Technical Co-operation Challenges Wo rld- w ide CNS/AT M Sy stems Im plem enta tion Co nferen ce Rio de Jan eiro 11 -15 Ma y 1 998 Technical Co-operation Challenges OVERVIEW SESSION 1: Assistance requirements of States CNS/ATM and ICAO Technical Co-operation Presentations by States SESSION 2: ICAO Objectives Implementation Mechanism Presentations by partner Conclusion and recommendation ICAO Technical Co-operation Complements ICAO standardization & guidance Since 1952 Assistance to more than 100 States Program volume US$ 1 Billion, 100 projects per year Across civil aviation sector Complete project cycle Non-profit, neutral, objective, participatory Accountable, audited, transparent ICAO Technical Co-operation Mandate for CNS/ATM “… ICAO shall co-ordinate and monitor the implementation of the CNS/ATM systems on a global basis… Towards this end, ICAO shall play its central role in co-ordinating technical co-operation arrangements for CNS/ATM systems implementation. … ICAO shall facilitate the provision of assistance to States with regard to the technical, financial, managerial, legal and co-operative aspects of implementation.” (Council Decision 141/13 of 1994) Assistance Requirements of States Needs assessment and project development Donor mobilization and financing arrangements Familiarization and specialized training Transition planning, cost-benefit and recovery analyses Systems planning and specification Equipment procurement Human resource planning and development ICAO Technical Co-operation CNS/ATM Global needs assessment surveys Global Plan Transition planning Familiarization and training Equipment procurement Financing arrangements ICAO Technical Co-operation Experts Over 2600 individual experts from around the world More than 100 registered consulting companies Advisers/consultants, Operational Assistance Virtually all aviation aspects covered OJT for national counterparts ICAO Technical Co-operation Training Basic, advanced, refresher: classroom, OJT, factory Workshops, seminars, international fellowship training Establishment of over 70 training institutes TRAINAIR standardized training development methodology, ensuring compatibility of training courses with SARPs training resource sharing system for cost-effective utilization of training material international, co-operative network of CATIs ICAO Technical Co-operation CNS/ATM Training Asia/Pacific: 27 in-country and 3 Inter-country familiarization seminars for 40 States/1000 participants Latin America: 4 seminars for 23 States/300 participants Europe/Middle East: 3 seminars on WGS-84 Africa: involvement in 1 sub-regional economics seminar specialized training courses, such as on GPS Procedures Design, GNSS Implementation etc. ICAO Technical Co-operation Procurement Chief, ICAO Procurement Services Mr Arnold Schwatschko ICAO Technical Co-operation CNS/ATM Equipment ICAO can effect procurement of ground systems, such as ATC consoles and terminals for CNS applications, such as: Automatic Dependent Surveillance (ADS) equipment Controller/Pilot Data Link Communications (CPDLC) systems Local Area Augmentation GNSS SSR with/without Mode-S and associated Data Link systems VHF Digital Data Link ICAO Technical Co-operation Procurement ICAO provides procurement services, including identification/definition of equipment needs development of specifications and tender documents call for international, regional or national tenders evaluation of bids contract award and management factory and site acceptance commissioning of systems CNS/ATM Technical Co-operation India Mr H. V. Sudarshan DGCA Chile Mr Luis A. Rossi IPV Brazil Mr Eno Siewerdt
© Copyright 2026 Paperzz