Electricity North West (Construction and Maintenance) Hilltop Depot, Brackley Street, Walkden, Manchester, M28 3GU WYG Engineering Ltd Executive Park Avalon Way Leicester LE7 7GR Direct line (Redacted) Direct fax (Redacted) (Redacted) FAO A P Fox Our Ref DW/12775 14 July 2017 Dear Sir Supply and install a new 1No, HV radial feeder between the existing ENWL Heasanford Network S/S and the existing private B substation at Aircelle B5. Further to your recent enquiry regarding the above work I am pleased to submit our proposals and quotation for your consideration. It is proposed to undertake the following work: Civil Works. 1/ Provide the services of one of our Approved Civil Contractors to carry out the following? Highway Works. a) Apply for the required (Section 50) opening notice. b) Excavate within the footpath on “Bancroft Road” (assumed length 292Mtrs) of HV cable trench. c) Excavate within the carriageway on “Bancroft Road” (assumed length 12Mtrs) of HV cable trench. d) Excavate within the grass verge on Bancroft Road” (assumed length 5Mtrs) of HV cable trench. e) Reinstate on completion of all cabling works. Onsite Works. a) b) c) d) e) Excavate within the footpath (assumed length 46Mtrs) of HV cable trench. Excavate within the grass verge (assumed length 266Mtrs) of HV cable trench. Excavate within the carriageway (assumed length 24Mtrs) of HV cable trench. Excavate within the concrete (assumed length 11Mtrs) of HV cable trench. Reinstate on completion of all cabling works. Electricity North West (Construction and Maintenance) Limited | Registered in England & Wales No 07382637 | Registered Office: 304 Bridgewater Place | Birchwood Park | Warrington | WA3 6XG \continuation Intermediate Joint-Bay. a) Excavate within the “Bancroft Road” footpath for a 1No HV joint-bay. b) Excavate within the “Grass Verge” on the Michelin site for a 1No HV joint-bay. c) Reinstate on completion of all cabling works. HV Cable Ducts. a) Supply and install (assumed length 656mtrs) of Red HV cable ducts to ENWL codes of practice. HV Installation. 1/ Provide the services of one of our Senior Authorised Engineers to take control of the private HV network and issue safety documents to the ENWL staff. 2/ Identify spike and cut the HV cable between the existing E Substation No5, Michelin site and 1No, Substation, Aircelle site, carry out the HV disconnect and apply SEC’s (Short End Capps). 3/ Supply and install (assumed length 670Mtrs) of HV cable within HV cable ducts between the Heasanford Network Substation and the private Substation at Aircelle site and terminate both ends. 4/ Commission the proposed Electricity North West (Construction and Maintenance) Ltd installation works. Electricity North West (Construction and Maintenance) Ltd will be pleased to undertake the above works for (Redacted) nett plus VAT at the appropriate rate on 100% of the contract sum, inclusive of the necessary termination and jointing. Please note the above cost includes a provisional sum of (Redacted) as per tender documents. This quotation, which is subject to the attached Electricity North West (Construction and Maintenance) Ltd General Conditions of Contract, is available for acceptance for 30 days from the above date. Your acceptance of this quotation will be subject to satisfactory financial and contractual arrangements being concluded with Electricity North West (Construction and Maintenance) Ltd and it assumes your agreement to the terms and conditions set down in our conditions of contract. The price payable by the Customer in respect of the execution of the Works (the “Contract Price”) as stated in the quotation shall be payable in a lump sum prior to any equipment/site works being delivered. One receipt of your instruction to proceed we will issue our invoice to enable payment to be made prior to starting on site. Please note that due to the volatility of the metals markets the price quoted is subject to adjustment to the LME (London Metals Exchange) settlement price for copper and aluminium ruling on the day following receipt of an instruction to proceed. In the compilation of this quotation the following assumptions have been made. 1/ Cable lengths for the HV have been assumed and stated above. Should these be different at the time of construction then adjustment to the contract price either up or down will be made on a time and material basis. 2 \continuation 2/ It is assumed that all specified trenching and cable work is in ground free from obstruction. Any additional work involved in digging through or removing obstructions will be charged as extra to the price quoted. 3/ It’s assumed within this quotation that there is sufficient space within the footpath on Bancroft road for the proposed new HV radial feeder, with the assumption of Bancroft road crossing (Section 58) notice. 4/ No allowances have been made within this quotation for the modification if required of the existing metering CT’s on the proposed HV breaker within the private side of the Heasanford Network Substation. 5/ No allowances have been made for any cost associated with the transfer of control of the private HV network. 6/ No allowances have been made to carry out any civil works within the Heasanford Network Substation, it’s assumed within this quotation that the existing HV cable trenches are acceptable from outside the substation. I trust the above meets with your approval and should you require any further information, do not hesitate to contact me. Yours Faithfully (Redacted) Design & Estimating Engineer Electricity North West (Construction and Maintenance) Ltd 3
© Copyright 2026 Paperzz