Language: English Original: English AFRICAN DEVELOPMENT BANK Grant Proposal for Financing under the MENA TRANSITIONAL FUND: Support to Parliament: Building Capacity and Mainstreaming Inclusive Growth and Decentralization in Egypt COUNTRY: Arab Republic of Egypt Date: April 9, 2014 Questions on this document are to be addressed to G. El Sokkary, Principal Socio-Economist, EGFO A. Algindy, Procurement Officer, EGFO A. Sobhi, Disbursement Assistant, EGFO L. Mokadem, Resident Representative, EGFO M. Youssouf, Manager, OSHD1. A. Soucat, Director, OSHD J. Kolster, Director ORNA 0 1. Acronyms and Abbreviations ADF AFD AfDB BoD CAOA CSP DPG EGFO EGP EU G8 GDP GIZ GoE I-CSP IPU ISA IMF MENA MoPIC MPs PCs PCR PSC NGO UNDP USAID USD WB African Development Fund Agence Francaise de Developpement African Development Bank Group Board of Directors Central Agency for Organization and Administration Country Strategy Paper Development Partners Group Egypt Field Office Egyptian Pound European Union Group of Eight representing governments of largest economies in the world Gross Domestic Product German International Development Agency Government of Egypt Interim Country Strategy Paper Inter-Parliamentary Union Implementing Support Agency (under MENA TF) International Monetary Fund Middle East and North Africa Ministry of Planning and International Cooperation Members of Parliament Parliamentary Committees Program Completion Report Project Steering Committee Non-Governmental Organization United Nations Development Program The U.S. Agency for International Development United States of America Dollar World Bank 1 1. Introduction Launched by the G8 countries, the Deauville Partnership supports the countries of the Arab Spring as they move in a transitional phase. Within that framework, the MENA Transitional Fund was established as a broad-based technical assistance program to finance country-owned projects that aim at introducing reforms at the governance, social and economic levels. As an eligible recipient, the Government of Egypt has requested the collaboration of the African Development Bank, as an Implementation Support Agency, to prepare and implement a project to support the new Egyptian Parliament by enhancing its institutional and human development capacity so as to become more responsive to the needs for increased accountability and social justice voiced following the revolution of January 25, 2011. This proposal, for a total amount of USD 1,920,000 has been prepared for that purpose. 1.1 Background Information 1.1.1 Within the current transitional phase following the 25th of January 2011 revolution, the Government of Egypt is embarking on a series of institutional and legislative reforms to address existing structural challenges to improve social justice, freedom as well as access to and delivery of quality social services to citizens in an equitable manner. The outcome of these reforms should expedite delivery on the demands of the revolution resulting in a system that fosters inclusiveness and improved democratic rule. 1.1.2 Frustration and helplessness with the performance of the public sector was one of the main underlying causes that triggered mass protests three years ago. The public sector was largely perceived as lacking in transparency and inclusiveness as well as non-responsive to the needs of the large majority of citizens. In addition, corruption and cronyism were increasingly perceived as the norm. One of the symptoms of this state of affairs was the Parliamentary elections of November 2010, which were highly controversial in the way they were conducted, leading to an overwhelming majority of seats going to the then-ruling National Democratic Party. 1.1.3 A diagnosis of the legislative institution in Egypt highlighted the following main characteristics: A parliamentary agenda dominated by draft laws emanating at the last minute from the Executive and placing parliament under time pressure; A parliamentary agenda dominated by policy crises that are hotly debated in the media; Weak investment in time allocation to policy debates, research and technical knowledge of best practices from other countries; Weak awareness of global development concepts such as the Millennium Development Goals, rights-based programming budgets and gender sensitive planning. 1.1.4 By definition, the Parliament has three main roles: representation, legislation, and control over the Executive branch of Government. As representatives of citizens, the Parliament has the duty to ensure that the voice of the people is heard. Parliaments are typically at the apex 2 of accountability hierarchies, having the ability—at least de jure, if not de facto—to sanction governments when enforcement of accountability is required. When exercising oversight, the Parliament focuses, among others, on the following areas (i) the implementation of laws; (ii) the execution of budgets; and (iii) and the full activation of the Constitutional principles. In emerging economies and developing countries, the Parliament is uniquely positioned to understand and monitor the efforts at poverty reduction and equitable economic growth, serving as a forum for multiparty consensus on the way forward and for countrywide support and ownership. As such, a well-functioning parliament is a reflection of democracy, equity and social justice. 1.1.5 The 2011 revolution helped restore power and confidence to the Egyptian citizen in rec ognizing and calling for citizen’s rights. It also increased people’s awareness on the importance of Parliament, as a representative structure, for good governance. This was demonstrated by the unprecedented voter turnout and the number of parties that won seats in the 2011-2012 Parliamentary elections. However, with the elections declared unconstitutional the Parliament was soon after dissolved. It was then agreed that a revised constitution would be drafted before parliamentary or presidential elections took place. A Constitutional Committee of 50-members was commissioned to draft the revised constitution, which was passed and approved by national referendum in January 2014. General Structure of the Egyptian Parliament 1.1.6 Before the change in the current constitution, the Egyptian Parliament consisted of two chambers: the Upper Consultative Chamber – the Shoura Council; and the Lower Chamber – the People’s Assembly. Both chambers employ permanent staff for the general secretariat, research, administration, information system, etc. It is estimated that around 3500 persons are employed by both chambers. In addition, each chamber has its independent infrastructure in terms of library, resource center as well as IT system. In addition, the Shoura council has an e-voting system. 1.1.7 Parliamentary Committees (PCs) are established to facilitate monitoring of the Executive branch. These committees are the back-bone of Parliament’s oversight and legislative work: it is in these committees that different topics are reviewed and analyzed, evidence is requested, discussions and consultations are conducted, and draft recommendations are made. There are 18 specialized committees, of which the committee on budget is the largest and perhaps most important. 1.1.8 The committees consist of technical staff from the Parliament as well as the Members of Parliament. The former support the latter by preparing the topics to be discussed, conducting initial analysis, arranging for meetings for external stakeholders to present evidence as may be needed, prepare briefs and reports, retrieve documentation on previous cases, etc. Some of the technical staff are lawyers, political scientists and economists by academic training. Over the years, many have accumulated sector-specific expertise and maintain the “institutional memory” of the Parliament. However and despite that, most of the staff has insufficient capacity to provide the required quality support to the legislators to control the executive, influence policy or 3 contribute to consensus building and democratic consolidation. Indeed, the experience acquired by the staff is generally ad-hoc, based on the individual’s own motivation and is not based on updated Best Practices. There is insufficient dedicated capacity building training programs provided, both on general topics as well as on specialized topics of relevance. As a result, Committee Members of Parliament (MPs) have often resorted to independent consultants and think-tanks, party-specific experts, or even information provided by government entities over which they are supposed to have oversight. 1.1.9 It is anticipated that the upcoming parliamentary elections will be held during the fall of 2014, following the upcoming Presidential elections announced to be held on May 26-27, 2014.. It is expected that many of the incoming MPs will not have sufficient knowledge on the inner workings of parliament, nor on how to best monitor the implementation of the new constitutional amendments that respond to the social demands voiced during the revolution. It is also expected that the incoming MPs will rely heavily on the Parliamentary committee staff for research, briefings and information. At the same time, the revised constitution has addressed some of the main demands of the revolution, by clearly highlighting that the governing principles of the Egyptian economy would include social inclusion, equitable growth, decentralization, and good governance. The constitution has also modified the structure of Parliament from bicameral to unicameral. 1.1.10 Given the above, there is an urgent need to support the new Egyptian Parliament in various forms: there is a need to build adequate capacities of the Parliament staffers, particularly those that work in the specialized committees, as they will be directly assisting the Members of Parliament to fulfill their legislative and oversight rules successfully; there is a need to align the organizational structure of the Parliament with the constitution while fine-tuning the structure and operational mechanisms through the establishment of clear terms of reference for each specialized Committee as well as job descriptions for the main positions in these committees, as well as by upgrading the use of information technology; finally there is also a need to enhance awareness on the concepts of social inclusion and decentralization and provide the MPs and Parliament staffers with best practices on how to implement these concepts. The proposed project intends to provide support to the new Egyptian Parliament in these areas. Donor’s Support to Parliament 1.1.11 It is important to recognize from the onset that support to Parliaments is a highly sensitive topic which needs to be managed carefully and with utmost flexibility so as not to be perceived as interference in the sovereign affairs of a given nation. These concerns need to be factored in throughout project implementation, and at all levels, including in the selection of consultants who can gain access to work with the Parliament. It is also out of these same concerns that the operational guidelines of the MENA Transition Fund specifically mention that projects supporting parliaments must be ISA-executed. Inevitably such a context imposes its own limitations during project design and, in particular does not allow for the degree of preimplementation detail that could be expected for other projects. This is a constraint that the project team faced and had to cope with. 4 1.1.12 Given the sensitivity of working with Parliaments, only a few donors engage in that sector and engagement is generally limited to institutional development and capacity building. In Egypt, USAID provided support to the Egyptian Parliament in the mid-1990s under the “Decision Support Services Project,” followed ten years later by the UNDP under the project entitled “Strengthening the Capacity of the Egyptian Parliament in Legislation” implemented in 2006. 1.1.13 The proposed project builds on the lessons learnt from both above-mentioned donor financed projects. These lessons include the following: (i) Support should be given to institutional development and not reform which is politically sensitive. Focus of the support should be in tangible areas such as training and infrastructure development; (ii) Flexibility is of prime importance as support projects need to be willing to adapt to the changes in context and climates to prove their worth and not be viewed as interference; (iii) Involvement of a steering/facilitation committee, preferably including Members of Parliament, as a project champion would be very useful for stakeholder buy-in. 1.1.14 While there are no current donor-financed projects directly supporting the Egyptian Parliament, two projects engage civil society on topics that are highly relevant for the Parliament: public financial management and social audits. The proposed “Support to Parliament” project intends to establish synergies with these two recently approved donor projects, that include the project entitled “Public Financial Management as a Means of Improving Transparency and Tackling Corruption,” funded by Dfid and implemented by the Egyptian National Competitiveness Center (ENCC); and the AfDB’s-executed grant entitled “Social Audits to Improve Governance and Accountability in the Social Sectors in Egypt”, which will develop a social audit framework and toolkit for use in North African countries to be promoted through awareness and capacity building activities. Through the proposed “Support to Parliament” project Parliament Staff, and the elected members of Parliament will be introduced to public financial management and the social audit framework and toolkit 1.2 Project Objectives 1.2.1 The project’s objective is to enhance the performance of the Egyptian Parliament towards increased efficiency and effectiveness in response to the demand for improved social justice. 1.2.2 The project direct beneficiaries are the parliament staffers, with a focus on staffers who work in the Parliament Committees alongside the elected Members of Parliament. They will be the direct recipient of the training and capacity building. The indirect beneficiaries will be the Egyptian citizens at large who will benefit from the increased efficiency and effectiveness of the parliament in conducting its legislative and oversight functions. 1.3 Proposal Preparation 1.3.1 This proposal was prepared by the African Development Bank’s Egypt Field Office, in consultation with stakeholders within the Government of Egypt namely representatives from the Ministry of Transitional Justice and Parliamentary Affairs, the International Cooperation Division of the Shoura Council, and the Ministry of Planning and International Cooperation. 5 Consultations were also held with representatives of Civil Society as well as members of the academia. In addition, during its preparation, the project took into consideration lessons learnt from earlier support provided to the Parliament, namely support from the UNDP and the USAID. 1.4 Justifications and Rationale for the Use of Resources: 1.4.1 The proposed project is transformational as it seeks to address the demands of the Egyptian revolution for voice and accountability, and caters to the immediate restructuring needs of the Egyptian Parliament in line with the new Constitution adopted in January 2014. By building capacity of the Parliament Staffers who are the first and direct source of information mandated to assist the elected Parliamentarians, the project will contribute to enhancing the effectiveness and efficiency of the Parliament. This will be further strengthened through the institutional support component which will address the gaps in organizational structure and management and upgrade the tools and IT equipment available so as to provide Parliament staffers with the required environment and tools to perform their duties in an effective and efficient manner. Finally, through the project’s third component, Members of Parliament and their staff will be introduced to practical ways to mainstream social inclusion and decentralization through specific case studies and exposed to International Best Practices through the organization of two study tours. 1.4.2 The project is aligned with the Government of Egypt's revised constitution, adopted following the national referendum on 14-15 January 2014, which guides the manner by which the Executive, Legislative and Judiciary branches of government will be governed. Of particular relevance are the following elements in the new constitution, which this project proposes to support: Unicameral Parliament following the dissolution of Shoura Council: The revised Constitution of 2013, approved by national referendum in January 2014, has abolished the Shoura Council, and hence the Parliament structure has become unicameral. This will require a revision in the organizational structure of Parliament and merging of the staff under one single structure, based on a new strategy and revised roles and responsibilities. The Central Agency for Organization and Administration (CAOA) has started working on a revised structure. Increase in accountability role of Parliament: The 2013 Constitution expands the accountability role of Parliament. Article 101 requires Parliament "to approve the State’s general policies as well as public economic, cultural and social policies, and the public budget.” The article also clearly states that Parliament has a supervisory role relative to the executive authority, highlighting that the Parliament and its Committees will have powers to summon any official or institution to give evidence or produce documents, and to report to them. In addition, the parliamentary committees, which scrutinize and prioritize legislation, will play a critical role through the preparation of analytical reports and policy briefs to Members of Parliament. Inclusive Growth and Social Inclusion: Article 27 clearly states the guiding principles of the economy as prioritizing equitable growth, transparency and good governance, enhanced competitiveness, equal opportunities and equitable distribution of development 6 dividends. Meanwhile, articles 51-93 provide a wide array of social and economic rights to the Egyptian citizen. This reflects the importance given to inclusive growth and social inclusion. Decentralization: Articles 175- 183 lay the foundations for administrative, financial and economic decentralization in Egypt. Parliamentarians and the committee staff need to be aware of the international best practices regarding translating these rights and reforms to implementable laws and regulations. 1.4.3 The project is aligned with the Bank’s Interim Country Strategy Paper for Egypt 2012/13 extended to cover the period 2014/15 as it supports stabilization and economic recovery through enhancing governance at the level of Parliament, and promotes inclusive growth towards poverty reduction through enhancing the oversight role of Parliament. 1.4.4 The project is also aligned with the Bank’s Ten Year Strategy 2013-2022 as it focuses on the area of governance and accountability which is one of core operational principle of the Bank’s strategy. Finally, the project is aligned with the Bank’s Human Capital Development 2013-17, and particularly the area of governance reforms towards increasing value for money in social service delivery. 2. Project Description 2.1 The project has been designed to focus on training and capacity building as well as on institutional development. Using a multi-pronged approach, the project design allows for maximum flexibility so as to cater to capacity building and institutional development needs as they arise as a result of the assessments to be conducted. A pre-assessment of these needs could not be envisaged given the complexities of the transitional context and the inherent sensitivities of this kind of project, detailed above in point 1.1.11. The project seeks to: (i) build technical and professional capacities of the Parliament’s permanent staffers with a focus on staffers work in and support the Parliamentary Committees; (ii) support Parliament’s institutional development, with a focus on the new unicameral organizational structure, as well as on enhancing the use of up-to-date information technology to improve governance and transparency; and (iii) through a specific case study targeting Parliament staffers and Members of Parliament, raise awareness on mechanisms to mainstream social inclusion and decentralization towards enhanced social equity. 2.2 Accordingly, the project will consist of four main components as follows: Component 1: Capacity Building of Parliament’s Permanent Staff, with a focus on staffers involved in Committees: The Parliament employs around 3500 staff working in professional and administrative areas, in addition to general services such as drivers, maintenance staff etc. This component will give priority to the professional and administrative staff whose work is directly linked to the provision of support to Members of Parliament through activities such as research and analysis, monitoring and reporting, documentation and archiving, etc. Subcomponent 1.1: Capacity needs assessment: A needs assessment will be conducted to identify the capacity gaps and needs of the professional and administrative staff members working directly with Members of Parliament, with the objective of providing 7 them with requisite training and skills development that are lacking to capacitate them to improve their performance as they assist and support the incoming elected members of Parliament. Sub component 1.2: Capacity building programs: A set of dedicated capacity building programs will be implemented to address the gaps identified in the needs assessment. These could range from basic topics such as internet research and English language training, to more advanced technical trainings such as the drafting of legislation, media and communication, reading budgets and economic plans, parliamentary ethics, etc. As appropriate, local programs will be identified for on-shelf trainings, while for the more technical trainings international specialized bodies such as the Inter-Parliamentarian Union, may be used for specific capacity building activities in its areas of expertise. Overall, 800 persons are anticipated to be trained under this component. Sub component 1.3: Field visits: A series of field visits within different governorates in Egypt will be arranged to ensure that Parliament staffers are adequately exposed to the development challenges in the country. The field visits will provide them with the opportunity to see how their desk-work effectively translates on the ground. Visits will be conducted to development projects passed by Parliament in a variety of sectors such as energy, microfinance, agricultural rehabilitation, water and sanitation, health, and so forth. Component 2: Institutional Development: This component will focus on two sub-components: (i) assist with the on-going organizational restructuring of Parliament to become a unicameral structure by merging the staff of the dissolved Shoura Council (Upper House) with that of the People’s Assembly (Lower House) and establish clear terms of reference for the various committees and job descriptions for Parliament staffers in these committees, and (ii) improve the use of Information technology through an expansion/upgrade of the IT equipment as well as through the establishment of an e-voting system to improve efficiency and allow for transparency. In terms of the first sub-component (the organizational structure), the Central Agency for Organisation and Administration (CAOA), affiliated to the Ministry of Administrative Development, is mandated to review and propose a new structure of the Parliament. This sub-component of the project proposes to complement the work conducted by the CAOA and focus on fine-tuning the structure by developing clear terms of reference for each of the specialized Committees set up as well as job descriptions for main positions held by Parliament staffers in these committees. In terms of the second sub-component, a basic IT assessment will be conducted to upgrade the current usage of IT equipment and address, partially or fully, the gap that will result of this assessment. With regards to the third sub-component, an assessment of the needs to upgrade the e-voting system has been conducted by a team of experts from the Ministry of Communication and Technology; and hence this project sub-component will conduct the procurement of the e-voting systems required based on this assessment. Subcomponent 2.1: Review and fine-tune the new unicameral Organizational Structure: A new structure is currently being developed by the CAOA so as to be operationally ready once the Parliamentary elections take place and Parliament reconvenes towards the end of 2014. The activities under this sub-component will include the review and fine-tuning of the structure to ensure that it adequately includes all activities, committees and services that may be required; and in addition, terms of 8 reference for the Parliament Committees will be established, in addition to job descriptions for the Parliament staffers working in Committees. In addition, an “induction program” for first-time members of parliament will be proposed for development to facilitate their immersion in their Parliamentary role. Subcomponent 2.2: Information Technology Upgrade towards enhanced performance: There is a constant need to update and upgrade the Information Technology capacities used in the Parliament to enhance data collection, research, information retrieval and archiving, as well as to subscribe to international databases to allow access to specific information and data sources. This component will start with a basic IT assessment so as to enable identification and prioritization of the immediate needs in terms of IT equipment, such as computers, scanners, printers, for procurement. It will also include the establishment/upgrade of a dedicated website positioned as a resource for use by all citizens to identify priorities and take part in the legislative process. Subcomponent 2.3: Introducing the e-voting system to increase efficiency and enhance transparency. Building on the needs assessment conducted by the CAOA, this sub-component will include the procurement and installation of a comprehensive e-voting system, the installation of a digital registration system within the main hall of the Parliament and secondary Hall (“the Irrigation Hall) as well as a public announcement system. Component 3: Case study: Mainstreaming Social Inclusion and Decentralisation: This component will target both the professional staffers and the elected Parliament committee members. The activities under this component will focus on the development and implementation of a dedicated program to mainstream social inclusion and decentralisation as a means of enhancing social equity. The program beneficiaries will be Parliamentary Committee members, who will be provided with the requisite awareness, knowledge and Best Practices on these various concepts, and with toolkits developed to use these concepts in a practical manner. Sub-component 3.1: Development of a dedicated training program focusing on social inclusion and decentralization, to be provided to a set of pre-identified participants, consisting of Parliament staffers and Members of Parliament who are members of select Committees. This will include an overview of these global concepts, a compendium of Best Practices from other countries, toolkits and checklists to use as references, etc. It is expected that synergies with the two other donor financed programs on social audits and public financial management will fall under this sub-component. Sub-component 3.2: Implementation of the program, through a series of inter-active workshops that build upon one another and result in the selection of policies and reforms for a specific topic that has been identified collectively. Subcomponent 3.3: Study Tour: Increase the exposure of a select number of Parliament staff and Members of Parliament to international best practices and experiences in mainstreaming social inclusion and decentralisation through 2 study tours for 12 persons, to visit the Parliaments of other nations, and experience how the system operates. 9 Component 4: Project Management: This project will be Bank-executed by the Egypt Field Office.To manage this highly specialized project, three consultants will be recruited to work with the Project Task Manager on this project as follows: (i) a part-time Technical Advisor to provide guidance on the highly specialized technical aspects of the project; (ii) a Project Coordinator to coordinate the project activities in line with the timeline and budget, report on the progress in implementation and work closely with the technical advisor and Bank Task Manager, (iii) a project officer with procurement skills to prepare and manage all the procurement activities under the project. These consultants will be operating out of the Egypt Field Office. 3. Project Cost Estimates 3.1 The project costs are primarily for capacity building, field visits and study tours, organizational management, IT equipment and program management. The total cost of the project is budgeted at USD 2,920,000 to be provided through resources of the MENA Transition Fund. The project will include in-kind contributions provided by the Government of Egypt, in the form of assessments and restructuring exercise that have been conducted by the various specialized government institutions such as the CAOA and the Ministry of Information Technology. 3.2 In line with the rules of the MENA Transition Fund Agreement, the project will be Bank executed, and hence an additional human resource requirement for project management support has been factored in the project to the tune of USD 360,000. In addition, as the Implementing Support Agency, the African Development Bank is eligible to charge expenses related to guidance, support and execution by its staff. In this regard, the project has allocated an amount of 180,000 USD for expenses incurred by the ISA over 3 years. 3.3 Cost Estimates: By Component: The project will be financed 100% from the foreign component. In-kind contribution will be provided as the Government of Egypt’s cost-sharing portion. By Expenditure: The large majority of the project costs fall under the services category, including consultancies, study tours and trainings. Goods to be purchased consist mainly of IT, office equipment, electronic voting and registration equipment and supplies. ISA indirect costs are included in the contingency and travel expenses. Category Services (incl training and study tours) Goods Miscelleaneous (Contingency & Travel) ISA Indirect Costs Total USD 1,405,000 1,265,000 70,000 180,000 2,920,000 10 4. Procurement 4.1 The Bank will be responsible for all procurement foreseen under this grant. All procurement of Services and Good financed by the MENA Transition Fund will be in accordance with the current Procedures for Procurement of Consultant Services and Goods funded by the administrative or capital expenditure budget of the Bank Group using the relevant Bank Standard Bidding Documents. More specifically consultant services will be procured in accordance with the principles and procedures outlined in Presidential Directive PD 02/2012 while the Goods and ordinary services will be handled in accordance with the Presidential Directive PD 05/2013. 4.2 The procurement activities under the project, excluding the ISA charges, consist of: (1) consultancy services, for a total of USD 1,255,000; (2) field visits and study tours for USD 150,000; (3) goods for USD 1,265,000; in addition to contingency and transportation expenses budgeted for USD 70,000. Procurement of Consultant Services 4.3 The bulk of activities envisaged will be essentially consultancy assignments that will be performed, either through individual consultants or firms. For the time being, all assignments to be implemented under this grant are not yet well-defined because of it demand-driven nature which, given the inherently sensitive nature of the project could not be pre-assessed during the design phase. Hence, once the project is effective, a diagnostic assessment will be conducted to identify the specific needs in terms of capacity building as well as in terms of IT equipment. Any assignment to be implemented under this grant will fall under one of the four components of the project as detailed in the Annex entitled “Procurement of Activities”. A total amount of USD 1,255,000 has been allocated to consultant services. 4.4 In general, all consultant services excluding ”Review and Fine-Tune of the Unicameral Organization Structure” will be procured using the most appropriate competitive procurement method allowed by the Bank’s internal procurement rules for consultant services. Training 4.5 Training and capacity building is a critical element of the project. Following the capacity needs assessment to be conducted, a training plan and budget will be submitted to the Bank annually for prior review and approval. The training plan that will be implemented as agreed will identify the general framework of training and similar activities for the year; including the nature; relevance and objectives of training; number of participants; cost estimates and the translation of the knowledge gained in the actual implementation of project components. This is justified by the sensitivity of the assignment at hand, as it is not advisable to deal with a consultant from a specific country that may be perceived as interfering with affairs of a sovereign parliament. To avoid this, it is in the best interest of Egypt to go through an international organization qualified in this specific matter. 11 Procurement of Non-Consultants 4.6 There are several non-consulting services estimated to cost US$ 150,000 related to study tours and field visits. The non-consulting services foreseen will be procured through shopping method as described by the article 3.5 of the Bank procurement rules. Procurement of Goods 4.7 IT, office equipment and electronic voting system will be conducted through shopping and/or international or national competitive bidding as appropriate based on Bank rules. 4.8 There is no prior review per se between the Bank and the Country. However all procurement process foreseen will be submitted to the Bank current Delegation of Authority Matrix used for procurements of items funded by the administrative or capital expenditure budget of the Bank Group. 5. Implementation 5.1 The project will be implemented over a period of 3 years. Physical implementation is expected to start immediately upon approval of the proposal and finalization of disbursement procedures. This is expected to be ready by September 2014, and continue till September 30, 2017. 5.2 As per the MENA Transition Fund guidelines, the project will be AfDB-executed. Engaging with the Parliament entails working closely with several stakeholders including: the General Secretariat of the Parliament, the Ministry of Parliamentary Affairs and Transitional Justice, as well as Specialized Committees within the Parliament. This will be in addition to the Ministry of International Cooperation, which is the direct counterpart for donors operating in Egypt, as well as several specialized stakeholders such as the Ministry of Information Technology and the Ministry of Administrative Development for specific activities. Given the complexity of this set-up and the specific technical expertise required, the Bank has factored in the recruitment of consultants to assist the Bank’s Task Manager in executing the project. 5.3 A Facilitation Committee consisting of select members of Parliament Staffers, representatives from the Ministries of Parliamentary Affairs and Transitional Justice, and International Cooperation will be formed to facilitate the project team’s efforts in the implementation of the project and provide them with the requisite entry-points and support that may be required. 6. Gender and Environmental 6.1 With 23% of female labor participation rate, Egypt ranks amongst the lowest countries in that area. Egyptian women’s rate of employment in the private sector is below 10%, with most of the employment being in the public sector, where the social benefits are highly attractive particularly for women with children. Within the Parliament staffers, it is estimated that some 12 40% are female. The proposed project will take into consideration the gender element and will ensure that capacities of both men and women will be built. Of all beneficiaries trained, at least 40% will be women. 6.2 The proposed project has no negative environmental implications. 7. Monitoring and Reporting 7.1 The implementation progress of the project will be monitored and reported upon, as per Bank rules. Two field missions will be conducted annually by a team of experts with different skill mix to review progress on the ground and ascertain to which extent the project outcomes will be achieved. Similarly, a mid-term review will be conducted to review and assess implementation progress as per project design and preparation. Quarterly Progress Reports will be developed, and MENA Transition Fund Reports will be submitted as required. A Project Completion Report will be developed upon project closure, in compliance with Bank rules. 7.2 In order to accurately assess the first outcome of the project, namely enhanced staff capacities, a survey of staff performance will be conducted upon the start of the project and will become the baseline. Upon project completion a second survey will be conducted to assess the performance following the provision of capacity building programs and the comparison of both surveys will allow an accurate assessment of the outcome. Similarly, to assess the second project outcome, namely the mainstreaming of social inclusion and decentralization, the proxy indicator used will be the development and presentation of briefs/policy documents on social inclusion and decentralization. 7.3 Financial monitoring will be conducted in line with the rules and regulations for Bankexecuted projects. 8. Financing and Disbursement Arrangements Resources for the project will be channeled to the Bank in accordance with the MENA Transition Fund agreements with ISAs. Given that the project is Bank-executed, the disbursement and financial management rules of the AfDB will be followed for Bank-executed projects. Conclusions and Recommendations for Bank’s Consideration In conclusion, management is requested to approve the proposed Bank-executed project, for which resources will be forthcoming from the MENA Transition Fund. 13 Results-based Logical Framework Country and project EGYPT -Support to Parliament: Building Capacity and Mainstreaming name: Inclusive Growth and Decentralization in Egypt. Purpose of the project : To support the Parliament through capacity building, institutional support and dedicated training towards mainstreaming inclusive growth and decentralization, with the objective of enhancing the performance of the Egyptian Parliament towards increased efficiency and effectiveness in response to the demand for improved social justice. PERFORMANCE INDICATORS IMPACT RESULTS CHAIN Impact: Improved performance of government Proxy indicators: 1. Wastefulness of government spending 2. Perception of trust in national government Outcome 1 Performance of Parliament Staffers improved OUTCOMES Indicator (including CSI) Outcome 2: Social Inclusion and Decentralization mainstreamed Baseline UNDP Human Development Report 63% yes (20072011) Increased 0 RISKS/MITIGATION MEASURES Global Competitiveness Report Value 2.1 Ranked 135 out of 148 Members of TBD Parliament satisfied with the research and technical inputs provided by Parliament staffers Social inclusion/decentral ization related briefs developed and presented Target MEANS OF VERIFICATIO N 6 Survey of Performance conducted preproject and upon completion Delay in Parliamentary elections/ Parliament staffers are permanent employees regardless of whether parliament elections take place or not. Resolutions integrating social inclusion and decentralization Project Completion are not passed in Parliament/ Report/ copy of Briefs will have been briefs produced developed and would be accessible through the archiving system updated under the project, for use after project completion if need arises. 14 Component 1 Capacity building of Parliament’s Permanent staff Output 1.1 capacity building programs established based on skill needs Needs Assessment 0 produced 1 Assessment Project Reports Baseline Performance Survey conducted 0 1 Survey Project Reports Males/females trained in areas identified by skills assessment 0 Output 1.2 Field visits Awareness raised conducted Component 2 Institutional Development OUTPUTS Output 2.1 Organizational structure with clear roles and responsibilities developed Output 2.2 Upgraded IT Digital registration 0 800 (40% females) Project Reports 6 visits Progress reports HR Assessment Report Organizational structure finetuned 0 1 Updated unicameral structure HR Assessment Report/ Project Reports Job descriptions developed 0 Committee structure and functions developed 0 Equipment installed Based on Basic IT 0 IT Needs assessment, TBC Assessment Assessment 1 website 0 Website improved and operational Output 2.3 E-voting Progress Reports 54 job descriptions for main positions 18 Functions of specialized committees 0 Mechanism installed and operational Equipment installed Project reports 1 0 Project reports 1 Public announcement Equipment installed 0 Project reports 1 15 Component 3 Case Study: Mainstreaming Social Inclusion NonDedicated program existant Training Manual Component 3 Case Study: Mainstreaming Social Inclusion and Decentralization Output 3.1 Training Program developed and used Dedicated program Output 3.2 Raise awareness on 2 Study Tours for 12 Best Practices pax 4 Social Inclusion Non-existent briefs developed Non existent Training Manual 2 Recommendations Report following based on Best Study Tour Practices for implementation locally KEY ACTIVITIES Component 4: Project Mgmt COMPONENTS INPUTS Component 1 : Capacity Building Component 1: Provision of consultancies, trainings Component 2: Institutional Development Component 2: Provision of consultancies, IT equipment Component 3: Training on Case-Study Component 3: Provision of trainings and consultancies Component 4: Project management Component 4: resources Annex – Procurement of Activities under the Project 16 Activity Procurement Method Component 1: Capacity Building of Parliament’s Permanent Staff 1. 2. 3. Capacity Needs Assessment & Survey of Performance (assignment of 3 months) Implementation of Capacity Building Programs Field Visits Component 2: Institutional Development Estimated Budget (USD) (USD 500,000) Firm 150,000 Training Shopping 300,000 50,000 (1,500,000 USD) 4. 5. Initial organizational unicameral structure Review & fine-tune unicameral organizational structure, develop terms of reference for Parliamentary Committees and job descriptions for staffers engaged with these committees 6. Basic Information Technology Assessment 7. IT and office equipment 8 Initial assessment of e-voting and digital registration needs 9. Electronic voting system 10 Digital registration including screens, public . announcement system Single Source Selection In-kind contribution 200,000 Firm 75, 000 225,000 In-kind contribution Firm Firm 850,000 150,000 Component 3: Case Study: Mainstream Social Inclusion and Decentralization (270,000 USD) 61 Development and Implementation of dedicated 1 training program 12 2 Study tours . Component 4: Project Management (USD 470,000) 13 Recruitment of part-time Technical Advisor ( 3 years) . 14 Recruitment of Program Coordinator ( 3 years) . 15 Recruitment of project officer (3 years) 16 Computers and equipment 17 Travel and transportation expenses (3 years) 18 Contingency Firm 170,000 N/A 100,000 Individual 140,000 Individual 150,000 Individual shopping NA 70,000 40,000 40,000 30,000 2,740,000 180,000 2,920,000 Subtotal 19 ISA charges Total 17
© Copyright 2026 Paperzz