Firm Name : Site Allocation Request (SAR) Project Name : Date: SITE ALLOCATION REQUEST Guidance notes for completing the Site Allocation Request (SAR) 1. The Project Applicant is required to respond to all questions and appendices contained in the SAR document as thoroughly and accurately as possible. The SAR questions are designed to provide the Royal Commission with sufficient information to perform a comprehensive evaluation and assessment of a proposed project as part of the site allocation process. If responses to questions are not provided, the processing of the SAR application may be delayed until satisfactory answers are provided. 2. In the event that information requested in the SAR does not apply, please insert NA (i.e., Not Applicable). Nevertheless, all NA responses must be substantiated (i.e., sufficient detail must be provided to the Royal Commission to validate the NA response). In cases where there is insufficient space to provide more complete details, the Project Applicant is encouraged to include any and all such supporting documentation as attachments to the SAR document. 3. Although certain SAR questions will be answered on the basis of preliminary project information, these “preliminary” responses should be noted as preliminary and updated when more applicable or refined information becomes available. 4. As part of the SAR submittal, a conceptual plan layout of the project facilities, a process flow diagram (nonproprietary) of the process, and the technical feasibility study (as submitted to Ministry of Commerce and Industry or SAGIA) must be provided. 5. The conceptual plan layout (Item 9) while not developed for a specific industrial site, should clearly illustrate the location and dimensions of all major facilities within the property lines to enable the Royal Commission to identify the most appropriate industrial site for the project. 6. The process flow diagram (non-proprietary) of the process should take the form of an illustration plan showing the sequence of operations from raw material storage to the finished product stores. A narrative description should accompany the diagram to explain the process in greater detail. 7. In written format, a clear project scope definition document should be included as an attachment to the SAR submittal. This document should provide a complete description of the project objectives including technical and process details. 8. Please note that completion of Attachment 1, Environmental Screening Questionnaire, will not preclude the Royal Commission from requesting additional environmental information and/or a comprehensive Permit Application Package (PAP) and Environmental Impact Assessment. S: Adonis / SAR / Site Allocation Request Page 1 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: إدارة التنمية االقتصادية استمارة طلب ختصيص املوقع ----------------- املؤسسة/معلومات عامة عن الشركة : اسم الشركة : رقم الشارع :صب : املدينة : التاريخ : رقم السجل التجاري : جوال/فاكس : التاريخ : هاتف : رقم الرتخيص الصناعي اإلدارة العامة للهيئة امللكية ابجلبيل/إرسال صورة من الرتخيص الصناعي إىل مدير إدارة التنمية االقتصادية ابهليئة امللكية للجبيل وينبع GENERAL INFORMATION ABOUT THE COMPANY NAME OF COMPANY: STREET ADDRESS: P O BOX: CITY: TELEPHONE: FAX / MOBILE: INDUSTRIAL LICENSE(S) NO: DATE: COMM. REG. NO. DATE: NOTE: A copy of the Industrial License(s) and Commercial Registration must be sent to the Director of the Economic Development Department, Royal Commission in Jubail. S: Adonis / SAR / Site Allocation Request Page 2 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: 1. If the proposed project will be a joint-venture involving a foreign company, provide the following information: Name of Foreign Company: Address: Percent Saudi Ownership: Percent Foreign Ownership: Technology Supplier (if known) 2. Identify key individuals to contact regarding the proposed project: Name Title Company Phone and Fax No. 3. Project Description: Describe the product(s) to be produced, or service to be provided, and what they are used for. Attach additional sheets if necessary. S: Adonis / SAR / Site Allocation Request Page 3 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: 4. State the production capacity of the project for all product(s) and indicate the licensed capacity. Product Lic. Capacity Phase I Cap. /a/ Phase II Cap. /b/ /a/ Initial plant facilities; /b/ Future Plant expansion. 5. Describe the schedule and facilities for any/all additional or future developments. Project Description Schedule 6. Identify key markets for the proposed product and/or service: Percentage to/for local and Kingdom-wide market: Percentage to/for GCC States: Percentage to/for world market: S: Adonis / SAR / Site Allocation Request Page 4 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: 7. Identify the principal feedstock requirements for the project: (a) From local and Kingdom sources: Identify suppliers if known. Feedstock Source Quantity (UNIT) Value in SR per Year (b) From world import: 8. Investment and Financial Data For The Project. (a) Capital Structure: 1. Commercial Debt 2. SIDF Loan 3. Owner’s Equity 4. Total In Saudi Riyals Note: The Data provided above should be the same as indicated in the Industrial license. S: Adonis / SAR / Site Allocation Request Page 5 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: 8. Investment and Financial Data (continued). (b) Capital Investment: 1. Fixed Capital 2. Working Capital Total (c) Annual Sales: 1. Domestic/Saudi 2. Foreign Total Initial Plant/Phase 1 in Saudi Riyals Total Including Future Plant Expansion(s) in Saudi Riyals 9. Land Requirement As an attachment to this application, provide a scaled drawing (reproducible "E" size -- approximately 84 x 103 cm and 11” x 17”) showing the proposed layout of plant facilities. This drawing should show the total land required by phase (i.e., initial development, then future expansion, if any). The layout should reflect a standard lot configuration; however, it should not relate to a specific industrial lot in Madinat Al-Jubail Al-Sinaiyah. To the extent possible, the layout should clearly illustrate the location and dimensions of all major facilities within the property lines, including: Production or manufacturing areas. Administration buildings, employee service facilities such as change rooms, Mosque, training facilities, etc. Utility service facilities such as electrical control rooms/substations, emergency electrical generators, water treatment, steam generation, etc. Location and dimensions of potable, fire and waste water storage tanks, if applicable. Conceptual layout of perimeter fence showing entry points allocated for emergencies, vehicular access and the gate house. Location of above ground pipe ways, flare stacks, if any, and fuel feedstock storage tanks. Warehouses and maintenance facilities. Storage areas, car parking, roads, loading areas, etc. Areas reserved for landscaping. The plot plan should also illustrate the required Royal Commission setbacks. Setbacks include areas between the various buildings and facilities within the plant site and collectively between them and the plant site boundaries (i.e., property line). In addition to the overall plot plan, detailed layouts of the following -- if available -- will assist the Royal Commission in the review of the proposed project: Type and location of production equipment and machinery. Clear areas provided between machinery and equipment. Areas provided for temporary storage within the production flow. Raw materials and products storage. Maintenance workshop and replacement parts storage. NOTE: Your proposed layout will be reviewed in detail for efficient utilization of land. The total land area requested should be the minimum requirement for the safe and efficient operation of your plant. S: Adonis / SAR / Site Allocation Request Page 6 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: Initial Plant/Phase 1 in Square Meters 10. Plot Plan Breakdown Total Including Future Plant Expansion(s) in Square Meters Buildings and Structures Outside Storage Loading/Unloading Roads Parking Fire Lanes Landscaping Other Total 11. Analysis of Plot Plan 1. Gross Area of site in square meters 2. Total setback area in square meters 3. Net area of site in square meters Facilities Breakdown in net area Area in M2 Percentage of Net Area Percentage of Gross Area Area in M2 Percentage of Net Area Percentage of Gross Area Buildings and Structures Building Expansion Outside Storage Loading/Unloading Roads Parking Fire Lanes Landscaping Total Setbacks Breakdown in net area Parking Fire lanes Landscaping Outside Storage Total S: Adonis / SAR / Site Allocation Request Page 7 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: 12. Employment Forecast Labor Categories Initial Plant Facilities Phase I Saudi Non-Saudi Future Plant Expansion Phase II Saudi Total Non-Saudi Saudi Non-Saudi (a) Administration (b) Technical (c) Skilled (d) Unskilled Total 13. Modes of Transportation 1. Raw Materials 2. Operating Supplies 3. Products Note: Source: L - Local, F - Foreign; 14. Vehicle Trips Per Day Metric Tons/Day Source L/F Mode P/R/S Mode: P - Pipeline, R - Road, S - Sea In Out Total Trips 1. Automobiles, light trucks 2. Trucks, 6 or more wheels 3. Buses Total Vehicle Trips S: Adonis / SAR / Site Allocation Request Page 8 | 9 (SAR - Form) Firm Name : Site Allocation Request (SAR) Project Name : Date: Name: Signature Title Company Date Company Stamp/Seal: S: Adonis / SAR / Site Allocation Request Page 9 | 9 (SAR - Form)
© Copyright 2026 Paperzz