Learn More - Frog Environmental

Welcome to the Frog Environmental
Level 1 Status Stormwater Exceedance Seminar
800 E. Ocean Blvd, Suite 105
Long Beach, CA 90802
(310) 241 – 0866
www.Frogenv.com
Introduction
Level 1 Status Stormwater Exceedance Seminar
• Changes in the New Permit
• SMARTS Uploading – Your Results are Online Now
• Numeric Action Level (NAL) Exceedances
• Baseline Status
• Level 1 Status
• Level 2 Status
• Solutions:
 Basic BMPs
 Intermediate BMPs
 Advanced BMPs
 Draft Level 1 ERA Reports
2
Changes in the New Permit:
What You Need to Know Now and Next Year
•
•
•
•
•
SMARTS: Your results are online and transparent to the Water
Board, Third-Party Environmental groups and Attorneys
Exceedances: Numeric Action Levels can trigger consequences for
Annual and Instantaneous Maximum Results
 Annual (annual average of all results for a given parameter)
 Instantaneous Maximum (when two or more results within a
reporting year for the basic parameters of pH, TSS and O&G
exceed the instantaneous maximum NAL value)
Baseline: Stormwater year 2015-2016 is a baseline year – fresh start
Level 1: Exceedance Response Action (ERA) Evaluation and Report by
QISP
Level 2: Exceedance Response Action (ERA) Action Plan and
Technical Report with Demonstrations by QISP
3
Summary
What You Need to Know About Level 1
Facilities with high enough NAL Exceedances fall into
Level 1 Status for the 2016-2017 stormwater year
What Does Level 1 Require?
• An evaluation by a QISP about the facility’s pollutant sources
•
•
•
•
and drainage areas must be completed by October 1st, 2016
The evaluation will specify BMPs to prevent future NAL
Exceedances
A report prepared by a QISP must be completed by
January 1st, 2017
The report will describe SWPPP revisions and
additional BMPs
The report must be certified and submitted via the
SMARTS database
4
Level 1
What Happens Next?
Permit Requirements for Level 1
Level 1 ERA Evaluation
• Evaluation (QISP required) of Industrial Pollutant Sources / Identify BMPs /
Identify Necessary SWPPP
Level 1 ERA Report (Based on Evaluation)
• Revise the SWPPP / Implement Additional BMPs Identified in Evaluation
• Certify and Submit Level 1 ERA Report (Prepared by QISP) via SMARTS
• Summary of Level 1 ERA Evaluation Required
• Detailed Description of SWPPP Revisions / Additional BMPs
• Certify and Submit via SMARTS the QISP’s ID information
You Can Still Avoid Level 2!
5
TimeLine
New Permit Exceedance Steps
You Are Here
Baseline Status
July
SW Year 2015-2016
Level 1 Status
Level 2 Status
SW Year 2016-2017
SW Year 2017-2018
• Use BMPs to stay at Baseline, if possible
• Prepare for Level 1, if necessary
• Prevent Level 2 NOW!
6
Level 2
What Happens in the Future?
Permit Requirements for Level 2
Level 2 ERA Action Plan
• Certify and Submit Level 2 ERA Action Plan (prepared by QISP)
• Identify Demonstration Discharger Will Perform for each New NAL Exceedance
• List of Possible Demonstrations:
 Certify and Submit QISP Identification Information via SMARTS
 Must Address Drainage Areas
 Includes schedule and detailed description of tasks to complete demo
Level 2 ERA Technical Report
• Certify and Submit Level 2 ERA Technical Report (prepared by QISP)
• Including One of These Level 2 ERA Technical Report
Demonstrations:
 Industrial Activity BMPs Demonstration
 Non-Industrial Pollutant Source Demonstration
 Natural Background Pollutant Source Demonstration
• Level 2 ERA Technical Report Submittal
7
Solutions
Best Management Practices (BMPs)
•
•
•
•
Basic BMPs
Sweeping/Housekeeping
Source Control
Preventative Maintenance
BMP Kits
8
Solutions
Best Management Practices (BMPs)
•
•
•
Intermediate BMPs
Sweeper Trucks
Regenerative Airflow Vacuums
Down Spouts Media Filters
9
Solutions
Best Management Practices (BMPs)
Intermediate Structural BMPs
• Berms
• Ponds
• Control Water Flow
10
Solutions:
Best Management Practices (BMPs)
Advanced BMPs
•
•
•
Treatment
Exposure Minimization (Shelters, etc.)
Water Containment (Retention Ponds, etc.)
11
Solutions
Best Management Practices (BMPs)
Pre-Level 1 ERA Draft Report
•
•
•
•
Prepare for Level 1 NOW
Save Money on Future Reporting Needs
$750 for Pre-Level 1 ERA Draft Report, which will be
credited toward your official Level 1 ERA Report
 PLUS an extra $500 discount on your future Level 1
ERA Report
QISP Oversight
12
14
Contact Us
For More Information or Follow-Up Evaluation
Talk to Us Now
or
Schedule Your Free Field Evaluation
By Calling 1-877-FROG-ENV (1-877-376-4368)