Output in the construction industry

Statistical bulletin
Output in the construction industry: January
2016 and new orders Quarter 4 2015
Construction output at current price and chained volume measures seasonally adjusted
by public and private sector.
Contact:
Melanie Richard
[email protected].
gov.uk
Release date:
11 March 2016
Next release:
15 April 2016
Table of contents
1. Main points
2. About this release
3. Output in the Construction Industry, January 2016
4. Summary of growth rates for all work types
5. Contributions to growth
6. The quality of the estimate of Output in the Construction Industry
7. Construction estimates in gross domestic product
8. New Orders for Construction – Quarter 4 (Oct to Dec) 2015
9. Economic context
10. International perspective
11. Background notes
Page 1 of 20
1. Main points
In January 2016, output in the construction industry decreased by 0.2% compared with December 2015. All new
work decreased by 0.8% while all repair and maintenance increased by 0.8%.
Within all new work, there were decreases in public new housing (-10.6%) and infrastructure (-8.6%) which were
offset by increases in private commercial (4.7%), public other new work (1.6%), private industrial (0.7%) and
private new housing (0.6%). Within the repair and maintenance (R and M) category, housing repair and
maintenance increased by 3.0% while there was a decrease of 1.5% in non-housing repair and maintenance.
Compared with January 2015, output in the construction industry decreased by 0.8%. There were decreases in
both all new work and repair and maintenance of 0.4% and 1.4% respectively.
New orders for the construction industry in Quarter 4 (Oct to Dec) 2015 were estimated to have decreased by
0.5% compared with Quarter 3 (July to Sept) 2015 and increased by 1.4% compared with Quarter 4 (Oct to Dec)
2014.
The second estimate of gross domestic product (GDP) for Quarter 4 (Oct to Dec) 2015 published on 25 February
2016 included an estimate of construction which showed a decrease in output of 0.4% in Quarter 4 (Oct to Dec)
2015. This estimate has been revised upwards by 0.7 percentage points to an increase of 0.3% in this release.
This has no impact on GDP to 1 decimal place. More information on revisions are included in the Background
notes section of this bulletin.
2. About this release
Output is defined as the amount charged by construction companies to customers for the value of work (produced
during the reporting period) excluding VAT and payments to sub-contractors.
Construction output estimates are a short-term indicator of construction output by private sector and public
corporations within Great Britain. Output estimates are produced and published at current prices (including
inflationary price effects) and at chained volume estimates (with inflationary effects removed) both seasonally
adjusted and non-seasonally adjusted.
Chained volume measures are also described as volume. Construction output is used in the compilation of the
output approach to measuring gross domestic product (GDP).
Detailed estimates along with a longer run of time series data are available to download in the Output in the
Construction Industry, January 2016 datasets. In these tables, users will find chained volume estimates back to
Quarter 1 (Jan to Mar) 1997 and monthly estimates back to January 2010. Current price non-seasonally adjusted
data are available back to Quarter 1 (Jan to Mar) 1955. More information on these statistics can be found in the “
definitions and explanations” section in the background notes.
The data published in this release cover construction estimates for Great Britain. Construction output estimates
for Northern Ireland can be obtained from the Central Survey Unit .
Page 2 of 20
National Statistics status
On 11 December 2014, the UK Statistics Authority announced its decision to suspend designation of Construction
Price and Cost Indices due to concerns about the quality of these deflators. As a result the UK Statistics Authority
announced its decision to suspend the Output and New Orders as National Statistics in respect of the Code of
Practice for Official Statistics .
We took responsibility for the publication of the Construction Price and Cost Indices from the Department of
Business Innovation and Skills (BIS) on 1 April 2015. Since this point we have worked towards creating an interim
solution to measure output prices and replace the statistical models that had been used in the production of
chained volume measures (CVMs) for output in the construction industry since Quarter 3 (July to Sept) 2014 and
to provide an ongoing source of data from Quarter 1 (Jan to Mar) 2014 onwards. This interim solution was
included in the data published in June 2015 for all periods from January 2014 onwards.
3. Output in the Construction Industry, January 2016
All work
In January 2016 all work:
decreased by 0.2% compared with December 2015
decreased by 0.8% compared with January 2015
in the 3 months (November 2015, December 2015, January 2016) compared with the previous 3 months
(August 2015, September 2015, October 2015) construction output increased by 1.1%
Page 3 of 20
Figure 1: All work, monthly time series, chained volume measure, seasonally adjusted, Index (2012 = 100)
Great Britain, January 2016
Source: Office for National Statistics
Notes:
1. Survey: Construction: Output & Employment
Figure 1 shows seasonally adjusted chained volume measures of all construction work. It shows that since the
start of the monthly series in January 2010 the performance of the construction industry has been volatile. The
time series can be split into several distinct periods. The first period covers January 2010 to January 2011 and
saw an increase in output in the early part of the time series which fell sharply into 2011. From February 2011
output increased initially then showed a gradual decrease to December 2012. Between January 2013 and
January 2015 output increased gradually suggesting an underlying pattern of growth, and in more recent periods
output has been more volatile with months of growth and contraction, with growth of 2.1% in December 2015
followed by a fall of 0.2% into January 2016.
Page 4 of 20
Figure 2: All new work and repair and maintenance, monthly time series, chained volume measure,
seasonally adjusted, Index (2012 = 100)
Great Britain, January 2016
Source: Office for National Statistics
Notes:
1. Survey: Construction: Output & Employment
Figure 2 shows the 2 main components of all work. The chart shows that from January 2010 to December 2011
the path of all new work and all repair and maintenance follow a similar pattern. From early 2012 to late 2014, the
underlying pattern of both components shows growth. Since mid-2014, the paths of all new work and repair and
maintenance have moved in opposite directions with the level of all new work consistently higher than all repair
and maintenance. In January 2016, there was a decrease in all new work of 0.8% while repair and maintenance
increased by 0.8%.
Page 5 of 20
Figure 3: Components of all new work, monthly time series, chained volume measure, seasonally
adjusted, £ million
Great Britain, January 2016
Source: Office for National Statistics
Notes:
1. Survey: Construction: Output & Employment
Figure 3 looks at the main components of all new work. There was sustained growth in all new housing from early
2013 until early 2015 and after several months of contraction in early 2015 there was a return to growth in late
2015, however, January 2016 saw the first month-on-month fall since August 2015. Infrastructure is a quite
volatile series with periods of growth and contraction throughout the time series. After growth in December 2015
of 10.6%, January 2016 saw a contraction of 8.6%. Other new work remained fairly flat in recent periods and after
2 months of contraction in November 2015 and December 2015 there was a return to growth in January 2016 of
3.5%.
Page 6 of 20
Figure 4: Components of all new housing, monthly time series, chained volume measure, seasonally
adjusted, £ million
Great Britain, January 2016
Source: Office for National Statistics
Notes:
1. Survey: Construction: Output & Employment
Figure 4 looks at the components of total new housing. It shows that private new housing accounts for the overall
trend in total housing, accounting for approximately 85% of all new housing (based on January 2016 data). Public
new housing fell by 10.6% in January 2016 after an increase of 15.9% in December 2015, while private new
housing showed growth for the 4th consecutive month, increasing by 0.6%.
Page 7 of 20
Figure 5: Components of repair and maintenance, monthly time series, chained volume measure,
seasonally adjusted, £ million
Great Britain, January 2016
Source: Office for National Statistics
Notes:
1. Survey: Construction: Output & Employment
Figure 5 looks at the 2 main components of all repair and maintenance. The level of both housing and nonhousing repair and maintenance has been fairly consistent over the time series with non-housing the slightly
more volatile series. In January 2016, all repair and maintenance increased by 0.8% with housing repair and
maintenance the main contributor, increasing by 3.0%. This was offset by non-housing repair and maintenance
which decreased by 1.5%.
4. Summary of growth rates for all work types
Table 1 provides a summary of growth rates across the different types of construction work in January 2016.
Some main points from this table are as follows:
all work decreased in January 2016 compared with December 2015 due to a decrease in all new work
the month-on-month decrease in all new work was due to decreases in infrastructure and public new
housing
the increase in repair and maintenance was due to an increase in private housing repair and maintenance
all new work and all repair and maintenance contributed to the year-on-year decrease in all work; there
were decreases in all components apart from private new housing, public other new work, private
commercial work, and private housing repair and maintenance
Page 8 of 20
Table 1: Construction output summary tables, chained volume measures, seasonally adjusted
Great Britain, January 2016
Percentage change (%)
Most recent 3
months on a year
earlier
Most recent 3
Most recent month on Most recent month
months on 3 the same month a year
on the previous
months earlier
ago
month
Most
recent
level (£m)
Total all work
0.1
1.1
-0.8
-0.2
10,962
Total all new
work
1.3
1.7
-0.4
-0.8
7,031
Total repair
and
maintenance
-2.0
0.1
-1.4
0.8
3,931
1.3
1.7
-0.4
-0.8
7,031
-19.8
5.5
-20.2
-10.6
369
5.5
5.7
4.8
0.6
2,078
8.6
-2.6
-5.8
-8.6
1,383
-1.0
2.3
4.3
1.6
802
2.7
-5.5
-5.8
0.7
345
-1.7
1.5
2.1
4.7
2,055
-2.0
0.1
-1.4
0.8
3,931
-4.0
-3.3
-5.5
-1.8
590
2.4
-1.8
5.4
5.2
1,423
-4.4
2.6
-4.6
-1.5
1,917
All new work
Total all new
work
New housing
Public
corporations
Private
sector
Other new
work
Infrastructure
Excl
infrastructure
Public
corporations
Private sector
Private
sector industrial
Private
sector commercial
Repair and
maintenance
Total repair
and
maintenance
Housing
Public
corporations
Private
sector
Non-housing
Table source: Office for National Statistics
Page 9 of 20
5. Contributions to growth
Figure 6 shows the contribution of each sector to output growth in the construction industry between January
2016 and December 2015.
Figure 6: Contributions to month-on-month volume growth from the main construction sectors
Great Britain, January 2016
Source: Office for National Statistics
Notes:
1. Survey: Construction: Output & Employment
In January 2016, 3 of the main construction sectors saw a decrease in output growth. The largest contribution to
the fall came from infrastructure.
6. The quality of the estimate of Output in the Construction
Industry
Output in the construction industry estimates are produced from the monthly business survey on the second
Friday of the month, 2 months after the reporting month. Revised results, for previously published periods, are
published in line with the national accounts revisions policy. More information about the data content for this
release can be found in the background notes.
Revisions are an inevitable consequence of the trade-off between timeliness and accuracy. The response rate in
January 2016 was 71.8% of questionnaires, accounting for 81.8% of registered turnover in the construction
industry. Therefore the estimate is subject to revisions as more data become available.
Page 10 of 20
The monthly output in the construction industry time series now spans 73 months, however, users should note
that this is the minimum time span recommended by Eurostat for seasonal adjustment. While the seasonal
pattern is generally established after 60 months in a monthly time series, there is still potential for increased
revisions until the seasonal pattern has matured.
All estimates, by definition, are subject to statistical uncertainty and for many well-established statistics, we
measure and publish the sampling error associated with the estimate, using this as an indicator of accuracy. For
construction output we publish sample and non-sample errors in table 11 of the main reference tables. It should
be noted that we are continually working on methodological changes to improve the accuracy of the construction
output estimates, progress on these can be found on the ONS continuous improvement page on our website.
7. Construction estimates in gross domestic product
Construction estimates are a main component of the output approach to measuring GDP, along with the
estimates of services, production and agriculture. As an aid to users, the short-term economic indicator releases
that directly feed into GDP include an additional table of the GDP components. This table should help to inform
users of the relationship between the individual components which comprise GDP output. The publication dates
and the quarterly growths of the individual GDP components are shown below.
Each component of GDP has a weight within GDP based on its value in 2012. Construction has a weight of 59,
which means that it is 59 parts of the 1,000 that make up total GDP.
To determine the effect each component has on GDP multiply the component growth by its weight in GDP.
An example using Quarter 2 (Apr to June) 2015 data: Construction growth = 1.4 Weight in GDP = 0.059 (59
/1000) Effect on GDP = 1.4 * 0.059 = 0.08 or 0.1 to 1 decimal place (dp) Revisions to components and the effect
on GDP can be calculated using the same process. As a general rule there are no revisions to GDP when the
component revisions are:
Index of Production (IoP) = between 0.3 and -0.3 Construction = between 0.9 and -0.9 Index of Services (IoS) =
0.0 (all values above or below 0.0 effect GDP due to the high weight of IoS in GDP)
Because;
IoP = 0.148*0.4 = 0.0592 or 0.1 to 1 dp Construction = 0.059*0.9 = 0.0531 or 0.1 to 1 dp IoS = 0.786*0.1 =
0.0786 or 0.1 to 1 dp
Table 2 shows the latest monthly and revised quarterly output figures that fed into the second estimate of GDP
for Quarter 4 (Oct to Dec) 2015 published on 25 February 2016.
Page 11 of 20
Table 2: GDP component tables, chained volume measures, seasonally adjusted
Great Britain, January 2016
Percentage change (%)
Publication
GDP
Index of
Production
Construction
output
Index of
Services
Agriculture
Weight in Publication
GDP (%)
date
100.0
14.9
5.9
78.6
0.7
Latest
periods
Most recent period on a
year earlier
Most recent period on the
previous period
25 Feb Q4 2015
1.9
0.5
Q3 2015
2.1
0.4
9 Mar Q4 2015
0.8
-0.4
Q3 2015
1.2
0.2
Q4 2015
1.0
0.3
Q3 2015
1.3
-1.6
25 Feb Q4 2015
2.2
0.7
Q3 2015
2.4
0.6
25 Feb Q4 2015
-1.8
0.6
Q3 2015
-0.1
0.2
11 Mar
Table source: Office for National Statistics
The second estimate of GDP published on 25 February 2016 contained an estimate for quarterly construction of
a decrease of 0.4%. This estimate has been revised within this release based upon updated survey responses
and is now estimated to be an increase of 0.3%. This upward revision of 0.7 percentage points does not revise
the growth rate of GDP to 1 decimal place, all other things being equal.
Page 12 of 20
8. New Orders for Construction – Quarter 4 (Oct to Dec) 2015
Figure 7: New Orders, quarterly time series, constant prices, seasonally adjusted (SA) index (2005 = 100)
Great Britain, January 2016
Source: Barbour ABI
Notes:
1. Survey: Construction: Output and Employment
It is estimated that the seasonally adjusted volume of all new orders decreased by 0.5% between Quarter 3 (July
to Sept) 2015 and Quarter 4 (Oct to Dec) 2015, to £12.5 billion. There were decreases in the volume of new
orders for infrastructure, private industrial and public other new work while all other work types showed increases.
The volume of new orders in new housing increased by 11.1% between Quarter 3 (July to Sept) 2015 and
Quarter 4 (Oct to Dec) 2015, with both public and private new housing reporting increases of 46.5% and 7.9%
respectively. It should be noted that the weight of public new housing is small at only 11% of total new housing.
The volume of new orders in infrastructure decreased by 27.8% in Quarter 4 (Oct to Dec) 2015 compared with
Quarter 3 (July to Sept) 2015, to a level of £2.2 billion, the lowest level since Quarter 4 (Oct to Dec) 2014.
The volume of all new orders in Quarter 4 (Oct to Dec) 2015 increased by 1.4% compared with the same period a
year ago. There were increases in all work types except public other new work and private industrial work.
The volume of new orders in 2015 increased by 2.8% compared with 2014. The largest increase was reported by
infrastructure (50.3%) which at £10.9 billion is at its highest level since records began in 1980. Also reporting
increases were private industrial (24.7%) and all other work (6.1%). These were offset by decreases in public
other new work, new housing and private commercial work which decreased by 22.7%, 4.7% and 3.7%
respectively.
Page 13 of 20
Table 3: Volume of new orders summary tables, quarterly time series, constant (2005) prices, seasonally
adjusted
Great Britain, Q4 (Oct to Dec 2015)
Type of Work
Most recent quarter on a year earlier
(% change)
Most recent quarter on the previous
quarter (% change)
Most recent
level (£m)
All New Work
1.4
-0.5
12,546
All New
Housing
6.7
11.1
3,726
-0.6
-4.6
8,820
6.7
11.1
3,726
Public
29.2
46.5
403
Private
4.5
7.9
3,323
-0.6
-4.6
8,820
1.7
-27.8
2,214
-19.2
-6.1
1,552
-6.3
-15.3
953
9.1
20.5
4,102
1. All New Work
All Other Work
1.1 New
Housing
All New
Housing
1.2 Other New
Work
All Other Work
Infrastructure
Excl
Infrastructure
Public
Private Industrial
Private Commercial
Table source: Barbour ABI
Users should note that there is a time lag between how long an order turns into output (if at all) and therefore an
assumption that improved new orders data will result in an improved output picture is a difficult assumption to
make.
Further, users should note that there may be some discontinuity in the data around Quarter 3 (July to Sept) 2013
where the Barbour ABI data were used for the first time to compile these statistics.
Page 14 of 20
9. Economic context
Construction output fell by 0.2% between December 2015 and January 2016, following a contraction in output of
-0.6% and growth of 2.1% in November 2015 and December 2015 respectively. The main contributions to the
decline in output in January 2016 came from a contraction in infrastructure, new housing activity in the public
sector and non-housing repair and maintenance, which were partly offset by growth in output from private
commercial activity and private housing repair and maintenance. Compared to December 2015, infrastructure
output fell by 8.6% on the month, while public new housing activity and non housing-repair and maintenance
declined by 10.6% and 1.5% respectively. This contrasted with growth in private commercial activity and private
repair and maintenance of 4.7% and 5.2% respectively. In broad terms, the elements that pulled down on growth
in January were in the public sector, while those that provided the impetus to growth were in the private sector.
Comparing the figures for January 2016 with January 2015, output fell by 0.8%, while the rate of construction
output growth for the 2015 calendar year as a whole was 3.4%. Although growth for 2015 as whole was more
positive that it has been in recent years, and is above the pre-downturn annual average, it is nevertheless lower
than the strong growth of 7.5% observed in 2014.
The recent weakness of construction output has come alongside a moderation of price pressure in the housing
market. The ONS House Price Index indicates UK house prices increased by 6.7% in the year to December
2015, down from 7.7% in the year to November 2015. This is consistent with the Nationwide report that indicates
that UK house prices increased by 4.4% in the year to January 2016, down from 4.5% in the year to December
2015.However, Halifax reported that prices in the three months to January 2016 were 9.7% higher than in the
same three months a year earlier, up from 9.5% in December 2015. This easing in house price growth has
coincided with a 2.8% decline in residential property transactions between December 2015 and January 2016
according to HM Revenue and Customs data .
The housing market has been characterised by constrained supply in recent times. According to the Bank of
England’s February inflation report , the supply of newly built houses has been constrained by a shortage in the
supply of skilled labour and materials. While the latest RICS construction market survey has reported that
shortages of building materials have eased, which should increase construction activity, labour and skill
shortages still remain a constraint on activity.
Between Q4 (Oct to Dec) 2014 and Q4 (Oct to Dec) 2015, GDP growth outpaced construction output growth;
GDP growth was 1.9% while construction output growth was 1.0%. While quarterly GDP growth remained broadly
similar throughout 2015, varying between 0.4% and 0.6% growth, construction output growth has been more
volatile, increasing by 1.9% in Q1 (Jan to Mar) 2015 and contracting by 1.6% in Q3 (July to Sept) 2015.
Investment in dwellings increased by 3.7% in the fourth quarter of 2015 compared to the previous quarter, and
this was largely driven by growth in investment in private sector dwellings, with a positive but much smaller
contribution from public sector dwellings. This is consistent with the public-private make-up of activity in the
construction industry and the measure of construction output, though there is likely to be something of a lag
between construction output and the corresponding investment measurement of that activity.
10. International perspective
Output in the construction industry follows the Eurostat Short Term Statistics (STS) regulation for production in
construction. Before any comparisons are made with the euro area or EU28, it is worth noting that the UK is the
only member state to follow the A method for compiling production in construction statistics .
The latest release of production in construction showed that construction output in the euro area (EA19)
decreased by 0.6% in December 2015 and decreased by 0.1% in the EU28 compared with November 2015. The
Great Britain estimate for December 2015 showed that construction output increased by 2.1%. It should be noted
that an accurate comparison cannot be made as Eurostat data are calculated on a 2010 = 100 basis, while Great
Britain data are calculated on a 2012 = 100 basis.
Page 15 of 20
Outside of the EU, the US Census Bureau release Value of construction put in place published on 1 March 2016,
showed provisional estimates of construction output in January 2016 increased by 1.5% compared with
December 2015 and increased by 10.4% compared with January 2015.
International comparisons
International construction comparisons are compiled by Eurostat. The estimates produced in this bulletin are
included in these comparisons. Further information can be found on the Eurostat web page.
11. Background notes
1. What’s new
Coverage of Standard Business Survey population extended
As described in Improving the Coverage of the Standard Business Survey Population published on 21
December 2015, the coverage of our Standard Business Survey population has been extended to include
a population of solely PAYE-based businesses which has been implemented in the construction output
January 2016 estimates.
This was the first Construction release to contain the extended population of solely PAYE based
businesses. We are carrying out additional quality assurance on the impact of this improvement which
could result in revisions in the February 2016 estimates published on 15 April 2016. We expect changes to
top level construction output to be negligible.
Leap year adjustments
A methodological note on leap year adjustments was published on 29 February 2016, explaining how leap
years might affect ONS time series and the methods used to adjust for them as part of seasonal
adjustment. The Economic Review March 2016 was published on 2 March 2016, providing further
commentary on the economy, GDP and leap year effects.
Construction consultation
A consultation to find out more about how construction prices are used has been launched today. This
consultation will provide ONS with better information on the types of price indices users require as well as
the breakdown of categories and regions.
The consultation can be found on the ONS consultation web page . For more information contact Kate
Davies ([email protected]).
2. Revision policy
Construction output conforms to the standard national accounts revision policy , which can be found on our
website. In line with this, the construction output release for January 2016 contains revisions back to
January 2015.
New orders data has a revision period back to Quarter 2 (Apr to June) 2013 and is not covered by the
national accounts revisions policy due to not directly feeding the national accounts.
Figures for the most recent months are provisional and subject to revision in light of (a) late responses to
the monthly business survey MBS (b) revisions to seasonal adjustment factors which are re-estimated
every period and (c) improved treatment of outliers.
3. Revisions
One indication of the reliability of the key indicators can be obtained by monitoring the size of revisions.
Analysis of the previously published quarterly seasonally adjusted chained volume measure series has
shown that revisions to construction data are small. Generally these quarterly revisions are less than 1
Page 16 of 20
percentage point when compared with the final revised period five quarters after initial publication. This
indicates that the published estimates are a reliable snapshot of the output in the industry at the date of
publication.
The size and pattern of revisions for both output and new orders data which have occurred in the open
period can be found in the new revision triangles on the construction web page. Please note that these
indicators only report summary measures for revisions. The revised data may be subject to sampling or
other sources of error. Details about this revisions material can be found on our revisions page .
It should be noted that due to seasonal adjustment taking place on a short span of data points used to
interpret the seasonal effects, there is potential for increased revisions until the seasonal pattern is
established within the time series. The seasonal pattern is generally established after 60 months in a
monthly time series.
Please note that a monthly seasonally adjusted chained volume series is not available pre-2010. This is
due to monthly data not being available for this period. These data are a requirement for creating previous
year’s prices from which chain linked volume measures are created.
4. Use of the data
Output in the construction industry estimates are widely used both internally and externally and have been
identified by legal requirement and user engagement surveys.
The main users of data from the output of the construction industry dataset are: - UK national accounts Eurostat, the statistical office of the European Union, in order to comply with statutory legislation on shortterm business statistics (STS). Short-term business statistics provide information on the economic
development of four major domains: industry, construction, retail trade and other services - Industry
analysts requiring estimates of the construction industry output of Great Britain - Trade associations
making UK and international comparisons and to forecast trends in the construction industry - Other
government departments including; the Department for Business, Innovation and Skills (BIS), HM Treasury
(HMT), Department for Communities and Local Government (DCLG) and the Office for Budgetary
Responsibility (OBR)
As well as being a main indicator of the performance of construction companies, the results of the survey
also contribute to the estimate of the gross domestic product of the UK, contributing approximately 5.9% of
GDP.
More information on the uses made of short-term economic statistics is available.
Page 17 of 20
5. Methods
Our monthly construction output survey measures output from the construction industry in Great Britain. It
samples 8,000 businesses, with all businesses employing over 100 people or with an annual turnover of
more than £60 million receiving a questionnaire by post every month.
Estimates are based on output data collected through the monthly Construction Output Survey. Response
rates at the time of publication are included for the current month, and the 3 months prior. The response
rates for those historical periods are updated to reflect the current level of response, incorporating data
from late returns. There are 2 response rates included, with 1 percentage for the amount of turnover
returned, and the other percentage for the amount of questionnaire forms.
Table 4: Overall response rates (%)
Great Britain
Year Period
Turnover Questionnaire
2016 January
81.1
71.8
2015 December
91.9
77.7
November
92.9
71.1
October
91.5
79.1
Table source: Office for National
Statistics
Since the 1950s, New Orders in Construction data had been collected from a sample survey of
businesses; originally monthly and then quarterly. There were some known quality issues with the survey
data as:
the coverage of the survey was unknown
new orders allocated to regions were not always accurately recorded
The new orders data are now supplied under contract by Barbour ABI. Barbour ABI provide us with
improved coverage and regional splits of new orders in construction data.
6. Quality
The latest quality and methodology report for the output of the construction industry estimates and quality
and methodology report for new orders in the construction industry estimates can be found on our website.
7. Relevant links
Modelling Construction Statistics Deflators
Impact of quarterly employment question on monthly survey response
Government Statistical Service (GSS) uncertainty guidance
Annual Construction publication Construction Statistics, No. 15, 2014 Edition
Analysis of the construction industry
UK Statistics Authority assessment
Disclosure control policy
Types of Construction work
National Accounts and related statistics work plan
Page 18 of 20
8. Further information
Releases on construction output and employment prior to the transfer to ONS can be found on the BIS
website.
9. User engagement
The user engagement section contains results of the survey held in April 2011 regarding users' satisfaction
and use of the new orders and construction output surveys.
We published a summary of initial responses to the Short-term Indicators National Accounts Survey on 9
February 2015.
10. General information
Interpreting the data
When making comparisons it is recommended that users focus on chained volume measures or constant
price (volume), seasonally adjusted estimates as these show underlying movements rather than seasonal
movements.
Construction output estimates are subject to revision because of:
late responses to the construction output survey
revisions to seasonally adjusted factors which are re-estimated every quarter
annual updating of the inter-departmental business register (IDBR) that forms the basis of the
sampling for the construction output survey; this occurs in April and can have an effect on the results
published in May
Definitions and explanations
Definitions of terminology found within the main statistical bulletin are available.
11. Code of Practice for Official Statistics
National Statistics are produced to high professional standards which are set out in the Code of Practice
for Official Statistics . They undergo regular quality assurance reviews to ensure that they meet customer
needs and are produced free from any political interference.
12. Publication policy
Details of the policy governing the release of new data are available from the Media Relations Office .
13. Accessing data
The Output in the Construction Industry statistical bulletin and relevant time series datasets are available to
download free from the Office for National Statistics website at 9.30am on the day of publication.
14. Further information and user feedback
As a user of our statistics, we would welcome feedback on this release, in particular on the content, format
and structure. For further information about this release, or to send feedback on our publications, please
contact us using the following information.
Page 19 of 20
15. Declaration
Details of the policy governing the release of new data are available by visiting www.statisticsauthority.gov.
uk/assessment/code-of-practice/index.html or from the Media Relations Office email: media.relations@ons.
gsi.gov.uk
These National Statistics are produced to high professional standards and released according to the
arrangements approved by the UK Statistics Authority.
Page 20 of 20
1A.A
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
INDEX NUMBERS BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV38
80.8
78.5
76.3
71.6
76.7
MV39
45.8
48.3
54.3
51.4
51.9
MV3A
193.1
196.7
202.9
181.2
185.0
MV3B
92.6
100.4
112.4
113.3
112.5
MV3C
85.2
87.4
90.0
90.2
90.1
MV3D
110.9
103.6
99.4
96.2
91.0
MV3E
116.6
119.1
117.6
118.1
123.3
MV3F
115.7
114.0
111.3
110.2
110.9
MV3G
88.4
89.3
88.8
93.5
102.1
MV3H
100.6
100.4
98.9
100.9
105.9
MV3I
93.2
94.6
95.8
96.6
98.3
86.3
106.7
129.5
132.2
134.7
86.7
81.8
71.4
68.4
63.1
65.7
82.4
92.6
83.3
76.5
146.8
155.0
159.7
156.5
169.6
116.2
112.0
123.5
118.1
128.2
95.6
101.4
111.0
107.8
110.6
86.3
97.6
107.1
106.4
101.8
133.5
130.5
126.7
115.4
108.3
114.7
117.8
119.5
112.3
106.0
108.8
111.8
106.9
109.6
109.9
111.2
114.3
112.4
110.6
107.8
104.0
109.0
114.7
111.9
112.8
147.7
114.6
78.7
94.8
103.4
135.0
106.9
78.5
99.3
106.7
62.2
69.1
79.2
105.6
114.4
75.2
83.7
101.3
137.9
127.5
165.6
128.2
89.9
103.2
93.5
141.1
142.8
106.9
109.0
111.6
114.5
108.4
91.8
109.6
112.2
96.5
99.3
96.6
107.0
98.3
105.6
106.7
93.3
104.7
105.6
102.4
104.1
94.5
105.5
103.1
112.5
116.2
104.9
93.9
100.1
107.4
110.2
99.7
99.8
101.6
115.2
112.2
97.4
105.8
108.2
100.0
108.8
134.9
146.3
100.0
108.5
136.2
141.4
100.0
103.1
96.9
125.8
100.0
90.9
88.5
86.9
100.0
92.5
105.4
116.4
100.0
100.5
106.8
105.7
100.0
101.4
110.4
117.5
100.0
96.0
97.4
97.4
100.0
102.4
110.8
110.7
100.0
100.3
106.3
106.2
100.0
103.6
108.4
104.8
100.0
101.9
107.4
105.5
100.0
101.6
109.2
112.9
Public
housing
Private
housing
Total
new
housing
Infrastructure
1997
1998
1999
2000
2001
MV36
47.0
38.1
33.0
41.5
42.5
MV37
92.8
93.8
84.3
94.2
88.0
MVL7
83.7
82.7
74.1
83.7
78.9
2002
2003
2004
2005
2006
48.0
54.6
65.6
61.7
72.7
95.9
119.7
145.4
149.7
150.1
2007
2008
2009
2010
2011
84.0
75.9
77.5
117.5
120.0
2012
2013
2014
2015
100.0
106.9
141.3
121.5
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
1A.Q
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
INDEX NUMBERS BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV38
74.0
78.5
78.4
75.8
MV39
46.7
51.3
53.1
56.7
MV3A
183.3
193.1
192.2
171.5
MV3B
113.3
110.2
110.4
116.0
MV3C
87.8
90.0
90.9
91.7
MV3D
91.6
92.8
88.6
91.0
MV3E
125.0
124.6
121.5
122.1
MV3F
112.2
112.5
108.8
110.2
MV3G
98.3
102.2
101.0
106.8
MV3H
104.5
106.7
104.3
108.1
MV3I
96.3
98.5
98.3
100.2
82.2
81.6
88.4
93.2
84.2
85.9
91.4
85.5
59.2
63.7
68.6
71.4
149.9
140.7
149.0
147.8
115.2
115.3
117.1
117.1
92.8
93.4
98.0
98.4
87.5
85.6
84.4
87.6
123.8
131.7
135.7
143.0
109.7
113.3
115.0
120.6
108.8
107.3
108.2
110.9
109.0
109.8
111.1
115.1
101.2
101.9
105.5
107.2
109.3
112.7
122.5
134.1
97.7
100.8
109.2
119.3
85.2
83.6
79.8
78.4
74.1
79.1
85.0
91.6
149.4
149.3
155.3
166.0
110.8
109.5
111.0
116.4
97.9
98.7
101.7
107.4
86.3
96.0
105.8
102.4
121.8
135.3
132.9
131.8
107.9
119.9
122.7
120.6
110.7
112.5
113.6
110.6
109.2
115.6
117.5
114.9
104.8
107.5
110.3
113.2
65.3
66.7
66.2
64.4
142.4
144.7
146.9
147.6
127.1
129.2
130.8
131.1
74.3
73.2
70.7
67.2
94.9
94.1
92.0
89.4
167.9
161.3
157.2
152.3
122.4
125.2
124.6
121.7
111.3
112.2
111.4
109.2
109.6
106.1
104.4
108.2
133.9
124.1
127.1
121.9
124.9
117.5
118.6
116.9
112.8
105.3
103.2
106.2
118.1
110.6
110.0
110.9
117.0
114.9
114.1
113.0
2005 Q1
Q2
Q3
Q4
61.8
60.6
59.3
65.2
148.5
152.4
149.9
147.8
131.3
134.1
131.9
131.4
68.6
66.9
68.1
70.1
87.8
85.1
81.0
79.4
149.8
155.6
158.5
162.1
119.7
118.9
116.4
117.4
108.5
108.5
106.9
107.4
112.9
112.3
100.9
99.4
119.0
115.4
114.5
112.8
117.0
114.5
109.6
107.9
112.6
110.3
108.7
106.9
114.4
112.0
108.8
107.1
113.7
112.9
110.7
110.4
2006 Q1
Q2
Q3
Q4
68.4
71.8
74.8
75.9
147.1
149.1
151.4
152.8
131.4
133.8
136.2
137.5
67.7
62.8
61.0
60.8
78.8
76.8
75.7
74.9
169.9
167.6
168.1
172.9
122.3
125.0
130.2
135.3
109.0
109.1
111.1
113.2
99.8
98.9
105.3
103.2
112.7
110.9
105.4
104.2
108.1
106.6
105.5
104.0
107.2
111.8
108.0
112.6
107.3
109.1
106.6
108.3
111.5
112.3
112.7
114.7
2007 Q1
Q2
Q3
Q4
83.9
85.7
83.8
82.6
152.8
149.7
146.5
141.6
139.1
137.0
134.1
129.9
60.0
61.1
62.9
65.0
74.6
74.8
75.6
75.9
175.4
174.0
162.8
150.5
137.9
140.8
140.3
145.4
114.5
115.1
114.0
114.4
102.8
95.4
92.0
95.9
106.6
107.6
102.5
105.4
105.4
103.3
98.8
102.0
114.6
111.6
110.5
113.1
110.0
107.4
104.6
107.5
116.2
115.6
113.9
115.3
2008 Q1
Q2
Q3
Q4
79.2
78.1
76.1
70.3
134.6
122.1
108.3
93.4
123.6
113.3
101.9
88.8
67.5
70.2
71.9
66.9
80.2
82.3
85.9
86.3
148.4
132.4
123.1
108.9
149.5
144.2
144.3
133.0
115.2
110.8
108.2
99.4
96.3
102.6
100.4
97.9
105.1
108.0
103.5
110.5
102.0
106.1
102.4
106.1
117.2
121.9
116.9
108.9
109.6
114.0
109.7
107.4
116.5
115.2
111.9
105.3
2009 Q1
Q2
Q3
Q4
65.9
68.9
81.0
94.3
82.2
79.0
75.0
78.6
79.0
77.0
76.2
81.8
68.4
74.5
79.7
94.2
87.4
95.1
106.1
116.5
93.8
87.5
86.3
92.2
120.5
113.2
101.3
92.7
92.3
91.4
90.0
93.4
91.3
95.2
102.0
97.7
95.8
92.2
98.4
86.9
94.2
93.2
99.7
90.7
105.3
102.7
110.5
101.1
99.7
98.0
105.1
95.9
97.8
96.6
98.3
97.1
2010 Q1
Q2
Q3
Q4
101.1
116.9
125.6
126.3
83.1
96.5
100.0
99.7
86.7
100.6
105.1
105.0
106.9
111.7
105.6
98.0
127.9
142.3
140.6
140.8
97.0
105.7
118.1
92.0
102.0
108.2
114.3
111.5
102.3
111.7
114.1
110.4
106.7
109.4
106.0
105.8
94.8
103.2
111.6
109.3
98.8
105.3
109.7
108.1
89.8
95.2
93.5
96.9
94.4
100.3
101.7
102.6
99.2
107.4
109.4
107.4
2011 Q1
Q2
Q3
Q4
122.5
125.7
117.4
114.5
100.7
106.4
104.9
101.6
105.1
110.3
107.4
104.2
108.8
119.4
114.1
115.3
138.0
132.8
124.2
115.0
92.9
99.1
91.8
90.2
104.9
111.4
113.6
116.6
110.1
115.3
112.4
111.2
101.3
99.8
95.3
96.8
105.2
104.3
104.5
108.3
103.9
102.8
101.4
104.5
99.4
98.3
100.5
102.2
101.7
100.6
101.0
103.3
106.8
109.6
108.0
108.2
2012 Q1
Q2
Q3
Q4
101.9
98.0
100.0
100.1
105.0
99.9
95.4
99.7
104.4
99.5
96.3
99.8
98.3
93.2
102.1
106.3
106.3
102.6
97.6
93.5
93.7
98.9
100.7
106.8
103.0
104.2
94.4
98.3
102.5
100.2
97.3
100.0
96.7
99.2
102.2
101.9
106.3
99.2
98.2
96.4
103.1
99.2
99.5
98.2
101.8
101.1
96.8
100.4
102.4
100.1
98.2
99.3
102.5
100.2
97.6
99.7
2013 Q1
Q2
Q3
Q4
92.6
105.4
107.7
122.1
100.7
108.1
110.1
116.5
99.1
107.6
109.6
117.6
100.8
102.0
102.0
107.6
89.8
93.0
93.1
87.7
100.4
90.8
90.2
88.5
97.7
98.4
103.7
102.2
97.6
100.5
102.7
104.7
98.8
95.8
93.9
95.5
97.1
102.4
104.8
105.3
97.7
100.2
101.2
102.0
100.1
102.5
104.0
107.7
98.8
101.3
102.6
104.8
98.1
100.8
102.7
104.8
2014 Q1
Q2
Q3
Q4
132.9
140.4
148.5
143.2
127.5
131.5
139.5
141.2
128.6
133.3
141.3
141.6
96.5
92.5
96.0
102.6
86.3
87.8
89.6
90.4
99.1
108.4
107.9
106.4
106.2
106.5
106.6
107.9
107.3
108.6
111.9
113.7
97.8
97.9
97.5
96.3
111.6
109.7
112.6
109.3
106.9
105.8
107.5
105.0
104.9
108.9
110.0
109.9
106.0
107.3
108.7
107.4
106.8
108.1
110.7
111.3
2015 Q1
Q2
Q3
Q4
136.0
128.2
110.0
111.8
145.3
148.7
142.2
149.0
143.5
144.6
135.8
141.6
125.5
128.0
127.2
122.3
86.2
87.8
87.1
86.5
114.8
112.8
122.5
115.6
105.4
106.7
104.7
106.1
117.8
119.1
116.2
116.9
99.1
99.0
97.5
93.9
107.3
112.0
112.9
110.5
104.5
107.7
107.7
105.0
108.1
103.3
102.9
105.1
106.3
105.5
105.4
105.0
113.3
113.9
112.0
112.3
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MV36
36.7
44.5
42.6
46.1
MV37
84.1
87.2
90.3
90.3
MVL7
74.6
78.7
80.8
81.5
2002 Q1
Q2
Q3
Q4
47.7
46.5
49.2
48.5
90.7
90.3
98.1
104.3
2003 Q1
Q2
Q3
Q4
50.7
52.7
55.5
59.6
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
1A.M
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
INDEX NUMERS BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV38
103.9
108.5
104.5
103.3
102.8
88.0
MV39
141.1
141.8
138.9
143.3
141.9
137.4
MV3A
122.8
129.0
102.4
92.1
94.4
89.6
MV3B
113.6
116.6
112.7
111.2
118.1
105.1
MV3C
113.2
116.3
112.9
112.7
114.7
103.7
MV3D
107.6
104.3
106.2
107.7
106.6
103.0
MV3E
109.0
111.0
114.8
109.5
109.8
108.5
MV3F
108.5
108.7
111.9
108.9
108.7
106.6
MV3G
90.6
93.6
96.3
98.2
97.8
94.7
MV3H
99.7
101.3
104.2
103.7
103.4
100.7
MV3I
108.0
110.5
109.6
109.2
110.4
102.6
99.2
102.0
113.9
105.5
107.6
117.7
100.1
108.9
117.5
116.9
120.5
120.9
134.0
138.1
141.8
133.9
131.3
133.1
90.7
91.9
95.9
95.2
97.6
104.5
101.6
103.7
109.4
109.7
110.2
114.4
104.9
108.8
116.5
112.8
114.0
118.9
90.4
102.4
111.2
99.9
98.1
101.3
98.5
103.2
113.8
104.1
103.4
105.3
95.8
103.0
112.9
102.7
101.7
103.9
92.7
95.8
109.5
97.4
99.1
98.5
94.3
99.5
111.2
100.1
100.4
101.3
100.8
105.2
114.5
107.9
108.8
112.1
106.5
105.8
102.5
99.5
102.3
103.0
107.8
107.3
107.0
102.9
105.6
104.0
116.6
114.0
111.7
108.1
116.4
121.4
128.5
123.6
120.5
110.7
111.8
122.7
91.2
93.0
91.2
93.2
93.6
83.7
113.0
112.5
115.5
114.7
120.8
114.2
113.4
112.0
111.8
108.3
112.8
112.4
95.7
95.6
94.6
96.1
97.4
97.0
102.4
104.8
106.2
108.5
109.4
107.2
100.2
101.7
102.3
104.3
105.4
103.8
100.2
100.7
100.7
100.2
102.9
103.4
100.2
101.2
101.5
102.3
104.2
103.6
108.3
107.8
107.9
106.0
109.5
109.0
108.6
97.7
99.6
99.8
96.8
97.3
101.4
101.5
112.1
98.5
101.3
99.9
102.8
100.7
109.7
98.7
100.4
99.4
100.7
97.0
97.3
94.4
93.2
92.1
109.2
103.1
106.5
105.1
105.2
97.5
92.3
93.6
95.1
95.7
103.7
97.3
102.8
101.3
105.0
103.7
108.2
100.7
102.8
100.2
104.5
100.2
102.3
98.0
95.3
96.0
98.9
95.2
103.6
98.9
97.6
110.9
110.4
97.6
105.4
94.6
96.8
105.9
106.5
96.8
104.8
96.1
96.1
100.9
108.3
98.7
105.0
99.6
96.4
103.4
107.4
97.7
104.9
97.8
100.4
101.4
105.6
99.3
103.3
97.9
Jul
Aug
Sep
Oct
Nov
Dec
102.9
97.1
99.9
99.3
100.0
101.1
96.3
94.5
95.3
100.4
100.8
98.0
97.6
95.0
96.2
100.2
100.6
98.6
92.7
112.0
101.8
111.1
109.5
98.2
98.4
98.5
96.0
97.1
94.8
88.6
101.9
97.8
102.3
107.8
106.2
106.2
96.0
95.9
91.4
97.5
99.9
97.4
96.5
99.3
96.1
101.4
101.6
97.0
103.0
101.9
101.7
103.4
103.5
98.6
104.8
98.5
91.2
96.7
97.4
95.1
104.2
99.6
94.7
98.9
99.4
96.3
100.6
96.1
93.7
100.7
104.9
95.4
102.4
97.9
94.2
99.8
102.1
95.9
98.8
98.8
95.4
100.8
101.8
96.6
2013 Jan
Feb
Mar
Apr
May
Jun
85.5
93.3
99.0
99.3
102.7
114.2
97.2
102.7
102.3
106.1
106.4
111.8
94.9
100.9
101.6
104.8
105.6
112.3
97.2
101.5
103.5
101.6
101.7
102.6
86.0
91.2
92.1
91.3
94.9
93.0
103.1
102.4
95.7
92.6
89.8
90.0
98.5
97.8
96.8
97.9
99.8
97.4
95.6
98.6
98.7
99.3
100.6
101.6
98.1
99.1
99.0
99.5
95.5
92.3
95.4
97.9
98.0
101.3
103.7
102.2
96.3
98.3
98.3
100.7
101.0
98.8
97.7
100.6
101.9
100.6
105.4
101.6
97.0
99.5
100.1
100.7
103.1
100.2
96.1
99.0
99.2
99.8
101.6
101.1
Jul
Aug
Sep
Oct
Nov
Dec
107.7
106.7
108.8
121.9
122.9
121.5
109.7
112.2
108.3
116.2
113.1
120.2
109.3
111.1
108.4
117.3
115.0
120.4
104.0
106.4
95.5
113.1
106.6
103.2
93.1
91.2
94.9
88.0
87.7
87.5
88.4
98.4
83.9
86.2
87.9
91.4
102.0
103.7
105.3
104.7
101.5
100.4
102.4
104.2
101.6
106.5
103.6
104.2
90.8
96.1
94.7
97.0
93.9
95.6
104.8
104.4
105.3
107.4
106.5
102.1
100.1
101.6
101.8
103.9
102.2
99.9
103.8
106.3
101.9
111.2
106.7
105.3
101.9
103.9
101.8
107.5
104.4
102.6
102.2
104.1
101.7
106.9
103.9
103.6
2014 Jan
Feb
Mar
Apr
May
Jun
129.4
132.2
137.1
129.8
144.7
146.8
131.2
124.1
127.2
131.6
130.6
132.2
130.9
125.7
129.1
131.3
133.4
135.1
98.9
97.5
93.2
92.8
94.6
90.2
87.6
85.5
85.8
90.6
85.5
87.2
93.8
99.2
104.4
107.0
108.1
110.1
104.9
105.5
108.2
108.2
106.3
105.1
107.9
106.3
107.6
109.0
108.6
108.2
101.6
95.8
95.9
99.9
96.5
97.5
111.1
112.3
111.4
111.7
109.5
108.1
107.9
106.8
106.2
107.7
105.1
104.5
106.1
106.0
102.7
108.9
107.7
110.2
107.0
106.4
104.5
108.3
106.4
107.3
107.5
106.3
106.4
108.7
107.8
107.9
Jul
Aug
Sep
Oct
Nov
Dec
146.1
150.6
148.8
145.1
140.2
144.2
139.3
138.8
140.4
139.3
142.8
141.5
140.6
141.1
142.1
140.4
142.3
142.0
95.2
94.6
98.0
98.6
102.4
106.8
88.0
91.1
89.8
90.1
90.6
90.3
106.2
108.3
109.2
107.7
104.1
107.4
106.8
105.5
107.6
105.1
108.3
110.4
111.2
111.4
112.9
111.7
113.9
115.5
97.2
98.4
96.9
95.6
97.9
95.4
110.5
116.0
111.2
111.2
109.6
107.3
106.1
110.1
106.4
105.9
105.7
103.3
107.7
111.1
111.1
109.2
111.5
109.0
106.9
110.6
108.7
107.5
108.5
106.1
109.6
111.1
111.3
110.1
111.8
111.9
2015 Jan
Feb
Mar
Apr
May
Jun
137.7
136.5
133.7
137.6
123.9
123.0
146.6
144.0
145.5
153.2
149.0
143.8
144.8
142.5
143.1
150.1
144.0
139.7
124.9
122.5
129.2
132.8
128.0
123.2
85.5
88.3
84.7
86.9
87.0
89.4
118.2
114.3
111.8
115.4
112.4
110.6
107.4
107.7
101.0
104.5
106.1
109.4
118.7
117.9
116.6
120.9
118.6
117.8
98.5
97.6
101.3
97.7
99.6
99.7
107.6
104.0
110.2
111.1
111.1
113.9
104.5
101.9
107.2
106.6
107.2
109.2
109.8
106.4
108.0
104.6
103.5
101.9
107.1
104.1
107.6
105.6
105.4
105.6
114.3
112.6
113.2
115.0
113.5
113.1
Jul
Aug
Sep
Oct
Nov
Dec
115.2
103.9
110.9
106.4
106.1
122.9
142.6
142.0
142.0
145.9
148.3
152.6
137.1
134.4
135.8
138.1
139.9
146.7
130.8
126.6
124.2
121.8
116.4
128.8
88.2
86.4
86.5
84.8
86.8
87.8
128.7
117.8
120.8
119.7
116.7
110.4
105.6
105.3
103.2
107.4
106.2
104.7
118.1
115.6
115.0
116.2
115.4
119.1
97.4
96.9
98.2
94.7
92.3
94.7
113.2
111.9
113.7
112.7
111.1
107.8
107.9
106.9
108.5
106.7
104.8
103.4
105.1
100.5
103.1
104.2
104.8
106.3
106.5
103.7
105.8
105.5
104.8
104.8
113.6
111.0
111.5
112.0
111.3
113.6
2016 Jan
109.8
153.6
144.9
117.7
89.2
111.2
109.6
118.2
93.1
113.3
106.5
104.7
105.6
113.4
Public
housing
Private
housing
Total
new
housing
Infrastructure
2010 Jul
Aug
Sep
Oct
Nov
Dec
MV36
123.6
126.8
126.4
130.2
131.8
116.9
MV37
97.5
100.0
102.4
103.1
102.9
92.9
MVL7
102.7
105.3
107.1
108.5
108.7
97.7
2011 Jan
Feb
Mar
Apr
May
Jun
117.7
119.5
130.2
122.6
126.2
128.3
94.6
97.7
109.9
101.2
103.0
115.1
Jul
Aug
Sep
Oct
Nov
Dec
113.4
113.7
125.0
116.2
119.2
108.2
2012 Jan
Feb
Mar
Apr
May
Jun
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This is
due to the growth rates being calculated at a higher precision than 1 dp within the production system. This accuracy is truncated when transferred into
the published tables.
Housing
All
Work
1B.A
CONSTRUCTION OUTPUT: VOLUME NON-SEASONALLY ADJUSTED
INDEX NUMBERS BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV3L
83.7
81.3
79.4
74.3
79.5
MV3M
46.6
49.0
55.5
52.4
52.9
MV3N
196.1
199.7
206.9
184.2
188.2
MV3O
94.2
102.1
114.8
115.4
114.5
MV3P
87.3
89.6
92.2
92.4
92.1
MV3Q
113.1
105.6
101.7
98.2
92.8
MV3R
120.4
122.8
121.8
122.1
127.4
MV3S
117.9
117.0
115.1
114.1
115.8
MV3T
87.9
88.8
88.7
93.1
101.6
MV3U
103.1
103.1
102.1
103.8
108.8
MV3V
93.4
94.8
96.0
96.8
98.5
86.6
107.2
130.6
133.5
136.6
89.9
84.8
74.3
71.4
66.1
66.8
84.0
94.7
85.3
78.7
149.1
157.7
163.0
160.1
174.3
118.2
114.0
126.2
121.0
131.8
97.5
104.0
114.3
111.4
114.4
88.1
99.6
109.7
109.2
104.9
137.9
134.8
131.5
120.0
113.0
121.2
123.0
124.1
116.3
110.3
108.3
111.4
106.9
109.8
110.5
114.8
117.3
115.6
113.1
110.4
104.2
109.1
114.8
112.0
112.8
150.9
117.3
80.5
94.8
103.4
137.3
108.8
79.6
99.3
106.7
65.4
72.8
83.3
105.6
114.4
77.7
86.5
104.6
137.9
127.5
170.8
132.3
92.8
103.2
93.5
145.6
147.6
110.5
109.0
111.6
118.4
111.7
94.6
109.6
112.2
99.8
102.9
100.0
107.0
98.3
110.6
112.0
97.8
104.7
105.6
106.9
108.9
98.5
105.5
103.1
113.5
117.5
106.0
93.9
100.1
110.2
113.1
102.2
99.8
101.6
115.2
112.3
97.5
105.8
108.2
100.0
108.8
136.6
147.5
100.0
108.5
137.1
141.8
100.0
103.1
100.7
129.8
100.0
90.9
89.5
87.8
100.0
92.5
107.0
120.4
100.0
100.5
106.2
107.1
100.0
101.4
111.4
119.2
100.0
96.0
97.9
98.1
100.0
102.4
111.4
112.8
100.0
100.3
106.8
107.9
100.0
103.6
110.7
106.4
100.0
101.9
108.7
107.2
100.0
101.6
110.4
114.6
Public
housing
Private
housing
Total
new
housing
Infrastructure
1997
1998
1999
2000
2001
MV3J
45.4
36.7
32.0
40.1
41.0
MV3K
93.5
94.3
85.3
95.0
88.7
MVL8
83.9
82.9
74.7
84.1
79.2
2002
2003
2004
2005
2006
46.4
52.9
63.8
60.0
71.1
96.6
120.7
147.2
151.7
152.8
2007
2008
2009
2010
2011
82.3
74.5
76.0
117.5
120.0
2012
2013
2014
2015
100.0
106.9
139.4
118.5
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
1B.Q
CONSTRUCTION OUTPUT: VOLUME NON-SEASONALLY ADJUSTED
INDEX NUMBERS BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV3L
75.8
81.0
82.3
78.9
MV3M
46.7
51.8
54.4
58.7
MV3N
180.4
196.9
196.4
179.2
MV3O
111.9
111.1
113.9
121.1
MV3P
87.6
91.7
93.9
95.1
MV3Q
97.0
92.0
90.6
91.9
MV3R
126.7
128.4
127.8
126.7
MV3S
116.7
116.2
115.3
115.0
MV3T
97.0
99.0
102.9
107.6
MV3U
107.0
107.7
109.2
111.3
MV3V
95.1
97.9
99.8
101.4
81.8
81.7
89.6
93.3
86.2
89.1
96.2
87.9
59.0
64.5
70.1
73.8
147.5
142.0
152.4
154.6
114.9
116.6
120.0
121.5
93.1
94.7
100.8
101.4
92.8
85.9
86.1
87.3
126.1
135.6
142.1
147.7
115.0
118.9
123.3
127.4
107.8
104.2
110.0
111.2
111.4
111.7
116.8
119.5
100.1
101.2
106.9
108.3
109.5
112.5
124.6
136.0
97.8
100.8
110.5
119.8
87.4
86.8
84.4
80.5
74.1
80.1
86.8
94.9
149.0
149.8
158.4
173.6
111.1
110.6
113.7
120.7
99.0
100.5
105.3
111.4
92.0
97.0
107.7
101.8
124.2
138.7
139.0
137.4
113.4
124.7
128.5
125.4
109.7
108.8
115.5
111.6
111.6
116.9
122.1
118.6
103.8
106.8
111.8
114.1
65.2
67.8
63.5
58.5
142.8
146.1
149.9
149.8
127.4
130.6
132.7
131.7
76.2
76.8
75.2
69.0
95.6
96.1
94.4
92.5
169.5
163.0
160.1
159.4
123.3
127.7
128.1
125.8
113.4
115.5
115.5
113.0
117.5
108.1
106.0
107.2
136.5
128.4
133.1
127.9
130.1
121.6
124.0
120.9
111.7
102.8
105.4
107.5
121.1
112.3
114.9
114.3
116.3
114.3
115.3
113.5
2005 Q1
Q2
Q3
Q4
62.4
61.2
56.9
59.7
149.3
154.4
153.5
149.7
132.0
135.9
134.3
131.8
70.5
70.3
72.8
71.9
89.4
86.7
83.3
81.9
153.2
157.5
160.9
168.9
121.5
121.1
120.1
121.0
111.2
112.0
111.3
110.9
121.6
113.6
102.5
99.0
121.4
119.5
119.7
119.2
121.5
117.5
113.9
112.4
111.9
107.6
111.3
108.3
116.8
112.6
112.6
110.4
113.4
112.2
111.8
110.7
2006 Q1
Q2
Q3
Q4
69.3
72.4
72.4
70.2
148.3
152.0
155.9
155.2
132.6
136.2
139.3
138.3
69.8
66.5
65.5
62.5
80.7
78.2
78.3
77.6
175.5
170.2
171.0
180.5
125.0
127.4
135.4
139.7
112.2
112.6
115.9
116.8
107.5
99.9
108.1
104.1
114.8
115.4
110.2
111.6
112.3
110.2
109.5
109.1
106.8
109.3
111.2
114.7
109.6
109.8
110.3
111.9
111.2
111.5
113.8
114.9
2007 Q1
Q2
Q3
Q4
84.5
85.7
81.9
76.9
154.8
153.7
151.2
143.8
140.9
140.2
137.5
130.5
62.1
65.2
67.6
66.7
76.8
76.4
78.6
78.8
182.0
177.3
166.0
157.9
141.5
144.2
146.9
149.9
117.9
118.9
119.2
117.6
109.8
96.6
95.5
97.2
108.5
112.9
107.2
113.7
108.9
107.4
103.3
108.2
114.7
109.8
114.0
115.5
111.8
108.6
108.6
111.8
115.6
114.9
115.1
115.4
2008 Q1
Q2
Q3
Q4
79.2
77.7
75.0
65.9
136.8
125.5
112.3
94.4
125.4
116.0
104.9
88.8
70.1
75.1
77.3
68.7
82.5
84.1
89.3
90.2
154.1
133.9
126.0
115.3
153.6
147.8
152.2
136.8
118.3
114.0
113.1
101.5
101.6
104.7
106.1
99.2
106.6
113.5
108.5
119.3
104.9
110.5
107.7
112.6
117.7
120.0
120.9
111.3
111.2
115.2
114.2
111.9
115.6
114.5
113.5
105.5
2009 Q1
Q2
Q3
Q4
65.9
69.1
80.0
88.8
83.2
81.5
77.8
79.6
79.8
79.0
78.2
81.4
71.1
80.3
85.3
96.6
89.8
97.4
109.5
121.9
96.8
87.7
88.1
98.8
122.7
116.3
107.6
95.4
94.0
94.3
94.1
95.8
95.5
97.8
108.4
98.2
96.5
97.0
103.1
94.8
96.1
97.2
104.9
95.9
105.6
101.2
113.9
103.2
100.8
99.2
109.3
99.5
96.6
96.2
100.0
97.3
2010 Q1
Q2
Q3
Q4
101.2
117.7
126.7
124.2
77.6
97.3
102.1
102.2
82.3
101.4
107.0
106.6
104.1
114.2
107.3
96.5
123.9
137.8
146.7
143.3
95.3
103.3
119.5
94.7
98.4
106.8
119.5
111.2
98.7
111.2
117.7
111.0
110.6
105.7
106.9
104.8
88.0
102.5
113.1
115.3
95.6
103.6
111.0
111.8
88.3
93.1
99.7
94.3
92.0
98.4
105.4
103.2
96.1
106.3
113.0
108.0
2011 Q1
Q2
Q3
Q4
120.8
127.2
118.4
113.7
93.3
108.1
107.5
104.9
98.7
111.9
109.7
106.6
105.7
121.8
115.7
114.4
131.8
129.2
132.4
116.6
91.1
97.5
92.2
93.2
100.3
110.2
118.8
117.3
105.2
115.2
116.3
112.3
105.5
95.8
96.0
96.0
97.7
103.5
106.7
114.3
100.3
100.9
103.1
108.2
97.6
95.7
107.4
99.8
99.0
98.4
105.2
104.0
102.8
108.7
112.0
109.1
2012 Q1
Q2
Q3
Q4
99.4
99.9
101.2
99.6
95.8
102.4
98.3
103.6
96.5
101.9
98.9
102.8
95.2
94.4
103.7
106.8
100.6
99.5
104.8
95.1
90.7
98.3
102.2
108.8
97.7
102.9
99.2
100.2
96.9
100.2
101.0
101.9
101.0
94.8
102.5
101.7
98.4
98.4
100.8
102.3
99.3
97.2
101.4
102.1
99.7
98.2
103.9
98.3
99.5
97.7
102.6
100.2
97.9
99.2
101.6
101.3
2013 Q1
Q2
Q3
Q4
89.8
107.8
109.0
121.1
90.2
111.3
113.4
120.5
90.1
110.6
112.5
120.7
97.5
102.5
103.5
108.9
82.6
90.5
101.3
89.2
96.0
92.2
92.2
89.4
92.2
96.8
108.6
104.4
91.4
100.7
106.7
106.8
101.9
91.5
94.7
95.7
89.3
101.6
107.7
111.1
93.5
98.3
103.3
105.9
97.4
99.4
111.5
106.0
95.5
98.8
107.4
106.0
92.9
99.9
107.0
106.5
2014 Q1
Q2
Q3
Q4
123.3
144.2
147.9
142.3
116.6
138.6
144.4
146.7
117.9
139.7
145.1
145.8
96.6
97.5
101.4
107.3
79.7
87.6
98.3
92.6
96.7
112.0
114.3
105.2
99.3
104.4
110.4
110.5
101.0
110.9
116.8
116.9
102.3
94.2
99.0
96.2
104.4
109.7
116.1
115.2
103.7
104.5
110.3
108.8
104.6
108.5
119.0
110.8
104.1
106.5
114.6
109.8
102.2
109.2
116.0
114.2
2015 Q1
Q2
Q3
Q4
124.7
131.4
108.3
109.6
133.3
156.6
146.2
154.1
131.6
151.6
138.7
145.2
124.9
133.5
134.0
126.8
79.9
87.6
95.6
88.3
114.1
118.7
130.7
118.1
101.1
106.9
110.4
109.9
111.9
122.5
121.9
120.4
104.1
95.5
99.3
93.4
101.9
113.7
118.4
117.1
102.6
107.6
112.0
109.2
107.3
102.2
110.4
105.9
104.9
104.9
111.2
107.5
109.2
115.8
117.8
115.5
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MV3J
35.1
44.7
41.8
42.4
MV3K
83.4
88.1
92.1
91.2
MVL8
73.8
79.4
82.1
81.5
2002 Q1
Q2
Q3
Q4
46.3
47.1
47.9
44.3
90.6
90.3
99.9
105.4
2003 Q1
Q2
Q3
Q4
50.3
53.4
53.6
54.1
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period
on period growths for the same component differ between tables. This is due
to the growth rates being calculated at a higher precision than 1 dp within the
production system. This accuracy is truncated when transferred into the published tables.
Housing
All
Work
1B.M
CONSTRUCTION OUTPUT: VOLUME NON-SEASONALLY ADJUSTED
INDEX NUMBERS BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV3L
107.2
109.2
105.5
103.7
102.5
83.5
MV3M
144.7
151.5
144.0
150.8
150.0
129.1
MV3N
121.6
130.6
106.3
94.7
101.3
88.0
MV3O
117.6
123.0
117.9
116.3
120.1
97.3
MV3P
116.1
120.3
116.6
117.3
117.8
97.9
MV3Q
108.6
104.4
107.6
109.0
110.3
95.1
MV3R
112.1
109.5
117.6
117.6
120.5
107.9
MV3S
111.0
107.8
114.2
114.7
117.1
103.6
MV3T
94.7
102.2
102.1
99.0
96.9
87.1
MV3U
102.9
105.1
108.3
107.0
107.1
95.5
MV3V
111.0
114.5
113.4
113.4
113.7
96.9
87.5
95.9
112.8
103.0
109.2
123.3
91.0
101.9
124.3
116.1
123.0
126.4
115.9
128.7
150.7
126.8
128.4
132.2
82.6
89.3
101.3
87.4
100.6
104.5
90.1
96.4
114.3
104.9
108.5
117.3
93.1
101.8
120.7
109.0
114.2
122.4
83.6
104.3
128.5
93.1
94.3
100.0
88.7
93.9
110.7
99.6
102.4
108.3
87.0
97.4
116.7
97.5
99.7
105.5
84.4
93.8
114.4
94.6
95.6
97.0
85.7
95.6
115.6
96.1
97.7
101.3
90.2
99.4
118.7
104.0
107.8
114.3
109.4
106.5
106.5
108.3
108.3
97.9
110.0
108.3
110.7
110.2
110.7
99.0
119.6
114.2
113.2
109.9
117.7
115.5
134.0
136.3
127.0
117.9
118.4
113.5
89.9
94.1
92.4
98.0
99.8
82.0
116.4
118.7
121.2
122.3
124.3
105.2
116.5
116.3
116.0
114.5
117.0
105.5
96.0
96.1
96.0
98.5
102.0
87.5
106.7
104.2
109.3
117.5
120.2
105.2
103.1
101.5
104.8
111.2
114.1
99.3
104.6
110.3
107.2
101.7
102.7
94.9
103.8
105.8
106.0
106.5
108.5
97.1
111.6
112.3
112.1
111.4
113.7
102.3
98.5
95.0
104.6
99.3
98.2
102.2
87.0
92.1
108.2
95.5
104.1
107.5
89.3
92.7
107.5
96.3
102.9
106.4
90.6
90.4
104.5
92.7
94.5
96.0
92.9
96.8
112.1
99.4
103.7
95.4
80.8
93.0
98.4
89.8
109.2
95.9
91.2
93.0
109.0
99.1
107.4
102.1
90.3
93.0
107.6
96.6
103.1
100.8
87.4
100.6
115.0
88.4
99.4
96.5
86.0
101.2
108.1
93.3
104.6
97.4
86.5
101.0
110.4
91.7
102.8
97.1
86.6
98.5
113.8
95.5
100.9
98.0
86.5
99.8
112.1
93.6
101.9
97.6
88.8
95.6
109.3
95.4
102.6
99.5
Jul
Aug
Sep
Oct
Nov
Dec
101.9
98.8
102.8
101.1
101.7
96.0
100.1
94.9
99.9
111.3
107.6
91.7
100.5
95.6
100.5
109.3
106.4
92.6
94.9
112.1
104.1
114.9
112.0
93.4
104.1
110.1
100.3
105.0
99.5
80.8
104.6
97.2
104.8
112.3
109.5
104.5
100.3
101.4
95.9
108.3
104.7
87.6
100.1
103.0
100.0
109.6
106.1
90.0
103.0
102.4
102.2
108.2
109.2
87.7
110.2
98.3
93.9
107.1
107.9
92.0
107.8
99.7
96.7
107.5
108.4
90.5
105.4
105.7
100.6
103.6
105.2
86.1
106.6
102.6
98.6
105.6
106.8
88.4
102.6
102.8
99.4
108.0
106.4
89.4
2013 Jan
Feb
Mar
Apr
May
Jun
76.8
89.5
103.3
98.6
104.3
120.4
81.7
90.9
97.8
103.6
109.6
120.7
80.7
90.6
98.9
102.6
108.5
120.7
86.5
94.7
111.3
98.8
102.4
106.4
71.8
80.6
95.5
87.0
93.9
90.8
91.4
101.7
94.8
91.0
93.5
92.1
87.3
90.0
99.2
94.3
99.3
96.8
83.1
90.3
100.7
96.2
101.4
104.3
89.9
100.0
115.9
93.2
91.8
89.6
82.6
88.8
96.4
97.8
102.9
104.3
85.0
92.6
102.9
96.2
99.2
99.4
87.5
97.1
107.7
97.4
100.7
100.1
86.3
94.8
105.3
96.8
99.9
99.7
84.3
92.0
102.5
96.5
100.8
102.6
Jul
Aug
Sep
Oct
Nov
Dec
106.9
108.1
112.1
124.2
125.0
114.1
114.7
111.8
113.7
128.7
119.4
113.5
113.1
111.1
113.4
127.8
120.5
113.6
105.8
106.1
98.5
118.3
110.0
98.3
100.1
102.6
101.0
95.7
91.3
80.6
92.1
98.9
85.7
91.0
88.4
89.0
107.2
107.6
110.8
116.1
105.7
91.4
106.8
107.1
106.3
115.5
107.7
97.3
91.4
96.7
96.1
102.4
99.3
85.3
110.9
103.9
108.2
118.3
116.5
98.7
104.4
101.5
104.1
113.0
110.7
94.2
109.1
115.7
109.8
115.1
107.0
95.8
106.7
108.5
106.9
114.0
108.9
95.0
106.7
107.6
106.6
114.9
108.2
96.4
2014 Jan
Feb
Mar
Apr
May
Jun
106.9
122.0
141.0
126.7
144.9
160.9
112.5
110.1
127.1
132.3
135.8
147.9
111.4
112.4
129.9
131.2
137.6
150.5
89.8
94.6
105.5
96.5
99.8
96.2
72.5
75.8
90.8
88.6
85.6
88.5
78.8
101.3
109.9
108.2
114.3
113.5
92.2
96.3
109.5
104.0
104.0
105.2
93.5
97.7
111.7
108.1
110.5
114.2
95.5
96.9
114.4
94.1
92.5
96.1
96.6
102.7
114.0
109.0
109.0
111.1
96.2
100.8
114.1
104.0
103.5
106.1
96.4
102.4
114.9
108.1
106.4
110.9
96.3
101.6
114.5
106.0
104.9
108.5
94.6
99.2
112.8
107.3
108.3
112.0
Jul
Aug
Sep
Oct
Nov
Dec
143.7
149.4
150.7
148.0
142.4
136.6
148.4
137.6
147.1
156.6
147.5
135.9
147.5
140.0
147.8
154.9
146.5
136.0
102.2
98.5
103.6
110.0
108.7
103.3
96.7
101.3
96.9
99.7
93.6
84.6
117.0
110.7
115.1
105.3
106.4
104.0
112.3
106.6
112.3
116.9
111.5
103.0
118.2
113.9
118.5
123.1
117.9
109.7
99.3
97.0
100.6
100.7
101.8
86.2
118.9
113.2
116.1
123.4
116.8
105.3
112.3
107.7
110.9
115.8
111.8
98.9
116.9
118.9
121.1
118.2
112.7
101.4
114.6
113.2
115.9
117.0
112.2
100.1
116.8
113.6
117.5
120.8
115.7
106.0
2015 Jan
Feb
Mar
Apr
May
Jun
112.7
125.0
136.5
133.6
123.3
137.2
124.8
127.7
147.4
154.2
152.2
163.3
122.4
127.1
145.2
150.1
146.5
158.1
110.0
117.8
147.0
137.4
131.3
131.9
70.3
78.6
90.7
84.8
85.8
92.2
101.7
118.2
122.4
117.7
115.9
122.4
95.4
101.0
106.9
102.6
104.2
113.7
102.5
109.2
124.1
121.1
119.4
127.1
91.0
98.5
122.6
92.6
94.2
99.9
93.1
96.0
116.6
110.4
110.1
120.7
92.4
96.9
118.6
104.4
104.8
113.7
97.2
102.2
122.5
103.2
99.3
104.0
94.8
99.5
120.5
103.8
102.1
109.0
99.5
105.5
122.7
114.4
112.7
120.1
Jul
Aug
Sep
Oct
Nov
Dec
111.7
101.3
111.8
107.6
104.7
116.4
151.7
139.6
147.4
160.3
155.3
146.7
143.8
132.0
140.3
149.8
145.3
140.7
140.2
131.5
130.4
133.1
122.9
124.4
97.1
96.2
93.5
91.4
91.1
82.5
134.1
127.9
130.1
122.8
121.2
110.3
113.4
108.4
109.3
119.3
112.8
97.6
125.9
118.8
121.0
126.7
121.2
113.5
99.3
96.3
102.3
98.5
96.4
85.2
123.5
111.0
120.8
125.0
121.4
105.1
115.4
106.0
114.6
116.1
113.0
98.4
112.6
106.9
111.6
110.4
108.1
99.1
114.0
106.4
113.1
113.3
110.6
98.8
121.3
114.1
118.0
121.5
117.1
107.8
2016 Jan
85.1
129.1
120.3
101.8
72.0
92.4
95.6
100.1
84.8
97.2
93.0
91.0
92.0
97.0
Public
housing
Private
housing
Total
new
housing
Infrastructure
2010 Jul
Aug
Sep
Oct
Nov
Dec
MV3J
123.2
129.3
127.6
130.5
131.1
111.2
MV3K
99.5
101.1
105.8
110.4
107.1
89.2
MVL8
104.2
106.7
110.1
114.4
111.8
93.6
2011 Jan
Feb
Mar
Apr
May
Jun
108.3
117.8
136.5
121.6
127.1
132.9
82.3
90.4
107.0
98.5
104.8
120.9
Jul
Aug
Sep
Oct
Nov
Dec
112.2
115.6
127.3
117.6
120.3
103.1
2012 Jan
Feb
Mar
Apr
May
Jun
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This is
due to the growth rates being calculated at a higher precision than 1 dp within the production system. This accuracy is truncated when transferred into
the published tables.
Housing
All
Work
2A.A
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV3Y
11 900
11 571
11 248
10 554
11 302
MV3Z
5 103
5 378
6 053
5 734
5 788
MV42
7 405
7 544
7 784
6 947
7 098
MV43
21 667
23 482
26 291
26 492
26 301
MV44
62 367
64 008
65 925
66 045
65 984
MV45
8 604
8 037
7 709
7 461
7 056
MV46
18 000
18 377
18 149
18 232
19 032
MV47
26 762
26 364
25 742
25 492
25 664
MV48
20 302
20 525
20 411
21 484
23 451
MV49
46 389
46 274
45 584
46 522
48 817
MV4A
108 110
109 715
111 095
112 070
114 061
17 242
21 314
25 867
26 392
26 903
12 780
12 047
10 513
10 084
9 296
7 324
9 190
10 319
9 286
8 529
5 631
5 946
6 124
6 002
6 508
27 170
26 182
28 875
27 621
29 979
70 042
74 256
81 288
78 938
80 992
6 695
7 569
8 304
8 252
7 897
20 610
20 135
19 561
17 817
16 710
26 527
27 244
27 637
25 970
24 532
24 999
25 697
24 562
25 190
25 250
51 283
52 696
51 808
50 976
49 704
120 602
126 402
133 118
129 877
130 882
23 754
18 433
12 667
15 394
16 789
26 959
21 345
15 671
20 124
21 623
9 168
10 190
11 673
14 887
16 136
8 386
9 328
11 289
14 891
13 764
6 352
4 916
3 450
3 837
3 476
32 997
33 386
25 011
24 502
25 101
83 845
79 375
67 215
78 241
80 099
7 482
7 701
7 490
8 144
7 485
16 292
16 474
14 402
15 781
15 908
23 682
24 093
21 857
23 925
23 393
25 840
26 699
24 104
20 620
21 991
49 502
50 781
45 953
44 546
45 384
133 707
130 210
113 028
122 787
125 483
16 235
17 671
21 903
23 749
20 262
21 977
27 591
28 641
14 103
14 539
13 668
17 737
10 795
9 813
9 555
9 377
3 718
3 438
3 920
4 328
22 485
22 593
24 017
23 766
71 363
72 361
78 752
83 849
7 613
7 306
7 413
7 413
15 070
15 437
16 700
16 681
22 683
22 743
24 113
24 094
21 968
22 755
23 821
23 032
44 651
45 497
47 934
47 127
116 014
117 858
126 686
130 976
Public
housing
Private
housing
Total
new
housing
Infrastructure
1997
1998
1999
2000
2001
MV3W
1 832
1 484
1 287
1 614
1 652
MV3X
14 934
15 084
13 569
15 159
14 150
MVL9
16 719
16 513
14 805
16 721
15 756
2002
2003
2004
2005
2006
1 870
2 128
2 556
2 404
2 833
15 421
19 251
23 391
24 074
24 148
2007
2008
2009
2010
2011
3 272
2 957
3 017
4 730
4 833
2012
2013
2014
2015
4 027
4 307
5 688
4 892
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
2A.Q
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV3Y
2 727
2 893
2 889
2 793
MV3Z
1 300
1 429
1 481
1 579
MV42
1 758
1 852
1 844
1 644
MV43
6 622
6 441
6 456
6 782
MV44
16 078
16 479
16 633
16 794
MV45
1 776
1 799
1 717
1 765
MV46
4 825
4 808
4 689
4 710
MV47
6 489
6 504
6 295
6 375
MV48
5 648
5 872
5 799
6 132
MV49
12 038
12 295
12 024
12 460
MV4A
27 920
28 579
28 500
29 062
4 103
4 072
4 412
4 655
3 100
3 164
3 365
3 150
1 650
1 774
1 911
1 990
1 437
1 349
1 429
1 416
6 734
6 743
6 845
6 848
16 995
17 094
17 942
18 010
1 697
1 661
1 637
1 699
4 778
5 083
5 234
5 515
6 343
6 553
6 653
6 977
6 252
6 166
6 214
6 368
12 560
12 658
12 802
13 262
29 366
29 558
30 598
31 079
4 398
4 534
4 926
5 393
4 876
5 033
5 450
5 954
3 139
3 079
2 940
2 889
2 065
2 205
2 367
2 552
1 433
1 432
1 489
1 592
6 480
6 405
6 492
6 804
17 916
18 060
18 622
19 658
1 673
1 861
2 050
1 985
4 701
5 220
5 128
5 087
6 237
6 933
7 097
6 977
6 358
6 461
6 525
6 353
12 580
13 325
13 544
13 247
30 383
31 188
31 985
32 845
635
651
643
627
5 728
5 819
5 908
5 936
6 344
6 450
6 531
6 542
2 739
2 697
2 604
2 474
2 643
2 622
2 564
2 490
1 610
1 546
1 507
1 461
7 154
7 319
7 286
7 115
20 372
20 532
20 396
19 988
2 126
2 058
2 023
2 097
5 166
4 788
4 906
4 702
7 220
6 797
6 857
6 762
6 482
6 048
5 929
6 103
13 607
12 749
12 674
12 778
33 924
33 323
33 107
32 764
2005 Q1
Q2
Q3
Q4
602
590
577
635
5 973
6 128
6 030
5 944
6 554
6 696
6 585
6 558
2 526
2 464
2 510
2 584
2 446
2 370
2 257
2 213
1 436
1 492
1 520
1 554
7 000
6 949
6 807
6 866
19 855
19 861
19 563
19 659
2 189
2 177
1 957
1 929
4 593
4 454
4 418
4 352
6 768
6 624
6 336
6 242
6 468
6 338
6 244
6 140
13 180
12 907
12 544
12 346
32 991
32 752
32 106
32 028
2006 Q1
Q2
Q3
Q4
666
699
728
739
5 916
5 997
6 089
6 146
6 563
6 677
6 798
6 865
2 494
2 314
2 247
2 240
2 195
2 139
2 107
2 088
1 630
1 607
1 612
1 659
7 151
7 306
7 613
7 910
19 947
19 980
20 333
20 732
1 935
1 918
2 043
2 001
4 347
4 277
4 066
4 020
6 249
6 165
6 104
6 014
6 155
6 422
6 205
6 468
12 368
12 574
12 284
12 479
32 350
32 572
32 679
33 280
2007 Q1
Q2
Q3
Q4
816
834
817
805
6 145
6 021
5 893
5 696
6 943
6 837
6 694
6 485
2 209
2 250
2 315
2 394
2 079
2 085
2 106
2 115
1 680
1 668
1 561
1 443
8 060
8 231
8 203
8 502
20 954
21 067
20 873
20 950
1 993
1 848
1 782
1 859
4 116
4 153
3 956
4 067
6 096
5 972
5 712
5 902
6 584
6 412
6 347
6 497
12 676
12 375
12 056
12 394
33 695
33 539
33 042
33 431
2008 Q1
Q2
Q3
Q4
771
760
741
685
5 412
4 909
4 355
3 757
6 168
5 657
5 086
4 434
2 489
2 585
2 650
2 467
2 234
2 293
2 394
2 407
1 421
1 270
1 180
1 045
8 741
8 432
8 437
7 775
21 088
20 277
19 813
18 197
1 866
1 990
1 947
1 898
4 054
4 167
3 992
4 261
5 898
6 138
5 924
6 133
6 729
7 003
6 713
6 255
12 625
13 140
12 639
12 377
33 787
33 418
32 468
30 537
2009 Q1
Q2
Q3
Q4
640
670
788
918
3 308
3 178
3 017
3 164
3 942
3 844
3 804
4 082
2 519
2 747
2 936
3 471
2 437
2 649
2 957
3 246
899
839
827
884
7 048
6 620
5 923
5 419
16 898
16 737
16 479
17 102
1 771
1 846
1 979
1 895
3 696
3 556
3 796
3 353
5 450
5 393
5 766
5 248
6 050
5 901
6 347
5 806
11 495
11 291
12 112
11 054
28 362
28 006
28 504
28 156
2010 Q1
Q2
Q3
Q4
1 018
1 176
1 264
1 272
3 374
3 918
4 057
4 045
4 391
5 095
5 322
5 317
3 770
3 937
3 724
3 456
3 453
3 842
3 795
3 801
902
983
1 098
855
5 732
6 081
6 424
6 266
18 248
19 936
20 362
19 695
2 031
2 083
2 018
2 013
3 570
3 889
4 205
4 117
5 601
5 972
6 223
6 130
4 934
5 229
5 135
5 322
10 535
11 201
11 358
11 452
28 783
31 137
31 720
31 147
2011 Q1
Q2
Q3
Q4
1 233
1 266
1 182
1 153
4 088
4 320
4 257
4 124
5 322
5 585
5 439
5 277
3 837
4 211
4 023
4 064
3 723
3 583
3 352
3 105
863
921
854
838
5 897
6 264
6 388
6 552
19 642
20 565
20 056
19 836
1 928
1 899
1 814
1 843
3 962
3 929
3 935
4 082
5 891
5 828
5 750
5 925
5 458
5 400
5 522
5 611
11 348
11 228
11 272
11 536
30 990
31 793
31 327
31 372
2012 Q1
Q2
Q3
Q4
1 026
986
1 006
1 008
4 261
4 054
3 872
4 047
5 288
5 041
4 878
5 055
3 467
3 287
3 602
3 747
2 868
2 768
2 635
2 524
871
919
936
992
5 792
5 858
5 309
5 526
18 285
17 874
17 360
17 844
1 841
1 889
1 945
1 939
4 004
3 737
3 698
3 632
5 845
5 625
5 643
5 570
5 589
5 553
5 315
5 512
11 433
11 178
10 958
11 082
29 719
29 052
28 317
28 926
2013 Q1
Q2
Q3
Q4
932
1 061
1 084
1 229
4 088
4 387
4 468
4 728
5 020
5 448
5 552
5 957
3 552
3 596
3 596
3 795
2 423
2 511
2 512
2 368
933
844
839
822
5 490
5 530
5 827
5 745
17 419
17 929
18 326
18 687
1 880
1 823
1 787
1 817
3 660
3 858
3 950
3 969
5 539
5 681
5 737
5 786
5 495
5 631
5 711
5 917
11 034
11 311
11 448
11 703
28 454
29 241
29 774
30 390
2014 Q1
Q2
Q3
Q4
1 338
1 414
1 495
1 441
5 175
5 336
5 661
5 730
6 513
6 750
7 157
7 172
3 404
3 262
3 383
3 619
2 330
2 368
2 419
2 439
921
1 007
1 003
989
5 970
5 987
5 994
6 067
19 139
19 374
19 955
20 284
1 860
1 864
1 856
1 833
4 204
4 134
4 242
4 119
6 064
5 998
6 098
5 952
5 763
5 984
6 040
6 035
11 827
11 982
12 138
11 987
30 966
31 356
32 093
32 272
2015 Q1
Q2
Q3
Q4
1 369
1 290
1 107
1 125
5 899
6 033
5 771
6 046
7 268
7 324
6 878
7 172
4 425
4 513
4 485
4 313
2 325
2 369
2 349
2 333
1 067
1 049
1 138
1 075
5 923
5 995
5 885
5 963
21 009
21 250
20 735
20 856
1 887
1 884
1 855
1 788
4 041
4 221
4 255
4 164
5 928
6 105
6 110
5 952
5 935
5 675
5 651
5 772
11 862
11 780
11 760
11 724
32 871
33 030
32 496
32 580
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MV3W
357
432
414
449
MV3X
3 381
3 507
3 633
3 630
MVL9
3 726
3 928
4 035
4 067
2002 Q1
Q2
Q3
Q4
464
454
479
473
3 650
3 630
3 946
4 196
2003 Q1
Q2
Q3
Q4
493
514
541
580
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
2A.M
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV3Y
1 221
1 275
1 228
1 214
1 208
1 034
MV3Z
1 270
1 276
1 250
1 289
1 276
1 236
MV42
381
400
317
285
292
278
MV43
2 128
2 185
2 111
2 084
2 213
1 969
MV44
6 733
6 914
6 716
6 705
6 824
6 166
MV45
683
662
674
683
676
654
MV46
1 369
1 394
1 442
1 375
1 379
1 362
MV47
2 052
2 055
2 116
2 058
2 056
2 016
MV48
1 658
1 714
1 763
1 799
1 791
1 733
MV49
3 710
3 769
3 879
3 857
3 846
3 748
MV4A
10 442
10 683
10 594
10 562
10 670
9 915
1 675
1 723
1 924
1 781
1 817
1 987
1 176
1 279
1 381
1 374
1 417
1 421
1 205
1 242
1 276
1 204
1 181
1 198
281
285
297
295
303
324
1 904
1 943
2 050
2 056
2 064
2 144
6 241
6 472
6 928
6 710
6 782
7 073
573
650
705
634
623
643
1 237
1 296
1 429
1 308
1 299
1 322
1 811
1 946
2 134
1 941
1 922
1 965
1 698
1 755
2 005
1 782
1 814
1 804
3 508
3 701
4 139
3 724
3 735
3 769
9 750
10 173
11 068
10 434
10 517
10 842
1 440
1 431
1 387
1 347
1 384
1 393
1 821
1 812
1 806
1 737
1 784
1 756
1 370
1 339
1 313
1 270
1 368
1 427
1 156
1 112
1 084
996
1 006
1 104
283
288
283
289
290
259
2 116
2 108
2 164
2 150
2 263
2 139
6 746
6 660
6 650
6 441
6 710
6 685
607
607
600
609
618
616
1 286
1 316
1 334
1 362
1 374
1 346
1 893
1 922
1 934
1 972
1 992
1 961
1 835
1 844
1 844
1 835
1 884
1 892
3 728
3 766
3 778
3 807
3 876
3 854
10 474
10 426
10 428
10 248
10 586
10 539
364
328
334
335
325
326
1 371
1 373
1 517
1 332
1 370
1 352
1 736
1 701
1 851
1 667
1 695
1 679
1 184
1 140
1 143
1 109
1 095
1 083
982
927
958
945
946
877
286
290
295
297
321
301
1 927
1 898
1 968
1 943
2 028
1 887
6 114
5 956
6 215
5 961
6 086
5 827
605
609
627
604
657
627
1 225
1 392
1 387
1 225
1 323
1 189
1 830
2 001
2 014
1 829
1 980
1 816
1 759
1 847
1 983
1 807
1 922
1 824
3 588
3 848
3 997
3 637
3 902
3 639
9 703
9 804
10 212
9 598
9 988
9 466
Jul
Aug
Sep
Oct
Nov
Dec
345
326
335
333
336
339
1 303
1 279
1 290
1 358
1 364
1 326
1 648
1 605
1 625
1 691
1 699
1 665
1 090
1 316
1 196
1 306
1 287
1 154
885
886
864
874
853
797
316
303
317
334
329
329
1 799
1 798
1 713
1 828
1 873
1 825
5 737
5 908
5 715
6 032
6 041
5 771
653
646
645
656
657
625
1 316
1 237
1 145
1 214
1 223
1 195
1 969
1 883
1 791
1 870
1 880
1 820
1 842
1 758
1 715
1 844
1 921
1 747
3 811
3 641
3 506
3 714
3 800
3 567
9 548
9 549
9 220
9 747
9 841
9 338
2013 Jan
Feb
Mar
Apr
May
Jun
287
313
332
333
345
383
1 315
1 390
1 383
1 435
1 439
1 513
1 602
1 703
1 716
1 769
1 783
1 896
1 143
1 193
1 216
1 194
1 195
1 206
773
821
829
821
853
837
320
317
296
287
278
279
1 845
1 832
1 813
1 835
1 870
1 826
5 682
5 866
5 870
5 906
5 980
6 043
623
629
628
631
606
585
1 199
1 230
1 231
1 272
1 303
1 283
1 821
1 859
1 859
1 904
1 909
1 868
1 788
1 842
1 865
1 841
1 930
1 860
3 609
3 701
3 724
3 745
3 838
3 728
9 292
9 568
9 594
9 651
9 818
9 771
Jul
Aug
Sep
Oct
Nov
Dec
361
358
365
409
412
408
1 485
1 518
1 466
1 572
1 530
1 626
1 846
1 876
1 831
1 981
1 942
2 034
1 222
1 251
1 123
1 330
1 253
1 212
837
821
854
792
789
787
274
305
260
267
272
283
1 911
1 943
1 973
1 962
1 902
1 881
6 091
6 195
6 040
6 331
6 159
6 197
576
610
601
615
596
606
1 316
1 311
1 323
1 349
1 337
1 283
1 892
1 921
1 923
1 964
1 933
1 889
1 900
1 946
1 865
2 036
1 953
1 928
3 792
3 867
3 789
4 001
3 886
3 817
9 883
10 062
9 829
10 332
10 045
10 014
2014 Jan
Feb
Mar
Apr
May
Jun
434
444
460
436
485
493
1 776
1 679
1 720
1 781
1 767
1 788
2 210
2 123
2 180
2 216
2 253
2 281
1 162
1 146
1 096
1 091
1 112
1 060
788
769
772
815
769
784
291
307
323
331
335
341
1 965
1 978
2 028
2 027
1 991
1 969
6 416
6 323
6 399
6 480
6 460
6 434
644
608
608
634
612
619
1 395
1 410
1 399
1 403
1 375
1 357
2 039
2 018
2 007
2 036
1 987
1 976
1 942
1 940
1 881
1 994
1 972
2 017
3 981
3 958
3 888
4 031
3 958
3 993
10 397
10 281
10 288
10 511
10 418
10 427
Jul
Aug
Sep
Oct
Nov
Dec
490
506
499
487
471
484
1 884
1 878
1 900
1 884
1 932
1 914
2 374
2 383
2 399
2 371
2 403
2 398
1 119
1 112
1 152
1 159
1 204
1 255
791
819
808
811
815
813
329
336
338
334
322
333
2 001
1 977
2 016
1 969
2 029
2 069
6 615
6 627
6 713
6 644
6 773
6 868
617
624
615
606
621
605
1 388
1 457
1 397
1 396
1 377
1 347
2 005
2 081
2 012
2 002
1 997
1 953
1 972
2 033
2 034
1 998
2 041
1 996
3 977
4 115
4 046
4 000
4 039
3 948
10 592
10 742
10 759
10 644
10 812
10 816
2015 Jan
Feb
Mar
Apr
May
Jun
462
458
449
462
416
413
1 983
1 948
1 968
2 073
2 015
1 945
2 446
2 406
2 417
2 534
2 431
2 358
1 468
1 440
1 518
1 561
1 504
1 448
769
794
762
782
783
804
366
354
346
357
348
343
2 013
2 019
1 892
1 957
1 987
2 051
7 061
7 012
6 935
7 191
7 053
7 005
625
619
643
620
632
633
1 351
1 306
1 384
1 395
1 395
1 431
1 976
1 925
2 026
2 014
2 027
2 064
2 009
1 948
1 978
1 915
1 894
1 866
3 985
3 873
4 004
3 929
3 921
3 930
11 046
10 885
10 939
11 121
10 975
10 934
Jul
Aug
Sep
Oct
Nov
Dec
387
349
372
357
356
412
1 929
1 921
1 921
1 974
2 007
2 065
2 316
2 269
2 293
2 332
2 363
2 477
1 537
1 488
1 460
1 431
1 368
1 513
794
778
778
763
781
790
399
365
374
371
362
342
1 978
1 973
1 933
2 012
1 990
1 962
7 023
6 873
6 839
6 908
6 864
7 084
618
614
623
601
586
601
1 422
1 405
1 428
1 416
1 395
1 353
2 040
2 020
2 050
2 016
1 981
1 954
1 925
1 839
1 887
1 907
1 919
1 946
3 964
3 859
3 937
3 924
3 900
3 900
10 987
10 733
10 776
10 832
10 763
10 984
2016 Jan
369
2 078
2 447
1 383
802
345
2 055
7 031
590
1 423
2 014
1 917
3 931
10 962
Public
housing
Private
housing
Total
new
housing
Infrastructure
2010 Jul
Aug
Sep
Oct
Nov
Dec
MV3W
415
426
424
437
442
392
MV3X
1 319
1 353
1 385
1 395
1 392
1 257
MVL9
1 734
1 779
1 809
1 832
1 835
1 650
2011 Jan
Feb
Mar
Apr
May
Jun
395
401
437
411
424
431
1 280
1 322
1 487
1 370
1 393
1 557
Jul
Aug
Sep
Oct
Nov
Dec
381
382
419
390
400
363
2012 Jan
Feb
Mar
Apr
May
Jun
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This is
due to the growth rates being calculated at a higher precision than 1 dp within the production system. This accuracy is truncated when transferred into
the published tables.
Housing
All
Work
2B.A
CONSTRUCTION OUTPUT: VOLUME NON-SEASONALLY ADJUSTED
BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV4D
11 798
11 464
11 193
10 476
11 211
MV4E
5 028
5 294
5 987
5 657
5 708
MV4F
7 293
7 424
7 693
6 851
6 998
MV4G
21 188
22 951
25 811
25 941
25 746
MV4H
62 312
63 928
65 812
65 962
65 711
MV4I
8 610
8 039
7 743
7 476
7 068
MV4J
18 140
18 509
18 360
18 399
19 199
MV4K
26 750
26 548
26 104
25 875
26 266
MV4L
19 307
19 508
19 484
20 455
22 325
MV4M
46 056
46 056
45 587
46 330
48 592
MV4N
108 369
109 984
111 400
112 292
114 303
17 545
21 720
26 460
27 048
27 673
12 675
11 955
10 475
10 064
9 317
7 215
9 065
10 219
9 208
8 497
5 545
5 863
6 061
5 953
6 481
26 583
25 640
28 381
27 197
29 643
69 564
74 244
81 595
79 471
81 612
6 704
7 584
8 349
8 311
7 988
20 781
20 319
19 812
18 079
17 030
27 485
27 903
28 161
26 390
25 018
23 788
24 473
23 474
24 118
24 278
51 273
52 376
51 635
50 508
49 296
120 836
126 620
133 230
129 979
130 907
24 496
19 040
13 074
15 394
16 789
27 810
22 038
16 134
20 124
21 623
9 221
10 266
11 753
14 887
16 136
8 384
9 340
11 297
14 891
13 764
6 350
4 920
3 451
3 837
3 476
32 743
33 183
24 845
24 502
25 101
84 508
79 746
67 480
78 241
80 099
7 597
7 831
7 610
8 144
7 485
16 661
16 875
14 741
15 781
15 908
24 259
24 707
22 351
23 925
23 393
24 935
25 805
23 283
20 620
21 991
49 194
50 512
45 634
44 546
45 384
133 701
130 258
113 113
122 787
125 483
16 235
17 671
22 171
23 954
20 262
21 977
27 786
28 725
14 103
14 539
14 204
18 307
10 795
9 813
9 666
9 483
3 718
3 438
3 980
4 476
22 485
22 593
23 868
24 073
71 363
72 361
79 504
85 064
7 613
7 306
7 455
7 466
15 070
15 437
16 782
17 000
22 683
22 743
24 237
24 466
21 968
22 755
24 318
23 378
44 651
45 497
48 554
47 845
116 014
117 858
128 058
132 909
Public
housing
Private
housing
Total
new
housing
Infrastructure
1997
1998
1999
2000
2001
MV4B
1 830
1 480
1 288
1 614
1 651
MV4C
15 176
15 316
13 840
15 423
14 397
MVLR
17 006
16 796
15 128
17 037
16 048
2002
2003
2004
2005
2006
1 868
2 130
2 567
2 418
2 862
15 677
19 590
23 892
24 630
24 811
2007
2008
2009
2010
2011
3 314
2 998
3 059
4 730
4 833
2012
2013
2014
2015
4 027
4 307
5 615
4 772
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
2B.Q
CONSTRUCTION OUTPUT: VOLUME NON-SEASONALLY ADJUSTED
BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV4D
2 671
2 858
2 901
2 782
MV4E
1 259
1 397
1 467
1 584
MV4F
1 677
1 830
1 826
1 666
MV4G
6 290
6 247
6 402
6 807
MV4H
15 635
16 355
16 754
16 968
MV4I
1 846
1 750
1 723
1 748
MV4J
4 773
4 837
4 814
4 773
MV4K
6 619
6 588
6 538
6 522
MV4L
5 329
5 439
5 650
5 907
MV4M
11 948
12 027
12 187
12 429
MV4N
27 583
28 382
28 942
29 397
4 144
4 140
4 536
4 725
3 040
3 143
3 392
3 100
1 592
1 740
1 891
1 992
1 371
1 320
1 417
1 437
6 457
6 554
6 743
6 830
16 604
16 897
17 980
18 084
1 767
1 635
1 639
1 662
4 752
5 109
5 355
5 565
6 519
6 745
6 994
7 227
5 919
5 720
6 041
6 108
12 438
12 465
13 035
13 335
29 042
29 362
31 015
31 418
4 445
4 566
5 058
5 521
4 952
5 104
5 598
6 066
3 081
3 060
2 975
2 840
2 001
2 161
2 343
2 560
1 385
1 392
1 473
1 614
6 243
6 218
6 393
6 788
17 661
17 934
18 782
19 867
1 751
1 846
2 050
1 937
4 681
5 225
5 238
5 175
6 432
7 070
7 288
7 112
6 026
5 976
6 344
6 127
12 458
13 047
13 632
13 239
30 119
30 981
32 414
33 106
657
682
639
589
5 796
5 932
6 084
6 080
6 453
6 614
6 723
6 669
2 686
2 707
2 650
2 432
2 580
2 593
2 549
2 497
1 576
1 515
1 488
1 482
6 929
7 178
7 199
7 074
20 224
20 607
20 609
20 154
2 236
2 057
2 017
2 039
5 143
4 836
5 015
4 818
7 379
6 893
7 031
6 857
6 137
5 644
5 790
5 903
13 516
12 537
12 822
12 760
33 740
33 144
33 431
32 915
2005 Q1
Q2
Q3
Q4
628
617
572
601
6 060
6 266
6 231
6 074
6 688
6 883
6 803
6 675
2 486
2 478
2 566
2 534
2 412
2 339
2 247
2 210
1 424
1 464
1 495
1 570
6 832
6 809
6 752
6 803
19 842
19 974
19 863
19 791
2 315
2 162
1 950
1 884
4 574
4 502
4 511
4 492
6 889
6 663
6 461
6 376
6 147
5 909
6 113
5 949
13 036
12 573
12 574
12 325
32 878
32 547
32 437
32 116
2006 Q1
Q2
Q3
Q4
698
728
728
707
6 018
6 168
6 327
6 299
6 716
6 897
7 055
7 006
2 460
2 344
2 309
2 205
2 179
2 111
2 112
2 095
1 632
1 582
1 589
1 678
7 024
7 159
7 610
7 851
20 010
20 092
20 676
20 834
2 047
1 902
2 058
1 981
4 324
4 346
4 153
4 206
6 371
6 248
6 211
6 187
5 865
6 006
6 106
6 302
12 236
12 254
12 317
12 489
32 246
32 346
32 993
33 323
2007 Q1
Q2
Q3
Q4
851
863
825
775
6 285
6 238
6 138
5 835
7 136
7 101
6 963
6 610
2 189
2 298
2 384
2 350
2 072
2 063
2 121
2 128
1 691
1 648
1 543
1 467
7 953
8 107
8 258
8 425
21 041
21 217
21 268
20 981
2 089
1 839
1 818
1 851
4 088
4 253
4 038
4 282
6 177
6 092
5 856
6 133
6 301
6 028
6 262
6 344
12 478
12 120
12 118
12 477
33 520
33 337
33 386
33 458
2008 Q1
Q2
Q3
Q4
797
782
755
664
5 553
5 095
4 559
3 833
6 350
5 878
5 314
4 497
2 471
2 648
2 725
2 422
2 226
2 269
2 411
2 434
1 432
1 244
1 171
1 072
8 633
8 306
8 554
7 690
21 113
20 344
20 175
18 114
1 934
1 992
2 019
1 887
4 016
4 276
4 087
4 496
5 950
6 268
6 106
6 384
6 464
6 590
6 641
6 111
12 413
12 858
12 746
12 494
33 526
33 202
32 921
30 609
2009 Q1
Q2
Q3
Q4
664
696
805
894
3 377
3 308
3 158
3 231
4 041
4 004
3 963
4 125
2 507
2 831
3 009
3 406
2 425
2 628
2 954
3 289
899
815
819
918
6 895
6 539
6 049
5 362
16 767
16 818
16 795
17 100
1 817
1 861
2 062
1 869
3 635
3 653
3 884
3 570
5 452
5 514
5 946
5 439
5 801
5 557
6 255
5 670
11 253
11 071
12 201
11 109
28 020
27 888
28 996
28 209
2010 Q1
Q2
Q3
Q4
1 019
1 185
1 275
1 251
3 149
3 951
4 145
4 149
4 168
5 136
5 420
5 400
3 671
4 027
3 784
3 404
3 345
3 718
3 960
3 867
886
960
1 111
880
5 530
6 002
6 717
6 253
17 601
19 843
20 993
19 804
2 105
2 011
2 034
1 994
3 314
3 863
4 260
4 344
5 419
5 874
6 295
6 338
4 851
5 115
5 474
5 181
10 269
10 989
11 768
11 520
27 870
30 832
32 761
31 323
2011 Q1
Q2
Q3
Q4
1 216
1 281
1 192
1 145
3 785
4 386
4 363
4 256
5 001
5 666
5 555
5 401
3 728
4 296
4 079
4 033
3 556
3 486
3 574
3 147
846
906
857
867
5 636
6 195
6 677
6 592
18 769
20 549
20 741
20 040
2 007
1 823
1 827
1 827
3 682
3 898
4 020
4 307
5 689
5 721
5 848
6 134
5 358
5 258
5 896
5 479
11 047
10 979
11 744
11 614
29 816
31 529
32 485
31 653
2012 Q1
Q2
Q3
Q4
1 000
1 006
1 018
1 003
3 887
4 155
3 990
4 203
4 887
5 160
5 008
5 206
3 356
3 328
3 656
3 764
2 715
2 686
2 829
2 566
843
914
950
1 011
5 494
5 784
5 576
5 631
17 295
17 871
18 020
18 178
1 922
1 804
1 952
1 936
3 708
3 709
3 798
3 855
5 630
5 512
5 750
5 791
5 473
5 391
5 705
5 399
11 103
10 903
11 455
11 190
28 398
28 774
29 475
29 368
2013 Q1
Q2
Q3
Q4
905
1 085
1 098
1 219
3 659
4 517
4 602
4 893
4 564
5 602
5 700
6 112
3 437
3 615
3 649
3 838
2 230
2 444
2 733
2 407
892
857
857
831
5 180
5 441
6 103
5 870
16 303
17 958
19 041
19 058
1 940
1 742
1 803
1 821
3 363
3 830
4 056
4 187
5 303
5 572
5 860
6 008
5 352
5 459
6 124
5 820
10 655
11 030
11 983
11 828
26 958
28 989
31 025
30 886
2014 Q1
Q2
Q3
Q4
1 241
1 452
1 489
1 433
4 731
5 627
5 860
5 953
5 972
7 079
7 349
7 386
3 407
3 438
3 575
3 783
2 151
2 364
2 652
2 500
899
1 041
1 062
978
5 585
5 869
6 205
6 210
18 013
19 791
20 843
20 857
1 947
1 793
1 884
1 831
3 935
4 134
4 373
4 340
5 882
5 927
6 257
6 171
5 743
5 958
6 534
6 083
11 625
11 885
12 790
12 254
29 638
31 675
33 634
33 111
2015 Q1
Q2
Q3
Q4
1 256
1 323
1 090
1 103
5 409
6 355
5 935
6 254
6 665
7 678
7 025
7 357
4 404
4 708
4 725
4 471
2 155
2 364
2 580
2 384
1 061
1 103
1 215
1 098
5 682
6 006
6 205
6 179
19 967
21 859
21 750
21 489
1 981
1 818
1 890
1 778
3 839
4 285
4 462
4 414
5 820
6 103
6 352
6 191
5 892
5 611
6 062
5 814
11 712
11 714
12 414
12 005
31 679
33 573
34 164
33 494
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MV4B
353
450
421
427
MV4C
3 383
3 574
3 738
3 702
MVLR
3 737
4 024
4 159
4 129
2002 Q1
Q2
Q3
Q4
466
474
482
446
3 677
3 666
4 054
4 279
2003 Q1
Q2
Q3
Q4
507
538
540
545
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
2B.M
CONSTRUCTION OUTPUT: VOLUME NON-SEASONALLY ADJUSTED
BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV4D
1 260
1 283
1 240
1 218
1 204
981
MV4E
1 302
1 363
1 296
1 357
1 349
1 161
MV4F
377
405
329
293
314
273
MV4G
2 204
2 304
2 210
2 179
2 250
1 824
MV4H
6 902
7 157
6 934
6 978
7 006
5 819
MV4I
689
662
683
691
700
603
MV4J
1 408
1 376
1 476
1 476
1 513
1 355
MV4K
2 097
2 038
2 159
2 168
2 213
1 958
MV4L
1 733
1 872
1 869
1 813
1 774
1 595
MV4M
3 831
3 910
4 028
3 981
3 986
3 552
MV4N
10 733
11 066
10 962
10 959
10 993
9 372
1 477
1 619
1 905
1 740
1 844
2 082
1 070
1 197
1 461
1 364
1 446
1 486
1 043
1 158
1 356
1 141
1 155
1 190
256
277
314
271
312
324
1 688
1 807
2 141
1 966
2 032
2 197
5 534
6 057
7 177
6 482
6 789
7 279
530
662
815
591
598
635
1 114
1 179
1 390
1 251
1 286
1 360
1 644
1 840
2 205
1 842
1 884
1 995
1 546
1 717
2 095
1 732
1 751
1 775
3 190
3 557
4 300
3 574
3 635
3 770
8 724
9 614
11 478
10 056
10 424
11 049
1 481
1 441
1 441
1 466
1 465
1 325
1 857
1 829
1 868
1 860
1 869
1 671
1 405
1 342
1 331
1 292
1 383
1 358
1 206
1 227
1 142
1 061
1 065
1 021
279
292
286
304
309
254
2 181
2 225
2 270
2 292
2 330
1 970
6 928
6 915
6 898
6 809
6 957
6 274
609
610
609
625
647
555
1 339
1 309
1 372
1 476
1 510
1 321
1 948
1 919
1 981
2 101
2 157
1 877
1 914
2 019
1 963
1 862
1 881
1 737
3 862
3 938
3 944
3 963
4 037
3 613
10 791
10 852
10 842
10 772
10 994
9 887
331
319
351
333
329
343
1 177
1 246
1 464
1 292
1 408
1 454
1 507
1 565
1 815
1 626
1 738
1 797
1 065
1 062
1 228
1 089
1 110
1 128
836
871
1 008
895
933
858
250
288
305
278
338
297
1 709
1 743
2 042
1 857
2 013
1 914
5 368
5 528
6 398
5 745
6 133
5 994
554
638
730
561
631
612
1 080
1 270
1 358
1 172
1 313
1 223
1 634
1 909
2 087
1 733
1 944
1 835
1 586
1 804
2 083
1 749
1 847
1 795
3 220
3 712
4 170
3 482
3 791
3 630
8 589
9 241
10 569
9 226
9 924
9 624
Jul
Aug
Sep
Oct
Nov
Dec
342
331
345
339
341
322
1 355
1 283
1 352
1 506
1 456
1 241
1 697
1 615
1 697
1 846
1 797
1 563
1 115
1 318
1 223
1 350
1 316
1 098
936
991
902
944
895
727
324
301
325
348
339
324
1 879
1 900
1 797
2 029
1 962
1 641
5 950
6 124
5 945
6 517
6 310
5 352
653
650
649
686
693
556
1 384
1 235
1 179
1 345
1 355
1 155
2 038
1 884
1 828
2 031
2 048
1 711
1 929
1 934
1 842
1 897
1 926
1 577
3 967
3 818
3 669
3 928
3 974
3 288
9 918
9 943
9 614
10 445
10 284
8 640
2013 Jan
Feb
Mar
Apr
May
Jun
258
300
347
331
350
404
1 105
1 230
1 324
1 401
1 482
1 633
1 363
1 531
1 670
1 732
1 832
2 037
1 016
1 112
1 308
1 161
1 204
1 250
646
725
859
782
844
817
283
315
294
282
290
285
1 636
1 686
1 859
1 766
1 860
1 814
4 945
5 369
5 990
5 724
6 030
6 204
570
635
735
591
582
569
1 037
1 116
1 210
1 228
1 292
1 309
1 607
1 750
1 946
1 819
1 875
1 878
1 602
1 778
1 971
1 783
1 843
1 833
3 210
3 529
3 917
3 601
3 718
3 711
8 154
8 897
9 906
9 325
9 748
9 915
Jul
Aug
Sep
Oct
Nov
Dec
359
363
376
417
419
383
1 551
1 513
1 538
1 741
1 616
1 535
1 910
1 875
1 914
2 158
2 035
1 918
1 244
1 247
1 157
1 391
1 293
1 155
900
923
909
861
821
725
285
307
266
282
274
276
2 009
2 017
2 077
2 176
1 981
1 713
6 349
6 369
6 323
6 867
6 404
5 786
580
614
610
650
630
541
1 393
1 305
1 359
1 486
1 463
1 239
1 973
1 919
1 968
2 135
2 093
1 780
1 996
2 118
2 010
2 107
1 959
1 754
3 969
4 036
3 978
4 242
4 052
3 534
10 318
10 405
10 301
11 109
10 456
9 321
2014 Jan
Feb
Mar
Apr
May
Jun
359
409
473
425
486
540
1 522
1 489
1 720
1 790
1 837
2 000
1 881
1 898
2 193
2 215
2 323
2 541
1 055
1 111
1 240
1 134
1 173
1 131
652
682
817
797
770
797
244
314
340
335
354
352
1 728
1 805
2 051
1 949
1 949
1 972
5 561
5 810
6 642
6 430
6 570
6 791
606
615
726
597
587
610
1 213
1 290
1 432
1 369
1 369
1 396
1 819
1 905
2 158
1 966
1 956
2 005
1 764
1 875
2 104
1 979
1 948
2 031
3 583
3 780
4 261
3 945
3 904
4 036
9 145
9 590
10 903
10 375
10 473
10 827
Jul
Aug
Sep
Oct
Nov
Dec
482
501
506
497
478
459
2 008
1 862
1 990
2 119
1 996
1 838
2 490
2 363
2 496
2 616
2 474
2 297
1 201
1 157
1 217
1 293
1 277
1 214
870
911
871
897
842
761
363
343
357
326
330
322
2 103
1 997
2 104
2 191
2 089
1 930
7 027
6 772
7 045
7 322
7 011
6 524
630
615
639
639
646
547
1 493
1 421
1 458
1 550
1 467
1 323
2 123
2 037
2 097
2 189
2 113
1 869
2 141
2 176
2 217
2 164
2 063
1 856
4 264
4 213
4 314
4 353
4 176
3 725
11 290
10 985
11 358
11 675
11 187
10 249
2015 Jan
Feb
Mar
Apr
May
Jun
378
419
458
448
414
461
1 689
1 727
1 994
2 086
2 059
2 210
2 067
2 147
2 452
2 535
2 473
2 670
1 292
1 384
1 727
1 615
1 543
1 550
633
707
816
762
772
829
315
366
379
365
359
379
1 787
1 892
2 004
1 923
1 952
2 131
6 094
6 495
7 377
7 200
7 100
7 559
578
625
778
587
597
634
1 169
1 206
1 465
1 386
1 383
1 516
1 747
1 831
2 242
1 973
1 980
2 150
1 779
1 871
2 242
1 889
1 817
1 904
3 526
3 702
4 484
3 863
3 797
4 054
9 620
10 197
11 862
11 062
10 897
11 614
Jul
Aug
Sep
Oct
Nov
Dec
375
340
375
361
351
391
2 052
1 889
1 994
2 168
2 101
1 985
2 427
2 228
2 369
2 529
2 453
2 375
1 647
1 545
1 532
1 564
1 445
1 462
873
866
841
822
819
742
416
396
403
380
376
342
2 125
2 032
2 049
2 236
2 114
1 829
7 488
7 067
7 195
7 532
7 207
6 750
630
611
649
625
612
541
1 551
1 394
1 517
1 570
1 524
1 320
2 181
2 004
2 166
2 195
2 136
1 860
2 062
1 956
2 044
2 020
1 980
1 814
4 243
3 961
4 210
4 215
4 116
3 674
11 731
11 028
11 404
11 747
11 323
10 424
2016 Jan
285
1 746
2 032
1 196
648
286
1 792
5 954
538
1 220
1 758
1 665
3 423
9 377
Public
housing
Private
housing
Total
new
housing
Infrastructure
2010 Jul
Aug
Sep
Oct
Nov
Dec
MV4B
413
434
428
438
440
373
MV4C
1 346
1 368
1 431
1 494
1 449
1 207
MVLR
1 760
1 802
1 859
1 932
1 888
1 580
2011 Jan
Feb
Mar
Apr
May
Jun
363
395
458
408
427
446
1 114
1 224
1 447
1 332
1 417
1 636
Jul
Aug
Sep
Oct
Nov
Dec
377
388
427
395
404
346
2012 Jan
Feb
Mar
Apr
May
Jun
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This is
due to the growth rates being calculated at a higher precision than 1 dp within the production system. This accuracy is truncated when transferred into
the published tables.
Housing
All
Work
3A.A
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
PERCENTAGE CHANGE ON SAME PERIOD A YEAR EARLIER
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV5J
−2.8
−2.8
−6.2
7.1
13.1
MV5K
5.4
12.6
−5.3
0.9
26.5
MV5L
1.9
3.2
−10.7
2.2
−20.7
MV5M
8.4
12.0
0.8
−0.7
3.3
MV5N
2.6
3.0
0.2
−0.1
6.1
MV5O
−6.6
−4.1
−3.2
−5.4
−5.1
MV5P
2.1
−1.2
0.5
4.4
8.3
MV5Q
−1.5
−2.4
−1.0
0.7
3.4
MV5R
1.1
−0.6
5.3
9.2
6.6
MV5S
−0.2
−1.5
2.1
4.9
5.1
MV5T
1.5
1.3
0.9
1.8
5.7
23.6
21.4
2.0
1.9
0.2
−5.7
−12.7
−4.1
−7.8
−1.4
25.5
12.3
−10.0
−8.1
−1.7
5.6
3.0
−2.0
8.4
−2.4
−3.6
10.3
−4.3
8.5
10.1
6.0
9.5
−2.9
2.6
3.5
13.1
9.7
−0.6
−4.3
−5.3
−2.3
−2.9
−8.9
−6.2
−2.5
2.7
1.4
−6.0
−5.5
−3.5
2.8
−4.4
2.6
0.2
2.3
2.8
−1.7
−1.6
−2.5
−0.4
4.8
5.3
−2.4
0.8
2.2
−22.4
−31.3
21.5
9.1
−3.3
−20.8
−26.6
28.4
7.4
−6.3
11.2
14.5
27.5
8.4
−12.6
11.2
21.0
31.9
−7.6
−21.6
−22.6
−29.8
11.2
−9.4
7.0
1.2
−25.1
−2.0
2.4
−10.4
−5.3
−15.3
16.4
2.4
−10.9
2.9
−2.7
8.7
−8.1
1.7
1.1
−12.6
9.6
0.8
−5.3
1.7
−9.3
9.5
−2.2
−3.0
3.3
−9.7
−14.5
6.6
−0.1
2.6
−9.5
−3.1
1.9
−1.6
−2.6
−13.2
8.6
2.2
−7.5
8.8
24.0
8.4
8.5
25.5
3.8
3.1
−6.0
29.8
−9.1
−2.6
−1.9
−7.5
14.0
10.4
0.5
6.3
−1.0
1.4
8.8
6.5
−4.0
1.5
−
2.4
8.2
−0.1
0.3
6.0
−0.1
3.6
4.7
−3.3
1.9
5.4
−1.7
1.6
7.5
3.4
Public
housing
Private
housing
Total
housing
Infrastructure
1998
1999
2000
2001
2002
MV5H
−19.0
−13.3
25.5
2.3
13.2
MV5I
1.0
−10.0
11.7
−6.7
9.0
MVM3
−1.2
−10.3
12.9
−5.8
9.4
2003
2004
2005
2006
2007
13.8
20.1
−5.9
17.9
15.5
24.8
21.5
2.9
0.3
−1.6
2008
2009
2010
2011
2012
−9.6
2.0
56.8
2.2
−16.7
2013
2014
2015
6.9
32.1
−14.0
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
3A.Q
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
PERCENTAGE CHANGE ON PREVIOUS QUARTER
2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV56
1.6
6.1
−0.1
−3.3
MV57
−6.3
9.9
3.6
6.6
MV58
0.4
5.3
−0.4
−10.9
MV59
0.8
−2.7
0.2
5.0
MV5A
−2.1
2.5
0.9
1.0
MV5B
3.3
1.3
−4.6
2.8
MV5C
8.2
−0.3
−2.5
0.4
MV5D
6.4
0.2
−3.2
1.3
MV5E
−0.8
4.0
−1.2
5.8
MV5F
2.6
2.1
−2.2
3.6
MV5G
−0.3
2.4
−0.3
2.0
0.9
−0.7
8.3
5.5
11.0
2.1
6.4
−6.4
4.5
7.5
7.7
4.1
−12.6
−6.1
5.9
−0.9
−0.7
0.1
1.5
−
1.2
0.6
5.0
0.4
−3.8
−2.2
−1.4
3.8
1.4
6.4
3.0
5.4
−0.5
3.3
1.5
4.9
1.9
−1.4
0.8
2.5
0.8
0.8
1.1
3.6
1.0
0.7
3.5
1.6
4.8
3.1
8.6
9.5
4.8
3.2
8.3
9.3
−0.4
−1.9
−4.5
−1.7
3.8
6.8
7.4
7.8
1.2
−0.1
4.0
6.9
−5.4
−1.2
1.4
4.8
−0.5
0.8
3.1
5.6
−1.6
11.3
10.1
−3.2
−14.8
11.0
−1.8
−0.8
−10.6
11.2
2.4
−1.7
−0.1
1.6
1.0
−2.6
−5.1
5.9
1.6
−2.2
−2.2
2.7
2.6
2.7
9.3
2.6
−1.2
−2.6
6.2
1.6
1.5
0.5
6.5
1.7
1.3
0.2
−5.2
−1.5
−3.4
−5.0
3.6
−0.8
−2.2
−2.9
1.2
−4.0
−2.5
−3.1
5.1
2.3
−0.5
−2.3
3.6
0.8
−0.7
−2.0
7.1
−3.2
−1.7
3.6
1.6
−7.3
2.5
−4.2
3.5
−5.9
0.9
−1.4
2.0
−6.7
−2.0
2.9
2.7
−6.3
−0.6
0.8
3.3
−1.8
−0.6
−1.0
2005 Q1
Q2
Q3
Q4
−4.0
−1.9
−2.1
9.9
0.6
2.6
−1.6
−1.4
0.2
2.2
−1.6
−0.4
2.1
−2.5
1.9
3.0
−1.8
−3.1
−4.8
−2.0
−1.7
3.9
1.9
2.2
−1.6
−0.7
−2.1
0.9
−0.7
−
−1.5
0.5
4.4
−0.6
−10.1
−1.5
−2.3
−3.0
−0.8
−1.5
0.1
−2.1
−4.3
−1.5
6.0
−2.0
−1.5
−1.7
3.1
−2.1
−2.8
−1.6
0.7
−0.7
−2.0
−0.2
2006 Q1
Q2
Q3
Q4
5.0
4.9
4.1
1.5
−0.5
1.4
1.5
0.9
0.1
1.7
1.8
1.0
−3.5
−7.2
−2.9
−0.3
−0.8
−2.5
−1.5
−0.9
4.8
−1.4
0.3
2.9
4.2
2.2
4.2
3.9
1.5
0.2
1.8
2.0
0.3
−0.8
6.5
−2.0
−0.1
−1.6
−4.9
−1.1
0.1
−1.4
−1.0
−1.5
0.3
4.3
−3.4
4.2
0.2
1.7
−2.3
1.6
1.0
0.7
0.3
1.8
2007 Q1
Q2
Q3
Q4
10.5
2.1
−2.0
−1.5
−
−2.0
−2.1
−3.3
1.1
−1.5
−2.1
−3.1
−1.4
1.8
2.9
3.4
−0.4
0.2
1.0
0.4
1.3
−0.7
−6.4
−7.5
1.9
2.1
−0.3
3.6
1.1
0.5
−0.9
0.4
−0.4
−7.3
−3.6
4.3
2.4
0.9
−4.7
2.8
1.4
−2.0
−4.4
3.3
1.8
−2.6
−1.0
2.4
1.6
−2.4
−2.6
2.8
1.2
−0.5
−1.5
1.2
2008 Q1
Q2
Q3
Q4
−4.2
−1.4
−2.5
−7.6
−5.0
−9.3
−11.3
−13.7
−4.9
−8.3
−10.1
−12.8
4.0
3.9
2.5
−6.9
5.6
2.6
4.4
0.5
−1.5
−10.7
−7.1
−11.5
2.8
−3.5
0.1
−7.9
0.7
−3.8
−2.3
−8.2
0.4
6.6
−2.2
−2.5
−0.3
2.8
−4.2
6.7
−0.1
4.1
−3.5
3.5
3.6
4.1
−4.1
−6.8
1.9
4.1
−3.8
−2.1
1.1
−1.1
−2.8
−5.9
2009 Q1
Q2
Q3
Q4
−6.5
4.7
17.6
16.4
−11.9
−3.9
−5.1
4.8
−11.1
−2.5
−1.0
7.3
2.1
9.0
6.9
18.2
1.2
8.7
11.6
9.8
−13.9
−6.8
−1.4
6.9
−9.4
−6.1
−10.5
−8.5
−7.1
−1.0
−1.5
3.8
−6.7
4.3
7.2
−4.2
−13.3
−3.8
6.8
−11.7
−11.1
−1.0
6.9
−9.0
−3.3
−2.5
7.6
−8.5
−7.1
−1.8
7.3
−8.7
−7.1
−1.3
1.8
−1.2
2010 Q1
Q2
Q3
Q4
10.9
15.6
7.5
0.6
6.6
16.1
3.5
−0.3
7.6
16.0
4.5
−0.1
8.6
4.4
−5.4
−7.2
6.4
11.3
−1.2
0.2
1.9
9.0
11.7
−22.1
5.8
6.1
5.6
−2.5
6.7
9.3
2.1
−3.3
7.2
2.6
−3.1
−0.2
6.5
8.9
8.1
−2.1
6.7
6.6
4.2
−1.5
−15.0
6.0
−1.8
3.6
−4.7
6.3
1.4
0.8
2.2
8.2
1.9
−1.8
2011 Q1
Q2
Q3
Q4
−3.0
2.6
−6.6
−2.4
1.1
5.7
−1.4
−3.1
0.1
5.0
−2.6
−3.0
11.0
9.8
−4.5
1.0
−2.0
−3.8
−6.5
−7.4
0.9
6.7
−7.3
−1.8
−5.9
6.2
2.0
2.6
−0.3
4.7
−2.5
−1.1
−4.2
−1.5
−4.5
1.6
−3.8
−0.9
0.2
3.7
−3.9
−1.1
−1.3
3.1
2.5
−1.1
2.3
1.6
−0.9
−1.1
0.4
2.3
−0.5
2.6
−1.5
0.1
2012 Q1
Q2
Q3
Q4
−11.0
−3.9
2.1
0.2
3.3
−4.9
−4.5
4.5
0.2
−4.7
−3.2
3.6
−14.7
−5.2
9.6
4.0
−7.6
−3.5
−4.8
−4.2
3.9
5.6
1.8
6.0
−11.6
1.1
−9.4
4.1
−7.8
−2.3
−2.9
2.8
−0.1
2.6
3.0
−0.3
−1.9
−6.7
−1.0
−1.8
−1.4
−3.7
0.3
−1.3
−0.4
−0.6
−4.3
3.7
−0.9
−2.2
−2.0
1.1
−5.3
−2.2
−2.5
2.2
2013 Q1
Q2
Q3
Q4
−7.5
13.8
2.2
13.4
1.0
7.3
1.8
5.8
−0.7
8.5
1.9
7.3
−5.2
1.2
−
5.5
−4.0
3.6
−
−5.7
−6.0
−9.6
−0.6
−1.9
−0.6
0.7
5.4
−1.4
−2.4
2.9
2.2
2.0
−3.0
−3.0
−2.0
1.7
0.8
5.4
2.4
0.5
−0.6
2.6
1.0
0.9
−0.3
2.5
1.4
3.6
−0.4
2.5
1.2
2.2
−1.6
2.8
1.8
2.1
2014 Q1
Q2
Q3
Q4
8.9
5.7
5.8
−3.6
9.5
3.1
6.1
1.2
9.3
3.6
6.0
0.2
−10.3
−4.2
3.7
7.0
−1.6
1.7
2.1
0.8
12.0
9.3
−0.4
−1.4
3.9
0.3
0.1
1.2
2.4
1.2
3.0
1.7
2.4
0.2
−0.4
−1.3
5.9
−1.7
2.6
−2.9
4.8
−1.1
1.7
−2.4
−2.6
3.8
0.9
−0.1
1.1
1.3
1.3
−1.2
1.9
1.3
2.3
0.6
2015 Q1
Q2
Q3
Q4
−5.0
−5.7
−14.2
1.6
2.9
2.3
−4.4
4.8
1.3
0.8
−6.1
4.3
22.3
2.0
−0.6
−3.8
−4.6
1.9
−0.8
−0.7
7.9
−1.7
8.5
−5.6
−2.4
1.2
−1.8
1.3
3.6
1.1
−2.4
0.6
3.0
−0.1
−1.5
−3.6
−1.9
4.5
0.8
−2.1
−0.4
3.0
0.1
−2.6
−1.7
−4.4
−0.4
2.1
−1.0
−0.7
−0.2
−0.3
1.9
0.5
−1.6
0.3
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MV54
−16.5
21.1
−4.3
8.4
MV55
−8.7
3.7
3.6
−0.1
MVM7
−9.5
5.4
2.7
0.8
2002 Q1
Q2
Q3
Q4
3.4
−2.3
5.5
−1.2
0.5
−0.5
8.7
6.3
2003 Q1
Q2
Q3
Q4
4.3
4.1
5.3
7.3
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
3A.M
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
PERCENTAGE CHANGE ON PREVIOUS MONTH
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV4Q
−9.6
4.4
−3.7
−1.2
−0.5
−14.4
MV4R
−1.1
0.5
−2.0
3.1
−1.0
−3.1
MV4S
−0.1
5.0
−20.6
−10.1
2.5
−5.0
MV4T
2.7
2.7
−3.4
−1.3
6.2
−11.0
MV4U
−1.5
2.7
−2.9
−0.2
1.8
−9.6
MV4V
−5.7
−3.1
1.8
1.4
−1.0
−3.3
MV4X
2.4
1.8
3.5
−4.6
0.3
−1.3
MV4Y
−0.5
0.2
2.9
−2.7
−0.1
−2.0
MV4Z
−8.9
3.4
2.9
2.0
−0.4
−3.2
MV52
−4.4
1.6
2.9
−0.6
−0.3
−2.5
MV53
−2.6
2.3
−0.8
−0.3
1.0
−7.1
1.5
2.8
11.7
−7.4
2.0
9.4
13.7
8.8
8.0
−0.5
3.1
0.3
−2.5
3.1
2.7
−5.6
−1.9
1.4
1.2
1.4
4.3
−0.8
2.6
7.0
−3.3
2.1
5.5
0.3
0.4
3.9
1.2
3.7
7.0
−3.1
1.1
4.3
−12.3
13.4
8.6
−10.1
−1.8
3.3
−9.1
4.8
10.2
−8.5
−0.6
1.8
−10.2
7.5
9.7
−9.0
−1.0
2.2
−2.0
3.4
14.3
−11.1
1.8
−0.5
−6.4
5.5
11.9
−10.0
0.3
0.9
−1.7
4.3
8.8
−5.7
0.8
3.1
−7.5
−0.7
−3.1
−2.9
2.8
0.7
−8.4
−0.5
−0.4
−3.8
2.7
−1.5
−3.5
−2.3
−2.0
−3.3
7.7
4.3
−3.5
−3.8
−2.5
−8.2
1.0
9.7
−12.7
2.0
−1.9
2.1
0.5
−10.6
−1.3
−0.4
2.6
−0.7
5.3
−5.5
−4.6
−1.3
−0.2
−3.1
4.2
−0.4
−5.5
−0.1
−1.1
1.6
1.4
−0.4
−2.7
2.3
1.4
2.1
0.8
−2.0
−3.6
1.5
0.6
1.9
1.0
−1.5
1.7
0.5
−
−0.5
2.7
0.5
−1.1
1.0
0.3
0.8
1.8
−0.6
−3.4
−0.5
−
−1.7
3.3
−0.4
0.3
−10.0
2.0
0.2
−3.0
0.5
−1.6
0.1
10.5
−12.2
2.8
−1.3
−1.2
−2.0
8.9
−9.9
1.7
−1.0
−17.0
−3.7
0.3
−3.0
−1.2
−1.2
−11.0
−5.5
3.3
−1.3
0.1
−7.3
10.3
1.4
1.6
0.7
8.3
−6.2
−9.9
−1.5
3.7
−1.3
4.4
−6.9
−8.5
−2.6
4.4
−4.1
2.1
−4.3
−1.8
0.7
3.0
−3.7
8.8
−4.6
−9.0
13.6
−0.4
−11.6
8.0
−10.2
−6.7
9.4
0.6
−9.2
8.3
−8.3
−7.1
5.0
7.4
−8.9
6.3
−5.1
−6.9
7.2
3.9
−9.0
7.3
−6.7
−7.9
1.0
4.2
−6.0
4.1
−5.2
Jul
Aug
Sep
Oct
Nov
Dec
5.8
−5.6
2.8
−0.6
0.7
1.1
−3.6
−1.8
0.9
5.3
0.4
−2.8
−1.8
−2.6
1.3
4.1
0.5
−2.0
0.7
20.8
−9.1
9.2
−1.4
−10.3
0.9
0.2
−2.6
1.2
−2.4
−6.5
4.8
−4.0
4.6
5.4
−1.5
−
−4.7
−0.1
−4.7
6.7
2.5
−2.5
−1.5
3.0
−3.3
5.6
0.1
−4.5
4.2
−1.1
−0.1
1.7
0.1
−4.8
10.7
−6.0
−7.4
6.0
0.7
−2.3
8.4
−4.4
−4.9
4.4
0.5
−3.2
1.0
−4.5
−2.5
7.6
4.2
−9.0
4.7
−4.4
−3.7
6.0
2.3
−6.1
0.9
−
−3.4
5.7
1.0
−5.1
2013 Jan
Feb
Mar
Apr
May
Jun
−15.4
9.1
6.1
0.3
3.4
11.2
−0.8
5.7
−0.5
3.8
0.2
5.1
−3.8
6.3
0.7
3.1
0.8
6.3
−1.0
4.5
1.9
−1.8
0.1
0.9
−3.0
6.1
1.0
−0.9
3.9
−2.0
−2.9
−0.7
−6.6
−3.2
−3.0
0.1
1.1
−0.7
−1.1
1.2
1.9
−2.4
−1.5
3.2
0.1
0.6
1.3
1.0
−0.5
1.0
−0.1
0.5
−4.1
−3.4
0.3
2.6
0.1
3.4
2.4
−1.5
−
2.1
−
2.4
0.2
−2.1
2.3
3.0
1.2
−1.3
4.8
−3.6
1.2
2.5
0.6
0.6
2.5
−2.9
−0.5
3.0
0.3
0.6
1.7
−0.5
Jul
Aug
Sep
Oct
Nov
Dec
−5.7
−0.9
2.0
12.1
0.8
−1.1
−1.9
2.2
−3.4
7.3
−2.7
6.3
−2.6
1.6
−2.4
8.2
−2.0
4.7
1.3
2.3
−10.3
18.4
−5.7
−3.3
0.1
−2.0
4.1
−7.3
−0.3
−0.2
−1.8
11.3
−14.7
2.7
2.0
4.0
4.7
1.6
1.6
−0.6
−3.0
−1.1
0.8
1.7
−2.5
4.8
−2.7
0.6
−1.5
5.8
−1.5
2.4
−3.2
1.8
2.6
−0.3
0.9
2.0
−0.9
−4.1
1.3
1.5
0.1
2.1
−1.6
−2.3
2.1
2.5
−4.2
9.2
−4.1
−1.3
1.7
2.0
−2.0
5.6
−2.9
−1.8
1.1
1.8
−2.3
5.1
−2.8
−0.3
2014 Jan
Feb
Mar
Apr
May
Jun
6.5
2.2
3.7
−5.3
11.4
1.5
9.2
−5.4
2.5
3.5
−0.7
1.2
8.7
−3.9
2.7
1.6
1.7
1.2
−4.1
−1.4
−4.4
−0.5
1.9
−4.7
0.2
−2.4
0.3
5.6
−5.7
2.0
2.7
5.8
5.2
2.5
1.0
1.9
4.4
0.7
2.5
−
−1.7
−1.2
3.5
−1.4
1.2
1.3
−0.3
−0.4
6.3
−5.6
0.1
4.2
−3.4
1.1
8.8
1.1
−0.8
0.3
−2.0
−1.3
8.0
−1.0
−0.5
1.4
−2.4
−0.5
0.7
−0.1
−3.0
6.0
−1.1
2.3
4.3
−0.6
−1.8
3.7
−1.8
0.9
3.8
−1.1
0.1
2.2
−0.9
0.1
Jul
Aug
Sep
Oct
Nov
Dec
−0.5
3.1
−1.2
−2.5
−3.4
2.8
5.4
−0.3
1.2
−0.8
2.5
−0.9
4.1
0.4
0.7
−1.2
1.3
−0.2
5.6
−0.6
3.6
0.6
3.9
4.3
0.9
3.5
−1.4
0.4
0.5
−0.3
−3.5
2.0
0.8
−1.4
−3.3
3.3
1.7
−1.2
2.0
−2.3
3.0
2.0
2.8
0.2
1.3
−1.0
1.9
1.4
−0.3
1.2
−1.5
−1.4
2.4
−2.5
2.3
5.0
−4.1
−0.1
−1.4
−2.1
1.5
3.8
−3.3
−0.5
−0.2
−2.2
−2.2
3.1
−
−1.8
2.2
−2.2
−0.4
3.5
−1.7
−1.1
1.0
−2.2
1.6
1.4
0.2
−1.1
1.6
−
2015 Jan
Feb
Mar
Apr
May
Jun
−4.5
−0.9
−2.0
2.9
−9.9
−0.7
3.6
−1.8
1.0
5.3
−2.8
−3.5
2.0
−1.6
0.5
4.9
−4.1
−3.0
16.9
−1.9
5.4
2.8
−3.6
−3.7
−5.3
3.2
−4.0
2.6
0.1
2.8
10.0
−3.3
−2.2
3.2
−2.5
−1.6
−2.7
0.3
−6.3
3.5
1.5
3.2
2.8
−0.7
−1.1
3.7
−1.9
−0.7
3.2
−0.9
3.8
−3.6
2.0
0.1
0.3
−3.3
5.9
0.8
−
2.6
1.2
−2.5
5.2
−0.6
0.6
1.8
0.7
−3.1
1.6
−3.2
−1.1
−1.5
0.9
−2.8
3.4
−1.9
−0.2
0.2
2.1
−1.5
0.5
1.7
−1.3
−0.4
Jul
Aug
Sep
Oct
Nov
Dec
−6.4
−9.8
6.7
−4.1
−0.3
15.9
−0.8
−0.4
−
2.8
1.6
2.9
−1.8
−2.0
1.1
1.7
1.3
4.9
6.1
−3.2
−1.9
−2.0
−4.4
10.6
−1.3
−2.0
0.1
−2.0
2.4
1.1
16.3
−8.4
2.5
−0.9
−2.5
−5.4
−3.5
−0.2
−2.0
4.1
−1.1
−1.4
0.3
−2.1
−0.5
1.0
−0.6
3.2
−2.4
−0.5
1.3
−3.5
−2.5
2.6
−0.6
−1.2
1.6
−0.9
−1.4
−3.0
−1.2
−1.0
1.5
−1.7
−1.8
−1.3
3.1
−4.4
2.6
1.1
0.6
1.4
0.9
−2.7
2.0
−0.3
−0.6
−
0.5
−2.3
0.4
0.5
−0.6
2.1
2016 Jan
−10.6
0.6
−1.2
−8.6
1.6
0.7
4.7
−0.8
−1.8
5.2
3.0
−1.5
0.8
−0.2
Public
housing
Private
housing
Total
new
housing
Infrastructure
2010 Jul
Aug
Sep
Oct
Nov
Dec
MV4O
3.2
2.6
−0.3
3.1
1.2
−11.3
MV4P
−2.1
2.6
2.3
0.8
−0.2
−9.7
MVM2
−0.9
2.6
1.7
1.3
0.1
−10.1
2011 Jan
Feb
Mar
Apr
May
Jun
0.6
1.6
9.0
−5.9
3.0
1.6
1.8
3.2
12.5
−7.9
1.7
11.7
Jul
Aug
Sep
Oct
Nov
Dec
−11.6
0.3
9.9
−7.0
2.6
−9.2
2012 Jan
Feb
Mar
Apr
May
Jun
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
3B.A
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
PERCENTAGE CHANGE ON SAME PERIOD A YEAR EARLIER BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV5J
−2.8
−2.8
−6.2
7.1
13.1
MV5K
5.4
12.6
−5.3
0.9
26.5
MV5L
1.9
3.2
−10.7
2.2
−20.7
MV5M
8.4
12.0
0.8
−0.7
3.3
MV5N
2.6
3.0
0.2
−0.1
6.1
MV5O
−6.6
−4.1
−3.2
−5.4
−5.1
MV5P
2.1
−1.2
0.5
4.4
8.3
MV5Q
−1.5
−2.4
−1.0
0.7
3.4
MV5R
1.1
−0.6
5.3
9.2
6.6
MV5S
−0.2
−1.5
2.1
4.9
5.1
MV5T
1.5
1.3
0.9
1.8
5.7
23.6
21.4
2.0
1.9
0.2
−5.7
−12.7
−4.1
−7.8
−1.4
25.5
12.3
−10.0
−8.1
−1.7
5.6
3.0
−2.0
8.4
−2.4
−3.6
10.3
−4.3
8.5
10.1
6.0
9.5
−2.9
2.6
3.5
13.1
9.7
−0.6
−4.3
−5.3
−2.3
−2.9
−8.9
−6.2
−2.5
2.7
1.4
−6.0
−5.5
−3.5
2.8
−4.4
2.6
0.2
2.3
2.8
−1.7
−1.6
−2.5
−0.4
4.8
5.3
−2.4
0.8
2.2
−22.4
−31.3
21.5
9.1
−3.3
−20.8
−26.6
28.4
7.4
−6.3
11.2
14.5
27.5
8.4
−12.6
11.2
21.0
31.9
−7.6
−21.6
−22.6
−29.8
11.2
−9.4
7.0
1.2
−25.1
−2.0
2.4
−10.4
−5.3
−15.3
16.4
2.4
−10.9
2.9
−2.7
8.7
−8.1
1.7
1.1
−12.6
9.6
0.8
−5.3
1.7
−9.3
9.5
−2.2
−3.0
3.3
−9.7
−14.5
6.6
−0.1
2.6
−9.5
−3.1
1.9
−1.6
−2.6
−13.2
8.6
2.2
−7.5
8.8
24.0
8.4
8.5
25.5
3.8
3.1
−6.0
29.8
−9.1
−2.6
−1.9
−7.5
14.0
10.4
0.5
6.3
−1.0
1.4
8.8
6.5
−4.0
1.5
−
2.4
8.2
−0.1
0.3
6.0
−0.1
3.6
4.7
−3.3
1.9
5.4
−1.7
1.6
7.5
3.4
Public
housing
Private
housing
Total
new
housing
Infrastructure
1998
1999
2000
2001
2002
MV5H
−19.0
−13.3
25.5
2.3
13.2
MV5I
1.0
−10.0
11.7
−6.7
9.0
MVM3
−1.2
−10.3
12.9
−5.8
9.4
2003
2004
2005
2006
2007
13.8
20.1
−5.9
17.9
15.5
24.8
21.5
2.9
0.3
−1.6
2008
2009
2010
2011
2012
−9.6
2.0
56.8
2.2
−16.7
2013
2014
2015
6.9
32.1
−14.0
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
3B.Q
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
PERCENTAGE CHANGE ON SAME PERIOD A YEAR EARLIER
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV6A
3.7
8.1
12.6
4.1
MV6B
−13.8
−2.7
8.1
13.8
MV6C
−0.1
7.5
7.5
−6.1
MV6D
−1.2
−3.9
−1.0
3.2
MV6E
−3.8
−1.2
2.4
2.3
MV6F
−10.4
−6.7
−6.2
2.6
MV6G
3.1
6.2
2.6
5.7
MV6H
−2.1
1.2
−0.6
4.5
MV6I
4.7
11.7
12.9
7.7
MV6J
1.3
6.4
6.0
6.2
MV6K
−1.9
1.6
3.7
3.8
10.1
3.7
9.4
14.4
13.7
9.4
16.5
12.8
26.9
24.1
29.1
26.0
−18.3
−27.1
−22.5
−13.9
1.7
4.7
6.0
1.0
5.7
3.7
7.9
7.2
−4.4
−7.7
−4.6
−3.7
−1.0
5.7
11.6
17.1
−2.2
0.8
5.7
9.4
10.7
5.0
7.2
3.8
4.3
3.0
6.5
6.4
5.2
3.4
7.4
6.9
20.5
24.9
24.8
28.5
18.9
23.6
23.5
27.9
1.2
−2.7
−12.6
−8.3
25.2
24.3
23.9
28.3
−0.3
6.1
4.3
12.4
−3.8
−5.0
−5.2
−0.6
5.4
5.7
3.8
9.2
−1.4
12.1
25.2
16.8
−1.6
2.7
−2.0
−7.8
−1.7
5.8
6.7
−
1.7
4.8
5.0
−0.2
0.2
5.3
5.8
−0.1
3.5
5.5
4.5
5.7
28.6
26.7
19.0
8.0
30.3
28.3
19.9
10.1
30.1
28.2
19.8
9.9
−12.7
−12.4
−11.4
−14.4
28.0
18.9
8.3
−2.4
12.4
8.0
1.2
−8.2
10.4
14.3
12.2
4.6
13.7
13.7
9.5
1.7
27.1
10.6
−1.3
5.6
9.9
−8.3
−4.3
−7.6
15.8
−2.0
−3.4
−3.1
1.9
−6.4
−9.1
−3.9
8.2
−4.3
−6.4
−3.5
11.7
6.8
3.5
−0.2
2005 Q1
Q2
Q3
Q4
−5.2
−9.4
−10.2
1.2
4.3
5.3
2.1
0.1
3.3
3.8
0.8
0.2
−7.7
−8.6
−3.6
4.4
−7.5
−9.6
−12.0
−11.2
−10.8
−3.5
0.9
6.4
−2.2
−5.1
−6.6
−3.5
−2.5
−3.3
−4.1
−1.6
3.0
5.8
−3.3
−8.0
−11.1
−7.0
−9.9
−7.4
−6.3
−2.6
−7.6
−7.7
−0.2
4.8
5.3
0.6
−3.1
1.2
−1.0
−3.4
−2.8
−1.7
−3.0
−2.2
2006 Q1
Q2
Q3
Q4
10.8
18.5
26.1
16.5
−1.0
−2.1
1.0
3.4
0.1
−0.3
3.2
4.7
−1.3
−6.1
−10.4
−13.3
−10.3
−9.8
−6.6
−5.6
13.5
7.7
6.0
6.7
2.2
5.1
11.8
15.2
0.5
0.6
3.9
5.5
−11.6
−11.9
4.4
3.8
−5.4
−4.0
−8.0
−7.6
−7.7
−6.9
−3.7
−3.7
−4.8
1.3
−0.6
5.3
−6.2
−2.6
−2.1
1.1
−1.9
−0.5
1.8
3.9
2007 Q1
Q2
Q3
Q4
22.5
19.2
12.2
8.9
3.9
0.4
−3.2
−7.3
5.8
2.4
−1.5
−5.5
−11.4
−2.8
3.0
6.9
−5.3
−2.6
−
1.3
3.1
3.8
−3.2
−13.0
12.7
12.7
7.8
7.5
5.1
5.4
2.7
1.1
3.0
−3.7
−12.8
−7.1
−5.3
−2.9
−2.7
1.2
−2.4
−3.1
−6.4
−1.9
7.0
−0.2
2.3
0.5
2.5
−1.6
−1.8
−0.7
4.2
3.0
1.1
0.5
2008 Q1
Q2
Q3
Q4
−5.6
−8.8
−9.3
−14.9
−11.9
−18.5
−26.1
−34.0
−11.2
−17.3
−24.0
−31.6
12.7
14.9
14.4
3.1
7.4
10.0
13.7
13.8
−15.4
−23.9
−24.4
−27.6
8.5
2.4
2.9
−8.6
0.6
−3.8
−5.1
−13.1
−6.3
7.7
9.3
2.1
−1.5
0.3
0.9
4.8
−3.3
2.8
3.7
3.9
2.2
9.2
5.8
−3.7
−0.4
6.2
4.8
−0.1
0.3
−0.4
−1.7
−8.7
2009 Q1
Q2
Q3
Q4
−16.9
−11.8
6.4
34.0
−38.9
−35.3
−30.7
−15.8
−36.1
−32.1
−25.2
−7.9
1.2
6.3
10.8
40.7
9.1
15.5
23.5
34.9
−36.7
−34.0
−29.9
−15.4
−19.4
−21.5
−29.8
−30.3
−19.9
−17.5
−16.8
−6.0
−5.1
−7.2
1.6
−0.2
−8.8
−14.7
−4.9
−21.3
−7.6
−12.1
−2.7
−14.4
−10.1
−15.7
−5.5
−7.2
−9.0
−14.1
−4.2
−10.7
−16.1
−16.2
−12.2
−7.8
2010 Q1
Q2
Q3
Q4
58.9
75.5
60.4
38.6
2.0
23.3
34.5
27.9
11.4
32.6
39.9
30.3
49.7
43.3
26.8
−0.4
41.7
45.0
28.3
17.1
0.2
17.2
32.7
−3.3
−18.7
−8.2
8.4
15.6
8.0
19.1
23.6
15.2
14.7
12.8
2.0
6.2
−3.4
9.4
10.8
22.8
2.8
10.7
7.9
16.8
−18.4
−11.4
−19.1
−8.3
−8.3
−0.8
−6.2
3.6
1.5
11.2
11.3
10.6
2011 Q1
Q2
Q3
Q4
21.2
7.6
−6.5
−9.3
21.2
10.2
4.9
1.9
21.2
9.6
2.2
−0.8
1.8
7.0
8.0
17.6
7.8
−6.7
−11.7
−18.3
−4.3
−6.3
−22.2
−2.0
2.9
3.0
−0.6
4.6
7.6
3.2
−1.5
0.7
−5.0
−8.8
−10.1
−8.4
11.0
1.0
−6.4
−0.8
5.2
−2.4
−7.6
−3.3
10.6
3.3
7.5
5.4
7.7
0.2
−0.8
0.7
7.7
2.1
−1.2
0.7
2012 Q1
Q2
Q3
Q4
−16.8
−22.1
−14.8
−12.6
4.2
−6.1
−9.1
−1.9
−0.6
−9.8
−10.3
−4.2
−9.6
−21.9
−10.5
−7.8
−23.0
−22.7
−21.4
−18.7
0.8
−0.2
9.7
18.4
−1.8
−6.5
−16.9
−15.7
−6.9
−13.1
−13.4
−10.0
−4.5
−0.6
7.2
5.2
1.0
−4.9
−6.0
−11.0
−0.8
−3.5
−1.9
−6.0
2.4
2.8
−3.7
−1.8
0.8
−0.4
−2.8
−3.9
−4.1
−8.6
−9.6
−7.8
2013 Q1
Q2
Q3
Q4
−9.2
7.6
7.7
21.9
−4.1
8.2
15.4
16.8
−5.1
8.1
13.8
17.8
2.4
9.4
−0.2
1.3
−15.5
−9.3
−4.7
−6.2
7.2
−8.2
−10.4
−17.1
−5.2
−5.6
9.8
4.0
−4.7
0.3
5.6
4.7
2.1
−3.5
−8.1
−6.3
−8.6
3.2
6.8
9.3
−5.2
1.0
1.7
3.9
−1.7
1.4
7.5
7.4
−3.5
1.2
4.5
5.6
−4.3
0.7
5.1
5.1
2014 Q1
Q2
Q3
Q4
43.5
33.2
37.9
17.3
26.6
21.6
26.7
21.2
29.7
23.9
28.9
20.4
−4.2
−9.3
−5.9
−4.6
−3.8
−5.7
−3.7
3.0
−1.3
19.3
19.6
20.2
8.7
8.3
2.9
5.6
9.9
8.1
8.9
8.5
−1.0
2.3
3.9
0.8
14.9
7.2
7.4
3.8
9.5
5.6
6.3
2.9
4.9
6.3
5.7
2.0
7.2
5.9
6.0
2.4
8.8
7.2
7.8
6.2
2015 Q1
Q2
Q3
Q4
2.3
−8.7
−25.9
−21.9
14.0
13.1
1.9
5.5
11.6
8.5
−3.9
−
30.0
38.4
32.6
19.2
−0.2
−
−2.9
−4.3
15.8
4.1
13.5
8.7
−0.8
0.1
−1.8
−1.7
9.8
9.7
3.9
2.8
1.4
1.1
−0.1
−2.4
−3.9
2.1
0.3
1.1
−2.3
1.8
0.2
−
3.0
−5.2
−6.4
−4.4
0.3
−1.7
−3.1
−2.2
6.2
5.3
1.3
1.0
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MV68
−8.0
8.2
3.6
5.0
MV69
−12.0
−8.1
−4.3
−2.0
MVM8
−11.6
−6.6
−3.5
−1.3
2002 Q1
Q2
Q3
Q4
30.1
4.9
15.7
5.4
7.9
3.5
8.6
15.6
2003 Q1
Q2
Q3
Q4
6.3
13.2
12.9
22.7
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
3B.M
CONSTRUCTION OUTPUT: VOLUME SEASONALLY ADJUSTED
PERCENTAGE CHANGE ON SAME PERIOD A YEAR EARLIER
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MV5V
3.2
−1.9
7.0
8.9
5.2
MV5W
13.0
−3.0
−6.4
−7.0
−6.7
MV5X
−4.9
−8.0
−1.7
0.3
−15.0
MV5Y
−0.7
2.5
4.0
1.5
3.5
MV5Z
6.7
3.2
3.1
2.9
3.5
MV62
−3.8
1.5
−5.3
−9.7
−11.2
MV63
6.8
8.1
4.7
−0.3
−1.1
MV64
3.0
5.9
1.2
−3.6
−4.7
MV65
8.3
10.2
4.0
7.0
−0.9
MV66
5.5
7.9
2.5
1.3
−2.9
MV67
6.2
4.9
2.9
2.3
1.2
5.0
1.9
−0.2
−5.2
−2.8
6.5
12.3
5.1
6.9
4.6
13.2
37.9
−9.0
−12.8
−13.2
−22.7
−21.2
−10.7
−25.7
−27.9
−10.9
1.2
−0.8
−6.6
−0.5
−3.5
2.5
3.1
2.3
8.7
0.2
−3.7
−1.0
−3.9
−1.7
8.4
−11.0
−8.3
−10.9
−10.8
−8.6
−5.8
−6.1
−5.6
−7.5
−0.9
−0.4
−1.2
−7.7
−6.5
−8.6
−4.2
−3.1
−2.7
10.7
7.6
4.6
2.0
5.2
9.2
0.5
−0.1
−2.6
−1.3
0.8
2.8
0.3
−2.4
−1.6
−3.0
−0.8
6.3
7.1
3.9
2.0
−2.7
−1.7
−13.1
3.6
−1.3
−3.8
−6.4
−6.7
−15.5
0.7
−10.9
−17.2
−19.3
−22.7
−23.8
−18.5
−25.3
−24.9
−21.5
−19.9
−26.8
1.8
1.8
−0.9
0.6
6.2
−6.9
1.2
−2.4
−4.0
−5.5
−1.7
−12.0
−2.0
−8.0
−10.3
−11.2
−10.3
−17.6
5.5
−6.3
−11.1
−4.7
5.6
−2.5
−1.0
7.4
−2.9
−6.3
1.9
−10.1
1.1
2.8
−5.6
−5.8
3.1
−7.6
3.6
5.3
−1.1
1.4
6.0
1.1
2.3
4.0
−3.4
−2.3
4.5
−3.4
−0.5
−3.6
−7.7
−8.0
−5.0
−12.7
−9.3
−14.6
−20.1
−14.5
−16.1
−6.6
−9.5
−10.6
−7.0
0.8
−1.5
−4.8
−9.5
−11.5
−10.0
−2.6
−4.7
−5.2
−20.5
−1.8
−8.9
2.8
−5.9
−19.1
−23.4
−20.3
−20.4
−12.2
−15.2
−27.7
11.7
5.2
12.2
15.7
13.5
26.9
−15.0
−14.7
−20.8
−15.0
−17.3
−14.7
−15.0
−11.3
−14.1
−6.3
−10.0
−13.7
7.6
6.5
7.6
7.7
6.3
1.6
2.3
−6.0
−14.1
−10.9
−11.0
−11.2
4.0
−2.0
−7.4
−5.1
−5.6
−7.2
0.4
−4.6
−7.0
0.5
2.0
−7.7
2.2
−3.3
−7.2
−2.4
−1.9
−7.4
−8.8
−8.4
−11.6
−4.9
−7.0
−11.4
2013 Jan
Feb
Mar
Apr
May
Jun
−21.3
−4.5
−0.6
−0.5
6.1
17.4
−4.1
1.2
−8.8
7.7
5.0
11.9
−7.7
0.1
−7.3
6.1
5.2
13.0
−3.5
4.7
6.4
7.6
9.1
11.4
−21.2
−11.5
−13.5
−13.1
−9.8
−4.6
11.7
9.4
0.6
−3.3
−13.4
−7.5
−4.3
−3.4
−7.9
−5.5
−7.8
−3.3
−7.1
−1.5
−5.6
−0.9
−1.7
3.7
3.0
3.3
0.1
4.5
−7.8
−6.7
−2.2
−11.6
−11.2
3.9
−1.5
7.9
−0.5
−7.1
−7.7
4.1
−3.6
2.9
1.7
−0.3
−6.0
1.9
0.4
2.0
0.6
−3.8
−6.8
3.0
−1.6
2.4
−4.2
−2.4
−6.1
0.6
−1.7
3.2
Jul
Aug
Sep
Oct
Nov
Dec
4.6
9.8
8.9
22.8
22.9
20.2
13.9
18.7
13.6
15.8
12.2
22.6
12.0
16.9
12.6
17.2
14.3
22.1
12.2
−4.9
−6.1
1.8
−2.6
5.0
−5.4
−7.4
−1.1
−9.4
−7.5
−1.3
−13.3
0.6
−18.0
−20.1
−17.3
−14.0
6.3
8.1
15.2
7.3
1.6
3.1
6.2
4.9
5.7
5.0
1.9
7.4
−11.8
−5.7
−6.9
−6.2
−9.3
−3.0
−
6.0
15.5
11.1
9.4
7.3
−3.9
2.0
7.4
5.0
2.8
3.8
3.1
10.7
8.8
10.4
1.7
10.3
−0.5
6.2
8.1
7.7
2.3
7.0
3.5
5.4
6.6
6.0
2.1
7.2
2014 Jan
Feb
Mar
Apr
May
Jun
51.3
41.7
38.5
30.7
40.9
28.6
35.0
20.8
24.4
24.0
22.8
18.2
37.9
24.7
27.1
25.3
26.3
20.3
1.7
−4.0
−9.9
−8.6
−7.0
−12.2
1.9
−6.2
−6.8
−0.7
−9.9
−6.3
−9.0
−3.1
9.1
15.5
20.3
22.3
6.5
7.9
11.8
10.4
6.5
7.8
12.9
7.8
9.0
9.7
8.0
6.5
3.5
−3.3
−3.2
0.3
1.0
5.7
16.4
14.6
13.7
10.2
5.5
5.8
12.0
8.6
8.0
7.0
4.1
5.8
8.6
5.3
0.9
8.3
2.2
8.5
10.3
6.9
4.4
7.6
3.1
7.1
11.9
7.5
7.2
8.9
6.1
6.7
Jul
Aug
Sep
Oct
Nov
Dec
35.7
41.2
36.8
19.0
14.1
18.7
26.9
23.7
29.6
19.8
26.3
17.7
28.6
27.1
31.1
19.7
23.7
17.9
−8.5
−11.1
2.6
−12.8
−3.9
3.5
−5.5
−0.2
−5.4
2.4
3.3
3.3
20.1
10.1
30.1
24.9
18.4
17.6
4.7
1.8
2.2
0.4
6.7
10.0
8.6
7.0
11.1
4.9
10.0
10.8
7.0
2.4
2.4
−1.5
4.2
−0.1
5.5
11.1
5.6
3.5
2.9
5.0
6.0
8.3
4.6
1.9
3.3
3.4
3.8
4.5
9.1
−1.9
4.5
3.5
4.9
6.4
6.8
−
3.9
3.4
7.2
6.8
9.5
3.0
7.6
8.0
2015 Jan
Feb
Mar
Apr
May
Jun
6.5
3.2
−2.4
6.0
−14.3
−16.2
11.7
16.0
14.4
16.4
14.0
8.8
10.7
13.3
10.8
14.3
7.9
3.4
26.3
25.6
38.5
43.1
35.3
36.7
−2.4
3.2
−1.3
−4.1
1.8
2.6
26.0
15.2
7.2
7.8
4.1
0.5
2.4
2.1
−6.7
−3.4
−0.2
4.2
10.1
10.9
8.4
11.0
9.2
8.9
−3.0
1.9
5.7
−2.2
3.2
2.3
−3.2
−7.4
−1.1
−0.6
1.5
5.4
−3.1
−4.6
1.0
−1.1
2.0
4.4
3.5
0.4
5.1
−4.0
−3.9
−7.5
0.1
−2.1
3.0
−2.5
−0.9
−1.6
6.2
5.9
6.3
5.8
5.3
4.9
Jul
Aug
Sep
Oct
Nov
Dec
−21.2
−31.0
−25.5
−26.7
−24.4
−14.8
2.4
2.3
1.1
4.8
3.9
7.9
−2.5
−4.8
−4.4
−1.7
−1.7
3.3
37.4
33.8
26.7
23.5
13.6
20.6
0.3
−5.1
−3.7
−5.9
−4.1
−2.8
21.2
8.8
10.7
11.2
12.2
2.8
−1.2
−0.2
−4.1
2.2
−1.9
−5.2
6.2
3.7
1.9
4.0
1.3
3.1
0.1
−1.6
1.3
−0.9
−5.7
−0.7
2.4
−3.6
2.2
1.4
1.3
0.5
1.7
−3.0
1.9
0.7
−0.8
0.1
−2.4
−9.5
−7.3
−4.6
−6.0
−2.5
−0.3
−6.2
−2.7
−1.9
−3.4
−1.2
3.7
−0.1
0.2
1.8
−0.4
1.6
2016 Jan
−20.2
4.8
−
−5.8
4.3
−5.8
2.1
−0.4
−5.5
5.4
1.9
−4.6
−1.4
−0.8
Public
housing
Private
housing
Total
new
housing
Infrastructure
2011 Feb
Mar
Apr
May
Jun
MV4W
9.5
16.5
8.4
7.2
7.1
MV5U
19.3
15.3
6.7
8.3
15.5
MVM4
16.9
15.6
7.1
8.0
13.6
Jul
Aug
Sep
Oct
Nov
Dec
−8.2
−10.3
−1.1
−10.8
−9.6
−7.5
9.2
5.7
0.1
−3.5
−0.6
10.8
2012 Jan
Feb
Mar
Apr
May
Jun
−7.7
−18.3
−23.5
−18.6
−23.3
−24.2
Jul
Aug
Sep
Oct
Nov
Dec
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
4A.A
CONSTRUCTION OUTPUT: VALUE SEASONALLY ADJUSTED
CURRENT PRICES BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Total
Public Private
new Infrasthousing housing housing ructure
Housing
Other Work
All
Repair
Private
Private
and
industr- commercAll
Public Private
Total InfrastMaintenPublic
ial
ial new work housing housing housing ructure Public Private
ance
1997
1998
1999
2000
2001
MVM9
1 028
881
824
1 075
1 174
MVN2
7 559
8 146
8 079
9 475
9 639
MVN3
8 587
9 027
8 903
10 550
10 813
MVN4
7 953
7 703
7 610
7 941
8 814
MVN5
3 063
3 343
3 907
3 863
4 253
MVN6
4 536
4 893
5 030
4 717
4 709
MVN7
12 631
14 747
17 713
18 608
19 988
MVN8
36 770
39 713
43 163
45 679
48 577
MVN9
5 229
5 110
5 059
5 104
5 164
MVNM
7 460
7 890
7 990
8 358
8 870
MVO2
12 689
13 000
13 049
13 462
14 034
2002
2003
2004
2005
2006
1 411
1 706
2 210
2 251
2 853
11 453
15 017
18 977
20 715
21 765
12 864 10 033
16 723 9 333
21 187 8 243
22 966 8 241
24 618 8 178
5 517
7 280
8 638
8 362
8 047
4 323
4 765
5 210
5 610
6 308
22 220
22 893
25 509
26 325
30 121
54 957
60 994
68 787
71 504
77 272
4 974
5 781
6 414
6 642
6 819
10 255
11 146
11 951
12 276
12 568
15 229
16 927
18 365
18 918
19 387
−
−
−
−
−
2007
2008
2009
2010
2011
3 480
3 299
3 327
4 891
4 919
22 146
18 138
12 592
14 839
16 398
25 626 8 642 8 347
21 437 9 715 9 988
15 919 10 738 11 857
19 730 13 538 14 372
21 317 15 321 13 306
6 438
5 339
3 515
3 550
3 364
34 404
35 190
25 558
23 712
24 275
83 457
81 669
67 587
74 902
77 584
6 885
7 467
7 417
7 873
7 224
13 476
14 708
13 283
14 406
15 159
20 361
22 175
20 700
22 279
22 383
−
−
−
6 841
8 030
7 439 15 807
8 635 16 165
8 631 14 165
5 072 8 290
5 044 8 963
43 607
46 975
43 496
42 483
44 244
127 064
128 644
111 083
117 385
121 828
2012
2013
2014
2015
4 027
4 334
5 850
5 199
16 235
18 119
23 807
26 410
20 262
22 453
29 657
31 609
3 718
3 538
4 142
4 667
22 485
23 587
26 124
26 582
71 363
74 917
84 965
92 793
7 613
7 518
7 751
7 823
15 070
16 132
18 012
18 244
22 683
23 650
25 763
26 067
8 084
8 375
9 154
8 925
4 962 9 191
5 341 9 703
5 834 10 352
5 077 10 837
44 744
46 887
50 806
50 905
116 107
121 804
135 771
143 698
14 103
15 112
14 747
19 574
10 795
10 227
10 295
10 361
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
N42T N42U
− 4 669
− 4 778
− 4 882
− 5 158
− 5 541
N42V
6 862
7 334
7 487
8 412
9 808
6 065
7 168
7 215
8 044
7 868
10 969
12 169
12 291
13 027
13 794
MVO4
24 220
25 112
25 418
27 032
29 383
All
Work
MVO5
60 990
64 825
68 581
72 711
77 960
32 263 87 220
36 264 97 258
37 871 106 658
39 989 111 493
41 049 118 321
4A.Q
CONSTRUCTION OUTPUT: VALUE SEASONALLY ADJUSTED
CURRENT PRICES BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Housing
Other Work
All
Repair
Total
Private
Private
and
Public Private
new Infrastindustr- commercAll
Public Private
Total InfrastMaintenhousing housing housing ructure Public
ial
ial new work housing housing housing ructure Public Private
ance
All
Work
2001 Q1
Q2
Q3
Q4
MVM9
247
305
297
325
MVN2
2 234
2 363
2 494
2 547
MVN3
2 481
2 668
2 791
2 873
MVN4 MVN5
2 103
925
2 191 1 044
2 273 1 103
2 247 1 181
MVN6
1 155
1 209
1 202
1 143
MVN7
4 854
4 875
4 978
5 281
MVN8
11 518
11 987
12 347
12 725
MVN9
1 258
1 336
1 236
1 334
MVNM
2 255
2 202
2 243
2 171
MVO2
3 512
3 538
3 479
3 505
N42T
−
−
−
−
N42U
1 241
1 294
1 444
1 561
N42V
2 429
2 543
2 359
2 477
MVO4
7 183
7 374
7 283
7 543
MVO5
18 701
19 361
19 630
20 268
2002 Q1
Q2
Q3
Q4
345
345
360
361
2 600
2 726
2 952
3 175
2 945
3 071
3 312
3 536
2 507
2 571
2 557
2 399
1 240
1 330
1 433
1 514
1 083
1 061
1 090
1 089
5 336
5 488
5 639
5 757
13 111
13 520
14 031
14 295
1 225
1 211
1 238
1 300
2 300
2 505
2 601
2 849
3 525
3 716
3 839
4 149
−
−
−
−
1 560
1 502
1 423
1 580
2 597
2 696
2 835
2 841
7 682
7 914
8 097
8 570
20 792
21 434
22 128
22 865
2003 Q1
Q2
Q3
Q4
384
406
438
478
3 365
3 507
3 867
4 277
3 749
3 913
4 305
4 755
2 405
2 374
2 299
2 254
1 601
1 735
1 886
2 057
1 118
1 142
1 211
1 293
5 554
5 567
5 719
6 053
14 428
14 732
15 421
16 413
1 298
1 425
1 550
1 507
2 512
2 828
2 851
2 955
3 810
4 253
4 401
4 463
−
−
−
−
1 789
1 832
1 729
1 818
2 881
3 007
3 233
3 049
8 480
9 092
9 363
9 329
22 908
23 824
24 784
25 742
2004 Q1
Q2
Q3
Q4
533
557
562
558
4 572
4 684
4 813
4 907
5 105
5 241
5 376
5 465
2 134
2 109
2 049
1 952
2 160
2 179
2 161
2 138
1 309
1 285
1 304
1 313
6 299
6 429
6 420
6 361
17 007
17 242
17 309
17 228
1 626
1 571
1 566
1 650
3 029
2 868
3 035
3 019
4 656
4 439
4 601
4 669
−
−
−
−
1 854
1 806
1 714
1 842
3 218
3 011
3 004
3 058
9 728
9 256
9 319
9 569
26 735
26 498
26 628
26 797
2005 Q1
Q2
Q3
Q4
546
545
546
614
4 999
5 224
5 248
5 244
5 545
5 769
5 794
5 858
2 009
1 989
2 074
2 170
2 144
2 119
2 056
2 044
1 316
1 391
1 432
1 470
6 416
6 582
6 563
6 764
17 429
17 849
17 920
18 306
1 747
1 741
1 578
1 576
3 040
3 055
3 096
3 085
4 787
4 796
4 674
4 661
−
−
−
−
2 029
2 112
1 921
1 982
3 282
3 275
3 277
3 193
10 098
10 182
9 873
9 836
27 527
28 032
27 792
28 141
2006 Q1
Q2
Q3
Q4
657
700
738
758
5 306
5 386
5 486
5 587
5 963
6 086
6 224
6 345
2 131
2 018
2 003
2 026
2 049
2 011
1 995
1 991
1 550
1 548
1 575
1 635
7 131
7 349
7 652
7 988
18 824
19 013
19 449
19 985
1 637
1 652
1 780
1 751
3 161
3 178
3 110
3 119
4 798
4 830
4 889
4 870
−
−
−
−
1 960
2 115
1 921
1 872
3 318
3 431
3 356
3 690
10 075
10 376
10 166
10 432
28 900
29 389
29 615
30 418
2007 Q1
Q2
Q3
Q4
849
881
876
874
5 642
5 589
5 516
5 399
6 491
6 469
6 392
6 273
2 037
2 112
2 202
2 291
2 007
2 051
2 116
2 173
1 666
1 674
1 590
1 508
8 218
8 495
8 665
9 025
20 419
20 802
20 965
21 271
1 764
1 692
1 667
1 762
3 284
3 367
3 299
3 526
5 049
5 059
4 966
5 288
−
−
−
−
1 803
1 939
1 792
1 905
3 928
3 897
3 955
4 027
10 779
10 895
10 713
11 220
31 199
31 696
31 678
32 490
2008 Q1
Q2
Q3
Q4
849
848
832
770
5 213
4 809
4 338
3 778
6 062
5 657
5 169
4 548
2 388
2 474
2 523
2 330
2 341
2 451
2 585
2 610
1 514
1 376
1 294
1 154
9 263
8 932
8 845
8 151
21 569
20 890
20 417
18 793
1 760
1 914
1 904
1 890
3 522
3 706
3 616
3 865
5 281
5 620
5 519
5 755
−
−
−
−
2 051
2 266
2 217
2 101
4 179
4 285
3 974
3 726
11 511
12 171
11 711
11 582
33 080
33 061
32 128
30 375
2009 Q1
Q2
Q3
Q4
720
749
866
992
3 315
3 151
2 986
3 140
4 035
3 900
3 852
4 132
2 350
2 534
2 697
3 158
2 626
2 837
3 094
3 300
969
872
826
847
7 303
6 794
6 013
5 448
17 283
16 938
16 482
16 884
1 799
1 800
1 928
1 890
3 400
3 276
3 509
3 098
5 199
5 076
5 437
4 988
−
−
−
−
2 048
2 070
2 378
2 136
3 636
3 519
3 611
3 400
10 882
10 665
11 425
10 524
28 165
27 603
27 907
27 408
2010 Q1
Q2
Q3
Q4
1 080
1 229
1 288
1 294
3 284
3 693
3 893
3 968
4 364
4 922
5 182
5 263
3 390
3 566
3 387
3 195
3 407
3 717
3 625
3 624
847
916
1 018
769
5 677
5 877
6 148
6 010
17 684
18 998
19 359
18 860
1 974
2 006
1 950
1 944
3 200
3 573
3 834
3 799
5 173
5 579
5 783
5 743
1 597
1 758
1 721
1 764
1 293
1 298
1 226
1 255
2 018
2 031
2 075
2 166
9 994
10 652
10 970
10 867
27 678
29 651
30 329
29 727
2011 Q1
Q2
Q3
Q4
1 275
1 296
1 183
1 165
4 008
4 089
4 138
4 162
5 283
5 385
5 321
5 328
3 560
3 963
3 839
3 959
3 563
3 438
3 253
3 053
829
888
829
818
5 695
6 008
6 183
6 389
18 930
19 683
19 426
19 546
1 846
1 825
1 754
1 799
3 688
3 736
3 761
3 974
5 534
5 561
5 515
5 773
1 945
1 954
2 077
2 054
1 269
1 244
1 268
1 263
2 276
2 205
2 221
2 261
10 896
10 912
11 186
11 251
29 825
30 595
30 612
30 797
2012 Q1
Q2
Q3
Q4
1 052
989
983
1 004
4 308
3 934
3 827
4 166
5 360
4 922
4 809
5 170
3 399
3 267
3 628
3 809
2 835
2 752
2 643
2 565
882
924
938
974
5 699
5 757
5 403
5 626
18 174
17 623
17 422
18 144
1 827
1 893
1 946
1 947
3 895
3 713
3 731
3 732
5 721
5 605
5 677
5 679
2 023
2 142
1 919
2 000
1 311
1 206
1 203
1 241
2 377
2 274
2 264
2 277
11 302
11 174
11 176
11 092
29 477
28 797
28 598
29 236
2013 Q1
Q2
Q3
Q4
944
1 055
1 072
1 263
4 194
4 350
4 528
5 047
5 138
5 405
5 599
6 310
3 608
3 718
3 771
4 016
2 479
2 597
2 634
2 517
934
876
883
846
5 569
5 616
6 213
6 188
17 727
18 212
19 101
19 877
1 912
1 885
1 839
1 881
3 757
4 012
4 138
4 226
5 669
5 897
5 977
6 107
1 996
1 980
2 152
2 247
1 306
1 339
1 341
1 354
2 296
2 448
2 465
2 495
11 106
11 644
12 049
12 088
28 833
29 857
31 149
31 965
2014 Q1
Q2
Q3
Q4
1 371
1 449
1 536
1 493
5 619
5 782
6 159
6 247
6 990
7 231
7 696
7 740
3 648
3 502
3 664
3 933
2 514
2 547
2 593
2 641
967
1 058
1 063
1 054
6 479
6 488
6 526
6 631
20 598
20 826
21 542
22 000
1 940
1 943
1 945
1 924
4 497
4 460
4 592
4 463
6 437
6 403
6 536
6 387
2 234
2 238
2 304
2 379
1 427
1 517
1 510
1 379
2 498
2 608
2 610
2 636
12 396
12 688
13 052
12 671
32 993
33 514
34 594
34 671
2015 Q1
Q2
Q3
Q4
1 439
1 373
1 183
1 204
6 482
6 689
6 456
6 783
7 921
8 063
7 639
7 987
4 835
4 940
4 991
4 808
2 549
2 600
2 604
2 609
1 141
1 122
1 236
1 168
6 545
6 646
6 643
6 748
22 991
23 371
23 112
23 319
1 984
1 984
1 960
1 895
4 391
4 619
4 667
4 567
6 375
6 603
6 627
6 461
2 490
2 256
2 140
2 038
1 293
1 220
1 257
1 306
2 646
2 644
2 693
2 855
12 804
12 723
12 717
12 661
35 795
36 094
35 829
35 980
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
4A.M
CONSTRUCTION OUTPUT: VALUE SEASONALLY ADJUSTED
CURRENT PRICES BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
All
Repair
Total
Private
Private
and
Public Private
new Infrastindustr- commercAll
Public Private
Total InfrastMaintenhousing housing housing ructure Public
ial
ial new work housing housing housing ructure Public Private
ance
2010 Jul
Aug
Sep
Oct
Nov
Dec
MVM9
425
434
430
441
449
404
MVN2
1 258
1 297
1 339
1 388
1 355
1 226
MVN3
1 682
1 730
1 769
1 830
1 803
1 630
MVN4 MVN5
1 106 1 216
1 153 1 218
1 128 1 190
1 117 1 229
1 120 1 214
958 1 180
2011 Jan
Feb
Mar
Apr
May
Jun
408
412
455
425
434
437
1 264
1 332
1 413
1 282
1 331
1 476
1 672
1 743
1 868
1 707
1 765
1 913
1 099
1 171
1 290
1 277
1 330
1 357
Jul
Aug
Sep
Oct
Nov
Dec
382
382
419
391
403
371
1 389
1 391
1 359
1 376
1 382
1 404
1 771
1 773
1 778
1 767
1 785
1 775
2012 Jan
Feb
Mar
Apr
May
Jun
376
333
343
341
327
320
1 383
1 436
1 489
1 283
1 351
1 299
Jul
Aug
Sep
Oct
Nov
Dec
338
318
326
330
333
341
2013 Jan
Feb
Mar
Apr
May
Jun
Housing
Other Work
MVN6
354
372
293
249
272
249
MVN7
2 056
2 097
1 994
1 966
2 141
1 902
MVN8
6 414
6 570
6 374
6 390
6 551
5 920
MVN9
655
642
653
661
651
632
MVNM
1 251
1 280
1 303
1 273
1 268
1 258
MVO2
1 905
1 923
1 955
1 934
1 919
1 890
1 141
1 190
1 232
1 150
1 134
1 154
262
270
296
273
302
314
1 802
1 905
1 988
1 951
1 973
2 084
5 975
6 280
6 675
6 358
6 503
6 822
552
624
670
608
606
611
1 159
1 224
1 305
1 243
1 236
1 258
1 711
1 848
1 975
1 851
1 841
1 869
626
636
683
654
641
660
380
418
470
418
418
408
732
739
806
732
745
727
3 347 9 322
3 591 9 871
3 958 10 632
3 628 9 985
3 628 10 131
3 656 10 478
1 297
1 272
1 269
1 229
1 338
1 392
1 118
1 079
1 055
976
986
1 091
273
285
271
276
289
253
2 062
2 055
2 066
2 052
2 226
2 110
6 522
6 463
6 440
6 301
6 624
6 621
583
588
584
590
601
607
1 232
1 262
1 267
1 323
1 332
1 319
1 814
1 850
1 851
1 913
1 933
1 927
674
700
703
659
675
720
443
407
418
392
435
436
716
760
746
735
751
775
3 667
3 772
3 747
3 707
3 783
3 761
1 759
1 768
1 833
1 625
1 678
1 620
1 168
1 094
1 137
1 087
1 085
1 095
962
920
953
938
940
875
283
298
300
291
338
296
1 875
1 878
1 946
1 876
2 003
1 878
6 047
5 959
6 169
5 817
6 044
5 763
602
606
619
602
669
622
1 210
1 343
1 341
1 215
1 311
1 186
1 813
1 949
1 960
1 817
1 980
1 808
660
674
689
708
734
700
398
437
475
397
418
391
763
793
820
751
772
751
3 516 9 563
3 813 9 772
3 973 10 141
3 645 9 461
3 896 9 940
3 633 9 396
1 285
1 268
1 274
1 430
1 373
1 363
1 623
1 586
1 600
1 759
1 706
1 704
1 094
1 319
1 215
1 325
1 312
1 172
885
889
869
884
864
817
319
304
315
323
323
328
1 861
1 848
1 694
1 845
1 927
1 855
5 782
5 946
5 693
6 135
6 132
5 877
650
648
649
656
659
633
1 322
1 249
1 160
1 246
1 259
1 227
1 972
1 897
1 809
1 902
1 918
1 859
671
625
623
647
697
656
401
409
393
387
432
422
779
740
746
779
782
715
3 850
3 736
3 590
3 738
3 822
3 533
293
314
337
338
346
371
1 339
1 469
1 386
1 418
1 449
1 484
1 632
1 783
1 722
1 756
1 795
1 854
1 163
1 192
1 253
1 216
1 228
1 273
784
843
852
849
883
865
323
324
286
293
293
289
1 852
1 877
1 839
1 847
1 925
1 845
5 755
6 019
5 953
5 961
6 124
6 127
633
640
639
647
638
600
1 229
1 275
1 253
1 322
1 355
1 335
1 863
1 915
1 891
1 969
1 993
1 935
661
691
644
643
681
656
422
437
447
441
452
446
758
764
774
814
814
820
3 575 9 329
3 741 9 761
3 790 9 743
3 852 9 813
3 943 10 067
3 849 9 976
Jul
Aug
Sep
Oct
Nov
Dec
358
354
360
418
423
422
1 507
1 536
1 485
1 715
1 583
1 748
1 865
1 890
1 845
2 134
2 007
2 170
1 279
1 305
1 186
1 404
1 327
1 284
874
862
898
837
837
843
285
327
272
273
275
297
2 080
2 064
2 069
2 094
2 062
2 032
6 382
6 449
6 270
6 743
6 507
6 627
595
626
618
633
617
631
1 375
1 375
1 388
1 426
1 429
1 372
1 969
2 002
2 006
2 059
2 046
2 003
701
729
723
754
723
770
455
444
442
456
456
442
803
846
816
866
815
814
3 968
4 077
4 004
4 153
4 033
3 903
10 350
10 525
10 274
10 896
10 540
10 529
2014 Jan
Feb
Mar
Apr
May
Jun
445
456
470
444
495
510
1 937
1 823
1 859
1 925
1 909
1 947
2 382
2 279
2 328
2 369
2 404
2 457
1 247
1 229
1 171
1 167
1 191
1 144
850
828
835
878
826
843
306
323
339
348
353
358
2 142
2 142
2 195
2 191
2 156
2 140
6 928
6 801
6 868
6 954
6 930
6 942
670
635
634
661
637
646
1 487
1 507
1 503
1 505
1 482
1 473
2 157
2 143
2 137
2 166
2 119
2 118
760
739
734
739
744
755
489
468
469
529
491
498
824
838
836
861
853
894
4 087
4 108
4 201
4 268
4 182
4 238
11 015
10 909
11 069
11 222
11 111
11 181
Jul
Aug
Sep
Oct
Nov
Dec
505
518
513
503
484
506
2 050
2 040
2 069
2 051
2 110
2 086
2 555
2 558
2 582
2 554
2 594
2 592
1 211
1 201
1 252
1 261
1 310
1 363
850
875
868
880
883
878
348
355
359
354
345
355
2 179
2 152
2 195
2 153
2 219
2 260
7 143
7 142
7 257
7 201
7 351
7 447
645
653
646
636
651
636
1 503
1 573
1 515
1 515
1 491
1 457
2 148
2 227
2 161
2 152
2 142
2 093
748
773
783
819
792
767
487
503
519
469
451
459
864
869
876
834
906
895
4 294
4 382
4 376
4 322
4 242
4 107
11 437
11 524
11 633
11 523
11 593
11 554
2015 Jan
Feb
Mar
Apr
May
Jun
480
481
477
488
442
444
2 165
2 136
2 181
2 294
2 235
2 160
2 646
2 618
2 658
2 782
2 677
2 604
1 592
1 570
1 672
1 708
1 651
1 581
833
870
846
858
860
882
389
378
374
383
373
366
2 200
2 228
2 118
2 169
2 208
2 270
7 660
7 664
7 668
7 899
7 769
7 703
656
652
676
653
665
666
1 465
1 416
1 511
1 522
1 526
1 571
2 120
2 068
2 187
2 175
2 191
2 238
823
767
900
783
726
747
437
433
424
412
408
399
883
885
878
875
889
881
4 263
4 153
4 389
4 245
4 214
4 264
11 922
11 816
12 057
12 144
11 983
11 967
Jul
Aug
Sep
Oct
Nov
Dec
415
372
396
383
379
442
2 164
2 148
2 144
2 213
2 257
2 313
2 579
2 520
2 540
2 596
2 636
2 755
1 711
1 656
1 624
1 597
1 529
1 681
882
860
863
854
874
881
433
396
406
403
394
371
2 237
2 229
2 177
2 280
2 257
2 211
7 842
7 660
7 610
7 730
7 690
7 899
653
649
659
637
621
637
1 562
1 538
1 567
1 556
1 535
1 475
2 215
2 186
2 226
2 193
2 156
2 112
760
691
689
669
687
683
411
412
435
436
438
432
898
870
925
931
949
975
4 284
4 160
4 274
4 230
4 230
4 201
12 126
11 819
11 884
11 960
11 921
12 100
2016 Jan
391
2 338
2 729
1 530
900
373
2 324
7 857
625
1 552
2 177
618
450
979
4 224 12 080
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
N42T N42U
526
406
594
407
602
413
587
416
586
415
591
425
N42V
681
682
713
725
719
722
MVO4
3 561
3 676
3 734
3 677
3 631
3 559
All
Work
MVO5
9 975
10 246
10 108
10 066
10 182
9 479
10 189
10 235
10 187
10 008
10 407
10 382
9 632
9 683
9 283
9 873
9 954
9 409
4A
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY SECTOR
£ million
New Housing
Total
Public Private
new Infrasthousing housing housing ructure
Other New Work
Repair and Maintenance
Excluding Infrastructure
Housing
Other Work
All
Repair
Private
Private
and
industr- commercAll
Public Private
Total InfrastMaintenPublic
ial
ial new work housing housing housing ructure Public Private
ance
1997
1998
1999
2000
2001
MV6L
1 028
881
824
1 075
1 174
MV6M
7 559
8 146
8 079
9 475
9 639
MVM5
8 587
9 027
8 903
10 550
10 813
MV6N
7 953
7 703
7 610
7 941
8 814
MV6O
3 063
3 343
3 907
3 863
4 253
MV6P
4 536
4 893
5 030
4 717
4 709
MV6Q
12 631
14 747
17 713
18 608
19 988
MV6R
36 770
39 713
43 163
45 679
48 577
MV6S
5 229
5 110
5 059
5 104
5 164
MV6T
7 460
7 890
7 990
8 358
8 870
2002
2003
2004
2005
2006
1 411
1 706
2 210
2 251
2 853
11 453
15 017
18 977
20 715
21 765
12 864 10 033
16 723 9 333
21 187 8 243
22 966 8 241
24 618 8 178
5 517
7 280
8 638
8 362
8 047
4 323
4 765
5 210
5 610
6 308
22 220
22 893
25 509
26 325
30 121
54 957
60 994
68 787
71 504
77 272
4 974
5 781
6 414
6 642
6 819
10 255
11 146
11 951
12 276
12 568
15 229
16 927
18 365
18 918
19 387
−
−
−
−
−
2007
2008
2009
2010
2011
3 480
3 299
3 327
4 893
4 919
22 146
18 138
12 592
14 839
16 398
25 626 8 642 8 347
21 437 9 715 9 988
15 919 10 738 11 857
19 732 13 540 14 372
21 317 15 321 13 306
6 438
5 339
3 515
3 551
3 364
34 404
35 190
25 558
23 710
24 275
83 457
81 669
67 587
74 905
77 584
6 885
7 467
7 417
7 871
7 224
13 476
14 708
13 283
14 405
15 159
20 361
22 175
20 700
22 276
22 383
−
−
−
6 841
7 762
7 439 15 807
8 635 16 165
8 631 14 165
5 074 8 290
5 044 8 963
43 607
46 975
43 496
42 480
44 152
127 064
128 644
111 083
117 385
121 737
2012
2013
2014
2015
4 027
4 334
5 782
5 031
16 235
18 119
23 622
26 144
20 262
22 453
29 405
31 175
3 718
3 538
4 201
4 816
22 485
23 587
25 944
26 812
71 363
74 917
85 294
93 467
7 613
7 518
7 784
7 864
15 070
16 132
17 969
18 365
22 683
23 650
25 753
26 229
7 815
8 096
8 809
8 459
4 962 9 191
5 341 9 703
5 513 10 642
4 817 11 039
44 651
46 789
50 717
50 545
116 014
121 706
136 011
144 012
14 103
15 112
15 384
20 248
10 795
10 227
10 360
10 417
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
MV6V MV6W MV6X
12 689
− 4 669
13 000
− 4 778
13 049
− 4 882
13 462
− 5 158
14 034
− 5 541
6 065
7 168
7 215
8 044
7 868
MV6Y
6 862
7 334
7 487
8 412
9 808
10 969
12 169
12 291
13 027
13 794
MV6Z
24 220
25 112
25 418
27 032
29 383
All
Work
MV72
60 990
64 825
68 581
72 711
77 960
32 263 87 220
36 264 97 258
37 871 106 658
39 989 111 493
41 049 118 321
4Q
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Housing
Other Work
All
Repair
Total
Private
Private
and
Public Private
new Infrastindustr- commercAll
Public Private
Total InfrastMaintenhousing housing housing ructure Public
ial
ial new work housing housing housing ructure Public Private
ance
2001 Q1
Q2
Q3
Q4
MV6L
246
318
300
310
MV6M
2 187
2 380
2 517
2 555
MVM5
2 433
2 698
2 817
2 865
2002 Q1
Q2
Q3
Q4
347
362
361
341
2 556
2 719
2 984
3 194
2003 Q1
Q2
Q3
Q4
393
428
437
448
2004 Q1
Q2
Q3
Q4
All
Work
MV6N MV6O
2 083
907
2 198 1 034
2 281 1 110
2 252 1 202
MV6P
1 119
1 206
1 204
1 180
MV6Q
4 721
4 827
5 029
5 411
MV6R
11 263
11 963
12 441
12 910
MV6S
1 291
1 304
1 241
1 328
MV6T
2 219
2 175
2 292
2 184
MV6V MV6W MV6X
3 510
− 1 245
3 479
− 1 212
3 533
− 1 517
3 512
− 1 567
MV6Y
2 374
2 493
2 415
2 526
MV6Z
7 129
7 184
7 465
7 605
MV72
18 392
19 147
19 906
20 515
2 903
3 081
3 345
3 535
2 479
2 586
2 583
2 385
1 209
1 321
1 442
1 545
1 053
1 050
1 093
1 127
5 217
5 439
5 677
5 887
12 861
13 477
14 140
14 479
1 256
1 197
1 241
1 280
2 266
2 474
2 644
2 871
3 522
3 671
3 885
4 151
−
−
−
−
1 567
1 410
1 499
1 589
2 536
2 641
2 898
2 894
7 625
7 722
8 282
8 634
20 486
21 199
22 422
23 113
3 324
3 492
3 909
4 292
3 717
3 920
4 346
4 740
2 378
2 392
2 335
2 228
1 567
1 726
1 896
2 091
1 097
1 127
1 212
1 329
5 451
5 526
5 754
6 162
14 210
14 691
15 543
16 550
1 340
1 422
1 553
1 466
2 476
2 798
2 880
2 992
3 816
4 220
4 433
4 458
−
−
−
−
1 799
1 720
1 821
1 828
2 811
2 945
3 305
3 108
8 426
8 885
9 559
9 394
22 636
23 576
25 102
25 944
551
582
556
521
4 534
4 675
4 862
4 906
5 085
5 257
5 418
5 427
2 109
2 125
2 087
1 922
2 133
2 169
2 171
2 165
1 298
1 269
1 299
1 344
6 220
6 390
6 462
6 437
16 845
17 210
17 437
17 295
1 696
1 568
1 562
1 588
2 985
2 845
3 046
3 075
4 681
4 413
4 608
4 663
−
−
−
−
1 863
1 695
1 805
1 852
3 144
2 952
3 075
3 120
9 688
9 060
9 488
9 635
26 533
26 270
26 925
26 930
2005 Q1
Q2
Q3
Q4
567
568
539
577
4 962
5 231
5 301
5 221
5 529
5 799
5 840
5 798
1 984
2 008
2 118
2 131
2 132
2 107
2 064
2 059
1 316
1 378
1 421
1 495
6 360
6 537
6 619
6 809
17 321
17 829
18 062
18 292
1 828
1 730
1 568
1 516
2 983
3 041
3 087
3 165
4 811
4 771
4 655
4 681
−
−
−
−
2 041
1 984
2 024
1 995
3 208
3 210
3 353
3 256
10 060
9 965
10 032
9 932
27 381
27 794
28 094
28 224
2006 Q1
Q2
Q3
Q4
683
723
731
716
5 274
5 404
5 540
5 547
5 957
6 127
6 271
6 263
2 103
2 043
2 047
1 985
2 045
1 994
2 005
2 003
1 560
1 533
1 559
1 656
7 093
7 279
7 743
8 006
18 758
18 976
19 625
19 913
1 708
1 637
1 778
1 696
3 087
3 174
3 090
3 217
4 795
4 811
4 868
4 913
−
−
−
−
1 972
1 987
2 024
1 885
3 241
3 361
3 432
3 760
10 008
10 159
10 324
10 558
28 766
29 135
29 949
30 471
2007 Q1
Q2
Q3
Q4
876
901
872
831
5 613
5 615
5 567
5 351
6 489
6 516
6 439
6 182
2 010
2 146
2 248
2 238
2 003
2 028
2 128
2 188
1 679
1 655
1 574
1 530
8 172
8 414
8 806
9 012
20 353
20 759
21 195
21 150
1 817
1 675
1 680
1 713
3 195
3 369
3 278
3 634
5 012
5 044
4 958
5 347
−
−
−
−
1 814
1 821
1 888
1 916
3 835
3 818
4 046
4 108
10 661
10 683
10 892
11 371
31 014
31 442
32 087
32 521
2008 Q1
Q2
Q3
Q4
866
860
834
739
5 186
4 835
4 386
3 731
6 052
5 695
5 220
4 470
2 353
2 517
2 568
2 277
2 333
2 420
2 594
2 641
1 525
1 351
1 283
1 180
9 195
8 848
9 039
8 108
21 458
20 831
20 704
18 676
1 787
1 903
1 943
1 834
3 420
3 712
3 600
3 976
5 207
5 615
5 543
5 810
−
−
−
−
2 063
2 128
2 333
2 111
4 086
4 204
4 070
3 805
11 356
11 947
11 946
11 726
32 814
32 778
32 650
30 402
2009 Q1
Q2
Q3
Q4
734
763
874
956
3 288
3 175
3 031
3 098
4 022
3 938
3 905
4 054
2 323
2 590
2 741
3 084
2 621
2 802
3 087
3 347
971
848
818
878
7 195
6 742
6 229
5 392
17 132
16 920
16 780
16 755
1 813
1 802
1 983
1 819
3 295
3 282
3 501
3 205
5 108
5 084
5 484
5 024
− 2 053
− 1 938
− 2 497
− 2 143
3 554
3 450
3 694
3 467
10 715
10 472
11 675
10 634
27 847
27 392
28 455
27 389
2010 Q1
Q2
Q3
Q4
1 072
1 230
1 311
1 279
3 029
3 815
3 996
3 999
4 101
5 045
5 307
5 279
3 315
3 647
3 448
3 130
3 303
3 600
3 786
3 683
823
882
1 025
821
5 443
5 817
6 453
5 997
16 985
18 991
20 019
18 910
2 038
1 941
1 963
1 930
3 011
3 524
3 887
3 983
5 049
5 464
5 850
5 912
1 607
1 791
1 764
1 679
1 238
1 200
1 409
1 227
1 943
1 992
2 174
2 180
9 837
10 448
11 197
10 999
26 822
29 439
31 216
29 908
2011 Q1
Q2
Q3
Q4
1 241
1 305
1 212
1 160
3 658
4 260
4 273
4 207
4 899
5 566
5 485
5 368
3 473
4 048
3 890
3 909
3 397
3 353
3 471
3 085
795
865
839
865
5 422
5 992
6 454
6 408
17 987
19 824
20 138
19 635
1 920
1 751
1 762
1 792
3 447
3 692
3 852
4 168
5 367
5 443
5 614
5 959
1 882
1 869
2 068
1 943
1 210
1 144
1 457
1 233
2 189
2 175
2 326
2 273
10 649
10 631
11 465
11 408
28 636
30 455
31 603
31 042
2012 Q1
Q2
Q3
Q4
1 009
1 008
1 015
995
3 871
4 143
3 996
4 223
4 880
5 152
5 011
5 219
3 304
3 314
3 671
3 813
2 684
2 675
2 839
2 597
847
914
947
1 010
5 422
5 767
5 618
5 678
17 137
17 822
18 087
18 317
1 906
1 803
1 954
1 950
3 666
3 671
3 823
3 910
5 573
5 474
5 776
5 860
1 957
2 051
1 915
1 891
1 255
1 107
1 394
1 206
2 286
2 247
2 368
2 290
11 070
10 880
11 454
11 247
28 208
28 702
29 541
29 564
2013 Q1
Q2
Q3
Q4
900
1 087
1 107
1 238
3 692
4 586
4 727
5 114
4 592
5 673
5 834
6 353
3 514
3 733
3 810
4 056
2 284
2 533
2 863
2 547
902
879
888
869
5 296
5 639
6 385
6 266
16 589
18 457
19 781
20 091
1 971
1 805
1 860
1 882
3 473
3 977
4 250
4 433
5 443
5 782
6 109
6 315
1 931
1 894
2 140
2 130
1 243
1 243
1 541
1 314
2 180
2 432
2 579
2 512
10 797
11 351
12 369
12 271
27 386
29 808
32 151
32 362
2014 Q1
Q2
Q3
Q4
1 280
1 487
1 535
1 480
5 049
5 963
6 249
6 362
6 329
7 450
7 784
7 842
3 673
3 700
3 887
4 124
2 301
2 522
2 848
2 690
946
1 091
1 123
1 042
6 059
6 351
6 758
6 777
19 307
21 113
22 399
22 474
2 027
1 871
1 971
1 915
4 202
4 423
4 691
4 653
6 230
6 293
6 662
6 568
2 152
2 129
2 265
2 263
1 284
1 309
1 641
1 278
2 456
2 670
2 807
2 709
12 122
12 402
13 375
12 818
31 429
33 515
35 774
35 292
2015 Q1
Q2
Q3
Q4
1 314
1 388
1 156
1 173
5 855
6 896
6 514
6 879
7 169
8 283
7 671
8 052
4 831
5 153
5 270
4 993
2 340
2 569
2 859
2 648
1 135
1 173
1 318
1 190
6 254
6 621
6 974
6 962
21 730
23 800
24 092
23 846
2 078
1 915
1 993
1 877
4 131
4 627
4 827
4 780
6 210
6 542
6 820
6 657
2 354
2 102
2 072
1 931
1 173
1 055
1 372
1 217
2 579
2 681
2 867
2 912
12 317
12 381
13 131
12 717
34 047
36 180
37 223
36 562
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
4M
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY SECTOR
£ million
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Housing
Other Work
All
Repair
Total
Private
Private
and
Public Private
new Infrastindustr- commercAll
Public Private
Total InfrastMaintenhousing housing housing ructure Public
ial
ial new work housing housing housing ructure Public Private
ance
2010 Jul
Aug
Sep
Oct
Nov
Dec
MV6L
426
446
439
448
450
381
MV6M
1 299
1 319
1 379
1 439
1 396
1 164
MVM5
1 725
1 765
1 818
1 887
1 846
1 545
MV6N MV6O
1 145 1 248
1 169 1 303
1 133 1 235
1 116 1 292
1 108 1 285
906 1 106
2011 Jan
Feb
Mar
Apr
May
Jun
371
403
467
416
435
454
1 075
1 182
1 400
1 291
1 376
1 593
1 446
1 586
1 868
1 707
1 811
2 047
992
1 115
1 366
1 281
1 362
1 405
Jul
Aug
Sep
Oct
Nov
Dec
383
394
434
401
409
350
1 446
1 411
1 416
1 444
1 449
1 314
1 829
1 806
1 850
1 845
1 858
1 664
2012 Jan
Feb
Mar
Apr
May
Jun
334
321
353
335
330
343
1 171
1 242
1 459
1 288
1 404
1 451
Jul
Aug
Sep
Oct
Nov
Dec
341
330
343
337
339
320
2013 Jan
Feb
Mar
Apr
May
Jun
MV6P
346
374
305
273
293
255
MV6Q
2 121
2 212
2 120
2 089
2 158
1 750
MV6R
6 585
6 823
6 611
6 658
6 690
5 563
MV6S
664
639
661
670
678
582
MV6T
1 285
1 255
1 347
1 348
1 386
1 249
MV6V MV6W MV6X
1 949
545
441
1 894
614
498
2 008
605
470
2 018
593
438
2 064
591
407
1 831
496
381
994
1 106
1 297
1 095
1 111
1 148
240
260
296
256
297
312
1 621
1 737
2 064
1 899
1 966
2 126
5 293
5 803
6 891
6 238
6 548
7 038
509
632
779
566
574
610
1 035
1 104
1 308
1 181
1 218
1 293
1 544
1 736
2 087
1 747
1 792
1 903
536
595
752
615
614
640
332
389
489
386
378
381
655
709
826
706
735
734
3 067 8 360
3 429 9 232
4 153 11 044
3 454 9 692
3 519 10 067
3 658 10 696
1 334
1 280
1 276
1 245
1 341
1 323
1 167
1 191
1 113
1 037
1 044
1 004
271
286
283
302
309
255
2 109
2 150
2 195
2 220
2 264
1 924
6 710
6 713
6 716
6 648
6 816
6 170
585
587
589
609
635
547
1 279
1 255
1 318
1 420
1 459
1 288
1 865
1 842
1 907
2 029
2 094
1 836
685
697
686
667
656
620
477
507
474
420
432
380
735
801
790
761
780
731
3 762
3 847
3 857
3 878
3 963
3 567
1 505
1 563
1 813
1 623
1 734
1 795
1 044
1 046
1 215
1 082
1 106
1 127
824
861
999
889
929
857
252
290
306
279
339
297
1 679
1 720
2 022
1 844
2 007
1 916
5 303
5 479
6 355
5 717
6 115
5 991
548
633
726
560
631
612
1 063
1 258
1 345
1 159
1 298
1 215
1 611
1 891
2 071
1 718
1 929
1 827
569
631
757
667
705
679
344
411
500
367
381
360
675
771
840
724
768
755
3 199 8 502
3 704 9 183
4 167 10 523
3 477 9 193
3 782 9 896
3 621 9 612
1 355
1 286
1 356
1 512
1 463
1 248
1 696
1 616
1 699
1 849
1 802
1 568
1 116
1 323
1 232
1 364
1 334
1 115
937
994
908
953
906
738
323
300
323
347
339
324
1 890
1 916
1 813
2 043
1 977
1 658
5 962
6 149
5 975
6 556
6 357
5 404
653
650
650
690
699
561
1 386
1 245
1 192
1 360
1 373
1 177
2 040
1 894
1 842
2 050
2 072
1 738
682
625
608
655
678
559
437
516
442
422
430
354
803
782
783
815
815
660
3 961 9 924
3 818 9 967
3 675 9 650
3 942 10 498
3 994 10 351
3 311 8 715
256
299
346
331
351
406
1 113
1 241
1 337
1 419
1 505
1 663
1 369
1 540
1 683
1 749
1 855
2 069
1 036
1 137
1 341
1 194
1 243
1 296
659
742
883
808
875
850
285
319
298
288
297
294
1 662
1 723
1 911
1 825
1 929
1 886
5 011
5 461
6 117
5 864
6 199
6 394
576
643
751
610
605
590
1 065
1 153
1 255
1 273
1 341
1 362
1 641
1 796
2 006
1 883
1 946
1 952
570
648
714
605
653
636
365
403
476
410
417
416
662
725
792
794
813
826
3 237 8 248
3 572 9 033
3 988 10 105
3 692 9 556
3 830 10 028
3 830 10 224
Jul
Aug
Sep
Oct
Nov
Dec
361
366
380
423
426
390
1 586
1 553
1 588
1 808
1 689
1 617
1 947
1 919
1 968
2 231
2 115
2 007
1 294
1 302
1 214
1 464
1 367
1 225
940
967
956
908
869
770
295
318
276
294
286
289
2 093
2 108
2 184
2 305
2 116
1 845
6 569
6 615
6 597
7 201
6 753
6 136
600
632
628
670
651
561
1 453
1 367
1 429
1 568
1 549
1 316
2 053
2 000
2 057
2 238
2 200
1 877
710
725
705
758
703
669
498
554
489
493
453
368
835
884
859
903
849
760
4 096
4 163
4 110
4 392
4 206
3 674
10 665
10 779
10 707
11 593
10 959
9 809
2014 Jan
Feb
Mar
Apr
May
Jun
372
422
486
435
496
556
1 631
1 588
1 829
1 894
1 940
2 129
2 003
2 010
2 316
2 329
2 436
2 685
1 145
1 197
1 331
1 216
1 257
1 227
703
728
870
848
820
854
260
330
357
350
371
370
1 888
1 955
2 216
2 103
2 105
2 143
5 998
6 220
7 089
6 846
6 988
7 279
630
641
757
622
612
637
1 292
1 379
1 531
1 463
1 464
1 495
1 922
2 020
2 287
2 086
2 076
2 132
670
692
790
696
707
725
398
408
478
461
420
429
749
820
887
872
868
930
3 739
3 940
4 443
4 114
4 071
4 217
9 737
10 160
11 532
10 960
11 059
11 496
Jul
Aug
Sep
Oct
Nov
Dec
498
515
522
512
494
474
2 145
1 980
2 124
2 261
2 136
1 964
2 643
2 495
2 646
2 773
2 631
2 438
1 308
1 253
1 327
1 411
1 393
1 321
935
975
937
965
907
818
384
361
378
346
352
343
2 295
2 169
2 294
2 390
2 282
2 104
7 564
7 253
7 581
7 886
7 565
7 023
658
644
668
668
675
572
1 600
1 525
1 565
1 662
1 573
1 419
2 258
2 170
2 234
2 329
2 248
1 991
765
752
748
832
763
667
504
570
567
473
414
390
931
913
963
916
942
851
4 458
4 405
4 512
4 551
4 367
3 900
12 022
11 659
12 093
12 436
11 933
10 923
2015 Jan
Feb
Mar
Apr
May
Jun
392
438
484
470
434
484
1 810
1 864
2 181
2 262
2 231
2 402
2 202
2 302
2 666
2 732
2 665
2 886
1 414
1 511
1 906
1 764
1 689
1 700
681
766
894
827
838
904
336
391
409
389
381
403
1 949
2 078
2 227
2 115
2 150
2 356
6 581
7 048
8 101
7 827
7 723
8 250
605
656
817
617
630
668
1 256
1 298
1 577
1 495
1 494
1 639
1 862
1 954
2 395
2 112
2 124
2 307
705
702
948
724
674
704
352
378
443
360
341
354
782
858
939
879
878
924
3 701
3 892
4 724
4 076
4 016
4 289
10 282
10 939
12 825
11 902
11 740
12 539
Jul
Aug
Sep
Oct
Nov
Dec
400
360
397
383
375
414
2 264
2 068
2 182
2 382
2 320
2 177
2 664
2 428
2 579
2 765
2 695
2 592
1 845
1 720
1 705
1 747
1 618
1 628
971
957
931
913
913
823
452
429
437
412
408
369
2 397
2 278
2 299
2 517
2 388
2 058
8 329
7 813
7 950
8 354
8 022
7 469
665
644
684
660
646
571
1 679
1 507
1 640
1 700
1 651
1 428
2 344
2 152
2 325
2 361
2 297
1 999
765
660
646
675
662
594
427
469
476
434
415
367
955
906
1 006
997
986
929
4 490
4 188
4 453
4 467
4 360
3 889
12 819
12 000
12 403
12 822
12 382
11 358
2016 Jan
304
1 926
2 231
1 333
721
310
2 022
6 617
568
1 321
1 889
530
355
851
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
MV6Y
702
717
755
747
743
691
MV6Z
3 638
3 723
3 837
3 795
3 805
3 399
All
Work
MV72
10 223
10 545
10 448
10 453
10 494
8 961
10 472
10 559
10 572
10 526
10 779
9 738
3 625 10 243
5
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY TYPE OF WORK
£ million
2013
Q4
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
MV6L
MV6M
1 238
5 114
1 280
5 049
1 487
5 963
1 535
6 249
1 480
6 362
1 314
5 855
1 388
6 896
1 156
6 514
1 173
6 879
MV73
MV74
MV75
MV76
MV77
MV78
MV79
MV6N
338
121
1 099
743
1 145
187
407
4 056
264
101
1 136
670
975
177
349
3 673
229
92
1 270
699
904
185
320
3 700
207
101
1 443
817
821
202
297
3 887
167
115
1 615
951
791
224
262
4 124
184
131
1 896
1 276
835
260
250
4 831
179
136
2 100
1 495
773
267
203
5 153
177
275
2 227
1 516
673
249
153
5 270
164
424
2 103
1 377
589
215
121
4 993
MV7A
MV7B
1 516
2 524
1 367
2 305
1 364
2 335
1 443
2 444
1 592
2 533
1 968
2 864
2 101
3 052
2 010
3 261
1 778
3 215
OTHER PUBLIC NON-HOUSING
Factories
Warehouses
Oil, Steel, Coal
Schools & Colleges
Universities
Health
Offices
Enter tainment
Garages, Shops
Agriculture, Miscellaneous
TOTAL
MV7C
MV7D
MV7E
MV7F
MV7G
MV7H
MV7I
MV7J
MV7Z
MV82
MV6O
19
11
4
999
372
511
150
181
41
259
2 547
20
9
2
878
365
431
115
185
39
257
2 301
22
8
2
940
431
438
116
214
44
305
2 522
23
7
2
1 066
514
446
127
244
48
370
2 848
19
4
2
1 025
485
398
120
225
48
361
2 690
15
2
2
906
407
357
106
191
45
308
2 340
16
2
2
1 035
410
420
122
198
51
315
2 569
18
2
1
1 198
419
495
147
198
60
321
2 859
18
2
1
1 140
358
490
151
165
56
268
2 648
PRIVATE INDUSTRIAL
Factories
Warehouses
Oil, Steel, Coal
TOTAL
MV83
MV84
MV85
MV6P
460
350
59
869
479
401
65
946
591
440
60
1 091
662
423
38
1 123
602
421
19
1 042
617
508
11
1 135
601
571
1
1 173
689
627
2
1 318
652
534
4
1 190
PRIVATE COMMERCIAL
Schools, Universities
Health
Offices
Enter tainment
Garages
Shops
Agriculture, Miscellaneous
TOTAL
MV86
MV87
MV88
MV89
MV8A
MV8B
MV8C
MV6Q
906
243
1 930
1 326
95
1 279
487
6 266
922
220
1 893
1 337
78
1 261
347
6 059
967
250
2 035
1 420
67
1 349
263
6 351
1 067
262
2 210
1 478
62
1 423
257
6 758
1 079
266
2 295
1 448
54
1 389
245
6 777
992
255
2 191
1 298
52
1 229
237
6 254
1 064
281
2 361
1 348
60
1 254
253
6 621
1 189
287
2 511
1 389
71
1 263
265
6 974
1 196
266
2 565
1 425
77
1 183
250
6 962
TOTAL NEW WORK
MV6R
20 091
19 307
21 113
22 399
22 474
21 730
23 800
24 092
23 846
PUBLIC HOUSING
PRIVATE HOUSING
INFRASTRUCTURE
Water
Sewerage
Electricity
Roads
Railways
Harbours
Other1
TOTAL
of which
public
private
6
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY REGION
NORTH EAST
New Housing
Housing
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
YORKSHIRE AND THE HUMBER
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
EAST MIDLANDS
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
EAST OF ENGLAND
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
£ million
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
MV8D
MV8E
N3QP
MV8F
61
163
224
188
74
188
262
203
76
203
279
227
69
224
294
243
57
232
288
272
52
296
349
261
41
305
347
257
40
329
369
245
MV8G
MV8H
MV8I
MV8J
85
87
240
823
105
129
218
916
120
134
243
1 002
112
97
229
975
97
79
188
925
106
61
186
963
120
54
180
957
109
41
187
952
MV8K
146
131
156
148
134
143
141
143
MV8L
MV8M
MV8N
MV8O
MV8P
20
53
56
275
1 098
17
72
51
271
1 187
20
75
60
311
1 313
19
66
56
289
1 264
15
70
59
278
1 203
17
71
65
296
1 259
25
81
71
318
1 275
29
79
61
312
1 264
MV8Q
MV8R
N3QQ
MV8S
55
365
420
349
88
441
529
320
119
471
589
336
139
485
624
332
141
436
576
363
153
519
672
340
124
485
610
301
109
504
613
270
MV8T
MV8U
MV8V
MV8W
136
65
539
1 508
137
80
612
1 677
152
95
607
1 779
145
103
537
1 741
129
121
421
1 611
146
123
399
1 680
174
151
398
1 634
170
140
378
1 571
MV8X
433
462
490
467
432
434
412
419
MV8Y
MV8Z
MV92
MV93
MV94
73
202
125
833
2 341
78
192
141
873
2 550
98
203
188
979
2 758
76
196
178
917
2 658
69
178
150
829
2 440
72
175
100
781
2 461
85
182
77
756
2 390
64
185
54
722
2 293
MV95
MV96
N3QR
MV97
42
412
454
186
46
499
545
182
48
507
555
201
50
486
536
215
48
429
477
261
56
470
527
285
49
415
464
374
50
430
480
393
MV98
MV99
MV9A
MV9B
134
101
265
1 140
137
111
260
1 234
150
102
247
1 255
144
121
231
1 247
128
155
218
1 239
144
165
228
1 348
183
182
242
1 444
192
168
255
1 488
MV9C
367
337
361
340
317
345
354
318
MV9D
MV9E
MV9F
MV9G
MV9H
60
134
112
673
1 813
62
142
112
653
1 887
72
151
120
704
1 959
68
169
116
693
1 940
62
154
94
627
1 866
67
154
97
663
2 011
85
174
123
736
2 180
88
167
115
688
2 176
MV9I
MV9J
N3QS
MV9K
70
411
481
399
89
447
536
413
100
439
539
422
103
424
526
434
98
392
489
497
109
475
584
577
88
480
568
562
86
539
625
497
MV9L
MV9M
MV9N
MV9O
241
68
478
1 667
244
69
477
1 740
251
74
467
1 753
222
74
458
1 714
191
70
499
1 747
209
77
563
2 010
225
92
634
2 082
198
101
639
2 061
MV9P
804
791
851
856
817
827
919
917
MV9Q
MV9R
MV9S
MV9T
MV9U
134
330
264
1 532
3 199
115
336
258
1 500
3 240
182
355
268
1 656
3 409
147
351
279
1 633
3 347
130
336
292
1 575
3 322
123
333
333
1 616
3 626
156
343
375
1 793
3 875
126
324
369
1 736
3 797
6
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY REGION
continued
LONDON
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
SOUTH EAST
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
SOUTH WEST
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
WALES
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
£ million
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
MV9V
MV9W
N3QT
MV9X
541
1 165
1 706
654
626
1 455
2 081
596
616
1 571
2 186
540
556
1 608
2 164
557
444
1 488
1 932
608
422
1 730
2 152
561
321
1 592
1 913
640
316
1 622
1 939
703
MV9Y
MV9Z
MVA2
MVA3
376
53
1 570
4 358
421
64
1 796
4 959
470
70
2 127
5 394
431
60
2 261
5 473
364
60
2 113
5 076
395
57
2 279
5 445
446
96
2 385
5 480
451
106
2 474
5 672
MVA4
1 128
1 186
1 199
1 185
1 155
1 274
1 291
1 244
MVA5
MVA6
MVA7
MVA8
MVA9
307
444
379
2 258
6 616
331
481
383
2 381
7 340
387
474
354
2 414
7 808
299
428
403
2 315
7 788
292
398
515
2 360
7 436
241
438
426
2 379
7 824
328
457
293
2 369
7 849
292
460
312
2 308
7 980
MVB2
MVB3
N3QU
MVB4
145
712
857
436
153
803
956
427
143
806
948
462
127
813
940
487
106
734
841
532
112
864
976
658
96
833
929
711
100
890
990
679
MVB5
MVB6
MVB7
MVB8
272
103
803
2 471
296
109
842
2 630
348
112
890
2 761
348
118
846
2 741
316
139
719
2 547
359
161
709
2 864
406
182
736
2 965
382
152
715
2 918
MVB9
1 098
1 130
1 266
1 284
1 234
1 274
1 341
1 297
MVBN
MVC2
MVC3
MVC4
MVC5
231
309
290
1 928
4 399
229
352
264
1 975
4 605
279
413
290
2 248
5 009
197
414
299
2 194
4 935
183
400
314
2 131
4 678
175
419
254
2 122
4 986
217
465
224
2 247
5 212
197
478
192
2 164
5 082
MVC6
MVC7
N3QV
MVC8
44
565
608
225
44
633
677
237
40
653
693
256
39
647
687
276
40
569
610
335
53
646
699
357
53
594
646
347
74
612
686
306
MVC9
MVD2
MVD3
MVD4
207
79
446
1 565
218
83
444
1 658
234
72
429
1 684
210
58
395
1 626
171
58
344
1 518
173
60
375
1 665
173
67
408
1 642
146
56
397
1 591
MVD5
601
587
632
575
531
571
618
627
MVD6
MVD7
MVD8
MVD9
MVDD
79
146
203
1 029
2 594
79
150
197
1 013
2 671
102
140
195
1 069
2 753
93
133
183
984
2 610
90
143
224
988
2 506
82
157
169
979
2 644
112
169
153
1 052
2 694
109
193
138
1 067
2 658
MVE2
MVE3
N3QW
MVE4
28
172
200
146
31
180
211
150
34
167
201
156
35
166
201
156
32
147
179
282
36
169
204
358
31
163
194
357
33
185
218
330
MVE5
MVE6
MVE7
MVE8
136
23
235
740
169
30
215
776
208
32
202
799
201
31
166
755
170
32
128
792
172
39
128
901
167
48
129
897
134
44
131
857
MVE9
254
274
295
276
225
220
239
242
MVF2
MVF3
MVF4
MVF5
MVF6
29
69
73
425
1 165
26
77
80
457
1 233
32
60
101
488
1 287
23
43
83
425
1 180
26
38
68
357
1 149
29
48
74
371
1 272
41
60
101
441
1 338
31
54
99
426
1 283
6
CONSTRUCTION OUTPUT: VALUE NON-SEASONALLY ADJUSTED
CURRENT PRICES BY REGION
continued
WEST MIDLANDS
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
NORTH WEST
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
SCOTLAND
New Housing
Public
Private
Total Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
Repair and Maintenance
Housing
Other New Work
Public
Private
Infrastructure
All Repair and Maintenance
All Work
£ million
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
MVF7
MVF8
N3QX
MVF9
97
334
431
162
113
387
500
168
119
401
520
175
112
415
527
180
100
393
493
195
104
486
590
199
80
473
552
202
75
528
602
180
MVFB
MVG2
MVG3
MVG4
191
132
412
1 329
203
140
429
1 440
217
141
452
1 505
189
119
551
1 565
156
124
551
1 520
163
126
571
1 648
170
145
604
1 673
152
147
559
1 641
MVG5
497
489
506
504
449
425
455
423
MVG6
MVG7
MVG8
MVG9
MVGO
86
298
168
1 049
2 378
91
332
148
1 060
2 500
137
378
152
1 173
2 678
110
379
139
1 132
2 697
96
380
141
1 066
2 586
98
410
134
1 067
2 715
129
396
117
1 097
2 770
115
394
79
1 011
2 652
MVH2
MVH3
N3QY
MVH4
101
440
542
418
112
566
678
434
115
647
761
455
116
696
812
450
108
669
777
485
123
805
928
474
110
768
878
484
108
810
918
468
MVH5
MVH6
MVH7
MVH8
270
130
540
1 900
297
134
520
2 062
342
128
548
2 235
329
127
535
2 253
295
192
532
2 281
330
225
578
2 536
364
229
605
2 560
315
179
593
2 473
MVH9
536
517
512
554
537
583
580
553
MVI2
MVI3
MVI4
MVI5
MVI6
178
294
289
1 297
3 197
198
324
302
1 341
3 403
227
333
327
1 399
3 634
168
330
321
1 373
3 626
136
291
281
1 245
3 526
81
267
243
1 174
3 710
104
296
287
1 267
3 827
89
320
267
1 229
3 702
MVI7
MVI8
N3QZ
MVI9
96
310
406
511
112
365
476
569
126
385
511
658
135
396
532
794
139
367
506
1 000
168
434
603
1 081
162
406
569
1 036
182
430
612
922
MVIJ
MVJ2
MVJ3
MVJ4
252
106
531
1 806
295
143
539
2 021
355
162
545
2 232
359
134
567
2 386
322
105
540
2 473
372
81
605
2 742
430
71
653
2 759
400
55
634
2 623
MVJ5
367
388
394
378
379
446
469
473
MVJ6
MVJ7
MVJ8
MVJ9
MVK2
87
177
194
825
2 631
82
211
192
873
2 894
107
223
209
933
3 165
78
201
208
865
3 251
73
194
218
864
3 337
71
210
207
934
3 676
90
245
254
1 058
3 817
78
256
245
1 052
3 675
9A.A
CONSTRUCTION OUTPUT: IMPLIED PRICE DEFLATOR
NON-SEASONALLY ADJUSTED INDEX NUMBER
BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MVK5
67.5
67.3
68.0
75.8
78.7
MVK6
60.9
63.1
65.3
68.3
74.4
MVK7
62.1
66.0
65.4
68.9
67.3
MVK8
59.6
64.2
68.6
71.7
77.6
MVK9
59.0
62.1
65.6
69.3
73.9
MVKB
60.8
63.6
65.3
68.3
73.1
MVL2
41.1
42.6
43.5
45.4
46.2
MVL3
47.4
49.0
50.0
52.0
53.4
MVL4
59.7
62.1
63.5
66.3
68.7
MVL5
52.6
54.5
55.7
58.3
60.5
MVL6
56.3
58.9
61.5
64.8
68.2
73.3
76.9
80.1
84.9
89.0
79.3
78.1
78.7
81.9
87.9
76.4
80.2
84.5
90.9
94.7
78.0
81.2
86.0
94.2
97.3
83.5
89.3
89.9
96.8
101.6
79.0
82.1
84.3
90.0
94.7
74.2
76.3
76.8
80.0
85.4
49.3
54.8
60.4
67.9
73.8
55.4
60.6
65.3
71.7
77.5
71.6
79.0
83.1
87.4
89.2
62.9
69.2
73.4
79.2
83.3
72.2
76.8
80.1
85.8
90.4
90.4
95.5
96.3
96.4
97.6
92.2
97.5
98.7
98.1
98.6
93.7
94.7
91.5
91.0
95.0
99.5
106.9
105.2
96.6
96.7
101.5
108.7
101.9
92.5
96.8
105.0
106.0
102.8
96.9
96.7
98.8
102.4
100.2
95.8
96.9
90.8
95.3
97.5
96.7
96.6
80.9
87.1
90.1
91.3
95.2
84.0
89.7
92.6
93.1
95.7
93.2
96.1
97.9
98.0
99.0
88.7
93.0
95.3
95.4
97.3
95.0
98.8
98.2
95.6
97.0
100.0
102.4
106.6
109.1
100.0
102.1
105.8
108.5
100.0
103.9
108.4
110.6
100.0
104.1
107.2
109.8
100.0
102.9
105.6
107.5
100.0
104.3
108.7
111.3
100.0
103.5
107.3
109.9
100.0
102.9
104.4
105.3
100.0
104.4
107.1
108.0
100.0
104.0
106.3
107.2
100.0
101.7
102.7
104.0
100.0
102.8
104.5
105.6
100.0
103.2
106.2
108.3
Public
housing
Private
housing
Total
new
housing
Infrastructure
1997
1998
1999
2000
2001
MVK3
56.2
59.6
63.9
66.6
71.0
MVK4
49.8
53.2
58.4
61.4
66.9
MVM6
50.5
53.8
58.9
61.9
67.3
2002
2003
2004
2005
2006
75.5
80.1
86.2
93.1
99.7
73.0
76.6
79.4
84.1
87.7
2007
2008
2009
2010
2011
105.1
110.1
108.9
103.5
101.8
2012
2013
2014
2015
100.0
100.5
103.0
105.5
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
9A.Q
CONSTRUCTION OUTPUT: IMPLIED PRICE DEFLATOR
NON-SEASONALLY ADJUSTED INDEX NUMBERS
BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MVK5
78.0
77.0
78.7
81.0
MVK6
72.0
74.0
75.6
75.9
MVK7
66.7
65.9
65.9
70.8
MVK8
75.1
77.3
78.6
79.5
MVK9
72.0
73.2
74.3
76.1
MVKB
69.9
74.5
72.0
76.0
MVL2
46.5
45.0
47.6
45.8
MVL3
53.0
52.8
54.0
53.9
MVL4
67.9
68.1
69.6
69.3
MVL5
59.7
59.7
61.3
61.2
MVL6
66.7
67.5
68.8
69.8
70.1
74.4
73.7
74.8
81.6
82.3
76.2
77.0
75.9
75.9
76.2
77.6
76.8
79.5
77.1
78.4
80.8
83.0
84.2
86.2
77.5
79.8
78.7
80.1
71.1
73.2
75.7
77.0
47.7
48.4
49.4
51.6
54.0
54.4
55.6
57.4
69.3
70.8
72.8
73.4
61.3
62.0
63.5
64.8
70.5
72.2
72.3
73.6
74.8
76.5
77.3
77.7
75.1
76.8
77.6
78.1
77.2
78.2
78.5
78.5
78.3
79.9
80.9
81.7
79.2
80.9
82.3
82.3
87.3
88.9
90.0
90.8
80.5
81.9
82.8
83.3
76.5
77.0
75.8
75.7
52.9
53.6
55.0
57.8
59.3
59.7
60.8
62.7
76.5
78.1
80.8
80.6
67.6
68.1
70.1
71.0
75.2
76.1
77.4
78.4
83.9
85.3
87.0
88.4
78.2
78.8
79.9
80.7
78.8
79.5
80.6
81.4
78.6
78.5
78.8
79.1
82.7
83.6
85.2
86.7
82.4
83.8
87.3
90.7
89.8
89.0
89.8
91.0
83.3
83.5
84.6
85.8
75.8
76.2
77.5
77.9
58.1
58.8
60.8
63.8
63.4
64.0
65.5
68.0
81.6
82.4
84.3
84.2
71.7
72.3
74.0
75.5
78.6
79.3
80.5
81.8
2005 Q1
Q2
Q3
Q4
90.2
92.1
94.2
96.0
81.9
83.5
85.1
86.0
82.7
84.3
85.8
86.9
79.9
81.1
82.6
84.1
88.4
90.1
91.8
93.2
92.4
94.1
95.0
95.2
93.1
96.0
98.0
100.1
87.3
89.3
90.9
92.4
79.0
80.0
80.4
80.5
65.2
67.6
68.4
70.5
69.8
71.6
72.1
73.4
85.4
87.9
88.0
88.3
77.2
79.3
79.8
80.6
83.3
85.4
86.6
87.9
2006 Q1
Q2
Q3
Q4
97.8
99.2
100.3
101.3
87.6
87.6
87.6
88.1
88.7
88.8
88.9
89.4
85.5
87.2
88.7
90.1
93.9
94.4
94.9
95.6
95.6
96.9
98.1
98.7
101.0
101.7
101.8
102.0
93.8
94.5
94.9
95.6
83.5
86.1
86.4
85.6
71.4
73.0
74.4
76.5
75.3
77.0
78.4
79.4
88.9
89.1
89.4
89.6
81.8
82.9
83.8
84.5
89.2
90.1
90.8
91.4
2007 Q1
Q2
Q3
Q4
102.9
104.4
105.7
107.3
89.3
90.0
90.7
91.7
90.9
91.8
92.5
93.5
91.9
93.4
94.4
95.3
96.7
98.3
100.3
102.8
99.2
100.4
102.0
104.2
102.8
103.8
106.6
107.0
96.7
97.9
99.7
100.8
87.0
91.1
92.4
92.6
78.2
79.2
81.2
84.9
81.1
82.8
84.7
87.2
89.7
93.6
94.8
95.0
85.4
88.1
89.9
91.1
92.5
94.3
96.1
97.2
2008 Q1
Q2
Q3
Q4
108.6
109.9
110.5
111.3
93.4
94.9
96.2
97.3
95.3
96.9
98.2
99.4
95.3
95.1
94.3
94.1
104.8
106.7
107.6
108.5
106.5
108.6
109.5
110.1
106.5
106.5
105.7
105.4
101.6
102.4
102.6
103.1
92.4
95.5
96.3
97.2
85.2
86.8
88.1
88.4
87.5
89.6
90.8
91.0
95.2
96.1
96.4
96.8
91.5
92.9
93.7
93.9
97.9
98.7
99.2
99.3
2009 Q1
Q2
Q3
Q4
110.6
109.6
108.6
106.9
97.4
96.0
96.0
95.9
99.5
98.4
98.5
98.3
92.7
91.5
91.1
90.6
108.1
106.6
104.5
101.7
107.9
104.1
99.9
95.6
104.4
103.1
103.0
100.6
102.2
100.6
99.9
98.0
99.8
96.8
96.2
97.3
90.7
89.9
90.2
89.8
93.7
92.2
92.2
92.4
96.7
97.0
99.0
99.0
95.2
94.6
95.7
95.7
99.4
98.2
98.1
97.1
2010 Q1
Q2
Q3
Q4
105.2
103.8
102.8
102.2
96.1
96.6
96.4
96.4
98.3
98.2
97.9
97.7
90.3
90.6
91.1
92.0
98.8
96.8
95.6
95.2
92.9
91.7
92.2
93.3
98.5
97.0
96.1
95.9
96.5
95.7
95.4
95.5
96.9
96.5
96.6
96.8
90.9
91.2
91.2
91.7
93.2
93.0
93.0
93.3
98.8
97.5
97.7
98.2
95.8
95.1
95.2
95.5
96.3
95.5
95.3
95.5
2011 Q1
Q2
Q3
Q4
102.1
101.9
101.7
101.4
96.6
97.1
97.9
98.9
98.0
98.2
98.7
99.4
93.2
94.3
95.4
97.0
95.5
96.2
97.1
98.0
93.9
95.4
97.9
99.8
96.2
96.7
96.7
97.2
95.8
96.5
97.1
98.0
95.7
96.0
96.4
98.1
93.6
94.7
95.8
96.8
94.3
95.1
96.0
97.2
98.6
98.7
99.3
99.4
96.4
96.8
97.6
98.2
96.0
96.6
97.3
98.1
2012 Q1
Q2
Q3
Q4
100.9
100.3
99.6
99.3
99.6
99.7
100.2
100.5
99.9
99.8
100.1
100.3
98.5
99.7
100.5
101.4
98.8
99.6
100.4
101.2
100.5
100.1
99.6
99.9
98.7
99.7
100.8
100.8
99.1
99.7
100.4
100.8
99.2
100.0
100.1
100.8
98.9
99.0
100.7
101.5
99.0
99.3
100.5
101.2
100.4
100.3
99.5
99.8
99.7
99.8
100.0
100.5
99.3
99.8
100.2
100.7
2013 Q1
Q2
Q3
Q4
99.5
100.2
100.9
101.6
100.9
101.5
102.7
104.6
100.6
101.3
102.4
104.0
102.3
103.3
104.5
105.7
102.4
103.6
104.8
105.8
101.1
102.5
103.6
104.5
102.2
103.6
104.6
106.8
101.7
102.8
103.9
105.5
101.5
103.6
103.2
103.4
103.3
103.8
104.8
105.9
102.6
103.8
104.3
105.1
100.0
102.0
102.2
102.3
101.3
102.9
103.2
103.8
101.6
102.8
103.6
104.8
2014 Q1
Q2
Q3
Q4
103.2
102.4
103.1
103.3
106.7
106.0
106.6
106.9
106.0
105.2
105.9
106.2
107.9
107.7
108.8
109.1
107.0
106.7
107.4
107.6
105.4
104.8
105.7
106.5
108.5
108.2
108.9
109.1
107.2
106.7
107.5
107.8
104.1
104.3
104.6
104.6
106.8
107.0
107.3
107.2
105.9
106.2
106.5
106.4
102.6
102.5
102.7
102.8
104.3
104.4
104.6
104.6
106.1
105.8
106.4
106.6
2015 Q1
Q2
Q3
Q4
104.6
104.9
106.1
106.3
108.2
108.5
109.8
110.0
107.5
107.9
109.2
109.4
109.7
109.5
111.6
111.7
108.5
108.7
110.8
111.1
107.0
106.3
108.4
108.3
110.0
110.2
112.4
112.7
108.8
108.9
110.8
111.0
104.9
105.3
105.5
105.6
107.6
108.0
108.2
108.3
106.7
107.2
107.4
107.5
103.6
104.1
104.1
104.2
105.2
105.7
105.8
105.9
107.4
107.8
109.0
109.2
Public
housing
Private
housing
Total
new
housing
Infrastructure
2001 Q1
Q2
Q3
Q4
MVK3
69.6
70.7
71.2
72.6
MVK4
64.6
66.6
67.3
69.0
MVM6
65.1
67.1
67.7
69.4
2002 Q1
Q2
Q3
Q4
74.4
76.3
74.9
76.5
69.5
74.2
73.6
74.6
2003 Q1
Q2
Q3
Q4
77.6
79.5
80.9
82.2
2004 Q1
Q2
Q3
Q4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
9A.M
CONSTRUCTION OUTPUT: IMPLIED PRICE DEFLATOR
NON-SEASONALLY ADJUSTED INDEX NUMBERS
BY SECTOR
Index 2012 = 100
New Housing
Other New Work
Repair and Maintenance
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All
new work
Public
housing
Private
housing
Total
housing
Non
housing
R&M
All
Repair
and
Maintenance
MVK5
90.9
91.1
91.4
91.7
92.0
92.4
MVK6
95.9
95.6
95.3
95.2
95.2
95.2
MVK7
91.8
92.4
92.6
93.1
93.3
93.5
MVK8
96.3
96.0
95.9
95.9
95.9
95.9
MVK9
95.4
95.4
95.3
95.4
95.5
95.6
MVKB
96.4
96.5
96.8
96.9
96.9
96.5
MVL2
91.3
91.2
91.2
91.3
91.6
92.2
MVL3
92.9
93.0
93.0
93.1
93.3
93.5
MVL4
97.5
97.7
97.9
98.1
98.2
98.3
MVL5
95.0
95.2
95.3
95.3
95.5
95.7
MVL6
95.3
95.3
95.3
95.4
95.5
95.6
97.9
98.0
98.0
98.1
98.2
98.3
92.8
93.2
93.6
93.9
94.3
94.6
95.3
95.5
95.7
95.9
96.2
96.5
93.6
93.8
94.2
94.7
95.4
96.2
96.0
96.2
96.4
96.6
96.8
96.8
95.7
95.8
96.0
96.2
96.5
96.7
96.0
95.6
95.6
95.8
96.1
96.1
93.0
93.7
94.1
94.4
94.7
95.1
93.9
94.4
94.7
94.9
95.1
95.4
98.5
98.6
98.6
98.6
98.6
98.8
96.1
96.4
96.6
96.7
96.8
97.0
95.8
96.0
96.2
96.4
96.6
96.8
97.6
97.9
98.2
98.6
98.9
99.2
98.5
98.7
99.0
99.2
99.4
99.6
95.0
95.4
95.9
96.4
97.0
97.5
96.8
97.1
97.4
97.7
98.0
98.3
97.1
98.0
98.7
99.3
99.8
100.2
96.7
96.6
96.7
96.8
97.2
97.7
96.9
97.1
97.4
97.7
98.0
98.4
96.1
96.3
96.8
97.5
98.2
98.6
95.5
95.9
96.0
96.2
96.7
97.5
95.7
96.0
96.3
96.6
97.1
97.8
99.1
99.3
99.3
99.3
99.4
99.7
97.4
97.7
97.8
97.9
98.2
98.7
97.1
97.3
97.5
97.7
98.1
98.5
101.1
100.9
100.7
100.5
100.3
100.0
99.5
99.6
99.7
99.7
99.7
99.8
99.8
99.9
99.9
99.8
99.8
99.9
98.0
98.5
99.0
99.3
99.7
99.9
98.6
98.8
99.1
99.3
99.6
99.8
100.5
100.5
100.5
100.3
100.0
99.8
98.2
98.7
99.1
99.3
99.7
100.1
98.8
99.1
99.3
99.5
99.7
100.0
98.9
99.1
99.5
99.8
100.0
100.1
98.4
99.1
99.1
98.8
98.8
99.3
98.6
99.1
99.2
99.2
99.2
99.6
100.1
100.5
100.6
100.6
100.3
99.9
99.3
99.8
99.9
99.9
99.7
99.8
99.0
99.4
99.6
99.7
99.7
99.9
Jul
Aug
Sep
Oct
Nov
Dec
99.8
99.6
99.4
99.3
99.2
99.2
100.0
100.2
100.3
100.4
100.5
100.6
100.0
100.1
100.1
100.2
100.2
100.3
100.2
100.4
100.8
101.1
101.4
101.7
100.1
100.4
100.6
100.9
101.2
101.6
99.7
99.6
99.5
99.6
99.8
100.1
100.6
100.9
100.8
100.7
100.7
101.1
100.2
100.4
100.5
100.6
100.8
101.0
100.0
100.0
100.3
100.6
100.8
100.9
100.2
100.8
101.1
101.1
101.3
101.9
100.1
100.6
100.8
100.9
101.2
101.6
99.6
99.4
99.5
99.7
99.8
99.7
99.9
100.0
100.2
100.4
100.5
100.7
100.1
100.3
100.4
100.5
100.7
100.9
2013 Jan
Feb
Mar
Apr
May
Jun
99.3
99.5
99.7
99.9
100.2
100.4
100.7
100.9
101.0
101.2
101.5
101.8
100.5
100.6
100.8
101.0
101.2
101.5
102.0
102.3
102.6
102.9
103.3
103.7
102.0
102.4
102.8
103.2
103.6
104.0
100.5
101.0
101.6
102.1
102.6
103.0
101.6
102.2
102.8
103.3
103.7
103.9
101.4
101.7
102.1
102.5
102.8
103.1
101.0
101.4
102.2
103.2
103.9
103.8
102.7
103.4
103.7
103.7
103.8
104.0
102.1
102.6
103.1
103.6
103.8
104.0
99.6
99.8
100.5
101.5
102.2
102.4
100.9
101.2
101.8
102.5
103.0
103.2
101.2
101.5
102.0
102.5
102.9
103.1
Jul
Aug
Sep
Oct
Nov
Dec
100.7
100.9
101.1
101.3
101.6
101.8
102.2
102.7
103.2
103.8
104.5
105.3
101.9
102.3
102.8
103.4
103.9
104.6
104.1
104.5
104.9
105.3
105.7
106.2
104.4
104.8
105.1
105.5
105.8
106.2
103.3
103.6
103.9
104.2
104.5
104.9
104.2
104.6
105.2
106.0
106.8
107.7
103.5
103.9
104.3
104.9
105.5
106.1
103.4
103.1
103.0
103.2
103.4
103.6
104.4
104.8
105.2
105.6
105.9
106.2
104.1
104.2
104.5
104.8
105.2
105.4
102.3
102.2
102.2
102.2
102.3
102.4
103.2
103.2
103.3
103.5
103.8
103.9
103.4
103.6
103.9
104.4
104.8
105.3
2014 Jan
Feb
Mar
Apr
May
Jun
103.6
103.1
102.8
102.3
102.1
102.9
107.2
106.7
106.4
105.8
105.6
106.5
106.5
105.9
105.6
105.1
104.9
105.7
108.5
107.8
107.4
107.2
107.2
108.6
107.7
106.8
106.5
106.4
106.4
107.2
106.3
105.0
104.8
104.5
104.6
105.2
109.2
108.3
108.0
107.9
108.0
108.7
107.9
107.1
106.7
106.5
106.4
107.2
103.9
104.2
104.3
104.2
104.3
104.5
106.6
106.9
106.9
106.9
106.9
107.1
105.7
106.0
106.0
106.1
106.2
106.3
103.0
102.4
102.4
102.5
102.4
102.7
104.4
104.2
104.3
104.3
104.3
104.5
106.5
106.0
105.8
105.6
105.6
106.2
Jul
Aug
Sep
Oct
Nov
Dec
103.3
102.8
103.2
103.1
103.5
103.3
106.8
106.3
106.7
106.7
107.0
106.9
106.1
105.6
106.0
106.0
106.3
106.2
108.9
108.3
109.1
109.2
109.1
108.9
107.6
107.0
107.5
107.6
107.7
107.5
105.8
105.3
105.9
106.1
106.8
106.5
109.1
108.6
109.1
109.1
109.3
109.0
107.7
107.1
107.6
107.7
107.9
107.7
104.5
104.7
104.7
104.5
104.5
104.6
107.2
107.3
107.4
107.2
107.2
107.3
106.4
106.5
106.5
106.4
106.4
106.5
102.7
102.7
102.8
102.7
102.7
102.8
104.6
104.6
104.6
104.5
104.6
104.7
106.5
106.1
106.5
106.5
106.7
106.6
2015 Jan
Feb
Mar
Apr
May
Jun
103.6
104.3
105.7
104.8
104.8
105.1
107.2
107.9
109.4
108.4
108.4
108.7
106.5
107.2
108.7
107.8
107.8
108.1
109.5
109.2
110.4
109.3
109.5
109.8
107.5
108.3
109.6
108.4
108.6
109.0
106.6
106.7
107.8
106.5
106.1
106.4
109.1
109.9
111.1
110.0
110.1
110.6
108.0
108.5
109.8
108.7
108.8
109.1
104.8
104.9
105.1
105.2
105.4
105.4
107.5
107.6
107.7
107.8
108.1
108.1
106.6
106.7
106.8
107.0
107.3
107.3
103.4
103.6
103.9
103.9
104.2
104.1
105.0
105.1
105.3
105.5
105.8
105.8
106.9
107.3
108.1
107.6
107.7
108.0
Jul
Aug
Sep
Oct
Nov
Dec
106.6
105.8
105.8
106.2
106.7
106.0
110.3
109.5
109.4
109.9
110.4
109.7
109.8
108.9
108.8
109.3
109.9
109.1
112.0
111.4
111.4
111.8
112.0
111.4
111.2
110.5
110.6
111.0
111.4
110.9
108.7
108.3
108.2
108.4
108.6
108.1
112.8
112.1
112.2
112.6
113.0
112.5
111.2
110.6
110.5
110.9
111.3
110.7
105.5
105.5
105.5
105.7
105.6
105.6
108.2
108.2
108.1
108.4
108.3
108.3
107.5
107.4
107.3
107.6
107.6
107.5
104.1
104.1
104.1
104.3
104.2
104.2
105.8
105.7
105.8
106.0
105.9
105.8
109.3
108.8
108.8
109.2
109.4
109.0
2016 Jan
106.6
110.3
109.8
111.5
111.2
108.4
112.9
111.2
105.6
108.3
107.5
104.3
105.9
109.2
Public
housing
Private
housing
Total
new
housing
Infrastructure
2010 Jul
Aug
Sep
Oct
Nov
Dec
MVK3
103.1
102.8
102.6
102.3
102.3
102.1
MVK4
96.5
96.4
96.4
96.3
96.4
96.4
MVM6
98.0
98.0
97.8
97.7
97.8
97.8
2011 Jan
Feb
Mar
Apr
May
Jun
102.1
102.1
102.0
102.0
101.9
101.9
96.5
96.6
96.8
96.9
97.1
97.4
Jul
Aug
Sep
Oct
Nov
Dec
101.8
101.7
101.6
101.5
101.4
101.2
2012 Jan
Feb
Mar
Apr
May
Jun
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
Housing
All
Work
NO1
NEW ORDERS FOR CONSTRUCTION: VOLUME SEASONALLY ADJUSTED
INDEX NUMBERS
By Main Contractor, By Sector
Index 2005 = 100
New Housing
Other New Work
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
N3SV
68.3
71.7
111.7
62.4
73.6
N3SW
70.6
71.6
76.1
80.1
85.8
N3SX
94.5
100.7
103.5
125.1
113.7
N3SY
68.4
78.3
101.5
120.3
122.3
N3SZ
72.9
79.9
95.1
110.4
111.3
N3T2
85.9
92.9
108.4
113.4
105.1
N3T3
−1.2
8.1
16.7
4.6
−7.4
72.3
70.5
69.7
81.9
88.1
83.7
100.6
127.1
137.1
101.4
74.7
73.3
86.9
103.1
100.7
111.1
104.0
74.8
80.4
88.6
101.2
82.2
69.4
70.5
73.3
95.7
83.2
74.9
80.6
82.9
87.8
81.4
78.9
86.9
86.3
−16.4
−7.3
−3.1
10.1
−0.7
65.8
71.0
79.0
71.0
65.2
72.1
75.1
80.8
72.3
66.9
106.2
121.5
100.0
109.9
102.4
81.1
74.5
68.8
79.1
71.5
109.6
97.3
121.6
106.5
92.1
78.0
84.9
94.2
109.8
98.4
83.6
84.0
91.7
101.2
90.4
82.8
85.4
89.4
93.9
85.0
−4.1
3.2
4.7
5.0
−9.5
69.4
78.3
74.2
80.7
95.9
63.8
64.3
72.3
79.0
98.2
64.6
66.2
72.6
79.2
97.9
109.1
110.9
113.9
100.6
74.6
79.5
78.6
107.1
105.0
108.2
88.4
89.2
71.2
80.1
75.6
99.2
97.0
92.3
83.2
100.1
92.4
91.0
93.0
88.4
98.5
86.2
86.0
89.4
87.1
95.8
1.5
−0.2
3.9
−2.6
10.0
2005
2006
2007
2008
2009
100.0
130.3
135.7
110.3
115.6
100.0
97.4
91.1
49.7
34.1
100.0
101.8
97.0
57.7
44.8
100.0
70.6
91.3
108.6
153.3
100.0
87.5
95.1
119.7
130.1
100.0
109.4
88.8
64.9
41.4
100.0
127.9
126.2
95.7
54.7
100.0
114.4
112.3
97.3
72.6
100.0
106.2
105.7
87.3
73.2
4.4
6.2
−0.4
−17.5
−16.1
2010
2011
2012
2013
2014
125.1
98.4
91.2
147.8
73.6
52.9
55.1
55.3
72.9
79.9
62.4
60.8
60.1
82.8
79.1
125.0
103.8
145.3
120.9
103.7
117.5
79.4
67.9
73.7
77.7
35.0
33.7
40.4
53.0
56.6
57.1
54.8
48.8
52.9
63.3
69.6
58.1
52.5
58.4
66.1
73.4
63.7
64.5
71.9
73.8
0.3
−13.3
1.2
11.5
2.6
2015
53.2
78.8
75.4
155.8
60.1
70.6
61.0
62.2
75.8
2.8
Public
housing
Private
housing
Total
new housing
Infrastructure
1985
1986
1987
1988
1989
N3SS
106.8
107.8
116.9
101.4
88.1
N3ST
122.4
131.8
138.7
144.6
105.6
N3SU
120.3
128.6
135.8
138.9
103.3
1990
1991
1992
1993
1994
68.7
90.2
136.0
162.7
135.8
72.8
67.5
59.7
69.6
80.9
1995
1996
1997
1998
1999
113.6
101.8
92.6
81.0
78.1
2000
2001
2002
2003
2004
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO1Q
NEW ORDERS FOR CONSTRUCTION: VOLUME SEASONALLY ADJUSTED
INDEX NUMBERS
By Main Contractor, by Sector
Index 2005=100
New Housing
Other New Work
Excluding Infrastructure
Period on
same period
one year ago
growths (%)
Public
housing
Private
housing
Total
new housing
Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
2000 Q1
Q2
Q3
Q4
N3SS
64.1
64.1
69.5
80.0
N3ST
66.4
66.1
64.5
58.3
N3SU
66.1
65.9
65.2
61.1
N3SV
98.4
110.8
98.6
128.5
N3SW
85.2
92.9
71.0
68.9
N3SX
96.0
85.3
84.1
88.1
N3SY
83.7
112.5
104.6
96.1
N3SZ
85.9
103.2
92.6
87.7
N3T2
81.6
93.4
85.5
84.5
N3T3
−3.8
14.4
−8.5
−1.2
N3T4
−5.8
7.5
4.9
−0.5
2001 Q1
Q2
Q3
Q4
74.6
83.9
76.7
78.0
61.2
64.4
66.0
65.7
63.0
66.9
67.4
67.4
131.9
96.3
115.6
99.8
64.9
86.0
84.1
79.5
97.0
101.4
85.8
72.8
107.1
89.6
94.8
96.5
94.4
90.4
90.6
88.4
89.5
84.4
86.7
83.6
5.9
−5.7
2.7
−3.5
9.6
−9.7
1.4
−1.0
2002 Q1
Q2
Q3
Q4
79.1
72.2
83.3
62.1
68.0
67.0
73.9
80.3
69.5
67.7
75.2
77.9
158.1
86.9
124.8
85.9
89.2
81.7
98.8
158.7
67.5
68.2
74.9
74.1
88.3
91.1
98.8
90.8
85.4
85.2
95.2
106.1
88.6
80.4
92.6
96.0
5.9
−9.2
15.2
3.6
−1.0
−4.7
6.9
14.8
2003 Q1
Q2
Q3
Q4
85.8
79.4
81.8
75.9
79.5
76.0
73.2
87.1
80.3
76.4
74.3
85.6
116.5
112.6
86.8
86.7
105.9
97.8
113.8
102.3
81.2
75.9
84.2
79.1
85.2
76.2
88.1
83.1
90.1
81.8
94.3
87.5
90.1
83.6
87.8
86.9
−6.2
−7.3
5.1
−1.1
1.7
3.9
−5.2
−9.5
2004 Q1
Q2
Q3
Q4
93.8
106.1
94.7
89.1
100.0
90.6
103.0
98.9
99.2
92.7
101.9
97.6
64.4
85.8
65.1
83.3
107.8
117.3
92.8
114.8
67.5
71.5
80.7
82.7
114.2
96.5
96.0
93.5
105.4
98.2
92.8
97.5
99.3
95.3
92.5
96.0
14.3
−4.0
−3.0
3.8
10.2
14.1
5.3
10.5
2005 Q1
Q2
Q3
Q4
85.4
95.4
97.1
122.1
96.6
106.6
109.0
87.7
95.1
105.2
107.5
92.3
93.8
95.1
114.1
97.1
97.8
102.3
105.5
94.4
80.7
107.2
96.9
115.2
97.2
94.8
93.6
114.4
94.9
98.7
97.3
109.2
94.8
100.1
101.9
103.1
−1.3
5.6
1.8
1.2
−4.5
5.0
10.2
7.4
2006 Q1
Q2
Q3
Q4
124.3
121.4
162.4
113.1
95.1
102.4
96.4
95.8
98.9
104.9
105.1
98.1
58.0
73.3
76.5
74.9
95.1
78.6
86.8
89.4
115.7
102.2
116.0
103.7
126.8
143.3
128.5
113.0
116.8
120.0
115.6
105.4
105.5
110.8
108.5
100.1
2.3
5.0
−2.1
−7.8
11.3
10.6
6.4
−3.0
2007 Q1
Q2
Q3
Q4
151.1
139.9
122.6
129.0
97.2
93.5
88.7
85.0
104.3
99.6
93.2
90.8
94.3
87.4
88.9
94.6
90.5
99.1
94.3
96.4
110.5
94.1
72.1
78.4
120.8
136.0
121.0
127.0
111.2
119.9
106.5
111.5
107.5
110.7
100.9
103.9
7.4
3.0
−8.9
3.0
1.9
−0.1
−7.0
3.8
2008 Q1
Q2
Q3
Q4
108.2
129.1
113.5
90.4
69.5
54.2
40.5
34.5
74.6
64.1
50.2
41.9
105.7
121.7
108.7
98.2
115.2
113.3
124.4
125.8
81.0
56.6
68.2
53.6
118.1
95.0
95.0
74.7
111.7
94.0
98.7
84.9
100.5
88.4
86.0
74.1
−3.2
−12.0
−2.8
−13.8
−6.5
−20.1
−14.8
−28.6
2009 Q1
Q2
Q3
Q4
84.2
106.2
147.5
124.5
28.7
31.7
34.0
41.7
36.1
41.6
49.0
52.6
122.0
175.5
202.6
113.1
96.4
147.4
151.6
125.1
36.3
45.8
38.6
44.8
56.2
56.1
51.1
55.6
63.7
78.6
75.7
72.2
62.0
78.3
81.5
71.0
−16.3
26.2
4.1
−12.9
−38.3
−11.5
−5.1
−4.2
2010 Q1
Q2
Q3
Q4
140.8
125.2
86.8
147.5
47.6
43.4
64.7
55.9
59.9
54.2
67.6
68.0
153.6
135.5
94.6
116.4
124.6
118.8
96.1
130.5
35.3
38.9
33.6
32.2
55.4
58.4
61.0
53.5
70.6
71.3
66.1
70.6
76.3
73.2
69.5
74.7
7.5
−4.0
−5.1
7.4
23.0
−6.5
−14.7
5.2
2011 Q1
Q2
Q3
Q4
135.7
97.8
87.8
72.4
57.9
52.4
56.4
53.8
68.2
58.4
60.6
56.2
98.0
79.1
98.8
139.3
101.6
74.4
80.4
61.3
37.2
34.0
31.9
31.8
55.4
53.6
64.9
45.0
64.8
56.1
64.0
47.3
69.3
59.2
66.7
59.6
−7.2
−14.6
12.7
−10.7
−9.2
−19.2
−4.1
−20.3
2012 Q1
Q2
Q3
Q4
83.4
86.3
94.3
101.0
50.2
52.2
56.8
62.2
54.6
56.7
61.7
67.3
152.5
103.3
138.1
187.4
56.9
70.3
70.4
73.9
50.0
34.1
42.5
34.9
58.1
46.2
43.1
47.7
56.5
50.7
50.2
52.7
66.1
58.0
62.8
71.1
11.0
−12.3
8.2
13.2
−4.6
−2.0
−5.9
19.3
2013 Q1
Q2
Q3
Q4
116.1
151.5
169.8
153.9
63.8
75.5
74.7
77.5
70.7
85.5
87.2
87.6
90.7
144.8
134.1
114.1
82.2
71.1
66.2
75.2
39.6
44.4
54.6
73.6
51.6
55.7
51.2
53.2
57.8
58.1
55.7
62.1
64.9
75.0
72.9
74.8
−8.6
15.5
−2.8
2.6
−1.8
29.4
16.2
5.3
2014 Q1
Q2
Q3
Q4
87.5
93.5
63.1
50.4
79.6
75.1
86.8
78.3
80.6
77.5
83.6
74.6
83.4
97.9
108.5
124.9
77.1
86.6
74.9
72.3
63.1
61.0
36.2
66.3
53.8
62.1
73.5
63.9
61.3
68.4
68.2
66.5
69.1
74.1
76.8
74.9
−7.6
7.2
3.7
−2.5
6.5
−1.2
5.4
0.2
2015 Q1
Q2
Q3
Q4
50.5
52.8
44.4
65.1
80.6
76.8
75.8
81.8
76.7
73.7
71.6
79.6
141.9
178.2
176.0
127.0
63.1
56.6
62.2
58.4
71.7
75.3
73.3
62.1
61.9
54.5
57.8
69.7
63.7
58.2
61.3
65.5
75.7
75.3
76.4
76.0
1.0
−0.5
1.4
−0.5
9.4
1.6
−0.6
1.4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO2
NEW ORDERS FOR CONSTRUCTION: VOLUME SEASONALLY ADJUSTED
By Main Contractors, By Sector
£million
New Housing
Other New Work
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
N3T8
4 761
4 997
7 787
4 350
5 136
N3T9
7 499
7 608
8 083
8 509
9 117
N3TA
5 803
6 183
6 351
7 678
6 978
N3TB
16 106
18 438
23 898
28 329
28 795
N3TC
34 169
37 226
46 119
48 866
50 026
N3TD
56 704
61 317
71 561
74 882
69 367
N3TE
−1.2
8.1
16.7
4.6
−7.4
13 538
13 208
13 064
15 345
16 504
5 839
7 014
8 864
9 564
7 075
7 939
7 787
9 233
10 950
10 698
6 818
6 384
4 589
4 936
5 441
23 835
19 371
16 356
16 599
17 267
44 431
40 556
39 042
42 049
40 481
57 969
53 764
52 106
57 394
56 985
−16.4
−7.3
−3.1
10.1
−0.7
10 701
11 541
12 837
11 548
10 600
13 511
14 059
15 126
13 550
12 532
7 408
8 472
6 975
7 667
7 144
8 611
7 915
7 307
8 399
7 596
6 726
5 976
7 467
6 538
5 654
18 380
19 987
22 178
25 851
23 177
41 125
42 350
43 927
48 455
43 571
54 636
56 409
59 053
62 005
56 103
−4.1
3.2
4.7
5.0
−9.5
1 717
1 936
1 834
1 996
2 372
10 378
10 457
11 757
12 836
15 957
12 095
12 393
13 591
14 832
18 329
7 608
7 735
7 946
7 019
5 206
8 442
8 355
11 380
11 150
11 493
5 427
5 479
4 370
4 917
4 641
23 368
22 846
21 730
19 585
23 568
44 845
44 415
45 426
42 671
44 908
56 940
56 808
59 017
57 503
63 237
1.5
−0.2
3.9
−2.6
10.0
2005
2006
2007
2008
2009
2 473
3 222
3 355
2 728
2 859
16 257
15 837
14 810
8 078
5 537
18 730
19 059
18 165
10 806
8 396
6 974
4 927
6 368
7 572
10 690
10 624
9 293
10 099
12 713
13 822
6 139
6 717
5 452
3 982
2 540
23 553
30 122
29 721
22 537
12 890
47 290
51 059
51 640
46 804
39 942
66 020
70 118
69 805
57 610
48 338
4.4
6.2
−0.4
−17.5
−16.1
2010
2011
2012
2013
2014
3 093
2 434
2 257
3 656
1 820
8 600
8 963
8 996
11 844
12 994
11 694
11 397
11 252
15 500
14 814
8 720
7 239
10 133
8 432
7 229
12 485
8 440
7 211
7 826
8 256
2 150
2 069
2 480
3 257
3 476
13 441
12 897
11 488
12 463
14 916
36 796
30 645
31 313
31 978
33 877
48 490
42 042
42 565
47 478
48 691
0.3
−13.3
1.2
11.5
2.6
2015
1 315
12 804
14 119
10 863
6 383
4 333
14 362
35 941
50 060
2.8
Public
housing
Private
housing
Total
new housing
Infrastructure
1985
1986
1987
1988
1989
N3T5
2 641
2 667
2 890
2 508
2 179
N3T6
19 894
21 424
22 552
23 508
17 162
N3T7
22 535
24 091
25 442
26 016
19 341
1990
1991
1992
1993
1994
1 698
2 231
3 363
4 023
3 359
11 840
10 977
9 701
11 322
13 145
1995
1996
1997
1998
1999
2 810
2 518
2 289
2 002
1 932
2000
2001
2002
2003
2004
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO2Q
NEW ORDERS FOR CONSTRUCTION: VOLUME SEASONALLY ADJUSTED
By Main Contractor, By sector
£million
New Housing
Other New Work
Excluding Infrastructure
Period on
same period
one year ago
growths
Public
housing
Private
housing
Total
new housing
Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
2000 Q1
Q2
Q3
Q4
N3T5
396
396
429
495
N3T6
2 700
2 687
2 623
2 368
N3T7
3 096
3 084
3 053
2 862
N3T8
1 716
1 932
1 719
2 240
N3T9
2 262
2 467
1 885
1 829
N3TA
1 474
1 310
1 291
1 352
N3TB
4 927
6 625
6 160
5 656
N3TC
10 379
12 334
11 055
11 077
N3TD
13 475
15 417
14 108
13 940
N3TE
−3.8
14.4
−8.5
−1.2
N3TF
−5.8
7.5
4.9
−0.5
2001 Q1
Q2
Q3
Q4
461
519
474
482
2 488
2 616
2 681
2 672
2 949
3 134
3 155
3 155
2 300
1 679
2 016
1 740
1 725
2 284
2 234
2 112
1 488
1 557
1 316
1 117
6 305
5 275
5 584
5 682
11 819
10 795
11 151
10 651
14 768
13 929
14 305
13 806
5.9
−5.7
2.7
−3.5
9.6
−9.7
1.4
−1.0
2002 Q1
Q2
Q3
Q4
489
446
515
384
2 764
2 723
3 005
3 265
3 253
3 169
3 520
3 649
2 756
1 515
2 176
1 498
2 370
2 171
2 625
4 214
1 036
1 046
1 150
1 138
5 200
5 367
5 817
5 347
11 362
10 099
11 768
12 197
14 615
13 268
15 288
15 846
5.9
−9.2
15.2
3.6
−1.0
−4.7
6.9
14.8
2003 Q1
Q2
Q3
Q4
530
491
506
469
3 232
3 087
2 976
3 541
3 762
3 579
3 481
4 010
2 031
1 964
1 513
1 511
2 813
2 598
3 023
2 716
1 246
1 165
1 292
1 214
5 017
4 485
5 190
4 893
11 108
10 212
11 017
10 334
14 870
13 790
14 498
14 344
−6.2
−7.3
5.1
−1.1
1.7
3.9
−5.2
−9.5
2004 Q1
Q2
Q3
Q4
580
656
586
551
4 065
3 684
4 188
4 021
4 645
4 340
4 773
4 571
1 122
1 496
1 135
1 452
2 863
3 117
2 464
3 050
1 036
1 098
1 238
1 269
6 723
5 684
5 654
5 507
11 744
11 395
10 491
11 278
16 389
15 735
15 264
15 849
14.3
−4.0
−3.0
3.8
10.2
14.1
5.3
10.5
2005 Q1
Q2
Q3
Q4
528
590
600
755
3 925
4 334
4 432
3 566
4 453
4 924
5 032
4 321
1 635
1 658
1 989
1 692
2 598
2 718
2 801
2 507
1 238
1 645
1 487
1 769
5 724
5 581
5 514
6 735
11 196
11 601
11 791
12 703
15 649
16 525
16 823
17 024
−1.3
5.6
1.8
1.2
−4.5
5.0
10.2
7.4
2006 Q1
Q2
Q3
Q4
769
750
1 004
699
3 863
4 160
3 919
3 894
4 632
4 911
4 923
4 593
1 010
1 278
1 334
1 305
2 526
2 088
2 306
2 374
1 776
1 569
1 780
1 592
7 466
8 440
7 564
6 653
12 778
13 374
12 984
11 923
17 410
18 285
17 907
16 517
2.3
5.0
−2.1
−7.8
11.3
10.6
6.4
−3.0
2007 Q1
Q2
Q3
Q4
934
865
758
797
3 951
3 800
3 605
3 454
4 885
4 665
4 364
4 251
1 645
1 524
1 550
1 649
2 403
2 631
2 505
2 560
1 697
1 445
1 107
1 204
7 113
8 006
7 123
7 479
12 857
13 606
12 285
12 892
17 742
18 271
16 649
17 143
7.4
3.0
−8.9
3.0
1.9
−0.1
−7.0
3.8
2008 Q1
Q2
Q3
Q4
669
798
702
559
2 824
2 203
1 647
1 403
3 493
3 001
2 349
1 962
1 844
2 122
1 895
1 711
3 059
3 010
3 303
3 341
1 243
868
1 047
823
6 953
5 593
5 595
4 396
13 098
11 594
11 840
10 272
16 592
14 596
14 189
12 234
−3.2
−12.0
−2.8
−13.8
−6.5
−20.1
−14.8
−28.6
2009 Q1
Q2
Q3
Q4
521
657
912
769
1 168
1 290
1 384
1 696
1 688
1 946
2 296
2 465
2 127
3 059
3 532
1 971
2 560
3 914
4 026
3 321
558
703
593
687
3 307
3 301
3 011
3 271
8 551
10 977
11 163
9 251
10 240
12 924
13 459
11 716
−16.3
26.2
4.1
−12.9
−38.3
−11.5
−5.1
−4.2
2010 Q1
Q2
Q3
Q4
871
774
536
912
1 934
1 764
2 629
2 273
2 805
2 538
3 166
3 185
2 679
2 362
1 650
2 029
3 310
3 157
2 551
3 467
542
597
516
494
3 261
3 436
3 593
3 151
9 793
9 552
8 310
9 141
12 597
12 090
11 476
12 327
7.5
−4.0
−5.1
7.4
23.0
−6.5
−14.7
5.2
2011 Q1
Q2
Q3
Q4
839
605
543
448
2 355
2 129
2 294
2 185
3 193
2 734
2 837
2 633
1 709
1 380
1 722
2 429
2 699
1 975
2 137
1 629
571
522
489
487
3 263
3 158
3 824
2 651
8 242
7 035
8 172
7 197
11 436
9 768
11 008
9 830
−7.2
−14.6
12.7
−10.7
−9.2
−19.2
−4.1
−20.3
2012 Q1
Q2
Q3
Q4
516
534
583
624
2 041
2 122
2 307
2 526
2 557
2 656
2 890
3 150
2 658
1 801
2 407
3 267
1 510
1 867
1 871
1 963
768
524
652
536
3 419
2 722
2 538
2 810
8 355
6 913
7 467
8 577
10 912
9 569
10 357
11 727
11.0
−12.3
8.2
13.2
−4.6
−2.0
−5.9
19.3
2013 Q1
Q2
Q3
Q4
718
937
1 050
952
2 592
3 067
3 035
3 150
3 310
4 004
4 085
4 101
1 581
2 525
2 338
1 989
2 182
1 889
1 758
1 997
607
681
838
1 130
3 036
3 281
3 016
3 131
7 406
8 377
7 949
8 246
10 716
12 380
12 034
12 348
−8.6
15.5
−2.8
2.6
−1.8
29.4
16.2
5.3
2014 Q1
Q2
Q3
Q4
541
578
390
312
3 234
3 052
3 526
3 181
3 775
3 630
3 916
3 493
1 453
1 708
1 891
2 177
2 047
2 300
1 988
1 920
968
936
555
1 017
3 166
3 659
4 330
3 760
7 635
8 603
8 764
8 875
11 409
12 233
12 680
12 368
−7.6
7.2
3.7
−2.5
6.5
−1.2
5.4
0.2
2015 Q1
Q2
Q3
Q4
312
326
275
403
3 278
3 123
3 080
3 323
3 590
3 449
3 355
3 726
2 474
3 108
3 068
2 214
1 676
1 504
1 652
1 552
1 100
1 155
1 125
953
3 647
3 210
3 403
4 102
8 897
8 976
9 248
8 820
12 487
12 425
12 603
12 546
1.0
−0.5
1.4
−0.5
9.4
1.6
−0.6
1.4
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO3
NEW ORDERS FOR CONSTRUCTION: VOLUME NON-SEASONALLY ADJUSTED
By Main Contractor, By Sector
£million
New Housing
Other New Work
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
N3TJ
4 761
4 997
7 787
4 350
5 136
N3TK
7 499
7 608
8 083
8 509
9 117
N3TL
5 803
6 183
6 351
7 678
6 978
N3TM
16 106
18 438
23 898
28 329
28 795
N3TN
34 169
37 226
46 119
48 866
50 026
N3TO
56 704
61 317
71 561
74 882
69 367
N3TP
−1.2
8.1
16.7
4.6
−7.4
13 538
13 208
13 064
15 345
16 504
5 839
7 014
8 864
9 564
7 075
7 939
7 787
9 233
10 950
10 698
6 818
6 384
4 589
4 936
5 441
23 835
19 371
16 356
16 599
17 267
44 431
40 556
39 042
42 049
40 481
57 969
53 764
52 106
57 394
56 985
−16.4
−7.3
−3.1
10.1
−0.7
10 701
11 541
12 837
11 548
10 600
13 511
14 059
15 126
13 550
12 532
7 408
8 472
6 975
7 667
7 144
8 611
7 915
7 307
8 399
7 596
6 726
5 976
7 467
6 538
5 654
18 380
19 987
22 178
25 851
23 177
41 125
42 350
43 927
48 455
43 571
54 636
56 409
59 053
62 005
56 103
−4.1
3.2
4.7
5.0
−9.5
1 717
1 936
1 834
1 996
2 372
10 378
10 457
11 757
12 836
15 957
12 095
12 393
13 591
14 832
18 329
7 608
7 735
7 946
7 019
5 206
8 442
8 355
11 380
11 150
11 493
5 427
5 479
4 370
4 917
4 641
23 368
22 846
21 730
19 585
23 568
44 845
44 415
45 426
42 671
44 908
56 940
56 808
59 017
57 503
63 237
1.5
−0.2
3.9
−2.6
10.0
2005
2006
2007
2008
2009
2 473
3 222
3 355
2 728
2 859
16 257
15 837
14 810
8 078
5 537
18 730
19 059
18 165
10 806
8 396
6 974
4 927
6 368
7 572
10 690
10 624
9 293
10 099
12 713
13 822
6 139
6 717
5 452
3 982
2 540
23 553
30 122
29 721
22 537
12 890
47 290
51 059
51 640
46 804
39 942
66 020
70 118
69 805
57 610
48 338
4.4
6.2
−0.4
−17.5
−16.1
2010
2011
2012
2013
2014
3 093
2 434
2 257
3 656
1 820
8 600
8 963
8 996
11 844
12 994
11 694
11 397
11 252
15 500
14 814
8 720
7 239
10 133
8 432
7 229
12 485
8 440
7 211
7 826
8 256
2 150
2 069
2 480
3 257
3 476
13 441
12 897
11 488
12 463
14 916
36 796
30 645
31 313
31 978
33 877
48 490
42 042
42 565
47 478
48 691
0.3
−13.3
1.2
11.5
2.6
2015
1 315
12 804
14 119
10 863
6 383
4 333
14 362
35 941
50 060
2.8
Public
housing
Private
housing
Total
new housing
Infrastructure
1985
1986
1987
1988
1989
N3TG
2 641
2 667
2 890
2 508
2 179
N3TH
19 894
21 424
22 552
23 508
17 162
N3TI
22 535
24 091
25 442
26 016
19 341
1990
1991
1992
1993
1994
1 698
2 231
3 363
4 023
3 359
11 840
10 977
9 701
11 322
13 145
1995
1996
1997
1998
1999
2 810
2 518
2 289
2 002
1 932
2000
2001
2002
2003
2004
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO3Q
NEW ORDERS FOR CONSTRUCTION: VOLUME NON-SEASONALLY
ADJUSTED
By Main Contractor, By Sector
£million
New Housing
Other New Work
Excluding Infrastructure
Period on
same period
one year ago
growths (%)
Public
housing
Private
housing
Total
new housing
Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
2000 Q1
Q2
Q3
Q4
N3TG
549
371
338
459
N3TH
2 882
2 737
2 728
2 031
N3TI
3 431
3 108
3 066
2 490
N3TJ
2 008
1 887
1 790
1 923
N3TK
2 288
2 614
1 825
1 715
N3TL
1 458
1 335
1 316
1 318
N3TM
4 970
6 623
6 450
5 325
N3TN
10 724
12 459
11 381
10 281
N3TO
14 155
15 567
14 447
12 771
N3TP
8.1
10.0
−7.2
−11.6
N3TQ
−4.7
6.9
6.3
−2.5
2001 Q1
Q2
Q3
Q4
636
485
374
441
2 698
2 654
2 780
2 325
3 334
3 139
3 154
2 766
2 727
1 633
2 018
1 357
1 735
2 417
2 191
2 012
1 467
1 550
1 366
1 096
6 422
5 227
5 933
5 264
12 351
10 827
11 508
9 729
15 685
13 966
14 662
12 495
22.8
−11.0
5.0
−14.8
10.8
−10.3
1.5
−2.2
2002 Q1
Q2
Q3
Q4
667
420
403
344
2 979
2 772
3 093
2 913
3 646
3 192
3 496
3 257
3 263
1 467
2 115
1 101
2 398
2 302
2 660
4 020
1 010
1 019
1 206
1 135
5 380
5 265
6 193
4 892
12 051
10 053
12 174
11 148
15 697
13 245
15 670
14 405
25.6
−15.6
18.3
−8.1
0.1
−5.2
6.9
15.3
2003 Q1
Q2
Q3
Q4
718
465
397
416
3 432
3 163
3 056
3 185
4 150
3 628
3 453
3 601
2 404
2 024
1 475
1 116
2 821
2 654
3 072
2 603
1 202
1 115
1 369
1 231
5 235
4 422
5 496
4 432
11 662
10 215
11 412
9 382
15 812
13 843
14 865
12 983
9.8
−12.5
7.4
−12.7
0.7
4.5
−5.1
−9.9
2004 Q1
Q2
Q3
Q4
785
625
467
495
4 233
3 806
4 238
3 680
5 018
4 431
4 705
4 175
1 358
1 637
1 113
1 098
2 860
3 140
2 586
2 907
989
1 038
1 305
1 309
6 995
5 700
5 863
5 010
12 202
11 515
10 867
10 324
17 220
15 946
15 572
14 499
32.6
−7.4
−2.3
−6.9
8.9
15.2
4.8
11.7
2005 Q1
Q2
Q3
Q4
717
572
494
690
4 054
4 497
4 445
3 261
4 771
5 069
4 939
3 951
1 941
1 871
1 862
1 300
2 607
2 701
2 950
2 366
1 181
1 538
1 569
1 851
5 936
5 799
5 666
6 152
11 665
11 909
12 047
11 669
16 436
16 978
16 986
15 620
13.4
3.3
−
−8.0
−4.6
6.5
9.1
7.7
2006 Q1
Q2
Q3
Q4
1 028
723
840
631
3 949
4 360
3 889
3 639
4 977
5 083
4 729
4 270
1 193
1 459
1 232
1 043
2 525
2 097
2 478
2 193
1 681
1 482
1 853
1 701
7 598
8 867
7 555
6 102
12 997
13 905
13 118
11 039
17 974
18 988
17 847
15 309
15.1
5.6
−6.0
−14.2
9.4
11.8
5.1
−2.0
2007 Q1
Q2
Q3
Q4
1 210
798
641
706
4 009
4 013
3 530
3 258
5 219
4 811
4 171
3 964
1 906
1 710
1 381
1 371
2 424
2 648
2 683
2 344
1 594
1 400
1 158
1 300
7 120
8 521
7 137
6 943
13 044
14 279
12 359
11 958
18 263
19 090
16 530
15 922
19.3
4.5
−13.4
−3.7
1.6
0.5
−7.4
4.0
2008 Q1
Q2
Q3
Q4
868
722
632
506
2 873
2 400
1 540
1 265
3 741
3 122
2 172
1 771
2 104
2 282
1 626
1 560
3 098
3 035
3 559
3 021
1 156
868
1 077
881
6 896
5 935
5 602
4 104
13 254
12 120
11 864
9 566
16 995
15 242
14 036
11 337
6.7
−10.3
−7.9
−19.2
−6.9
−20.2
−15.1
−28.8
2009 Q1
Q2
Q3
Q4
716
597
857
689
1 221
1 444
1 266
1 606
1 937
2 041
2 123
2 295
2 474
3 241
2 999
1 976
2 586
3 943
4 270
3 023
511
706
608
715
3 287
3 460
3 061
3 082
8 858
11 350
10 938
8 796
10 795
13 391
13 061
11 091
−4.8
24.0
−2.5
−15.1
−36.5
−12.1
−6.9
−2.2
2010 Q1
Q2
Q3
Q4
1 169
656
488
781
1 987
1 882
2 516
2 215
3 156
2 537
3 004
2 997
3 009
2 268
1 336
2 107
3 375
3 218
2 710
3 182
495
613
532
510
3 259
3 546
3 642
2 995
10 138
9 645
8 220
8 794
13 294
12 182
11 224
11 790
19.9
−8.4
−7.9
5.0
23.1
−9.0
−14.1
6.3
2011 Q1
Q2
Q3
Q4
1 086
484
483
382
2 411
2 224
2 188
2 140
3 497
2 707
2 671
2 522
1 837
1 257
1 467
2 678
2 754
2 001
2 180
1 506
527
539
512
493
3 268
3 197
3 895
2 537
8 386
6 993
8 054
7 213
11 883
9 700
10 724
9 735
0.8
−18.4
10.6
−9.2
−10.6
−20.4
−4.4
−17.4
2012 Q1
Q2
Q3
Q4
672
450
547
587
2 110
2 197
2 198
2 491
2 783
2 647
2 745
3 077
2 756
1 580
2 165
3 633
1 554
1 898
1 906
1 853
722
539
687
532
3 449
2 723
2 584
2 732
8 481
6 740
7 342
8 750
11 264
9 387
10 087
11 827
15.7
−16.7
7.5
17.3
−5.2
−3.2
−5.9
21.5
2013 Q1
Q2
Q3
Q4
955
820
966
914
2 674
3 126
2 922
3 121
3 630
3 947
3 889
4 035
1 604
2 322
2 309
2 197
2 258
1 917
1 757
1 895
579
682
893
1 103
3 073
3 235
3 081
3 073
7 513
8 156
8 040
8 268
11 143
12 103
11 929
12 303
−5.8
8.6
−1.4
3.1
−1.1
28.9
18.3
4.0
2014 Q1
Q2
Q3
Q4
684
501
339
296
3 327
3 107
3 401
3 158
4 011
3 609
3 740
3 454
1 423
1 599
1 937
2 270
2 126
2 314
1 986
1 830
939
936
602
1 000
3 187
3 579
4 412
3 738
7 675
8 428
8 937
8 838
11 686
12 037
12 677
12 292
−5.0
3.0
5.3
−3.0
4.9
−0.5
6.3
−0.1
2015 Q1
Q2
Q3
Q4
382
290
242
402
3 382
3 171
2 954
3 297
3 764
3 461
3 196
3 699
2 347
3 016
3 241
2 259
1 744
1 514
1 636
1 489
1 061
1 140
1 203
929
3 646
3 131
3 488
4 097
8 798
8 800
9 568
8 775
12 562
12 261
12 763
12 474
2.2
−2.4
4.1
−2.3
7.5
1.9
0.7
1.5
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO4
NEW ORDERS FOR CONSTRUCTION: VALUE NON-SEASONALLY ADJUSTED
By Main Contractor, By Sector
£million
New Housing
Other New Work
Excluding Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
N3TU
2 549
2 636
4 746
2 823
3 589
N3TV
3 489
3 493
4 050
4 946
5 858
N3TW
3 392
3 462
3 861
5 138
5 277
N3TX
7 073
8 410
11 506
15 774
17 111
N3TY
16 503
18 001
24 163
28 681
31 835
N3TZ
23 057
25 710
33 239
39 521
40 788
N3U2
4.9
11.5
29.3
18.9
3.2
6 684
6 606
6 447
8 074
8 777
3 884
4 292
4 835
5 207
4 439
4 783
4 223
4 493
5 567
5 896
4 952
4 181
2 771
3 113
3 651
13 497
9 935
7 742
8 041
9 223
27 116
22 631
19 841
21 928
23 209
33 800
29 237
26 289
30 004
31 987
−17.1
−13.5
−10.1
14.1
6.6
5 942
6 572
7 608
7 229
7 125
7 416
7 908
8 852
8 388
8 328
5 262
5 921
4 971
5 503
5 173
5 091
4 726
4 538
5 423
5 084
4 888
4 236
5 595
5 216
4 505
10 502
11 524
13 320
16 764
16 102
25 743
26 407
28 424
32 906
30 864
33 160
34 317
37 278
41 293
39 191
3.7
3.5
8.6
10.8
−5.1
1 126
1 344
1 406
1 690
2 160
7 323
7 865
9 803
11 611
15 040
8 450
9 208
11 210
13 301
17 200
6 179
6 399
7 008
6 203
4 722
5 949
6 423
9 304
9 770
10 793
4 577
4 500
4 019
4 294
4 631
17 104
18 019
18 672
17 452
21 395
33 809
35 341
39 003
37 719
41 541
42 259
44 547
50 211
51 021
58 742
7.8
5.4
12.7
1.6
15.1
2005
2006
2007
2008
2009
2 475
3 356
3 733
3 081
3 107
16 258
16 572
16 037
9 200
6 393
18 730
19 929
19 769
12 283
9 500
6 974
5 306
6 965
7 897
11 032
10 624
9 541
11 393
14 672
14 709
6 140
6 376
5 836
4 346
2 654
23 553
30 627
32 115
23 353
12 886
47 291
51 850
56 309
50 268
41 281
66 021
71 779
76 078
62 550
50 780
12.4
8.7
6.0
−17.8
−18.8
2010
2011
2012
2013
2014
3 482
2 691
2 450
3 990
2 034
9 953
10 506
10 805
14 575
16 627
13 435
13 196
13 255
18 565
18 661
9 774
8 499
12 510
10 819
9 666
13 430
9 065
8 028
9 062
9 841
2 131
2 145
2 659
3 604
3 934
13 581
13 005
11 973
13 563
16 916
38 916
32 714
35 170
37 047
40 357
52 349
45 911
48 423
55 612
59 019
3.1
−12.3
5.5
14.8
6.1
2015
1 506
16 774
18 280
14 819
7 793
4 994
16 690
44 295
62 575
6.0
Public
housing
Private
housing
Total
new housing
Infrastructure
1985
1986
1987
1988
1989
N3TR
931
985
1 144
1 117
1 085
N3TS
5 623
6 725
7 932
9 724
7 869
N3TT
6 553
7 710
9 077
10 839
8 954
1990
1991
1992
1993
1994
845
1 090
1 558
2 103
1 750
5 838
5 515
4 889
5 972
7 027
1995
1996
1997
1998
1999
1 474
1 335
1 245
1 159
1 203
2000
2001
2002
2003
2004
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO4Q
NEW ORDERS FOR CONSTRUCTION: VALUE NON-SEASONALLY ADJUSTED
By Main Contractor, By Sector
£million
New Housing
Other New Work
Excluding Infrastructure
Period on
same period
one year ago
growths (%)
Public
housing
Private
housing
Total
new housing
Infrastructure
Public
Private
industrial
Private
commercial
All Other
Work
All New Work
Period on
period
growths (%)
2000 Q1
Q2
Q3
Q4
N3TR
356
240
220
310
N3TS
1 995
1 945
1 924
1 459
N3TT
2 352
2 185
2 145
1 768
N3TU
1 601
1 539
1 460
1 579
N3TV
1 557
1 825
1 306
1 261
N3TW
1 246
1 131
1 107
1 093
N3TX
3 560
4 805
4 748
3 991
N3TY
7 964
9 300
8 621
7 924
N3TZ
10 316
11 485
10 766
9 692
N3U2
10.1
11.3
−6.3
−10.0
N3U3
1.9
13.1
12.8
3.5
2001 Q1
Q2
Q3
Q4
431
335
262
316
1 982
1 979
2 104
1 800
2 413
2 313
2 366
2 116
2 245
1 324
1 669
1 161
1 291
1 842
1 709
1 581
1 196
1 246
1 108
950
4 908
4 094
4 743
4 274
9 640
8 506
9 229
7 966
12 052
10 819
11 595
10 081
24.3
−10.2
7.2
−13.1
16.8
−5.8
7.7
4.0
2002 Q1
Q2
Q3
Q4
493
316
320
277
2 289
2 261
2 693
2 560
2 783
2 578
3 013
2 836
2 875
1 303
1 861
969
1 903
1 823
2 183
3 395
957
997
1 055
1 010
4 486
4 487
5 403
4 296
10 221
8 610
10 502
9 670
13 004
11 186
13 515
12 506
29.0
−14.0
20.8
−7.5
7.9
3.4
16.6
24.1
2003 Q1
Q2
Q3
Q4
586
394
344
366
3 048
2 848
2 785
2 930
3 634
3 242
3 129
3 296
2 140
1 796
1 291
976
2 451
2 322
2 688
2 309
1 072
979
1 153
1 090
4 616
3 933
4 969
3 934
10 279
9 030
10 101
8 309
13 914
12 272
13 230
11 605
11.3
−11.8
7.8
−12.3
7.0
9.7
−2.1
−7.2
2004 Q1
Q2
Q3
Q4
700
564
428
468
3 926
3 567
4 017
3 530
4 626
4 131
4 445
3 998
1 205
1 470
1 015
1 032
2 588
2 917
2 465
2 823
987
1 062
1 274
1 308
6 012
5 075
5 486
4 822
10 792
10 524
10 240
9 985
15 418
14 655
14 686
13 983
32.9
−4.9
0.2
−4.8
10.8
19.4
11.0
20.5
2005 Q1
Q2
Q3
Q4
701
572
497
705
3 954
4 467
4 491
3 346
4 655
5 038
4 987
4 050
1 879
1 854
1 891
1 350
2 563
2 704
2 989
2 368
1 229
1 549
1 528
1 834
5 916
5 855
5 628
6 154
11 587
11 962
12 036
11 706
16 241
17 000
17 023
15 757
16.1
4.7
0.1
−7.4
5.3
16.0
15.9
12.7
2006 Q1
Q2
Q3
Q4
1 054
741
880
681
4 102
4 555
4 074
3 841
5 156
5 296
4 954
4 523
1 258
1 569
1 337
1 142
2 513
2 125
2 587
2 316
1 686
1 408
1 673
1 609
7 701
8 957
7 658
6 311
13 158
14 059
13 255
11 378
18 314
19 356
18 208
15 901
16.2
5.7
−5.9
−12.7
12.8
13.9
7.0
0.9
2007 Q1
Q2
Q3
Q4
1 338
886
713
796
4 280
4 327
3 841
3 589
5 618
5 213
4 553
4 385
2 110
1 881
1 501
1 473
2 618
2 956
3 076
2 743
1 574
1 491
1 324
1 447
7 499
9 400
7 999
7 217
13 801
15 728
13 900
12 880
19 420
20 940
18 453
17 265
22.1
7.8
−11.9
−6.4
6.0
8.2
1.3
8.6
2008 Q1
Q2
Q3
Q4
992
829
709
551
3 217
2 732
1 778
1 473
4 210
3 562
2 487
2 024
2 220
2 379
1 695
1 603
3 588
3 498
4 123
3 463
1 267
942
1 166
971
7 066
6 268
5 832
4 187
14 141
13 087
12 816
10 224
18 351
16 648
15 303
12 248
6.3
−9.3
−8.1
−20.0
−5.5
−20.5
−17.1
−29.1
2009 Q1
Q2
Q3
Q4
765
638
907
797
1 422
1 668
1 456
1 847
2 186
2 306
2 363
2 645
2 474
3 265
3 089
2 204
2 793
4 091
4 405
3 420
554
738
630
732
3 297
3 433
2 926
3 230
9 118
11 527
11 050
9 586
11 303
13 833
13 413
12 231
−7.7
22.4
−3.0
−8.8
−38.4
−16.9
−12.4
−0.1
2010 Q1
Q2
Q3
Q4
1 333
738
544
867
2 294
2 182
2 913
2 564
3 627
2 920
3 457
3 431
3 350
2 533
1 501
2 390
3 712
3 465
2 882
3 371
492
603
526
510
3 348
3 586
3 650
2 997
10 902
10 187
8 559
9 268
14 529
13 106
12 016
12 698
18.8
−9.8
−8.3
5.7
28.5
−5.3
−10.4
3.8
2011 Q1
Q2
Q3
Q4
1 203
535
533
420
2 798
2 594
2 573
2 541
4 001
3 129
3 105
2 961
2 110
1 461
1 726
3 202
2 927
2 141
2 355
1 642
530
551
537
527
3 279
3 225
3 928
2 573
8 846
7 378
8 546
7 944
12 847
10 508
11 652
10 904
1.2
−18.2
10.9
−6.4
−11.6
−19.8
−3.0
−14.1
2012 Q1
Q2
Q3
Q4
736
490
592
632
2 524
2 631
2 644
3 006
3 260
3 121
3 236
3 638
3 347
1 941
2 681
4 541
1 709
2 103
2 128
2 088
778
578
734
569
3 550
2 833
2 716
2 874
9 384
7 455
8 259
10 072
12 643
10 577
11 494
13 709
15.9
−16.3
8.7
19.3
−1.6
0.7
−1.4
25.7
2013 Q1
Q2
Q3
Q4
1 032
892
1 058
1 007
3 240
3 811
3 605
3 920
4 272
4 704
4 663
4 927
2 022
2 958
2 974
2 864
2 572
2 210
2 048
2 231
627
750
992
1 236
3 277
3 498
3 363
3 425
8 498
9 415
9 378
9 756
12 769
14 119
14 040
14 683
−6.9
10.6
−0.6
4.6
1.0
33.5
22.2
7.1
2014 Q1
Q2
Q3
Q4
766
557
379
332
4 264
3 954
4 355
4 053
5 030
4 511
4 735
4 385
1 893
2 122
2 598
3 053
2 531
2 747
2 372
2 191
1 060
1 051
682
1 141
3 608
4 040
5 013
4 255
9 092
9 960
10 665
10 639
14 123
14 472
15 400
15 024
−3.8
2.5
6.4
−2.4
10.6
2.5
9.7
2.3
2015 Q1
Q2
Q3
Q4
433
330
278
464
4 393
4 132
3 893
4 355
4 827
4 462
4 172
4 819
3 175
4 072
4 459
3 113
2 105
1 831
2 017
1 840
1 217
1 299
1 398
1 079
4 185
3 600
4 089
4 816
10 682
10 802
11 964
10 848
15 509
15 264
16 135
15 667
3.2
−1.6
5.7
−2.9
9.8
5.5
4.8
4.3
Users of these data should note that there may be instances where the period on period growths for the same component differ between tables. This
is due to the growth rates being calculated at a higher precision than 1 dp
within the production system. This accuracy is truncated when transferred
into the published tables.
NO5
NEW ORDERS FOR CONSTRUCTION: VALUE NON-SEASONALLY ADJUSTED
By Main Contractor, By Type of Work
£million
2013
Q4
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
N3TR
N3TS
1 007
3 920
766
4 264
557
3 954
379
4 355
332
4 053
433
4 393
330
4 132
278
3 893
464
4 355
N3WD
N3WE
N3WF
N3WG
N3WH
N3WI
N3WJ
N3TU
208
28
1 387
351
539
193
158
2 864
43
36
1 042
122
449
62
139
1 893
136
22
992
678
117
131
47
2 122
20
158
1 038
1 050
135
138
59
2 598
12
105
1 162
892
627
212
44
3 053
196
41
811
1 669
308
104
47
3 175
56
86
2 247
1 133
367
164
18
4 072
205
1 288
2 026
608
201
67
63
4 459
104
855
955
385
579
122
114
3 113
N3WK
N3WL
1 001
1 863
413
1 480
754
1 368
1 228
1 370
1 479
1 573
1 884
1 291
1 093
2 979
671
3 788
723
2 390
OTHER PUBLIC NON-HOUSING
Other Public Industrial
Schools & Colleges
Universities
Health
Offices
Enter tainment
Garages, Shops
Agriculture, Miscellaneous
TOTAL
N3WM
N3WN
N3WO
N3WP
N3WQ
N3WR
N3WS
N3WT
N3TV
65
964
335
231
56
174
10
395
2 231
15
900
421
244
173
374
78
326
2 531
9
996
576
518
161
117
33
338
2 747
17
1 064
457
189
49
180
28
388
2 372
12
845
245
481
133
154
93
228
2 191
9
803
319
538
64
171
24
178
2 105
29
1 067
70
297
148
78
31
112
1 831
18
842
316
328
169
69
55
221
2 017
17
768
219
446
129
113
33
114
1 840
PRIVATE INDUSTRIAL
Factories
Warehouses
Oil, Steel, Coal
TOTAL
N3WU
N3WV
N3WW
N3TW
383
668
185
1 236
741
317
2
1 060
724
326
−
1 051
415
268
−
682
485
656
−
1 141
655
557
5
1 217
546
754
−
1 299
969
423
6
1 398
596
474
9
1 079
PRIVATE COMMERCIAL
Schools, Universities
Health
Offices
Enter tainment
Garages
Shops
Agriculture, Miscellaneous
TOTAL
N3WX
N3WY
N3WZ
N3X2
N3X3
N3X4
N3X5
N3TX
658
173
1 068
783
30
619
94
3 425
507
112
1 103
816
39
891
140
3 608
513
240
1 420
859
21
885
102
4 040
934
125
1 705
962
45
943
298
5 013
645
186
1 649
852
24
787
113
4 255
657
200
1 587
816
54
704
166
4 185
641
183
1 251
770
48
586
121
3 600
951
100
1 441
718
53
669
157
4 089
597
128
1 976
1 237
59
701
117
4 816
TOTAL NEW WORK
N3TZ
14 683
14 123
14 472
15 400
15 024
15 509
15 264
16 135
15 667
PUBLIC HOUSING
PRIVATE HOUSING
INFRASTRUCTURE
Water
Sewerage
Electricity
Roads
Railways
Harbours
Other1
TOTAL
of which
public
private
NO6
NEW ORDERS FOR CONSTRUCTION: VALUE NON-SEASONALLY ADJUSTED
By Main Contractor, Government Office Region and Sector
NORTH EAST
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
YORKSHIRE AND THE HUMBER
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
EAST MIDLANDS
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
EAST OF ENGLAND
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
£million
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
N3U4
N3U5
N3X6
N3U6
15
118
133
261
33
164
196
70
8
221
228
179
15
193
208
49
13
261
274
93
9
186
195
77
14
196
210
314
8
167
175
222
N3U7
N3U8
N3U9
N3UA
179
202
58
833
43
113
87
508
54
37
309
807
118
14
50
438
105
89
71
631
72
22
91
457
117
56
84
781
20
23
194
633
N3UB
N3UC
N3X7
N3UD
60
325
385
86
177
366
543
23
20
293
313
413
30
277
308
151
9
279
288
116
32
373
405
90
17
270
287
150
37
284
321
249
N3UE
N3UF
N3UG
N3UH
128
78
362
1 040
133
119
499
1 317
158
80
161
1 125
115
133
212
919
129
135
176
844
130
95
197
917
179
259
285
1 160
94
67
239
970
N3UI
N3UJ
N3X8
N3UK
23
305
328
81
21
248
269
127
28
271
299
233
11
227
239
178
23
361
384
156
10
209
219
214
4
214
218
915
24
244
268
73
N3UL
N3UM
N3UN
N3UO
60
72
147
688
170
81
109
755
157
47
130
867
146
289
137
989
100
114
205
959
112
176
109
830
309
192
145
1 779
110
179
222
853
N3UP
N3UQ
N3X9
N3UR
79
268
348
434
20
209
228
175
21
322
343
80
28
294
322
324
51
337
389
304
15
351
366
811
11
441
452
69
40
326
366
190
N3US
N3UT
N3UU
N3UV
231
50
166
1 229
155
63
269
890
169
78
268
939
210
74
332
1 262
228
25
697
1 642
109
154
212
1 653
72
80
442
1 116
136
176
311
1 179
NO6
NEW ORDERS FOR CONSTRUCTION: VALUE NON-SEASONALLY ADJUSTED
By Main Contractor, Government Office Region and Sector
continued
LONDON
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
SOUTH EAST
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
SOUTH WEST
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
WALES
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
£million
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
N3UW
N3UX
N3XA
N3UY
261
1 125
1 385
124
77
976
1 054
84
120
1 010
1 129
189
103
996
1 098
643
109
1 039
1 148
132
108
1 193
1 301
220
72
591
662
1 335
101
864
964
876
N3UZ
N3V2
N3V3
N3V4
592
70
1 151
3 322
353
71
1 473
3 035
327
48
2 001
3 695
305
38
1 391
3 475
324
59
1 218
2 881
320
62
1 407
3 310
398
262
1 222
3 880
579
38
2 223
4 680
N3V5
N3V6
N3XB
N3V7
69
573
641
123
52
442
493
203
31
531
562
496
22
587
609
216
28
550
578
119
46
430
476
1 438
24
665
688
263
29
559
588
383
N3V8
N3V9
N3VA
N3VB
222
130
523
1 640
328
66
481
1 571
446
107
633
2 244
328
177
375
1 704
274
130
304
1 405
296
241
385
2 836
252
144
560
1 907
261
75
395
1 703
N3VC
N3VD
N3XC
N3VE
16
389
405
97
19
350
370
193
15
498
513
142
26
334
360
238
27
299
326
276
20
404
424
215
8
345
352
173
89
396
484
92
N3VF
N3VG
N3VH
N3VI
248
65
249
1 065
125
24
208
920
182
44
237
1 118
133
58
211
1 000
102
44
229
977
89
100
315
1 143
88
47
229
890
94
28
191
889
N3VJ
N3VK
N3XD
N3VL
24
127
151
53
18
101
119
107
11
94
105
51
5
138
143
60
11
98
109
1 020
11
69
80
54
8
124
132
51
17
206
224
178
N3VM
N3VN
N3VO
N3VP
273
35
127
640
347
26
61
659
105
23
139
423
112
32
33
380
100
26
66
1 322
26
82
89
329
83
38
65
369
105
34
117
659
NO6
NEW ORDERS FOR CONSTRUCTION: VALUE NON-SEASONALLY ADJUSTED
By Main Contractor, Government Office Region and Sector
continued
WEST MIDLANDS
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
NORTH WEST
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
SCOTLAND
New Housing
Public
Private
All New Housing
Infrastructure
Other New Work
Excluding Infrastructure
Public
Private Industrial
Private Commercial
All New Work
£million
2014
Q1
2014
Q2
2014
Q3
2014
Q4
2015
Q1
2015
Q2
2015
Q3
2015
Q4
N3VQ
N3VR
N3XE
N3VS
64
323
387
88
34
285
319
197
26
295
320
75
10
315
325
90
36
381
417
98
13
258
271
103
23
311
334
192
36
426
462
59
N3VT
N3VU
N3VV
N3VW
270
130
259
1 133
105
167
247
1 034
152
68
329
944
88
86
751
1 341
181
167
259
1 120
77
107
151
709
97
191
421
1 235
122
212
216
1 071
N3VX
N3VY
N3XF
N3VZ
99
457
556
142
29
513
542
347
39
563
602
169
43
409
453
86
44
554
598
276
24
427
452
263
22
499
522
700
27
532
559
310
N3W2
N3W3
N3W4
N3W5
163
111
288
1 261
499
97
235
1 720
311
71
475
1 628
253
208
274
1 275
350
368
573
2 165
164
181
230
1 289
170
99
320
1 811
113
174
363
1 518
N3W6
N3W7
N3XG
N3W8
57
254
311
404
78
301
379
598
61
258
319
571
39
283
322
1 018
80
236
316
586
42
231
273
587
77
237
314
297
57
351
408
480
N3W9
N3WA
N3WB
N3WC
164
117
276
1 272
489
224
371
2 061
311
80
330
1 610
383
29
490
2 242
214
60
387
1 562
436
80
415
1 791
252
30
317
1 209
205
74
345
1 513