH-09
Residency:
30409(04)
STP-261C(058)SS
MCALESTER
Contractor:
T. MCDONALD CONSTRUCTION, INC.
Engineer:
Plymate, Larry
Contract Amount:
$1,349,928.35
Letting Date:
04/21/2016
02400
Completion Date:
Final Est Sub:
07/25/2016
02/06/2017
INTERSECTION MODIFICATION SH-9: AT THE
INTERSECTION OF SH-9A, NEAR EUFAULA.
PROJECT LENGTH = 0.639 MILE.
Completion Date:
Final Est Sub:
Contract: 160297 CO.RD.
Residency:
22538(04)
02013
STP-161D(157)CI
CIRCUIT ENGR. DISTR. # 3
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
CED3
Contract Amount:
$346,958.00
Letting Date:
08/18/2016
County:
BRIDGE PAINTING SH-9: OVER LONGTOWN
CREEK, 3.3 MI EAST OF THE MCINTOSH C/L.
SH-31: OVER BLUE CREEK, 13.05 MI EAST OF
THE US-270 JCT.
05/05/2017
BRIDGE AND APPROACHES COUNTY ROAD
(D1645): OVER BUCK CREEK, 1.1 MILES
SOUTHEAST OF THE INDIAN NATION
TURNPIKE NEAR PITTSBURG. PROJECT
LENGTH = 0.152 MILE.
Completion Date:
Final Est Sub:
05/30/2017
Commissioner District:
Pontotoc
3
Contracts Completed - Final Estimate Not Processed
Contract: 120294 CO.RD.
Residency:
27268(04)
BRF-162C(205)CI
ADA
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
Russell, Julie
Contract Amount:
$759,293.10
Letting Date:
09/20/2012
03100
BRIDGE AND APPROACHES COUNTY ROAD
(NS-344.5): OVER SANDY CREEK, 1.0 MILE
SOUTH OF VANOSS. PROJECT LENGTH =
0.349 MILE.
Completion Date:
Final Est Sub:
09/05/2014
PAVEMENT REHABILITATION (PC CONCRETE)
Contract: 130165 SH-01
Residency:
29906(04)
03100
SH-1: FROM WEST 4TH STREET IN ADA,
ADA
MC-262N(014)
EXTEND NORTH. PROJECT LENGTH = 0.36
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
MILE.INC JV
Engineer:
Russell, Julie
Contract Amount:
$1,067,618.82
Completion Date:
03/04/2014
Letting Date:
04/18/2013
Final Est Sub:
RESURFACE (CONCRETE) SH-3W: FROM
Contract: 140276 SH-3W
Residency:
29702(04)
03100
SH-59, EXTEND NORTH. PROJECT LENGTH =
SSR-262B(024)SR
ADA
2.533 MILES.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Russell, Julie
Contract Amount:
$3,177,536.87
Completion Date:
07/31/2016
Letting Date:
08/21/2014
Final Est Sub:
Construction Status Report
Page 45
Contract: 140373 SH-19
Residency:
27988(04)
STPY-262B(025)SS
ADA
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Russell, Julie
Contract Amount:
$5,793,312.49
Letting Date:
11/20/2014
03100
Contract: 140374 SH-19
Residency:
30834(04)
MC-262B(021)
ADA
Contractor:
SCHIRALLI CONSTRUCTION CORP.
Engineer:
Russell, Julie
Contract Amount:
$617,671.80
Letting Date:
03/19/2015
03100
BRIDGE AND APPROACHES SH-19: OVER BIG
SANDY CREEK, 1.0 MILE EAST OF SH-3W.
PROJECT LENGTH = 0.241 MILE.
Completion Date:
Final Est Sub:
05/25/2016
INTERSECTION MODIFICATION SH-19: AT
THE INTERSECTION OF RANGELINE ROAD,
1.0 MILE WEST OF JUNCTION SH-19/SH-3 IN
ADA. PROJECT LENGTH = 0.588 MILE.
Completion Date:
Final Est Sub:
10/06/2016
Contract: 150072 CO.RD.
Residency:
27267(04)
03100
STP-162C(204)CI
ADA
Contractor:
BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Engineer:
Russell, Julie
Contract Amount:
$2,583,219.33
Letting Date:
02/19/2015
BRIDGE AND APPROACHES COUNTY ROAD
(NS-364): OVER CLEAR BOGGY CREEK, 2.0
MILES SOUTH OF SH-3. PROJECT LENGTH =
0.695 MILE.
Contract: 150177 SH-3
31575(04)
MC-262N(028)
Contractor:
PBX CORPORATION
Engineer:
Russell, Julie
Contract Amount:
$202,912.56
Letting Date:
05/21/2015
BRIDGE REPAIR - DIVISION III SH-3: OVER
BNSF RAILROAD, 0.4 MILE SOUTHEAST OF
SH-1 IN ADA. PROJECT LENGTH = 0.065 MILE.
Residency:
ADA
Completion Date:
Final Est Sub:
Contract: 150306 SH-1
Residency:
31589(04)
SAP-262C(029)
ADA
Contractor:
TRAFFIC & LIGHTING SYSTEMS, LLC
Engineer:
Russell, Julie
Contract Amount:
$101,522.00
Letting Date:
10/15/2015
County:
03100
Completion Date:
Final Est Sub:
03100
07/25/2016
11/12/2015
05/11/2017
TRAFFIC SIGNALS SH-1: AT THE
INTERSECTION OF 33RD STREET IN ADA.
Completion Date:
Final Est Sub:
05/12/2016
01/30/2017
Commissioner District:
Pottawatomie
3
Contracts Completed - Final Estimate Not Processed
Contract: 120242 CT.ST.
Residency:
22908(05)
STPY-163A(356)SG
WEWOKA
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Helton, Matthew
Contract Amount:
$10,314,639.29
Letting Date:
11/15/2012
03300
Construction Status Report
GRADE, DRAIN, AND SURFACE CITY STREET
(KICKAPOO STREET): FROM WEST
KICKAPOO SPUR STREET, EXTEND NORTH
TO WEST MACARTHUR STREET IN THE CITY
OF SHAWNEE. PROJECT LENGTH = 1.245
MILES.
Completion Date:
Final Est Sub:
08/25/2016
Page 46
Contract: 130144 SH-3W
20309(04)
STPY-162B(092)IP
Contractor:
OBC, INC.
Engineer:
Russell, Julie
Contract Amount:
$11,411,300.49
Letting Date:
03/21/2013
Residency:
ADA
03100
BRIDGE AND APPROACHES SH-3W: OVER
CANADIAN RIVER, 1.07 MILES NORTH OF
US-177. PROJECT LENGTH = 0.750 MILE.
Completion Date:
Final Est Sub:
Contract: 150073 CT.ST.
Residency:
18865(04)
STP-163B(075)UR
WEWOKA
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Helton, Matthew
Contract Amount:
$3,725,847.39
Letting Date:
02/19/2015
03300
Contract: 150074 SH-102
Residency:
21788(04)
STP-163C(165)SS
WEWOKA
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Helton, Matthew
Contract Amount:
$11,209,225.00
Letting Date:
02/19/2015
03300
04/09/2015
RECONSTRUCT - ADD LANES CITY STREET
(GORDON COOPER DRIVE): FROM BOB
COUCH DRIVE, EXTEND NORTH TO BENSON
PARK STREET IN TECUMSEH. PROJECT
LENGTH = 1.106 MILES.
Completion Date:
Final Est Sub:
07/14/2016
WIDEN AND RESURFACE SH-102: FROM 3.06
MILES NORTH OF SH-9, EXTEND NORTH.
PROJECT LENGTH = 4.596 MILES.
Completion Date:
Final Est Sub:
03/13/2017
Contract: 150307 I-40
Residency:
31662(04)
03001
STP-263F(029)3B
ENGR. SERV. & TESTING
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
EST
Contract Amount:
$1,044,891.95
Letting Date:
09/17/2015
JOINT SEAL/REPAIR
I-40/US-177/SH-19/SH-74/SH-99/SH-270: AT
MULTIPLE LOCATIONS IN DIVISION III.
Contract: 160210 CO.RD.
30029(04)
CIRB-263D(040)RB
Contractor:
CP3 ENTERPRISES, INC.
Engineer:
Helton, Matthew
Contract Amount:
$305,220.24
Letting Date:
05/19/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-129): OVER MARCUM CREEK, 3.5 MILES
WEST OF THE SEMINOLE COUNTY LINE NEAR
MAUD. PROJECT LENGTH = 0.198 MILE.
Residency:
WEWOKA
Completion Date:
Final Est Sub:
Contract: 160331 US-177
Residency:
32430(04)
HSIPG-263N(037)TR
ADA
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Russell, Julie
Contract Amount:
$101,440.00
Letting Date:
09/15/2016
County:
03300
Completion Date:
Final Est Sub:
03100
10/21/2016
05/08/2017
01/19/2017
05/16/2017
TRAFFIC SIGNALS US-177/SH-270: AT THE
INTERSECTION OF 45TH STREET AND
HARDESTY ROAD IN THE CITY OF SHAWNEE.
Completion Date:
Final Est Sub:
02/28/2017
Commissioner District:
Pushmataha
2
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 47
Contract: 150399 CO.RD.
Residency:
29968(04)
02013
CIRB-264C(034)RB
CIRCUIT ENGR. DISTR. # 3
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
CED3
Contract Amount:
$2,271,812.50
Letting Date:
11/19/2015
County:
RESURFACE (ASPHALT) COUNTY
ROAD(NS-409): FROM 3.5 MILES NORTH OF
SH-3, EXTEND NORTH NEAR ANTLERS.
PROJECT LENGTH = 4.605 MILES.
Completion Date:
Final Est Sub:
08/11/2016
Commissioner District:
Roger Mills
5
Contracts Completed - Final Estimate Not Processed
Contract: 150078 SH-33
Residency:
24359(04)
CLINTON
STP-165C(087)(090)SS
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
Davis, Shawn
Contract Amount:
$2,768,821.45
Letting Date:
02/19/2015
05100
Contract: 160332 US-283
Residency:
31699(04)
STP-265B(015)3B
CLINTON
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Engineer:
Davis, Shawn
Contract Amount:
$337,024.70
Letting Date:
09/15/2016
05100
County:
BRIDGE AND APPROACHES SH-33: OVER
TURKEY CREEK AND LITTLE TURKEY CREEK,
1.2 MILES AND 2.6 MILES EAST OF SH-30.
PROJECT LENGTH = 0.740 MILE.
Completion Date:
Final Est Sub:
12/20/2016
JOINT SEAL/REPAIR US-283: OVER WASHITA
RIVER, 0.9 MILE NORTH OF THE SH-47
JUNCTION NEAR CHEYENNE.
Completion Date:
Final Est Sub:
03/24/2017
Commissioner District:
Rogers
8
Contracts Completed - Final Estimate Not Processed
Contract: 130008 I-44
Residency:
21898(04)
IMY-0044-2(437)
CLAREMORE
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$15,022,863.20
Letting Date:
01/17/2013
08300
Contract: 130059 SH-66
Residency:
21920(04)
STPY-166C(155)
CLAREMORE
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$3,356,595.92
Letting Date:
01/17/2013
08300
Contract: 130290 SH-66
Residency:
23160(04)
SSP-166N(179)SS
CLAREMORE
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$626,681.31
Letting Date:
08/22/2013
08300
BRIDGE AND APPROACHES I-44: OVER
177TH EAST AVENUE (LYNN LANE), IN
CATOOSA. PROJECT LENGTH = 0.586 MILE.
Completion Date:
Final Est Sub:
BRIDGE AND APPROACHES SH-66: OVER
PRYOR CREEK, 0.9 MILE NORTHEAST OF
SH-28. PROJECT LENGTH = 0.537 MILES.
Completion Date:
Final Est Sub:
Construction Status Report
05/18/2016
09/08/2015
05/16/2017
GRADE, DRAIN, AND SURFACE SH-66:
UNDER SH-266 (ADD TURN LANE). PROJECT
LENGTH = 0.236 MILE.
Completion Date:
Final Est Sub:
08/05/2014
Page 48
Contract: 140307 SH-266
Residency:
24957(04)
STPY-166C(208)
CLAREMORE
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$3,522,167.49
Letting Date:
09/18/2014
08300
Completion Date:
Final Est Sub:
Contract: 150406 CO.RD.
Residency:
27811(04)
08011
STP-266D(039)(040)CI
GARVER, LLC.
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
GARV
Contract Amount:
$2,105,223.85
Letting Date:
11/19/2015
County:
BRIDGE AND APPROACHES SH-266: OVER
VERDIGRIS OVERFLOW, 5.9 MILES EAST OF
THE TULSA COUNTY LINE. PROJECT LENGTH
= 0.184 MILES
08/31/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-41): OVER DOG CREEK, 1.2 MI E OF
SH-66. COUNTY ROAD (NS-420): OVER
UNNAMED CREEK, 2.2 MI N OF I-44. PROJECT
LENGTH = 0.446 MILE.
Completion Date:
Final Est Sub:
03/08/2017
Commissioner District:
Seminole
3
Contracts Completed - Final Estimate Not Processed
Contract: 150411 SH-99A
28926(04)
SSP-267C(050)SS
Contractor:
SEWELL BROS., INC.
Engineer:
Helton, Matthew
Contract Amount:
$2,109,249.80
Letting Date:
11/19/2015
Residency:
WEWOKA
Contract: 160238 CO.RD.
30043(04)
CIRB-267D(054)RB
Contractor:
K & R BUILDERS, INC.
Engineer:
Helton, Matthew
Contract Amount:
$472,683.20
Letting Date:
06/16/2016
Residency:
WEWOKA
County:
03300
BRIDGE AND APPROACHES SH-99A: OVER
EAST GAR CREEK, 6.52 MILES EAST OF
SH-99A NEAR SEMINOLE. PROJECT LENGTH
= 0.266 MILE.
Completion Date:
Final Est Sub:
03300
05/15/2017
BRIDGE AND APPROACHES COUNTY ROAD
(EW-137): OVER MUD CREEK, 0.8 MILES EAST
OF SH-9A NEAR KONAWA. PROJECT LENGTH
= 0.150 MILE
Completion Date:
Final Est Sub:
05/30/2017
Commissioner District:
Sequoyah
1
Contracts Completed - Final Estimate Not Processed
Contract: 120357 SH-100
Residency:
12531(04)
STPY-068C(238)
SALLISAW
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Edwards, Carl
Contract Amount:
$11,931,291.82
Letting Date:
09/20/2012
01200
WIDEN, RESURFACE, AND BRIDGE SH-100:
FROM THE CITY OF GORE, EXTEND NORTH.
PROJECT LENGTH = 6.180 MILES
Completion Date:
Final Est Sub:
11/30/2015
PAVEMENT REHABILITATION (P.C.
Contract: 140185 I-40
Residency:
27112(04)
01200
CONCRETE) I-40: BEGIN AT MILEPOST 303,
NHPPIY-268N(010)
SALLISAW
EXTEND EAST. PROJECT LENGTH = 5.031
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO.,
INC JV
MILES.
Engineer:
Edwards, Carl
Contract Amount:
$10,488,903.77
Completion Date:
08/31/2016
Letting Date:
05/15/2014
Final Est Sub:
Construction Status Report
Page 49
Contract: 150118 I-40
Residency:
28277(05)
SSR-168N(214)SR
SALLISAW
Contractor:
TRI-STAR CONSTRUCTION ARKANSAS, LLC
Engineer:
Edwards, Carl
Contract Amount:
$675,594.34
Letting Date:
03/19/2015
01200
Contract: 160440 I-40
Residency:
32974(04)
EMC-4000(045)
SALLISAW
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Edwards, Carl
Contract Amount:
$144,325.00
Letting Date:
09/29/2016
01200
County:
PAVEMENT REHABILITATION (CONCRETE)
I-40: FROM MILE MARKER 298, EXTEND EAST
TO MILE MARKER 303. PROJECT LENGTH =
5.633 MILES.
Completion Date:
Final Est Sub:
08/26/2016
BRIDGE REPAIR I-40: WESTBOUND OVER BIG
SALLISAW CREEK, 14.4 MILES EAST OF THE
MUSKOGEE COUNTY LINE.
Completion Date:
Final Est Sub:
10/16/2016
05/30/2017
Commissioner District:
Stephens
7
Contracts Completed - Final Estimate Not Processed
Contract: 150311 SH-53
Residency:
27045(04)
07100
STP-269C(016)SS
DUNCAN
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Roberts, Colton
Contract Amount:
$3,572,991.51
Letting Date:
09/17/2015
BRIDGE AND APPROACHES SH-53: OVER
NEGRO CREEK, 5.84 MILES WEST OF SH-89
IN LOCO. PROJECT LENGTH = 0.710 MILE.
Contract: 160208 CO.RD.
28450(04)
STP-269D(039)CI
Contractor:
K & R BUILDERS, INC.
Engineer:
Roberts, Colton
Contract Amount:
$523,626.76
Letting Date:
05/19/2016
BRIDGE AND APPROACHES COUNTY ROAD
(EW-187): OVER COW CREEK, 0.7 MILES
EAST OF US-81 NEAR COMANCHE. PROJECT
LENGTH = 0.298 MILE
County:
Residency:
DUNCAN
07100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/24/2017
04/11/2017
Commissioner District:
Texas
6
Contracts Completed - Final Estimate Not Processed
Contract: 160399 US-54
Residency:
32800(04)
HSIPG-270N(023)TR
GUYMON
Contractor:
DIRECT TRAFFIC CONTROL INC.
Engineer:
Michael, Charles
Contract Amount:
$33,375.00
Letting Date:
10/20/2016
County:
06200
SAFETY IMPROVEMENT (RUMBLE STRIP AND
PAVEMENT MARKING) US-54: FROM 4.9
MILES NORTHEAST OF THE US-64 JUNCTION,
EXTEND NORTHEAST NEAR HOOKER.
Completion Date:
Final Est Sub:
03/08/2017
05/30/2017
Commissioner District:
Tulsa
8
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 50
Contract: 100617 I-44
Residency:
06374(44)
IMY-0044-2(396)225
TULSA
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Arnold, Bruce
Contract Amount:
$32,439,488.87
Letting Date:
11/18/2010
08100
Contract: 110205 I-244
Residency:
26604(04)
IM-TIGR(497)SS
TULSA
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Arnold, Bruce
Contract Amount:
$63,637,567.76
Letting Date:
02/17/2011
08100
Contract: 110526 SH-51
Residency:
27633(04)
SBR-172A(515)SB/SBR-272A*
TULSA
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Arnold, Bruce
Contract Amount:
$2,680,788.96
Letting Date:
01/19/2012
08100
GRADE, DRAIN, SURFACE, AND BRIDGE I-44:
FROM RIVERSIDE DRIVE TO EAST OF PEORIA
AVENUE IN THE CITY OF TULSA. PROJECT
LENGTH = 1.215 MILES.
Completion Date:
Final Est Sub:
03/04/2013
BRIDGE AND APPROACHES I-244: OVER THE
ARKANSAS RIVER, IN THE CITY OF TULSA.
PROJECT LENGTH = 0.968 MILE.
Completion Date:
Final Est Sub:
07/13/2016
04/21/2017
BRIDGE REHABILITATION SH-51: OVER
PITTSBURG AVE 0.5 MI E OF HARVARD AVE,
AND OVER MK&T RAILROAD 0.7 MI E OF YALE
AVE IN THE CITY OF TULSA. PROJECT
LENGTH = 0.051 MILES
Completion Date:
Final Est Sub:
03/27/2013
*(005)SB
Contract: 120230 I-244
Residency:
29191(04)
HSIPIG-0244-1(009)000TR
TULSA
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Arnold, Bruce
Contract Amount:
$1,124,670.55
Letting Date:
07/19/2012
08100
SAFETY IMPROVEMENT (CABLE BARRIER)
I-244: BEGIN AT MILE MARKER 0, EXTEND
NORTH. SH-11: FROM HARVARD AVENUE
OVERPASS, EXTEND SOUTHEAST.
Completion Date:
Final Est Sub:
07/03/2013
Contract: 120265 CO.RD.
Residency:
15860(04)
08014
BRO-172D(598)CO
BENHAM (AKA - LEIDOS)
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
BENH
Contract Amount:
$325,782.00
Letting Date:
07/19/2012
BRIDGE AND APPROACHES COUNTY ROAD
(NS-397/HARVARD AVENUE): OVER BIRD
CREEK TRIBUTARY 2.8 MILES SOUTH AND 1.0
MILE WEST OF THE US-75/SH-20 JUNCTION.
PROJECT LENGTH = 0.099 MILE.
Contract: 120363 US-75
Residency:
24300(04)
NHY-014N(071)
TULSA
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Arnold, Bruce
Contract Amount:
$5,400,126.08
Letting Date:
09/20/2012
08100
INTERCHANGE US-75: AT 116TH STREET
NORTH. PROJECT LENGTH = 0.365 MILES.
Contract: 120422 US-75
Residency:
23170(04)
SSP-272N(021)SS
TULSA
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Arnold, Bruce
Contract Amount:
$1,537,397.99
Letting Date:
11/15/2012
08100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Construction Status Report
03/13/2013
01/06/2014
SAFETY IMPROVEMENT (GUARDRAIL AND
CABLE BARRIER) US-75/US-169/SH-51: US-75
FROM 131ST TO 81ST; US-169 FROM 56TH TO
I-244; AND SH-51 FROM GARNET STREET TO
15TH.
Completion Date:
Final Est Sub:
02/18/2014
Page 51
Contract: 130146 I-244
Residency:
26604(08)
NHPPIY-244-2(505)
TULSA
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Arnold, Bruce
Contract Amount:
$38,609,796.04
Letting Date:
02/21/2013
08100
Contract: 140280 US-75
Residency:
23170(06)
SSP-272F(067)SS
CEC CORP.
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
CEC
Contract Amount:
$786,801.03
Letting Date:
08/21/2014
08003
Contract: 140376 US-169
Residency:
27939(04)
NHPP-272N(077)SS
TULSA
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Arnold, Bruce
Contract Amount:
$32,753,940.32
Letting Date:
03/19/2015
08100
Contract: 150039 I-244
Residency:
27145(04)
NHPPI-0244-2(502)SS
TULSA
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Arnold, Bruce
Contract Amount:
$20,029,682.58
Letting Date:
01/22/2015
08100
Contract: 150219 US-75
Residency:
30592(04)
SBR-272N(114)SB/SSP-272N*
TULSA
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Arnold, Bruce
Contract Amount:
$7,094,095.90
Letting Date:
06/18/2015
08100
BRIDGE AND APPROACHES I-244: OVER
ARKANSAS RIVER (EASTBOUND ONLY).
PROJECT LENGTH = 1.024 MILES.
Completion Date:
Final Est Sub:
08/26/2016
SAFETY IMPROVEMENT (SIGNING)
INTERSTATE / STATE HIGHWAYS / CITY
STREETS: AT MULTIPLE LOCATIONS IN
DIVISION VIII.
Completion Date:
Final Est Sub:
02/08/2016
BRIDGE AND APPROACHES US-169: OVER
BIRD CREEK, BIRD CREEK OVERFLOW, AND
N. 56TH STREET, 5.0 MILES NORTH OF I-244.
PROJECT LENGTH = 1.211 MILES.
Completion Date:
Final Est Sub:
02/28/2017
PAVEMENT REHABILITATION (P.C.
CONCRETE) I-244: FROM THE US-75
INTERCHANGE IN TULSA, EXTEND EAST TO
DELAWARE AVENUE. PROJECT LENGTH =
1.746 MILES.
Completion Date:
Final Est Sub:
10/26/2016
PAVEMENT AND BRIDGE REHABILITATION DIVISION VIII US-75: FROM SH-20, EXTEND
NORTH NEAR COLLINSVILLE. PROJECT
LENGTH = 2.881 MILES.
Completion Date:
Final Est Sub:
03/21/2017
*(123)SS
Contract: 150245 SH-11
Residency:
24365(07)
STP-172B(368)SS/STP-272B*
TULSA
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Arnold, Bruce
Contract Amount:
$4,322,275.23
Letting Date:
07/23/2015
08100
BRIDGE AND APPROACHES SH-11: OVER
FLAT ROCK CREEK AND DELAWARE CREEK,
15.2 MILES AND 11.0 MILES SOUTH OF THE
WASHINGTON COUNTY LINE. PROJECT
LENGTH = 0.324 MILE.
Completion Date:
Final Est Sub:
02/14/2017
*(094)SS
Contract: 150247 CT.ST.
28869(04)
NHPPI-2440(005)SS/STP-27*
Contractor:
PBX CORPORATION
Engineer:
Arnold, Bruce
Contract Amount:
$4,819,267.84
Letting Date:
07/23/2015
Residency:
TULSA
08100
BRIDGE REHABILITATION GILCREASE
EXPRESSWAY: OVER I-244, BNSF RAILROAD,
AND 49TH W AVE IN TULSA. PROJECT
LENGTH = 0.355 MILE.
Completion Date:
Final Est Sub:
10/04/2016
*2C(103)SS
Construction Status Report
Page 52
Contract: 160062 I-244
Residency:
28861(09)
ACNHPPI-2440-(008)SS
TETRA TECH
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
TETR
Contract Amount:
$1,549,621.31
Letting Date:
01/21/2016
08002
Contract: 160122 SH-51
Residency:
28287(04)
SSR-172A(519)SR
TULSA
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
Arnold, Bruce
Contract Amount:
$4,323,323.00
Letting Date:
02/18/2016
08100
Contract: 160152 I-44
20315(09)
SSP-4400(017)SS
Contractor:
J.E. DIRT WURX, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$97,750.00
Letting Date:
03/17/2016
08300
Residency:
CLAREMORE
RETAINING AND SOUND WALLS I-244: FROM
0.1 MILES NORTH OF WEST 23RD STREET,
EXTEND SOUTH IN TULSA. PROJECT
LENGTH = 0.172 MILE.
Completion Date:
Final Est Sub:
01/18/2017
RESURFACE (ASPHALT) SH-51: FROM I-44,
EXTEND EAST NEAR BROKEN ARROW.
PROJECT LENGTH = 6.390 MILES
Completion Date:
Final Est Sub:
12/16/2016
RIGHT-OF-WAY CLEARANCE I-44: FROM 0.5
MILES EAST OF THE 163RD EAST AVENUE
INTERCHANGE, EXTEND EAST IN TULSA AND
CATOOSA. PROJECT LENGTH = 1.05 MILES
PREQUALIFICATION FOR THIS PROJECT HAS
BEEN WAIVED. BOTH BID EXPRESS AND
WRITTEN BIDS WILL
BE ACCEPTABLE.
Completion
Date:
04/21/2017
Final Est Sub:
Contract: 160264 SH-51
Residency:
31735(04)
ERSTP-272C(128)ER
CEC CORP.
Contractor:
EARTH SMART CONSTRUCTION INC.
Engineer:
CEC
Contract Amount:
$1,358,659.20
Letting Date:
07/21/2016
08003
PAVEMENT REHABILITATION SH-51:
LANDSLIDE REPAIR 2.9 MILES EAST OF
SH-151, EXTEND EAST NEAR SAND SPRINGS.
PROJECT LENGTH = 0.208 MILE.
Completion Date:
Final Est Sub:
02/21/2017
Contract: 160299 I-244
Residency:
23170(08)
08001
SSP-272F(179)SS
ENGR. SERV. & TESTING
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
EST
Contract Amount:
$465,408.13
Letting Date:
08/18/2016
SAFETY IMPROVEMENT (GUARDRAIL) I-244:
FROM US-75, EXTEND EAST IN THE CITY OF
TULSA. PROJECT LENGTH = 5.46 MILES
Contract: 160304 US-64
Residency:
31939(04)
08400
SSP-272N(137)SS
SAND SPRINGS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$2,039,000.00
Letting Date:
08/18/2016
RESURFACE (ASPHALT) US-64: FROM 4.3
MILES EAST OF SH-151, EXTEND EAST NEAR
SAND SPRINGS. PROJECT LENGTH = 4.960
MILES.
Contract: 160402 IS-44
Residency:
32674(04)
08020
HSIPG-272F(197)TR
POE AND ASSOCIATES
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
ZPAA
Contract Amount:
$181,288.62
Letting Date:
10/20/2016
STRIPING AND PAVEMENT MARKING
I-44/US-75/SH-51: AT MULTIPLE LOCATIONS IN
DIVISION VIII. PROJECT LENGTH = 13.25
MILES
Construction Status Report
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
05/24/2017
05/25/2017
04/12/2017
Page 53
County:
Commissioner District:
Wagoner
1
Contracts Completed - Final Estimate Not Processed
Contract: 140377 CO.RD.
Residency:
28963(04)
01017
STP-173C(178)CI
CIRCUIT ENGR. DISTR. # 2
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
CE2
Contract Amount:
$715,562.48
Letting Date:
11/20/2014
GRADE, DRAIN, AND SURFACE COUNTY
ROAD (EW-75): FROM 0.5 MILE WEST OF
US-72, EXTEND EAST. PROJECT LENGTH
=0.506 MILE.
Contract: 160123 SH-51B
Residency:
29754(04)
MUSKOGEE
STP-273C(014)3P
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$1,083,186.42
Letting Date:
02/18/2016
01100
RESURFACE (ASPHALT) SH-51B: FROM THE
SH-72 JUNCTION, EXTEND EAST NEAR
COWETA. PROJECT LENGTH = 6.248 MILES
Contract: 160157 US-69
Residency:
29515(04)
SBR-273N(012)SB
MUSKOGEE
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$849,428.00
Letting Date:
03/17/2016
01100
Contract: 160403 SH-51
Residency:
32796(04)
HSIPG-273F(038)TR
MUSKOGEE
Contractor:
DIRECT TRAFFIC CONTROL INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$78,279.45
Letting Date:
10/20/2016
01100
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/07/2015
09/23/2016
BRIDGE REHABILITATION US-69: OVER THE
UNION PACIFIC RAILROAD, 1.50 MILES
NORTH OF SH-51 IN WAGONER.
Completion Date:
Final Est Sub:
12/13/2016
SAFETY IMPROVEMENT (RUMBLE STRIP AND
PAVEMENT MARKING) SH-51: FROM 0.33
MILES EAST OF THE SH-16 JUNCTION,
EXTEND EAST NEAR WAGONER. PROJECT
LENGTH = 9.070 MILES
Completion Date:
Final Est Sub:
02/28/2017
Commissioner District:
Washington
8
Contracts Completed - Final Estimate Not Processed
Contract: 160125 US-75
Residency:
08400
30535(04)
SAND SPRINGS
NHPP-274N(015)3P
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
Williams, Mark J.
Contract Amount:
$1,233,233.00
Letting Date:
02/18/2016
County:
RESURFACE (ASPHALT) US-75: FROM 5.93
MILES SOUTH OF US-60, EXTEND NORTH
NEAR BARTLESVILLE. PROJECT LENGTH =
2.070 MILES
Completion Date:
Final Est Sub:
03/30/2017
Commissioner District:
Washita
5
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 54
Contract: 150081 SH-55
26479(04)
STP-175C(106)SS
Contractor:
SEWELL BROS., INC.
Engineer:
CEC
Contract Amount:
$2,987,735.76
Letting Date:
02/19/2015
Residency:
CEC CORP.
05003
BRIDGE AND APPROACHES SH-55: OVER BIG
ELK CREEK AND BIG ELK OVERFLOW, 5.1
MILES AND 5.2 MILES EAST OF THE
BECKHAM COUNTY LINE. PROJECT LENGTH
= 0.331 MILE.
Completion Date:
Final Est Sub:
08/11/2016
Contract: 150316 SH-152
Residency:
26478(04)
05100
STP-175C(103)SS
CLINTON
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Davis, Shawn
Contract Amount:
$3,700,781.87
Letting Date:
09/17/2015
BRIDGE AND APPROACHES SH-152: OVER
FARMRAIL RAILROAD, 13.5 MILES EAST OF
THE BECKHAM COUNTY LINE IN DILL CITY.
PROJECT LENGTH = 0.516 MILE.
Contract: 160126 SH-152
Residency:
29649(04)
ACSTP-275C(030)3P
CLINTON
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
Davis, Shawn
Contract Amount:
$1,672,420.74
Letting Date:
03/17/2016
RESURFACE (ASPHALT) SH-152: FROM 0.1
MILE EAST OF THE US-183 JUNCTION,
EXTEND EAST IN CORDELL. PROJECT
LENGTH = 7.670 MILES.
County:
05100
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
10/12/2016
02/17/2017
Commissioner District:
Woods
6
Contracts Completed - Final Estimate Not Processed
Contract: 130407 US-64
Residency:
27010(04)
06100
SSP-176B(195)SS
BUFFALO
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$5,045,921.32
Letting Date:
11/21/2013
BRIDGE AND APPROACHES US-64: OVER
RED HORSE CREEK, 5.3 MILES EAST OF
SH-50. PROJECT LENGTH = 1.012 MILES.
Contract: 140220 US-281
Residency:
27002(06)
SSP-276B(008)SS
BUFFALO
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$403,167.02
Letting Date:
06/19/2014
06100
GUARDRAIL US-281: FROM US-64, EXTEND
NORTH. PROJECT LENGTH = 14.00 MILES.
Contract: 140378 US-281
Residency:
30269(04)
STP-276B(006)TR
BUFFALO
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$174,776.13
Letting Date:
11/20/2014
06100
County:
Completion Date:
Final Est Sub:
Completion Date:
Final Est Sub:
04/14/2017
04/07/2015
TRAFFIC SIGNALS US-281: AT US-64 IN ALVA.
Completion Date:
Final Est Sub:
07/30/2015
Commissioner District:
Woodward
6
Contracts Completed - Final Estimate Not Processed
Construction Status Report
Page 55
Contract: 150276 SH-15
Residency:
30957(04)
SSR-277N(016)SR
BUFFALO
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$996,940.97
Letting Date:
07/23/2015
06100
Construction Status Report
WIDEN AND RESURFACE SH-15: FROM 2.9
MILES WEST OF US-270 NORTH IN
WOODWARD, EXTEND EAST. PROJECT
LENGTH = 0.716 MILE
Completion Date:
Final Est Sub:
11/28/2016
Page 56
County:
Adair
1
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 150043
Residency:
16928(16)
US-59
01200
US-59: FROM 2.0 MILES NORTH OF US-62,
EXTEND NORTH. PROJECT LENGTH = 4.949
NHPP-101N(050)SS
SALLISAW
MILES.
Contractor:
KOSS CONSTRUCTION COMPANY & SUBSIDIARY
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$17,475,683.31
$17,475,683.33)
Contract Time:
(
365
365 )
Letting Date:
02/19/2015
Contract Date:
03/16/2015
W/O Issued
Adjusted:
04/14/2015
W/O Effective:
Amount Paid:
07/06/2015
86 % (
86 %)
Work Started:
Time Passed:
07/06/2015
99 % (
99 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160405
01200
28652(04)
COUNTY RO Residency:
(NS-466): OVER SALLISAW CREEK, 3.8 MILES
SOUTH OF SH-100 NEAR STILLWELL.
SALLISAW
CIRB-201D(022)RB
PROJECT LENGTH = 0.208 MILE
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$619,500.64
$619,500.64)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
01/23/2017
W/O Issued
Adjusted:
12/19/2016
W/O Effective:
Amount Paid:
01/23/2017
13 % (
13 %)
Work Started:
Time Passed:
01/23/2017
30 % (
30 %)
County:
Alfalfa
6
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 140266
Residency:
06100
24124(04)
US-64
US-64: BEGIN AT THE WOODS COUNTY LINE,
EXTEND EAST. PROJECT LENGTH = 4.513
BUFFALO
STPY-102C(116)SS
MILES.
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$8,930,111.47
$8,961,127.21)
Contract Time:
(
200
200 )
Letting Date:
09/18/2014
Contract Date:
10/22/2014
W/O Issued
Adjusted:
11/03/2014
W/O Effective:
Amount Paid:
02/02/2015
95 % (
94 %)
Work Started:
Time Passed:
12/01/2014
98 % (
98 %)
Construction Status Report
Page 57
Contract: 160002
29465(04)
SH-08
SBR-202C(027)SB
Contractor:
L & M CONTRACTORS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$789,897.30
Contract Time:
150
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
04/05/2016
W/O Effective:
06/06/2016
Work Started:
05/24/2016
Residency:
BUFFALO
06100
BRIDGE REHABILITATION SH-8: OVER STINK
CREEK, 3.0 MILES WEST OF SH-58 NEAR
BURLINGTON. PROJECT LENGTH = 0.112 MILE
Adjusted:
(
$806,308.35)
(
150 )
Amount Paid:
Time Passed:
Adjusted:
102 % (
100 %)
89 % (
89 %)
BRIDGE AND APPROACHES SH-58: OVER
Residency:
Contract: 160069
28032(04)
SH-58
06100
MEDICINE LODGE RIVER OVERFLOW, 1.1
MILES EAST OF THE SH-8 JUNCTION NEAR
ACSTP-202C(029)SS
BUFFALO
CHEROKEE. PROJECT LENGTH = 0.225 MILE.
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Adjusted:
Engineer:
Embree, Jerry (Acting)
Contract Amount:
(
$2,697,204.35
$2,701,747.95)
Contract Time:
(
220
224 )
Letting Date:
02/18/2016
Contract Date:
03/21/2016
W/O Issued
Adjusted:
04/19/2016
W/O Effective:
Amount Paid:
09/06/2016
92 % (
92 %)
Work Started:
Time Passed:
06/13/2016
106 % (
104 %)
Contract: 160161
27006(04)
US-64
ACSTP-202C(003)SS
Contractor:
SEWELL BROS., INC.
Engineer:
Hoover, Jacob
Contract Amount:
$3,621,486.88
Contract Time:
340
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
05/18/2016
W/O Effective:
09/06/2016
Work Started:
09/06/2016
Contract: 160212
28033(04)
SH-38
ACSTP-202C(032)SS
Contractor:
OBC, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$2,768,806.58
Contract Time:
210
Letting Date:
08/18/2016
Contract Date:
09/14/2016
W/O Issued
09/15/2016
W/O Effective:
10/17/2016
Work Started:
10/17/2016
Residency:
ENID
04300
BRIDGE AND APPROACHES US-64: OVER
WAGON CREEK, 0.9 MILE WEST OF THE
GRANT COUNTY LINE. PROJECT LENGTH =
0.624 MILE.
Adjusted:
(
$3,715,536.88)
(
362 )
Amount Paid:
Time Passed:
Residency:
BUFFALO
06100
Adjusted:
53 % (
52 %)
57 % (
54 %)
BRIDGE AND APPROACHES SH-38: OVER
SALT FORK OF ARKANSAS RIVER, 8.8 MILES
NORTH OF THE US-64 JUNCTION NEAR JET.
PROJECT LENGTH = 0.359 MILE.
Adjusted:
(
$2,768,806.58)
(
224 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
70 % (
70 %)
99 % (
92 %)
Page 58
Contract: 160347
29442(04)
SH-8B
STP-202C(035)SS
Contractor:
FRONTIER BRIDGE, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$2,011,850.58
Contract Time:
150
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
11/29/2016
W/O Effective:
01/09/2017
Work Started:
01/03/2017
Residency:
BUFFALO
06100
BRIDGE AND APPROACHES SH-8B: OVER
EAGLE CHIEF CREEK, 0.8 MILE WEST OF THE
SH-8 JUNCTION NEAR CARMEN. PROJECT
LENGTH = 0.295 MILE.
Adjusted:
(
$2,059,696.56)
(
161 )
Amount Paid:
Time Passed:
Adjusted:
68 % (
66 %)
81 % (
75 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 160406
28351(04)
CO. RD.
06009
(NS-264): OVER COTTONWOOD CREEK, 3.0
MILES SOUTH OF SH-11 NEAR CHEROKEE.
STP-202C(009)CI
CIRCUIT ENGR. DISTR. # 8
PROJECT LENGTH = 0.303 MILE
Contractor:
SEWELL BROS., INC.
Adjusted:
Engineer:
CED8
Contract Amount:
(
$651,437.01
$651,437.01)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
6%(
6 %)
Work Started:
Time Passed:
05/08/2017
3%(
3 %)
Contract: 170112
27943(04)
SH-8
STP-202C(033)
Contractor:
L & M CONTRACTORS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$2,388,858.65
Contract Time:
300
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
04/25/2017
W/O Effective:
09/05/2017
Work Started:
05/15/2017
Residency:
BUFFALO
06100
BRIDGE AND APPROACHES SH-8: OVER
DRIFTWOOD CREEK, 0.9 MILES NORTH OF
THE SH-11 JUNCTION NEAR BURLINGTON.
PROJECT LENGTH = 0.251 MILE
Adjusted:
(
$2,388,858.65)
(
300 )
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
RESURFACE (ASPHALT) SH-58: FROM 7.0
Contract: 170113
Residency:
29027(04)
SH-58
06100
MILES SOUTH OF THE KANSAS STATE LINE,
EXTEND NORTH NEAR BYRON. PROJECT
STPY-202C(001)3P
BUFFALO
LENGTH = 7.00 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$1,014,298.25
$1,014,298.25)
Contract Time:
(
)
Letting Date:
03/16/2017
Contract Date:
04/14/2017
Fixed Completion Date: 10/31/2017
W/O Issued
Adjusted:
04/18/2017
W/O Effective:
Amount Paid:
0%(
0 %)
Work Started:
Time Passed:
05/16/2017
0%(
0 %)
County:
Atoka
2
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 59
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170001
Residency:
29947(04)
CO. RD.
02013
(EW-194/MT. CARMEL ROAD): OVER DAVIS
CREEK, 1.4 MILES EAST OF US-69 NEAR
CIRB-203D(038)RB
CIRCUIT ENGR. DISTR. # 3
CANEY. PROJECT LENGTH = 0.165 MILE.
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$600,656.46
$605,120.46)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
03/21/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
05/08/2017
0%(
0 %)
Contract: 170002
32009(04)
SH-7
SSR-203C(062)SR
Contractor:
OVERLAND CORPORATION
Engineer:
January, Trenton (Acting)
Contract Amount:
$733,183.20
Contract Time:
30
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
02/17/2017
W/O Effective:
06/05/2017
Work Started:
05/23/2017
County:
Beaver
Residency:
MADILL
02300
RESURFACE (ASPHALT) SH-7: FROM THE
JOHNSTON COUNTY LINE, EXTEND EAST.
PROJECT LENGTH = 5.790 MILES
Adjusted:
(
$733,183.20)
(
)
30
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
6
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES US-270: OVER
Residency:
Contract: 160275
06200
27007(04)
US-270
AURORA CREEK, 5.1 MILES SOUTH OF THE
US-64 JUNCTION NEAR BEAVER. PROJECT
GUYMON
ACSTP-204C(020)SS
LENGTH = 0.056 MILE
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$1,723,293.05
$1,723,293.05)
Contract Time:
(
210
210 )
Letting Date:
08/18/2016
Contract Date:
09/14/2016
W/O Issued
Adjusted:
12/13/2016
W/O Effective:
Amount Paid:
01/03/2017
24 % (
24 %)
Work Started:
Time Passed:
01/03/2017
35 % (
35 %)
RESURFACE (ASPHALT) US-270: FROM 12.00
Contract: 170003
Residency:
32749(04)
US-270
06200
MILES WEST OF THE HARPER COUNTY LINE,
EXTEND EAST NEAR SLAPOUT. PROJECT
SSR-204N(022)SR
GUYMON
LENGTH = 4.700 MILES
Contractor:
J & R SAND COMPANY, INC.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$1,287,937.00
$1,287,937.00)
Contract Time:
(
)
Letting Date:
01/19/2017
Contract Date:
02/15/2017
Fixed Completion Date: 10/01/2017
W/O Issued
Adjusted:
02/17/2017
W/O Effective:
Amount Paid:
9%(
9 %)
Work Started:
Time Passed:
05/09/2017
7%(
3 %)
Construction Status Report
Page 60
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170150
Residency:
24836(04)
CO. RD.
06200
(NS-165): OVER BEAVER RIVER, 4.4 MILES
SOUTH OF US-64 NEAR BUFFALO. PROJECT
CIRB-104C(060)RB
GUYMON
LENGTH = 0.906 MILE
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$4,673,802.35
$4,673,802.35)
Contract Time:
(
240
240 )
Letting Date:
04/20/2017
Contract Date:
05/16/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Beckham
5
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 150083
24840(04)
CO.RD.
05005
COUNTY ROAD (NS-198/EW-106): ON NS-198
FROM 1.8 MILES NORTH OF SH-6, EXTEND
CIRB-105C(158)RB
CIRCUIT ENGR. DISTR. # 7
NORTH THEN EAST ON EW-106 NEAR ELK
Contractor:
CASWELL CONTRACTING, INC.
CITY. PROJECT LENGTH = 7.490 MILES.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$6,676,566.30
$7,278,959.39)
Contract Time:
(
230
289 )
Letting Date:
07/23/2015
Contract Date:
08/26/2015
W/O Issued
Adjusted:
09/02/2015
W/O Effective:
Amount Paid:
12/07/2015
100 % (
92 %)
Work Started:
Time Passed:
10/26/2015
126 % (
100 %)
Contract: 160076
32208(04)
I-40B
STP-205B(057)SS
Contractor:
K & R BUILDERS, INC.
Engineer:
Davis, Shawn
Contract Amount:
$289,981.73
Contract Time:
45
Letting Date:
02/18/2016
Contract Date:
03/21/2016
W/O Issued
03/23/2016
W/O Effective:
09/06/2016
Work Started:
09/07/2016
Residency:
CLINTON
05100
BRIDGE REPAIR I-40B: OVER WEST ELK
CREEK, 4.0 MILES EAST OF THE I-40
JUNCTION IN ELK CITY.
Adjusted:
(
$292,481.73)
(
)
50
Amount Paid:
Time Passed:
Adjusted:
96 % (
95 %)
131 % (
118 %)
RESURFACE (ASPHALT) AND BRIDGE REPAIR
Contract: 160160
Residency:
24354(04)
I-40
05100
I-40: FROM 0.3 MILE EAST OF SH-30, EXTEND
EAST NEAR SAYRE. PROJECT LENGTH =
ACNHPPI-4000(022)(028)SS
CLINTON
9.395 MILES.
Contractor:
CORNELL CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$11,066,589.87
$11,066,589.87)
Contract Time:
(
230
230 )
Letting Date:
05/19/2016
Contract Date:
06/24/2016
W/O Issued
Adjusted:
06/29/2016
W/O Effective:
Amount Paid:
10/03/2016
99 % (
99 %)
Work Started:
Time Passed:
10/03/2016
90 % (
90 %)
Construction Status Report
Page 61
GRADE, DRAIN, SURFACE AND BRIDGE
Contract: 170004
Residency:
24839(04)
CO. RD.
05005
COUNTY ROAD (RED HILLS ROAD/EW-117):
FROM SH-30, EXTEND EAST NEAR MAYFIELD.
CIRB-105C(157)RB
CIRCUIT ENGR. DISTR. # 7
PROJECT LENGTH = 6.830 MILES
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$6,804,603.73
$6,804,603.73)
Contract Time:
(
270
270 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
RESURFACE (ASPHALT) AND BRIDGE
Residency:
Contract: 170061
27023(04)
I-40
05100
REHABILITATION I-40: FROM SH-34 SOUTH,
EXTEND EAST NEAR ELK CITY. PROJECT
SSP-4000(041)SS/SBR-4000*
CLINTON
LENGTH = 6.853 MILES
Contractor:
CORNELL CONSTRUCTION COMPANY, INC.
Adjusted:
Engineer:
Davis, Shawn
Contract Amount:
(
$9,629,728.25
$9,629,728.25)
Contract Time:
(
240
240 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
03/21/2017
W/O Effective:
Amount Paid:
06/05/2017
3%(
3 %)
Work Started:
Time Passed:
0%(
0 %)
*(038)SB
County:
Blaine
5
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 160277
05005
31659(04)
CO. RD.
(EW-76): OVER OTTER CREEK, 7.1 MILES
EAST OF SH-8 NEAR WATONGA. PROJECT
CIRCUIT ENGR. DISTR. # 7
STP-206C(038)CI
LENGTH = 0.132 MILE.
Contractor:
D. M. DOZERS, INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$251,612.80
$251,612.80)
Contract Time:
(
)
90
90
Letting Date:
09/15/2016
Contract Date:
10/13/2046
W/O Issued
Adjusted:
10/20/2016
W/O Effective:
Amount Paid:
02/16/2017
100 % (
100 %)
Work Started:
Time Passed:
01/03/2017
72 % (
72 %)
County:
Bryan
2
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 62
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160007
Residency:
24800(04)
CO.RD.
02013
(CARPENTERS BLUFF RD/NS-371.5): OVER
THE RED RIVER, 0.8 MILE SOUTH OF EW-224
CIRB-107C(134)RB
CIRCUIT ENGR. DISTR. # 3
RD (KEMP RD) NEAR HENDRIX. PROJECT
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
LENGTH = 0.837 MILE.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$6,928,519.12
$6,967,193.25)
Contract Time:
(
290
290 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/03/2016
W/O Effective:
Amount Paid:
06/06/2016
91 % (
91 %)
Work Started:
Time Passed:
07/19/2016
90 % (
90 %)
Contract: 160241
29562(04)
US-70
SBR-207N(026)(045)SB
Contractor:
L & N BRIDGE, LLC
Engineer:
January, Trenton (Acting)
Contract Amount:
$2,997,357.19
Contract Time:
345
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
08/25/2016
W/O Effective:
12/05/2016
Work Started:
12/06/2016
Contract: 160309
24333(08)
US-69
STP-207F(062)SS/STP-245G*
Contractor:
B & B CONSTRUCTION SERVICE
Engineer:
Moy, Ryan
Contract Amount:
$1,359,240.10
Contract Time:
120
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
11/30/2016
W/O Effective:
02/16/2017
Work Started:
02/06/2017
*(042)3B
Residency:
MADILL
02300
BRIDGE REHABILITATION US-70: OVER ROCK
CREEK AND SULPHUR CREEK, 2.4 MILES
WEST AND 4.6 MILES EAST OF SH-22 NEAR
BOKCHITO.
Adjusted:
(
$2,997,357.19)
(
345 )
Amount Paid:
Time Passed:
Residency:
02100
ANTLERS
J.T., INC.
Adjusted:
(
$1,508,190.10)
(
150 )
Adjusted:
47 % (
47 %)
42 % (
42 %)
JOINT SEAL/REPAIR
US-69/US-70/US-259/US-270/US-271/SH-2/SH-3:
AT MULTIPLE LOCATIONS IN DIVISION II.
Amount Paid:
Time Passed:
Adjusted:
83 % (
75 %)
58 % (
47 %)
BRIDGE PAINTING US-69/US-270/SH-78/SH-83:
Contract: 160310
Residency:
24333(14)
US-69
02002
AT MULTIPLE LOCATIONS IN DIVISION II.
STP-NBIP(507)SS/STP-NBIP*
TETRA TECH
Contractor:
ELITE INDUSTRIAL PAINTING, INC.
Engineer:
Adjusted:
TETR
Contract Amount:
(
$717,430.10
$717,430.10)
Contract Time:
(
140
140 )
Letting Date:
09/15/2016
Contract Date:
10/28/2016
W/O Issued
Adjusted:
01/09/2017
W/O Effective:
Amount Paid:
09/01/2017
3%(
3 %)
Work Started:
Time Passed:
04/05/2017
19 % (
19 %)
*(504)3B
Construction Status Report
Page 63
Contract: 160311
27912(04)
SH-78
ACSTP-207B(053)SS
Contractor:
C3 CONSTRUCTION, INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$1,589,905.31
Contract Time:
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
10/20/2016
W/O Effective:
Work Started:
05/18/2017
Residency:
MADILL
02300
BRIDGE REHABILITATION SH-78: OVER
CHUCKWA CREEK, 0.9 MILE NORTH OF THE
US-70 JUNCTION IN DURANT.
Adjusted:
(
$1,589,905.31)
(
)
Fixed Completion Date: 08/15/2017
Adjusted:
Amount Paid:
0%(
0 %)
Time Passed:
0%(
0 %)
GRADE, DRAIN, AND SURFACE CITY STREET
Residency:
Contract: 160348
32112(04)
CT. ST.
02300
(HILLCREST AVENUE/OLD EAST MAIN): FROM
THE INTERSECTION OF US-70 BYPASS,
NHPP-207N(064)SS/SSP-207*
MADILL
EXTEND WEST NEAR DURANT. PROJECT
Contractor:
OVERLAND CORPORATION
LENGTH = 0.891 MILE.
Adjusted:
Engineer:
January, Trenton (Acting)
Contract Amount:
(
$3,447,653.96
$3,447,653.96)
Contract Time:
(
150
150 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
01/09/2017
43 % (
43 %)
Work Started:
Time Passed:
01/09/2017
62 % (
62 %)
*N(066)SS
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170006
Residency:
31305(04)
CO. RD.
02013
(NS-3710/BRYAN ROAD): OVER LITTLE BLUE
RIVER, 1.2 MILES SOUTH OF SH-78 NEAR
CIRB-207C(055)RB
CIRCUIT ENGR. DISTR. # 3
DURANT. PROJECT LENGTH = 0.227 MILE.
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$648,551.78
$648,551.78)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/17/2017
W/O Issued
Adjusted:
02/21/2017
W/O Effective:
Amount Paid:
06/05/2017
27 % (
27 %)
Work Started:
Time Passed:
03/17/2017
24 % (
24 %)
Contract: 170007
31328(04)
SH-78
SSR-207C(067)(070)SR
Contractor:
OVERLAND CORPORATION
Engineer:
January, Trenton (Acting)
Contract Amount:
$2,383,318.00
Contract Time:
75
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
02/17/2017
W/O Effective:
06/05/2017
Work Started:
Residency:
MADILL
02300
RESURFACE (ASPHALT) SH-78: FROM THE
RED RIVER, EXTEND NORTH NEAR THE
TEXAS STATE LINE. PROJECT LENGTH = 15.58
MILES
Adjusted:
(
$2,383,318.00)
(
)
75
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
0%(
0 %)
0%(
0 %)
Page 64
BRIDGE REPAIR SH-78: OVER THE RED
Contract: 170191
Residency:
33175(04)
SH-78
02300
RIVER, ON THE TEXAS STATE LINE NEAR
KEMP.
E-MC-207C-(076)
MADILL
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Adjusted:
January, Trenton (Acting)
Contract Amount:
(
$272,322.00
$272,322.00)
Contract Time:
(
)
60
60
Letting Date:
04/20/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/21/2017
W/O Effective:
Amount Paid:
04/24/2017
54 % (
54 %)
Work Started:
Time Passed:
04/25/2017
30 % (
30 %)
County:
Caddo
7
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, AND SURFACE COUNTY
Residency:
Contract: 160078
24802(04)
CO.RD.
07300
ROAD (EW-131): FROM US-281, EXTEND
WEST NEAR ANADARKO. PROJECT LENGTH
CIRB-108C(182)RB
ANADARKO
= 5.236 MILES.
Contractor:
T & G CONSTRUCTION, INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$5,459,545.81
$5,487,787.21)
Contract Time:
(
210
312 )
Letting Date:
02/18/2016
Contract Date:
03/17/2016
W/O Issued
Adjusted:
03/23/2016
W/O Effective:
Amount Paid:
07/05/2016
98 % (
98 %)
Work Started:
Time Passed:
05/06/2016
151 % (
102 %)
GRADE, DRAIN, AND SURFACE SH-152: FROM
Residency:
Contract: 160278
07300
01817(09)
SH-152
0.4 MILES WEST OF THE SH-146 JUNCTION,
EXTEND EAST NEAR BINGER. PROJECT
ANADARKO
ACSTP-208C(041)SS
LENGTH = 2.46 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$9,214,596.05
$9,214,596.05)
Contract Time:
(
400
400 )
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
Adjusted:
09/23/2016
W/O Effective:
Amount Paid:
01/03/2017
21 % (
21 %)
Work Started:
Time Passed:
11/21/2016
36 % (
36 %)
BRIDGE AND APPROACHES SH-58: OVER
Contract: 160407
Residency:
28998(04)
SH-58
05100
DEER CREEK, 0.4 MILES NORTH OF I-40 NEAR
HYDRO. PROJECT LENGTH = 0.499 MILE
STP-208C(047)SS
CLINTON
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$3,871,743.86
$3,871,743.86)
Contract Time:
(
210
210 )
Letting Date:
11/17/2016
Contract Date:
12/14/2016
W/O Issued
Adjusted:
12/16/2016
W/O Effective:
Amount Paid:
03/06/2017
27 % (
27 %)
Work Started:
Time Passed:
03/27/2017
18 % (
18 %)
Construction Status Report
Page 65
RESURFACE (ASPHALT) US-62: FROM 0.86
Contract: 170008
Residency:
32836(04)
US-62
07300
MILES SOUTH OF SH-19, EXTEND EAST IN
APACHE. PROJECT LENGTH = 1.410 MILES
SSR-208B(054)SR
ANADARKO
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$499,746.60
$499,746.60)
Contract Time:
(
)
30
30
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
03/31/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 170059
28425(04)
CO. RD.
07300
(EW-114): OVER SUGAR CREEK, 0.5 MILES
EAST OF US-281/SH-8 IN LOOKEBA. PROJECT
STP-208C(055)CI
ANADARKO
LENGTH = 0.217 MILE
Contractor:
K & R BUILDERS, INC.
Adjusted:
Engineer:
Knight, Reese
Contract Amount:
(
$679,231.15
$679,231.15)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
Adjusted:
02/16/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 170064
Residency:
24803(04)
CO. RD.
07300
COUNTY ROAD (NS-267): OVER LITTLE
WASHITA RIVER, 0.4 MILES SOUTH OF THE
CIRB-108C(184)RB
ANADARKO
SH-19 JUNCTION NEAR CYRIL. PROJECT
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
LENGTH = 2.728 MILES
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$4,333,849.70
$4,333,849.70)
Contract Time:
(
)
Letting Date:
02/16/2017
Contract Date:
03/16/2017
Fixed Completion Date: 10/31/2017
W/O Issued
Adjusted:
03/21/2017
W/O Effective:
Amount Paid:
0%(
0 %)
Work Started:
Time Passed:
05/15/2017
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170149
Residency:
30454(04)
CO. RD.
07300
(NS-273): OVER STINKING CREEK, 3.9 MILES
SOUTH OF SH-152 NEAR BINGER. PROJECT
CIRB-208C(056)RB
ANADARKO
LENGTH = 0.155 MILE
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$539,444.26
$539,444.26)
Contract Time:
(
)
90
90
Letting Date:
04/20/2017
Contract Date:
05/11/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Canadian
4
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 66
GRADE, DRAIN, SURFACE, AND BRIDGE -
Contract: 150180
Residency:
29257(04)
I-40
04200
DIVISION IV I-40: AT RADIO ROAD IN EL
RENO, 2.0 MILES EAST OF US-81. PROJECT
NHPPIY-0040-4(441)
EL RENO
LENGTH = 0.444 MILE.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Harlin, Chris
Contract Amount:
(
$16,901,090.73
$17,506,713.44)
Contract Time:
(
365
385 )
Letting Date:
05/21/2015
Contract Date:
06/10/2015
W/O Issued
Adjusted:
06/15/2015
W/O Effective:
Amount Paid:
11/02/2015
92 % (
89 %)
Work Started:
Time Passed:
11/02/2015
84 % (
79 %)
BRIDGE REHABILITATION
Residency:
Contract: 160011
29494(04)
I-40
04200
I-40/I-44/I-240/CIMMARON ROAD/NW 16TH
STREET/SUNNYLANE ROAD: AT MULTIPLE
SSP-255N(373)SS/SBR-255N*
EL RENO
LOCATIONS IN DIVISION IV.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
Harlin, Chris
Contract Amount:
(
$4,363,694.67
$4,387,331.30)
Contract Time:
(
380
380 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/02/2016
W/O Effective:
Amount Paid:
06/06/2016
100 % (
100 %)
Work Started:
Time Passed:
05/09/2016
85 % (
85 %)
*(362)SB/SBR-209N(037)SB
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 160079
Residency:
30439(04)
CO.RD.
04200
ROAD (BANNER RD/NS-289): FROM RENO
AVENUE, EXTEND NORTH NEAR EL RENO.
ACSTP-209C(038)CI
EL RENO
PROJECT LENGTH = 0.596 MILE.
Contractor:
SCHWARZ PAVING CO., INC.
Engineer:
Adjusted:
Harlin, Chris
Contract Amount:
(
$1,231,014.10
$1,231,014.10)
Contract Time:
(
)
60
92
Letting Date:
02/18/2016
Contract Date:
03/17/2016
W/O Issued
Adjusted:
03/23/2016
W/O Effective:
Amount Paid:
07/05/2016
95 % (
95 %)
Work Started:
Time Passed:
07/05/2016
178 % (
116 %)
TRAFFIC SIGNAL, SIGNING, AND PAVEMENT
Contract: 170116
Residency:
33076(04)
SH-4
04200
MARKING SH-4: AT THE INTERSECTION OF
BRITTON ROAD, IN THE CITY OF OKLAHOMA
HSIPG-209C(059)TR
EL RENO
CITY. PROJECT LENGTH = 0.100 MILE
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
Harlin, Chris
Contract Amount:
(
$43,937.05
$43,937.05)
Contract Time:
(
)
10
10
Letting Date:
03/16/2017
Contract Date:
04/25/2017
W/O Issued
Adjusted:
04/26/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Carter
7
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 67
BRIDGE AND APPROACHES US-177: OVER
Contract: 140256
Residency:
28035(04)
US-177
07200
THE WASHITA RIVER, 3.2 MILES NORTH OF
SH-199. PROJECT LENGTH = 1.011 MILES.
SSP-210B(021)SS
ARDMORE
Contractor:
DONDLINGER & SONS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Fuhrmann, Chris
Contract Amount:
(
$6,598,483.00
$6,608,891.50)
Contract Time:
(
300
300 )
Letting Date:
08/21/2014
Contract Date:
09/22/2014
W/O Issued
Adjusted:
10/02/2014
W/O Effective:
Amount Paid:
01/05/2015
90 % (
90 %)
Work Started:
Time Passed:
01/05/2015
153 % (
153 %)
Contract: 160162
24335(07)
US-53
SSP-210F(049)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Fuhrmann, Chris
Contract Amount:
$37,477.80
Contract Time:
30
Letting Date:
04/21/2016
Contract Date:
05/16/2016
W/O Issued
05/20/2016
W/O Effective:
09/06/2016
Work Started:
08/15/2016
Residency:
ARDMORE
07200
BRIDGE WATER PROOF SEAL
US-70/US-77/US-177/SH-5/SH-53: AT MULTIPLE
LOCATIONS IN DIVISION VII.
Adjusted:
(
$37,477.80)
(
)
30
Amount Paid:
Time Passed:
Adjusted:
97 % (
97 %)
100 % (
100 %)
BRIDGE PAINTING I-35/US-70: AT MULTIPLE
Contract: 160215
Residency:
24336(06)
I-35
07001
LOCATIONS IN DIVISION VII.
SSP-NBIP(500)SS
ENGR. SERV. & TESTING
Contractor:
POSEIDON CONSTRUCTION, INC.
Engineer:
Adjusted:
EST
Contract Amount:
(
$753,500.00
$753,500.00)
Contract Time:
(
150
150 )
Letting Date:
06/16/2016
Contract Date:
07/27/2016
W/O Issued
Adjusted:
10/25/2016
W/O Effective:
Amount Paid:
11/07/2016
96 % (
96 %)
Work Started:
Time Passed:
02/11/2017
89 % (
89 %)
BRIDGE REHABILITATION US-70: OVER
Contract: 170117
Residency:
32794(04)
US-70
07200
WILSON CREEK, 2.4 MILES EAST OF THE
SH-77S INTERSECTION NEAR ARDMORE.
SBR-210N(055)SB
ARDMORE
Contractor:
T. MCDONALD CONSTRUCTION, INC.
Engineer:
Adjusted:
Fuhrmann, Chris
Contract Amount:
(
$314,541.00
$314,541.00)
Contract Time:
(
)
60
60
Letting Date:
03/16/2017
Contract Date:
04/19/2017
W/O Issued
Adjusted:
04/20/2017
W/O Effective:
Amount Paid:
05/15/2017
0%(
0 %)
Work Started:
Time Passed:
05/15/2017
0%(
0 %)
County:
Cherokee
1
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 68
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 130359
Residency:
10006(12)
SH-51
01100
SH-51: BEGIN 7.8 MILES EAST OF THE US-69
JCT, EXTEND EAST OVER GRAND RIVER.
STPY-011B(377)SS
MUSKOGEE
PROJECT LENGTH = 2.120 MILES.
Contractor:
JENSEN CONSTRUCTION COMPANY
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$16,887,802.75
$16,887,802.75)
Contract Time:
(
380
390 )
Letting Date:
01/23/2014
Contract Date:
02/19/2014
W/O Issued
Adjusted:
02/25/2014
W/O Effective:
Amount Paid:
06/02/2014
94 % (
94 %)
Work Started:
Time Passed:
09/05/2014
111 % (
108 %)
BRIDGE AND APPROACHES SH-82: OVER
Residency:
Contract: 140166
23139(04)
SH-82
01100
FOURTEEN MILE CREEK AND THOMPSON
BRANCH CREEK, 9.7 AND 9.9 MILES NORTH
STPY-111C(093)
MUSKOGEE
OF US-62. PROJECT LENGTH = 1.708 MILES.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Hagerman, Jeremy
Contract Amount:
(
$7,207,745.51
$7,457,569.79)
Contract Time:
(
400
400 )
Letting Date:
05/15/2014
Contract Date:
06/10/2014
W/O Issued
Adjusted:
06/12/2014
W/O Effective:
Amount Paid:
10/06/2014
99 % (
95 %)
Work Started:
Time Passed:
10/20/2014
108 % (
108 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160192
Residency:
29371(04)
CO.RD.
01100
(EW-687): OVER BLACKBIRD CREEK, 0.8
MILES WEST OF SH-82 NEAR TAHLEQUAH.
STP-211D(025)CI
MUSKOGEE
PROJECT LENGTH = 0.204 MILE
Contractor:
RRY SERVICES, LLC
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$671,281.98
$671,281.98)
Contract Time:
(
120
120 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/24/2016
W/O Effective:
Amount Paid:
12/05/2016
91 % (
91 %)
Work Started:
Time Passed:
10/20/2016
113 % (
113 %)
Contract: 160243
27038(04)
SH-51
ACSTP-211B(023)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$2,398,511.37
Contract Time:
130
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
08/24/2016
W/O Effective:
12/05/2016
Work Started:
12/05/2016
Residency:
SALLISAW
01200
BRIDGE AND APPROACHES SH-51: OVER
PECAN CREEK, 6.6 MILES EAST OF SH-80
NEAR TAHLEQUAH. PROJECT LENGTH = 0.438
MILE
Adjusted:
(
$2,398,511.37)
(
130 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
0%(
0 %)
0%(
0 %)
Page 69
Contract: 160279
23138(04)
SH-51
ACSTP-111B(090)SS
Contractor:
OBC, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$6,737,488.16
Contract Time:
330
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
11/29/2016
W/O Effective:
03/06/2017
Work Started:
01/05/2017
Residency:
MUSKOGEE
01100
BRIDGE AND APPROACHES SH-51: OVER
FOURTEEN MILE CREEK, 5.0 MILES EAST OF
THE WAGONER COUNTY LINE. PROJECT
LENGTH = 0.870 MILE.
Adjusted:
(
$6,737,488.16)
(
330 )
Amount Paid:
Time Passed:
Adjusted:
36 % (
36 %)
26 % (
26 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160312
29394(04)
CO. RD.
01017
COUNTY ROAD (BARRINGTON HOLLOW
ROAD/NS-4400): OVER CLEAR CREEK, 3.2 MI
CIRB-211D(024)RB
CIRCUIT ENGR. DISTR. # 2
AND 3.5 MI SOUTH OF THE MAYES COUNTY
Contractor:
RRY SERVICES, LLC
LINE. PROJECT LENGTH = 3.037 MILES
Adjusted:
Engineer:
CE2
Contract Amount:
(
$2,525,585.84
$2,525,585.84)
Contract Time:
(
210
210 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
40 % (
40 %)
Work Started:
Time Passed:
01/31/2017
37 % (
37 %)
Contract: 160351
31680(04)
US-62
HISPG-211B(018)TR
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$434,626.34
Contract Time:
60
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
11/29/2016
W/O Effective:
01/09/2017
Work Started:
01/09/2017
County:
Choctaw
Residency:
SALLISAW
01200
Adjusted:
(
$434,626.34)
(
)
60
SAFETY IMPROVEMENT (CABLE BARRIER
AND GUARDRAIL) US-62: FROM 4.2 MILES
EAST OF THE SH-10 JUNCTION, EXTEND EAST
NEAR ELDON. PROJECT LENGTH = 1.470
MILES
Amount Paid:
Time Passed:
Adjusted:
74 % (
74 %)
97 % (
97 %)
2
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160013
Residency:
25144(04)
CO.RD.
02013
(NS-422): OVER HORSE CREEK, 2.4 MILES
NORTH OF US-271 NEAR HUGO. PROJECT
STP-112D(082)CI
CIRCUIT ENGR. DISTR. # 3
LENGTH = 0.227 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$830,447.39
$830,447.39)
Contract Time:
(
120
120 )
Letting Date:
03/17/2016
Contract Date:
04/12/2016
W/O Issued
Adjusted:
04/25/2016
W/O Effective:
Amount Paid:
08/01/2016
93 % (
93 %)
Work Started:
Time Passed:
05/10/2016
100 % (
100 %)
Construction Status Report
Page 70
RESURFACE (ASPHALT) COUNTY ROAD
Contract: 170010
Residency:
31229(04)
CO. RD.
02013
(NS-436): FROM US-70, EXTEND NORTH IN
FORT TOWSON. PROJECT LENGTH = 3.00
CIRB-212C(028)RB
CIRCUIT ENGR. DISTR. # 3
MILES.
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$1,283,916.23
$1,283,916.23)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
29 % (
29 %)
Work Started:
Time Passed:
03/27/2017
35 % (
35 %)
RESURFACE (ASPHALT) US-70: FROM 0.38
Residency:
Contract: 170065
29717(04)
US-70
02100
MILES EAST OF THE SH-93 JUNCTION,
EXTEND EAST NEAR HUGO. PROJECT
NHPPY-212N(011)3P
ANTLERS
LENGTH = 2.39 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Moy, Ryan
Contract Amount:
(
$1,114,650.20
$1,114,650.20)
Contract Time:
(
)
30
30
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170066
Residency:
29967(04)
CO. RD.
02013
(NS-436.75/TRAM ROAD): OVER UNNAMED
CREEK, 1.2 MILES NORTH OF US-70 NEAR
CIRB-212D(036)RB
CIRCUIT ENGR. DISTR. # 3
FORT TOWSON. PROJECT LENGTH = 0.104
Contractor:
HUB CONSTRUCTION, INC.
MILE
Engineer:
Adjusted:
CED3
Contract Amount:
(
$281,281.50
$281,281.50)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/24/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170152
Residency:
31220(04)
CO. RD.
02013
(NS-437): OVER SCS CHANNEL, 4.3 MILES
NORTH OF THE RED RIVER NEAR THE TEXAS
CIRB-212D(038)RB
CIRCUIT ENGR. DISTR. # 3
STATE LINE. PROJECT LENGTH = 0.053 MILE
Contractor:
HUB CONSTRUCTION, INC.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$207,438.33
$207,438.33)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/11/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Cimarron
6
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 71
BRIDGE AND APPROACHES US-56: OVER
Contract: 160352
Residency:
28658(04)
US-56
06200
BEAVER RIVER, 8.5 MILES SOUTHWEST OF
THE US-385 JUNCTION NEAR BOISE CITY.
NHPP-213N(019)SS
GUYMON
PROJECT LENGTH = 0.236 MILE
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$3,958,345.68
$3,958,345.68)
Contract Time:
(
240
240 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
12/19/2016
W/O Effective:
Amount Paid:
03/06/2017
24 % (
24 %)
Work Started:
Time Passed:
03/06/2017
26 % (
26 %)
WEIGH STATION US-56: BOISE CITY WEIGH
Residency:
Contract: 170011
31688(04)
US-56
06002
STATION, 0.7 MILES WEST OF US-287.
BSAP-213N(015)FM
TETRA TECH
Contractor:
UNIFIED SERVICES OF TEXAS, INC.
Adjusted:
Engineer:
TETR
Contract Amount:
(
$2,942,104.22
$2,942,104.22)
Contract Time:
(
270
270 )
Letting Date:
01/19/2017
Contract Date:
03/02/2017
W/O Issued
Adjusted:
03/16/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
05/22/2017
0%(
0 %)
SAFETY IMPROVEMENT (RUMBLE STRIP AND
Contract: 170067
Residency:
32663(04)
US-64
06100
PAVEMENT MARKING) US-64/US-412/SH-3: AT
MULTIPLE LOCATIONS IN DIVISION VI.
HSIPG-213N(018)(020)MS/H*
BUFFALO
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$725,873.63
$725,873.63)
Contract Time:
(
)
60
60
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
05/16/2017
0%(
0 %)
*SIPG-270N(024)(025)MS
County:
Cleveland
3
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE I-35:
Contract: 120328
Residency:
09031(08)
I-35
03200
SINGLE POINT URBAN INTERCHANGE (SPUI)
AT MAIN STREET IN THE CITY OF NORMAN.
IM-NHIY-0035-2(289)109
PURCELL
PROJECT LENGTH = 1.491 MILES.
Contractor:
ALLEN CONTRACTING, INC./ MANHATTAN ROAD & BRIDGE (JV)
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$28,887,284.36
$32,064,596.15)
Contract Time:
(
500
644 )
Letting Date:
10/18/2012
Contract Date:
11/19/2013
W/O Issued
Adjusted:
11/26/2012
W/O Effective:
Amount Paid:
01/07/2013
107 % (
97 %)
Work Started:
Time Passed:
01/07/2013
132 % (
102 %)
Construction Status Report
Page 72
GRADE, DRAIN, SURFACE, AND BRIDGE I-35:
Contract: 130208
Residency:
09031(11)
I-35
03200
INTERCHANGE AT SH-9E (SOUTH HALF
ONLY). PROJECT LENGTH = 0.828 MILE.
NHPPIY-0035-2(326)
PURCELL
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$11,633,998.55
$12,208,367.47)
Contract Time:
(
375
437 )
Letting Date:
08/22/2013
Contract Date:
09/17/2013
W/O Issued
Adjusted:
09/19/2013
W/O Effective:
Amount Paid:
11/18/2013
101 % (
96 %)
Work Started:
Time Passed:
11/17/2013
96 % (
82 %)
GRADE, DRAIN, SURFACE, AND BRIDGE I-35:
Residency:
Contract: 140287
09031(05)
I-35
03200
INTERCHANGE AT SH-9 AND LINDSEY
STREET IN NORMAN. PROJECT LENGTH =
NHPPIY-0035-2(176)(304)
PURCELL
1.036 MILES.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Reed, Lucas
Contract Amount:
(
$71,124,697.35
$71,458,927.96)
Contract Time:
(
920
920 )
Letting Date:
11/20/2014
Contract Date:
12/19/2014
W/O Issued
Adjusted:
12/30/2014
W/O Effective:
Amount Paid:
03/02/2015
92 % (
92 %)
Work Started:
Time Passed:
03/02/2015
88 % (
88 %)
GRADE, DRAIN, SURFACE, AND BRIDGE -
Contract: 150159
Residency:
20266(07)
SH-09
03010
DIVISION III SH-9: FROM 36TH AVE IN
NORMAN, EXTEND EAST. PROJECT LENGTH
STP-114B(108)SS
ATKINS
= 3.056 MILES.
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
ATKINS
Contract Amount:
(
$18,944,484.44
$18,984,171.85)
Contract Time:
(
470
474 )
Letting Date:
05/21/2015
Contract Date:
06/18/2015
W/O Issued
Adjusted:
06/24/2015
W/O Effective:
Amount Paid:
10/05/2015
97 % (
97 %)
Work Started:
Time Passed:
09/08/2015
96 % (
95 %)
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
Contract: 160128
Residency:
29293(04)
CT.ST.
03010
STREET (LINDSEY STREET): FROM SW 24TH
AVENUE, EXTEND EAST IN THE CITY OF
STP-214B(042)(063)AG
ATKINS
NORMAN. PROJECT LENGTH = 1.247 MILES.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
ATKINS
Contract Amount:
(
$26,817,149.43
$26,934,865.43)
Contract Time:
(
540
540 )
Letting Date:
04/21/2016
Contract Date:
05/10/2016
W/O Issued
Adjusted:
05/11/2016
W/O Effective:
Amount Paid:
07/05/2016
55 % (
54 %)
Work Started:
Time Passed:
07/05/2016
58 % (
58 %)
Construction Status Report
Page 73
WIDEN, RESURFACE, AND BRIDGE SH-39:
Contract: 160163
Residency:
24112(04)
SH-39
03200
FROM 2.0 MILES EAST OF US-77, EXTEND
EAST NEAR LEXINGTON. PROJECT LENGTH =
ACSTP-114B(185)SS
PURCELL
5.325 MILES
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$9,699,000.00
$9,699,000.00)
Contract Time:
(
350
350 )
Letting Date:
06/16/2016
Contract Date:
07/28/2016
W/O Issued
Adjusted:
08/02/2016
W/O Effective:
Amount Paid:
11/07/2016
44 % (
44 %)
Work Started:
Time Passed:
11/02/2016
56 % (
56 %)
SAFETY IMPROVEMENT (FIBER OPTIC CABLE)
Residency:
Contract: 160313
24285(04)
CT. ST.
03018
CITY STREET (BOYD STREET): FROM BERRY
ROAD, EXTEND EAST TO CLASSEN
STPG-114C(200)AG
BENCHMARK CONSTR. SERVS., LLC
BOULEVARD IN THE CITY OF NORMAN.
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Adjusted:
Engineer:
BCS
Contract Amount:
(
$568,772.33
$580,977.33)
Contract Time:
(
120
120 )
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
10/20/2016
W/O Effective:
Amount Paid:
02/16/2017
89 % (
87 %)
Work Started:
Time Passed:
01/30/2017
77 % (
77 %)
Contract: 160314
31566(04)
CT. ST.
STPG-214B(075)AG
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
BCS
Contract Amount:
$202,624.30
Contract Time:
60
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
10/17/2016
W/O Effective:
02/16/2017
Work Started:
02/22/2017
TRAFFIC SIGNALS CITY STREET (PORTLAND
Residency:
03018
AVENUE): AT THE INTERSECTION OF SW
119TH STREET IN OKLAHOMA CITY.
BENCHMARK CONSTR. SERVS., LLC
LLC
Adjusted:
(
$219,190.73)
(
)
60
Amount Paid:
Time Passed:
Adjusted:
40 % (
37 %)
102 % (
102 %)
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
Contract: 160354
Residency:
26835(04)
CT. ST.
03018
STREET (FRANKLIN ROAD): OVER LITTLE
RIVER, 0.9 MILES EAST OF NORTH FLOOD
STP-114C(254)AG
BENCHMARK CONSTR. SERVS., LLC
AVENUE IN THE CITY OF NORMAN. PROJECT
Contractor:
FRONTIER BRIDGE, INC.
LENGTH = 0.378 MILE
Engineer:
Adjusted:
BCS
Contract Amount:
(
$2,126,191.87
$2,126,191.87)
Contract Time:
(
180
180 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
57 % (
57 %)
Work Started:
Time Passed:
01/16/2017
52 % (
52 %)
Construction Status Report
Page 74
TRAFFIC SIGNALS CITY STREETS: AT
Contract: 160356
Residency:
29008(04)
CT. ST.
03004
MULTIPLE LOCATIONS IN THE CITY OF
NORMAN.
STPG-214A(073)AG
JACOBS ENGINEERING
Contractor:
TRAFFIC SIGNALS, INC.
Engineer:
Adjusted:
JACOBS
Contract Amount:
(
$382,200.00
$382,200.00)
Contract Time:
(
)
90
90
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
26 % (
26 %)
Work Started:
Time Passed:
04/14/2017
71 % (
71 %)
INTERSECTION MODIFICATION AND TRAFFIC
Residency:
Contract: 160358
30501(04)
CT. ST.
03004
SIGNAL CITY STREET (36TH AVENUE NW): AT
THE INTERSECTION OF HAVENBROOK
STP-214B(077)AG
JACOBS ENGINEERING
STREET IN THE CITY OF NORMAN. PROJECT
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
LENGTH = 0.188 MILE
Adjusted:
Engineer:
JACOBS
Contract Amount:
(
$1,105,800.00
$1,131,822.40)
Contract Time:
(
120
125 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
42 % (
41 %)
Work Started:
Time Passed:
03/06/2017
55 % (
53 %)
TRAFFIC SIGNALS CITY STREET (48TH
Contract: 160359
Residency:
30658(04)
CT. ST.
03003
AVENUE NW): AT THE INTERSECTION OF
ROBINSON STREET IN THE CITY OF NORMAN.
STPG-214B(076)AG
CEC CORP.
Contractor:
TRAFFIC SIGNALS, INC.
Engineer:
Adjusted:
CEC
Contract Amount:
(
$324,739.98
$324,739.98)
Contract Time:
(
)
90
90
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
52 % (
52 %)
Work Started:
Time Passed:
03/06/2017
64 % (
64 %)
TRAFFIC SIGNALS CITY STREET (MAIN
Contract: 160360
Residency:
31508(04)
CT. ST.
03003
STREET): FROM 24TH AVENUE WEST,
EXTEND EAST IN THE CITY OF NORMAN.
STPG-214A(074)AG
CEC CORP.
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Adjusted:
CEC
Contract Amount:
(
$293,862.00
$293,862.00)
Contract Time:
(
)
90
90
Letting Date:
10/20/2016
Contract Date:
11/17/2016
W/O Issued
Adjusted:
11/21/2016
W/O Effective:
Amount Paid:
03/06/2017
83 % (
83 %)
Work Started:
Time Passed:
03/06/2017
50 % (
50 %)
Construction Status Report
Page 75
STRIPING AND PAVEMENT MARKING CITY
Contract: 160361
32452(04)
CITY STRE Residency:
03200
STREETS: AT MULTIPLE LOCATIONS IN THE
CITY OF NORMAN.
STPG-214F(072)AG
PURCELL
Contractor:
DIRECT TRAFFIC CONTROL INC.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$112,635.75
$112,635.75)
Contract Time:
(
)
30
30
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
100 % (
100 %)
Work Started:
Time Passed:
03/13/2017
87 % (
87 %)
RESURFACE (ASPHALT) CITY STREETS
Residency:
Contract: 160408
28903(04)
CT. ST.
03200
(LINDSEY ST/CONSTITUTION ST/IMHOFF RD):
AT MULTIPLE LOCATIONS IN THE CITY OF
STP-214C(004)AG
PURCELL
NORMAN. PROJECT LENGTH = 2.313 MILES.
Contractor:
MARKWELL PAVING COMPANY, INC.
Adjusted:
Engineer:
Reed, Lucas
Contract Amount:
(
$965,827.37
$965,827.37)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
4%(
4 %)
Work Started:
Time Passed:
05/08/2017
7%(
7 %)
RESURFACE (ASPHALT) US-77: FROM SH-9,
Contract: 170068
Residency:
30569(04)
US-77
03200
EXTEND NORTH THEN WEST AND
NORTHWEST IN THE CITY OF NORMAN.
STPY-214N(078)3P
PURCELL
PROJECT LENGTH = 9.72 MILES
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$1,279,020.33
$1,279,020.33)
Contract Time:
(
)
50
50
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/31/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
05/15/2017
0%(
0 %)
BRIDGE REHABILITATION SH-39: OVER
Contract: 170069
Residency:
30579(04)
SH-39
03200
WILLOW CREEK, 1.67 MILES EAST OF US-77
NEAR LEXINGTON. PROJECT LENGTH = 0.106
SBR-214A(079)SB
PURCELL
MILE
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$921,247.96
$921,247.96)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
03/13/2017
0%(
0 %)
County:
Coal
3
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 76
BRIDGE AND APPROACHES US-75: OVER
Contract: 150129
Residency:
20317(04)
US-75
03100
COAL CREEK, 2.2 MILES NORTH OF THE
ATOKA COUNTY LINE. PROJECT LENGTH =
NHPP-215N(014)SS
ADA
0.208 MILE.
Contractor:
BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$2,005,154.27
$2,091,446.72)
Contract Time:
(
180
211 )
Letting Date:
04/16/2015
Contract Date:
05/13/2015
W/O Issued
Adjusted:
05/18/2015
W/O Effective:
Amount Paid:
09/01/2015
103 % (
98 %)
Work Started:
Time Passed:
06/29/2015
141 % (
120 %)
BRIDGE AND APPROACHES US-75: OVER
Residency:
Contract: 150130
27998(04)
US-75
03100
ROCK CREEK, 7.09 MILES NORTH OF SH-3.
PROJECT LENGTH = 0.416 MILE.
STP-215B(015)SS
ADA
Contractor:
BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
Adjusted:
Engineer:
Russell, Julie
Contract Amount:
(
$2,529,033.82
$2,554,153.82)
Contract Time:
(
180
180 )
Letting Date:
04/16/2015
Contract Date:
05/13/2015
W/O Issued
Adjusted:
05/19/2015
W/O Effective:
Amount Paid:
09/01/2015
91 % (
90 %)
Work Started:
Time Passed:
07/27/2015
123 % (
123 %)
Contract: 150330
29541(04)
SH-43
STP-215C(017)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Russell, Julie
Contract Amount:
$2,151,445.69
Contract Time:
210
Letting Date:
10/15/2015
Contract Date:
11/20/2015
W/O Issued
11/25/2015
W/O Effective:
03/07/2016
Work Started:
06/24/2016
Contract: 160017
28201(04)
US-75
SSR-115B(105)SR
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Russell, Julie
Contract Amount:
$3,600,028.59
Contract Time:
90
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
03/04/2016
W/O Effective:
06/06/2016
Work Started:
12/07/2016
Residency:
ADA
03100
BRIDGE REHABILITATION SH-43: OVER
MUDDY BOGGY CREEK AND MUDDY BOGGY
O'FLOW, 1.53 MILES EAST OF US-75 NEAR
COALGATE. PROJECT LENGTH = 0.311 MILE
Adjusted:
(
$2,151,445.69)
(
210 )
Amount Paid:
Time Passed:
Residency:
ADA
03100
Adjusted:
45 % (
45 %)
189 % (
189 %)
RESURFACE (ASPHALT) US-75: FROM SH-3,
EXTEND NORTH NEAR COALGATE. PROJECT
LENGTH = 6.92 MILES
Adjusted:
(
$3,600,028.59)
(
)
90
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
0%(
0 %)
218 % (
218 %)
Page 77
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170070
Residency:
30010(04)
CO. RD.
03100
(OLD SH-3): OVER ROCK CREEK, 0.8 MILES
SOUTHEAST OF THE PONTOTOC COUNTY
STP-215D(021)CI
ADA
LINE NEAR STONEWALL. PROJECT LENGTH =
Contractor:
C3 CONSTRUCTION, INC.
0.311 MILE
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$543,761.81
$543,761.81)
Contract Time:
(
)
90
90
Letting Date:
02/16/2017
Contract Date:
03/22/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
GRADE, DRAIN, AND SURFACE COUNTY
Residency:
Contract: 170119
24944(08)
CO. RD.
03100
ROAD (NS-382/POLK ROAD): FROM 4.2 MILES
NORTH OF SH-31, EXTEND NORTH NEAR
CIRB-215C(024)RB
ADA
COALGATE. PROJECT LENGTH = 1.561 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Russell, Julie
Contract Amount:
(
$1,746,298.20
$1,746,298.20)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/11/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Comanche
7
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 140014
07300
21717(04)
US-277
US-277: FROM US-62, EXTEND EAST.
PROJECT LENGTH = 4.398 MILES.
ANADARKO
STPY-116C(117)SS
Contractor:
T & G CONSTRUCTION, INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$14,964,530.44
$15,136,891.48)
Contract Time:
(
270
362 )
Letting Date:
09/18/2014
Contract Date:
10/27/2014
W/O Issued
Adjusted:
12/22/2014
W/O Effective:
Amount Paid:
02/02/2015
91 % (
90 %)
Work Started:
Time Passed:
02/02/2015
134 % (
100 %)
Contract: 160441
32503(04)
I-44
SSP-4400(026)SS
Contractor:
C3 CONSTRUCTION, INC.
Engineer:
Roberts, Colton
Contract Amount:
$451,671.21
Contract Time:
60
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
01/03/2017
W/O Effective:
03/06/2017
Work Started:
Residency:
DUNCAN
07100
FENCING I-44: FROM SH-7, EXTEND NORTH IN
THE CITY OF LAWTON.
Adjusted:
(
$451,671.21)
(
)
60
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
0%(
0 %)
0%(
0 %)
Page 78
INTERSECTION MODIFICATION US-62: AT THE
Contract: 170013
Residency:
28834(11)
US-62
07300
INTERSECTION OF EDGEWATER BOULEVARD
AND CHERRY ROAD, NEAR FORT SILL.
HSIP-216B(063)SS
ANADARKO
PROJECT LENGTH = 0.639 MILE
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$219,098.24
$219,098.24)
Contract Time:
(
)
30
30
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/25/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
RESURFACE (ASPHALT) SH-36: FROM THE
Residency:
Contract: 170014
30540(04)
SH-36
07100
TILLMAN COUNTY LINE, EXTEND NORTHEAST
NEAR CHATTANOOGA. PROJECT LENGTH =
SSR-216B(064)SR
DUNCAN
5.34 MILES.
Contractor:
MARKWELL PAVING COMPANY, INC.
Adjusted:
Engineer:
Roberts, Colton
Contract Amount:
(
$1,461,600.24
$1,461,600.24)
Contract Time:
(
)
60
60
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170071
Residency:
28426(04)
CO. RD.
07018
(EW-168/BISHOP ROAD): OVER NUMU CREEK,
0.2 MILES EAST OF I-44 NEAR LAWTON.
CIRB-216D(062)RB
BENCHMARK CONSTR. SERVS., LLC
PROJECT LENGTH = 0.224 MILE
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
BCS
Contract Amount:
(
$797,529.03
$797,529.03)
Contract Time:
(
)
90
90
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Contract: 170072
30523(04)
SH-7
NHPPY-216N(065)3P
Contractor:
T & G CONSTRUCTION, INC.
Engineer:
Roberts, Colton
Contract Amount:
$893,071.73
Contract Time:
60
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
03/25/2017
W/O Effective:
07/03/2017
Work Started:
County:
Cotton
Residency:
DUNCAN
07100
RESURFACE (ASPHALT) SH-7 (EASTBOUND
LANES ONLY): FROM SH-65, EXTEND EAST
NEAR LAWTON. PROJECT LENGTH = 4.10
MILES
Adjusted:
(
$893,071.73)
(
)
60
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
7
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 79
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 150008
Residency:
29338(04)
CO.RD.
07100
(NS-265): OVER THE TRIBUTARY OF EAST
CACHE CREEK, 1.5 MILES NORTH OF SH-5.
STP-217D(012)CI
DUNCAN
PROJECT LENGTH = 0.066 MILE
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$235,827.50
$235,827.50)
Contract Time:
(
)
90
90
Letting Date:
01/22/2015
Contract Date:
02/23/2015
W/O Issued
Adjusted:
02/26/2015
W/O Effective:
Amount Paid:
06/01/2015
95 % (
95 %)
Work Started:
Time Passed:
06/01/2015
76 % (
76 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 160018
28410(04)
CO.RD.
07100
(EW-185): OVER WEST CACHE CREEK, 1.4
MILES WEST OF I-44 NEAR WALTERS.
CIRB-117D(091)RB
DUNCAN
PROJECT LENGTH = 0.250 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
Roberts, Colton
Contract Amount:
(
$536,047.60
$536,047.60)
Contract Time:
(
)
90
90
Letting Date:
01/21/2016
Contract Date:
02/10/2016
W/O Issued
Adjusted:
02/16/2016
W/O Effective:
Amount Paid:
06/06/2016
94 % (
94 %)
Work Started:
Time Passed:
03/01/2016
61 % (
61 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160084
Residency:
24859(04)
CO.RD.
07100
COUNTY ROAD (NS-270): FROM 6.0 MILES
SOUTH OF SH-53, EXTEND NORTH NEAR
CIRB-117C(064)RB
DUNCAN
TEMPLE. PROJECT LENGTH = 6.000 MILES.
Contractor:
T & G CONSTRUCTION, INC.
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$5,925,768.83
$5,931,768.83)
Contract Time:
(
180
180 )
Letting Date:
02/18/2016
Contract Date:
03/16/2016
W/O Issued
Adjusted:
03/23/2016
W/O Effective:
Amount Paid:
09/06/2016
37 % (
37 %)
Work Started:
Time Passed:
09/06/2016
112 % (
112 %)
BRIDGE AND APPROACHES US-277: OVER
Contract: 160315
Residency:
28036(04)
US-277
07100
DEEP RED CREEK AND OVERFLOWS, 0.7 MI,
1.0 MI AND 1.2 MI SOUTH OF THE H.E. BAILEY
ACSTP-217C(029)SS
DUNCAN
TURNPIKE NEAR RANDLETT. PROJECT
Contractor:
OVERLAND CORPORATION
LENGTH = 1.124 MILES.
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$7,787,208.07
$7,787,208.07)
Contract Time:
(
300
300 )
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
10/19/2016
W/O Effective:
Amount Paid:
04/03/2017
9%(
9 %)
Work Started:
Time Passed:
04/10/2017
8%(
8 %)
Construction Status Report
Page 80
BRIDGE AND APPROACHES COUNTY ROADS
Contract: 160409
29900(04)
COUNTY RO Residency:
07100
(EW-179/NS-269): OVER BEAVER CR, 2.8 MI E
OF SH-65 AND OVER GOODEN CR, 6.2 MI N OF
STP-217D(032)CI/STP-217C*
DUNCAN
SH-53 NEAR WALTERS. PROJECT LENGTH =
Contractor:
K & R BUILDERS, INC.
2.32 MILES
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$1,196,103.11
$1,196,103.11)
Contract Time:
(
210
210 )
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
12/21/2016
W/O Effective:
Amount Paid:
03/06/2017
33 % (
33 %)
Work Started:
Time Passed:
03/14/2017
25 % (
25 %)
(033)CI
County:
Craig
8
Commissioner District:
Contracts Under Construction
Contract: 150160
24115(04)
US-59
STP-118B(080)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$5,040,025.51
Contract Time:
245
Letting Date:
05/21/2015
Contract Date:
06/15/2015
W/O Issued
09/01/2015
W/O Effective:
10/12/2015
Work Started:
10/19/2015
Residency:
CLAREMORE
08300
BRIDGE AND APPROACHES - DIVISION VIII
US-59: OVER UNION PACIFIC RAILROAD, 1.1
MILES NORTH OF SH-10 NEAR WELCH.
PROJECT LENGTH = 0.871 MILE.
Adjusted:
(
$5,040,025.51)
(
245 )
Amount Paid:
Time Passed:
Adjusted:
70 % (
70 %)
181 % (
181 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 150229
29405(04)
CO.RD.
08011
(NS-439/EW-24): OVER ELM CREEK, 2 MI N OF
US-69 ON NS-439, AND 1.8 MI W OF SH-2 ON
STP-218D(040)CI/STP-218C*
GARVER, LLC.
EW-24 NEAR VINITA. PROJECT LENGTH =
Contractor:
RRY SERVICES, LLC
0.388 MILE.
Engineer:
Adjusted:
GARV
Contract Amount:
(
$2,151,974.59
$2,300,566.07)
Contract Time:
(
270
285 )
Letting Date:
11/19/2015
Contract Date:
12/22/2015
W/O Issued
Adjusted:
01/07/2016
W/O Effective:
Amount Paid:
04/04/2016
99 % (
92 %)
Work Started:
Time Passed:
04/14/2016
108 % (
102 %)
*(041)CI
Contract: 150258
27089(04)
SH-82
STP-218C(037)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$3,723,826.73
Contract Time:
245
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
03/02/2016
W/O Effective:
06/06/2016
Work Started:
06/23/2016
Residency:
CLAREMORE
08300
BRIDGE AND APPROACHES SH-82: OVER
LOCUST CREEK, 6.5 MILES NORTH OF THE
MAYES COUNTY LINE NEAR VINITA.
PROJECT LENGTH = 0.711 MILE.
Adjusted:
(
$3,723,826.73)
(
245 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
55 % (
55 %)
97 % (
97 %)
Page 81
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160362
Residency:
30441(04)
CO. RD.
08011
(NS-428): OVER LIGHTNING CREEK, 0.1 MILES
SOUTH OF US-60 NEAR VINITA. PROJECT
CIRB-218C(049)RB
GARVER, LLC.
LENGTH = 0.132 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
GARV
Contract Amount:
(
$474,877.35
$474,877.35)
Contract Time:
(
120
120 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
40 % (
40 %)
Work Started:
Time Passed:
03/06/2017
34 % (
34 %)
County:
Creek
8
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES US-75A: OVER
Residency:
Contract: 160245
27075(04)
US-75A
08400
BNSF RAILROAD, 1.9 MILES NORTH OF THE
OKMULGEE COUNTY LINE NEAR MOUNDS.
ACSTP-219C(033)SS
SAND SPRINGS
PROJECT LENGTH = 0.667 MILE.
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Williams, Mark J.
Contract Amount:
(
$8,084,675.09
$8,084,675.09)
Contract Time:
(
370
370 )
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
Adjusted:
10/17/2016
W/O Effective:
Amount Paid:
06/05/2017
7%(
7 %)
Work Started:
Time Passed:
0%(
0 %)
Contract: 160246
29327(04)
US-75
STP-219B(042)IG
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
ATKINS
Contract Amount:
$631,654.59
Contract Time:
150
Letting Date:
07/21/2016
Contract Date:
08/09/2016
W/O Issued
08/11/2016
W/O Effective:
12/05/2016
Work Started:
11/14/2016
Residency:
08010
ATKINS
LLC
Adjusted:
(
$641,780.59)
(
150 )
TRAFFIC SIGNALS AND PAVEMENT MARKING
US-75 ALT/SH-97: FROM LINE AVENUE,
EXTEND SOUTH IN SAPULPA.
Amount Paid:
Time Passed:
Adjusted:
70 % (
68 %)
80 % (
80 %)
BRIDGE AND APPROACHES SH-51: OVER
Contract: 160280
Residency:
27071(04)
SH-51
08400
CIMARRON RIVER, 3.5 MILES EAST OF THE
SH-99 JUNCTION NEAR MANNFORD.
ACSTP-219B(047)SS
SAND SPRINGS
PROJECT LENGTH = 1.021 MILE.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Williams, Mark J.
Contract Amount:
(
$7,356,355.59
$7,357,730.59)
Contract Time:
(
280
280 )
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
Adjusted:
09/22/2016
W/O Effective:
Amount Paid:
01/03/2017
75 % (
75 %)
Work Started:
Time Passed:
10/17/2016
68 % (
68 %)
Construction Status Report
Page 82
Contract: 160281
30747(04)
CT.ST.
STP-219C(043)IG
Contractor:
APAC-CENTRAL, INC.
Engineer:
ATKINS
Contract Amount:
$750,648.40
Contract Time:
120
Letting Date:
08/18/2016
Contract Date:
09/14/2016
W/O Issued
09/15/2016
W/O Effective:
01/03/2017
Work Started:
01/03/2017
Residency:
ATKINS
08010
GRADE, DRAIN, AND SURFACE CITY STREET
(BRYAN AVENUE): FROM HAWTHORNE
STREET, EXTEND EAST IN SAPULPA.
PROJECT LENGTH = 0.183 MILE
Adjusted:
(
$750,648.40)
(
120 )
Amount Paid:
Time Passed:
Adjusted:
67 % (
67 %)
80 % (
80 %)
BRIDGE AND APPROACHES SH-16: OVER
Residency:
Contract: 160316
28858(04)
SH-16
08400
CHICKEN CREEK, 8.2 MILES AND 8.5 MILES
EAST OF THE SH-48 JUNCTION NEAR
ACSTP-219C(050)SS
SAND SPRINGS
BRISTOW. PROJECT LENGTH = 0.878 MILE.
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Adjusted:
Engineer:
Williams, Mark J.
Contract Amount:
(
$4,598,147.42
$4,598,147.42)
Contract Time:
(
250
250 )
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
10/19/2016
W/O Effective:
Amount Paid:
02/16/2017
51 % (
51 %)
Work Started:
Time Passed:
11/07/2016
66 % (
66 %)
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 160363
Residency:
22350(08)
CO. RD.
08010
ROAD (WEST 81ST STREET SOUTH): FROM
SH-97, EXTEND EAST IN SAPULPA. PROJECT
CIRB-119C(192)RB
ATKINS
LENGTH = 1.590 MILES
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
Adjusted:
ATKINS
Contract Amount:
(
$5,418,418.00
$5,418,418.00)
Contract Time:
(
270
270 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/30/2016
W/O Effective:
Amount Paid:
03/06/2017
33 % (
33 %)
Work Started:
Time Passed:
02/06/2017
29 % (
29 %)
Contract: 170015
30518(04)
SH-48
SSR-219B(053)SR
Contractor:
APAC-CENTRAL, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$1,972,304.65
Contract Time:
75
Letting Date:
01/19/2017
Contract Date:
02/27/2017
W/O Issued
03/29/2017
W/O Effective:
06/05/2017
Work Started:
05/08/2017
County:
Custer
Residency:
08400
SAND SPRINGS
RESURFACE (ASPHALT) SH-48: FROM THE
SH-51 JUNCTION, EXTEND NORTH NEAR
MANNFORD. PROJECT LENGTH = 6.990 MILES
Adjusted:
(
$1,972,304.65)
(
)
75
Amount Paid:
Time Passed:
Adjusted:
3%(
3 %)
7%(
7 %)
5
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 83
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 140091
Residency:
24863(04)
CO.RD.
05005
COUNTY ROAD (EW-99): FROM US-183,
EXTEND EAST. PROJECT LENGTH = 4.908
CIRB-120C(158)RB
CIRCUIT ENGR. DISTR. # 7
MILES.
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$4,678,008.55
$4,703,116.47)
Contract Time:
(
190
271 )
Letting Date:
06/19/2014
Contract Date:
07/18/2014
W/O Issued
Adjusted:
07/25/2014
W/O Effective:
Amount Paid:
10/06/2014
96 % (
96 %)
Work Started:
Time Passed:
10/06/2014
149 % (
105 %)
RESURFACE AND BRIDGE REHABILITATION
Residency:
Contract: 150051
24427(05)
I-40
05100
I-40: FROM MILE MARKER 68.7 TO MILE
MARKER 76.6. PROJECT LENGTH = 7.899
NHPPI-0040-3(072)SS
CLINTON
MILES.
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Adjusted:
Engineer:
Davis, Shawn
Contract Amount:
(
$10,440,306.71
$10,577,586.71)
Contract Time:
(
150
178 )
Letting Date:
02/19/2015
Contract Date:
03/16/2015
W/O Issued
Adjusted:
03/23/2015
W/O Effective:
Amount Paid:
07/06/2015
93 % (
92 %)
Work Started:
Time Passed:
08/03/2015
177 % (
149 %)
GRADE, DRAIN, SURFACE, AND TRAFFIC
Contract: 160317
Residency:
27911(06)
CT. ST.
05100
SIGNAL CITY STREETS (MAIN
STREET/WASHINGTON AVENUE): FROM 1.0
ACSTP-220B(040)SS
CLINTON
MILE EAST OF SH-54, EXTEND EAST IN
Contractor:
ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
WEATHERFORD. PROJECT LENGTH = 0.391
Engineer:
Adjusted:
Davis, Shawn
MILE.
Contract Amount:
(
$4,985,476.71
$4,985,476.71)
Contract Time:
(
280
280 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
6%(
6 %)
Work Started:
Time Passed:
05/10/2017
3%(
3 %)
County:
Delaware
8
Commissioner District:
Contracts Under Construction
RIGHT-OF-WAY CLEARANCE US-59: FROM
Contract: 160165
Residency:
24150(08)
US-59
08300
0.69 MILES SOUTH OF SH-127, EXTEND
NORTH NEAR GROVE. PROJECT LENGTH =
SSP-221B(030)RW
CLAREMORE
4.950 MILES PREQUALIFICATION FOR THIS
Contractor:
ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
PROJECT HAS BEEN WAIVED. BOTH BID
Engineer:
Adjusted:
Tyler, Jennifer
EXPRESS AND WRITTEN BIDS WILL BE
ACCEPTABLE.
Contract Amount:
(
$202,424.00
$202,424.00)
Contract Time:
(
180
180 )
Letting Date:
04/21/2016
Contract Date:
05/19/2016
W/O Issued
Adjusted:
06/01/2016
W/O Effective:
Amount Paid:
06/20/2016
83 % (
83 %)
Work Started:
Time Passed:
06/20/2016
91 % (
91 %)
Construction Status Report
Page 84
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170016
Residency:
28532(04)
CO. RD.
08002
(NS-462/CHEROKEE STREET): OVER WOLF
CREEK, 1.94 MILES NORTH OF SH-10/SH-25 IN
STP-221D(001)CI
TETRA TECH
GROVE. PROJECT LENGTH = 0.369 MILE.
Contractor:
RRY SERVICES, LLC
Engineer:
Adjusted:
TETR
Contract Amount:
(
$1,043,964.78
$1,043,964.78)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Dewey
5
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, AND BRIDGE US-183: OVER
Residency:
Contract: 160247
06377(20)
US-183
05100
THE CANADIAN RIVER, 6.6 MILES SOUTH OF
SH-51 NEAR SEILING. PROJECT LENGTH =
ACNHPP-222N(024)SS
CLINTON
0.359 MILE.
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$5,409,157.10
$5,409,157.10)
Contract Time:
(
270
275 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/24/2016
W/O Effective:
Amount Paid:
12/05/2016
67 % (
67 %)
Work Started:
Time Passed:
11/07/2016
66 % (
64 %)
GRADE, DRAIN, AND SURFACE US-270/SH-3:
Residency:
Contract: 160365
05100
17671(38)
US-270
FROM 1.8 MILES SOUTHEAST OF THE US-60
JUNCTION, EXTEND SOUTHEAST NEAR
CLINTON
NHPP-222N(023)SS
SEILING. PROJECT LENGTH = 3.920 MILES.
Contractor:
J & R SAND COMPANY, INC.
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$6,170,376.91
$6,204,317.71)
Contract Time:
(
270
270 )
Letting Date:
10/20/2016
Contract Date:
11/17/2016
W/O Issued
Adjusted:
11/18/2016
W/O Effective:
Amount Paid:
03/06/2017
38 % (
37 %)
Work Started:
Time Passed:
01/30/2017
36 % (
36 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160411
30026(04)
COUNTY RO Residency:
05005
(EW-64): OVER UNNAMED CREEK, 3.6 MILES
WEST OF THE BLAINE COUNTY LINE.
STP-222D(022)CI
CIRCUIT ENGR. DISTR. # 7
PROJECT LENGTH = 0.123 MILE
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$282,269.04
$282,269.04)
Contract Time:
(
)
60
60
Letting Date:
11/17/2016
Contract Date:
01/01/1
W/O Issued
Adjusted:
01/30/2017
W/O Effective:
Amount Paid:
04/03/2017
89 % (
89 %)
Work Started:
Time Passed:
02/17/2017
98 % (
98 %)
Construction Status Report
Page 85
RESURFACE (ASPHALT) US-183: FROM 0.19
Contract: 170074
Residency:
28129(04)
US-183
05100
MILES SOUTH OF THE SH-47 WEST
JUNCTION, EXTEND NORTH NEAR PUTNAM.
NHPPY-122N(083)(084)3P
CLINTON
PROJECT LENGTH = 14.83 MILES
Contractor:
HIGHWAY CONTRACTORS, INC.
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$3,569,836.41
$3,569,836.41)
Contract Time:
(
221
221 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
10/15/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Ellis
6
Commissioner District:
Contracts Under Construction
Contract: 160366
32686(04)
US-60
STP-223F(010)3B
Contractor:
RESTEK, INC.
Engineer:
Michael, Charles
Contract Amount:
$267,735.19
Contract Time:
90
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
01/04/2017
W/O Effective:
03/06/2017
Work Started:
03/06/2017
County:
Garfield
Residency:
GUYMON
06200
JOINT SEAL/REPAIR
US-54/US-60/US-412/SH-3/SH-15/SH-136: AT
MULTIPLE LOCATIONS IN DIVISION VI.
Adjusted:
(
$267,735.19)
(
)
90
Amount Paid:
Time Passed:
Adjusted:
32 % (
32 %)
43 % (
43 %)
4
Commissioner District:
Contracts Under Construction
RESURFACE (ASPHALT) SH-164: FROM THE
Contract: 160216
Residency:
29144(04)
SH-164
04300
SH-74 JUNCTION, EXTEND EAST NEAR
COVINGTON. PROJECT LENGTH = 7.500 MILES
SSR-224C(002)SR
ENID
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Hoover, Jacob
Contract Amount:
(
$1,672,180.00
$1,672,180.00)
Contract Time:
(
)
90
90
Letting Date:
06/16/2016
Contract Date:
07/19/2016
W/O Issued
Adjusted:
07/25/2016
W/O Effective:
Amount Paid:
11/07/2016
83 % (
83 %)
Work Started:
Time Passed:
10/28/2016
122 % (
122 %)
Construction Status Report
Page 86
GRADE, DRAIN, SURFACE, AND EROSION
Contract: 160273
Residency:
23087(04)
CT.ST.
04300
CONTROL CITY STREET (WILLOW ROAD):
FROM 0.1 MILE EAST OF OAKWOOD ROAD,
STP-124B(080)UR/STP-124E*
ENID
EXTEND EAST IN ENID. PROJECT LENGTH =
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
0.839 MILE.
Engineer:
Adjusted:
Hoover, Jacob
Contract Amount:
(
$3,876,074.28
$3,876,074.28)
Contract Time:
(
300
300 )
Letting Date:
07/21/2016
Contract Date:
08/08/2016
W/O Issued
Adjusted:
10/19/2016
W/O Effective:
Amount Paid:
02/21/2017
16 % (
16 %)
Work Started:
Time Passed:
02/13/2017
23 % (
23 %)
*(146)EH
GRADE, DRAIN, AND SURFACE COUNTY
Residency:
Contract: 170156
24868(08)
CO. RD.
04009
ROAD (EW-40): FROM SH-15, EXTEND WEST
NEAR GARBER. PROJECT LENGTH = 3.977
CIRB-224C(051)RB
CIRCUIT ENGR. DISTR. # 8
MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Adjusted:
Engineer:
CED8
Contract Amount:
(
$2,997,839.45
$2,997,839.45)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/16/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170169
Residency:
28428(04)
CO. RD.
04009
(EW-51): OVER SKELETON CREEK, 6.9 MILES
EAST OF US-81 NEAR WAUKOMIS. PROJECT
ACSTP-224D(048)CI
CIRCUIT ENGR. DISTR. # 8
LENGTH = 0.274 MILE
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
CED8
Contract Amount:
(
$776,040.90
$776,040.90)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/11/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Garvin
3
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 150053
Residency:
24869(04)
CO.RD.
03100
COUNTY ROAD (NS-334): FROM SH-19,
EXTEND NORTH. PROJECT LENGTH = 5.415
CIRB-125C(164)RB
ADA
MILES.
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$5,770,624.59
$5,813,562.40)
Contract Time:
(
210
255 )
Letting Date:
02/19/2015
Contract Date:
03/16/2015
W/O Issued
Adjusted:
03/24/2015
W/O Effective:
Amount Paid:
09/01/2015
93 % (
93 %)
Work Started:
Time Passed:
05/01/2015
121 % (
100 %)
Construction Status Report
Page 87
BRIDGE AND APPROACHES I-35: OVER
Contract: 150333
Residency:
28940(04)
I-35
03200
WASHITA RIVER, 3.3 MILES NORTH OF SH-19.
PROJECT LENGTH = 0.312 MILE.
NHPPI-3500(020)SS
PURCELL
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$10,431,981.00
$10,594,963.45)
Contract Time:
(
360
502 )
Letting Date:
11/19/2015
Contract Date:
12/16/2015
W/O Issued
Adjusted:
12/22/2015
W/O Effective:
Amount Paid:
04/04/2016
85 % (
83 %)
Work Started:
Time Passed:
02/15/2016
126 % (
90 %)
BRIDGE REHABILITATION COUNTY ROAD
Residency:
Contract: 160023
29607(04)
CO.RD.
03003
(RUPPE ROAD): OVER I-35, 4.74 MILES NORTH
OF SH-7 NEAR WYNNEWOOD. PROJECT
SBR-225N(046)SB
CEC CORP.
LENGTH = 0.135 MILE.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
CEC
Contract Amount:
(
$1,712,460.83
$1,726,060.83)
Contract Time:
(
135
135 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/03/2016
W/O Effective:
Amount Paid:
06/06/2016
98 % (
97 %)
Work Started:
Time Passed:
07/25/2016
112 % (
112 %)
Contract: 160134
29615(04)
I-35
SBR-225N(059)SB
Contractor:
OBC, INC.
Engineer:
Russell, Julie
Contract Amount:
$3,089,697.62
Contract Time:
300
Letting Date:
03/17/2016
Contract Date:
04/13/2016
W/O Issued
04/25/2016
W/O Effective:
08/01/2016
Work Started:
06/13/2016
Residency:
ADA
03100
BRIDGE REHABILITATION I-35: OVER
UNNAMED CREEK, 0.4 MILE SOUTH OF SH-29
NEAR WYNNEWOOD. PROJECT LENGTH =
0.258 MILE.
Adjusted:
(
$3,089,697.62)
(
406 )
Amount Paid:
Time Passed:
Adjusted:
81 % (
81 %)
102 % (
75 %)
RESURFACE (ASPHALT) I-35: FROM THE
Contract: 160167
Residency:
31838(04)
I-35
03200
WASHITA RIVER, EXTEND NORTH NEAR
PAOLI. PROJECT LENGTH = 7.450 MILES
ACNHPPI-3500(030)SS
PURCELL
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$2,560,657.15
$2,560,657.15)
Contract Time:
(
)
45
45
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
Adjusted:
05/18/2016
W/O Effective:
Amount Paid:
10/01/2016
93 % (
93 %)
Work Started:
Time Passed:
09/19/2016
251 % (
251 %)
Construction Status Report
Page 88
Contract: 160195
28000(04)
SH-74
ACSTP-225C(049)SS
Contractor:
TREAS CONSTRUCTION, INC.
Engineer:
Reed, Lucas
Contract Amount:
$5,197,304.30
Contract Time:
250
Letting Date:
08/18/2016
Contract Date:
09/12/2016
W/O Issued
09/14/2016
W/O Effective:
01/03/2017
Work Started:
02/20/2017
Contract: 160282
28942(04)
SH-74
STP-225C(063)SS
Contractor:
TREAS CONSTRUCTION, INC.
Engineer:
EST
Contract Amount:
$854,448.59
Contract Time:
120
Letting Date:
08/18/2016
Contract Date:
09/12/2016
W/O Issued
09/14/2016
W/O Effective:
01/03/2017
Work Started:
01/03/2017
Residency:
PURCELL
BRIDGE AND APPROACHES SH-74: OVER
WASHITA RIVER, 1.41 MILES NORTH OF SH-19
NEAR MAYSVILLE. PROJECT LENGTH = 0.864
MILE
03200
Adjusted:
(
$5,197,304.30)
(
250 )
Amount Paid:
Time Passed:
Residency:
03001
ENGR. SERV. & TESTING
Adjusted:
(
$854,448.59)
(
120 )
Adjusted:
38 % (
38 %)
26 % (
26 %)
BRIDGE AND APPROACHES SH-74: OVER
UNNAMED CREEKS, 3.19 MILES AND 3.28
MILES NORTH OF THE CARTER COUNTY LINE
NEAR ELMORE. PROJECT LENGTH = 0.076
MILE
Amount Paid:
Time Passed:
Adjusted:
67 % (
67 %)
62 % (
62 %)
BRIDGE AND APPROACHES SH-19: OVER
Contract: 160412
Residency:
28929(04)
SH-19
03100
BEEF CREEK, 0.6 MILES EAST OF THE SH-74
JUNCTION NEAR MAYSVILLE. PROJECT
STP-225C(066)SS
ADA
LENGTH = 0.057 MILE
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$1,315,000.00
$1,315,000.00)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
12/27/2016
W/O Effective:
Amount Paid:
03/06/2017
41 % (
41 %)
Work Started:
Time Passed:
02/07/2017
65 % (
65 %)
RESURFACE (ASPHALT) SH-17A: FROM I-35,
Contract: 170017
Residency:
30566(04)
SH-17A
03100
EXTEND EAST NEAR WYNNEWOOD.
PROJECT LENGTH = 3.171 MILES.
SSR-225C(065)SR
ADA
Contractor:
SEAL MASTERS, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$668,333.55
$668,333.55)
Contract Time:
(
)
25
25
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Construction Status Report
Page 89
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170076
Residency:
27869(04)
CO. RD.
03021
(NS-323): OVER OWL CREEK, 1.6 MILES
SOUTH OF THE MCCLAIN COUNTY LINE NEAR
STP-125D(193)CI
OLSSON ASSOCIATES
PAOLI. PROJECT LENGTH = 0.179 MILE
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
ZOA
Contract Amount:
(
$616,314.74
$616,314.74)
Contract Time:
(
)
90
90
Letting Date:
02/16/2017
Contract Date:
03/14/2017
W/O Issued
Adjusted:
03/16/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE REHABILITATION SH-17A: OVER I-35,
Residency:
Contract: 170077
29110(04)
SH-17A
03100
3.1 MILES WEST OF US-77 NEAR
WYNNEWOOD. PROJECT LENGTH = 0.159
NHPPI-225N(001)SS
ADA
MILE
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
Adjusted:
Engineer:
Russell, Julie
Contract Amount:
(
$2,161,373.46
$2,161,373.46)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/20/2017
W/O Issued
Adjusted:
03/31/2017
W/O Effective:
Amount Paid:
04/24/2017
17 % (
17 %)
Work Started:
Time Passed:
04/17/2017
19 % (
19 %)
Contract: 170079
29564(04)
I-35
NHPPIY-225N-(045)
Contractor:
OBC, INC.
Engineer:
CEC
Contract Amount:
$2,276,522.83
Contract Time:
420
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
03/17/2017
W/O Effective:
04/24/2017
Work Started:
04/24/2017
Residency:
CEC CORP.
03003
BRIDGE REHABILITATION I-35: OVER RUSH
CREEK, 0.6 MILES SOUTH OF SH-19 IN PAULS
VALLEY. PROJECT LENGTH = 0.541 MILE
Adjusted:
(
$2,276,522.83)
(
420 )
Amount Paid:
Time Passed:
Adjusted:
7%(
7 %)
5%(
5 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170121
Residency:
25658(04)
CO. RD.
03200
(NS-310/EASTERN AVENUE): OVER PANTHER
CREEK, 5.0 MILES NORTH OF SH-29 NEAR
CIRB-125D(165)RB
PURCELL
ELMORE CITY. PROJECT LENGTH = 0.089
Contractor:
BRIDGECO CONTRACTORS, INC.
MILE
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$369,443.51
$369,443.51)
Contract Time:
(
)
90
90
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/24/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Construction Status Report
Page 90
RESURFACE (ASPHALT) SH-19: FROM 0.6
Contract: 170122
Residency:
31826(04)
SH-19
03100
MILES WEST OF I-35, EXTEND EAST IN PAULS
VALLEY. PROJECT LENGTH = 2.84 MILES
STPY-225B(067)3P
ADA
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$1,013,103.95
$1,013,103.95)
Contract Time:
(
)
30
30
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/25/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Grady
7
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES SH-19: OVER
Residency:
Contract: 140292
28038(04)
SH-19
07300
WASHITA RIVER AND WASHITA RIVER
O'FLOW 1.5 MILES NORTHWEST OF THE
STPY-226C(014)
ANADARKO
GARVIN COUNTY LINE. PROJECT LENGTH =
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
0.946 MILE.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$7,368,368.15
$7,368,368.15)
Contract Time:
(
460
430 )
Letting Date:
09/18/2014
Contract Date:
10/17/2014
W/O Issued
Adjusted:
10/23/2014
W/O Effective:
Amount Paid:
02/02/2015
92 % (
92 %)
Work Started:
Time Passed:
05/04/2015
101 % (
108 %)
Contract: 160027
30384(04)
US-62
SBR-226N(030)SB
Contractor:
RESTEK, INC.
Engineer:
Knight, Reese
Contract Amount:
$2,483,740.96
Contract Time:
180
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
05/06/2016
W/O Effective:
06/06/2016
Work Started:
06/06/2016
Contract: 160086
20302(04)
SH-39
ACSTP-126B(066)SS
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
CEC
Contract Amount:
$8,867,757.41
Contract Time:
290
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
05/19/2016
W/O Effective:
09/06/2016
Work Started:
07/25/2016
Residency:
ANADARKO
07300
BRIDGE REHABILITATION US-62: OVER UNION
PACIFIC RAILROAD, 0.2 MILE EAST OF US-81.
PROJECT LENGTH = 0.204 MILE.
Adjusted:
(
$2,483,740.96)
(
180 )
Amount Paid:
Time Passed:
Residency:
CEC CORP.
07003
Adjusted:
54 % (
54 %)
135 % (
135 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-39: FROM 3.6 MILES EAST OF US-62,
EXTEND EAST NEAR CHICKASHA. PROJECT
LENGTH = 2.973 MILES.
Adjusted:
(
$8,867,757.41)
(
290 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
60 % (
60 %)
93 % (
93 %)
Page 91
JOINT SEAL/REPAIR US-81: OVER UNION
Contract: 160319
Residency:
31701(04)
US-81
07300
PACIFIC RAILROAD, 0.4 MILES NORTH OF THE
SH-37 JUNCTION IN MINCO.
NHPP-226N(038)3B
ANADARKO
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$611,380.00
$611,380.00)
Contract Time:
(
)
70
70
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
Adjusted:
12/13/2016
W/O Effective:
Amount Paid:
02/16/2017
85 % (
85 %)
Work Started:
Time Passed:
01/09/2017
84 % (
84 %)
RESURFACE (ASPHALT) SH-37: FROM
Residency:
Contract: 170080
30520(04)
SH-37
07300
FRISCOE ROAD 3.0 MILES WEST OF SH-4,
EXTEND EAST IN TUTTLE. PROJECT LENGTH
STPY-226C(048)3P
ANADARKO
= 6.00 MILES
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Adjusted:
Engineer:
Knight, Reese
Contract Amount:
(
$2,022,644.00
$2,022,644.00)
Contract Time:
(
)
60
60
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/10/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
TRAFFIC SIGNALS SH-37: AT THE
Contract: 170081
Residency:
32880(04)
SH-37
07300
INTERSECTION OF SARA ROAD, IN TUTTLE.
HSIP-226B(047)TR
ANADARKO
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Adjusted:
Knight, Reese
Contract Amount:
(
$160,307.34
$160,307.34)
Contract Time:
(
)
45
45
Letting Date:
02/16/2017
Contract Date:
03/22/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
05/30/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Grant
4
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE AND BRIDGE
Contract: 160088
Residency:
24946(05)
CO.RD.
04009
COUNTY ROAD (NS-301/NS-303/EW-21/EW-22):
ON NS-301, FROM EW-20 EXTEND SOUTH
CIRB-127C(138)RB
CIRCUIT ENGR. DISTR. # 8
THEN EAST NEAR LAMONT. PROJECT
Contractor:
EVANS & ASSOCIATES CONSTRUCTION CO., INC.
LENGTH = 4.887 MILES
Engineer:
Adjusted:
CED8
Contract Amount:
(
$3,207,175.48
$3,207,175.48)
Contract Time:
(
120
120 )
Letting Date:
02/18/2016
Contract Date:
03/21/2016
W/O Issued
Adjusted:
03/25/2016
W/O Effective:
Amount Paid:
09/06/2016
85 % (
85 %)
Work Started:
Time Passed:
09/06/2016
123 % (
123 %)
Construction Status Report
Page 92
SHOULDER IMPROVEMENT, RESURFACE
Contract: 160413
Residency:
24163(04)
SH-11
04300
(ASPHALT), AND BRIDGE SH-11: FROM 7.9
MILES WEST OF US-81, EXTEND EAST NEAR
STP-127B(107)(108)(109)*
ENID
MEDFORD. PROJECT LENGTH = 7.660 MILES.
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Adjusted:
Hoover, Jacob
Contract Amount:
(
$12,986,834.47
$13,019,507.41)
Contract Time:
(
440
440 )
Letting Date:
11/17/2016
Contract Date:
12/13/2016
W/O Issued
Adjusted:
12/30/2016
W/O Effective:
Amount Paid:
03/06/2017
20 % (
20 %)
Work Started:
Time Passed:
02/06/2017
20 % (
20 %)
(110)SS
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160414
27282(04)
COUNTY RO Residency:
04009
(EW-16): OVER SAND CREEK, 1.4 MILES EAST
OF THE SH-132 JUNCTION NEAR MEDFORD.
STP-127D(172)CI
CIRCUIT ENGR. DISTR. # 8
PROJECT LENGTH = 0.194 MILE
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
CED8
Contract Amount:
(
$804,365.53
$804,365.53)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/19/2016
W/O Effective:
Amount Paid:
03/06/2017
32 % (
32 %)
Work Started:
Time Passed:
03/06/2017
43 % (
43 %)
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 170082
Residency:
28419(05)
CO. RD.
04009
ROAD (EW-08): FROM THE ALFALFA COUNTY
LINE, EXTEND EAST NEAR WAKITA. PROJECT
CIRB-127C(188)RB
CIRCUIT ENGR. DISTR. # 8
LENGTH = 3.969 MILES
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Adjusted:
CED8
Contract Amount:
(
$2,121,376.86
$2,121,376.86)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
03/31/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Greer
5
Commissioner District:
Contracts Under Construction
Contract: 140357
24207(04)
SH-34
STPY-128C(069)SS
Contractor:
SEWELL BROS., INC.
Engineer:
ATKINS
Contract Amount:
$5,935,580.20
Contract Time:
220
Letting Date:
11/20/2014
Contract Date:
12/23/2014
W/O Issued
01/05/2015
W/O Effective:
03/02/2015
Work Started:
03/02/2015
Residency:
ATKINS
05010
BRIDGE AND APPROACHES SH-34: OVER THE
SALT FORK OF THE RED RIVER, 1.2 MILES
SOUTH OF US-283. PROJECT LENGTH = 0.861
MILE.
Adjusted:
(
$5,976,240.59)
(
270 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
109 % (
108 %)
122 % (
99 %)
Page 93
GRADE, DRAIN, SURFACE AND BRIDGE
Contract: 150231
Residency:
24948(04)
CO.RD.
05005
COUNTY ROAD (EW-144): FROM 1.0 MILE
WEST OF SH-6, EXTEND EAST. PROJECT
CIRB-128D(074)RB
CIRCUIT ENGR. DISTR. # 7
LENGTH = 4.230 MILES.
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$3,746,408.29
$3,811,408.29)
Contract Time:
(
180
204 )
Letting Date:
07/23/2015
Contract Date:
08/20/2015
W/O Issued
Adjusted:
10/15/2015
W/O Effective:
Amount Paid:
12/07/2015
93 % (
91 %)
Work Started:
Time Passed:
12/07/2015
146 % (
128 %)
GRADE, DRAIN, AND SURFACE SH-6: FROM
Residency:
Contract: 150370
15023(07)
SH-6
05200
1.0 MILE SOUTH OF SH-9 EXTEND NORTH IN
GRANITE. PROJECT LENGTH = 2.248 MILES.
ACSTP-128B(008)SS
ALTUS
Contractor:
CASWELL CONTRACTING, INC/TOM HUDSON PAVING, INC. (JV)
Adjusted:
Engineer:
Sirmons, Karl
Contract Amount:
(
$9,529,011.54
$9,784,831.14)
Contract Time:
(
300
300 )
Letting Date:
11/19/2015
Contract Date:
12/22/2015
W/O Issued
Adjusted:
01/04/2016
W/O Effective:
Amount Paid:
03/14/2016
74 % (
72 %)
Work Started:
Time Passed:
03/14/2016
104 % (
104 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160367
Residency:
30685(04)
CO. RD.
05005
(NS-196): OVER LAKE CREEK, 5.3 MILES
NORTH OF SH-9 NEAR GRANITE. PROJECT
STP-228D(009)CI
CIRCUIT ENGR. DISTR. # 7
LENGTH = 0.133 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$304,575.50
$304,575.50)
Contract Time:
(
)
60
60
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
97 % (
97 %)
Work Started:
Time Passed:
12/21/2016
107 % (
107 %)
County:
Harmon
5
Commissioner District:
Contracts Under Construction
Contract: 170018
27542(04)
SH-30
SSR-129C(045)SR
Contractor:
OVERLAND CORPORATION
Engineer:
Sirmons, Karl
Contract Amount:
$1,447,467.50
Contract Time:
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
02/17/2017
W/O Effective:
Work Started:
Residency:
ALTUS
05200
RESURFACE (ASPHALT) SH-30: FROM THE
US-62 JUNCTION, EXTEND NORTH IN HOLLIS.
PROJECT LENGTH = 8.00 MILES
Adjusted:
(
$1,447,467.50)
(
)
Fixed Completion Date: 10/31/2017
Adjusted:
Amount Paid:
0%(
0 %)
Time Passed:
0%(
0 %)
Construction Status Report
Page 94
County:
Harper
6
Commissioner District:
Contracts Under Construction
Contract: 150135
26494(04)
SH-34
STP-130B(141)SS
Contractor:
SEWELL BROS., INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$4,640,850.10
Contract Time:
190
Letting Date:
04/16/2015
Contract Date:
05/15/2015
W/O Issued
05/21/2015
W/O Effective:
08/03/2015
Work Started:
08/03/2015
Residency:
BUFFALO
06100
BRIDGE AND APPROACHES SH-34: OVER
BUFFALO CREEK, 5.9 MILES SOUTH OF US-64.
PROJECT LENGTH = 0.671 MILE.
Adjusted:
(
$4,647,019.35)
(
190 )
Amount Paid:
Time Passed:
Adjusted:
93 % (
93 %)
111 % (
111 %)
GRADE, DRAIN, AND SURFACE COUNTY
Residency:
Contract: 160089
29347(04)
CO.RD.
06009
ROAD (NS-183): FROM 4.0 MILES NORTH OF
US-64, EXTEND NORTH NEAR BUFFALO.
STP-230C(020)CI
CIRCUIT ENGR. DISTR. # 8
PROJECT LENGTH = 3.057 MILES
Contractor:
J & R SAND COMPANY, INC.
Engineer:
Adjusted:
CED8
Contract Amount:
(
$2,847,700.07
$2,847,700.07)
Contract Time:
(
150
150 )
Letting Date:
02/18/2016
Contract Date:
03/24/2016
W/O Issued
Adjusted:
04/01/2016
W/O Effective:
Amount Paid:
07/15/2016
99 % (
99 %)
Work Started:
Time Passed:
07/15/2016
90 % (
90 %)
Contract: 160368
29444(04)
US-64
STP-230B(023)SS
Contractor:
K & R BUILDERS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$1,199,277.14
Contract Time:
180
Letting Date:
10/20/2016
Contract Date:
11/17/2016
W/O Issued
11/21/2016
W/O Effective:
03/06/2017
Work Started:
03/06/2017
Residency:
BUFFALO
06100
BRIDGE AND APPROACHES US-64: OVER
UNNAMED CREEK, 0.1 MILES WEST OF THE
US-183 JUNCTION NEAR BUFFALO. PROJECT
LENGTH = 0.183 MILE
Adjusted:
(
$1,199,277.14)
(
180 )
Amount Paid:
Time Passed:
Adjusted:
27 % (
27 %)
31 % (
31 %)
JOINT SEAL/REPAIR US-270/SH-58: AT
Contract: 170019
Residency:
31670(04)
US-270
06100
MULTIPLE LOCATIONS IN DIVISION VI.
STP-230F(018)3B
BUFFALO
Contractor:
PBX CORPORATION
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$289,491.50
$289,491.50)
Contract Time:
(
)
80
80
Letting Date:
01/19/2017
Contract Date:
02/21/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
57 % (
57 %)
Work Started:
Time Passed:
04/17/2017
33 % (
33 %)
Construction Status Report
Page 95
County:
Haskell
1
Commissioner District:
Contracts Under Construction
Contract: 140358
27046(04)
SH-2
STP-231B(005)SS
Contractor:
OBC, INC.
Engineer:
Edwards, Carl
Contract Amount:
$4,515,264.45
Contract Time:
240
Letting Date:
02/19/2015
Contract Date:
03/16/2015
W/O Issued
03/23/2015
W/O Effective:
09/01/2015
Work Started:
07/29/2015
Contract: 150097
23105(11)
US-69
SSP-231C(016)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Edwards, Carl
Contract Amount:
$64,615.50
Contract Time:
60
Letting Date:
03/19/2015
Contract Date:
04/20/2015
W/O Issued
04/23/2015
W/O Effective:
08/03/2015
Work Started:
08/18/2015
Residency:
SALLISAW
01200
BRIDGE AND APPROACHES SH-2: OVER
BEAVER CREEK, 1.3 MILES WEST OF SH-31.
PROJECT LENGTH = 0.921 MILE
Adjusted:
(
$4,515,264.45)
(
240 )
Amount Paid:
Time Passed:
Residency:
SALLISAW
01200
Adjusted:
88 % (
88 %)
150 % (
150 %)
BRIDGE WATER PROOF SEAL
US-69/SH-9/SH-53: AT MULTIPLE LOCATIONS
IN DIVISION I.
Adjusted:
(
$64,615.50)
(
)
60
Amount Paid:
Time Passed:
Adjusted:
87 % (
87 %)
62 % (
62 %)
BRIDGE REHABILITATION SH-9: OVER SAN
Residency:
Contract: 160248
30511(04)
SH-9
01200
BOIS CREEK 0.8 MILES EAST OF SH-26 NEAR
STIGLER.
ACSTP-231B(024)SS
SALLISAW
Contractor:
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$726,282.26
$726,282.26)
Contract Time:
(
)
90
90
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
09/14/2016
W/O Effective:
Amount Paid:
03/06/2017
0%(
0 %)
Work Started:
Time Passed:
03/06/2017
0%(
0 %)
BRIDGE AND APPROACHES SH-82: OVER OWL
Contract: 160415
Residency:
27102(04)
SH-82
01200
CREEK, 5.6 MILES NORTH OF THE SH-31
JUNCTION NEAR STIGLER. PROJECT LENGTH
STP-231C(031)SS
SALLISAW
= 0.340 MILE
Contractor:
T. MCDONALD CONSTRUCTION, INC.
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$2,321,260.60
$2,321,260.60)
Contract Time:
(
180
180 )
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
12/27/2016
W/O Effective:
Amount Paid:
03/06/2017
55 % (
55 %)
Work Started:
Time Passed:
01/10/2017
43 % (
43 %)
Construction Status Report
Page 96
RESURFACE (ASPHALT) SH-9: FROM 5.48
Contract: 170020
Residency:
31375(04)
SH-9
01200
MILES EAST OF SH-2, EXTEND EAST NEAR
STIGLER. PROJECT LENGTH = 3.062 MILES
SSR-231B(028)SR
SALLISAW
Contractor:
JOB CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$1,261,310.00
$1,261,310.00)
Contract Time:
(
)
30
30
Letting Date:
01/19/2017
Contract Date:
02/21/2017
W/O Issued
Adjusted:
02/23/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Contract: 170083
30417(04)
SH-31
STPY-231C(029)(030)3P
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$1,427,769.80
Contract Time:
60
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
04/25/2017
W/O Effective:
07/05/2017
Work Started:
County:
Residency:
SALLISAW
01200
RESURFACE (ASPHALT) SH-31: FROM SH-2
EXTEND EAST, NEAR KINTA. SH-82: FROM 1.3
MI SOUTH OF THE SH-31 JCT, EXTEND
NORTH. PROJECT LENGTH = 7.157 MILES
Adjusted:
(
$1,427,769.80)
(
)
60
Amount Paid:
Time Passed:
Hughes
Adjusted:
0%(
0 %)
0%(
0 %)
3
Commissioner District:
Contracts Under Construction
Contract: 130123
29431(04)
SH-48
STPY-232C(009)(010)3P
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Russell, Julie
Contract Amount:
$2,382,259.62
Contract Time:
75
Letting Date:
02/21/2013
Contract Date:
03/15/2013
W/O Issued
06/25/2013
W/O Effective:
07/08/2013
Work Started:
07/08/2013
Residency:
ADA
03100
RESURFACE (ASPHALT) SH-48: BEGIN AT
SH-1 IN ATWOOD, EXTEND NORTH. PROJECT
LENGTH = 12.06 MILES.
Adjusted:
(
$2,433,683.18)
(
)
75
Amount Paid:
Time Passed:
Adjusted:
99 % (
97 %)
125 % (
125 %)
BRIDGE AND APPROACHES SH-9: OVER
Contract: 160029
Residency:
27059(04)
SH-09
03300
WEWOKA CREEK, 3.2 MILES EAST OF US-75
NEAR WETUMKA. PROJECT LENGTH = 0.747
ACSTP-232C(036)SS
WEWOKA
MILE.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$5,224,907.40
$5,230,406.80)
Contract Time:
(
250
253 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/02/2016
W/O Effective:
Amount Paid:
06/06/2016
92 % (
92 %)
Work Started:
Time Passed:
03/21/2016
99 % (
98 %)
Construction Status Report
Page 97
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160090
Residency:
28575(04)
CO.RD.
03300
COUNTY ROAD (EW-126): FROM 3.0 MILES
WEST OF US-75, EXTEND EAST NEAR
STP-232C(041)CI
WEWOKA
HOLDENVILLE. PROJECT LENGTH = 2.879
Contractor:
GLOVER & ASSOCIATES, INC.
MILES
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$3,220,801.19
$3,220,801.19)
Contract Time:
(
220
220 )
Letting Date:
02/18/2016
Contract Date:
03/21/2016
W/O Issued
Adjusted:
03/24/2016
W/O Effective:
Amount Paid:
07/05/2016
19 % (
19 %)
Work Started:
Time Passed:
09/06/2016
56 % (
56 %)
BRIDGE AND APPROACHES SH-9: OVER
Residency:
Contract: 160285
28921(04)
SH-9
03300
UNNAMED CREEK, 1.2 MILES WEST OF US-75,
NEAR WETUMKA. PROJECT LENGTH = 0.187
ACSTP-232C(050)SS
WEWOKA
MILE.
Contractor:
T. MCDONALD CONSTRUCTION, INC.
Adjusted:
Engineer:
Helton, Matthew
Contract Amount:
(
$1,727,399.83
$1,750,789.83)
Contract Time:
(
150
150 )
Letting Date:
08/18/2016
Contract Date:
09/21/2016
W/O Issued
Adjusted:
09/26/2016
W/O Effective:
Amount Paid:
01/03/2017
77 % (
76 %)
Work Started:
Time Passed:
10/19/2016
76 % (
76 %)
RESURFACE (ASPHALT) US-270: FROM 0.25
Contract: 170023
Residency:
29804(04)
US-270
03100
MILE WEST OF US-75, EXTEND EAST IN
CALVIN. PROJECT LENGTH = 10.730 MILES.
SSR-232B(051)(052)SR
ADA
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$2,002,093.65
$2,002,093.65)
Contract Time:
(
)
60
60
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Jackson
5
Commissioner District:
Contracts Under Construction
WIDEN, RESURFACE, AND BRIDGE US-283:
Contract: 150136
Residency:
24379(07)
US-283
05200
FROM 0.1 MILE SOUTH OF SH-5 EAST,
EXTEND NORTH NEAR ALTUS. PROJECT
STP-133B(087)SS
ALTUS
LENGTH = 6.099 MILES.
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Sirmons, Karl
Contract Amount:
(
$9,934,218.57
$10,359,847.95)
Contract Time:
(
275
275 )
Letting Date:
10/15/2015
Contract Date:
11/13/2015
W/O Issued
Adjusted:
11/17/2015
W/O Effective:
Amount Paid:
03/07/2016
63 % (
60 %)
Work Started:
Time Passed:
03/14/2016
112 % (
112 %)
Construction Status Report
Page 98
Contract: 160199
29528(04)
US-62
ACNHPP-233N(029)SS
Contractor:
OBC, INC.
Engineer:
Sirmons, Karl
Contract Amount:
$5,691,317.95
Contract Time:
270
Letting Date:
05/19/2016
Contract Date:
06/14/2016
W/O Issued
06/15/2016
W/O Effective:
10/03/2016
Work Started:
09/06/2016
Residency:
ALTUS
05200
BRIDGE AND APPROACHES US-62: OVER
SALT FORK OF THE RED RIVER, 0.6 MILE
EAST OF THE SH-6 JUNCTION NEAR ALTUS.
PROJECT LENGTH = 0.416 MILE.
Adjusted:
(
$5,691,317.95)
(
270 )
Amount Paid:
Time Passed:
Adjusted:
99 % (
99 %)
83 % (
83 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160249
28723(04)
CO.RD.
05005
COUNTY ROAD (NS-210): FROM 4.0 MILES
NORTH OF SH-5, EXTEND NORTH NEAR
CIRB-233C(008)RB
CIRCUIT ENGR. DISTR. # 7
ALTUS. PROJECT LENGTH = 4.975 MILES.
Contractor:
K & R BUILDERS, INC.
Adjusted:
Engineer:
CED7
Contract Amount:
(
$4,263,186.50
$4,277,366.50)
Contract Time:
(
220
223 )
Letting Date:
07/21/2016
Contract Date:
01/01/1
W/O Issued
Adjusted:
09/09/2016
W/O Effective:
Amount Paid:
12/05/2016
28 % (
27 %)
Work Started:
Time Passed:
12/05/2016
53 % (
52 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160286
Residency:
30061(04)
CO.RD.
05005
(NS-209): OVER UNNAMED CREEK, 5.6 MILES
SOUTH OF US-62 NEAR ALTUS. PROJECT
STP-233D(028)CI
CIRCUIT ENGR. DISTR. # 7
LENGTH = 0.180 MILE.
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$529,250.20
$529,250.20)
Contract Time:
(
110
110 )
Letting Date:
08/18/2016
Contract Date:
09/21/2016
W/O Issued
Adjusted:
09/23/2016
W/O Effective:
Amount Paid:
01/03/2017
88 % (
88 %)
Work Started:
Time Passed:
11/14/2016
99 % (
99 %)
County:
Jefferson
7
Commissioner District:
Contracts Under Construction
Contract: 150199
28800(04)
US-81
NHPP-234N(015)SS
Contractor:
OBC, INC.
Engineer:
Roberts, Colton
Contract Amount:
$2,516,112.74
Contract Time:
180
Letting Date:
06/18/2015
Contract Date:
07/15/2015
W/O Issued
07/17/2015
W/O Effective:
02/16/2016
Work Started:
02/16/2016
Residency:
DUNCAN
07100
BRIDGE AND APPROACHES - DIVISION VII
US-81: OVER FLAT CREEK, 7.88 MILES
NORTH OF THE TEXAS STATE LINE.
PROJECT LENGTH = 0.208 MILE.
Adjusted:
(
$2,516,112.74)
(
180 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
100 % (
100 %)
98 % (
98 %)
Page 99
Contract: 170025
30539(04)
US-81
SSR-234N(040)SR
Contractor:
OVERLAND CORPORATION
Engineer:
Roberts, Colton
Contract Amount:
$1,267,427.60
Contract Time:
75
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
02/17/2017
W/O Effective:
06/05/2017
Work Started:
03/13/2017
Contract: 170084
29566(04)
US-81
NHPPY-234N(041)/NHPPY-23*
Contractor:
FRONTIER BRIDGE, INC.
Engineer:
ATKINS
Contract Amount:
$3,849,793.25
Contract Time:
280
Letting Date:
03/16/2017
Contract Date:
04/14/2017
W/O Issued
04/18/2017
W/O Effective:
09/05/2017
Work Started:
*4N(043)SS
Contract: 170123
27977(04)
SH-79
STP-234B(014)SS
Contractor:
FRONTIER BRIDGE, INC.
Engineer:
Roberts, Colton
Contract Amount:
$11,164,064.48
Contract Time:
360
Letting Date:
03/16/2017
Contract Date:
04/14/2017
W/O Issued
04/18/2017
W/O Effective:
09/05/2017
Work Started:
Residency:
DUNCAN
07100
RESURFACE (ASPHALT) US-81: FROM THE
US-70 JUNCTION, EXTEND NORTH IN
WAURIKA. PROJECT LENGTH = 5.00 MILES
Adjusted:
(
$1,267,427.60)
(
)
75
Amount Paid:
Time Passed:
Residency:
ATKINS
07010
Adjusted:
92 % (
92 %)
35 % (
35 %)
BRIDGE AND APPROACHES US-81: OVER
UNNAMED CREEK AND HACKBERRY CREEK,
1.7 MILES AND 4.1 MILES NORTH OF SH-32
NEAR RYAN. PROJECT LENGTH = 0.411 MILE
Adjusted:
(
$3,849,793.25)
(
280 )
Amount Paid:
Time Passed:
Residency:
DUNCAN
07100
Adjusted:
0%(
0 %)
0%(
0 %)
BRIDGE AND APPROACHES SH-79: OVER THE
RED RIVER, 0.5 MILES NORTH OF THE TEXAS
STATE LINE. PROJECT LENGTH = 1.189 MILES
Adjusted:
(
$11,164,064.48)
(
360 )
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170124
Residency:
28449(04)
CO. RD.
07001
(NS-299): OVER TRIBUTARY TO BAKER
CREEK, 0.3 MILES NORTH OF SH-32 NEAR
STP-234D(042)CI
ENGR. SERV. & TESTING
GRADY. PROJECT LENGTH = 0.202 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
EST
Contract Amount:
(
$572,789.33
$572,789.33)
Contract Time:
(
)
90
90
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/24/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Johnston
3
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 100
Contract: 160250
23268(04)
SH-99
ACSTP-135B(086)SS
Contractor:
OVERLAND CORPORATION
Engineer:
Russell, Julie
Contract Amount:
$11,018,314.20
Contract Time:
330
Letting Date:
07/21/2016
Contract Date:
01/01/1
W/O Issued
08/25/2016
W/O Effective:
02/20/2017
Work Started:
02/20/2017
Contract: 160287
29603(04)
SH-1
SBR-235C(017)SB
Contractor:
C3 CONSTRUCTION, INC.
Engineer:
Russell, Julie
Contract Amount:
$2,483,537.37
Contract Time:
210
Letting Date:
08/18/2016
Contract Date:
09/21/2016
W/O Issued
09/26/2016
W/O Effective:
03/06/2017
Work Started:
10/18/2016
Residency:
ADA
03100
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-99: FROM 5.64 MILES NORTH OF SH-22,
EXTEND NORTH NEAR TISHOMINGO.
PROJECT LENGTH = 4.375 MILES.
Adjusted:
(
$11,018,314.20)
(
330 )
Amount Paid:
Time Passed:
Residency:
ADA
03100
Adjusted:
(
$2,541,365.29)
(
216 )
Adjusted:
8%(
8 %)
16 % (
16 %)
BRIDGE REHABILITATION SH-1: OVER
WASHITA RIVER AND OVERFLOW, 4.18 MILES
AND 4.44 MILES NORTH OF THE MARSHALL
COUNTY LINE. PROJECT LENGTH = 0.511
MILE.
Amount Paid:
Time Passed:
Adjusted:
81 % (
79 %)
95 % (
93 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160369
Residency:
28574(04)
CO. RD.
03100
(GREASY BEND ROAD): OVER THE WASHITA
RIVER, 1.4 MILES EAST OF THE CARTER
STP-235C(020)CI
ADA
COUNTY LINE. PROJECT LENGTH = 0.478 MILE
Contractor:
OBC, INC.
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$4,352,723.36
$4,352,723.36)
Contract Time:
(
365
365 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
14 % (
14 %)
Work Started:
Time Passed:
03/06/2017
18 % (
18 %)
GRADE, DRAIN, SURFACE, BRIDGE, AND
Contract: 170157
Residency:
17543(04)
CO. RD.
03100
EROSION CONTROL. COUNTY ROAD (GREASY
BEND ROAD): OVER WASHITA RIVER, 5.0
CIRB-135C(020)RB
ADA
MILES EAST OF THE CARTER COUNTY LINE
Contractor:
OVERLAND CORPORATION
NEAR MANNSVILLE. PROJECT LENGTH =
Engineer:
Adjusted:
Russell, Julie
0.820 MILE
Contract Amount:
(
$2,557,873.81
$2,557,873.81)
Contract Time:
(
210
210 )
Letting Date:
04/20/2017
Contract Date:
05/16/2017
W/O Issued
Adjusted:
05/19/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Kay
4
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 101
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 140042
Residency:
29354(04)
CO.RD.
04100
(EW-18/HUBBARD ROAD): OVER CHIKASKIA
RIVER, 2.3 MILES EAST OF US-177. PROJECT
CIRB-236C(004)RB
PERRY
LENGTH = 0.18 MILE.
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Adjusted:
Zachary, Ted
Contract Amount:
(
$983,705.20
$987,944.75)
Contract Time:
(
120
121 )
Letting Date:
01/23/2014
Contract Date:
02/14/2014
W/O Issued
Adjusted:
04/10/2014
W/O Effective:
Amount Paid:
06/02/2014
96 % (
95 %)
Work Started:
Time Passed:
06/02/2014
142 % (
140 %)
BRIDGE AND APPROACHES I-35: UNDER
Residency:
Contract: 150139
27100(04)
I-35
04100
HUBBARD ROAD, 11.0 MILES NORTH OF THE
NOBLE COUNTY LINE. PROJECT LENGTH =
NHPPI-236N(025)SS
PERRY
0.225 MILE.
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Adjusted:
Engineer:
Zachary, Ted
Contract Amount:
(
$2,241,581.98
$2,339,563.46)
Contract Time:
(
180
180 )
Letting Date:
04/16/2015
Contract Date:
05/13/2015
W/O Issued
Adjusted:
05/19/2015
W/O Effective:
Amount Paid:
09/01/2015
104 % (
99 %)
Work Started:
Time Passed:
01/04/2016
88 % (
88 %)
GRADE, DRAIN, AND SURFACE I-35: OVER
Contract: 150373
Residency:
24226(06)
I-35
04100
ABANDONED RAILROAD, 2.58 MILES SOUTH
OF SH-11 NEAR BLACKWELL. PROJECT
NHPPI-236N(024)SS
PERRY
LENGTH = 0.094 MILE.
Contractor:
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Adjusted:
Zachary, Ted
Contract Amount:
(
$2,486,494.24
$2,781,585.37)
Contract Time:
(
180
180 )
Letting Date:
11/19/2015
Contract Date:
12/16/2015
W/O Issued
Adjusted:
01/14/2016
W/O Effective:
Amount Paid:
05/02/2016
109 % (
98 %)
Work Started:
Time Passed:
05/02/2016
71 % (
71 %)
Contract: 160289
27891(04)
SH-15
ACNHPPI-3500-(035)(039)*
Contractor:
OBC, INC.
Engineer:
Zachary, Ted
Contract Amount:
$8,809,330.54
Contract Time:
420
Letting Date:
08/18/2016
Contract Date:
09/14/2016
W/O Issued
09/15/2016
W/O Effective:
01/03/2017
Work Started:
01/03/2017
*(038)SS
Residency:
PERRY
04100
Adjusted:
(
$8,809,330.54)
(
420 )
BRIDGE AND APPROACHES SH-15/FOUNTAIN
RD/BENDER RD: OVER I-35, 28.1 MI, 20.1 MI
AND 1.0 MI SOUTH OF US-177 NEAR BILLINGS,
TONKAWA AND BRAMAN. PROJECT LENGTH
= 0.675 MILE
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
35 % (
35 %)
25 % (
25 %)
Page 102
Contract: 160370
32691(04)
US-60
STP-NBIP(511)3B
Contractor:
SOUTHEAST BRIDGE FL CORP
Engineer:
ATKINS
Contract Amount:
$336,260.00
Contract Time:
90
Letting Date:
10/20/2016
Contract Date:
11/30/2016
W/O Issued
12/27/2016
W/O Effective:
03/06/2017
Work Started:
05/13/2017
Residency:
ATKINS
04010
BRIDGE PAINTING US-60/CITY STREET
(ANDERSON ROAD): AT MULTIPLE LOCATIONS
IN DIVISION IV.
Adjusted:
(
$336,260.00)
(
)
90
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
RESURFACE (ASPHALT) COUNTY ROAD
Contract: 160416
30442(04)
COUNTY RO Residency:
04009
(HUBBARD ROAD/EW-18): FROM US-177,
EXTEND WEST NEAR BLACKWELL. PROJECT
STP-236C(042)CI
CIRCUIT ENGR. DISTR. # 8
LENGTH = 3.315 MILES
Contractor:
EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Adjusted:
Engineer:
CED8
Contract Amount:
(
$1,329,167.65
$1,329,167.65)
Contract Time:
(
)
90
90
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
12/27/2016
W/O Effective:
Amount Paid:
03/06/2017
44 % (
44 %)
Work Started:
Time Passed:
03/06/2017
54 % (
54 %)
EROSION CONTROL COUNTY ROAD
Contract: 160417
32051(04)
COUNTY RO Residency:
04003
(HUBBARD ROAD/EW-18): OVER CHIKASKIA
RIVER OVERFLOW, 2.9 MILES EAST OF US-177
ACERSTP-236C(030)ER
CEC CORP.
NEAR BLACKWELL.
Contractor:
BREWER CONSTRUCTION OKLAHOMA, LLC
Engineer:
Adjusted:
CEC
Contract Amount:
(
$324,362.80
$324,362.80)
Contract Time:
(
)
60
60
Letting Date:
11/17/2016
Contract Date:
12/15/2016
W/O Issued
Adjusted:
12/16/2016
W/O Effective:
Amount Paid:
01/23/2017
75 % (
75 %)
Work Started:
Time Passed:
01/23/2017
43 % (
43 %)
County:
Kingfisher
4
Commissioner District:
Contracts Under Construction
Contract: 160200
21858(04)
SH-51
ACSTP-137C(051)SS/ACSTP-*
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
Hoover, Jacob
Contract Amount:
$6,606,846.50
Contract Time:
390
Letting Date:
05/19/2016
Contract Date:
06/21/2016
W/O Issued
06/23/2016
W/O Effective:
10/03/2016
Work Started:
10/18/2016
*242C(045)SS
Residency:
ENID
04300
Adjusted:
(
$6,846,852.50)
(
390 )
BRIDGE AND APPROACHES SH-51: OVER
SKELETON CREEK AND BRIDGE CREEK, 6.0
MILES WEST AND 3.8 MILES EAST OF SH-74
NEAR HENNESSEY. PROJECT LENGTH =
0.912 MILE.
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
24 % (
23 %)
47 % (
47 %)
Page 103
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160223
Residency:
30461(04)
CO.RD.
04009
(NS-274): OVER KINGFISHER CREEK, 0.9 MILE
SOUTH OF SH-3 NEAR KINGFISHER.
STP-237C(032)CI
CIRCUIT ENGR. DISTR. # 8
PROJECT LENGTH = 0.189 MILE.
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
CED8
Contract Amount:
(
$858,178.58
$873,410.90)
Contract Time:
(
120
120 )
Letting Date:
06/16/2016
Contract Date:
07/26/2016
W/O Issued
Adjusted:
07/28/2016
W/O Effective:
Amount Paid:
11/07/2016
93 % (
91 %)
Work Started:
Time Passed:
11/01/2016
109 % (
109 %)
BRIDGE AND APPROACHES SH-33: OVER
Residency:
Contract: 160418
29490(04)
SH-33
04300
FOREMAN CREEK, 10.2 MILES EAST OF THE
US-81 JUNCTION NEAR KINGFISHER.
STP-237B(033)SS
ENID
PROJECT LENGTH = 0.067 MILE.
Contractor:
RDNJ, INC. DBA A-TECH PAVING
Adjusted:
Engineer:
Hoover, Jacob
Contract Amount:
(
$1,000,076.68
$1,000,076.68)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
01/03/2017
W/O Effective:
Amount Paid:
03/27/2017
23 % (
23 %)
Work Started:
Time Passed:
03/27/2017
31 % (
31 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170170
Residency:
28435(04)
CO. RD.
04009
(EW-84): OVER WINTER CAMP CREEK/DEAD
INDIAN CREEK, 5.3 MILES WEST OF
ACSTP-237C(004)CI
CIRCUIT ENGR. DISTR. # 8
US-81/SH-3 NEAR OKARCHE. PROJECT
Contractor:
K & R BUILDERS, INC.
LENGTH = 0.246 MILE
Engineer:
Adjusted:
CED8
Contract Amount:
(
$906,755.72
$906,755.72)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/11/2017
W/O Issued
Adjusted:
05/12/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 170171
Residency:
31185(04)
CO. RD.
04100
ROAD (EW-73): FROM US-81, EXTEND EAST
NEAR DOVER. PROJECT LENGTH = 3.375
ACSTP-237C(036)CI
PERRY
MILES
Contractor:
DUIT CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Zachary, Ted
Contract Amount:
(
$2,147,559.76
$2,147,559.76)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/11/2017
W/O Issued
Adjusted:
05/12/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Kiowa
5
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 104
Contract: 140204
23244(04)
SH-54
STPY-138C(108)SS
Contractor:
SEWELL BROS., INC.
Engineer:
Sirmons, Karl
Contract Amount:
$6,417,215.53
Contract Time:
270
Letting Date:
06/19/2014
Contract Date:
07/18/2014
W/O Issued
07/24/2014
W/O Effective:
11/03/2014
Work Started:
08/25/2014
Contract: 160224
27021(04)
SH-19
ACSTP-238C(031)SS/ACSTP-*
Contractor:
TREAS CONSTRUCTION, INC.
Engineer:
Sirmons, Karl
Contract Amount:
$2,624,740.48
Contract Time:
150
Letting Date:
08/18/2016
Contract Date:
09/12/2016
W/O Issued
09/14/2016
W/O Effective:
01/03/2017
Work Started:
10/24/2016
*138C(161)SS
Contract: 160320
28999(04)
SH-44
ACSTP-238C(037)SS/STP-27*
Contractor:
K & R BUILDERS, INC.
Engineer:
ATKINS
Contract Amount:
$3,321,240.72
Contract Time:
270
Letting Date:
09/15/2016
Contract Date:
10/17/2016
W/O Issued
11/30/2016
W/O Effective:
02/16/2017
Work Started:
02/20/2017
*5C(035)SS
Contract: 170085
29648(04)
US-62
NHPPY-238N(026)3P
Contractor:
T & G CONSTRUCTION, INC.
Engineer:
Sirmons, Karl
Contract Amount:
$504,346.55
Contract Time:
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
03/24/2017
W/O Effective:
Work Started:
County:
Latimer
Residency:
ALTUS
05200
Adjusted:
(
$6,443,401.88)
(
355 )
BRIDGE AND APPROACHES SH-54: OVER
RAINY MOUNTAIN CREEK AND TWO
UNNAMED CREEKS, 6.0 MILES, 6.4 MILES,
AND 6.8 MILES SOUTH OF SH-9. PROJECT
LENGTH = 1.092 MILES.
Amount Paid:
Time Passed:
Residency:
ALTUS
05200
Adjusted:
(
$2,693,221.50)
(
150 )
BRIDGE AND APPROACHES SH-19: OVER
UNNAMED CREEK AND PECAN CREEK, 0.3
MILE AND 2.8 MILES EAST OF THE SH-115
JUNCTION NEAR COOPERTON. PROJECT
LENGTH = 0.557 MILE.
Amount Paid:
Time Passed:
Residency:
ATKINS
05010
Adjusted:
(
$3,321,240.72)
(
270 )
05200
Adjusted:
92 % (
90 %)
109 % (
109 %)
BRIDGE AND APPROACHES SH-44: OVER ELK
CREEK, ELK CREEK O'FLOW, AND DRY ELK
CREEK, 7.6 MI, 7.8 MI AND 11.4 MILES NORTH
OF SH-9 NEAR SENTINEL. PROJECT LENGTH
= 0.410 MILE
Amount Paid:
Time Passed:
Residency:
ALTUS
Adjusted:
95 % (
94 %)
131 % (
100 %)
Adjusted:
57 % (
57 %)
30 % (
30 %)
RESURFACE (ASPHALT) US-62: FROM 3.22
MILES EAST OF THE TILLMAN COUNTY LINE,
EXTEND EAST NEAR SNYDER. PROJECT
LENGTH = 2.28 MILES
Adjusted:
(
$504,346.55)
(
)
Fixed Completion Date: 10/31/2017
Adjusted:
Amount Paid:
0%(
0 %)
Time Passed:
0%(
0 %)
2
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 105
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 170026
Residency:
31231(04)
CO. RD.
02013
ROAD (DRUMB ROAD): FROM THE PITTSBURG
COUNTY LINE, EXTEND NORTHEAST NEAR
STP-239C(026)CI
CIRCUIT ENGR. DISTR. # 3
WILBURTON. PROJECT LENGTH = 1.174
Contractor:
GLOVER & ASSOCIATES, INC.
MILES.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$1,055,044.90
$1,055,044.90)
Contract Time:
(
150
150 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Le Flore
2
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES & BRIDGE
Residency:
Contract: 150205
27029(04)
US-59
02200
REHABILITATION US-259/US-59/SH-63: AT
MULTIPLE BRIDGE LOCATIONS IN DIVISION II.
STP-240C(31)(29)SS/SBR-2*
HEAVENER
PROJECT LENGTH = 0.889 MILE.
Contractor:
C-GAWF CONSTRUCTION, INC.
Engineer:
Adjusted:
Huddleston, David
Contract Amount:
(
$12,483,862.80
$12,506,290.36)
Contract Time:
(
800
800 )
Letting Date:
07/23/2015
Contract Date:
08/26/2015
W/O Issued
Adjusted:
09/04/2015
W/O Effective:
Amount Paid:
11/02/2015
47 % (
47 %)
Work Started:
Time Passed:
10/05/2015
53 % (
53 %)
*45C(4)SB/SBR-240N(22)SB/NHPP-240N(32)SS
RESURFACE (ASPHALT) SH-112: FROM THE
Residency:
Contract: 160168
02200
31849(04)
SH-112
SH-120 JUNCTION, EXTEND NORTH NEAR
POCOLA. PROJECT LENGTH = 5.470 MILES.
HEAVENER
ACSTP-240C(046)SS
Contractor:
JOB CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Huddleston, David
Contract Amount:
(
$1,825,368.14
$1,835,004.14)
Contract Time:
(
)
45
45
Letting Date:
04/21/2016
Contract Date:
05/10/2016
W/O Issued
Adjusted:
05/11/2016
W/O Effective:
Amount Paid:
09/06/2016
88 % (
88 %)
Work Started:
Time Passed:
09/06/2016
164 % (
164 %)
BRIDGE AND APPROACHES AND BRIDGE
Contract: 160225
Residency:
27024(04)
US-59
02200
REHABILITATION US-59: OVER SHAWNEE CR,
SHAWNEE CR OVERFLOW, CEDAR CR AND
ACNHPP-240N(047)SS/ACNHP*
HEAVENER
CEDAR CR OVERFLOW, 2.6 AND 5.6 MI NW OF
Contractor:
C-GAWF CONSTRUCTION, INC.
US-259 NEAR PAGE. PROJECT LENGTH =
Engineer:
Adjusted:
Huddleston, David
0.603 MILE
Contract Amount:
(
$6,387,542.40
$6,387,542.40)
Contract Time:
(
500
500 )
Letting Date:
06/16/2016
Contract Date:
07/28/2016
W/O Issued
Adjusted:
08/02/2016
W/O Effective:
Amount Paid:
10/03/2016
58 % (
58 %)
Work Started:
Time Passed:
10/03/2016
37 % (
37 %)
*P-140N(171)SS
Construction Status Report
Page 106
County:
Lincoln
3
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160188
24228(10)
SH-62
03002
SH-102: FROM 0.2 MI NORTH OF US-62, EXT
NORTH NEAR MIDWAY. US-62: FROM 3.65 MI
ACSTP-141C(232)(168)(171*
TETRA TECH
WEST OF SH-102, EXT EAST NEAR MIDWAY.
Contractor:
HASKELL LEMON CONSTRUCTION CO.
PROJECT LENGTH = 6.370 MILES.
Engineer:
Adjusted:
TETR
Contract Amount:
(
$22,560,549.77
$23,647,800.93)
Contract Time:
(
550
550 )
Letting Date:
04/21/2016
Contract Date:
05/09/2016
W/O Issued
Adjusted:
05/11/2016
W/O Effective:
Amount Paid:
09/06/2016
48 % (
46 %)
Work Started:
Time Passed:
08/01/2016
52 % (
52 %)
*(224)SS
BRIDGE AND APPROACHES SH-105: OVER
Residency:
Contract: 160251
27060(04)
SH-105
03300
HEADQUARTERS CREEK, 1.0 MILE EAST OF
US-177 NEAR TRYON. PROJECT LENGTH =
ACSTP-241C(044)SS
WEWOKA
0.131 MILE.
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$1,758,457.36
$1,773,057.36)
Contract Time:
(
210
212 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/25/2016
W/O Effective:
Amount Paid:
12/05/2016
70 % (
69 %)
Work Started:
Time Passed:
11/16/2016
62 % (
61 %)
BRIDGE AND APPROACHES US-177: OVER
Residency:
Contract: 160321
03300
28941(04)
US-177
BRUSH CREEK, 0.7 MILE NORTH OF THE
POTTAWATOMIE COUNTY LINE NEAR
WEWOKA
ACSTP-241B(043)SS
MEEKER. PROJECT LENGTH = 0.076 MILE.
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$1,887,337.58
$1,909,211.58)
Contract Time:
(
180
180 )
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
Adjusted:
10/17/2016
W/O Effective:
Amount Paid:
02/16/2017
34 % (
34 %)
Work Started:
Time Passed:
02/13/2017
39 % (
39 %)
GRADE,DRAIN, SURFACE, AND BRIDGE
Contract: 160372
Residency:
28573(04)
CO. RD.
03001
COUNTY ROAD (PARKLAND ROAD/EW-81):
FROM SH-18, EXTEND EAST NEAR
STP-241C(032)CI
ENGR. SERV. & TESTING
CHANDLER. PROJECT LENGTH = 1.995 MILES
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Adjusted:
EST
Contract Amount:
(
$2,753,400.01
$2,753,400.01)
Contract Time:
(
180
180 )
Letting Date:
10/20/2016
Contract Date:
11/17/2015
W/O Issued
Adjusted:
11/18/2016
W/O Effective:
Amount Paid:
03/06/2017
28 % (
28 %)
Work Started:
Time Passed:
03/06/2017
35 % (
35 %)
Construction Status Report
Page 107
BRIDGE REHABILITATION SH-18B: OVER
Contract: 160420
Residency:
29570(04)
SH-18B
03001
QUAPAW CREEK, 3.3 MILES EAST OF THE
SH-18 JUNCTION NEAR CHANDLER. PROJECT
STP-241C(045)SS
ENGR. SERV. & TESTING
LENGTH = 0.177 MILE.
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
EST
Contract Amount:
(
$1,051,142.26
$1,051,142.26)
Contract Time:
(
120
115 )
Letting Date:
11/17/2016
Contract Date:
12/15/2016
W/O Issued
Adjusted:
12/16/2016
W/O Effective:
Amount Paid:
03/06/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE REHABILITATION SH-102: OVER
Residency:
Contract: 170086
29540(04)
SH-102
03010
CAPTAIN CREEK, 0.3 MILES NORTH OF THE
TURNER TURNPIKE NEAR WELLSTON.
STP-241C(049)SS
ATKINS
PROJECT LENGTH = 0.128 MILE
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Adjusted:
Engineer:
ATKINS
Contract Amount:
(
$1,011,235.28
$1,011,235.28)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/10/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Logan
4
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES SH-33: OVER
Residency:
Contract: 160290
04500
21860(04)
SH-33
COTTONWOOD CREEK AND BNSF RAILROAD,
0.2 MILE WEST OF SH-77 IN GUTHRIE.
STILLWATER
ACSTP-242C(046)SS
PROJECT LENGTH = 0.794 MILE.
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Buchanan, Seth
Contract Amount:
(
$17,235,548.53
$17,251,613.53)
Contract Time:
(
560
560 )
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
Adjusted:
10/17/2016
W/O Effective:
Amount Paid:
02/16/2017
26 % (
26 %)
Work Started:
Time Passed:
01/30/2017
16 % (
16 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160439
32379(04)
COUNTY RO Residency:
04003
(EW-84/SEWARD ROAD): OVER
COTTONWOOD CREEK, 4.3 MILES WEST OF
ACERSTP-242C(056)ER
CEC CORP.
US-77 NEAR GUTHRIE. PROJECT LENGTH =
Contractor:
BRIDGECO CONTRACTORS, INC.
0.249 MILE.
Engineer:
Adjusted:
CEC
Contract Amount:
(
$1,025,064.43
$1,025,064.43)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/15/2016
W/O Issued
Adjusted:
12/16/2016
W/O Effective:
Amount Paid:
01/23/2017
69 % (
69 %)
Work Started:
Time Passed:
01/23/2017
78 % (
78 %)
Construction Status Report
Page 108
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170027
Residency:
18265(04)
CO. RD.
04500
(EW-69/W. 92ND STREET): OVER BEAVER
CREEK, 0.6 MILES WEST OF THE PAYNE
STP-142D(045)CI
STILLWATER
COUNTY LINE. PROJECT LENGTH = 0.302 MILE
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
Buchanan, Seth
Contract Amount:
(
$1,015,190.95
$1,015,190.95)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
Adjusted:
02/16/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
RESURFACE (ASPHALT) COUNTY ROAD
Residency:
Contract: 170087
28727(04)
CO. RD.
04500
(SIMPSON ROAD/EW-86): FROM COLTRANE
ROAD (NS-312), EXTEND WEST NEAR
STP-242C(062)CI
STILLWATER
GUTHRIE. PROJECT LENGTH = 1.491 MILES
Contractor:
T.J. CAMPBELL CONSTRUCTION COMPANY
Adjusted:
Engineer:
Buchanan, Seth
Contract Amount:
(
$543,195.50
$543,195.50)
Contract Time:
(
)
30
30
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/24/2017
W/O Effective:
Amount Paid:
07/10/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
RESURFACE (ASPHALT) SH-74C: FROM 5.41
Contract: 170088
Residency:
30634(04)
SH-74C
04500
MILES EAST OF SH-74, EXTEND SOUTHEAST
NEAR CRESCENT. PROJECT LENGTH = 6.180
STPY-242C(053)3P
STILLWATER
MILES
Contractor:
T.J. CAMPBELL CONSTRUCTION COMPANY
Engineer:
Adjusted:
Buchanan, Seth
Contract Amount:
(
$790,816.00
$790,816.00)
Contract Time:
(
)
60
60
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
05/17/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Love
7
Commissioner District:
Contracts Under Construction
Contract: 150017
25909(26)
I-35
SAP-243N(009)(008)FM
Contractor:
OVERLAND CORPORATION
Engineer:
TETR
Contract Amount:
$9,621,309.21
Contract Time:
365
Letting Date:
02/19/2015
Contract Date:
03/13/2015
W/O Issued
03/16/2015
W/O Effective:
07/14/2015
Work Started:
07/13/2015
Residency:
TETRA TECH
07002
Adjusted:
(
$9,699,690.51)
(
388 )
GRADE, DRAIN, SURFACE, AND SITE PLAN
I-35: TRUCK WEIGH STATION FROM 12.0
MILES NORTH OF THE TEXAS STATE LINE,
EXTEND NORTH. PROJECT LENGTH = 1.195
MILES.
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
88 % (
88 %)
123 % (
116 %)
Page 109
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 150337
Residency:
10147(04)
SH-32
07200
SH-32: BEGIN 0.41 MILES WEST OF SH-96,
EXTEND EAST NEAR BURNEYVILLE. PROJECT
STP-043C(141)SS
ARDMORE
LENGTH = 4.303 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Fuhrmann, Chris
Contract Amount:
(
$13,594,551.91
$13,594,551.91)
Contract Time:
(
330
330 )
Letting Date:
10/15/2015
Contract Date:
11/13/2015
W/O Issued
Adjusted:
11/30/2015
W/O Effective:
Amount Paid:
03/07/2016
90 % (
90 %)
Work Started:
Time Passed:
03/07/2016
98 % (
98 %)
Contract: 160036
10147(05)
SH-32
ACSTP-143C(063)SS
Contractor:
OVERLAND CORPORATION
Engineer:
Fuhrmann, Chris
Contract Amount:
$7,876,548.52
Contract Time:
300
Letting Date:
03/17/2016
Contract Date:
04/14/2016
W/O Issued
04/25/2016
W/O Effective:
09/06/2016
Work Started:
08/15/2016
Contract: 160098
26502(04)
SH-32
ACSTP-143C(093)SS
Contractor:
OVERLAND CORPORATION
Engineer:
Fuhrmann, Chris
Contract Amount:
$11,463,969.39
Contract Time:
460
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
08/24/2016
W/O Effective:
11/07/2016
Work Started:
11/07/2016
Residency:
ARDMORE
07200
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-32: FROM 3.9 MILES WEST OF I-35,
EXTEND EAST NEAR MARIETTA. PROJECT
LENGTH = 3.842 MILES
Adjusted:
(
$7,876,548.52)
(
300 )
Amount Paid:
Time Passed:
Residency:
ARDMORE
07200
Adjusted:
(
$11,479,739.39)
(
460 )
Adjusted:
36 % (
36 %)
71 % (
71 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-32: OVER MUD CREEK AND MUD CREEK
OVERFLOWS, 0.6 MILE EAST OF SH-89 NEAR
COURTNEY. PROJECT LENGTH = 1.287
MILES.
Amount Paid:
Time Passed:
Adjusted:
34 % (
33 %)
33 % (
33 %)
BRIDGE AND APPROACHES US-77: OVER
Contract: 170028
Residency:
27047(04)
US-77
07200
CLOUDS BRANCH CREEK, 3.7 MILES SOUTH
OF THE SH-32 JUNCTION NEAR MARIETTA.
STP-243C(021)SS
ARDMORE
PROJECT LENGTH = 0.043 MILE.
Contractor:
SILVER STAR CONSTRUCTION COMPANY, INC.
Engineer:
Adjusted:
Fuhrmann, Chris
Contract Amount:
(
$1,038,300.00
$1,038,300.00)
Contract Time:
(
150
150 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
05/01/2017
0%(
0 %)
County:
McClain
3
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 110
Contract: 150236
27936(04)
SH-76
STP-244C(024)SS
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
JACOBS
Contract Amount:
$3,928,057.70
Contract Time:
240
Letting Date:
07/23/2015
Contract Date:
08/20/2015
W/O Issued
08/24/2015
W/O Effective:
12/07/2015
Work Started:
10/19/2015
Residency:
03004
JACOBS ENGINEERING
BRIDGE AND APPROACHES SH-76: OVER
NORTH FORK WALNUT CREEK, 2.87 MILES
NORTH OF US-62 NEAR BLANCHARD.
PROJECT LENGTH = 0.818 MILE
Adjusted:
(
$3,928,057.70)
(
240 )
Amount Paid:
Time Passed:
Adjusted:
91 % (
91 %)
97 % (
97 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 150367
23264(04)
SH-76
03018
SH-76: FROM SH-19, EXTEND NORTH IN
LINDSAY. PROJECT LENGTH = 3.312 MILES.
ACSTP-125B(137)SS
BENCHMARK CONSTR. SERVS., LLC
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Adjusted:
Engineer:
BCS
Contract Amount:
(
$7,999,978.49
$8,048,146.24)
Contract Time:
(
300
305 )
Letting Date:
11/19/2015
Contract Date:
12/16/2015
W/O Issued
Adjusted:
01/28/2016
W/O Effective:
Amount Paid:
03/07/2016
90 % (
89 %)
Work Started:
Time Passed:
01/16/2016
112 % (
110 %)
Contract: 160142
01964(06)
SH-76
ACSTP-144C(001)SS
Contractor:
MUNOZ CONSTRUCTION, INC.
Engineer:
JACOBS
Contract Amount:
$6,557,900.51
Contract Time:
290
Letting Date:
03/17/2016
Contract Date:
04/15/2016
W/O Issued
04/25/2016
W/O Effective:
09/06/2016
Work Started:
06/06/2016
Contract: 160143
31378(04)
I-35
SBR-244N(048)SB
Contractor:
C3 CONSTRUCTION, INC.
Engineer:
Reed, Lucas
Contract Amount:
$2,198,254.42
Contract Time:
300
Letting Date:
04/21/2016
Contract Date:
05/16/2016
W/O Issued
05/20/2016
W/O Effective:
09/06/2016
Work Started:
09/06/2016
Residency:
03004
JACOBS ENGINEERING
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-76: FROM 0.1 MILE SOUTH OF SH-74B,
EXTEND NORTH NEAR BLANCHARD.
PROJECT LENGTH = 2.162 MILES.
Adjusted:
(
$6,557,900.51)
(
290 )
Amount Paid:
Time Passed:
Residency:
PURCELL
03200
Adjusted:
91 % (
91 %)
105 % (
105 %)
BRIDGE REHABILITATION I-35: OVER SH-74,
2.1 MILES NORTH OF SH-39 IN PURCELL.
PROJECT LENGTH = 0.090 MILE.
Adjusted:
(
$2,198,254.42)
(
300 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
56 % (
56 %)
82 % (
82 %)
Page 111
RESURFACE (ASPHALT) SH-39: FROM 75 FEET
Contract: 160227
Residency:
32477(04)
SH-39
03200
WEST OF THE SH-59 SOUTH JUNCTION,
EXTEND EAST NEAR PURCELL. PROJECT
MC-244B(051)
PURCELL
LENGTH = 5.86 MILES
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$643,576.30
$643,576.30)
Contract Time:
(
)
21
21
Letting Date:
06/16/2016
Contract Date:
07/27/2016
W/O Issued
Adjusted:
07/28/2016
W/O Effective:
Amount Paid:
11/07/2016
97 % (
97 %)
Work Started:
Time Passed:
11/15/2016
124 % (
124 %)
BRIDGE REHABILITATION SH-74: OVER I-35,
Residency:
Contract: 160322
29572(04)
SH-74
03200
1.1 MILES SOUTH OF SH-39 IN PURCELL.
PROJECT LENGTH = 0.133 MILE
NHPPI-244N(029)SS
PURCELL
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Adjusted:
Engineer:
Reed, Lucas
Contract Amount:
(
$2,368,082.90
$2,368,082.90)
Contract Time:
(
240
240 )
Letting Date:
09/15/2016
Contract Date:
10/11/2016
W/O Issued
Adjusted:
10/12/2016
W/O Effective:
Amount Paid:
02/16/2017
97 % (
97 %)
Work Started:
Time Passed:
11/07/2016
75 % (
75 %)
SAFETY IMPROVEMENT (SIDEWALKS,
Contract: 170029
Residency:
31570(04)
CT. ST.
03200
LIGHTING AND LANDSCAPE) CITY STREET
(GREEN AVENUE): FROM WASHINGTON
STP-244E(054)UR
PURCELL
AVENUE, EXTEND NORTH IN PURCELL.
Contractor:
TRI-CITY SEAL CO., INC.
PROJECT LENGTH = 1.065 MILES
Engineer:
Adjusted:
Reed, Lucas
Contract Amount:
(
$1,972,840.23
$1,972,840.23)
Contract Time:
(
240
240 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
8%(
8 %)
Work Started:
Time Passed:
04/03/2017
16 % (
16 %)
County:
McCurtain
2
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 130408
Residency:
17427(04)
US-70
02100
US-70: FROM 6.2 MILES EAST OF US-259,
EXTEND EAST. PROJECT LENGTH = 3.296
NHPPY-245N(018)
ANTLERS
MILES.
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Moy, Ryan
Contract Amount:
(
$16,135,411.34
$16,585,625.18)
Contract Time:
(
330
420 )
Letting Date:
11/21/2013
Contract Date:
12/20/2013
W/O Issued
Adjusted:
01/02/2014
W/O Effective:
Amount Paid:
03/03/2014
97 % (
94 %)
Work Started:
Time Passed:
03/03/2014
127 % (
100 %)
Construction Status Report
Page 112
Contract: 150021
27908(07)
US-70
NHPP-245N(022)SS/HSIPG-2*
Contractor:
L & N BRIDGE, LLC
Engineer:
Moy, Ryan
Contract Amount:
$12,392,055.21
Contract Time:
400
Letting Date:
08/20/2015
Contract Date:
09/22/2015
W/O Issued
09/28/2015
W/O Effective:
01/04/2016
Work Started:
01/04/2016
45N(030)TR
Residency:
ANTLERS
02100
Adjusted:
(
$12,392,055.21)
(
400 )
BRIDGE AND APPROACHES AND GUARDRAIL
US-70: OVER LITTLE RIVER AND LITTLE
RIVER OVERFLOW, 5.8 MI NE OF US-259 AND
FROM SH-37, EXTEND N NEAR BROKEN BOW.
PROJECT LENGTH = 7.00 MILES.
Amount Paid:
Time Passed:
Adjusted:
83 % (
83 %)
88 % (
88 %)
GRADE, DRAIN, SURFACE, AND BRIDGE SH-3:
Residency:
Contract: 150299
24184(04)
SH-3
02100
FROM 10.54 MILES EAST OF THE
PUSHMATAHA COUNTY LINE,EXTEND EAST.
STP-145B(150)SS
ANTLERS
PROJECT LENGTH = 5.665 MILES.
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Moy, Ryan
Contract Amount:
(
$14,789,543.93
$14,789,543.93)
Contract Time:
(
400
400 )
Letting Date:
11/19/2015
Contract Date:
12/22/2015
W/O Issued
Adjusted:
01/11/2016
W/O Effective:
Amount Paid:
05/02/2016
47 % (
47 %)
Work Started:
Time Passed:
02/22/2016
65 % (
65 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160228
Residency:
18853(04)
US-70
02100
US-70: FROM 6.7 MILES EAST OF THE SH-109
JUNCTION, EXTEND EAST NEAR VALIANT.
ACNHPP-245N(037)SS
ANTLERS
PROJECT LENGTH = 2.718 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Moy, Ryan
Contract Amount:
(
$11,577,983.09
$11,577,983.09)
Contract Time:
(
295
295 )
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
Adjusted:
09/22/2016
W/O Effective:
Amount Paid:
01/03/2017
12 % (
12 %)
Work Started:
Time Passed:
01/03/2017
15 % (
15 %)
RIGHT-OF-WAY CLEARANCE US-70: FROM 2.5
Contract: 170030
Residency:
18859(11)
US-70
02100
MILES EAST OF THE CHOCTAW COUNTY
LINE, EXTEND EAST NEAR VALIANT. PROJECT
SSP-245N(048)RW
ANTLERS
LENGTH = 4.60 MILES PREQUALIFICATION
Contractor:
ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
FOR THIS PROJECT HAS BEEN WAIVED.
Engineer:
Adjusted:
Moy, Ryan
BOTH BID EXPRESS AND WRITTEN BIDS WILL
BE ACCEPTABLE.
Contract Amount:
(
$122,222.00
$122,222.00)
Contract Time:
(
180
180 )
Letting Date:
01/19/2017
Contract Date:
12/14/2017
W/O Issued
Adjusted:
02/16/2017
W/O Effective:
Amount Paid:
03/06/2017
43 % (
43 %)
Work Started:
Time Passed:
04/14/2017
6%(
6 %)
County:
McIntosh
1
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 113
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 140242
Residency:
30256(04)
CO.RD.
01100
ROAD (MC-4626C/TEXANNA RD): BEGIN 4.0 MI
EAST AND 1.0 MI SOUTH OF THE
STP-246C(009)CI
MUSKOGEE
US-69/SH-150 JCT, EXTEND SOUTH AND
Contractor:
GLOVER & ASSOCIATES, INC.
EAST. PROJECT LENGTH = 2.898 MILES.
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$2,689,316.85
$2,689,316.85)
Contract Time:
(
)
Letting Date:
08/21/2014
Contract Date:
09/22/2014
Fixed Completion Date: 04/30/2015
W/O Issued
Adjusted:
09/25/2014
W/O Effective:
Amount Paid:
93 % (
93 %)
Work Started:
Time Passed:
01/29/2015
259 % (
76 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160039
25103(04)
CO.RD.
01017
COUNTY ROAD (EW-103/NS-423): FROM OLD
US-69, EXTEND EAST THEN NORTH NEAR
CIRB-146C(101)RB
CIRCUIT ENGR. DISTR. # 2
CHECOTAH. PROJECT LENGTH = 3.638 MILES
Contractor:
GLOVER & ASSOCIATES, INC.
Adjusted:
Engineer:
CE2
Contract Amount:
(
$2,212,168.11
$2,212,168.11)
Contract Time:
(
)
90
90
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
05/17/2016
W/O Effective:
Amount Paid:
06/06/2016
83 % (
83 %)
Work Started:
Time Passed:
07/13/2016
201 % (
201 %)
Contract: 160170
26289(04)
I-40
ACNHPPI-4000(029)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
JACOBS
Contract Amount:
$13,056,622.86
Contract Time:
210
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
05/20/2016
W/O Effective:
06/27/2016
Work Started:
07/11/2016
Residency:
01004
JACOBS ENGINEERING
RESURFACE (ASPHALT) I-40: FROM THE
OKMULGEE COUNTY LINE, EXTEND EAST
NEAR CHECOTAH. PROJECT LENGTH = 7.971
MILES.
Adjusted:
(
$13,056,622.86)
(
232 )
Amount Paid:
Time Passed:
Adjusted:
78 % (
78 %)
138 % (
125 %)
RESURFACE (ASPHALT) US-266: FROM THE
Contract: 170031
Residency:
29750(06)
US-266
01200
OKMULGEE COUNTY LINE, EXTEND EAST
NEAR LAKE EUFAULA. PROJECT LENGTH =
SSR-246C(024)(025)SR
SALLISAW
13.798 MILES
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$1,985,106.23
$1,985,106.23)
Contract Time:
(
)
60
60
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/25/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Major
6
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 114
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 140128
Residency:
17358(10)
US-412
06100
US-412: FROM 0.1 MILE EAST OF US-281,
EXTEND EAST. PROJECT LENGTH = 4.109
NHPPY-147N(148)
BUFFALO
MILES.
Contractor:
J & R SAND COMPANY, INC.
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$13,606,502.62
$13,716,127.62)
Contract Time:
(
450
450 )
Letting Date:
03/20/2014
Contract Date:
04/11/2014
W/O Issued
Adjusted:
04/17/2014
W/O Effective:
Amount Paid:
08/04/2014
92 % (
92 %)
Work Started:
Time Passed:
08/04/2014
85 % (
85 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160229
28346(04)
CO.RD.
06009
COUNTY ROAD (NS-256): FROM 2.9 MILES
NORTH OF US-412, EXTEND NORTH NEAR
STP-247C(016)CI
CIRCUIT ENGR. DISTR. # 8
CLEO SPRINGS. PROJECT LENGTH = 0.246
Contractor:
SEWELL BROS., INC.
MILE
Adjusted:
Engineer:
CED8
Contract Amount:
(
$945,731.86
$945,731.86)
Contract Time:
(
120
120 )
Letting Date:
06/16/2016
Contract Date:
07/27/2016
W/O Issued
Adjusted:
07/28/2016
W/O Effective:
Amount Paid:
11/07/2016
98 % (
98 %)
Work Started:
Time Passed:
10/10/2016
95 % (
95 %)
BRIDGE REHABILITATION SH-8: OVER SAND
Contract: 160421
Residency:
28161(04)
SH-8
06018
CREEK, 1.6 MILES EAST OF THE US-60
JUNCTION NEAR FAIRVIEW. PROJECT
SBR-147C(166)SB
BENCHMARK CONSTR. SERVS., LLC
LENGTH = 0.125 MILE
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
BCS
Contract Amount:
(
$1,149,015.19
$1,149,015.19)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/19/2016
W/O Effective:
Amount Paid:
03/06/2017
34 % (
34 %)
Work Started:
Time Passed:
03/08/2017
42 % (
42 %)
Contract: 170128
29446(04)
US-60
STP-247B(017)
Contractor:
FRONTIER BRIDGE, INC.
Engineer:
ZOA
Contract Amount:
$5,360,055.79
Contract Time:
290
Letting Date:
03/16/2017
Contract Date:
04/14/2017
W/O Issued
04/18/2017
W/O Effective:
09/05/2017
Work Started:
County:
Mayes
Residency:
06021
OLSSON ASSOCIATES
BRIDGE AND APPROACHES US-60: OVER THE
NORTH CANADIAN RIVER, 2.2 MILES NORTH
OFUS-270 NEAR SEILING. PROJECT LENGTH =
0.851 MILE
Adjusted:
(
$5,360,055.79)
(
290 )
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
8
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 115
BRIDGE REHABILITATION US-412: OVER THE
Contract: 160042
Residency:
29073(04)
US-412
08300
UNION PACIFIC RAILROAD, 0.2 MILES WEST
OF US-69 NEAR CHOUTEAU. PROJECT
SBR-249N(001)SB
CLAREMORE
LENGTH = 0.134 MILE
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Adjusted:
Tyler, Jennifer
Contract Amount:
(
$2,664,000.00
$2,664,000.00)
Contract Time:
(
180
180 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
05/02/2016
W/O Effective:
Amount Paid:
06/06/2016
93 % (
93 %)
Work Started:
Time Passed:
06/06/2016
163 % (
163 %)
Contract: 170032
30516(04)
US-69
SSR-249N(026)SR
Contractor:
APAC-CENTRAL, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$1,361,195.40
Contract Time:
60
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
02/16/2017
W/O Effective:
06/05/2017
Work Started:
03/21/2017
Residency:
CLAREMORE
08300
RESURFACE (ASPHALT) US-69: FROM 0.88
MILE NORTH OF SH-20, EXTEND NORTH NEAR
PRYOR. PROJECT LENGTH = 7.990 MILES.
Adjusted:
(
$1,361,195.40)
(
)
60
Amount Paid:
Time Passed:
Adjusted:
100 % (
100 %)
63 % (
63 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170089
Residency:
30485(04)
CO. RD.
08003
(NS-426): OVER CHOUTEAU CREEK
TRIBUTARY, 3.6 MILES SOUTH OF SH-20 NEAR
STP-249C(036)CI
CEC CORP.
PRYOR. PROJECT LENGTH = 0.180 MILE
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Adjusted:
CEC
Contract Amount:
(
$574,581.56
$574,581.56)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
04/05/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Muskogee
1
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 140365
Residency:
25419(04)
CO.RD.
01017
(EW-83.5): OVER GRAND RIVER, 0.5 MILE
NORTH AND 0.6 MILE WEST OF FORT GIBSON.
CIRB-151C(181)RB
CIRCUIT ENGR. DISTR. # 2
PROJECT LENGTH = 0.529 MILE.
Contractor:
C-GAWF CONSTRUCTION, INC.
Engineer:
Adjusted:
CE2
Contract Amount:
(
$6,155,741.74
$6,200,446.11)
Contract Time:
(
300
320 )
Letting Date:
11/20/2014
Contract Date:
12/23/2014
W/O Issued
Adjusted:
02/04/2015
W/O Effective:
Amount Paid:
04/27/2015
100 % (
99 %)
Work Started:
Time Passed:
04/27/2015
95 % (
89 %)
Construction Status Report
Page 116
BRIDGE REHABILITATION US-64: OVER
Contract: 160044
Residency:
30583(04)
US-64
01100
SH-165 IN MUSKOGEE.
SBR-251N(050)SB
MUSKOGEE
Contractor:
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$1,818,806.71
$1,973,819.93)
Contract Time:
(
180
180 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
05/20/2016
W/O Effective:
Amount Paid:
06/06/2016
90 % (
83 %)
Work Started:
Time Passed:
07/07/2016
146 % (
146 %)
BRIDGE REHABILITATION US-62: OVER
Residency:
Contract: 160203
28954(04)
US-62
01100
CLOUD CREEK, 1.5 MILES EAST OF THE SH-16
JUNCTION NEAR MUSKOGEE. PROJECT
ACSTP-251B(029)SS
MUSKOGEE
LENGTH = 0.237 MILE.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
Hagerman, Jeremy
Contract Amount:
(
$1,845,070.21
$1,950,112.41)
Contract Time:
(
180
180 )
Letting Date:
05/19/2016
Contract Date:
06/24/2016
W/O Issued
Adjusted:
06/29/2016
W/O Effective:
Amount Paid:
10/03/2016
82 % (
78 %)
Work Started:
Time Passed:
10/03/2016
97 % (
97 %)
Contract: 160292
31245(04)
US-62
ACNHPP-251N(051)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$1,501,985.14
Contract Time:
45
Letting Date:
08/18/2016
Contract Date:
09/21/2016
W/O Issued
09/26/2016
W/O Effective:
03/06/2017
Work Started:
03/08/2017
Contract: 160323
27956(04)
US-62
ACSTP-251B(058)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$5,221,126.20
Contract Time:
210
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
10/19/2016
W/O Effective:
02/16/2017
Work Started:
02/16/2017
Residency:
MUSKOGEE
01100
RESURFACE (ASPHALT) US-62: FROM 2.98
MILES WEST OF US-69, EXTEND EAST IN
MUSKOGEE. PROJECT LENGTH = 2.948 MILES
Adjusted:
(
$1,501,985.14)
(
)
45
Amount Paid:
Time Passed:
Residency:
MUSKOGEE
01100
Adjusted:
(
$5,221,126.20)
(
210 )
GRADE, DRAIN, SURFACE, AND
INTERSECTION MODIFICATION US-62/SH-10:
FROM 2.2 MILES EAST OF THE MUSKOGEE
TURNPIKE (SH-165), EXTEND EAST IN FORT
GIBSON. PROJECT LENGTH = 4.408 MILES.
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
90 % (
90 %)
76 % (
76 %)
Adjusted:
13 % (
13 %)
23 % (
23 %)
Page 117
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160324
Residency:
31162(04)
CO. RD.
01017
(EW-094): OVER CLOUD CREEK, 1.2 MILES
EAST OF US-62 NEAR BOYNTON. PROJECT
CIRB-251C(062)RB
CIRCUIT ENGR. DISTR. # 2
LENGTH = 0.216 MILE
Contractor:
H & H BRIDGE COMPANY
Engineer:
Adjusted:
CE2
Contract Amount:
(
$535,256.00
$535,256.00)
Contract Time:
(
)
90
90
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
Adjusted:
12/09/2016
W/O Effective:
Amount Paid:
02/16/2017
96 % (
96 %)
Work Started:
Time Passed:
12/21/2016
100 % (
100 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 160373
28505(04)
CO. RD.
01017
(EW-870): OVER CLOUD CREEK, 1.8 MILES
EAST OF THE US-64 JUNCTION NEAR
CIRB-251C(064)RB
CIRCUIT ENGR. DISTR. # 2
HASKELL. PROJECT LENGTH = 0.235 MILE.
Contractor:
RRY SERVICES, LLC
Adjusted:
Engineer:
CE2
Contract Amount:
(
$1,447,171.12
$1,447,171.12)
Contract Time:
(
145
145 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
05/01/2017
5%(
5 %)
Work Started:
Time Passed:
05/01/2017
10 % (
10 %)
BRIDGE REHABILITATION SH-10: OVER
Contract: 170033
Residency:
31339(04)
SH-10
01100
MANARD BAYOU CREEK, 2.9 MILES EAST OF
THE US-62 INTERSECTION NEAR FORT
SBR-251C(068)SB
MUSKOGEE
GIBSON.
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$1,627,734.55
$1,627,734.55)
Contract Time:
(
120
120 )
Letting Date:
03/16/2017
Contract Date:
04/25/2017
W/O Issued
Adjusted:
04/26/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Contract: 170129
26976(04)
US-64
SSP-251F(069)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$82,294.60
Contract Time:
60
Letting Date:
03/16/2017
Contract Date:
04/20/2017
W/O Issued
04/21/2017
W/O Effective:
08/07/2017
Work Started:
Residency:
MUSKOGEE
01100
BRIDGE WATER PROOF SEAL
US-64/US-266/SH-9/SH-10/SH-51/SH-82: AT
MULTIPLE LOCATIONS IN DIVISION I.
Adjusted:
(
$82,294.60)
(
)
60
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
0%(
0 %)
0%(
0 %)
Page 118
Contract: 170130
26977(04)
SH-2
NHPPI-NBIP-(508)SS/STP-N*
Contractor:
JK INDUSTRIES, INC.
Engineer:
TETR
Contract Amount:
$188,640.00
Contract Time:
50
Letting Date:
03/16/2017
Contract Date:
04/14/2017
W/O Issued
04/18/2017
W/O Effective:
08/07/2017
Work Started:
05/08/2017
*BIP(509)SS
County:
Residency:
TETRA TECH
01002
BRIDGE PAINTING SH-2/SH-100:SH-2,OVER
GEORGES FORK CREEK 0.8 MI S OF US-266.
SH-100, OVER I-40 1.1 MI E OF THE
MUSKOGEE TURNPIKE.
Adjusted:
(
$188,640.00)
(
)
50
Amount Paid:
Time Passed:
Noble
Adjusted:
0%(
0 %)
0%(
0 %)
4
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, AND SURFACE COUNTY
Residency:
Contract: 160045
25422(05)
CO.RD.
04009
ROAD (NS-312): FROM US-412, EXTEND
NORTH NEAR PERRY. COUNTY ROAD (EW-40):
CIRB-152C(163)RB
CIRCUIT ENGR. DISTR. # 8
FROM NS-312, EXTEND WEST NEAR PERRY.
Contractor:
EVANS & ASSOCIATES CONSTRUCTION CO., INC.
PROJECT LENGTH = 5.505 MILES
Engineer:
Adjusted:
CED8
Contract Amount:
(
$3,417,573.84
$3,417,573.84)
Contract Time:
(
180
180 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/04/2016
W/O Effective:
Amount Paid:
06/06/2016
95 % (
95 %)
Work Started:
Time Passed:
04/11/2016
106 % (
106 %)
Contract: 160204
24238(06)
US-64
SSP-252F(022)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Zachary, Ted
Contract Amount:
$183,948.95
Contract Time:
60
Letting Date:
05/19/2016
Contract Date:
06/24/2016
W/O Issued
06/29/2016
W/O Effective:
10/03/2016
Work Started:
09/19/2016
Contract: 160375
30645(04)
IS-35
SBR-3500(047)SB
Contractor:
FRONTIER BRIDGE, INC.
Engineer:
Zachary, Ted
Contract Amount:
$3,038,074.98
Contract Time:
255
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
11/29/2016
W/O Effective:
03/06/2017
Work Started:
03/06/2017
Residency:
PERRY
04100
BRIDGE WATERPROOF SEAL
US-60/US-64/US-81/SH-11/SH-18/SH-33/SH-51/S
H-74: AT MULTIPLE LOCATIONS IN DIVISION
IV.
Adjusted:
(
$183,948.95)
(
)
60
Amount Paid:
Time Passed:
Residency:
PERRY
04100
Adjusted:
71 % (
71 %)
37 % (
37 %)
BRIDGE REHABILITATION I-35: OVER COW
CREEK, 1.6 MILES SOUTH OF US-77 NEAR
PERRY. PROJECT LENGTH = 0.176 MILE.
Adjusted:
(
$3,038,074.98)
(
255 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
41 % (
41 %)
14 % (
14 %)
Page 119
BRIDGE AND APPROACHES SH-86: OVER
Contract: 160422
Residency:
26421(04)
SH-86
04100
COW CREEK, 0.5 MILE EAST OF US-77 IN THE
CITY OF PERRY. PROJECT LENGTH = 0.099
STP-152B(172)SS
PERRY
MILE.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
Zachary, Ted
Contract Amount:
(
$1,586,933.20
$1,586,933.20)
Contract Time:
(
150
157 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
01/12/2017
W/O Effective:
Amount Paid:
03/06/2017
57 % (
57 %)
Work Started:
Time Passed:
03/13/2017
28 % (
27 %)
RESURFACE (ASPHALT) SH-164: FROM THE
Residency:
Contract: 170034
29145(04)
SH-164
04100
GARFIELD COUNTY LINE, EXTEND EAST
NEAR LUCIEN. PROJECT LENGTH = 5.020
SSR-252C(001)SR
PERRY
MILES
Contractor:
EVANS & ASSOCIATES CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Zachary, Ted
Contract Amount:
(
$915,057.00
$915,057.00)
Contract Time:
(
)
90
90
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
Adjusted:
02/17/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Nowata
8
Commissioner District:
Contracts Under Construction
Contract: 150302
24269(04)
US-60
NHPP-153N(153)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
C&KI
Contract Amount:
$12,585,000.00
Contract Time:
325
Letting Date:
04/21/2016
Contract Date:
05/09/2016
W/O Issued
05/11/2016
W/O Effective:
09/06/2016
Work Started:
09/06/2016
Residency:
08007
CRAIG & KEITHLINE, INC.
GRADE, DRAIN, AND SURFACE US-60: FROM
THE WASHINGTON COUNTY LINE, EXTEND
EAST NEAR NOWATA. PROJECT LENGTH =
4.900 MILES
Adjusted:
(
$12,585,000.00)
(
325 )
Amount Paid:
Time Passed:
Adjusted:
29 % (
29 %)
59 % (
59 %)
BRIDGE AND APPROACHES US-169: OVER
Contract: 160325
Residency:
24750(04)
US-169
08007
OPOSSUM CREEK AND HICKORY CREEK, 3.4
MILES AND 7.4 MILES SOUTH OF THE KANSAS
ACNHPP-253N(036)(037)SS
CRAIG & KEITHLINE, INC.
STATE LINE. PROJECT LENGTH = 1.739
Contractor:
B & B BRIDGE COMPANY, LLC
MILES.
Engineer:
Adjusted:
C&KI
Contract Amount:
(
$11,558,127.59
$11,585,223.23)
Contract Time:
(
365
368 )
Letting Date:
09/15/2016
Contract Date:
10/12/2016
W/O Issued
Adjusted:
11/16/2016
W/O Effective:
Amount Paid:
02/16/2017
32 % (
32 %)
Work Started:
Time Passed:
12/06/2016
27 % (
27 %)
Construction Status Report
Page 120
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160378
Residency:
27815(04)
CO. RD.
08007
(NS-406): OVER PURGATORY CREEK, 3.8
MILES SOUTH OF US-60 NEAR BARTLESVILLE.
CIRB-153C(203)RB
CRAIG & KEITHLINE, INC.
PROJECT LENGTH = 0.330 MILE
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Adjusted:
C&KI
Contract Amount:
(
$713,144.03
$713,144.03)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
04/05/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Okfuskee
3
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES SH-48: OVER I-40,
Residency:
Contract: 160424
27055(04)
SH-48
03300
1.8 MILES SOUTH OF THE SH-56 JUNCTION
NEAR OKEMAH. PROJECT LENGTH = 0.290
NHPPI-4000-(032)SS
WEWOKA
MILE.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$5,778,393.15
$5,815,302.31)
Contract Time:
(
200
200 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/20/2016
W/O Effective:
Amount Paid:
03/06/2017
25 % (
25 %)
Work Started:
Time Passed:
03/06/2017
30 % (
30 %)
Contract: 170133
33100(04)
I-40
MC-4000(054)
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Helton, Matthew
Contract Amount:
$207,900.00
Contract Time:
60
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
04/24/2017
W/O Effective:
08/07/2017
Work Started:
County:
Oklahoma
Residency:
WEWOKA
03300
Adjusted:
(
$207,900.00)
(
)
60
PAVEMENT REHABILITATION (P.C.
CONCRETE) I-40: WESTBOUND LANES FROM
5.0 MILES EAST OF SH-27, EXTEND EAST
NEAR OKEMAH. PROJECT LENGTH = 4.82
MILES
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
4
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 121
SAFETY IMPROVEMENT (DYNAMIC MESSAGE
Contract: 150340
Residency:
25909(48)
I-35
04200
SIGN AND CCTV PROJECT)
I-35/I-40/I-44/US-69/US-271: AT MULTIPLE
HSIPG-255F(180)IT
EL RENO
LOCATIONS ON THE OKLAHOMA STATE LINE.
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Adjusted:
Harlin, Chris
Contract Amount:
(
$3,771,714.50
$3,771,714.50)
Contract Time:
(
210
210 )
Letting Date:
05/19/2016
Contract Date:
06/21/2016
W/O Issued
Adjusted:
06/23/2016
W/O Effective:
Amount Paid:
10/24/2016
76 % (
76 %)
Work Started:
Time Passed:
10/24/2016
76 % (
76 %)
GRADE, DRAIN, AND SURFACE I-240: FROM
Residency:
Contract: 160046
09032(20)
I-240
04600
SANTA FE AVENUE, EXTEND EAST IN
OKLAHOMA CITY. PROJECT LENGTH = 0.484
ACNHPPI-2400-(004)SS
OKLAHOMA CITY
MILE.
Contractor:
ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV)
Adjusted:
Engineer:
Howell, Terry
Contract Amount:
(
$11,958,193.19
$11,958,193.19)
Contract Time:
(
400
419 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/03/2016
W/O Effective:
Amount Paid:
06/06/2016
94 % (
94 %)
Work Started:
Time Passed:
05/16/2016
91 % (
87 %)
Contract: 160147
30277(04)
CT.ST.
STP-255C(343)AG
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
Hubbard, Tom
Contract Amount:
$11,798,388.72
Contract Time:
310
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
05/18/2016
W/O Effective:
08/01/2016
Work Started:
06/13/2016
Contract: 160189
09033(16)
I-235
ACNHPPI-2350-(004)(005)SS
Contractor:
ALLEN CONTRACTING, INC.
Engineer:
Hubbard, Tom
Contract Amount:
$80,999,877.96
Contract Time:
850
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
05/18/2016
W/O Effective:
01/02/2017
Work Started:
01/02/2017
Residency:
EDMOND
04400
Adjusted:
(
$11,798,388.72)
(
310 )
GRADE, DRAIN, SURFACE, AND TRAFFIC
SIGNAL CITY STREET (COVELL ROAD): AT
THE INTERSECTION OF SOONER ROAD IN
THE CITY OF EDMOND. PROJECT LENGTH =
1.032 MILES.
Amount Paid:
Time Passed:
Residency:
EDMOND
04400
Adjusted:
95 % (
95 %)
95 % (
95 %)
GRADE, DRAIN, SURFACE AND BRIDGE I-235:
FROM THE NW 36TH STREET INTERCHANGE,
EXTEND NORTH IN OKLAHOMA CITY.
PROJECT LENGTH = 1.718 MILES.
Adjusted:
(
$80,999,877.96)
(
850 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
24 % (
24 %)
14 % (
14 %)
Page 122
Contract: 160271
30730(05)
I-35
HSIPG-255F(342)TR
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
Hoover, Jacob
Contract Amount:
$972,200.00
Contract Time:
180
Letting Date:
07/21/2016
Contract Date:
08/09/2016
W/O Issued
08/11/2016
W/O Effective:
12/05/2016
Work Started:
02/15/2017
Residency:
04300
ENID
LLC
Adjusted:
(
$972,200.00)
(
180 )
TRAFFIC SIGNALS INTERSTATE/US
HIGHWAYS/STATE HIGHWAYS/CITY STREETS:
BACKPLATE REPLACEMENT AT MULTIPLE
LOCATIONS STATEWIDE.
Amount Paid:
Time Passed:
Adjusted:
34 % (
34 %)
49 % (
49 %)
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
Residency:
Contract: 160379
24364(04)
CT. ST.
04600
STREETS (SE 15TH STREET): FROM 0.2
MILES WEST OF WESTMINISTER ROAD,
STP-155B(614)AG
OKLAHOMA CITY
EXTEND EAST IN MIDWEST CITY AND
Contractor:
SCHWARZ PAVING CO., INC.
CHOCTAW. PROJECT LENGTH = 1.405 MILES
Adjusted:
Engineer:
Howell, Terry
Contract Amount:
(
$8,844,680.81
$8,844,680.81)
Contract Time:
(
475
475 )
Letting Date:
10/20/2016
Contract Date:
11/17/2016
W/O Issued
Adjusted:
11/21/2016
W/O Effective:
Amount Paid:
03/06/2017
31 % (
31 %)
Work Started:
Time Passed:
01/23/2017
20 % (
20 %)
BRIDGE REHABILITATION CITY STREETS (NW
Contract: 160382
Residency:
29143(06)
CT. ST.
04200
12TH ST/NW 23RD ST/NW 36TH ST/SCOTT ST):
AT MULTIPLE LOCATIONS IN OKLAHOMA
SSP-4000(033)SS
EL RENO
CITY. PROJECT LENGTH = 0.104 MILE
Contractor:
GIBSON & ASSOCIATES, INC.
Engineer:
Adjusted:
Harlin, Chris
Contract Amount:
(
$3,775,580.53
$3,775,580.53)
Contract Time:
(
240
240 )
Letting Date:
10/20/2016
Contract Date:
11/17/2016
W/O Issued
Adjusted:
11/21/2016
W/O Effective:
Amount Paid:
04/03/2017
15 % (
15 %)
Work Started:
Time Passed:
04/03/2017
17 % (
17 %)
Contract: 160384
29843(08)
IS-35
SSP-3500(043)SS
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
Buchanan, Seth
Contract Amount:
$284,131.69
Contract Time:
100
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
02/16/2017
W/O Effective:
03/20/2017
Work Started:
03/20/2017
Residency:
04500
STILLWATER
LLC
Adjusted:
(
$284,131.69)
(
100 )
INTERSECTION MODIFICATION AND TRAFFIC
SIGNAL I-35: AT THE INTERSECTION OF
WATERLOO ROAD NEAR THE CITY OF
EDMOND. PROJECT LENGTH = 0.052 MILE
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
40 % (
40 %)
38 % (
38 %)
Page 123
BRIDGE REHABILITATION SH-152: OVER
Contract: 160385
Residency:
30635(04)
SH-152
04600
PORTLAND AVENUE, 0.6 MI NW, 0.6 MI W, AND
1.1 MI NW OF THE I-44 INTERCHANGE IN
SBR-255N(416)SB
OKLAHOMA CITY
OKLAHOMA CITY.
Contractor:
RESTEK, INC.
Engineer:
Adjusted:
Howell, Terry
Contract Amount:
(
$966,416.19
$966,416.19)
Contract Time:
(
110
110 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
04/03/2017
14 % (
14 %)
Work Started:
Time Passed:
04/03/2017
25 % (
25 %)
PEDESTRIAN IMPROVEMENTS (SIDEWALKS)
Residency:
Contract: 160387
31440(04)
CT. ST.
04200
CITY STREETS (NW 50TH STREET): FROM
MERIDIAN AVENUE, EXTEND WEST IN THE
TAP-255B(333)AG
EL RENO
CITY OF WARR ACRES. PROJECT LENGTH =
Contractor:
SCHIRALLI CONSTRUCTION CORP.
0.913 MILE PREQUALIFICATION FOR THIS
Adjusted:
Engineer:
Harlin, Chris
PROJECT HAS BEEN WAIVED. BOTH BID
EXPRESS AND WRITTEN BIDS WILL BE
Contract Amount:
(
$227,731.94
$227,731.94)
ACCEPTED.
Contract Time:
(
100
100 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
33 % (
33 %)
Work Started:
Time Passed:
03/06/2017
60 % (
60 %)
RESURFACE (ASPHALT) AND PEDESTRIAN
Contract: 160388
Residency:
31476(04)
CT. ST.
04600
IMPROVEMENTS CITY STREET (SE 15TH
STREET): FROM MIDWEST BOULEVARD,
STP-255B(337)AG
OKLAHOMA CITY
EXTEND WEST IN MIDWEST CITY. PROJECT
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
LENGTH = 1.560 MILES.
Engineer:
Adjusted:
Howell, Terry
Contract Amount:
(
$2,344,841.28
$2,373,306.04)
Contract Time:
(
180
180 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
34 % (
33 %)
Work Started:
Time Passed:
02/20/2017
42 % (
42 %)
Contract: 160389
31817(04)
IS-44
SSP-4400(012)SS
Contractor:
PBX CORPORATION
Engineer:
Harlin, Chris
Contract Amount:
$3,756,828.25
Contract Time:
150
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
11/29/2016
W/O Effective:
05/01/2017
Work Started:
03/13/2017
Residency:
EL RENO
04200
BRIDGE REHABILITATION I-44/I-44 RAMPS:
OVER NORTHWEST EXPRESSWAY AND
CLASSEN BOULEVARD, AT MULTIPLE
LOCATIONS IN OKLAHOMA CITY.
Adjusted:
(
$3,756,828.25)
(
150 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
85 % (
85 %)
38 % (
38 %)
Page 124
GRADE, DRAIN, AND SURFACE I-240/I-35:
Contract: 160425
Residency:
09032(17)
I-240/I-3
04600
FROM SHIELDS BOULEVARD, EXTEND EAST
ON I-240 THEN SOUTH ON I-35 IN OKLAHOMA
NHPPI-0240-1(358)004SS
OKLAHOMA CITY
CITY. PROJECT LENGTH = 0.962 MILE.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Adjusted:
Howell, Terry
Contract Amount:
(
$10,629,506.29
$10,629,506.29)
Contract Time:
(
380
380 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/20/2016
W/O Effective:
Amount Paid:
05/01/2017
1%(
1 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160426
29335(04)
COUNTY RO Residency:
04003
(LUTHER ROAD/NS-326): OVER WEST FORK
OF WILDHORSE CREEK, 2.45 MILES SOUTH
STP-255C(403)AG
CEC CORP.
OF I-44 IN LUTHER. PROJECT LENGTH = 0.079
Contractor:
BRIDGECO CONTRACTORS, INC.
MILE
Adjusted:
Engineer:
CEC
Contract Amount:
(
$599,138.70
$599,138.70)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/19/2016
W/O Effective:
Amount Paid:
03/06/2017
68 % (
68 %)
Work Started:
Time Passed:
03/06/2017
38 % (
38 %)
PAVEMENT REHABILITATION I-35: FROM NE
Contract: 160427
Residency:
31008(04)
I-35/I-40
04400
122ND ST, EXTEND NORTH IN THE CITY OF
EDMOND. I-40: FROM MERIDIAN AVE,
SSP-3500(049)SS/SSP-4000*
EDMOND
EXTEND EAST IN OKLAHOMA CITY. PROJECT
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
LENGTH = 6.41 MILES
Engineer:
Adjusted:
Hubbard, Tom
Contract Amount:
(
$9,960,682.12
$9,960,682.12)
Contract Time:
(
360
360 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/20/2016
W/O Effective:
Amount Paid:
04/03/2017
3%(
3 %)
Work Started:
Time Passed:
04/03/2017
6%(
6 %)
(042)SS
WIDEN, RESURFACE, AND BRIDGE SH-66:
Contract: 170035
Residency:
24357(04)
SH-66
04400
FROM THE LINCOLN COUNTY LINE, EXTEND
WEST IN LUTHER. PROJECT LENGTH = 2.286
STPY-155C(611)
EDMOND
MILES
Contractor:
HASKELL LEMON CONSTRUCTION CO.
Engineer:
Adjusted:
Hubbard, Tom
Contract Amount:
(
$4,046,765.06
$4,046,765.06)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Construction Status Report
Page 125
BRIDGE REHABILITATION I-240: OVER
Contract: 170036
Residency:
27971(04)
IS-240
04600
CROOKED OAK CREEK, 0.8 MILE EAST OF
THE I-35 INTERCHANGE IN OKLAHOMA CITY.
NHPPI-2400-(002)SS
OKLAHOMA CITY
PROJECT LENGTH = 0.025 MILE.
Contractor:
REDLANDS CONTRACTING, LLC
Engineer:
Adjusted:
Howell, Terry
Contract Amount:
(
$345,584.80
$345,584.80)
Contract Time:
(
)
90
90
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 170037
28621(04)
CO. RD.
04400
(HIWASSEE ROAD): OVER TRIBUTARY TO THE
NORTH CANADIAN RIVER, 0.8 MI SOUTH OF
STP-155C(879)AG
EDMOND
WILSHIRE BLVD NEAR JONES. PROJECT
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
LENGTH = 0.345 MILE
Adjusted:
Engineer:
Hubbard, Tom
Contract Amount:
(
$534,270.08
$534,270.08)
Contract Time:
(
)
90
90
Letting Date:
02/16/2017
Contract Date:
03/14/2017
W/O Issued
Adjusted:
04/14/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE REHABILITATION CITY STREET
Contract: 170038
Residency:
31526(04)
CT. ST.
04400
(RENO AVENUE): OVER CHERRY CREEK, 0.3
MILES EAST OF SUNNYLANE ROAD IN THE
STP-255D(419)AG
EDMOND
CITY OF DEL CITY. PROJECT LENGTH = 0.056
Contractor:
M.J. HUGHES CONSTRUCTION, INC.
MILE
Engineer:
Adjusted:
Hubbard, Tom
Contract Amount:
(
$914,777.72
$914,777.72)
Contract Time:
(
160
160 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/24/2017
W/O Effective:
Amount Paid:
07/10/2017
9%(
9 %)
Work Started:
Time Passed:
05/01/2017
6%(
6 %)
SAFETY IMPROVEMENT (SIGNING) I-35: FROM
Contract: 170039
Residency:
32876(04)
IS-35
04600
THE TEXAS STATE LINE, EXTEND NORTH.
I-40: FROM THE TEXAS STATE LINE, EXTEND
HSIPIG-299I(132)TR
OKLAHOMA CITY
EAST.
Contractor:
DIRECT TRAFFIC CONTROL INC.
Engineer:
Adjusted:
Howell, Terry
Contract Amount:
(
$536,000.00
$536,000.00)
Contract Time:
(
)
60
60
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
13 % (
13 %)
Work Started:
Time Passed:
04/03/2017
47 % (
47 %)
Construction Status Report
Page 126
STRIPING AND PAVEMENT MARKING I-40:
Contract: 170135
Residency:
33097(04)
I-40
04600
FROM THE EASTBOUND RAMP, EXTEND TO
NORTHBOUND I-235 IN OKLAHOMA CITY.
NHPPIG-4000(053)
OKLAHOMA CITY
PROJECT LENGTH = 0.020
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
Howell, Terry
Contract Amount:
(
$65,234.00
$65,234.00)
Contract Time:
(
)
10
10
Letting Date:
03/16/2017
Contract Date:
04/25/2017
W/O Issued
Adjusted:
04/26/2017
W/O Effective:
Amount Paid:
07/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
BRIDGE REPAIR CITY STREET (OKLAHOMA
Residency:
Contract: 170136
33099(04)
CT. ST.
04600
CITY BLVD/OLD I-40): REPAIR VEHICLE
IMPACT DAMAGE OVER PENN. AVE, 0.2 MI N
SAP-255I(425)
OKLAHOMA CITY
OF I-40 IN OKC.
Contractor:
PBX CORPORATION
Adjusted:
Engineer:
Howell, Terry
Contract Amount:
(
$121,142.00
$121,142.00)
Contract Time:
(
)
30
30
Letting Date:
03/16/2017
Contract Date:
04/20/2017
W/O Issued
Adjusted:
04/21/2017
W/O Effective:
Amount Paid:
05/15/2017
0%(
0 %)
Work Started:
Time Passed:
05/15/2017
0%(
0 %)
County:
Okmulgee
1
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 150265
01100
21740(04)
US-75
US-75: FROM 7.0 MILES NORTH OF I-40,
EXTEND NORTH NEAR OKMULGEE. PROJECT
MUSKOGEE
NHPP-256N(024)SS
LENGTH = 2.538 MILES.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$29,671,928.47
$30,142,272.00)
Contract Time:
(
580
580 )
Letting Date:
08/20/2015
Contract Date:
09/16/2015
W/O Issued
Adjusted:
09/18/2015
W/O Effective:
Amount Paid:
01/04/2016
95 % (
94 %)
Work Started:
Time Passed:
01/04/2016
70 % (
70 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160254
Residency:
11399(04)
CO.RD.
01003
COUNTY ROAD (EW-0945): FROM 0.7 MILES
EAST OF THE CREEK COUNTY LINE, EXTEND
STP-056C(199)CI
CEC CORP.
EAST NEAR OKMULGEE. PROJECT LENGTH =
Contractor:
HASKELL LEMON CONSTRUCTION CO.
0.502 MILE
Engineer:
Adjusted:
CEC
Contract Amount:
(
$3,363,594.72
$3,363,594.72)
Contract Time:
(
270
270 )
Letting Date:
07/21/2016
Contract Date:
08/08/2016
W/O Issued
Adjusted:
08/09/2016
W/O Effective:
Amount Paid:
12/05/2016
87 % (
87 %)
Work Started:
Time Passed:
10/05/2016
62 % (
62 %)
Construction Status Report
Page 127
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160255
Residency:
24369(04)
US-75A
01003
US-75A: FROM 1.1 MILES NORTH OF THE
SH-16 JUNCTION, EXTEND NORTH IN BEGGS.
ACSTP-156C(136)SS
CEC CORP.
PROJECT LENGTH = 7.511 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
CEC
Contract Amount:
(
$16,214,688.52
$16,214,688.52)
Contract Time:
(
360
360 )
Letting Date:
07/21/2016
Contract Date:
08/08/2016
W/O Issued
Adjusted:
08/09/2016
W/O Effective:
Amount Paid:
12/05/2016
13 % (
13 %)
Work Started:
Time Passed:
12/05/2016
29 % (
29 %)
Contract: 160294
27098(04)
US-62
ACSTP-256C(025)SS
Contractor:
TREAS CONSTRUCTION, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$1,467,383.90
Contract Time:
180
Letting Date:
08/18/2016
Contract Date:
09/12/2016
W/O Issued
09/14/2016
W/O Effective:
01/03/2017
Work Started:
10/10/2016
Residency:
MUSKOGEE
01100
BRIDGE AND APPROACHES US-62: OVER
GRAVE CREEK TRIBUTARY, 2.4 MILES EAST
OF THE SH-52 JUNCTION NEAR MORRIS.
PROJECT LENGTH = 0.246 MILE.
Adjusted:
(
$1,472,383.90)
(
180 )
Amount Paid:
Time Passed:
Adjusted:
88 % (
87 %)
85 % (
85 %)
TRAFFIC SIGNALS US-75: AT THE
Contract: 160295
Residency:
27109(05)
US-75
01100
INTERSECTION OF 6TH, 8TH AND 13TH
STREET, IN THE CITY OF OKMULGEE.
SSP-256N(032)SS
MUSKOGEE
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$150,772.50
$150,772.50)
Contract Time:
(
)
30
30
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
Adjusted:
09/23/2016
W/O Effective:
Amount Paid:
01/03/2017
98 % (
98 %)
Work Started:
Time Passed:
01/03/2017
93 % (
93 %)
Contract: 160327
31694(04)
I-40
STP-256G(033)3B
Contractor:
KEYSTONE SERVICES, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$508,526.60
Contract Time:
120
Letting Date:
09/15/2016
Contract Date:
10/18/2016
W/O Issued
10/20/2016
W/O Effective:
04/03/2017
Work Started:
04/03/2017
Residency:
MUSKOGEE
01100
JOINT SEAL/REPAIR I-40/SH-64D: AT
MULTIPLE LOCATIONS IN DIVISION I.
Adjusted:
(
$508,526.60)
(
120 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
7%(
7 %)
0%(
0 %)
Page 128
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160428
22666(04)
COUNTY RO Residency:
01100
(EW-101): OVER HONEY CREEK, 5.11 MILES
WEST OF US-75 NEAR OKMULGEE. PROJECT
STP-156D(111)CI
MUSKOGEE
LENGTH = 0.194 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$550,356.58
$550,356.58)
Contract Time:
(
)
90
90
Letting Date:
11/17/2016
Contract Date:
12/15/2016
W/O Issued
Adjusted:
12/16/2016
W/O Effective:
Amount Paid:
01/23/2017
59 % (
59 %)
Work Started:
Time Passed:
01/23/2017
78 % (
78 %)
County:
Osage
8
Commissioner District:
Contracts Under Construction
BRIDGE REHABILITATION SH-18: OVER
Residency:
Contract: 160256
27086(04)
SH-18
08400
SOLOMON CREEK, 4.2 MILES SOUTH OF
US-60 NEAR FAIRFAX. PROJECT LENGTH =
ACSTP-257B(033)SS
SAND SPRINGS
0.219 MILE.
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Adjusted:
Williams, Mark J.
Contract Amount:
(
$1,179,477.28
$1,216,377.28)
Contract Time:
(
150
150 )
Letting Date:
07/21/2016
Contract Date:
08/23/2016
W/O Issued
Adjusted:
09/26/2016
W/O Effective:
Amount Paid:
12/05/2016
92 % (
89 %)
Work Started:
Time Passed:
12/05/2016
97 % (
97 %)
Contract: 170041
27996(04)
US-60
NHPP-257N(053)SS
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Williams, Mark J.
Contract Amount:
$424,986.92
Contract Time:
60
Letting Date:
01/19/2017
Contract Date:
03/16/2017
W/O Issued
04/05/2017
W/O Effective:
06/05/2017
Work Started:
County:
Ottawa
Residency:
08400
SAND SPRINGS
BRIDGE REPAIR US-60: OVER UNNAMED
CREEK, 2.0 MILES EAST OF THE SH-18
JUNCTION NEAR BURBANK.
Adjusted:
(
$424,986.92)
(
)
60
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
8
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 129
BRIDGE AND APPROACHES SH-10: OVER
Contract: 160257
Residency:
27074(04)
SH-10
08300
COUNCIL HOLLOW CREEK, 4.2 MILES NORTH
OF THE DELAWARE COUNTY LINE. PROJECT
ACSTP-258C(023)SS
CLAREMORE
LENGTH = 0.832 MILE.
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Adjusted:
Tyler, Jennifer
Contract Amount:
(
$4,272,537.25
$4,274,409.25)
Contract Time:
(
240
240 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/24/2016
W/O Effective:
Amount Paid:
02/16/2017
21 % (
21 %)
Work Started:
Time Passed:
02/06/2017
28 % (
28 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 160391
29894(04)
CO. RD.
08011
(EW-023): OVER HICKORY CREEK, 1.4 MILES
EAST OF SH-125 NEAR AFTON. PROJECT
CIRB-258D(026)RB
GARVER, LLC.
LENGTH = 0.151 MILE
Contractor:
RRY SERVICES, LLC
Adjusted:
Engineer:
GARV
Contract Amount:
(
$1,173,450.89
$1,173,450.89)
Contract Time:
(
120
120 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
15 % (
15 %)
Work Started:
Time Passed:
02/14/2017
41 % (
41 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160429
28596(04)
COUNTY RO Residency:
08011
(NS-467.5): OVER TRIBUTARY OF WARREN
BRANCH, 2.1 MILES NORTH OF SH-10C NEAR
STP-258C(027)CI
GARVER, LLC.
PEORIA. PROJECT LENGTH = 0.113 MILE.
Contractor:
B & B BRIDGE COMPANY, LLC
Engineer:
Adjusted:
GARV
Contract Amount:
(
$670,679.47
$670,679.47)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
01/04/2017
W/O Effective:
Amount Paid:
03/06/2017
55 % (
55 %)
Work Started:
Time Passed:
02/23/2017
43 % (
43 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160430
28597(04)
COUNTY RO Residency:
08011
(EW-004): OVER ELM CREEK, 3.4 MILES WEST
OF US-69 NEAR MIAMI. PROJECT LENGTH =
STP-258D(028)CI
GARVER, LLC.
0.200 MILE
Contractor:
H & H BRIDGE COMPANY
Engineer:
Adjusted:
GARV
Contract Amount:
(
$865,290.37
$865,290.37)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/14/2016
W/O Issued
Adjusted:
01/12/2017
W/O Effective:
Amount Paid:
04/03/2017
5%(
5 %)
Work Started:
Time Passed:
03/29/2017
3%(
3 %)
Construction Status Report
Page 130
Contract: 170043
30517(04)
US-69
SSR-258N(024)SR
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
Tyler, Jennifer
Contract Amount:
$598,895.00
Contract Time:
75
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
03/29/2017
W/O Effective:
06/05/2017
Work Started:
Contract: 170044
32544(04)
SH-10
SSR-258C(025)SR
Contractor:
APAC-CENTRAL, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$928,218.30
Contract Time:
45
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
02/16/2017
W/O Effective:
06/05/2017
Work Started:
04/18/2017
Residency:
CLAREMORE
08300
Adjusted:
(
$598,895.00)
(
)
75
RESURFACE (ASPHALT) US-69NW/US-69NE:
FROM THE SH-10 JCT, EXTEND NORTH IN
MIAMI. SH-10: FROM 0.25 MILES WEST OF
US-69 EXTEND EAST IN MIAMI. PROJECT
LENGTH = 5.28 MILES
Amount Paid:
Time Passed:
Residency:
CLAREMORE
08300
Adjusted:
0%(
0 %)
0%(
0 %)
RESURFACE (ASPHALT) SH-10: FROM 0.1
MILES SOUTH OF US-60, EXTEND SOUTH
NEAR WYANDOTTE. PROJECT LENGTH =
5.280 MILES
Adjusted:
(
$928,218.30)
(
)
45
Amount Paid:
Time Passed:
Adjusted:
91 % (
91 %)
38 % (
38 %)
RESURFACE (ASPHALT) COUNTY ROADS
Contract: 170091
Residency:
32845(04)
CO. RD.
08001
(EW-210/EW-230/NS-4590/NS-4600): ON
MULTIPLE COUNTY ROADS SOUTH OF US-60
CIRB-258D(037)(038)(039)*
ENGR. SERV. & TESTING
NEAR FAIRLAND. PROJECT LENGTH = 11.267
Contractor:
APAC-CENTRAL, INC.
MILES
Engineer:
Adjusted:
EST
Contract Amount:
(
$1,570,936.20
$1,570,936.20)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/20/2017
W/O Issued
Adjusted:
03/21/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
*(040)RB
County:
Pawnee
8
Commissioner District:
Contracts Under Construction
SAFETY IMPROVEMENT (GUARDRAIL)
Contract: 160296
Residency:
32484(04)
US-64
08001
US-64/US-412: FROM THE SH-48 JUNCTION,
EXTEND EAST NEAR WESTPORT.
HSIPG-259N(031)TR
ENGR. SERV. & TESTING
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
EST
Contract Amount:
(
$2,145,339.76
$2,145,339.76)
Contract Time:
(
150
150 )
Letting Date:
08/18/2016
Contract Date:
09/19/2016
W/O Issued
Adjusted:
09/22/2016
W/O Effective:
Amount Paid:
01/03/2017
100 % (
100 %)
Work Started:
Time Passed:
10/24/2016
95 % (
95 %)
Construction Status Report
Page 131
Contract: 160431
28877(04)
US-64
ACSTP-259B(030)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Williams, Mark J.
Contract Amount:
$4,254,900.00
Contract Time:
260
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
12/20/2016
W/O Effective:
03/06/2017
Work Started:
03/06/2017
Residency:
08400
SAND SPRINGS
BRIDGE REHABILITATION US-64: OVER
COWSKIN CREEK, 1.0 MILE NORTH OF THE
US-412 JUNCTION NEAR CLEVELAND.
PROJECT LENGTH = 0.194 MILE
Adjusted:
(
$4,254,900.00)
(
260 )
Amount Paid:
Time Passed:
Adjusted:
18 % (
18 %)
17 % (
17 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160432
29924(04)
COUNTY RO Residency:
08001
(NS-3460): OVER TRIBUTARY TO MUD CREEK,
3.6 MILES NORTH OF SH-15 NEAR PAWNEE.
STP-259D(033)CI
ENGR. SERV. & TESTING
PROJECT LENGTH = 0.217 MILE
Contractor:
EARTH SMART CONSTRUCTION INC.
Adjusted:
Engineer:
EST
Contract Amount:
(
$893,634.25
$893,634.25)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
01/03/2017
W/O Effective:
Amount Paid:
04/03/2017
24 % (
24 %)
Work Started:
Time Passed:
04/03/2017
20 % (
20 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170162
Residency:
23259(04)
CO. RD.
08001
(NS-357): OVER LAGOON CREEK, 0.5 MILES
NORTH OF THE PAYNE COUNTY LINE NEAR
CIRB-159D(063)RB
ENGR. SERV. & TESTING
JENNINGS. PROJECT LENGTH = 0.133 MILE
Contractor:
H & H BRIDGE COMPANY
Engineer:
Adjusted:
EST
Contract Amount:
(
$694,556.47
$694,556.47)
Contract Time:
(
120
120 )
Letting Date:
04/20/2017
Contract Date:
05/16/2017
W/O Issued
Adjusted:
05/26/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Payne
4
Commissioner District:
Contracts Under Construction
Contract: 160149
27932(04)
SH-51
STP-260B(022(024)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Buchanan, Seth
Contract Amount:
$1,818,200.00
Contract Time:
210
Letting Date:
03/17/2016
Contract Date:
04/13/2016
W/O Issued
04/22/2016
W/O Effective:
09/06/2016
Work Started:
09/06/2016
Residency:
STILLWATER
04500
Adjusted:
(
$1,864,468.75)
(
244 )
BRIDGE REHABILITATION SH-51: OVER WEST
AND EAST BRUSH CREEKS AND OVER SALT
CREEK, 2.1 MI E OF US-177 AND 1.6 MI E OF
SH-18 NEAR STILLWATER. PROJECT LENGTH
= 0.533 MILE.
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
40 % (
39 %)
118 % (
101 %)
Page 132
BRIDGE AND APPROACHES SH-51 (6TH
Contract: 160231
Residency:
26369(04)
SH-51
04500
AVENUE): OVER BOOMER CREEK, 0.02 MILE
WEST OF THE US-177 (PERKINS ROAD)
SSP-160B(190)SS
STILLWATER
INTERSECTION IN STILLWATER. PROJECT
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
LENGTH = 0.353 MILE.
Engineer:
Adjusted:
Buchanan, Seth
Contract Amount:
(
$7,354,181.48
$7,392,743.89)
Contract Time:
(
)
Letting Date:
06/16/2016
Contract Date:
07/19/2016
Fixed Completion Date: 09/30/2016
W/O Issued
Adjusted:
08/19/2016
W/O Effective:
Amount Paid:
29 % (
29 %)
Work Started:
Time Passed:
09/19/2016
240 % (
59 %)
GRADE, DRAIN, AND SURFACE CITY STREET
Residency:
Contract: 160345
31595(04)
CT. ST.
04500
(WESTERN ROAD): FROM MCELROY ROAD,
EXTEND NORTH IN STILLWATER. PROJECT
STP-260B(027)MS
STILLWATER
LENGTH = 1.170 MILES.
Contractor:
ALLEN CONTRACTING, INC.
Adjusted:
Engineer:
Buchanan, Seth
Contract Amount:
(
$3,884,716.00
$3,901,137.43)
Contract Time:
(
)
Letting Date:
09/15/2016
Contract Date:
10/13/2016
Fixed Completion Date: 08/01/2017
W/O Issued
Adjusted:
10/19/2016
W/O Effective:
Amount Paid:
69 % (
69 %)
Work Started:
Time Passed:
11/14/2016
183 % (
68 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170092
Residency:
27804(04)
CO. RD.
04500
(EW-67/E 68TH STREET): OVER STILLWATER
CREEK, 5.8 MILES EAST OF US-177 NEAR
STP-160C(204)CI
STILLWATER
STILLWATER. PROJECT LENGTH = 0.188 MILE
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
Buchanan, Seth
Contract Amount:
(
$866,635.83
$866,635.83)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/14/2017
W/O Issued
Adjusted:
03/16/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Pittsburg
2
Commissioner District:
Contracts Under Construction
Contract: 160111
29854(04)
SH-31
ACSTP-261C(037)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Plymate, Larry
Contract Amount:
$3,254,491.15
Contract Time:
120
Letting Date:
03/17/2016
Contract Date:
04/15/2016
W/O Issued
04/25/2016
W/O Effective:
08/01/2016
Work Started:
08/01/2016
Residency:
MCALESTER
02400
RESURFACE (ASPHALT) SH-31: FROM 3.0
MILES EAST OF THE SH-31A JUNCTION,
EXTEND NORTHEAST NEAR MCALESTER.
PROJECT LENGTH = 5.000 MILES
Adjusted:
(
$3,254,491.15)
(
120 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
85 % (
85 %)
216 % (
216 %)
Page 133
Contract: 160115
31063(04)
US-69
ACNHPP-261N(057)SS/ACSTP*
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Plymate, Larry
Contract Amount:
$7,737,114.40
Contract Time:
230
Letting Date:
02/18/2016
Contract Date:
03/22/2016
W/O Issued
03/25/2016
W/O Effective:
07/05/2016
Work Started:
07/05/2016
*-261B(055)3P/NHPP-261N(056)3P
Residency:
MCALESTER
02400
Adjusted:
(
$7,752,114.40)
(
230 )
RESURFACE (ASPHALT) US-69: FROM 1.40 MI
N OF SH-63 JCT, EXT N NEAR MCALESTER.
US-270: FROM 3.75 MI E OF US-69B JCT, EXT
E NEAR MCALESTER. PROJECT LENGTH =
14.95 MILES.
Amount Paid:
Time Passed:
Adjusted:
90 % (
90 %)
129 % (
129 %)
BRIDGE AND APPROACHES SH-71: OVER
Residency:
Contract: 160206
26348(04)
SH-71
02400
UNNAMED CREEK, 3.0 MILES NORTH OF
SH-31 NEAR QUINTON. PROJECT LENGTH =
ACSTP-161C(226)SS
MCALESTER
0.110 MILE
Contractor:
BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
Plymate, Larry
Contract Amount:
(
$1,054,966.67
$1,054,966.67)
Contract Time:
(
100
100 )
Letting Date:
05/19/2016
Contract Date:
06/21/2016
W/O Issued
Adjusted:
06/23/2016
W/O Effective:
Amount Paid:
10/03/2016
97 % (
97 %)
Work Started:
Time Passed:
08/22/2016
108 % (
108 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160329
Residency:
14999(04)
US-69
02400
US-69: FROM PEACEABLE ROAD (EW-145),
EXTEND NORTH IN MCALESTER. PROJECT
ACNHPP-013N(017)SS
MCALESTER
LENGTH = 0.846 MILE.
Contractor:
KOSS CONSTRUCTION COMPANY & SUBSIDIARY
Engineer:
Adjusted:
Plymate, Larry
Contract Amount:
(
$13,420,172.08
$13,458,664.35)
Contract Time:
(
385
387 )
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
12/12/2016
W/O Effective:
Amount Paid:
02/16/2017
17 % (
17 %)
Work Started:
Time Passed:
02/13/2017
20 % (
20 %)
Contract: 160395
31332(04)
US-69
NHPP-261N(062)3P
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Plymate, Larry
Contract Amount:
$486,229.00
Contract Time:
10
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
12/20/2016
W/O Effective:
08/15/2017
Work Started:
Residency:
MCALESTER
02400
RESURFACE (ASPHALT) US-69: FROM THE
US-69B INTERCHANGE, EXTEND NORTH IN
MCALESTER. PROJECT LENGTH = 2.32
MILES.
Adjusted:
(
$486,229.00)
(
)
10
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
0%(
0 %)
0%(
0 %)
Page 134
Contract: 170060
32563(05)
US-270
HSIP-261N(065)(064)TR
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
Plymate, Larry
Contract Amount:
$732,268.72
Contract Time:
90
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
02/16/2017
W/O Effective:
06/05/2017
Work Started:
Residency:
02400
MCALESTER
LLC
Adjusted:
(
$732,268.72)
(
)
90
TRAFFIC SIGNALS US-270: FROM 'A' STREET,
EXTEND EAST IN THE CITY OF MCALESTER.
PROJECT LENGTH = 1.628 MILES
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
RESURFACE (ASPHALT) US-69: FROM 2.3
Residency:
Contract: 170093
31973(04)
US-69
02400
MILES SOUTH OF THE US-69B JUNCTION,
EXTEND NORTH IN MCALESTER. PROJECT
NHPPY-261N(068)3P
MCALESTER
LENGTH = 2.160 MILES
Contractor:
JOB CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Plymate, Larry
Contract Amount:
(
$819,602.08
$819,602.08)
Contract Time:
(
)
45
45
Letting Date:
02/16/2017
Contract Date:
03/14/2017
W/O Issued
Adjusted:
03/16/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Pottawatomie
3
Commissioner District:
Contracts Under Construction
Contract: 160177
22973(14)
I-35
SSP-263F(039)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
Russell, Julie
Contract Amount:
$46,206.80
Contract Time:
40
Letting Date:
04/21/2016
Contract Date:
05/16/2016
W/O Issued
05/20/2016
W/O Effective:
09/06/2016
Work Started:
07/25/2016
Residency:
ADA
03100
BRIDGE WATER PROOF SEAL
I-35/SH-22/SH-66/SH-76/SH-102: AT MULTIPLE
LOCATIONS IN DIVISION III.
Adjusted:
(
$46,206.80)
(
)
40
Amount Paid:
Time Passed:
Adjusted:
87 % (
87 %)
18 % (
18 %)
BRIDGE AND APPROACHES I-40: OVER
Contract: 160433
Residency:
28928(04)
I-40
03300
COUNTY ROAD (OLD TOWN TRAIL): 0.5 MILES
WEST OF US-177 NEAR SHAWNEE. PROJECT
NHPPI-4000-(035)SS
WEWOKA
LENGTH = 0.364 MILE
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$7,097,309.01
$7,097,309.01)
Contract Time:
(
400
400 )
Letting Date:
11/17/2016
Contract Date:
12/14/2016
W/O Issued
Adjusted:
12/16/2016
W/O Effective:
Amount Paid:
03/06/2017
26 % (
26 %)
Work Started:
Time Passed:
03/06/2017
12 % (
12 %)
Construction Status Report
Page 135
RESURFACE (ASPHALT) SH-9A: FROM SH-9,
Contract: 170139
Residency:
29711(04)
SH-9A
03300
EXTEND NORTH IN EARLSBORO. PROJECT
LENGTH = 8.650 MILES
STPY-263C(042)(043)3P
WEWOKA
Contractor:
MARKWELL PAVING COMPANY, INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$1,322,626.76
$1,322,626.76)
Contract Time:
(
)
35
35
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/24/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Pushmataha
2
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, AND SURFACE - DIVISION II
Residency:
Contract: 150214
24332(04)
SH-93
02100
SH-93: FROM THE CHOCTAW COUNTY LINE,
EXTEND NORTH. PROJECT LENGTH = 2.791
STP-164C(116)SS
ANTLERS
MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Moy, Ryan
Contract Amount:
(
$8,957,819.74
$8,957,819.74)
Contract Time:
(
300
300 )
Letting Date:
06/18/2015
Contract Date:
07/15/2015
W/O Issued
Adjusted:
07/24/2015
W/O Effective:
Amount Paid:
11/02/2015
96 % (
96 %)
Work Started:
Time Passed:
11/02/2015
100 % (
100 %)
Contract: 160180
23144(11)
US-70
SSP-264F(044)SS
Contractor:
GARY A. CRAIN, INC.
Engineer:
January, Trenton (Acting)
Contract Amount:
$73,732.90
Contract Time:
90
Letting Date:
04/21/2016
Contract Date:
05/16/2016
W/O Issued
05/19/2016
W/O Effective:
09/06/2016
Work Started:
11/14/2016
Residency:
MADILL
02300
BRIDGE WATER PROOF SEAL
US-70/SH-1/SH-3/SH-9A/SH-78: AT MULTIPLE
LOCATIONS IN DIVISION II.
Adjusted:
(
$73,732.90)
(
)
90
Amount Paid:
Time Passed:
Adjusted:
53 % (
53 %)
102 % (
102 %)
BRIDGE AND APPROACHES US-271: OVER
Contract: 160298
Residency:
26346(04)
US-271
02100
KIAMICHI RIVER, 1.3 MILES NORTH OF THE
SH-3 JUNCTION NEAR ANTLERS. PROJECT
ACSTP-164B(153)SS
ANTLERS
LENGTH = 0.908 MILE
Contractor:
L & N BRIDGE, LLC
Engineer:
Adjusted:
Moy, Ryan
Contract Amount:
(
$6,036,484.89
$6,036,484.89)
Contract Time:
(
225
225 )
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
10/19/2016
W/O Effective:
Amount Paid:
02/16/2017
27 % (
27 %)
Work Started:
Time Passed:
02/16/2017
21 % (
21 %)
Construction Status Report
Page 136
WIDEN, RESURFACE, AND BRIDGE COUNTY
Contract: 170094
Residency:
31216(04)
CO. RD.
02013
ROAD (AIRPORT ROAD/EW-195): FROM
US-271, EXTEND WEST NEAR ANTLERS.
STP-264C(056)CI
CIRCUIT ENGR. DISTR. # 3
PROJECT LENGTH = 1.991 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
CED3
Contract Amount:
(
$746,520.04
$746,520.04)
Contract Time:
(
120
120 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Roger Mills
5
Commissioner District:
Contracts Under Construction
RESURFACE (ASPHALT) COUNTY ROAD
Residency:
Contract: 170045
30691(04)
CO. RD.
05005
(NS-182/EW-093): FROM SH-47, EXTEND
NORTH ON NS-182 THEN WEST ON EW-093
STP-265C(016)CI
CIRCUIT ENGR. DISTR. # 7
NEAR CHEYENNE. PROJECT LENGTH = 3.030
Contractor:
CASWELL CONTRACTING, INC.
MILES.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$968,210.81
$968,210.81)
Contract Time:
(
)
60
60
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
05/18/2017
0%(
0 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 170095
25477(04)
CO. RD.
05005
COUNTY ROAD (NS-197/EW-97/NS-200/EW-96):
FROM SH-34, EXTEND WEST AND SOUTH TO
CIRB-165C(099)RB
CIRCUIT ENGR. DISTR. # 7
THE EW-98/NS-197 JCT NEAR HAMMON.
Contractor:
CASWELL CONTRACTING, INC.
PROJECT LENGTH = 7.79 MILES
Engineer:
Adjusted:
CED7
Contract Amount:
(
$6,283,092.30
$6,283,092.30)
Contract Time:
(
270
270 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Rogers
8
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 137
Contract: 150244
27167(04)
SH-20
STP-266A(001)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Tyler, Jennifer
Contract Amount:
$3,087,000.00
Contract Time:
160
Letting Date:
09/17/2015
Contract Date:
10/22/2015
W/O Issued
10/28/2015
W/O Effective:
02/01/2016
Work Started:
02/01/2016
Residency:
CLAREMORE
08300
INTERSECTION MODIFICATION SH-20: AT THE
INTERSECTION OF SOUTHHAVEN
RD/CLUBHOUSE RD IN CLAREMORE.
PROJECT LENGTH = 0.664 MILE
Adjusted:
(
$3,087,000.00)
(
160 )
Amount Paid:
Time Passed:
Adjusted:
86 % (
86 %)
117 % (
117 %)
BRIDGE AND APPROACHES COUNTY ROAD
Residency:
Contract: 160116
25480(04)
CO.RD.
08011
(NS-423/EW-52): OVER CHOUTEAU CREEK, ON
NS-423, 3.5 MI SOUTH OF SH-20, AND ON
CIRB-166C(212)RB
GARVER, LLC.
EW-52, 1.2 MI EAST OF NS-423. PROJECT
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
LENGTH = 0.509 MILE.
Adjusted:
Engineer:
GARV
Contract Amount:
(
$1,751,341.40
$1,792,770.04)
Contract Time:
(
130
195 )
Letting Date:
02/18/2016
Contract Date:
03/21/2016
W/O Issued
Adjusted:
03/24/2016
W/O Effective:
Amount Paid:
09/06/2016
99 % (
96 %)
Work Started:
Time Passed:
09/06/2016
143 % (
95 %)
GRADE, DRAIN, AND SURFACE CITY STREET
Contract: 160181
Residency:
26988(04)
CT.ST.
08300
(NORTH 193RD EAST AVENUE): FROM SH-266,
EXTEND NORTH NEAR CATOOSA. PROJECT
STP-166C(244)CI
CLAREMORE
LENGTH = 0.584 MILE.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Tyler, Jennifer
Contract Amount:
(
$3,970,132.62
$5,502,127.62)
Contract Time:
(
210
250 )
Letting Date:
04/21/2016
Contract Date:
05/10/2016
W/O Issued
Adjusted:
05/11/2016
W/O Effective:
Amount Paid:
09/06/2016
116 % (
83 %)
Work Started:
Time Passed:
09/06/2016
104 % (
88 %)
BRIDGE REHABILITATION US-412: OVER
Contract: 160232
Residency:
24846(04)
US-412
08300
VERDIGRIS RIVER, 7.5 MILES EAST OF I-44
NEAR INOLA. PROJECT LENGTH = 0.237 MILE
ACNHPP-166N(207)SS
CLAREMORE
Contractor:
JENSEN CONSTRUCTION COMPANY
Engineer:
Adjusted:
Tyler, Jennifer
Contract Amount:
(
$14,700,627.94
$14,700,627.94)
Contract Time:
(
405
405 )
Letting Date:
08/18/2016
Contract Date:
09/21/2016
W/O Issued
Adjusted:
09/22/2016
W/O Effective:
Amount Paid:
01/03/2017
54 % (
54 %)
Work Started:
Time Passed:
10/05/2016
49 % (
49 %)
Construction Status Report
Page 138
Contract: 160259
22144(04)
CT.ST.
STP-166B(164)IG
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
GARV
Contract Amount:
$2,343,181.49
Contract Time:
270
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
09/22/2016
W/O Effective:
01/03/2017
Work Started:
12/06/2016
Residency:
GARVER, LLC.
08011
GRADE, DRAIN, AND SURFACE CITY STREET
(PINE STREET): FROM NORTH 193RD
AVENUE, EXTEND EAST IN CATOOSA.
PROJECT LENGTH = 0.631 MILE.
Adjusted:
(
$2,348,021.49)
(
270 )
Amount Paid:
Time Passed:
Adjusted:
28 % (
28 %)
37 % (
37 %)
BRIDGE REHABILITATION COUNTY ROAD
Residency:
Contract: 160396
32517(04)
CO. RD.
08300
(OLD US-169): OVER FOUR MILE CREEK, 0.2
MILE WEST OF US-169 NEAR OOLOGAH.
SBR-266D(044)SB
CLAREMORE
PROJECT LENGTH = 0.030 MILE.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
Tyler, Jennifer
Contract Amount:
(
$361,737.56
$361,737.56)
Contract Time:
(
140
140 )
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
03/06/2017
95 % (
95 %)
Work Started:
Time Passed:
01/27/2017
33 % (
33 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170046
Residency:
30711(04)
CO. RD.
08003
(EW-46): OVER TRIBUTARY TO SEMINOLE
CREEK, 0.4 MILE WEST OF THE MAYES
STP-266C(047)CI
CEC CORP.
COUNTY LINE. PROJECT LENGTH = 0.160
Contractor:
RRY SERVICES, LLC
MILE.
Engineer:
Adjusted:
CEC
Contract Amount:
(
$415,933.94
$415,933.94)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
6%(
6 %)
Work Started:
Time Passed:
04/17/2017
7%(
7 %)
RESURFACE (CONCRETE) SH-167: FROM 0.32
Contract: 170096
Residency:
30534(04)
SH-167
08300
MILES NORTH OF I-44, EXTEND NORTH IN
CATOOSA. PROJECT LENGTH = 4.320 MILES
STPY-266C(041)3P
CLAREMORE
Contractor:
IOWA CIVIL CONTRACTING, INC.
Engineer:
Adjusted:
Tyler, Jennifer
Contract Amount:
(
$2,385,727.54
$2,385,727.54)
Contract Time:
(
)
90
90
Letting Date:
02/16/2017
Contract Date:
03/14/2017
W/O Issued
Adjusted:
03/29/2017
W/O Effective:
Amount Paid:
07/03/2017
38 % (
38 %)
Work Started:
Time Passed:
04/10/2017
28 % (
28 %)
County:
Seminole
3
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 139
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 160117
Residency:
30039(04)
CO.RD.
03300
ROAD (MARKET ROAD/NS-360): FROM SH-9,
EXTEND NORTH NEAR SEMINOLE. PROJECT
STP-267C(044)CI
WEWOKA
LENGTH = 1.056 MILES.
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$1,167,119.73
$1,234,266.20)
Contract Time:
(
120
145 )
Letting Date:
02/18/2016
Contract Date:
03/16/2016
W/O Issued
Adjusted:
03/22/2016
W/O Effective:
Amount Paid:
07/05/2016
48 % (
45 %)
Work Started:
Time Passed:
09/01/2016
168 % (
139 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160211
28495(04)
CO.RD.
03300
COUNTY ROAD (EW-127): FROM US-270,
EXTEND EAST NEAR WEWOKA. PROJECT
CIRB-267C(055)RB
WEWOKA
LENGTH = 2.049 MILES.
Contractor:
KLAVER CONSTRUCTION COMPANY, INC.
Adjusted:
Engineer:
Helton, Matthew
Contract Amount:
(
$641,271.32
$641,271.32)
Contract Time:
(
100
102 )
Letting Date:
05/19/2016
Contract Date:
06/17/2016
W/O Issued
Adjusted:
07/29/2016
W/O Effective:
Amount Paid:
10/03/2016
69 % (
69 %)
Work Started:
Time Passed:
11/14/2016
101 % (
99 %)
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 170097
Residency:
30039(08)
CO. RD.
03300
ROAD (NS-360/MARKET ROAD): FROM 1.1
MILES NORTH OF SH-9, EXTEND NORTH NEAR
CIRB-267C(053)RB
WEWOKA
SEMINOLE. PROJECT LENGTH = 2.963 MILES
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$2,508,689.16
$2,508,689.16)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
RESURFACE (ASPHALT) SH-9A: FROM THE
Contract: 170098
Residency:
31314(04)
SH-9A
03300
SH-59 JUNCTION, EXTEND SOUTH NEAR
MAUD. PROJECT LENGTH = 2.66 MILES
STPY-267C(058)3P
WEWOKA
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Helton, Matthew
Contract Amount:
(
$418,879.60
$418,879.60)
Contract Time:
(
)
25
25
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
05/16/2017
0%(
0 %)
Construction Status Report
Page 140
SAFETY IMPROVEMENT (RUMBLE STRIP AND
Contract: 170100
Residency:
32798(04)
US-77
03100
PAVEMENT MARKING)
US-77/US-270/SH-9/SH-78: AT MULTIPLE
HSIPG-267F(057)TR/HSIPG-*
ADA
LOCATIONS IN DIVISION III.
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
Russell, Julie
Contract Amount:
(
$143,206.00
$143,206.00)
Contract Time:
(
)
30
30
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/24/2017
W/O Effective:
Amount Paid:
07/03/2017
69 % (
69 %)
Work Started:
Time Passed:
05/01/2017
17 % (
17 %)
*235C(032)TR
RESURFACE (ASPHALT) SH-3E/SH-9A: SH-3E,
Residency:
Contract: 170110
28205(04)
SH-9A
03300
FROM THE SH-9 JCT, EXT NORTHWEST IN
SEMINOLE. SH-9A, FROM THE SH-39 JCT, EXT
SSR-167C(184)SR/SSR-267C*
WEWOKA
NORTH IN KONAWA. PROJECT LENGTH =
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
9.280 MILES.
Adjusted:
Engineer:
Helton, Matthew
Contract Amount:
(
$1,488,678.75
$1,488,678.75)
Contract Time:
(
)
60
60
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/27/2017
W/O Effective:
Amount Paid:
06/05/2017
22 % (
22 %)
Work Started:
Time Passed:
05/08/2017
12 % (
12 %)
*(056)SR
County:
Sequoyah
1
Commissioner District:
Contracts Under Construction
Contract: 140116
09242(06)
US-64
STPY-068C(231)SS
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$5,579,176.11
Contract Time:
230
Letting Date:
07/24/2014
Contract Date:
08/12/2014
W/O Issued
08/14/2014
W/O Effective:
12/01/2014
Work Started:
11/11/2014
Residency:
SALLISAW
01200
BRIDGE AND APPROACHES US-64: OVER BIG
SALLISAW CREEK, 3.1 MILES WEST OF US-59
IN SALLISAW. PROJECT LENGTH = 1.320
MILES.
Adjusted:
(
$5,629,175.91)
(
244 )
Amount Paid:
Time Passed:
Adjusted:
78 % (
78 %)
217 % (
204 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 150402
Residency:
25434(04)
CO.RD.
01200
COUNTY ROAD (NS-462): OVER BRUSHY
CREEK, 6.5 MILES NORTH OF SH-64 NEAR
CIRB-168C(190)RB
SALLISAW
SALLISAW. PROJECT LENGTH = 0.464 MILE
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$2,499,565.09
$2,499,565.09)
Contract Time:
(
120
120 )
Letting Date:
11/19/2015
Contract Date:
12/22/2015
W/O Issued
Adjusted:
12/30/2015
W/O Effective:
Amount Paid:
03/07/2016
69 % (
69 %)
Work Started:
Time Passed:
03/07/2016
236 % (
236 %)
Construction Status Report
Page 141
Contract: 160154
27954(05)
US-64
STP-268C(031)SS/STP-268B*
Contractor:
B & B CONSTRUCTION SERVICE
Engineer:
Edwards, Carl
Contract Amount:
$340,048.60
Contract Time:
120
Letting Date:
03/17/2016
Contract Date:
04/19/2016
W/O Issued
04/25/2016
W/O Effective:
09/06/2016
Work Started:
09/06/2016
*(032)SS
Contract: 160159
23107(12)
US-59
NHPP-268N(038)RW
Contractor:
J.E. DIRT WURX, LLC
Engineer:
Edwards, Carl
Contract Amount:
$170,000.00
Contract Time:
180
Letting Date:
03/17/2016
Contract Date:
05/06/2016
W/O Issued
05/09/2016
W/O Effective:
05/31/2016
Work Started:
05/31/2016
Residency:
01200
SALLISAW
J.T., INC.
Adjusted:
(
$340,048.60)
(
120 )
JOINT SEAL/REPAIR US-64: OVER GENERAL
OVERFLOW, 0.9 MILES AND 3.4 MILES WEST
OF THE ARKANSAS STATE LINE NEAR
ROLAND.
Amount Paid:
Time Passed:
Residency:
SALLISAW
01200
Adjusted:
89 % (
89 %)
86 % (
86 %)
RIGHT-OF-WAY CLEARANCE US-59: FROM
US-64, EXTEND NORTH IN SALLISAW.
PROJECT LENGTH = 3.459 MILES.
Adjusted:
(
$170,000.00)
(
180 )
Amount Paid:
Time Passed:
Adjusted:
66 % (
66 %)
23 % (
23 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160207
Residency:
28515(04)
CO.RD.
01200
COUNTY ROAD (EW-112): FROM 0.1 MILES
SOUTH OF US-64, EXTEND SOUTHEAST THEN
CIRB-268C(037)RB
SALLISAW
EAST NEAR MULDROW. PROJECT LENGTH =
Contractor:
TREAS CONSTRUCTION, INC.
3.995 MILES
Engineer:
Adjusted:
Edwards, Carl
Contract Amount:
(
$2,947,508.69
$2,947,508.69)
Contract Time:
(
225
225 )
Letting Date:
05/19/2016
Contract Date:
06/24/2016
W/O Issued
Adjusted:
06/29/2016
W/O Effective:
Amount Paid:
10/03/2016
69 % (
69 %)
Work Started:
Time Passed:
08/22/2016
84 % (
84 %)
BRIDGE PAINTING US-64: OVER NEGRO
Contract: 160260
Residency:
31695(04)
US-64
01001
CREEK 4.6 MI EAST OF SH-82 JCT AND OVER
GENERAL O'FLOW 3.5 MI AND 6.0 MI EAST OF
STP-NBIP(503)3B/STP-NBIP*
ENGR. SERV. & TESTING
THE I-40 JCT.
Contractor:
POSEIDON CONSTRUCTION, INC.
Engineer:
Adjusted:
EST
Contract Amount:
(
$325,993.40
$325,993.40)
Contract Time:
(
)
90
90
Letting Date:
09/15/2016
Contract Date:
10/17/2016
W/O Issued
Adjusted:
12/12/2016
W/O Effective:
Amount Paid:
02/16/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
*(494)(495)SS
Construction Status Report
Page 142
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 160398
Residency:
32223(04)
CO. RD.
01002
ROAD (INDIAN ROAD): FROM 1.1 MILES
NORTHEAST OF THE SH-10A JUNCTION,
ERSTP-268C(025)ER
TETRA TECH
EXTEND EAST NEAR TENKILLER STATE
Contractor:
GLOVER & ASSOCIATES, INC.
PARK. PROJECT LENGTH = 0.227 MILE
Engineer:
Adjusted:
TETR
Contract Amount:
(
$748,033.36
$748,033.36)
Contract Time:
(
)
45
45
Letting Date:
10/20/2016
Contract Date:
11/23/2016
W/O Issued
Adjusted:
11/29/2016
W/O Effective:
Amount Paid:
01/09/2017
74 % (
74 %)
Work Started:
Time Passed:
01/09/2017
171 % (
171 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160434
29376(04)
COUNTY RO Residency:
01200
(EW-1107): OVER LITTLE SKIN BAYOU CREEK,
0.9 MILES WEST OF SH-64B NEAR MULDROW.
STP-268D(040)CI
SALLISAW
PROJECT LENGTH = 0.327 MILE
Contractor:
H & H BRIDGE COMPANY
Adjusted:
Engineer:
Edwards, Carl
Contract Amount:
(
$732,998.87
$732,998.87)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/14/2016
W/O Issued
Adjusted:
03/03/2017
W/O Effective:
Amount Paid:
04/10/2017
23 % (
23 %)
Work Started:
Time Passed:
04/10/2017
17 % (
17 %)
Contract: 170049
30502(04)
US-64
SSR-268C(039)SR
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Edwards, Carl
Contract Amount:
$505,270.70
Contract Time:
60
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
02/24/2017
W/O Effective:
06/05/2017
Work Started:
County:
Residency:
SALLISAW
01200
SHOULDER REHABILITATION (ASPHALT)
US-64/SH-10: FROM THE SH-100 JUNCTION,
EXTEND EAST NEAR GORE. PROJECT
LENGTH = 9.784 MILES.
Adjusted:
(
$505,270.70)
(
)
60
Amount Paid:
Time Passed:
Stephens
Adjusted:
0%(
0 %)
0%(
0 %)
7
Commissioner District:
Contracts Under Construction
Contract: 150310
20316(23)
US-81
NHPP-269N(020)SS
Contractor:
OVERLAND CORPORATION
Engineer:
Roberts, Colton
Contract Amount:
$15,567,066.97
Contract Time:
365
Letting Date:
09/17/2015
Contract Date:
10/21/2015
W/O Issued
10/27/2015
W/O Effective:
02/01/2016
Work Started:
02/16/2016
Residency:
DUNCAN
07100
Adjusted:
(
$15,688,836.83)
(
374 )
GRADE, DRAIN, SURFACE, AND BRIDGE
US-81: FROM 0.2 MILE SOUTH OF SEMINOLE
ROAD, EXTEND NORTHWEST TO SH-7
(DUNCAN BYPASS) IN DUNCAN. PROJECT
LENGTH = 1.608 MILES.
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
94 % (
94 %)
98 % (
96 %)
Page 143
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160155
Residency:
28366(04)
CO.RD.
07100
(NS-279/DEWITT ROAD): OVER LITTLE
BEAVER CREEK, 0.7 MILES SOUTH OF THE
STP-NBIL(192)CI
DUNCAN
GRADY COUNTY LINE NEAR MARLOW.
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
PROJECT LENGTH = 0.264 MILE
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$937,479.14
$937,479.14)
Contract Time:
(
120
120 )
Letting Date:
03/17/2016
Contract Date:
04/19/2016
W/O Issued
Adjusted:
04/22/2016
W/O Effective:
Amount Paid:
09/06/2016
98 % (
98 %)
Work Started:
Time Passed:
09/06/2016
103 % (
103 %)
RIGHT-OF-WAY CLEARANCE SH-29: FROM 2.6
Residency:
Contract: 160190
24412(11)
SH-29
07100
MILES EAST OF US-81, EXTEND EAST NEAR
MARLOW. PROJECT LENGTH = 7.990 MILES
STP-269B(040)RW
DUNCAN
PREQUALIFICATION FOR THIS PROJECT HAS
Contractor:
ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC
BEEN WAIVED. BOTH BID EXPRESS AND
Adjusted:
Engineer:
Roberts, Colton
WRITTEN BIDS WILL BE ACCEPTABLE.
Contract Amount:
(
$52,035.56
$52,035.56)
Contract Time:
(
180
180 )
Letting Date:
04/21/2016
Contract Date:
05/19/2016
W/O Issued
Adjusted:
05/31/2016
W/O Effective:
Amount Paid:
06/13/2016
50 % (
50 %)
Work Started:
Time Passed:
12/12/2016
18 % (
18 %)
Contract: 160261
20316(04)
US-81
ACNHPP-011N(100)SS
Contractor:
OVERLAND CORPORATION
Engineer:
Roberts, Colton
Contract Amount:
$14,336,306.11
Contract Time:
420
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
08/24/2016
W/O Effective:
12/05/2016
Work Started:
12/05/2016
Residency:
DUNCAN
07100
GRADE, DRAIN, SURFACE, AND BRIDGE
US-81: FROM CHEROKEE ROAD, EXTEND
NORTH NEAR DUNCAN. PROJECT LENGTH =
1.123 MILES.
Adjusted:
(
$14,337,638.11)
(
420 )
Amount Paid:
Time Passed:
Adjusted:
26 % (
26 %)
33 % (
33 %)
BRIDGE REHABILITATION SH-7: OVER 7TH
Contract: 160262
Residency:
32402(04)
SH-7
07100
STREET AND UNION PACIFIC RAILROAD, 0.7
MILE EAST OF THE US-81 JUNCTION IN
SBR-269N(038)SB
DUNCAN
DUNCAN.
Contractor:
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$2,431,662.08
$2,435,710.08)
Contract Time:
(
230
230 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
11/21/2016
W/O Effective:
Amount Paid:
12/05/2016
20 % (
20 %)
Work Started:
Time Passed:
02/23/2017
43 % (
43 %)
Construction Status Report
Page 144
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160435
28444(04)
COUNTY RO Residency:
07100
(NS-304): OVER WILDHORSE CREEK, 1.7
MILES NORTH OF SH-7 NEAR VELMA.
STP-269C(041)CI
DUNCAN
PROJECT LENGTH = 0.207 MILE
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
Roberts, Colton
Contract Amount:
(
$1,180,099.91
$1,180,099.91)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/20/2016
W/O Effective:
Amount Paid:
03/06/2017
46 % (
46 %)
Work Started:
Time Passed:
03/23/2017
52 % (
52 %)
County:
Texas
6
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, AND SURFACE COUNTY
Residency:
Contract: 160118
28465(06)
CO.RD.
06200
ROAD (EW-10): FROM 3.0 MILES EAST OF
SH-136, EXTEND EAST NEAR GUYMON.
CIRB-270C(021)RB
GUYMON
PROJECT LENGTH = 3.030 MILES.
Contractor:
J & R SAND COMPANY, INC.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$1,991,180.31
$1,992,060.31)
Contract Time:
(
120
120 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/24/2016
W/O Effective:
Amount Paid:
02/06/2017
94 % (
94 %)
Work Started:
Time Passed:
02/06/2017
68 % (
68 %)
BRIDGE AND APPROACHES US-54: OVER
Residency:
Contract: 160233
06200
29447(04)
US-54
PONY CREEK, 10.8 MILES NORTHEAST OF
THE SH-3 JUNCTION NEAR GUYMON.
GUYMON
ACNHPP-008N(087)SS
PROJECT LENGTH = 0.055 MILE.
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$1,354,334.20
$1,369,329.20)
Contract Time:
(
120
143 )
Letting Date:
06/16/2016
Contract Date:
07/28/2016
W/O Issued
Adjusted:
10/10/2016
W/O Effective:
Amount Paid:
11/07/2016
98 % (
97 %)
Work Started:
Time Passed:
11/07/2016
136 % (
114 %)
BRIDGE AND APPROACHES SH-95: OVER
Contract: 160239
Residency:
29448(04)
SH-95
06200
GOFF CREEK, 7.1 MILES NORTH OF THE
US-64 JUNCTION NEAR EVA. PROJECT
ACSTP-270C(022)SS
GUYMON
LENGTH = 0.203 MILE.
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$2,462,399.16
$2,462,399.16)
Contract Time:
(
180
183 )
Letting Date:
06/16/2016
Contract Date:
07/26/2016
W/O Issued
Adjusted:
09/26/2016
W/O Effective:
Amount Paid:
11/07/2016
68 % (
68 %)
Work Started:
Time Passed:
11/07/2016
86 % (
85 %)
Construction Status Report
Page 145
SAFETY IMPROVEMENT (RUMBLE STRIP AND
Contract: 170102
Residency:
32663(08)
US-270
06100
PAVEMENT MARKING) US-270/US-412/SH-3: AT
MULTIPLE LOCATIONS IN DIVISION VI.
HSIPG-270N(026)(027)MS/H*
BUFFALO
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$885,499.15
$885,499.15)
Contract Time:
(
)
60
60
Letting Date:
02/16/2017
Contract Date:
03/20/2017
W/O Issued
Adjusted:
03/21/2017
W/O Effective:
Amount Paid:
07/03/2017
0%(
0 %)
Work Started:
Time Passed:
05/18/2017
0%(
0 %)
*SIPG-204N(021)MS/HSIPG-230N(025)MS
RESURFACE (ASPHALT) SH-95/SH-136: SH-95
Contract: 170111
Residency:
30528(04)
SH-95
06200
FROM 8.1 MILES N OF US-64 NEAR SURREY
HILLS. SH-136 FROM 8.8 MILES N OF US-64
SSR-270C(028)SR
GUYMON
NEAR GUYMON. PROJECT LENGTH = 16.300
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
MILES
Engineer:
Adjusted:
Michael, Charles
Contract Amount:
(
$1,799,898.00
$1,799,898.00)
Contract Time:
(
)
Letting Date:
01/19/2017
Contract Date:
02/14/2017
Fixed Completion Date: 10/01/2017
W/O Issued
Adjusted:
03/17/2017
W/O Effective:
Amount Paid:
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Tillman
5
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160182
Residency:
05005
25486(04)
CO.RD.
COUNTY ROAD (EW-173): FROM 5.2 MILES
EAST OF US-183, EXTEND EAST NEAR
CIRCUIT ENGR. DISTR. # 7
CIRB-171C(127)RB
MANITOU. PROJECT LENGTH = 5.742 MILES
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$5,983,257.10
$5,983,257.10)
Contract Time:
(
270
270 )
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
Adjusted:
05/19/2016
W/O Effective:
Amount Paid:
08/01/2016
85 % (
85 %)
Work Started:
Time Passed:
06/20/2016
106 % (
106 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160263
Residency:
28689(04)
CO.RD.
05005
COUNTY ROAD (EW-173/BASELINE ROAD):
FROM 12.0 MILES EAST OF US-183, EXTEND
CIRB-271C(002)RB
CIRCUIT ENGR. DISTR. # 7
EAST NEAR MANITOU. PROJECT LENGTH =
Contractor:
T & G CONSTRUCTION, INC.
4.371 MILES
Engineer:
Adjusted:
CED7
Contract Amount:
(
$4,488,839.75
$4,488,839.75)
Contract Time:
(
270
270 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/24/2016
W/O Effective:
Amount Paid:
12/05/2016
27 % (
27 %)
Work Started:
Time Passed:
12/05/2016
32 % (
32 %)
Construction Status Report
Page 146
Contract: 170052
30403(04)
SH-5
SSR-271B(054)SR
Contractor:
OVERLAND CORPORATION
Engineer:
Sirmons, Karl
Contract Amount:
$3,585,473.00
Contract Time:
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
02/17/2017
W/O Effective:
Work Started:
County:
Residency:
ALTUS
05200
RESURFACE (ASPHALT) SH-5: FROM 0.42
MILES EAST OF THE US-183 JUNCTION,
EXTEND EAST IN FREDERICK. PROJECT
LENGTH = 15.81 MILES
Adjusted:
(
$3,585,473.00)
(
)
Fixed Completion Date: 10/31/2017
Adjusted:
Amount Paid:
0%(
0 %)
Time Passed:
0%(
0 %)
Tulsa
8
Commissioner District:
Contracts Under Construction
SAFETY IMPROVEMENT (CABLE BARRIER)
Residency:
Contract: 130350
30270(04)
US-75
08011
US-75: FROM 6.0 MILES SOUTH OF THE
WASHINGTON COUNTY LINE, EXTEND
HSIPG-272N(044)TR/HSIPG-*
GARVER, LLC.
NORTH. PROJECT LENGTH = 22.50 MILES.
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
GARV
Contract Amount:
(
$3,945,413.26
$4,821,036.52)
Contract Time:
(
240
240 )
Letting Date:
09/19/2013
Contract Date:
10/29/2013
W/O Issued
Adjusted:
11/01/2013
W/O Effective:
Amount Paid:
02/17/2014
117 % (
96 %)
Work Started:
Time Passed:
02/17/2014
144 % (
144 %)
*274N(004)TR
PAVEMENT AND BRIDGE REHABILITATION
Residency:
Contract: 140304
26300(06)
I-244
08100
I-244: BEGIN 1.5 MILES EAST OF US-75,
EXTEND EAST. PROJECT LENGTH = 2.939
NHPPIY-0244-2(501)(504)(*
TULSA
MILES.
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$36,170,934.33
$36,486,544.19)
Contract Time:
(
440
440 )
Letting Date:
10/16/2014
Contract Date:
11/12/2014
W/O Issued
Adjusted:
11/20/2014
W/O Effective:
Amount Paid:
03/02/2015
98 % (
97 %)
Work Started:
Time Passed:
03/02/2015
90 % (
90 %)
*507)
Contract: 150117
30914(04)
I-44
SSP-4400(002)SS/SSP-272N*
Contractor:
APAC-CENTRAL, INC.
Engineer:
Arnold, Bruce
Contract Amount:
$5,195,474.88
Contract Time:
120
Letting Date:
03/19/2015
Contract Date:
04/20/2015
W/O Issued
04/30/2015
W/O Effective:
05/29/2015
Work Started:
05/29/2015
*(106)(107)(108)SS
Residency:
TULSA
08100
RESURFACE (UTBWC) I-44/I-244/US-169/SH-51:
AT MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 6.959 MILES.
Adjusted:
(
$5,195,474.88)
(
120 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
143 % (
143 %)
306 % (
306 %)
Page 147
BRIDGE REHABILITATION CITY STREETS: AT
Contract: 150270
Residency:
28862(04)
CT.ST.
08100
BOSTON AVE, MAIN STREET, AND CHEYENNE
AVE, EACH OVER I-444 IN TULSA.
NHPPI-4440(001)SS
TULSA
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$4,065,649.75
$4,065,649.75)
Contract Time:
(
300
300 )
Letting Date:
08/20/2015
Contract Date:
09/16/2015
W/O Issued
Adjusted:
09/18/2015
W/O Effective:
Amount Paid:
01/04/2016
104 % (
104 %)
Work Started:
Time Passed:
01/04/2016
135 % (
135 %)
BRIDGE REHABILITATION US-64: OVER 161ST
Residency:
Contract: 150272
28883(04)
US-64
08400
W. AVE AND 193RD W. AVE, 4.6 MI
SOUTHEAST OF THE OSAGE COUNTY LINE IN
NHPP-272N(094)SS
SAND SPRINGS
SAND SPRINGS. PROJECT LENGTH = 2.201
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
MILES.
Adjusted:
Engineer:
Williams, Mark J.
Contract Amount:
(
$5,894,292.84
$5,907,609.29)
Contract Time:
(
315
315 )
Letting Date:
08/20/2015
Contract Date:
09/16/2015
W/O Issued
Adjusted:
09/18/2015
W/O Effective:
Amount Paid:
01/04/2016
88 % (
88 %)
Work Started:
Time Passed:
01/04/2016
105 % (
105 %)
Contract: 150273
30318(05)
MULT
SSP-272F(124)SS
Contractor:
JLT CONTRACTING, LLC
Engineer:
C&KI
Contract Amount:
$435,114.15
Contract Time:
45
Letting Date:
08/20/2015
Contract Date:
09/21/2015
W/O Issued
09/23/2015
W/O Effective:
10/12/2015
Work Started:
11/09/2015
Residency:
08007
CRAIG & KEITHLINE, INC.
BRIDGE WATER PROOF SEAL
I-44/I-244/I-444/US-60/US-69/SH-28/SH-51/SH-66
/LEWIS AVE: AT MULTIPLE LOCATIONS IN
DIVISION VIII.
Adjusted:
(
$435,114.15)
(
)
45
Amount Paid:
Time Passed:
Adjusted:
93 % (
93 %)
271 % (
271 %)
BRIDGE AND APPROACHES SH-266: FROM
Contract: 150312
Residency:
27053(04)
SH-26
08100
0.3 MILES EAST OF US-169, EXTEND EAST
NEAR CATOOSA. PROJECT LENGTH = 2.528
STP-272A(093)SS
TULSA
Contractor:
DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$23,466,001.38
$23,466,001.38)
Contract Time:
(
450
450 )
Letting Date:
09/17/2015
Contract Date:
10/21/2015
W/O Issued
Adjusted:
10/29/2015
W/O Effective:
Amount Paid:
12/01/2015
95 % (
95 %)
Work Started:
Time Passed:
12/01/2015
97 % (
97 %)
Construction Status Report
Page 148
Contract: 150345
23170(07)
I-44
HSIPG-272C(122)IT
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
TETR
Contract Amount:
$2,726,955.40
Contract Time:
300
Letting Date:
10/15/2015
Contract Date:
11/20/2015
W/O Issued
11/30/2015
W/O Effective:
04/04/2016
Work Started:
04/04/2016
Contract: 160063
28867(04)
CT.ST.
STP-272C(097)SS/NHPP-272*
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
ATKINS
Contract Amount:
$3,086,000.00
Contract Time:
200
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
03/02/2016
W/O Effective:
06/06/2016
Work Started:
06/06/2016
*A(125)SS
Contract: 160156
28861(04)
I-244
ACNHPPI-2440(010)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
TETR
Contract Amount:
$18,810,000.00
Contract Time:
580
Letting Date:
04/21/2016
Contract Date:
05/06/2016
W/O Issued
05/09/2016
W/O Effective:
05/31/2016
Work Started:
05/23/2016
Residency:
08002
TETRA TECH
LLC
Adjusted:
(
$2,816,299.52)
(
330 )
SAFETY IMPROVEMENT (ITS)
I-44/I-244/US-75/US-169/SH-51: AT MULTIPLE
LOCATIONS IN DIVISION VIII.
Amount Paid:
Time Passed:
Residency:
ATKINS
08010
Adjusted:
97 % (
94 %)
109 % (
99 %)
BRIDGE REHABILITATION CITY STREETS: ON
SHERIDAN AVE, OVER SH-11 3.0 MILES WEST
OF US-75, AND ON 69TH E. AVE, OVER SH-11
IN TULSA. PROJECT LENGTH = 0.120 MILE.
Adjusted:
(
$3,088,750.00)
(
200 )
Amount Paid:
Time Passed:
Residency:
TETRA TECH
08002
Adjusted:
(
$18,811,925.00)
(
580 )
Adjusted:
90 % (
90 %)
143 % (
143 %)
BRIDGE REHABILITATION I-244 RAMP/23RD
STREET: OVER I-244 AND THE BNSF
RAILROAD, 1.2 MILES SOUTH OF THE US-75
INTERCHANGE IN TULSA. PROJECT LENGTH
= 0.548 MILE.
Amount Paid:
Time Passed:
Adjusted:
58 % (
58 %)
62 % (
62 %)
GRADE, DRAIN, SURFACE, AND TRAFFIC
Contract: 160234
Residency:
29323(04)
CT.ST.
08010
SIGNALS CITY STREET (111TH STREET): AT
THE INTERSECTION OF MINGO ROAD IN THE
STP-272B(175)IG
ATKINS
CITY OF BIXBY. PROJECT LENGTH = 0.350
Contractor:
TRI-STAR CONSTRUCTION ARKANSAS, LLC
MILE.
Engineer:
Adjusted:
ATKINS
Contract Amount:
(
$1,287,134.01
$1,337,121.65)
Contract Time:
(
180
180 )
Letting Date:
06/16/2016
Contract Date:
07/19/2016
W/O Issued
Adjusted:
07/25/2016
W/O Effective:
Amount Paid:
11/07/2016
78 % (
75 %)
Work Started:
Time Passed:
12/15/2016
54 % (
54 %)
Construction Status Report
Page 149
Contract: 160270
30730(04)
I-44
HSIPG-272F(084)TR
Contractor:
TRAFFIC & LIGHTING SYSTEMS,
Engineer:
CEC
Contract Amount:
$580,550.00
Contract Time:
120
Letting Date:
07/21/2016
Contract Date:
08/09/2016
W/O Issued
08/11/2016
W/O Effective:
12/05/2016
Work Started:
12/05/2016
Residency:
08003
CEC CORP.
LLC
Adjusted:
(
$580,550.00)
(
120 )
TRAFFIC SIGNALS INTERSTATE/US
HIGHWAYS/STATE HIGHWAYS/CITY STREETS:
BACKPLATE REPLACEMENT AT MULTIPLE
LOCATIONS STATEWIDE.
Amount Paid:
Time Passed:
Adjusted:
84 % (
84 %)
77 % (
77 %)
BRIDGE AND APPROACHES US-75: OVER
Residency:
Contract: 160300
28848(04)
US-75
08004
NORTH DUCK CREEK, 4.7 MILES SOUTH OF
SH-67 NEAR THE TOWN OF MOUNDS.
ACNHPP-272N(148)SS
JACOBS ENGINEERING
PROJECT LENGTH = 0.211 MILE.
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Adjusted:
Engineer:
JACOBS
Contract Amount:
(
$3,693,425.16
$3,693,425.16)
Contract Time:
(
300
300 )
Letting Date:
08/18/2016
Contract Date:
09/14/2016
W/O Issued
Adjusted:
09/15/2016
W/O Effective:
Amount Paid:
02/06/2017
67 % (
67 %)
Work Started:
Time Passed:
11/14/2016
61 % (
61 %)
BRIDGE REHABILITATION US-75: OVER
Contract: 160301
Residency:
28849(04)
US-75
08002
POLECAT CREEK, 0.4 MILES NORTH OF THE
CREEK TURNPIKE IN JENKS. PROJECT
ACNHPP-272N(185)SS
TETRA TECH
LENGTH = 0.088 MILE
Contractor:
LOGOS CONSTRUCTION CO., LLC
Engineer:
Adjusted:
TETR
Contract Amount:
(
$686,896.02
$686,896.02)
Contract Time:
(
120
120 )
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
Adjusted:
09/23/2016
W/O Effective:
Amount Paid:
01/03/2017
53 % (
53 %)
Work Started:
Time Passed:
11/16/2016
49 % (
49 %)
Contract: 160302
28873(04)
CT.ST.
ACNHPP-030N(076)SS
Contractor:
PBX CORPORATION
Engineer:
Arnold, Bruce
Contract Amount:
$1,815,047.30
Contract Time:
120
Letting Date:
08/18/2016
Contract Date:
09/16/2016
W/O Issued
09/20/2016
W/O Effective:
01/03/2017
Work Started:
12/08/2016
Residency:
TULSA
08100
BRIDGE REHABILITATION CITY STREET (EAST
36TH STREET): OVER US-169, 3.5 MILES
NORTH OF I-244 IN THE CITY OF TULSA.
PROJECT LENGTH = 0.142 MILE.
Adjusted:
(
$1,824,797.30)
(
120 )
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
90 % (
89 %)
95 % (
95 %)
Page 150
BRIDGE REHABILITATION I-444/CINCINNATI
Contract: 160303
Residency:
31881(04)
I-444
08100
AVENUE: AT MULTIPLE LOCATIONS IN THE
CITY OF TULSA.
ACNHPPI-4440(006)SS
TULSA
Contractor:
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$6,982,546.64
$6,982,546.64)
Contract Time:
(
365
365 )
Letting Date:
08/18/2016
Contract Date:
09/19/2016
W/O Issued
Adjusted:
09/28/2016
W/O Effective:
Amount Paid:
01/03/2017
13 % (
13 %)
Work Started:
Time Passed:
01/03/2017
30 % (
30 %)
Contract: 160305
31939(05)
US-75
SSP-272N(138)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Arnold, Bruce
Contract Amount:
$4,670,000.00
Contract Time:
110
Letting Date:
08/18/2016
Contract Date:
09/19/2016
W/O Issued
09/22/2016
W/O Effective:
03/31/2017
Work Started:
03/31/2017
Residency:
TULSA
08100
RESURFACE (ASPHALT) US-75: FROM 2.0
MILES NORTH OF THE I-44 INTERCHANGE,
EXTEND SOUTH IN TULSA. PROJECT LENGTH
= 5.325 MILES.
Adjusted:
(
$4,670,000.00)
(
110 )
Amount Paid:
Time Passed:
Adjusted:
54 % (
54 %)
34 % (
34 %)
GRADE, DRAIN, SURFACE, AND BRIDGE I-44:
Contract: 160333
Residency:
21899(04)
I-44
08100
FROM 1.0 MILE EAST OF THE I-244
INTERCHANGE, EXTEND WEST IN THE CITY
ACNHPPI-4400-(438)SS
TULSA
OF TULSA. PROJECT LENGTH = 1.155 MILES.
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$29,559,681.69
$29,576,474.84)
Contract Time:
(
430
430 )
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
10/20/2016
W/O Effective:
Amount Paid:
02/16/2017
29 % (
29 %)
Work Started:
Time Passed:
02/13/2017
17 % (
17 %)
BRIDGE PAINTING I-244/I-444/SH-51: AT
Contract: 160337
Residency:
08010
30318(06)
I-244
MULTIPLE LOCATIONS IN THE CITY OF TULSA.
ATKINS
SSP-NBIP(506)SS
Contractor:
ELITE INDUSTRIAL PAINTING, INC.
Engineer:
Adjusted:
ATKINS
Contract Amount:
(
$1,566,487.00
$1,566,487.00)
Contract Time:
(
150
150 )
Letting Date:
09/15/2016
Contract Date:
10/28/2016
W/O Issued
Adjusted:
11/08/2016
W/O Effective:
Amount Paid:
02/16/2017
79 % (
79 %)
Work Started:
Time Passed:
02/25/2017
53 % (
53 %)
Construction Status Report
Page 151
Contract: 160339
31943(04)
I-244
SSP-272F(182)SS
Contractor:
KEYSTONE SERVICES, INC.
Engineer:
BKL
Contract Amount:
$188,945.30
Contract Time:
120
Letting Date:
09/15/2016
Contract Date:
10/20/2016
W/O Issued
10/25/2016
W/O Effective:
02/16/2017
Work Started:
03/06/2017
Contract: 170053
28872(04)
IS-44
ACNHPPI-4400-(016)(014)(*
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Arnold, Bruce
Contract Amount:
$5,833,000.00
Contract Time:
240
Letting Date:
01/19/2017
Contract Date:
02/21/2017
W/O Issued
02/24/2017
W/O Effective:
06/05/2017
Work Started:
*015)SS
Residency:
08019
BKL, INCORPORATED
BRIDGE WATER PROOF SEAL
INTERSTATE/US-HIGHWAYS/STATE
HIGHWAYS: AT MULTIPLE LOCATIONS IN
DIVISION VIII.
Adjusted:
(
$188,945.30)
(
120 )
Amount Paid:
Time Passed:
Residency:
TULSA
08100
Adjusted:
(
$5,833,000.00)
(
240 )
Adjusted:
65 % (
65 %)
52 % (
52 %)
BRIDGE REHABILITATION I-44/GILCREASE
EXPWY RAMP: OVER I-244, CITY ST, CNTY RD,
TSU RR AND BNSF RR, AT MULTIPLE
LOCATIONS IN TULSA. PROJECT LENGTH =
0.170 MILE
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
BRIDGE REHABILITATION CITY STREETS
Contract: 170054
Residency:
29071(04)
CT. ST.
08100
(HARVARD AVE/PITTSBURG AVE/YALE AVE/
MEMORIAL DR): OVER I-244 IN THE CITY OF
NHPPIY-2440-(014)(013)
TULSA
TULSA. PROJECT LENGTH = 0.121 MILE
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$8,097,436.74
$8,097,436.74)
Contract Time:
(
360
360 )
Letting Date:
01/19/2017
Contract Date:
02/15/2017
W/O Issued
Adjusted:
02/17/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
GRADE, DRAIN, SURFACE, AND TRAFFIC
Contract: 170103
Residency:
25211(04)
CT. ST.
08010
SIGNALS CITY STREET (W MAIN STREET/W.
96TH STREET): FROM US-75, EXTEND EAST
STP-172B(399(398)(456)IG
ATKINS
IN THE CITY OF JENKS. PROJECT LENGTH =
Contractor:
NABHOLZ CONSTRUCTION CORPORATION
2.218 MILES
Engineer:
Adjusted:
ATKINS
Contract Amount:
(
$10,544,739.61
$10,544,739.61)
Contract Time:
(
310
310 )
Letting Date:
02/16/2017
Contract Date:
03/21/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Construction Status Report
Page 152
Contract: 170106
29826(04)
US-64
SBR-272A(201)SB
Contractor:
PBX CORPORATION
Engineer:
Arnold, Bruce
Contract Amount:
$1,851,494.87
Contract Time:
150
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
05/16/2017
W/O Effective:
07/03/2017
Work Started:
Residency:
TULSA
08100
Adjusted:
(
$1,851,494.87)
(
150 )
BRIDGE REHABILITATION US-64/SH-51: OVER
YALE AVENUE AND 31ST STREET, 1.6 MILES
NORTHWEST OF THE I-44 INTERCHANGE IN
THE CITY OF TULSA. PROJECT LENGTH =
0.132 MILE
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
BRIDGE REHABILITATION SH-11: OVER US-75,
Residency:
Contract: 170107
30594(04)
SH-11
08100
3.5 MILES NORTH OF THE I-244 INTERCHANGE
IN THE CITY OF TULSA. PROJECT LENGTH =
SBR-272N(186)SB
TULSA
0.161 MILE
Contractor:
SHERWOOD CONSTRUCTION CO., INC.
Adjusted:
Engineer:
Arnold, Bruce
Contract Amount:
(
$1,750,485.40
$1,750,485.40)
Contract Time:
(
180
180 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
03/20/2017
W/O Effective:
Amount Paid:
09/05/2017
4%(
4 %)
Work Started:
Time Passed:
05/08/2017
5%(
5 %)
Contract: 170141
27937(04)
US-64
STP-272C(202)
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
CEC
Contract Amount:
$3,901,904.47
Contract Time:
210
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
04/24/2017
W/O Effective:
09/05/2017
Work Started:
Residency:
CEC CORP.
08003
BRIDGE AND APPROACHES US-64: OVER
SNAKE CREEK, 4.8 MILES SOUTH AND EAST
OF THE SH-67 JUNCTION IN BIXBY. PROJECT
LENGTH = 0.823 MILE
Adjusted:
(
$3,901,904.47)
(
210 )
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
BRIDGE REHABILITATION CITY STREETS:
Contract: 170142
Residency:
28865(04)
CT. ST.
08100
OVER I-444 AND US-75, AT MULTIPLE
LOCATIONS IN THE CITY OF TULSA. PROJECT
ACNHPPI-4440-(002)(003)S*
TULSA
LENGTH = 0.240 MILES
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Adjusted:
Arnold, Bruce
Contract Amount:
(
$9,256,000.00
$9,256,000.00)
Contract Time:
(
350
350 )
Letting Date:
03/16/2017
Contract Date:
04/19/2017
W/O Issued
Adjusted:
04/21/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
*S/NHPPI-4440-(004)SS/ACNHPP-272N(149)SS
County:
Wagoner
1
Commissioner District:
Contracts Under Construction
Construction Status Report
Page 153
Contract: 160067
28905(04)
CT.ST.
STPY-173C(177)MS
Contractor:
PARAGON CONTRACTORS, LLC
Engineer:
GARV
Contract Amount:
$2,811,811.00
Contract Time:
165
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
03/22/2016
W/O Effective:
06/06/2016
Work Started:
06/06/2016
Residency:
GARVER, LLC.
01011
Adjusted:
(
$2,871,311.80)
(
196 )
GRADE, DRAIN, AND SURFACE CITY
STREETS: ON 257TH E AVE, FROM SH-51
EXTEND NORTH THEN EAST ON 101ST
STREET IN COWETA. PROJECT LENGTH =
0.817 MILE.
Amount Paid:
Time Passed:
Adjusted:
48 % (
47 %)
162 % (
137 %)
GRADE, DRAIN, SURFACE, AND BRIDGE
Residency:
Contract: 160209
28506(04)
CO.RD.
01003
COUNTY ROAD (NS-414): FROM 0.9 MILES
SOUTH OF US-412, EXTEND NORTH IN FAIR
CIRB-273C(024)RB
CEC CORP.
OAKS. PROJECT LENGTH = 0.364 MILE
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Adjusted:
Engineer:
CEC
Contract Amount:
(
$2,008,145.87
$2,008,145.87)
Contract Time:
(
150
150 )
Letting Date:
05/19/2016
Contract Date:
06/24/2016
W/O Issued
Adjusted:
06/29/2016
W/O Effective:
Amount Paid:
11/07/2016
91 % (
91 %)
Work Started:
Time Passed:
09/07/2016
113 % (
113 %)
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 160267
Residency:
25488(04)
CO.RD.
01004
ROAD (ELEVATOR ROAD/EW-730/NS-4220):
FROM SH-51, EXTEND WEST THEN NORTH
CIRB-173C(145)RB/CIRB-27*
JACOBS ENGINEERING
NEAR COWETA. PROJECT LENGTH = 8.347
Contractor:
MCGUIRE BROTHERS CONSTRUCTION, INC.
MILES
Engineer:
Adjusted:
JACOBS
Contract Amount:
(
$6,487,576.35
$6,487,576.35)
Contract Time:
(
180
180 )
Letting Date:
07/21/2016
Contract Date:
08/09/2016
W/O Issued
Adjusted:
08/11/2016
W/O Effective:
Amount Paid:
12/05/2016
22 % (
22 %)
Work Started:
Time Passed:
12/05/2016
71 % (
71 %)
*3C(030)RB
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160268
Residency:
25489(04)
CO.RD.
01011
COUNTY ROAD (INDIAN ROAD/161ST STREET
SOUTH): FROM 2.0 MILES WEST OF SH-72,
CIRB-173C(146)RB
GARVER, LLC.
EXTEND EAST NEAR COWETA. PROJECT
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
LENGTH = 1.542 MILES.
Engineer:
Adjusted:
GARV
Contract Amount:
(
$2,887,499.15
$2,894,180.15)
Contract Time:
(
175
196 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/24/2016
W/O Effective:
Amount Paid:
12/05/2016
61 % (
61 %)
Work Started:
Time Passed:
10/24/2016
91 % (
82 %)
Construction Status Report
Page 154
Contract: 160306
24366(04)
SH-16
ACSTP-273C(025)SS
Contractor:
BECCO CONTRACTORS, INC.
Engineer:
Hagerman, Jeremy
Contract Amount:
$14,277,000.00
Contract Time:
320
Letting Date:
01/19/2017
Contract Date:
02/21/2017
W/O Issued
02/24/2017
W/O Effective:
06/05/2017
Work Started:
Residency:
MUSKOGEE
01100
GRADE, DRAIN, SURFACE, AND BRIDGE
SH-16: FROM 0.1 MILE NORTH OF THE SH-51
JUNCTION, EXTEND SOUTH NEAR WAGONER.
PROJECT LENGTH = 6.050 MILES.
Adjusted:
(
$14,277,000.00)
(
320 )
Amount Paid:
Time Passed:
Adjusted:
0%(
0 %)
0%(
0 %)
BRIDGE REHABILITATION US-64: OVER
Residency:
Contract: 170055
29513(04)
US-64
01010
MOUNTAIN CREEK, 0.4 MILES SOUTHEAST OF
THE TULSA COUNTY LINE NEAR BIXBY.
SBR-273C(037)SB
ATKINS
Contractor:
BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION
Adjusted:
Engineer:
ATKINS
Contract Amount:
(
$336,315.00
$336,315.00)
Contract Time:
(
)
90
90
Letting Date:
01/19/2017
Contract Date:
03/02/2017
W/O Issued
Adjusted:
03/03/2017
W/O Effective:
Amount Paid:
06/05/2017
9%(
9 %)
Work Started:
Time Passed:
04/06/2017
19 % (
19 %)
RESURFACE (ASPHALT) SH-51B: FROM THE
Contract: 170108
Residency:
29754(05)
SH-51B
01100
SH-104 JUNCTION, EXTEND EAST NEAR
PORTER. PROJECT LENGTH = 4.477 MILES
STPY-273C(015)3P
MUSKOGEE
Contractor:
GLOVER & ASSOCIATES, INC.
Engineer:
Adjusted:
Hagerman, Jeremy
Contract Amount:
(
$762,411.53
$762,411.53)
Contract Time:
(
)
Letting Date:
02/16/2017
Contract Date:
03/21/2017
Fixed Completion Date: 10/31/2017
W/O Issued
Adjusted:
03/25/2017
W/O Effective:
Amount Paid:
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Washington
8
Commissioner District:
Contracts Under Construction
BRIDGE REHABILITATION US-75: OVER
Contract: 160269
Residency:
27077(04)
US-75
08400
TURKEY CREEK, 1.3 MILES NORTH OF US-60
IN BARTLESVILLE. PROJECT LENGTH = 0.213
NHPP-274N(016)SS
SAND SPRINGS
MILE.
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Engineer:
Adjusted:
Williams, Mark J.
Contract Amount:
(
$1,857,945.35
$1,861,905.35)
Contract Time:
(
180
180 )
Letting Date:
07/21/2016
Contract Date:
08/18/2016
W/O Issued
Adjusted:
08/25/2016
W/O Effective:
Amount Paid:
02/16/2017
53 % (
53 %)
Work Started:
Time Passed:
02/16/2017
42 % (
42 %)
Construction Status Report
Page 155
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160436
23549(04)
COUNTY RO Residency:
08007
(NS-401): OVER LIMESTONE DRAW, 4.4 MILES
NORTH OF US-60 NEAR DEWEY. PROJECT
STP-174C(043)CI
CRAIG & KEITHLINE, INC.
LENGTH = 0.188 MILE
Contractor:
H & H BRIDGE COMPANY
Engineer:
Adjusted:
C&KI
Contract Amount:
(
$536,789.41
$536,789.41)
Contract Time:
(
120
120 )
Letting Date:
11/17/2016
Contract Date:
12/20/2016
W/O Issued
Adjusted:
01/12/2017
W/O Effective:
Amount Paid:
03/06/2017
82 % (
82 %)
Work Started:
Time Passed:
03/03/2017
46 % (
46 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160437
30615(04)
COUNTY RO Residency:
08007
(NS-394): OVER TRIBUTARY TO CANEY RIVER,
1.1 MILES SOUTH OF EW-24 NEAR
CIRB-274D(017)RB
CRAIG & KEITHLINE, INC.
BARTLESVILLE. PROJECT LENGTH = 0.212
Contractor:
H & H BRIDGE COMPANY
MILE
Adjusted:
Engineer:
C&KI
Contract Amount:
(
$705,462.91
$705,462.91)
Contract Time:
(
110
110 )
Letting Date:
11/17/2016
Contract Date:
12/14/2016
W/O Issued
Adjusted:
01/12/2017
W/O Effective:
Amount Paid:
04/03/2017
46 % (
46 %)
Work Started:
Time Passed:
03/30/2017
28 % (
28 %)
County:
Washita
5
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES SH-115: OVER
Residency:
Contract: 140283
05200
26998(04)
SH-115
GYP CREEK, 3.0 MILES SOUTH OF SH-152.
PROJECT LENGTH = 0.062 MILE.
ALTUS
STPY-275C(002)
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Engineer:
Adjusted:
Sirmons, Karl
Contract Amount:
(
$924,578.85
$941,307.27)
Contract Time:
(
)
90
90
Letting Date:
08/21/2014
Contract Date:
09/22/2014
W/O Issued
Adjusted:
09/25/2014
W/O Effective:
Amount Paid:
03/02/2015
97 % (
95 %)
Work Started:
Time Passed:
02/24/2015
68 % (
68 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 150317
Residency:
30067(04)
CO.RD.
05005
(NS-210): OVER TRAIL CREEK, 1.1 MILES
NORTH OF SH-55 NEAR SENTINEL. PROJECT
STP-275D(018)CI
CIRCUIT ENGR. DISTR. # 7
LENGTH = 0.189 MILE.
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
CED7
Contract Amount:
(
$469,461.46
$473,661.46)
Contract Time:
(
110
112 )
Letting Date:
09/17/2015
Contract Date:
10/21/2015
W/O Issued
Adjusted:
10/27/2015
W/O Effective:
Amount Paid:
02/01/2016
98 % (
97 %)
Work Started:
Time Passed:
11/18/2015
100 % (
98 %)
Construction Status Report
Page 156
Contract: 160065
29237(04)
SH-54
SBR-275C(005)SB
Contractor:
K & R BUILDERS, INC.
Engineer:
ATKINS
Contract Amount:
$824,463.54
Contract Time:
100
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
03/04/2016
W/O Effective:
06/06/2016
Work Started:
06/03/2016
Residency:
ATKINS
05010
BRIDGE REHABILITATION SH-54: OVER OAK
CREEK, 2.1 MILES SOUTH OF SH-55 NEAR
GOTEBO.
Adjusted:
(
$867,319.66)
(
100 )
Amount Paid:
Time Passed:
Adjusted:
94 % (
89 %)
74 % (
74 %)
BRIDGE AND APPROACHES SH-152: OVER
Residency:
Contract: 160183
29524(04)
SH-152
05100
TAYLOR CREEK, 1.5 MILES WEST OF THE
CADDO COUNTY LINE. PROJECT LENGTH =
ACSTP-275C(032)SS
CLINTON
0.217 MILE.
Contractor:
SEWELL BROS., INC.
Adjusted:
Engineer:
Davis, Shawn
Contract Amount:
(
$1,179,669.64
$1,349,443.39)
Contract Time:
(
120
120 )
Letting Date:
04/21/2016
Contract Date:
05/13/2016
W/O Issued
Adjusted:
05/19/2016
W/O Effective:
Amount Paid:
09/06/2016
111 % (
97 %)
Work Started:
Time Passed:
06/06/2016
68 % (
68 %)
BRIDGE REHABILITATION COUNTY ROAD
Contract: 160438
31783(04)
COUNTY RO Residency:
05100
(CANUTE ROAD): OVER I-40, 5.0 MILES EAST
OF THE BECKHAM COUNTY LINE IN CANUTE.
SBR-4000(036)SB
CLINTON
PROJECT LENGTH = 0.127 MILE
Contractor:
FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC.
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$1,458,401.62
$1,458,401.62)
Contract Time:
(
180
180 )
Letting Date:
11/17/2016
Contract Date:
12/16/2016
W/O Issued
Adjusted:
12/20/2016
W/O Effective:
Amount Paid:
04/03/2017
15 % (
15 %)
Work Started:
Time Passed:
05/08/2017
16 % (
16 %)
BRIDGE AND APPROACHES SH-152: OVER
Contract: 170056
Residency:
26480(04)
SH-152
05100
TRAIL CREEK, 4.2 MILES EAST OF THE
BECKHAM COUNTY LINE. PROJECT LENGTH =
STPY-175C(109)
CLINTON
0.342 MILE
Contractor:
K & R BUILDERS, INC.
Engineer:
Adjusted:
Davis, Shawn
Contract Amount:
(
$1,770,139.98
$1,770,139.98)
Contract Time:
(
100
100 )
Letting Date:
01/19/2017
Contract Date:
02/14/2017
W/O Issued
Adjusted:
02/16/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Construction Status Report
Page 157
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 170115
Residency:
24352(04)
SH-152
05200
SH-152: FROM SH-6, EXTEND EAST NEAR ELK
CITY. PROJECT LENGTH = 3.758 MILES
SSP-105C(147)SS
ALTUS
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
Adjusted:
Sirmons, Karl
Contract Amount:
(
$4,227,399.73
$4,227,399.73)
Contract Time:
(
200
200 )
Letting Date:
03/16/2017
Contract Date:
04/21/2017
W/O Issued
Adjusted:
04/25/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Woods
6
Commissioner District:
Contracts Under Construction
BRIDGE AND APPROACHES US-64: OVER
Residency:
Contract: 150318
26495(04)
US-64
06100
HOUSTON CREEK AND UNNAMED CREEK, 0.1
MILE WEST AND 0.1 MILE EAST OF US-50.
STP-176B(163)SS
BUFFALO
PROJECT LENGTH = 0.977 MILE.
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$4,887,586.41
$4,939,896.29)
Contract Time:
(
370
370 )
Letting Date:
09/17/2015
Contract Date:
10/21/2015
W/O Issued
Adjusted:
11/09/2015
W/O Effective:
Amount Paid:
02/01/2016
101 % (
100 %)
Work Started:
Time Passed:
02/01/2016
100 % (
100 %)
Contract: 160127
29463(04)
SH-50
SBR-276C(015)SB
Contractor:
K & R BUILDERS, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$989,550.33
Contract Time:
120
Letting Date:
02/18/2016
Contract Date:
03/21/2016
W/O Issued
03/25/2016
W/O Effective:
09/06/2016
Work Started:
10/04/2016
Residency:
BUFFALO
06100
BRIDGE REHABILITATION SH-50: OVER
HOUSTON CREEK, 0.6 MILE SOUTH OF US-64
NEAR FREEDOM. PROJECT LENGTH = 0.188
MILE.
Adjusted:
(
$1,041,090.33)
(
)
90
Amount Paid:
Time Passed:
Adjusted:
103 % (
98 %)
73 % (
97 %)
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 160342
Residency:
28347(04)
CO. RD.
06009
(NS-241): OVER LITTLE EAGLE CHIEF CREEK,
2.0 MILES SOUTH OF US-64 NEAR ALVA.
ACSTP-276D(020)CI
CIRCUIT ENGR. DISTR. # 8
PROJECT LENGTH = 0.199 MILE
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
CED8
Contract Amount:
(
$441,715.90
$441,715.90)
Contract Time:
(
)
90
90
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
Adjusted:
10/19/2016
W/O Effective:
Amount Paid:
02/16/2017
77 % (
77 %)
Work Started:
Time Passed:
01/09/2017
100 % (
100 %)
Construction Status Report
Page 158
GRADE, DRAIN, AND SURFACE COUNTY
Contract: 170109
Residency:
30492(04)
CO. RD.
06009
ROAD (NS-237): FROM 5 MILES NORTH OF
US-64, EXTEND NORTH NEAR ALVA. PROJECT
STP-276C(025)CI
CIRCUIT ENGR. DISTR. # 8
LENGTH = 2.964 MILES
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Engineer:
Adjusted:
CED8
Contract Amount:
(
$2,444,095.65
$2,444,095.65)
Contract Time:
(
150
150 )
Letting Date:
02/16/2017
Contract Date:
03/16/2017
W/O Issued
Adjusted:
03/31/2017
W/O Effective:
Amount Paid:
09/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
County:
Woodward
6
Commissioner District:
Contracts Under Construction
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 140347
Residency:
06100
24159(07)
SH-15
SH-15: FROM 2.1 MILES EAST OF THE ELLIS
COUNTY LINE, EXTEND EAST. PROJECT
BUFFALO
SSP-277N(008)SS/SSP-177N*
LENGTH = 5.434 MILES.
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$13,321,579.97
$13,540,736.49)
Contract Time:
(
275
333 )
Letting Date:
10/16/2014
Contract Date:
11/20/2014
W/O Issued
Adjusted:
01/20/2015
W/O Effective:
Amount Paid:
02/02/2015
95 % (
94 %)
Work Started:
Time Passed:
02/12/2015
136 % (
112 %)
*(085)SS
BRIDGE REHABILITATION SH-50: OVER THE
Contract: 150150
Residency:
06100
29119(04)
SH-50
NORTH CANADIAN RIVER AND NORTH
CANADIAN RIVER OVERFLOW, 5.3 MILES AND
BUFFALO
SBR-277C(004)(024)SB
5.4 MILES NORTH OF US-183. PROJECT
Contractor:
BRIDGECO CONTRACTORS, INC./FRONTIER BRIDGE, INC.
LENGTH = 0.383 MILE.
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$4,285,208.95
$4,285,208.95)
Contract Time:
(
330
330 )
Letting Date:
04/16/2015
Contract Date:
05/13/2015
W/O Issued
Adjusted:
05/18/2015
W/O Effective:
Amount Paid:
09/01/2015
99 % (
99 %)
Work Started:
Time Passed:
08/10/2015
90 % (
90 %)
SAFETY IMPROVEMENTS (GUARDRAIL)
Contract: 150217
Residency:
27005(06)
US-412
06100
US-412/SH-50: AT MULTIPLE LOCATIONS IN
DIVISION VI.
HSIPG-277F(026)
BUFFALO
Contractor:
ACTION SAFETY SUPPLY CO., LLC
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$245,642.50
$245,642.50)
Contract Time:
(
)
30
82
Letting Date:
08/20/2015
Contract Date:
09/24/2015
W/O Issued
Adjusted:
09/29/2015
W/O Effective:
Amount Paid:
01/04/2016
89 % (
89 %)
Work Started:
Time Passed:
01/04/2016
333 % (
122 %)
Construction Status Report
Page 159
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 150274
Residency:
17457(16)
US-18
06100
US-183: FROM 5.0 MILES SOUTHEAST OF THE
SH-50 JUNCTION, EXTEND SOUTHEAST NEAR
NHPP-277N(010)SS/NHPP-17*
BUFFALO
MUTUAL. PROJECT LENGTH = 5.643 MILES
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
Engineer:
Adjusted:
Embree, Jerry (Acting)
Contract Amount:
(
$19,773,696.37
$19,773,696.37)
Contract Time:
(
525
525 )
Letting Date:
08/20/2015
Contract Date:
09/22/2015
W/O Issued
Adjusted:
11/06/2015
W/O Effective:
Amount Paid:
12/07/2015
60 % (
60 %)
Work Started:
Time Passed:
12/15/2015
76 % (
76 %)
*N(060)SS
GRADE, DRAIN, SURFACE, AND BRIDGE
Contract: 160066
Residency:
27406(04)
CO.RD.
06009
COUNTY ROAD (NS-221/NS-223): FROM THE
US-412 JUNCTION, EXTEND NORTH NEAR
CIRB-177C(112)RB
CIRCUIT ENGR. DISTR. # 8
MOORELAND. PROJECT LENGTH = 6.639
Contractor:
THE CUMMINS CONSTRUCTION CO., INC.
MILES
Engineer:
Adjusted:
CED8
Contract Amount:
(
$5,559,949.55
$5,559,949.55)
Contract Time:
(
210
210 )
Letting Date:
01/21/2016
Contract Date:
02/25/2016
W/O Issued
Adjusted:
03/01/2016
W/O Effective:
Amount Paid:
06/06/2016
89 % (
89 %)
Work Started:
Time Passed:
06/06/2016
98 % (
98 %)
Contract: 160307
27924(04)
SH-34
ACSTP-277B(032)SS
Contractor:
SEWELL BROS., INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$2,177,003.94
Contract Time:
220
Letting Date:
08/18/2016
Contract Date:
09/21/2016
W/O Issued
09/26/2016
W/O Effective:
01/03/2017
Work Started:
01/03/2017
Contract: 160343
28825(04)
SH-34
ACSTP-277B(034)SS
Contractor:
SEWELL BROS., INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$5,717,619.96
Contract Time:
420
Letting Date:
09/15/2016
Contract Date:
10/13/2016
W/O Issued
10/19/2016
W/O Effective:
02/16/2017
Work Started:
02/13/2017
Residency:
BUFFALO
06100
BRIDGE AND APPROACHES SH - 34: OVER
INDIAN CREEK, 2.3 MILES SOUTH OF THE
US-183 JUNCTION NEAR WOODWARD.
PROJECT LENGTH = 0.199 MILE.
Adjusted:
(
$2,178,923.94)
(
220 )
Amount Paid:
Time Passed:
Residency:
BUFFALO
06100
Adjusted:
(
$5,728,293.09)
(
422 )
BRIDGE AND APPROACHES SH-34: OVER
SOUTH AND NORTH PERSIMMON CREEK, 4.9
MILES AND 7.6 MILES NORTH OF THE DEWEY
COUNTY LINE. PROJECT LENGTH = 0.601
MILE.
Amount Paid:
Time Passed:
Construction Status Report
Adjusted:
58 % (
58 %)
50 % (
50 %)
Adjusted:
23 % (
23 %)
16 % (
16 %)
Page 160
BRIDGE AND APPROACHES COUNTY ROAD
Contract: 170057
Residency:
30493(04)
CO. RD.
06009
(EW-21): OVER TRADERS CREEK, 3.5 MILES
EAST OF THE HARPER COUNTY LINE.
STP-277C(033)CI
CIRCUIT ENGR. DISTR. # 8
PROJECT LENGTH = 0.331 MILE.
Contractor:
SEWELL BROS., INC.
Engineer:
Adjusted:
CED8
Contract Amount:
(
$1,000,551.35
$1,000,551.35)
Contract Time:
(
120
120 )
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
Adjusted:
02/24/2017
W/O Effective:
Amount Paid:
06/05/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Contract: 170058
30526(04)
SH-34
SSR-277B(037)SR
Contractor:
CASWELL CONTRACTING, INC.
Engineer:
Embree, Jerry (Acting)
Contract Amount:
$632,093.93
Contract Time:
Letting Date:
01/19/2017
Contract Date:
02/23/2017
W/O Issued
02/24/2017
W/O Effective:
Work Started:
Residency:
BUFFALO
06100
RESURFACE (ASPHALT) SH-34: FROM 2.70
MILES NORTH OF THE DEWEY COUNTY LINE
EXTEND NORTH NEAR WOODWARD.
PROJECT LENGTH = 5.80 MILES.
Adjusted:
(
$632,093.93)
(
)
Fixed Completion Date: 10/01/2017
Adjusted:
Amount Paid:
0%(
0 %)
Time Passed:
0%(
0 %)
RESURFACE (ASPHALT) COUNTY ROAD
Contract: 170148
Residency:
31126(04)
CO. RD.
06009
(EW-51): FROM SH-34, EXTEND EAST NEAR
SHARON. PROJECT LENGTH = 2.004 MILES
STP-277C(038)CI
CIRCUIT ENGR. DISTR. # 8
Contractor:
HIGHWAY CONTRACTORS, INC.
Engineer:
Adjusted:
CED8
Contract Amount:
(
$888,273.39
$888,273.39)
Contract Time:
(
)
90
90
Letting Date:
03/16/2017
Contract Date:
04/25/2017
W/O Issued
Adjusted:
04/26/2017
W/O Effective:
Amount Paid:
08/07/2017
0%(
0 %)
Work Started:
Time Passed:
0%(
0 %)
Construction Status Report
Page 161
County:
Carter
7
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
27019(04)
170151
I-35
Contractor:
GARY A. CRAIN, INC.
Contract Amount:
$41,817.28
Letting Date:
04/20/2020
SSP-210F(056)SS
Residency:
ARDMORE
Contract:
33068(04)
170177
SH-199
Contractor:
WINDING ROAD CONSTRUCTION, INC.
Contract Amount:
Residency:
$984,871.64
Letting Date:
05/18/2020
ARDMORE
County:
Cimarron
07200
BRIDGE WATER PROOF SEAL I-35/US-177: AT
MULTIPLE LOCATIONS IN DIVISION VII.
SSR-210N(058)SR
07200
PAVEMENT REHABILITATION (P.C. CONCRETE)
SH-199: FROM SAM NOBLE PARKWAY, EXTEND
SOUTH IN ARDMORE. PROJECT LENGTH = 0.665
MILE
6
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
23273(04)
170118
US-385
Contractor:
BRIDGES, INC. DBA SCUDDER BRIDGE CO.
Contract Amount:
Residency:
$4,075,876.50
06200
Letting Date:
03/16/2017
GUYMON
County:
Cleveland
STP-113C(034)
BRIDGE AND APPROACHES US-385: OVER BEAVER
RIVER, 2.8 MILES SOUTH OF THE US-412 JUNCTION
NEAR BOISE CITY. PROJECT LENGTH = 0.274 MILE
3
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
30184(04)
170153
CT. ST.
Contractor:
PBX CORPORATION
Contract Amount:
$214,784.43
Letting Date:
04/20/2020
MC-3500(057)
Residency:
PURCELL
03200
BRIDGE REPAIR (GROUTING) CITY STREET
(SHIELDS AVENUE): OVER I-35 AND I-35 FRONTAGE
ROAD, 2.5 MILES SOUTHEAST OF I-240 IN THE CITY
OF MOORE.
Contract:
170178
CT ST
STP-114E(299)EH/STPG-114*
28810(04)
*A(141)AG
Contractor:
RUDY CONSTRUCTION CO.
ENHANCEMENT
(STREETSCAPE) CITY STREET
Contract Amount:
Residency:
$3,052,446.98
03018
(MAIN STREET): FROM JONES AVENUE, EXTEND
Letting Date:
05/18/2020
BENCHMARK CONSTR. SERVS.,SOUTHWEST
LLC
IN THE CITY OF NORMAN.
County:
Creek
8
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
30538(04)
170073
SH-51
Contractor:
IOWA CIVIL CONTRACTING, INC.
Contract Amount:
Residency:
$2,503,117.29
Letting Date:
02/16/2017
SAND SPRINGS
STPY-219B(049)3P
08400
Construction Status Report
PAVEMENT REHABILITATION (A.C. AND P.C.) SH-51:
FROM 2.7 MILES SOUTHWEST OF THE SH-48
JUNCTION, EXTEND NORTHEAST NEAR
MANNFORD. PROJECT LENGTH = 4.550 MILES
Page 162
County:
Custer
5
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
24134(08)
170155
SH-44
Contractor:
GARY A. CRAIN, INC.
Contract Amount:
$101,839.55
Letting Date:
04/20/2020
SSP-220F(047)SS
Residency:
ALTUS
Contract:
170189
SH-47
33153(04)
Contractor:
HIGHWAY CONTRACTORS, INC.
Contract Amount:
Residency:
$2,152,075.40
Letting Date:
05/18/2020
CLINTON
County:
Garfield
05200
BRIDGE WATER PROOF SEAL
SH-3/SH-9/SH-30/SH-44/SH-54/SH-55/SH-152/MERRIT
T ROAD: AT MULTIPLE LOCATIONS IN DIVISION V.
MC-220C(051)
05100
RESURFACE (ASPHALT) SH-47: FROM US-183,
EXTEND EAST NEAR THOMAS. PROJECT LENGTH =
12.62 MILES
4
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
29203(04)
170075
SH-45
Contractor:
BETTIS ASPHALT AND CONSTRUCTION, INC.
Contract Amount:
Residency:
$772,030.00
04300
Letting Date:
04/20/2020
ENID
County:
Le Flore
STPY-224C(044)(045)3P/ST*
*PY-227B(021)3P
PAVEMENT REHABILITATION SH-11/SH-45/SH-132:
SH-11, FROM THE ALFALFA C/L, EXT EAST. SH-45,
FROM US-81 EXT WEST. SH-132, FROM US-60 EXT
SOUTH. PROJECT LENGTH = 15.685 MILES
2
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
23144(13)
170158
US-270
Contractor:
GARY A. CRAIN, INC.
Contract Amount:
Residency:
$47,343.60
Letting Date:
04/20/2020
HEAVENER
County:
Logan
SSP-240F(051)SS
02200
BRIDGE WATER PROOF SEAL US-270/US-271/SH-63:
AT MULTIPLE LOCATIONS IN DIVISION II.
4
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
32640(04)
170179
CO. RD.
Contractor:
SCHWARZ PAVING CO., INC.
Contract Amount:
Residency:
$3,779,648.60
Letting Date:
05/18/2020
ATKINS
County:
McClain
CIRB-242B(054)RB
04010
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(COLTRANE ROAD): FROM 1.0 MILE NORTH OF THE
OKLAHOMA COUNTY LINE EXTEND NORTH NEAR
EDMOND. PROJECT LENGTH = 2.083 MILES
3
Commissioner District:
Contracts Awarded - NTP Not Processed
Construction Status Report
Page 163
Contract:
25448(04)
170180
CO. RD.
Contractor:
MARKWELL PAVING COMPANY, INC.
Contract Amount:
Residency:
$3,195,501.45
Letting Date:
05/18/2020
GARVER, LLC.
County:
McCurtain
CIRB-144C(129)RB
03011
GRADE, DRAIN, AND SURFACE COUNTY ROAD
(WAYNE RD/HOPPING AVE): FROM THE US-71 JCT,
EXT. EAST ON WAYNE RD THEN SOUTH ON
HOPPING AVE NEAR WAYNE. PROJECT LENGTH =
5.15 MILES
2
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
25828(04)
170172
CO. RD.
Contractor:
C3 CONSTRUCTION, INC.
Contract Amount:
Residency:
$1,075,678.93
02013
Letting Date:
05/18/2020
CIRCUIT ENGR. DISTR. # 3
ACSTP-145D(179)CI
Contract:
29961(04)
170173
CO. RD.
Contractor:
TREAS CONSTRUCTION, INC.
Contract Amount:
Residency:
$681,709.83
02013
Letting Date:
05/18/2020
CIRCUIT ENGR. DISTR. # 3
ACSTP-245D(049)CI
County:
Murray
BRIDGE AND APPROACHES COUNTY ROAD
(EW-174): OVER BIG EAGLE CREEK, 1.1 MILES
WEST OF US-259 NEAR SMITHVILLE. PROJECT
LENGTH = 0.217 MILE
BRIDGE AND APPROACHES COUNTY ROAD
(NS-4506): OVER CYPRESS CREEK, 3.8 MILES
NORTH OF SH-3 NEAR BROKEN BOW. PROJECT
LENGTH = 0.177 MILE
7
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
32969(04)
170160
I-35
Contractor:
LOGOS CONSTRUCTION CO., LLC
Contract Amount:
Residency:
$42,682.40
Letting Date:
04/20/2020
ARDMORE
County:
Nowata
SAP-3500(058)
07200
BRIDGE REPAIR I-35: REPAIR VEHICLE IMPACT
DAMAGE OVER US-77, 1.7 MILES NORTH OF THE
CARTER COUNTY LINE NEAR THE CITY OF DAVIS.
8
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
170131
CO. RD.
27816(04)
Contractor:
REECE CONSTRUCTION CO., INC.
Contract Amount:
Residency:
$798,639.62
08007
Letting Date:
04/20/2017
CRAIG & KEITHLINE, INC.
County:
Oklahoma
STP-153D(201)CI
BRIDGE AND APPROACHES COUNTY ROAD
(NS-406): OVER OPOSSUM CREEK, 2.6 MILES
SOUTH OF THE KANSAS STATE LINE. PROJECT
LENGTH = 0.406 MILE
4
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
28767(04)
170176
CT. ST.
Contractor:
MANHATTAN ROAD & BRIDGE COMPANY
Contract Amount:
Residency:
$7,800,000.00
Letting Date:
04/20/2020
EL RENO
CIRB-155C(917)CO
04200
Construction Status Report
GRADE, DRAIN, SURFACE, AND BRIDGE CITY
STREET (NORTH MACARTHUR BOULEVARD): FROM
3.0 MILES NORTH OF THE KILPATRICK TURNPIKE,
EXTEND NORTH IN EDMOND. PROJECT LENGTH =
1.875 MILES
Page 164
Contract:
31436(04)
170181
CT. ST.
Contractor:
PARATHON CONST. LLC
Contract Amount:
$644,640.18
Letting Date:
05/18/2020
TAP-255D(329)AG
Residency:
04600
OKLAHOMA CITY
Contract:
32963(04)
170182
I-40
Contractor:
B & B CONSTRUCTION SERVICE J.T., INC.
Contract Amount:
Residency:
$22,601.30
04600
Letting Date:
05/18/2020
OKLAHOMA CITY
County:
Okmulgee
PEDESTRIAN IMPROVEMENTS (TRAIL
CONSTRUCTION) CITY STREET (SE 29TH STREET
TRAIL): FROM SOONER ROAD, EXTEND EAST IN
MIDWEST CITY. PROJECT LENGTH = 1.050 MILES
PREQUALIFICATION FOR THIS PROJECT HAS BEEN
WAIVED. BOTH BID EXPRESS AND WRITTEN BIDS
WILL BE ACCEPTED.
SAP-4000(055)
BRIDGE REPAIR I-40: REPAIR VEHICLE IMPACT
DAMAGE OVER CHOCTAW ROAD IN OKLAHOMA
CITY.
1
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
30126(04)
170040
CT. ST.
Contractor:
PARADIGM CONSTRUCTION & ENGINEERING, INC
Contract Amount:
Residency:
$1,310,188.90
01100
Letting Date:
04/20/2020
MUSKOGEE
County:
Osage
STP-256C(029)UR
BRIDGE AND APPROACHES CITY STREET
(MUSKOGEE AVENUE): OVER OKMULGEE CREEK,
0.1 MILES AND 0.3 MILES NORTH OF SH-56 IN THE
CITY OF OKMULGEE. PROJECT LENGTH = 0.238
MILE
8
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
33151(04)
170183
SH-20
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Contract Amount:
Residency:
$64,523.50
Letting Date:
05/18/2020
SAND SPRINGS
County:
Pontotoc
HSIP-257C(057)TR
08400
SAFETY IMPROVEMENT (SCHOOL SIGNS)
SH-20/SH-99: SH-20, FROM THE SH-99
INTERSECTION, EXT WEST. SH-99, FROM THE
SH-20 INTERSECTION, EXT NORTH IN HOMINY.
3
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
30187(04)
170167
CT. ST.
Contractor:
LOGOS CONSTRUCTION CO., LLC
Contract Amount:
Residency:
$151,766.09
Letting Date:
04/20/2020
PURCELL
County:
Pushmataha
MC-262N(015)
03200
BRIDGE REPAIR CITY STREET (OAK AVENUE/KERR
LAB ROAD): OVER SH-3, 1.0 MILE AND 2.0 MILES
SOUTHEAST OF SH-1 IN THE CITY OF ADA.
2
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
30432(04)
170186
SH-2
Contractor:
TREAS CONSTRUCTION, INC.
Contract Amount:
Residency:
$1,697,217.59
Letting Date:
05/18/2020
ANTLERS
SBR-264C(049)SB
02100
Construction Status Report
BRIDGE REHABILITATION SH-2: OVER BUCK
CREEK, 7.6 MILES NORTH OF THE SH-3 JUNCTION
NEAR MOYERS.
Page 165
County:
Tulsa
8
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
32486(04)
160400
US-75
Contractor:
MIDSTATE TRAFFIC CONTROL, INC.
Contract Amount:
Residency:
$1,402,717.40
08020
Letting Date:
05/18/2020
POE AND ASSOCIATES
HSIPG-272N(165)(164)TR
Contract:
170144
US-169
31672(04)
Contractor:
APAC-CENTRAL, INC.
Contract Amount:
Residency:
$5,915,032.62
Letting Date:
03/16/2017
TULSA
NHPP-272A(126)3B/SSP-272*
County:
Washington
SAFETY IMPROVEMENT (CABLE BARRIER) US-75:
FROM SH-11, EXTEND SOUTH IN THE CITIES OF
TULSA AND GLENPOOL. PROJECT LENGTH = 6.300
MILES
*N(203)SS/STP-272A(174)3B
08100
RESURFACE (ASPHALT) AND JOINT SEAL REPAIR
US-169: AT MULTIPLE LOCATIONS IN DIVISION VIII.
PROJECT LENGTH = 6.789 MILES
8
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
23775(04)
170187
CO. RD.
Contractor:
B & B BRIDGE COMPANY, LLC
Contract Amount:
Residency:
$560,334.26
08004
Letting Date:
05/18/2020
JACOBS ENGINEERING
County:
Woods
CIRB-174D(050)RB
BRIDGE AND APPROACHES COUNTY ROAD
(NS-400): OVER UNNAMED CREEK, 1.5 MILES
SOUTH OF THE KANSAS STATE LINE NEAR COPAN.
PROJECT LENGTH = 0.217 MILE
6
Commissioner District:
Contracts Awarded - NTP Not Processed
Contract:
31764(04)
170147
SH-34
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Contract Amount:
Residency:
$2,357,020.00
06100
Letting Date:
03/16/2017
BUFFALO
STPY-276C(024)3P/STPY-17*
Contract:
170188
CO. RD.
28458(04)
Contractor:
VENTURE CORPORATION DBA V. C. O. PAVING
Contract Amount:
Residency:
$2,263,384.32
06009
Letting Date:
05/18/2020
CIRCUIT ENGR. DISTR. # 8
CIRB-276C(027)RB
Construction Status Report
*6C(192)3P
RESURFACE (ASPHALT) SH-34: FROM THE US-64
JUNCTION, EXTEND NORTH NEAR FREEDOM.
PROJECT LENGTH = 10.420 MILES
BRIDGE AND APPROACHES COUNTY ROAD
(NS-2300): OVER UNNAMED CREEK, 2.8 MILES
NORTH OF US-64 NEAR ALVA. PROJECT LENGTH =
1.022 MILES
Page 166
Resident Directory
Residency: 0X001 - ENGR. SERV. & TESTING
Engineer: EST
Ph:
(405)307-8378
Ph:
(405)606-8600
Ph:
(405)753-4200
Ph:
(405) 810-8254
Residency: 0X005 - CIRCUIT ENGR. DISTR. # 7
Engineer: CED7
Ph:
(580)323-8685
Residency: 0X006 - OLLAR & OLLAR ENGINEERING
Engineer: O&OE
Ph:
405-364-0281
Residency: 0X007 - CRAIG & KEITHLINE, INC.
Engineer: C&KI
Ph:
(918)743-6611
Residency: 0X008 - BRAWLEY ENGINEERING CORP.
Engineer: BEC
Ph:
(918)420-5500
Residency: 0X009 - CIRCUIT ENGR. DISTR. # 8
Engineer: CED8
Engineer: CED3
TULSA, OK
Ph:
Ph:
Engineer: CE2
Ph:
HUGO, OK
OKLAHOMA CITY, OK
(405)753-4142
Fx:
(405)603-7608
Fx:
OKLAHOMA CITY
OKLAHOMA CITY
(918) 682-2125
73114
10001 N. BROADWAY EXTENSION
73601
PO BOX 337 - 1779 MARSHALL RD.
73070
PO BOX 5997
74136
6940 S. UTICA AVE.
74501
521 S SECOND STREET
73717
909 WEST LAKES DRIVE
73072
350 DAVID L. BOREN BOULEVARD,
SUITE 1510
74136
6450 S. LEWIS
74119
1350 SOUTH BOULDER, STE 600
74743
203 PEPSI COLA AVE
73114
9400 NORTH BROADWAY, SUITE
300
73120
9636 N MAY ST STE 200
73162
9500 WESTGATE RD, STE 100
74402
PO BOX 2366
Fx:
Fx:
Residency: 0X017 - CIRCUIT ENGR. DISTR. # 2
4555 W. MEMORIAL RD.
Fx:
(405)478-5353
Residency: 0X016 - MKEC (AKA - KONERU)
Engineer: MKEC
ALVA, OK
TULSA, OK
Ph:
73142
Fx:
Fx:
(580)326-9191
[email protected]
(918)743-6680
MCALESTER, OK
(918)250-5922
Residency: 0X015 - FOSTER CM GROUP
Engineer: FCM
Fx:
Ph:
Residency: 0X014 - BENHAM (AKA - LEIDOS)
Engineer: BENH
TULSA, OK
NORMAN, OK
Ph:
119 N. ROBINSON AVE. - SUITE 700
(405) 810-2980
NORMAN, OK
Fx:
Residency: 0X013 - CIRCUIT ENGR. DISTR. # 3
73102
Fx:
(405)321-2480
(918)587-7283
3201 S. BERRY ROAD
[email protected]
(405)384-4589
CLINTON, OK
Ph:
Ph:
73072
Fx:
Fx:
Residency: 0X012 - DEWBERRY
Engineer: DEWB
Fx:
Ph:
Residency: 0X011 - GARVER, LLC.
Engineer: GARV
Fx:
(580)430-5078
Residency: 0X010 - ATKINS
Engineer: ATKINS
(405)608-8601
OKLAHOMA CITY, OK
Residency: 0X004 - JACOBS ENGINEERING
Engineer: JACOBS
Fx:
OKLAHOMA CITY, OK
Residency: 0X003 - CEC CORP.
Engineer: CEC
(405)329-1914
OKLAHOMA CITY, OK
Residency: 0X002 - TETRA TECH
Engineer: TETR
NORMAN, OK
Fx:
MUSKOGEE
Fx:
Construction Status Report
Page 167
Residency: 0X018 - BENCHMARK CONSTR. SERVS., LLC
Engineer: BCS
Ph:
Fx:
918-835-9588
Fx:
9186658800
Fx:
TULSA, OK
Residency: 0X019 - BKL, INCORPORATED
Engineer: BKL
Ph:
TULSA, OK
Residency: 0X020 - POE AND ASSOCIATES
Engineer: ZPAA
Ph:
OKLAHOMA CITY, OK
Residency: 0X021 - OLSSON ASSOCIATES
Engineer: ZOA
Ph:
4052426601
Residency: 0X022 - SMITH ROBERTS BALDISCHWILER, LLC
Engineer: ZSRB
Engineer: Edwards, Carl
Ph:
(918) 682-9471
Fx:
Ph:
(918) 775-2751
Fx:
Ph:
(918) 682-9471
Fx:
Engineer: Moy, Ryan
Ph:
(580) 298-3081
Fx:
(918) 653-7896
(580) 795-3675
Ph:
Fx:
Ph:
(580) 298-3371
Fx:
Ph:
(580) 332-2094
Fx:
(580) 298-6152
(580) 332-2566
PURCELL, OK
Ph:
(405) 527-5569
Fx:
(405) 527-6576
WEWOKA, OK
Residency: 03300 - WEWOKA
Ph:
(405) 257-3325
Ph:
(580) 332-1526
Fx:
Ph:
(580) 336-7374
Fx:
Fx:
(405) 257-5003
ADA, OK
Residency: 03700 - DIV. 3 BRIDGE
1623 E. 6TH STREET
74146
4606 S GARNETT RD, STE 600
73116
201 NW 63RD STREET, SUITE 130
73104
100 NE 5TH ST
74401
2800 S. 32ND - US-69 3 MI. S OF
US-62
[email protected]
74955
(580) 336-7373
Construction Status Report
P.O. BOX 449 - 113 MCGEE DRIVE
[email protected]
74401
2800 S. 32ND - US-69 3 MI. S
US-62
74523
P. O. BOX DRAWER 628 - US-271 2
MI. S. TOWN
[email protected]
74937
P.O. BOX 835 - N. HIGHWAY 59
[email protected]
73446
[email protected]
74502
[email protected]
74523
[email protected]
74820
[email protected]
73080
[email protected]
74884
[email protected]
P. O. BOX 297 - HWY. BLDG. S.
MADILL
P.O. BOX 3269 - US-270 E.
MCALESTER
P.O. BOX DRAWER 628 - US-271 2
MI. S TOWN
P.O. BOX 157 - 3 MI. NW ADA ON
SH-3W
P.O. BOX 468 - SH-74 2 MI. SW OF
PURCELL
P.O. BOX 918 - 1.5 MI. N. WEWOKA
ON SH-56
74820
P.O. BOX 549 - 3 MI. N.W. OF ADA
ON SH-3W
73077
P.O. BOX 548 - US-77 1/4 M. E. OF
I-35
(580) 332-0261
PERRY, OK
Residency: 04100 - PERRY
Engineer: Zachary, Ted
(918) 429-0807
ADA, OK
Residency: 03200 - PURCELL
Engineer: Vacant
(580) 795-7461
ANTLERS, OK
Residency: 03100 - ADA
Engineer: Helton, Matthew
Fx:
(918) 423-5443
Residency: 02700 - DIV. 2 BRIDGE
Engineer: Reed, Lucas
(918) 653-4532
MCALESTER, OK
Residency: 02400 - MCALESTER
Engineer: Russell, Julie
Fx:
MADILL, OK
Engineer: January, Trenton (Acting) Ph:
Engineer: Nabors, Monte
(580) 298-6152
HEAVENER, OK
Ph:
74120
(918) 682-2597
ANTLERS, OK
Residency: 02300 - MADILL
Engineer: Plymate, Larry
(918) 776-0285
MUSKOGEE, OK
Residency: 02200 - HEAVENER
Engineer: Huddleston, David
(918) 682-2597
SALLISAW, OK
Residency: 02100 - ANTLERS
3430 MAC DONNELL DR.
Fx:
MUSKOGEE, OK
Residency: 01700 - DIV. 1 BRIDGE
Engineer: Vacant
OKLAHOMA CITY, OK
4058407094
Residency: 01200 - SALLISAW
73069
Fx:
Ph:
Residency: 01100 - MUSKOGEE
Engineer: Hagerman, Jeremy
NORMAN
580-665-5178
[email protected]
Page 168
Yukon, OK
Residency: 04200 - EL RENO
Engineer: Harlin, Chris
Ph:
(405) 350-2331
Fx:
Ph:
(580) 234-3223
Fx:
Ph:
(405) 475-2860
Fx:
ENID, OK
Residency: 04300 - ENID
Engineer: Hoover, Jacob
Ph:
(405) 372-5644
Ph:
(405) 522-5575
Ph:
(580) 336-7340
Fx:
Ph:
(580) 323-0702
Fx:
Ph:
(580) 482-3191
Fx:
Engineer: Sirmons, Karl
Ph:
(580) 323-1431
Fx:
Ph:
(580) 735-2537
(580) 338-3545
Ph:
(580) 735-2561
Fx:
Ph:
(580) 255-7609
Fx:
Ph:
(580) 223-1351
Fx:
Ph:
(405) 247-2462
Fx:
Ph:
(580) 255-7586
Ph:
(918) 836-7116
(580) 226-8146
(405) 247-2057
Fx:
Ph:
(918) 266-1160
Fx:
Fx:
(580) 255-5064
TULSA, OK
(918) 832-0383
CLAREMORE, OK
Residency: 08300 - CLAREMORE
Engineer: Tyler, Jennifer
(580) 252-6178
DUNCAN, OK
Residency: 08100 - TULSA
Engineer: Arnold, Bruce
(580) 735-2248
ANADARKO, OK
Residency: 07700 - DIV. 7 BRIDGE
Engineer: Lawson, Bryce
Fx:
(580) 338-5685
ARDMORE, OK
Residency: 07300 - ANADARKO
Engineer: Knight, Reese
(580) 735-2024
DUNCAN, OK
Residency: 07200 - ARDMORE
Engineer: Fuhrmann, Chris
(580) 323-1430
BUFFALO, OK
Residency: 07100 - DUNCAN
Engineer: Roberts, Colton
Fx:
Ph:
Residency: 06700 - DIV. 6 BRIDGE
Engineer: Roesner, Wayne
(580) 482-0792
GUYMON, OK
Residency: 06200 - GUYMON
Engineer: Michael, Charles
(580) 323-3551
BUFFALO, OK
Residency: 06100 - BUFFALO
Engineer: Embree, Jerry (Acting)
(580) 336-7350
CLINTON, OK
Residency: 05700 - DIV. 5 BRIDGE
Engineer: Clanton, Mike
Fx:
ALTUS, OK
Residency: 05200 - ALTUS
73099
15100 NW 36th St.
[email protected]
73701
410 KREMLIN
[email protected]
73013
4105 E. MEMORIAL RD.
[email protected]
74075
3613 N. HUSBAND
[email protected]
73149
701 S.E. 82nd St.
[email protected]
CLINTON, OK
Residency: 05100 - CLINTON
Engineer: Davis, Shawn
(405) 377-8321
PERRY, OK
Residency: 04700 - DIV. 4 BRIDGE
Engineer: Mitchell, Matt
Fx:
OKLAHOMA CITY, OK
Residency: 04600 - OKLAHOMA CITY
Engineer: Howell, Terry
(405) 478-1126
STILLWATER, OK
Residency: 04500 - STILLWATER
Engineer: Buchanan, Seth
(580) 237-3328
EDMOND, OK
Residency: 04400 - EDMOND
Engineer: Hubbard, Tom
(405) 350-2199
(918) 343-1203
Construction Status Report
73077
[email protected]
73601
[email protected]
73521
P.O. BOX 471 - US-77 1/4 MI. E
I-35
P.O. BOX 818 - US-183 1 MI S. OF
I-40
608 S. JACKSON ST
[email protected]
73601
[email protected]
73834
[email protected]
73942
P.O. BOX 1449 - US-183 1 MI. S.
I-40
P. O. BOX 190 - US-64 1 MI. W
US-183
P.O. BOX 348 - 504 S. CRUMLEY
[email protected]
73834
[email protected]
73534
[email protected]
73402
[email protected]
73005
P.O. BOX 190 - US-64 1 MI. W
US-183
P.O. BOX 1107 - 2205 S. US-81
BYPASS
P. O. BOX 1826 - 525 INTERSTATE
DR.
P.O. BOX 220 - 211 W MAIN ST.
[email protected]
73533
[email protected]
74116
P.O. BOX 460 - 2205 S. US-81
BYPASS
4002 N. MINGO VAL. EXPWY.
[email protected]
74018
[email protected]
25825-B S. HWY. 66 - 729 S.
MORETZ
Page 169
SAND SPRINGS, OK
Residency: 08400 - SAND SPRINGS
Engineer: Williams, Mark J.
Ph:
(918) 245-9531
Fx:
Ph:
(918) 838-9933
Fx:
TULSA, OK
Residency: 08700 - DIV. 8 BRIDGE
Engineer: Casillas, Matt
(918) 245-0953
(918) 832-9074
Construction Status Report
74063
110 E. 41ST (PRATTVILLE)
[email protected]
74101
[email protected]
P.O. BOX 660 - 4002 N. MINGO
VAL. EXPWY.
Page 170