Major amendment to Brisbane City Plan 2014 for long term infrastructure (local government infrastructure plan related) Text and figure amendments Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 1. About the planning scheme Part 1 1.2 Table 1.2.3— Overlays and overlay codes - 2.3A.4 To update the overlay index to include the new community purposes network overlay. 2. Strategic framework Part 3 3.4 Table 3.4.5.1— Specific outcomes and land use strategies - INSERT: ‘Community purposes network overlay’ in column 1 and ‘Community purposes network overlay code’ in column 2 alphabetically. INSERT: ‘, long term infrastructure plans’ before ‘and’ in L7.2. 2.3A.4 Update assessment criteria for the long term planning framework. 3. Strategic framework Part 3 3.6 - INSERT: ‘or the long term infrastructure plans’ at the end of the sentence in L26. 2.3A.4 4. Strategic framework Part 3 3.6 Table 3.6.3.1— Specific outcomes and land use strategies Table 3.6.3.1— Specific outcomes and land use strategies REMOVE: ‘in part’ in L30.1 - 2.3A.4 Update assessment criteria for long term planning framework. Redundant term. 1 Statutory guideline 01/16 Making and amending local planning instruments 8 July 2016 Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 5. Strategic framework Part 3 3.6 - INSERT: ‘or the long term infrastructure plans’ at the end of the sentence in L30.1 2.3A.4 6. Strategic framework Part 3 3.6 - Strategic framework Part 3 3.6 INSERT: in place of ‘or’ ‘or the long term infrastructure plans’ at the end of the sentence in L30.2. INSERT: ‘or long term infrastructure plans’ after ‘local government infrastructure plan’ in L35. 2.3A.4 7. 8. Strategic framework Part 3 3.6 Table 3.6.3.1— Specific outcomes and land use strategies Table 3.6.3.1— Specific outcomes and land use strategies Table 3.6.3.1— Specific outcomes and land use strategies Table 3.6.4.1— Specific outcomes and land use strategies REMOVE: SO1(a) and (b) REPLACE WITH: SO1 (a) ‘for long term infrastructure for development which is not assumed future urban development, the long term infrastructure plans. (b) for existing and planned infrastructure for development which is assumed future urban development, the local government infrastructure plan.’ 2.3A.4 Update assessment criteria for the long term planning framework. Update assessment criteria for the long term planning framework. Update assessment criteria for the long term planning framework. Update assessment criteria for the amendments to the long term planning framework to clarify linkages with each type of infrastructure plan and insert new BCC administrative definitions. 9. Strategic framework Part 3 3.6 Table 3.6.4.1— Specific outcomes and land use strategies REMOVE: L1.2 REPLACE WITH: ‘L1.2 Development provides for the following development infrastructure: (a) the supply of non-trunk infrastructure for the 2.3A.4 - 2.3A.4 Update assessment criteria for the amendments to the long term planning Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to following: (i) networks internal to the premises; (ii) connecting the premises to external infrastructure networks; (iii) protecting or maintaining the safety or efficiency of the infrastructure network of which the non-trunk infrastructure is a component. (b) the supply of trunk infrastructure specified in the local government infrastructure plan which is necessary to service the premises; (c) the payment of infrastructure charges for trunk infrastructure in accordance with the applicable infrastructure charging instrument; (d) the payment of additional trunk infrastructure costs for the following: (i) for development completely or partly outside the priority infrastructure area in the local government infrastructure plan; (ii) for development MAALPI1 amendment type Reason framework. Expand assessment criteria to align with the Act’s full additional trunk infrastructure costs provisions. Item No. 10. Location Strategic framework Part/ Schedule/ Appendix Part 3 Section 3.6 Sub-section/ Table Table 3.6.4.1— Specific outcomes and land use strategies Existing text/Map to be removed REMOVE: L1.3 Insert/Replace with/ Renumber/Relocate to completely inside the priority infrastructure area in the local government infrastructure plan the following; (A) trunk infrastructure to be provided earlier than planned in the local government infrastructure plan; (B) infrastructure associated with development that is not assumed future urban development or long term infrastructure, which is made necessary by development that is not assumed future urban development.’ REPLACE WITH: ‘L1.3 Development protects existing and planned infrastructure in the local government infrastructure plan and long term infrastructure in accordance with the long term infrastructure plans.’ MAALPI1 amendment type Reason 2.3A.4 Update assessment criteria for the amendments to the long term planning framework. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 11. Strategic framework Part 3 3.7 3.7.1 Strategic outcomes REMOVE: ‘an infrastructure corridor plan in an overlay’ in (1)(l) REPLACE WITH: After ‘and long term infrastructure plans.’ at the end of the sentence 2.3A.4 12. Tables of assessment Part 5 5.10 - INSERT: New table of assessment for Community purposes network overlay. 2.3A.4 13. Zone codes Part 6 6.2 New section ‘Table 5.10.7.A —Levels of assessment for Community purposes network overlay’ 6.2.3.2 Open space zone code Update assessment criteria for the amendments to the long term planning framework. To support the inclusion of the new Community purposes network overlay. - INSERT: ‘or long term infrastructure plans’ in (2)(e) at the end of the sentence 2.3A.4 Create a cross reference to the new long term planning framework. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 14. Neighbourhood plans Part 7 7.2 7.2.3.6 Chermside centre neighbourhood plan code Table 7.2.3.6.3.A— Criteria for assessable development - INSERT: A new performance outcome and acceptable solution after PO9 and AO9: 2.3A.4 As this item is identified to be delivered post2026, the indicative long term park is to be moved from the transitional LGIP to the Long term infrastructure plan and neighbourhood plan. 2.3A.4 Update the figure to reflect the change in status of the park from the LGIP to the Long term infrastructure plan and neighbourhood plan. ‘PO10: Development provides long term infrastructure for the parks network to meet the recreational needs of residents and workers. AO10: Development protects land for the provision of a park in the general location specified in Figure a and in accordance with the Long term infrastructure plan.’ 15. Neighbourhood plans Part 7 7.2 7.2.3.6 Chermside centre neighbourhood plan code REMOVE: Figure a Renumber remainder of the table accordingly REPLACE WITH: New Figure A A future long term park (urban common) in Figure a – at the intersection of Gympie and Hamilton Roads. Add a ‘long term infrastructure – public parks infrastructure’ annotation to the Figure a legend Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 16. Neighbourhood plans Part 7 7.2 REMOVE: ‘and park (urban common)’ from (4)(h)(iii) - 2.3A.4 To reflect the removal of a park location from Figure b. 17. Neighbourhood plans Part 7 7.2 REMOVE: ‘Development provides new public open space to meet the recreational needs of residents and workers.’ in PO2 REPLACE WITH: ‘PO2 Development provides long term infrastructure for the parks network to meet the recreational needs of residents and workers.’ 2.3A.4 Update assessment criteria for the amendments to the long term planning framework. 18. Neighbourhood plans Part 7 7.2 7.2.9.1 Indooroopilly centre neighbourhood plan code 7.2.9.1.2 Purpose 7.2.9.1 Indooroopilly centre neighbourhood plan code Table 7.2.9.1.3.A— Criteria for assessable development 7.2.9.1 Indooroopilly centre neighbourhood plan code Table 7.2.9.1.3.A— Criteria for assessable development REMOVE: ‘AO2.1’ REPLACE WITH: ‘AO2.1 Development provides land for a new park in the location specified as future park in Figure b and the local government infrastructure plan.’ 2.3A.4 Update assessment criteria for the amendments to the long term planning framework. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 19. Neighbourhood plans Part 7 7.2 7.2.9.1 Indooroopilly centre neighbourhood plan code Table 7.2.9.1.3.A— Criteria for assessable development REMOVE: Whole of AO2.2 REPLACE WITH: 2.3A.4 7.2.9.1 Indooroopilly centre neighbourhood plan code Table 7.2.9.1.3.A— Criteria for assessable development - Updates assessment criteria for the amendments to the long term planning framework; reflects the removal of park at Moggill Road roundabout due to change in DSS (figure a and b), and the delivery of the plaza at Station Road/Stamford Road. As this item is identified to be delivered post2026, the indicative long term community facility is to be moved from the transitional LGIP to the Long term infrastructure plan and neighbourhood plan. 20. Neighbourhood plans Part 7 7.2 ‘AO2.2 Development protects land for the provision of park in the general location specified in Figure b annotation ‘A’ and in accordance with the long term infrastructure plan.’ INSERT: ‘PO2A Development provides long term infrastructure for the land for community facilities network to meet the recreational needs of residents and workers. AO2A Development protects land for community facilities network in the general location specified in Figure b and in accordance with the Long term infrastructure plan.’ 2.3A.4 Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 21. Neighbourhood plans Part 7 7.2 7.2.9.1 Indooroopilly centre neighbourhood plan code REMOVE: ‘future park’ and annotation A (Moggill Road roundabout), ‘future park and annotation B (Keating House), and annotation C from Plaza. REPLACE WITH: New Figure b - Plaza symbol - the ‘future park’ symbol (Barracks site - ‘long term park’ symbol (Keating House) - ‘long term community facilities’ symbol (CoonanBelgrave intersection) - ‘long term infrastructure – public parks network’ into legend - ‘long term infrastructure – community facilities network’ into legend. 2.3A.4 Update the figure to reflect the change in status of the park and community facility from the LGIP to the Long term infrastructure plan and neighbourhood plan. 22. Neighbourhood plans Part 7 7.2 7.2.9.2 Ithaca district neighbourhood plan code Table 7.2.9.2.3.A— Criteria for assessable development - INSERT: ‘PO25 Development provides long term infrastructure for the land for community facilities network to meet the recreational needs of residents and workers. 2.3A.4 As this item is identified to be delivered post2026, the indicative long term community facility is to be moved from the transitional LGIP to the Long term infrastructure plan and neighbourhood plan. AO25 Development protects land for community facilities in the general location specified in Figure b and in accordance with the long term infrastructure plan.’ Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 23. Neighbourhood plans Part 7 7.2 7.2.9.2 Ithaca district neighbourhood plan code - INSERT: new figure. ‘Figure b – Public domain.’ 2.3A.4 Update the figure to reflect the change in status of the community facility from the LGIP to the Long term infrastructure plan and neighbourhood plan. 2.3A.4 As this item is identified to be delivered post2026, the indicative long term community facility is to be moved from the transitional LGIP to the Long term infrastructure plan and neighbourhood plan. INSERT: ‘long term infrastructure community facility’ item into Figure b in alignment with indicative location of BDN-CF001. 24. Neighbourhood plans Part 7 7.2 7.2.19.4 South Brisbane riverside neighbourhood plan code Table 7.2.19.4.3.A— Criteria for assessable development - INSERT: ‘long term infrastructure – community facility’ into figure legend. INSERT: ‘PO9A Development provides long term infrastructure for the land for community facilities network to meet the recreational needs of residents and workers. AO9A Development protects land for community facilities in the general location specified in Figure a and in accordance with the Long term infrastructure plan.’ in numerical order of the existing Performance Outcomes and Acceptable Outcomes. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 25. Neighbourhood plans Part 7 7.2 7.2.19.4 South Brisbane riverside neighbourhood plan code REMOVE: Figure a INSERT: New Figure a ‘long term infrastructure community facility’ item into Figure a – New public open space, laneways, key development sites and significant views. 2.3.A.4 26. Neighbourhood plans Part 7 7.2 7.2.23.3 Western gateway neighbourhood plan code - INSERT: New figure. ‘Figure b – Public domain.’ 2.3A.4 Update the figure to reflect the change in status of the community facility from the LGIP to the Long term infrastructure plan and neighbourhood plan. Update the figure to reflect the change in status of the community facility from the LGIP to the Long term infrastructure plan and neighbourhood plan. INSERT: ‘long term infrastructure community facility’ item into figure in alignment with indicative location of INA-CF001. INSERT: ‘long term infrastructure – community facility’ into figure legend.- Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 27. Neighbourhood plans Part 7 7.2 7.2.23.3 Western gateway neighbourhood plan code Table 7.2.23.3.3 – criteria for assessable development - INSERT: New table row ‘Public domain’ ‘PO4 Development provides long term infrastructure for the land for community facilities network to meet the recreational needs of residents and workers. 2.3A.4 As this item is identified to be delivered post2026, the indicative long term community facility is to be moved from the transitional LGIP to the Long term infrastructure plan and neighbourhood plan. 7.2.23.6 Wynnum-Manly neighbourhood plan code Table 7.2.23.6.3.A— Criteria for assessable development - 2.3A.4 As this item is identified to be delivered post2026, the indicative long term park is to be moved from the transitional LGIP to the Long term infrastructure plan and neighbourhood plan. 28. Neighbourhood plans Part 7 7.2 AO4 Development protects land for community facilities in the general location specified in Figure b and in accordance with the Long term infrastructure plan.’ INSERT: New table row ‘Public domain’ after PO21/AO21 ‘PO22 Development provides long term infrastructure for the parks network to meet the future recreational needs of residents. AO22 Development protects land for a long term park in the general location specified in Figure c and in accordance with the Long term infrastructure plan’. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 29. Neighbourhood plans Part 7 7.2 7.2.23.6 Wynnum-Manly neighbourhood plan code - INSERT: New Figure c which maps the future long term park identified as PIP ID MNW-A1-001. 2.3A.4 30. Overlay codes Part 8 8.1 Table 8.1.1— Overlays and overlay codes - 2.3A.4 31. Overlay codes Part 8 8.2 DELETE: AO1.2 2.3A.4 This acceptable outcome is no longer required. 32. Overlay codes Part 8 8.2 8.2.3 Bicycle network overlay code Table 8.2.3.3— Criteria for selfassessable and assessable development 8.2.3 Bicycle network overlay code Table 8.2.3.3— Criteria for selfassessable and assessable development INSERT: ‘Community purposes network overlay’ in column 1 and ‘Community purposes network overlay code’ in column 2 alphabetically. RENUMBER: AO1.1 as AO1 Update the figure to reflect the change in status of the community facility from the LGIP to the Long term infrastructure plan and neighbourhood plan. To reflect the inclusion of new Community purposes network overlay. INSERT: ‘PO1A Development protects a cycle route or Riverwalk for the bicycle network shown on the Bicycle network overlay map to ensure the following are not compromised: (a) the long term infrastructure for the bicycle network in 2.3A.4 Update assessment criteria for the amendments to the long term planning framework, to clarify linkages with each type of infrastructure plan, and insert new - Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type the long term infrastructure plans; (b) the existing and planned infrastructure for the bicycle network in the local government infrastructure plan; (c) the provision of long term, existing and planned infrastructure for the bicycle network which: (i) is required to service the development or existing and future urban development in the planning scheme area; or (ii) is in the interests of rational development or the efficient and orderly planning of the general area in which the site is situated.’ 33. Overlay codes Part 8 8.2 8.2.3 Bicycle network overlay code Table 8.2.3.3— Criteria for selfassessable and assessable development - INSERT: ‘AO1A Development protects a cycle route or Riverwalk for the bicycle network shown on the Bicycle network overlay map in compliance with the following: (a) for long term infrastructure for the bicycle network in the long term infrastructure plans; Reason BCC administrative definitions. 2.3A.4 Update assessment criteria for the amendments to the long term planning framework, to clarify linkages with each type of infrastructure plan, and insert new BCC Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type (b) the existing and planned infrastructure for the bicycle network in the local government infrastructure plan; (c) the standards for the bicycle network in the Infrastructure design planning scheme policy.’ 34. Overlay codes Part 8 8.2 8.2.3 Bicycle network overlay code Table 8.2.3.3— Criteria for selfassessable and assessable development - INSERT: ‘PO1B Development provides for the payment of additional trunk infrastructure costs for the following: (a) for development completely or partly outside the priority infrastructure area in the local government infrastructure plan; (b) for development completely inside the priority infrastructure area in the local government infrastructure plan the following: (i) trunk infrastructure to be provided earlier than planned in the local government infrastructure plan; (ii) long term infrastructure for the bicycle network Reason administrative definitions. 2.3A.4 Expand assessment criteria to align with the Act’s full additional trunk infrastructure costs provisions. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 2.3A.4 Expand assessment criteria to align with the Act’s full additional trunk infrastructure costs provisions. which is made necessary by development that is not assumed future urban development; (iii) other infrastructure for the bicycle network associated with development that is not assumed future urban development which is made necessary by the development. Editor's Note —The payment of additional trunk infrastructure costs for development completely inside the priority infrastructure area in the local government infrastructure plan is to be worked out in accordance with the Charges Resolution. 35. Overlay codes Part 8 8.2 8.2.3 Bicycle network overlay code Table 8.2.3.3— Criteria for selfassessable and assessable development - INSERT: ‘AO1B No acceptable outcome is prescribed.’ Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 36. Overlay codes Part 8 8.2 New section ‘8.2.8.A Community purposes network overlay code’ - INSERT: New Community purposes network overlay code. 2.3A.4 The new code will ensure the parks and land for community facilities are included in the amended long term planning framework. Amendments will also clarify linkages with each type of infrastructure plan and insert new BCC administrative definitions. 37. Overlay codes Part 8 8.2 8.2.18 Road hierarchy overlay code Table 8.2.18.3— Criteria for selfassessable and assessable development - INSERT: ‘PO3A Development provides for the payment of additional trunk infrastructure costs for the following: (a) for development completely or partly outside the priority infrastructure area in the local government infrastructure plan; (b) for development completely inside the priority infrastructure area in the local government infrastructure plan the 2.3A.4 Include assessment criteria to align with the Act’s full additional trunk infrastructure costs provisions. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 2.3A.4 Include assessment criteria to align with the Act’s full following: (i) trunk infrastructure to be provided earlier than planned in the local government infrastructure plan; (ii) long term infrastructure for the road network which is made necessary by development that is not assumed future urban development; (iii) other infrastructure for the road network associated with development that is not assumed future urban development which is made necessary by the development. 38. Overlay codes Part 8 8.2 8.2.18 Road hierarchy overlay code Table - Editor's Note—The payment of additional trunk infrastructure costs for development completely inside the priority infrastructure area in the local government infrastructure plan is to be worked out in accordance with the Charges Resolution. INSERT: ‘AO3A No acceptable outcome is Item No. 39. Location Overlay codes Part/ Schedule/ Appendix Part 8 Section 8.2 Sub-section/ Table 8.2.18.3— Criteria for selfassessable and assessable development 8.2.18 Road hierarchy overlay code Table 8.2.18.3— Criteria for selfassessable and assessable development Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type prescribed.’ REMOVE: ‘a planned infrastructure corridor or an Infrastructure corridor plan’ in the table heading row above PO4/AO4 REPLACE WITH: ‘adjacent to the District road sub-category which has a width less than 20 metres, or to the Suburban road sub-category or to the Arterial road subcategory. Reason additional trunk infrastructure costs provisions. 2.3A.4 To address amended long term infrastructure requirements and remove reference to the infrastructure corridor plan. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 40. Overlay codes Part 8 8.2 8.2.18 Road hierarchy overlay code Table 8.2.18.3— Criteria for selfassessable and assessable development REMOVE: PO4 text REPLACE WITH: ‘Development protects a corridor for the road network shown on the Road hierarchy overlay map to ensure the following are not compromised: 2.3A.4 Update assessment criteria for the amendments to the long term planning framework, to clarify linkages with each type of infrastructure plan, and insert new BCC administrative definitions. (a) the long term road network infrastructure in the long term infrastructure plans; (b) the existing and planned road network infrastructure in the local government infrastructure plan; (c) the provision of existing, planned and long term road network infrastructure which: (i) is required to service the development or existing and future urban development in the planning scheme area; or (ii) is in the interests of rational development or the efficient and orderly planning of the general area in which the site is situated.’ Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 41. Overlay codes Part 8 8.2 8.2.18 Road hierarchy overlay code Table 8.2.18.3— Criteria for selfassessable and assessable development REMOVE: AO4 text REPLACE WITH: ‘Development protects a corridor for the road network shown on the Road hierarchy overlay map in compliance with the following: 2.3A.4 Update assessment criteria for the amendments to the long term planning framework, to clarify linkages with each type of infrastructure plan, and insert new BCC administrative definitions. Removes redundant information, as the standards are specified in the Infrastructure design planning scheme policy. Identification of which type of development the new assessment criteria are applied to. (a) (b) (c) 42. Development codes Part 9 9.4 43. Development codes Part 9 9.4 44. Development codes Part 9 9.4 9.4.9 Stormwater code Table 9.4.9.3.A— Criteria for assessable development 9.4.9 Stormwater code Table 9.4.9.3.A— Criteria for assessable development 9.4.9 Stormwater for long term road network infrastructure, the long term infrastructure plans; for existing and planned road network infrastructure, the local government infrastructure plan; the standards for the road network in the Infrastructure design planning scheme policy.’ REMOVE: ‘the Priority infrastructure plan and the standards in’ in AO11.2 - 2.3A.4 - INSERT: New table heading row ‘Section C—Additional criteria for assessable development for a material change of use or reconfiguring a lot’ after PO17. 2.3A.4 - INSERT: ‘PO18 2.3A.4 Insert new assessment Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed code Table 9.4.9.3.A— Criteria for assessable development 45. Development codes Part 9 9.4 9.4.9 Stormwater - Insert/Replace with/ Renumber/Relocate to Development protects stormwater infrastructure to ensure the following are not compromised: (a) the long term infrastructure for the stormwater network in the long term infrastructure plans; (b) the existing and planned infrastructure for the stormwater network in the local government infrastructure plan; (c) the provision of long term, existing and planned infrastructure for the stormwater network which: (i) is required to service the development or an existing and future urban development in the planning scheme area; or (ii) is in the interests of rational development or the efficient and orderly planning of the general area in which the site is situated. INSERT: ‘AO18 MAALPI1 amendment type Reason criteria for the amendments to the long term planning framework, to clarify linkages with each type of infrastructure plan, and insert new BCC administrative definitions. 2.3A.4 Insert new assessment Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed code Table 9.4.9.3.A— Criteria for assessable development 46. Development codes Part 9 9.4 9.4.9 Stormwater code Table 9.4.9.3.A— Criteria for assessable development Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Development protects stormwater infrastructure in compliance with the following: (a) for long term infrastructure for the stormwater network, the long term infrastructure plans; (b) for existing and planned infrastructure for the stormwater network, the local government infrastructure plan; (c) the standards for stormwater drainage in the Infrastructure design planning scheme policy. - INSERT: ‘PO19 Development provides for the payment of additional trunk infrastructure costs for the following: (a) for development completely or partly outside the priority infrastructure area in the local government infrastructure plan; (b) for development completely inside the priority infrastructure area in the local government infrastructure plan the following: (i) trunk infrastructure to be Reason criteria for the amendments to the long term planning framework, to clarify linkages with each type of infrastructure plan, and insert new BCC administrative definitions. 2.3A.4 Include assessment criteria to align with the Act’s full additional trunk infrastructure costs provisions. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 2.3A.4 Include assessment criteria to align with the Act’s full additional trunk provided earlier than planned in the local government infrastructure plan; (ii) long term infrastructure for the stormwater network which is made necessary by development that is not assumed future urban development; (iii) other infrastructure for the stormwater network associated with development that is not assumed future urban development which is made necessary by the development. Editor's Note—The payment of additional trunk infrastructure costs for development completely inside the priority infrastructure area in the local government infrastructure plan is to be worked out in accordance with the Charges Resolution.’ 47. Development codes Part 9 9.4 9.4.9 Stormwater code Table 9.4.9.3.A— - INSERT: ‘AO19 No acceptable outcome is prescribed.’ Item No. 48. Location Other Plans Part/ Schedule/ Appendix Part 10 Section 10.3 Sub-section/ Table Criteria for assessable development New Section Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason infrastructure costs provisions. - INSERT: New section called ‘long term infrastructure plans and tables’. 2.3A.4 10.3 long term infrastructure plans Reflect inclusion of the Long term infrastructure plan for 2026 to 2031 infrastructure items. Include in index of QPP administrative definitions. 49. Definitions Schedule 1 SC1.2 Table SC1.2.2.A— Index of QPP administrative definitions - INSERT: ‘Ultimate development’. 2.3A.4 50. Definitions Schedule 1 SC1.2 Table SC1.2.2.B— QPP administrative definitions - 2.3A.4 Include QPP administrative definition referred to in the LGIP. 51. Definitions Schedule 1 SC1.2 SC1.2.3.A— Index of Brisbane City Council administrative definitions - INSERT: ‘Ultimate development’ in column 1 and ‘The realistic extent of development anticipated to be achieved when a site (or projection area or infrastructure service catchment) is fully developed.’ in column 2. INSERT: ‘Assumed future urban development’ in column 1. 2.3A.4 Include new Council administrative definition to support the new Long term infrastructure plan. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 52. Definitions Schedule 1 SC1.2 SC1.2.3.A— Index of Brisbane City Council administrative definitions REMOVE: ‘Infrastructure corridor plan’ from column 2 - 2.3A.4 53. Definitions Schedule 1 SC1.2 SC1.2.3.AIndex of Brisbane City Council administrative definitions - INSERT: ‘long term infrastructure’ in column 2. 2.3A.4 54. Definitions Schedule 1 SC1.2 SC1.2.3.A— Index of Brisbane City Council administrative definitions - INSERT: ‘long term infrastructure plans’ in column 2. 2.3A.4 55. Definitions Schedule 1 SC1.2 Table SC1.2.3.B— Brisbane City Council administrative definitions - INSERT: ‘Assumed future urban development’ in column 1 and ‘The future urban development which is assumed to be serviced at the desired standards of service in the most cost effective manner by the plans for future trunk infrastructure up to the planning horizon identified in the local government infrastructure plan.’ in column 2. 2.3A.4 Remove definition to align with changes to the new long term infrastructure planning framework. Include in index of Council administrative definitions a new definition to support the new Long term infrastructure plan. Include in index of Council administrative definitions new definition to support the new Long term infrastructure plan. Define assumed future urban development to align with the LGIP planning horizon. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 56. Definitions Schedule 1 SC1.2 Table SC1.2.3.B— Brisbane City Council administrative definitions - 2.3A.4 Remove definition to align with changes to the new long term infrastructure planning framework. 57. Definitions Schedule 1 SC1.2 Table SC1.2.3.B— Brisbane City Council administrative definitions REMOVE: ‘Infrastructure corridor plan’ in column 1 and ‘See Schedule 3, SC3.1, Table SC3.1.1’ in column 2 - INSERT: ‘long term infrastructure’ in column 1 and ‘Development infrastructure which is not identified in the plans for future trunk infrastructure in the local government infrastructure plan which is required to service at the desired standards of service in the most cost effective manner development which is not assumed future urban development.’ in column 2. 2.3A.4 Define long term infrastructure (i.e. beyond the LGIP planning horizon). Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 58. Definitions Schedule 1 SC1.2 Table SC1.2.3.B— Brisbane City Council administrative definitions - 2.3A.4 Define the Long term infrastructure plan 59. Definitions Schedule 1 SC1.2 SC1.2.3.A— Index of Brisbane City Council administrative definitions REMOVE: ‘The year up to which a trunk infrastructure network has been planned.’ from column 2 in ‘Planning horizon’ definition INSERT: ‘long term infrastructure plans’ in column 1 and ‘The plans for long term infrastructure identified in the following: (a) the Road hierarchy overlay, for the road network; (b) the Bicycle network overlay, for the bicycle network; (c) the Community purpose network overlay and Other plans long term infrastructure plans, for the parks network and land for the community facilities network; (d) the Stormwater code and Other plans long term infrastructure plans, for the stormwater network.’ in column 2. REPLACE: ‘For the local government infrastructure plan means the year up to which a trunk infrastructure network has been planned.’ in column 2. 2.3A.4 To clarify the definition in relation to the LGIP and the Long term infrastructure plan framework. Item No. Location Part/ Schedule/ Appendix Section Sub-section/ Table Existing text/Map to be removed Insert/Replace with/ Renumber/Relocate to MAALPI1 amendment type Reason 60. Mapping Schedule 2 SC2.4 Table SC2.4.1— Overlay maps - 2.3A.4 To reflect the inclusion of the new Community purposes network overlay. 61. Mapping Schedule 2 SC2.5 Table SC2.5.1— Other plan maps - 2.3A.4 To reflect inclusion of new Other plan map. 62. Mapping Schedule 2 SC2.5 Table SC2.5.1— Other plan maps - INSERT: ‘OM-003.4’ in column 2, ‘Community purposes network overlay map’ in column 3 and gazettal date in column 4 alphabetically. INSERT: ‘OPM-012.1’ in column 2 ‘Long term infrastructure plan other plan map’ in column 3 and gazettal date in column 4 alphabetically. INSERT: Other rows with alphabetical listing in column 1 and ‘Intentionally left blank’ in column 2. As per other mapping series. 2.3A.4 For consistency with existing format of map tables. Planning scheme map amendments: Overlay maps Item No. Map number Map title Detail of change / amendment 63. OM-003.4 (all tiles) Community purposes network overlay map Overlay mapping that includes long term community facility and long term park items outside the LGIP planning horizon. MAALPI2 amendment type 2.3A.4 Reason Amendment Package To show long term community purposes items that are outside the LGIP planning horizon. Long Term Major Amendment MAALPI3 amendment type 2.3A.4 Reason Amendment Package To spatially support the new long term plan concept in Part 10. Long Term Major Amendment Other plan maps Item No. Map number Map title Detail of change / amendment 64. OPM012.2 (all tiles) Long term infrastructure plan other plan map To map longer term infrastructure. Currently only includes long term stormwater network. 2 3 Statutory guideline 01/16 Making and amending local planning instruments 8 July 2016 Statutory guideline 01/16 Making and amending local planning instruments 8 July 2016
© Copyright 2026 Paperzz