EXECUTIVE SUMMARY
INTRODUCTION
Overview
Municipalities within the District
Political and Administrative Leadership and Seat of District
Political Representation
SERVICE DELIVERY
Household Infrastructure
Sanitation
Water
Electricity
Refuse Removal
Service Provider
AUDIT OPINIONS
STATE OF LOCAL GOVERNMENT ASSESSMENT
Overview of findings on assessment in the Municipality
Governance
Financial Management and Viability
INFRASTRUCTURE PRIORITIES IN TERMS OF THE MUNICIPAL
TURN-AROUND STRATEGY
MIG PROJECTS
VULNERABILITY CLASSIFICATION
2
3
4
4
5
6
6
8
8
8
9
9
9
9
9
10
10
10
10
11
12
15
EXECUTIVE SUMMARY
The Umkhanyakude district is largely rural, Mtubatuba in the south being the only
substantial town. Low education levels and a youthful population profile emphasise the
need for a greater focus on education and related activities. Tourism is one of the
leading industries in the district, which is recognised as a significant and unique ecotourism location with the potential to be developed into a world-class destination.
Natural attractions in the district are underpinned by the Hluhluwe-Imfolozi Park and the
Isimangaliso Wetland Park World Heritage Site.
Unemployment and poverty are at a high level. More than 70% of the population
survives on less than R800 per month and 82.95% of households live below the poverty
line. The sanitation backlog is one of the major infrastructural challenges facing the
municipality, with Jozini and uMhlabuyalingana the most affected. An overview of
household access to infrastructure in the district shows an improvement from a low level
of 18% in 1996 to 44% in 2009. The main contributor to the increase in access is
electricity infrastructure and to a certain extent water and sanitation.
In 2009/10 all municipalities except Umkhanyakude district obtained financially
unqualified audit outcomes. Between 2005/6 and 2008/9 all audit outcomes for
Umkhanyakude were disclaimers, indicating the challenges in terms of financial
management.
Umkhanyakude District was highlighted in the KwaZulu-Natal State of Local
Government Assessment as having challenges with political instability, as well as
serious challenges in the issue of political-administrative interface. Umkhanyakude was
also among identified municipalities that have serious financial management
challenges.
In terms of its Municipal Turn-Around Strategy the Umkhanyakude District Municipality
identified a number of interventions and source funding required to address backlogs on
water and sanitation services provision. A further priority is the development of an
Operations and Maintenance Plan for the water services infrastructure. The District
must also engage ESKOM, as the major supplier of electricity, to increase the number
of connections throughout the Umkhanyakude district
Four of the five local municipalities in the Umkhanyakude District have been classified
as in the category of most vulnerable by DCoG in terms of functionality, socio-economic
profile and backlog status. This profile confirms that infrastructure prioritisation in
Umkhanyakude District should focus on addressing the high water and sanitation
backlogs, as well as improving operations and maintenance, especially of nonfunctioning water schemes.
3
1.
INTRODUCTION
1.1
Overview1
Umkhanyakude refers to the greenish tree with thorns (Acacia xanthophloea or fever
tree) that mainly grows in the Umkhanyakude district. Literally Umkhanyakude means
‘that shows light from afar’. The District Municipality is situated in the northeastern part
of KwaZulu- Natal, extending from the uMfolozi River up to the Mozambique and
Swaziland borders, being bounded to the east by the Isimangaliso Wetland Park World
Heritage Site, formerly known as the Greater St Lucia Wetland Park, that encompasses
the entire coastline onto the Indian Ocean.
The following five local municipalities are found under Umkhanyakude District
Municipality: uMhlabuyalingana Municipality, Jozini Municipality, the Big Five False Bay
Municipality, Hlabisa Municipality and Mtubatuba Municipality. There is also a district
management area that the district municipality is responsible for.
The district is largely rural, Mtubatuba in the south being the only substantial town.
Several smaller towns are growing rapidly, such as Manguzi, Jozini, Mkuze and, to a
lesser extent, Mbazwana. The total population is estimated at over 610 000. The
population is exceptionally young, with 70% being below 18 years of age. Low
education levels (46% of people have never been to school and 66.4% of adults have a
limited education) together with a youthful population profile emphasise the need for a
greater focus on education and related activities. There is limited access to information,
particularly in the deep rural areas.
Unemployment and poverty are at a high level. Only 6.6% of the total populations have
employment. More than 70% of the population survives on less than R800 per month
and 82.95% of households live below the poverty line.
Free basic services for water, sanitation and electricity are currently being piloted.
Although progress has been made in the provision of electricity, the majority of
households (almost 80%) still have no access to electricity and use candles for lighting.
A number of projects are currently being undertaken to address the backlog. The
sanitation backlog is one of the major infrastructural challenges facing the municipality,
with Jozini and uMhlabuyalingana the most affected. A health and hygiene programme
aimed at reducing the incidence of waterborne diseases such as cholera has been
implemented.
Tourism is one of the leading industries in the district, which is recognised as a
significant and unique eco-tourism location with the potential to be developed into a
world-class destination. Natural attractions in the district are underpinned by the
Hluhluwe-Imfolozi Park and the Isimangaliso Wetland Park World Heritage Site, which
have been under formal conservation since 1895 and 1999 respectively.
Source: Gaffney’s, November 2009: Local Government in South Africa 2009 – 2011, Official Yearbook:
p 819 - 921.
1
4
The district is embarking upon a craft enterprise development programme to enhance
cultural tourism through abundant art and craft activities readily available within the
district. A Tourism Plan and a Tourism Plan Implementation Strategy have been
developed and are being implemented to streamline tourism development in the district.
A number of community conservation areas such as Usuthu Gorge, Rhino Reserve,
Tshanini and others have been established by communities in a move to harness
tourism benefits. A number of large-scale tourism initiatives are underway. These
include Pongolapoort Dam Tourism Initiative, Makhathini Master Plan and the Lubombo
Transfrontier Conservation Area, which is international tourism development
collaboration between South Africa, Swaziland and Mozambique. Serious marketing
initiatives are being implemented in partnership with Tourism and the Elephant Coast
Tourism Association. These include district-wide state-of-the-art information centres, a
glossy Elephant Coast destination brochure and attendance of domestic and
international trade and consumer shows.
Sodwana Bay is among the best scuba diving spots in the world and attracts a multitude
of international visitors. The district has magnificent public and private game reserves
such as Tembe Elephant Park, Ndumo Game Reserve, Mkuze Game Reserve and
Thanda and Phinda private game reserves. About 60% of the visitors to the game
parks/reserves are domestic and 40% are international. Domestic visitors are mainly
from KwaZulu-Natal. International visitors are mainly from Europe (Germany, the
Netherlands and France), the UK and the USA.
Natural resources form the basis of most of the eco-tourism enterprises in the district
and provide the impetus for hunting, game farming and subsistence and recreational
fishing. Natural resources are also used extensively for food, crafts, construction and
‘muti’ (traditional medicine).
The district and the community do not benefit from the Isimangaliso Wetland Park
Reserve because of the buffer/boundary around it. It was also stated that there is
noncooperation between the park and the district. Despite the game attractions; the
district has not fully actualised community-based tourism.
1.2
Municipalities within the Umkhanyakude District
The details of the five local municipalities within the District are tabled below:
Table 1: Statistics of the Umkhhanyakude District and Local Municipalities
Municipalities
within the District
Umkhanyakude
District
Municipality
The Big 5 False
Area (km2)
in 2009
Area (km2) after 2011
Local Government
Elections & % change
13,855.36
13,855.35
1,060.80
2,486.54
134.40%
5
Populatio
n
No. of
Poverty
House
Rate
holds
621,672 116,404
64.00%
35,428
6,740
58.82%
Bay Local
Municipality
Hlabisa Local
Municipality
Jozini Local
Municipality
Mtubatuba Local
Municipality
uMhlabuyalingan
a Local
Municipality
Umkhanyakude
District
Management
Area (St
Lucia Park)
1.3
1,417.24
1,555.13
9.73%
152,427
29,624
60.52%
3,056.28
3,442.25
12.63%
209,826
39,010
75.66%
496.49
1,969.83
296.75%
47,169
11,480
49.62%
3,619.05
4,401.61
21.62%
165,729
27,342
74.55%
4,205.50 To be incorporated into
the local municipalities
11,093
2,208
64.00%
Political and Administrative Leadership and Seat of District2
Political Leadership: Executive Mayor: Mr J Vilane
Administrative Leadership: Municipal Manager: Mr K M Moodley
The head office of the District is located in Mkuze.
1.4
Political representation3
Table 2: Local Government Election 2006 / Provincial & National Elections 2009
comparison:
Leading
Parties in
the
Elections
1st
2nd
3rd
4th
Totals
Local Government Elections 2006
Party
Party Votes and
Ward Votes and %
%
IFP
ANC
DA
Other
82,169
33,580
1,628
1,930
119,30
7
68,9%
28,1%
1.4%
1.6%
100%
82,267
32,953
1,726
1,791
118,737
69.3%
27.8%
1.5%
1.5%
100%
Councillor Seats
Party
Seats
IFP
ANC
DA
-
21
6
27
-
Provincial Elections 2009
Party
Votes and %
National Elections 2009
Party
Votes and %
IFP
ANC
DA
COPE
Other
ANC
IFP
DA
COPE
Other
%
77.8%
22.2%
100%
91,279
88,758
1,537
559
2,788
184,92
1
49.4%
48.0%
0.8%
0.3%
1.5%
100%
2
Source: Umkhanyakude DM; August 2011
3
UPDATE Aug’09: DC40 seats - IFP (73%) 8 seats, ANC (27%) 3 seats, Total 11 DC40 seats
6
90,759
88,341
2.181
583
4,270
186,134
48.8%
47.5%
1.2%
0.3%
2.3%
100%
Figure 1: 2011 Local Government Election results and seat allocations:
The ANC is the leading party in terms of proportional DC40 Seats in Umkhanyakude,
with 6 seats of 12 seats.
7
2.
SERVICE DELIVERY4
2.1
Umkhanyakude District Municipality Household Infrastructure
Household Infrastructure Overview
KZN - DC27 Umkhanyakude District Municipality
0.80
0.70
0.60
0.50
Index
0.40
0.30
0.20
KZN - DC27…
South Africa
0.10
0.00
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Source: IHS Global Insight Regional eXplorer version 574
Umkhanyakude District has the third lowest access to infrastructure amongst the
districts in the province. An overview of household access to infrastructure in the district
shows an improvement from a low level of 18% in 1996 to 44% in 2009. The main
contributor to the increase in access is electricity infrastructure and to a certain extent
water and sanitation.
2.2
Sanitation
With regard to access to sanitation, the district municipality’s household access to
hygienic toilets has gone up from 9% in 1996 to 56% in 2009. The improvement in
access to sanitation in general in the Municipality is mainly due to the increase in the
use of pit latrines with ventilation.
4
Sources: IHS Global Insight Regional eXplorer version 574 and Municipal Demarcation Board, 2008:
National Report on Local Government Capacity, District and Local Municipalities, MDB Capacity
Assessment, 2007/2008.
8
2.3
Water
There are lower levels of access to clean water in the district. Access to piped water
above RDP level increased from a low level of only 13% to 46% from 1996 to 2009.
Similarly, there has been an increase as well in access to piped water below RDP level
and more than 15% of households are now getting this service.
2.4
Electricity
The increase in electricity connections is the biggest infrastructure achievement in the
municipality. In 1996, household access to electricity connections was at a low level of
12%. Access has, however, increased over the years reaching 60% by 2009.
2.5
Refuse removal
There has been a slight increase in access to formal refuse removal service from 1996
to 2009 in the Municipality. Access has gone up from 4% in 1996 to 14% in 2009.
Personal refuse removal also went up over the years reaching 70% in 2009. The high
levels of personal refuse removal must be taken in the context of low settlement
densities, where on-site disposal or backyard burning of waste is sometimes
appropriate.
2.6
Service provider
Umkhanyakude district performs the electricity reticulation, potable water and sanitation
functions for the local municipalities. The district has no authority and is not performing
the refuse removal, refuse dumps and solid waste disposal function.
3.
AUDIT OPINIONS
Table 3: Audit Opinions of the District and Local Municipalities
Municipality
Audit
Opinion
2005/6
Qualified
Audit
Opinion
2006/7
Disclaimer
Audit
Opinion
2007/8
Disclaimer
Audit
Opinion
2008/9
Disclaimer
Big 5 False Bay
LM
Qualified
Qualified
Qualified
Qualified
Hlabisa LM
Qualified
Qualified
Qualified
Jozini LM
Financially
unqualified
Disclaimer
Qualified
Financially
unqualified
with findings
Financially
unqualified
Umkhanyakude
DM
9
Audit
Opinion
2009/10
Audit not
finalised at
legislated
date
Financially
unqualified
with findings
Financially
unqualified
with findings
Financially
unqualified
Mtubatuba LM
with other
matters
Qualified
Umhlabuyalingana Qualified
LM
Qualified
Financially
unqualified
with other
matters
Qualified
Qualified
with findings
with findings
Financially
unqualified
with findings
Financially
unqualified
with findings
Financially
unqualified
with findings
Financially
unqualified
with findings
Source: Auditor-General 2009 and 2011, see. www.agsa.co.za
In 2009/10 all municipalities except Umkhanyakude district obtained financially
unqualified audit outcomes. Between 2005/6 and 2008/9 all audit outcomes for
Umkhanyakude were disclaimers. In the case of the Big 5 False Bay, before obtaining a
financially unqualified audit outcome in 2009/10 the municipality was granted qualified
audit opinions for four years in succession.
4.
STATE OF LOCAL GOVERNMENT ASSESSMENT
4.1
Overview of findings on assessment in the municipality
4.1
Governance
Umkhanyakude District Municipality is amongst the 61 identified municipalities in
Kwazulu-Natal that recorded serious challenges requiring immediate intervention. With
regards to the issue of political instability in the Umkhanyakude DM’s council is among
the 17 identified municipalities in KwaZulu-Natal that have moderate and serious
challenges. Some of the issues given as causes of political instability in the council
include: lack of understanding and adherence to the roles and responsibilities of political
office bearers; interference in council matters from the regional and provincial political
structures; caucuses not allowing individual councilor input on service delivery issues;
council dominated by a more politically powerful administration; lack of communication
and public participation frameworks creates environment for uncoordinated interaction
with community by provincial politicians, municipal political office bearers, ward
councilors and PR councilors.
Umkhanyakude DM is also among eight identified municipalities that have serious
challenges in the issue of political-administrative interface and these challenges require
immediate intervention.
4.1.2 Financial Management and Viability
Umkhanyakude is among the 30 identified municipalities that have serious financial
management challenges. Some of these challenges include: poor financial planning;
unskilled staff appointed to do finances; lack of proper financial controls; poor financial
competencies of elected representatives; and there is a negative credit control within
the municipalities due to high levels of poverty. The State of the Local Government
10
Assessment identified the following financial management challenges raised by
stakeholders: most municipalities do not have capacity to manage the indigent; supply
chain management is too political; there is an alleged favouritism and nepotism in the
awarding of tenders; and huge funds are spend on councilors salaries while nothing is
left for service delivery.
5.
INFRASTRUCTURE PRIORITIES OF THE MUNICIPAL TURN-AROUND
STRATEGY
The Umkhanyakude District Municipality identified a number of priorities for
infrastructure delivery in the Implementation Plan for the Umkhanyakude Turn-Around
Strategy:
 Packaging of interventions and source funding to address backlogs on water and
sanitation services provision in Umkhanyakude district.
 Development of Operations and Maintenance Plan for the water services
infrastructure.
 Engagement of ESKOM, as the major supplier of electricity, to increase number of
connections throughout the Umkhanyakude district.
Table 4: Infrastructure delivery in terms of the MTAS
Access to
Water
Water loss
Management
Challenges
46.4% of
households
without access
to water
25% of existing
schemes are
nonfunctioning
Areas lacking
infrastructure
to be
addressed –
Jozini South,
Jozini North,
KwaZibi ,
Phelandaba
and Hlabisa
South
Estimated to
be 50% water
loss
Municipal
Actions
Review WSDP Conduct an
for alignment
inventory of all
water
11
Operations &
maintenance
of water
services
infrastructure
The absence
of O & M
plans is a
challenge
Access to
Sanitation
Access to
Electricity
36%
sanitation
backlog
The District
municipality
only
distributes
electricity to
KwaMsane
township and
Ingwavuma
76%
electrification
backlog
The
department
is
understaffed
Water &
Harness
additional
funding to
Engage
Eskom as
the majority
sanitation
maintenance
Develop plan
which will
reduce non
functioning
schemes by
10%
schemes;
Commission
repairs in
identified areas
plans
completed
increase
service
delivery
projected
To prioritize all
projects to
address
backlog and
apply for
additional
funding
Other
support and
interventions
6.
Umhlathuze to
assist with
technical
assistance
DWA,
COGTA to
provide funding
and resources
for
implementation
DWAF,Cogta;
LMs; to provide
HR and
funding for
implementation
DWA, Cogta
to unlock
resources and
WSSA provide
technical
support
DWA and
Cogta to
supply
additional
funding
supplier of
electricity in
the UDM to
Increase
number of
connections
throughout
the district.
Survey to
determine
the number
of
connections
in the area of
our supply
and
unlicensed
areas.
DE to supply
funding to
implement
the transfer
process
MIG PROJECTS5
Table 6: MIG projects
Municipality
Project name
Umkhanyaku
de DM
Umkhanyakude DM
Rural Master PlanPlanning Phase
PMU
Mtubatuba Ward 2
Community Hall
Mtubatuba Treatment
Works Upgrade
Indlovu Village
Community Hall
Umtubatuba
LM
MIG funds
Actual
expenditure in
the 2010/11
financial year
Project status
(Registered/desi
gn/tender/const
ruction)
Project category
(e.g. water,
sanitation, PMU)
R 1,730,000.00
R 667,866.66
R 1,860,943.72
Registered
R 1,665,000.00
R 303,149.53
Design & Tender
Sanitation
Other
Multi purpose
community halls
R73,466,382.00
R 14,838,908.72
Construction
R 2,041,601.60
R 456,791.41
Design & Tender
5
Water
Multi purpose
community halls
According to the June 2011 non-financial report on Municipal Infrastructure Grant, KwaZulu-Natal has not
adopted the new format of reporting on MIG projects. As a result, it becomes a challenge to track the
implementation of MIG projects in that province.
12
Big 5 False
Bay LM
Hlabisa LM
Ndlovu Village Sewerage
Nordale Sewerage
Scheme
Mtubatuba sports
complex
KwaMsane Taxi Rank
(AFA) MIS 189397
Nomathiya Community
Hall
Ndlovu Village:
Installation of high mast
lights
Rural Roads Upgrade in
KwaMsane Ward 2
Ezwenelisha Community
Centre Ward 4
Upgrade of Informal
Trading facilities, Nordale
Park and Provide
Ablution facilities in CBD.
Dukuduku Community
Centre Ward 4
Phumlani Community
Hall
R 1,580,872.56
R 102,511.18
Design & Tender
Sanitation
R 1,231,560.00
R 62,809.44
Design & Tender
Sanitation
R 263,948.00
Construction
Sport Facility
R 4,141,976.07
R 2,713,181.78
Construction
R 1,613,000.00
R 1,093,240.22
Completed
Taxi Ranks
Multi purpose
community halls
R 1,600,000.00
R 884,737.94
Completed
Street / Community
Lighting
R 3,139,912.01
R 2,855,741.03
Construction
R 1,550,000.00
R 1,332,182.65
Construction
R 2,479,150.00
R 2,479,150.00
Construction
R 1,550,000.00
R 589,816.94
Design & Tender
R 2,360,000.00
R 27,017.26
Construction
Makhasa Community Hall
Ward 3 Access Roads
(AFA1) MIS 174203
Mnqobokazi Market
Stalls (AFA) MIS 182444
Ezimpondweni Market
Stalls (AFA) MIS 182445
Phumlani Creche
Nibela Community Hall
(AFA) MIS 198255
Bhekani Crèche
PMU
Hluhluwe: CWSS Phase
3 - Reticulation Water
Supply
Makhasa Sport Complex
Stormwater Drainage and
Road Upgrade for
Phumlani Village
Somkhele Taxi Rank
Ophaphasi Community
Hall (AFA2) MIS 164771,
MIS 169719
Community Hall for
Hlabisa (AFA) MIS
188076
Ndonga Community Hall
(AFA) MIS 169093
Negebeza Community
Hall (AFA) MIS 177513
P K Msweli Community
Hall (AFA) MIS 193531
Gabadela Community
Hall
Hlabisa Internal Roads
Hlabisa Testing Grounds
R 2,360,000.00
R 1,369,648.69
Construction
Markets
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
R 7,034,453.26
R 1,513,948.49
Construction
Road & Stormwater
R 1,097,476.37
R 245,339.43
Completed
Markets
R 1,230,831.23
R 2,500,000.00
R 306,709.31
R 778,285.49
Completed
Design & Tender
R 2,475,488.68
R 2,500,000.00
R 1,828,395.05
R 1,060,066.98
R 234,345.42
Construction
Construction
Markets
Child care fac
Multi purpose
community halls
Child care fac
Other
R23,431,930.00
R16,574,507.97
R 2,938,021.64
R 1,722,329.49
Construction
Construction
Water
Sport Facility
R 1,400,000.00
R 962,627.00
R 608,943.00
R 38,939.54
Construction
Completed
Road & Stormwater
Taxi Ranks
R 2,000,000.00
R 74,221.30
Completed
Multi purpose
community halls
R 6,844,250.72
R 1,272,262.72
Construction
R 1,950,000.00
R 1,107,672.94
Construction
R 1,454,398.00
R 48,537.57
Completed
R 2,215,667.07
R 1,385,062.93
Construction
R 1,455,600.00
R 3,300,000.00
R11,798,896.00
R 901,277.64
R 2,339,689.13
R 7,445,607.46
Construction
Construction
Construction
R 13,081,916.00
13
Road & Stormwater
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Road & Stormwater
Admin Facilities
Jozini LM
Ezibayeni Water Supply
Phase 2
Jozini Stadium (AFA1)
MIS 161516
Nondabuya Sportsfield
Mpondwane Community
Hall
Gangadweni Sports field
Mbombeni Community
Hall
Maphindela Community
Hall
Ekuhlehleni Service
Centre
Esihlangwini Community
Hall
Mkhuze Sports Complex
Makhonyeni Access
Roads
Mkhuze Storm water
management Phase 1
Mangwenya Kwajobe
Causeway (AFA) MIS
200623
Ophondweni Community
Hall
Ngwenya Community
Centre
Ntabayengwe
Community Centre
Mamfene Okhethe
Pedestrian Bridge
Jozini Vendor Shelters
Construction of
Makwakwa Sport Field
KwaNduna uNkosi
Community Hall
Majalantini Skills Centre
Construction of Ubombo
Skills Training Centre
Ezinyokeni Community
Hall
Construction of
Ingwavuma Sportsfield
Ablution Block
Majozini Community
Centre
Nkonya Community Hall
Ward 12
Bhanjana Dam Road
Tshongweni Pedestrian
Bridge
Oshabeni Community
Hall
Emlotheni Gravel Access
Road
Makhonyeni Gravel
Access Roads Phase 2
PMU
Ntshongwe/Malobeni
R41,895,535.00
R 1,258,835.74
Construction
Water
R 4,850,000.00
R 2,500,000.00
R 718,177.89
R 502,755.37
Completed
Completed
R 2,499,999.99
R 2,500,000.00
R 456,909.15
R 456,895.85
Construction
Completed
R 2,499,999.99
R 1,440,780.18
Construction
R 1,999,999.99
R 214,702.65
Completed
R 1,999,999.99
R 468,451.70
Completed
R 1,999,999.20
R 5,000,000.00
R 332,267.85
R 478,983.81
Completed
Design & Tender
Sport Facility
Sport Facility
Multi purpose
community halls
Sport Facility
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Sport Facility
R 3,150,000.00
R 1,049,034.60
Construction
Road & Stormwater
R16,917,600.00
R 2,110,390.79
Design & Tender
Stormwater
R 4,102,201.96
R 640,375.82
Construction
R 2,500,430.00
R 1,246,929.00
Completed
R 2,701,230.00
R 1,140,376.10
Construction
R 2,701,230.00
R 1,498,981.79
Construction
Sidewalks
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
R 2,398,560.00
R 292,980.00
R 580,407.89
R 97,143.35
Construction
Completed
Road & Stormwater
Markets
R 2,500,000.00
R 1,897,714.57
Construction
R 2,000,000.00
R 2,000,000.00
R 1,465,474.95
R 1,729,569.83
Construction
Construction
Sport Facility
Multi purpose
community halls
Admin Facilities
R 1,500,000.00
R 110,526.31
Design & Tender
R 2,100,000.00
R 680,261.68
Construction
R 329,653.69
R 314,676.83
Completed
R 2,919,790.57
R 270,112.77
Construction
R 2,000,000.00
R 1,580,925.71
R 168,948.00
R 36,818.79
Design & Tender
Design & Tender
R 915,853.34
R 20,135.25
Design & Tender
R 2,000,000.00
R 168,948.00
Design & Tender
Road & Stormwater
Multi purpose
community halls
R 4,216,955.08
R 511,855.55
Construction
Road & Stormwater
R 2,837,033.32
R 279,984.00
R 976,419.85
R 1,246,794.56
Design & Tender
Road & Stormwater
Other
Water
R 4,026,004.00
14
Construction
Admin Facilities
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Road & Stormwater
Umhlabuyali
ngana LM
Water Supply Project
Phase 2
Othobothini Sanitation
Project
Municipal Council
Chambers and Technical
Services offices (AFA)
MIS 171758
Mbazwana Town
Services
UMhlabuyalingana Traffic
Station at Mbazwana
(AFA) MIS 181811
Njinji Access Road
Mahlakwe Community
Hall (AFA) MIS 181597
Bhekabantu Community
Hall (AFA) MIS 185349
Mphakathini Community
Hall (AFA) MIS 185350
PMU
Phelandaba Water
Supply Scheme
Kwangwanase
Community Water Supply
Phase 3
Mpophomeni Community
Water Supply Scheme
Shemula Sanitation
Phase 3 (AFA) MIS
163688
Phelandaba Sanitation
Project Phase 2
Source: All MIG projects, 2011 June
R 5,396,780.00
R 4,801,539.32
R11,817,380.23
Construction
Sanitation
Construction
Multi purpose
community halls
Construction
Road & Stormwater
Admin Facilities
Road & Stormwater
Multi purpose
community halls
Multi purpose
community halls
Multi purpose
community halls
Other
R 2,032,435.12
R12,277,500.00
R 583,525.61
R 9,918,877.39
R 2,650,500.00
R 1,461,214.97
R 637,482.91
Construction
Construction
R 2,678,228.51
R 150,817.02
Construction
R 2,833,924.64
R 1,797,680.34
Construction
R 2,491,234.71
R 1,682,623.64
R 70,431.37
Construction
R57,158,751.00
R 155,052.30
Construction
Water
R102,657,991.00
R 17,429,914.62
Construction
Water
R38,715,718.00
R 3,235,862.30
Construction
Water
R22,142,131.50
R 3,279,341.67
Construction
Sanitation
R19,882,940.00
R 8,183,726.54
Construction
Sanitation
In Hlabisa and Jozini local municipalities most projects are about the establishment of
multi-purpose community halls. A mix of projects is found in Umtubatuba, Big 5 False
Bay and Umhlabuyalingana local municipalities. In all the locals most projects are still at
a construction stage. The June 2011 non-financial report on MIG states that
Umkhanyakude district and its locals did not submit their 2011 June MIG reports.
7.
VULNERABILITY CLASSIFICATION
The DCoG Municipal Spatial Classification System was designed to develop municipal
profiles according to spatial location, based upon results from indicator sets on
functionality, socio-economic profile and backlog status. Its purpose is to inform a
differentiated approach to municipalities.
The four municipal classifications developed by DCoG are:
Class 1: Most vulnerable (57 local municipalities)
Class 2: Second most vulnerable (58 local municipalities)
Class 3: Second highest performing (58 local municipalities)
Class 4: Highest performing (58 local municipalities)
15
The five local municipalities in the Umkhanyakude District can be classified as follow:
Table 6: Vulnerability Classification
Local Municipality
Big 5 False Bay
Hlabisa
Jozini
Mtubatuba
uMhlabuyalingana
Classification
Most vulnerable
Most vulnerable
Most vulnerable
Second highest
performing
Most vulnerable
From this table it is evident that four of the five local municipalities in the uMkhanyakude
District fall into the most vulnerable category.
16