1 OPMT2510 – Project Quality and Risk Management Learning Objectives #outcomes Upon completion of Module 10, you will be able to: 1. Define Quality Plan 2. Discuss Quality Improvement including: a. PDCA b. 7 Tools of Quality c. Additional Quality Tools /outcomes 2 Linking Characteristics with Parameters Remember back to Module 9: Agreed Specifications; the Quality Characteristics must be linked with project or process parameters. #image /image Control Activities Control activities include: Metric Acceptance Criteria – Quality Plan Appropriate sample – Statistics Documented Method with required accuracy and precision o Correctness – Calibration, Measurement Control o Spread 3 Decision: Does performance meet acceptance criteria? Correction/fix: If not then what Does this require improvement? Example Let’s apply this understanding to an example: beer. Beer has several Quality Characteristics: Clarity, Taste, Percentage Alcohol and Colour, among others. It also goes through several stages during production: Cooking, Fermentation, etc. We use control activities during the stages of production in order to gather data and monitor quality. #image /image So what happens if (when) things go horribly wrong? Quality Improvement. 4 Problem-Solving Process Problem solving methods allow us to improve quality. We use them in both a process and project sense. #table Plan Define the problem Describe the current process Identify and verify root cause Develop a solution and action plan Do Implement the solution Check Review and evaluate Act Reflect and act on learnings /table Shewhart Cycle #image /image Check Check is the start of the problem-solving process. During the Check stage, we: Analyze existing performance. Identify a gap (opportunity). Identify an indicator or symptom that suggests action is required. #image 5 /image Data Sources Data allows us to identify that quality is not being met. Data can come from many avenues: Business data Management data o Performance Deficiencies NC o Time o Cost o Resource usage o Procurement/Contract Management Product/Deliverable data Attribute vs. Variable Data Data also comes in different forms: Attribute o Exists or doesn’t o Go/No go o Binary Variable o Measured values (the number 7) 6 Viewing Data Run Chart Why use it: A run chart allows us to “see” potential changes in the process. When to use it: It is used to study process data over time. Run charts allows us to: o Compare performance after changes o To observe trends, shifts or cycles #image /image Histogram #image Why use it: A histogram visually summarize large amounts of data collected over time. When to use it: It is used when: o Data is numerical (variable data) o Reveals centering, variation and shape o @ Define Problem or Checking Solution Examples o At least 50 but not too long a collection time o k=√N 7 /image Stratification #image Why use it: Stratification separates multiple effects. When to use it: When data comes from several sources. Like the Pareto principle, the benefit is separating the critical few from the trivial many. Example o Set averages 8 /image #image 9 /image Problem Solving Methodology Act Act begins when we determine the need for a problem-solving project. The next step is to form a team and commit the necessary resources. This team is different depending on the process: Problem solving team CPA team Kaizen blitz Six Sigma team Etc. Remember that NO is always an alternative. 7 Tools of Quality The diagram below illustrates the most common tools used in the formal problem solving methodologies explored in other courses. We will only be touching on problem-solving methodology in this one. #image 10 /image Problem Solving Project A problem-solving project puts each stage of Plan, Do, Check, and Act to use. Plan Plan, in the context of a problem-solving project, seeks to describe the Problem using data as a success measure. It narrows down the project focus and results in a written problem statement Viewing Data During Plan, the following tools are used. 11 • • • • Run Chart Check Sheet Affinity Diagram Pareto Diagram Check Sheet A check sheet is a defect concentration diagram. Why use it? It is a simple and efficient data collection tool. When to use it: o When data can be observed and recorded repeatedly by same person/location. o When Collecting data on frequency or patterns. Note: o For a check sheet to be most useful, collect data over time. o You must clearly define what data will be collected. Example: #image /image Affinity Diagram Why use it? Allows you to organize a large number of ideas (brainstorming) into a few key issues. When to use it: o When associating Symptoms to Problems o When associating Causes to Solutions Pareto Diagram Why use it? Allows you to focus efforts on the most significant items. When to use it: When analyzing data on frequency, cost, time, quantity of problems or causes. Example: 12 #image Final Inspection Failures 100.0% 2,000 90.0% 80.0% 70.0% 60.0% 50.0% 1,000 40.0% 30.0% 500 20.0% 10.0% 0 0.0% Warpage Charring Warpage Excessive Cracking Shrinkage Excessive (Fan) (Shroud) (Shroud) Weight (Fan) (Housing) Weight (Fan) (Shroud) /image Describe the Current Process To fully describe the current process: Create a flowchart of the current process Validate the flowchart and performance measures with owners, users and customers Flowchart Why use it? Flowchart shows complexity and departure from ideal. When to use it: o To understand the current process o To study the process for improvement Note: Experience the less symbols the better Examples: #image Cum % Orders 1,500 13 /image #image Outlook Primes 14 Outlook Preparation Segment +/Yes 5% or <$15M? Actuals +/10% Incremental Doability Template Template Template Actuals No Labour Supply Finance Review Lock Down Second Draft First Draft IRT Subcommittee Review IRT Ops No Final Draft Enter into SAP Actuals IRT Incremental Doability Guidance Finalization /image #table Supplier Executive Director (in consultation with Program Director) Shop Steward Inputs Welcome letter Orientation Manual Collective Agreement Policy Manual Confidentiality agreement Assignment Training Job Description Process Orient new employee Outputs Signed confidentiality agreement ??????? Customer Employee ?????????? Start probationary period Employee Employee Program Director Probation period warning notification Evaluation Form Complete probationary period Management Gifts Recognize years of Assignment Outcome Updated Payroll System Letter outlining benefits package Completed Evaluation Form Probationary Extension Letter Termination Letter Updated Payroll System Acknowledgement Employee Employee Program Director 15 PBA Certificates service of 5, 10, 15, 20 year employees /table Identify and Verify Root Cause Root cause is identified by: Constructing a cause and effect diagram. Determining additional data required to clarify cause and effect relationships. Selecting and verifying root cause. Primary Tools include: Cause and Effect Diagram 5 whys Stratification Scatter Diagram Multi-voting Decision Matrix Cause and Effect Diagram Why use it? Identifies potential causes of a problem. When to use it: This is a brainstorming tool to consolidate your (team’s) thinking. Examples: #image 16 /image #image 17 Ask why 5 times /image Scatter Diagram Why use it? Allows you to measure relationships between variables. When to use it: o To investigate the possibility that two variables are related. o Use in conjunction with a cause and effect diagram to indicate potential causal relationship. Note: Cannot confirm cause and effect. Examples: 18 o o Linear regression or correlation Quadrant method #image /image Develop a Solution To develop a solution: Generate potential solutions Rank potential solutions (typically against weighted criteria – cost, ease, effectiveness) Test potential solutions Primary tools include: Brainstorming SCAMPER Benchmarking Decision Matrix or Weighted Matrix Experimentation (DOE) Pilot Projects Brainstorming Why use it? Generate ideas. When to use it: Anytime. Note: Generation and Evaluation are SEPARATE 19 SCAMPER Why use it? Generate possible solutions #image 20 /image Develop an Implementation Plan An implementation plan: Uses Project Management tools (Module 11) Constructs a detailed action plan Defines key success measures Primary tools include: Project Charter Network Diagram Gantt Chart Responsibility Matrix Risk Analysis Do Do is where you implement the solution. It is done through: Project Control Manage the implementation work packages (cost, time, quality) Manage project risk Primary tools include: Action Plan (Schedule, Budget, Quality Plan) Change Management Force Field Diagrams #image Why use it? Understand support and resistance to an idea/solution. When to use it: Typically solution stage. Example: 21 /image Check During Check we review and evaluate. It is done by: Evaluating results of the change against key success measures. Determine if actions produced the desired results. o Yes, standardize. o No, return to cause. Primary tools include: Pareto Chart Control Chart Run Chart Act During Act we turn learnings into action. We do this through: Revising process as necessary Standardizing improvement Continuing to monitor the process for changes Assessing the problem-solving process Celebrating success Primary tools include: 22 Control Charts Flowcharting and Process Documentation Process Review and Brainstorming Summary In this module, we have covered: Quality Planning/Quality Plan Quality Control Activities External Resource For greater understanding please review the following external resource. Quality Improvement Guide 2012 Quality Tools Construction Industry including Exercise and Data Set
© Copyright 2026 Paperzz