TERMINALS FIRE IMPAIRMENT PROCEDURE Notification of Fire System Isolation FIP – NORA No. Sections (A) and (B) must be complete before any impairment. Note, 3 business days’ notice is required. Call BAC Buildings Facilities (07) 3068 6675 for any questions or further clarification on the Impairment Procedures in normal business working hours Monday to Friday. SECTION A - WORKS To be completed by Company requesting isolation Company Name Name and Contact Details of person requesting isolation Type of Fire System Impairment Maintenance Repair Building Works NOTE 1. 2. 3. Simultaneous isolations are not allowed: e.g. Sprinkler & Detection, without a risk assessment. All current FIPS are to be reviewed prior to creating a new FIP. Simultaneous isolations and Hot Works are not allowed System requested to be Isolated Sprinkler System Fire Pump Fire Hydrant Alarm / Detection System CO2 or Gas System Other Provide a description below of the Building, Location of Impairment, device/systems to be isolated and reason for isolation. Examples include; Smoke Detector Address 02.08.15.073, ITB Level 2 Border Force Office for Tenant fitout works Smoke Detection Zone AZF19, DTB Level 2 Qantas Store for Project XXXX Tenancy refurbishment Sprinkler Zone N4-Z2, ITB Level 5 Terminal North Plantroom for Flow switch testing Proposed Time of isolation: a.m. p.m. Date: Expected duration of impairment: Will system(s) be fully restored daily? Yes No Attach a site drawing showing area to be isolated and affected works area. Submit the FIP to the Responsible Person for the work. ie Project Manager, Maintenance Co-ordinator, Retail Manager, Property Manager OR Tenant Facility Manager Company Requesting isolation to complete this section in consultation with Responsible Person Area drawings are available on iServer, contact BAC if further drawings are required D:\875100035.doc Page 1 TERMINALS FIRE IMPAIRMENT PROCEDURE SECTION B – NOTIFICATION To be completed by Responsible Person Responsible Person Email Mobile Date NOTE a) Simultaneous isolations are not allowed: e.g. Sprinkler & Detection, without a risk assessment. All current FIPS are to be reviewed prior to creating a new FIP. b) Simultaneous isolations and Hot Works are not allowed c) It is acknowledged that the Responsible Person may not have the requisite experience in Fire Safety Systems to complete their requirements personally, but they are responsible for ensuring that the review of the FIP is completed by an appropriately experienced person. Type of Precautions being taken during isolation Hot Work Prohibited Hot Works Permit Fire Extinguisher or small hose available Smoking Controlled Hot Works Permit Number: Is either a Fire Watch or Watchmen required? Contractor is aware of Emergency Procedures and has contact information on site in case of fire system activation during the isolation. The responsible person acknowledges that they have a) Reviewed the FIP application b) Have considered the impact of the works on the Fire System, and Building Operations. c) Taken all reasonable steps have been taken to ensure no impact to occupants or BAC Operations Email FIP details to BAC Risk and Compliance at [email protected] Enter Time and Date of Communication: Email FIP details to BAC Insurer at [email protected] or Fax (03) 9602 5882 Enter Time and Date of Communication: Email FIP details to BAC Facilities at [email protected], Enter Time and Date of Communication: BAC Facilities Approval Received Name: Enter Time and Date of Communication Signature Once signed, ensure email notifications are sent as detailed Once signed and approval received from BAC Facilities, send to the Contractor to enable isolation to occur Any minor last minute changes must be approved by BAC Facilities prior to implementation. Comments D:\875100035.doc Page 2 TERMINALS FIRE IMPAIRMENT PROCEDURE SECTION C – ISOLATION and DE-ISOLATION To be completed by BAC approved Fire Contractor carrying out isolation at the time of the isolation Activity Isolation De-Isolation Prerequisite Section B signed by Responsible Person Works completed. Contractor has confirmed all systems are in normal state and all security doors are secure. Date of Isolation Date of De-Isolation Time and Date of Communication Time and Date of Communication Time and Date of Communication Time and Date of Communication Responsible Person notified? Time and Date of Communication Time and Date of Communication Any other required Notifications? Time and Date of Communication Time and Date of Communication Technician Name and Signature Technician Company Date Log Book Updated? Aviation Rescue & Fire Fighting (ARFF) notified? Phone 07 3860 3210 DTM personally notified? Phone 07 3406 3171 ASO, confirm all security doors secure? Time and Date of Communication Phone 07 3068 6642 FIP Display at Terminals FIP Displayed on the front of the mimic EWIS panel in the Duty Terminal Managers office. FIP placed in the Completed display FIP area on the Fire Panel. Comments D:\875100035.doc Page 3
© Copyright 2026 Paperzz