Application for Registration as an Accredited Contractor for Live Sewer Construction Works NOTE Inclusion on the Accredited Contractor List only entitles an Accredited Contractor to be considered to provide certain categories of works and services. Inclusion on the List does not in any way: guarantee or suggest that the Accredited Contractor will be invited to tender for work or be engaged to undertake any work or services; create any relationship between the Accredited Contractor and YVW in relation to the provision of any works or services to the Water Company. An Application for Registration as an Accredited Contractor for Live Sewer Construction work is not an application to undertake any works for Yarra Valley Water as part of its capital works program. Company Name Australian Company Number (ACN) Business or Trading Name (if applicable) Australian Business Number (ABN) Contact Person for this Application Name Position Mobile Phone Email Declaration To be completed by a partner, director or other senior manager who has the authority to do so. I, as a partner, director or senior manager and authorised officer of the organisation, declare that the applicant organisation accepts Yarra Valley Water’s Conditions of Accreditation and declare that the particulars shown herein and supplementary documentation are true and correct in every detail. Name: Signed: Position: Date: Application for Registration as an Accredited Contractor for Live Sewer Construction Works SECTION 1 Contact Details 1.1 General Business Main Office address Postal address (if different) Phone Company Email address Web address SECTION 2 Business Profile 2.1 Date business established 2.2 Directors, Partners, Associates (Attach CV for each individual listed) 2.3 2.4 Name Position Victorian WorkSafe Authority Certificate Premium paid Details of registration as an employer pursuant to the provisions of the Accident Compensation Act 1985 Expiry date Public Liability Insurance Name of Insured Minimum cover of $20M is required Sum insured Qualifications $ $ Insurance Company Policy No. Expiry date 2.5 Membership of Associations List relevant associations (e.g. Civil Contractors Federation, etc) with which the business is currently affiliated v1.0 2 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 3 Requested Categories of Work (for which accreditation is sought) NOTE To be considered for accreditation in a category, the business must demonstrate clearly that all accreditation criteria are met or exceeded Categories of Work LS1 Date of last contract Property Service Connections Property Service Connection including: LS2 installation of a new individual property service branch on an existing live sewer gravity system ≤DN300 installation of an individual property service branch into an existing live gravity sewer maintenance structure installation of spur service branch on an existing live sewer gravity system ≤ DN300 installation of service branch on an existing live sewer gravity system; ≤ DN300 Minor Live Sewer Works Minor Sewer Works includes YVW Capital Works and Land Development projects required to service an individual property including:- SEWER LS3 property service connection installation and connection of short gravity sewer system ≤20m in length and ≤DN300 installation of new maintenance structures on existing live gravity sewer system; ≤DN300 repair and/or modification of existing property service connection on an existing live gravity sewer system ≤DN300, ie repair of damaged property service pipework, property service re-lining/renewal repair and/or modification of existing maintenance structure(s) on an existing live gravity sewer system; ≤ DN300, ie change to M/H cover level Major Live Sewer works Major Live Sewer Works include YVW Capital Works and Land Development projects including the following live sewer works;- SECTION 4 4.1 property service connections modification to existing live gravity sewer system, ie pipeline re-alignment, maintenance structure modifications etc minor sewer works connections of gravity sewer pipelines, ≤ DN300, to an existing live gravity sewer Business Capability Capability Statement [Please provide a statement defining the company’s core business and capability] 4.2 Resourcing Average number of people employed on a permanent basis in the last 12 months within the categories if work requested Average number of apprentices and trainees employed in the last 12 months within the categories if work requested v1.0 3 Application for Registration as an Accredited Contractor for Live Sewer Construction Works 4.3 Plant and Equipment Provide a list of current plant & equipment owned, including service/maintenance history to the required standards - 4.4 Including rick assessments Training / Qualifications Provide a list of employees training and qualifications relevant for the categories of work requested 4.5 Organisational Structure Please provide a copy of your organisational structure, including functional reporting lines, in particular how the role of any sub-contractors fit within your adopted structure 4.6 Access to Industry Standards Please provide evidence of your access to the relevant MRWA Editions of the WSAA Codes, including Supplementary manuals and MRWA Specifications 4.7 Key Personnel Key Personnel include personnel, subcontractors or agents engaged as the development works construction site supervisor or equivalent training and skills and hold qualifications, competencies necessary to carry out the specified key roles of the Accredited Consultant undertaking land development works or services. Please nominate the company key personnel Please complete Appendix 1 to nominate your company Key Personnel 4.8 Name 4.9 v1.0 Support Personnel (e.g. Contractors, Specialist Service Personnel) Position/Title Description Support Service Areas of Specific Expertise / Specialisation 4 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 5 Applicant Work History - Recent Contracts & Customer References List projects relevant to the Category types above [three (3) for each type and preferably completed in the Yarra Valley Water area]. Include the most recently completed project. A current project may be included as well as projects of significance you wish to highlight. If necessary, include projects completed in other Water Company areas Category (Code) v1.0 Client Project name & Address Project Value Engagement end date 5 Referee Name Referee’s Phone Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 6 Occupational Health & Safety (OH&S) Questionnaire Comments PART A – Contractor accredited with Yarra Valley Water DO NOT need to completed Part A ALL new Contractors need to complete this Part A 6.1 OH&S Policy & Management 6.1.1 Is there a written company OHS policy? Yes No Yes No If Yes provide a copy of the policy 6.1.2 Does your company have an OH&S Management System certified by a recognised independent authority (eg, AS4801, Safety Map, CCF)? If Yes provide details and a copy of the last 2 audit reports (internal and external) together with the status of any nonconformances 6.1.3 Has the company instigated a process of review and continuous improvement of their OH&S management system? Yes No 6.1.4 Is there a company OH&S Management System manual or plan? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No If Yes, a copy of the contents page is required 6.1.5 Are OH&S responsibilities clearly identified for all levels of staff? If Yes provide a copy of the policy 6.1.6 Are personnel with relevant OH&S qualifications engaged or employed to advise the contractor on OH&S matters available? If yes, attach Curriculum Vitae of person(s) with relevant OH&S qualifications engaged or employed to advise the contractor on OH&S matters. 6.2 Safe Work Practices & Procedures 6.2.1 Has the company prepared safe operating procedures or specific instructions relevant to its operations? If Yes provide a summary listing of procedures or instructions 6.2.2 Does the company have any permit to work system? (eg. Hot work, electrical isolation, working at height etc) If Yes, provide a summary listing or permits: 6.2.3 Is there a documented incident/accident investigation procedure? If Yes, provide a copy of a standard incident report form. 6.2.4 Are there procedures in place for maintaining, inspecting and assessing the hazards of plant operated/owned by the company? If Yes, provide details:………………………………………………… ………………………………………………………………………….. 6.2.5 Are there procedures for storing/handling hazardous substances? If Yes, provide details. ……………………………………………… ………………………………………………………………………….. 6.2.6 Are there procedures for emergency response and employee first aid and training? If Yes, provide a copy of emergency response procedure and first aid training v1.0 6 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 6 6.2.7 Occupational Health & Safety (OH&S) Questionnaire Are there procedures for identifying, assessing and controlling risks associated with manual handling? Comments Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.2.8 Are plant risk assessments undertaken for hired plant / equipment? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.2.9 Is quick corrective action taken to control health and safety risks revealed by workplace inspections and hazard reports? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.3 OH&S Training 6.3.1 Is health and safety training conducted in your organisation? Describe how health and safety training is conducted in your company. 6.3.2 Is a record maintained of all employees training and induction programs? If Yes, provide examples of safety training records. …………………………………………………………..……………… ………………………………………………………………………….. 6.3.3 Do you have appropriate licences, permits in relation to required safety competencies (eg. Plant, equipment)? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.4 Health and Safety Workplace Inspection 6.4.1 Are regular health and safety inspections at worksites undertaken? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.4.2 Is there a procedure for employees to report hazards at workplaces? . If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.4.3 Are standard workplace inspection checklists used for OH&S inspections? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.4.4 Are employees consulted during workplace inspections? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.5 v1.0 Health and Safety Consultation 7 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 6 6.5.1 Occupational Health & Safety (OH&S) Questionnaire Is there a workplace health and safety committee? Comments Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.5.2 Are employees involved in decision making over OH&S matters? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.5.3 Are there employee elected health and safety representatives? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.6 Sub-contracting 6.6.1 Does your company ensure that all sub-contractors you understand and agree to comply with their legal responsibilities under the applicable OHS legalisation and any other relevant OHS requirements? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.6.2 Is there documentation to ensure that the sub-contractor understands and agrees to comply with all your health and safety rules and procedures i.e how they inducted? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.7 OH&S Performance Monitoring 6.7.1 Is there a system for recording & analysing OH&S performance statistics? If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.7.2 Are other measure used to measure safety (for example hazard inspections conducted, hazards identified, hazards rectified or OHS training figures? . If Yes provide details. ……………………………………………… ………………………………………………………………………….. 6.7.3 Has the company ever been convicted of occupational OHS offences? If Yes provide details. ……………………………………………… ………………………………………………………………………….. v1.0 8 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 6 Occupational Health & Safety (OH&S) Questionnaire Comments PART B – To be completed by ALL Live Sewer Contractors 6.8 Please confirm you have been able to locate, read and accept YVWs Access Permit requirements as defined on the YVW website? Yes No Yes No Yes No Click HERE to find YVW’s Access Permit requirements 6.9 **Land Development Only ** Please confirm you have been able to locate, read and accept YVWs Confined Space Entry requirements as defined on the YVW website? Click HERE to find YVW’s Confined Space Entry requirements 6.10 Please confirm you have been able to locate YVWs Access Permit application form on the YVW website? Click HERE to find YVW’s Application Form for an Access Permit 6.11 Please provide a copy of your Procedures for carrying out Live Sewer Works and/or Confined Space Entry. Copy of procedures needs to be supplied as part of application 6.12 Please provide a sample Safe Work Method Statement(SWMS) for live sewer works A copy of SWMS needs to be supplied as part of application 6.13 Please confirm you have read and are prepared to accept the Live Sewer Accreditation Deed terms and conditions 6.14 Please provide a list of company Confined Space Trained Personnel Name v1.0 Registered Training Organisation Yes No Copies of training certificates or cards needs to be supplied as part of application. Certificate No. Date of Expiry 9 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 7 Environmental Management System (EMS) Questionnaire Comments Contractor accredited with Yarra Valley Water DO NOT need to complete this Section ALL new Contractors need to complete this Section 7.1 Certification under ISO 14001 7.1.1 Is the contractor’s EMS currently accredited by a certification body in accordance with ISO 14001. Yes No 7.2.2 Has the Contractor indicated when the EMS was formally implemented and provided evidence of its use on projects they completed? Yes No 7.1.3 Has the contractor provided satisfactory evidence of implementation through: 7.1.3.1 minutes of management review; 7.1.3.2 internal audit reports; 7.1.3.3 typical EMP. 7.1.4 Has the contractor provided a copy of the Certificate of certification? 7.2 EMS Accreditation by the CCF 7.2.1 Is the contractor’s EMS currently accredited by the CCF? Yes No Yes No Yes No Yes No Yes No Yes No If yes when was the CCF IMS certified. 7.2.2 Has the contractor provided a copy of the CCF Contractor Management Systems certification? If yes, provide a copy of the Certificate of Certification 7.2.3 Has the contractor provided satisfactory evidence of implementation through: 7.2.3.1 minutes of management review; 7.2.3.2 internal audit reports; 7.2.3.3 typical Environmental Management Plan (EMP). Yes No Yes No Yes No 7.2.4 Has the Contractor indicated when the EMS was formally implemented and provided evidence of its use on projects they completed? Yes No 7.3 Has any certification body withdrawn the contractor EMS accreditation? Yes No (If yes, give details.) v1.0 10 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 8 Quality Management System (QMS) Questionnaire Comments Contractor accredited with Yarra Valley Water DO NOT need to complete this Section ALL new Contractors need to complete this Section 8.1 Certification under ISO9001 8.1.1 Is the contractor’s Quality Management System currently accredited by a certification body in accordance with ISO 9001? If Yes please provide details. Yes No 8.1.2 Has the contractors Indicated when the QMS was formally implemented and provided evidence of its use on projects completed? Yes No . For a recent completed project provide a copy of the Project Management Plan used 8.1.3 Has the contractor provided satisfactory evidence of implementation through: 8.1.3.1 minutes of management review Provide evidence that recommendations of Management reviews have been implemented internal audit reports; Provide a copy of the last internal audit report. typical Project Management Plan (PMP). Provide a copy of a typical Project Management Plan. 8.1.3.2 8.1.3.3 8.1.4 Has the contractor provided a copy of the Certificate of Certification? 8.2 Quality Accreditation by the CCF 8.2.1 Is the contractor’s QMS currently accredited by the CCF? Yes No Yes No Yes No Yes No Yes No Yes No If Yes please provide details. 8.2.2 Has the contractor provided a copy of the CCF IMS Certificate of certification? Provide Copy of the Certificate of Certifications. 8.2.3 8.2.3.1 8.2.3.2 8.2.3.3 8.2.4 8.3 Has the contractor provided satisfactory evidence of implementation through: minutes of management review Provide evidence that recommendations of Management reviews have been implemented internal audit reports; Provide a copy of the last internal audit report. typical Project Management Plan (PMP). Provide a copy of a typical Project Management Plan. Yes No Yes No Yes No Has the Contractor indicated when the QMS was formally implemented and provided evidence of its use on projects completed? For a recent completed project provide a copy of the Project Management Plan used Yes No Has any certification body withdrawn the contractor QMS accreditation? Yes No . . (If Yes give details.) v1.0 11 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 9 Checklist of Attachments Copies of the following items must be supplied to support and complete this application Section No. Item ATTACHED 2.1 Certificate of Business Registration Yes 2.2 CVs - Directors, Partners, Associates Yes 2.3 Current Victorian WorkSafe Authority Certificate Yes 2.4 Certificate of Currency Public Liability Insurance ($20M, minimum cover required) Yes 4.3 A list of currently owned plant & equipment Yes 4.4 A copy of employees training register Yes 4.5 A copy of your organisational structure, including functional reporting lines, in particular how the role of any sub-contractors fit within your adopted structure Yes 4.6 Evidence of your access to the relevant MRWA Editions of the WSAA Codes, including Supplementary manuals and MRWA Specifications Yes Section 6, Part A – Contractors accredited with Yarra Valley Water DO NOT need to completed Part A ALL new Contractors need to complete this Part A 6.1.1 Copy of OH&S Policy Yes 6.1.2. Evidence of certification of the company’s OH&S management system against AS/NZS4801. Yes 6.1.4 Copy of OH&S management system contents page Yes 6.1.6 Copy CVs of personnel engaged or employed to advise on OH&S matters Yes 6.2.1 List of company OH&S procedures and work instructions Yes 6.2.2 List of company permits to work system Yes 6.2.3 A copy of a completed company Incident/Accident report form Yes 6.2.5 A copy of company procedures for storing/handling hazardous substances Yes 6.2.6 A copy of company emergency response procedures Yes 6.2.7 A copy of procedures for identifying, assessing & controlling project risks associated with manual handling Yes 6.4.2 A copy of a recently completed employee hazard report Yes 6.4.3 A copy of a recently completed workplace inspection checklist Yes Section 6, Part B – Needs to be completed by ALL Contractors v1.0 6.11 A copy of Live Sewer Entry/Confined Space Entry procedures Yes 6.12 A copy of SWMS for Live Sewer Works Yes 6.14 Copies of training certificates or CSE cards needs to be supplied as part of application. Yes 12 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Section 9 Checklist of Attachments Copies of the following items must be supplied to support and complete this application Section No. 7.1.2/7.2.2 Item ATTACHED Evidence of certification of the company’s environmental management system against either ISO1401 or the Civil Contractors Federation Integrated Management System Yes Section 7 - Contractors accredited with Yarra Valley Water DO NOT need to complete this Section ALL new Contractors need to complete this Section 7.1.3 / 7.2.3 Objective evidence of applicant organisation EMS implementation and work practices; preferably: 8.1.2/8.2.2 Yes Environmental Management Plan for a recently completed project a copy of the last internal audit report a copy of minutes of management review Evidence of certification of the company’s quality management system against either AS/NZS 9001or the Civil Contractors Federation Integrated Management System. Yes Section 8 - Contractors accredited with Yarra Valley Water DO NOT need to complete this Section ALL new Contractors need to complete this Section 8.1.3 / 8.2.3 Objective evidence of applicant organisation EMS implementation and work practices; preferably: Yes Environmental Management Plan for a recently completed project a copy of the last internal audit report a copy of minutes of management review (only for new contractors) Appendix A Complete Key Personnel Nominations Yes Copies of qualification & training certificates are required for all nominated Key Personnel Yes Information – YVW Contact Kevin Dawson - Phone : (03) 9872 1474; Email : [email protected] v1.0 13 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Appendix A – Key Personnel Nominations v1.0 14 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 15 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 16 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 17 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 18 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 19 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 20 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 21 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 22 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 v1.0 LS2 23 Application for Registration as an Accredited Contractor for Live Sewer Construction Works Name [please enter the name of nominated key personnel] Brief profile of industry experience [please provide a summary of industry experience to support requested categories of work] Live Sewer Categories of Work [please select the relevant categories of work for this person] Position/Title ☐ LS1 [please enter position/title] ☐ LS2 ☐ LS3 Qualifications and training certificates [please select relevant qualifications, training achievements for this person] ☐ Relevant TAFE/Tertiary Qualification with industry experience or equivalent extensive relevant industry experience ☐ OHS Industry Induction (Red Card) ☐ Pipe laying Accreditation ☐ Confined Space Entry Certificate (Sewerage Works only) ☐ Trench Safety Awareness ☐ Traffic Management ☐ Fall form Heights ☐ Mobile Plant Operator, and/or Extensive demonstrated relevant experience working with mobile plant and mobile plant risk assessment. ☐ Successful completion of YVW new Contractor Induction Questionnaire (when available) Competencies Project Experience [please provide a list key personnel project experience for requested category of work – a minimum of 3 projects is required for each category of work] LS1 LS3 LS2 PLEASE Copy and paste blocks as required to include additional Key Personnel nominations v1.0 24
© Copyright 2026 Paperzz