Department Circular No. DC2015-06-0008 POLICY ON MANDATORY COMPETITIVE SELECTION PROCESS FOR DISTRIBUTION UTILITIES IN SECURING POWER SUPPLY AGREEMENTS Director Mylene C. Capongcol Department of Energy Intercontinental Hotel, Makati City 07 August 2015 Presentation Coverage o Background CIRCULAR NO. 2015-06o RecentDEPARTMENT Policy Issuances 008 MANDATING ALL DISTRIBUTION UTILITIES TO UNDERGO COMPETITIVE SELECTION PROCESS (CSP) IN SECURING POWER SUPPLY AGREEMENTS o Supply-Demand Highlights o DOE Circular No. DC2015-06-0008 o Next Steps 7 August 2015 Policy Framework 3 Recent Policy Issuances Ensuring Energy Security and Transparency in Rates and Processes Department Circular No. No.DC2015-06-0010, “Providing Policies to Facilitate the Full Implementation of RCOA in the Philippine Electric Power Industry” Department Circular No. DC2015-06-0009, “Providing for Additional Guidelines for DUs in Complying with their Mandate to Ensure Supply Security” Enhancing PSAs for Captive Customers Protection Department Circular No. Dc2015-06-0008, “Mandating All DUs to Undergo Competitive Selection Process (CSP) In Securing PSAs” Mandatory CSP for all DUs Supply-Demand Profile, 2015-2024 Luzon Distribution Utilities Luzon DUs Contracted Capacity (MW) For PSA Approval (MW) Uncontracted Demand (MW) Peak Demand (MW) WITH CCs 2015 2016 6,060 5,963 296 802 2,282 2,242 8,639 9,006 WITHOUT CCs 2015 2016 6,060 5,963 296 802 1,333 1,253 7,690 8,018 Source: 2015 DDP Submissions; PEMC’s RCOA Operational Highlights as of 21 July 2015 *For 2015, it refers to the current available capacity corresponding to the 2015 highest system peak demand in Luzon while 2016 onwards, pertains to available capacity of 2015 plus committed capacity Supply-Demand Profile, 2015-2024 Visayas Distribution Utilities Visayas DUs Contracted Capacity (MW) For PSA Approval (MW) Uncontracted Demand (MW) Peak Demand (MW) WITH CCs 2015 2016 1,108 1,039 273 284 173 312 1,554 1,635 WITHOUT CCs 2015 2016 1,108 1,039 273 284 158 297 1,539 1,620 Source: 2015 DDP Submissions; PEMC’s RCOA Operational Highlights as of 21 July 2015 *For 2015, it refers to the current available capacity corresponding to the 2015 highest system peak demand in Visayas while 2016 onwards, pertains to available capacity of 2015 plus committed capacity Supply-Demand Profile, 2015-2024 Mindanao Distribution Utilities Source: 2015 DDP Submissions *For 2015, it refers to the current available capacity corresponding to the 2015 highest system peak demand in Mindanao while 2016 onwards, pertains to available capacity of 2015 plus committed capacity Department Circular No. DC2015-06-0008 “Mandating All Distribution Utilities to Undergo Competitive Selection Process (CSP) in Securing Power Supply Agreements” Department Circular No. DC2015-06-0008 “Mandating All DUs to Undergo CSP in Securing PSAs” • CSP is not new. – First mandated in off-grid areas through DC2004-01-001, issued on 24 Jan 2004, introducing Private Sector Participation (PSP) in Existing NPC-SPUG Areas. • Complemented by the Regulator. – Issued ERC Resolution No. 11, Series of 2005, “Adopting the Guidelines for the Setting and Approval of Electricity Generation Rates and Subsidies for Missionary Electrification Areas.” 7 August 2015 Department Circular No. DC2015-06-0008 “Mandating All DUs to Undergo CSP in Securing PSAs” Highlights: • Signed on 11 June 2015 and published on 30 June 2015 at the Philippine Daily Inquirer and The Philippine Star. • Will not apply to PSAs with tariff rates already approved and/or have been applied for approval by the ERC before the effectivity of the Circular. • There shall be enforcement and compliance monitoring by the DOE, and with penalty provision through ERC. 7 August 2015 Department Circular No. DC2015-06-0008 “Mandating All DUs to Undergo CSP in Securing PSAs” Salient Features: • All DUs shall undergo CSP, through a Third Party duly DEPARTMENT CIRCULAR NO. 2015-06recognized by008 the DOE and ERC. – ALL DISTRIBUTION In the caseMANDATING for ECs, shall also be recognized by the NEA • Conduct – – – UTILITIES TO UNDERGO COMPETITIVE SELECTION PROCESS (CSP) IN SECURING of CSP shall observe the following: POWER SUPPLY AGREEMENTS Aggregation of DUs’ un-contracted demand requirements; Yearly undertaking; and Conformance with the PSA Template containing key provisions to be issued by the ERC in coordination with DOE. 7 August 2015 Department Circular No. DC2015-06-0008 “Mandating All DUs to Undergo CSP in Securing PSAs” The Implementing Guidelines (IG): CIRCULAR 2015-06-of aggregation of • Shall containDEPARTMENT specific details on theNO. process 008 un-contracted demand requirements of DUs and accreditation MANDATING ALL DISTRIBUTION TO UNDERGO of Third PartyUTILITIES authorized to conduct CSP. COMPETITIVE SELECTION PROCESS (CSP) IN SECURING Supplemental Guidelines and Procedures POWER SUPPLY AGREEMENTS • ERC to issue design and execution of the CSP. on the 7 August 2015 Implementing Guidelines Preparatory Activities • • • Creation of DOE and ERC Working Group on CSP to work on the preparation of the Implementing Guidelines. DEPARTMENT CIRCULAR NO. 2015-06008 Formulation of Accreditation Rules for the Third Party. MANDATING ALL DISTRIBUTION TO UNDERGO PreparationUTILITIES of a Standard PSA Template with key provisions COMPETITIVE SELECTION PROCESS e.g., commencement date or COD, allowable outages, tariffs, (CSP) IN SECURING replacement power, responsibilities of the Parties, among POWER SUPPLY AGREEMENTS others. • Setting of Parameters and Rules for Demand Aggregation. 7 August 2015 Department Circular No. DC2015-06-0008 “Mandating All DUs to Undergo CSP in Securing PSAs” Next Steps: • Develop TOR/Qualifications forNO. the Third Party and DEPARTMENT CIRCULAR 2015-06008of the Third Party. engagement • MANDATING ALL DISTRIBUTION UTILITIES TO UNDERGO Data gathering and continue validation COMPETITIVE SELECTION PROCESS IN SECURINGof DUs. contracted (CSP) requirements POWER SUPPLY AGREEMENTS of un- • Conduct of Public Consultations/Public Hearings. • Issue IG within 120 days from the effectivity of the Circular i.e., 27 October 2015 7 August 2015 End of Presentation THANK YOU! POLICY ON COMPETITIVE SELECTION PROCESS IN SECURING POWER SUPPLY AGREEMENTS Director Mylene C. Capongcol Department of Energy Intercontinental Hotel, Makati City 07 August 2015
© Copyright 2026 Paperzz