Utility Rates 2017 Information Session Agenda • • • • Water Utility Wastewater (Sewer) Utility Electrical Utility Proposed Rate increase What is proposed? 2016 • 5% Water • 5% Wastewater (sewer) • 4% Electrical Why is an increase for Utilities proposed? • Lack of investment in past years – consistent with Municipalities across Canada…. • Old infrastructure which is overdue for replacement • New infrastructure that requires ongoing maintenance • Revenues available for operating expenses but are not sufficient to cover capital costs • Lack of reserves – relatively low water & sewer rates compared to other municipalities with similar infrastructure • In the past, difficult to convince councils to invest in infrastructure… “what you don’t see…..” Water Revenue ‐ $5m (2016 projected actual) Domestic Rates Irrigation Rates Parcel Taxes Other Total 51% 10% 30% 9% 100% Water Expenses ‐ $4.5m (2016 projected actual) Labour and Benefits Contracted Services Materials and Supplies Debt Servicing Other Total 32% 8% 29% 30% 1% 100% Water Utility Revenue $ 5,000,000 Expenses 4,500,000 Amount Left for Capital and Reserves $ 500,000 “$500,000 for Capital and Reserves……” Water Reserves projected balance at end of 2016 =$576,048 BUT, $582,931 required for District’s portion of the Trout Creek Reservoir Flume project leaving little reserve balance if all expenses are used. Borrowing in water fund is more than $11,873,000. Water • • • • • • • • 220 km of water mains 6,000 water services 440 hydrants 11 dams Water Treatment plant 13 PRV stations 9 pump stations 3 in‐ground storage tanks Thirsk Dam Spillway Thirsk Dam Water Treatment Plant Priority Capital Projects ‐ WATER Garnet Valley Water Separation $ 6.6M project (Building Canada Grant ‐$2.2M District portion) PRV 10 Upgrades $180,000 project Prairie Valley Road Valves Installation Trout Creek Reservoir Flume $3.3m total project (Grant Application = $582,931 District portion) Isintok Dam Safety review $ 50,000 Garnett Dam Safety review $ 60,000 Okanagan Lake Pump Station Design $ 313,000 Pressure Reducing Valves (PRV) upgrades $ 80,000 Isintok Dam Alarmed Remote Monitoring Design $ 60,000 Watermain Replacement program ‐ ongoing 2016 Capital Program =$1.03 million Funds came from Build Canada grant, reserves and borrowing Scenes and headlines like this are becoming increasingly common in North America… Water • Over 40 watermain/service breaks in 2016 in Summerland • Watermain replacement = 220,000m / 80 years = 2,750m per year x $700/m = $1,925,000 per year • Regulatory requirements may lead to upgrades Dam safety regulations Canadian Drinking Water Guidelines changes WorksafeBC Regulation changes Wastewater (Sewer) Revenue $2.8 million projected for 2016, comprised of: Domestic User Charges Sewer Tax Levies OBWB Grant Other Total 43% 28% 13% 16% 100% Wastewater (Sewer) Expenses $2.6 million projected for 2016, comprised of: Labour and Benefits Contracted Services Materials and Supplies Debt Servicing Total 33% 7% 20% 40% 100% Wastewater (sewer) Utility Revenue $ 2,800,000 Expenses 2,600,000 Amount Left for Capital and Reserves $ 200,000 “$200,000 for Capital and Reserves……” Projected total amount in Sewer Reserve at end of 2016 = $83,640 (after our portion Grit Removal project) Wastewater (sewer) • • • • 80 km of collection pipes 2,400 sanitary sewer services Wastewater Treatment Plant 7 lift stations Wastewater Treatment Plant Lift Station Pumps Wastewater (sewer) Capital Projects 2017 Grit Removal and Effluent Filter $3.2m project (District portion = $538,336) Peach Orchard Lift Station Building $74,000 Centrifuge Major Overhaul 18,000 Engineered Air MUA model 60,000 Wastewater • Wastewater collection pipe replacement = 80,000m / 80 years = 1,000m per year x $700/m = $700,000 per year • Licence requirements may lead to more stringent treatment requirements Ministry of Environment Regulation changes WorksafeBC Regulation changes Electrical Revenue $9.8 million projected for 2016, comprised of: Residential Rates Commercial Rates Pole Rental & Street Lighting Other Total 53% 42% 3% 2% 100% Electrical Expenses $9.7 million projected for 2016, comprised of: Labour and Benefits Contracted Services Materials and Supplies Electric Supply (from Fortis) Total 8% 3% 14% 75% 100% Electric Utility Revenue $ 9,800,000 Expenses (including $500,000 transfer to general) Amount Left for Capital and Reserves 9,700,000 $ 100,000 “$100,000 for Capital and Reserves……” Electrical • • • • • 2 Substations 185 km of electrical conductor 3,923 power poles 1,446 transformers 1,364 street lights Substation Maintenance Transformer Replacement Electrical Capital Projects 2017 PCB Transformer Removal and Replacement $ 87,000 Bentley Road Conductor Upgrade $ 273,000 Substation Switch Upgrade $ 20,000 Meter Recertification $ 35,000 Main Street Lane Upgrade $ 40,000 Armstrong Upgrade – Substation to Wharton $ 500,000 Why is the Asset Management project so important?? History of Rate Increases 2012 2013 2014 2015 2016 Proposed 2017 Water 5% 0% 0% 5% 15% 5% Sewer 3% 0% 5% 5% 15% 5% Electrical 4% 4% 3% 3.34% 4.2% 4% Utility Rates – Water 5% (overall) proposed increase for 2017 Residential Current rates Base $33.57 2017 Proposed rates $34.35 Commercial Current rates 2017 Proposed rates Base $33.57 $34.35 Consumption $0.37 per 1st 25 cubic metres $1.40 per cubic metre thereafter $0.38 per 1st 25 cubic metres $1.42 per cubic metre thereafter Consumption $0.37 per cubic metre $0.38 per cubic metre *2016 increase was implemented June 1, 2016 (retroactive to January 1st) therefore 15% increase was collected over 7 months. Utility Rates – Irrigation Water 5% proposed increase for 2017 15% increase was implemented in prior year. Base fee for irrigator water up to a depth of 800mm per season (per hectare (1 acre)) Agricultural Water Current rate 2017 Proposed rate $166.62 $174.95 Greenhouses Current rate 2017 Proposed rate $359.75 $377.74 Groundwater Current rate 2017 Proposed rate $109.50 $114.98 Council recently passed a resolution delaying implementation of the tiered rate system for use over the 800mm threshold. The District will be reviewing the existing rate model, including the inclining block fee, which will be fully implemented in 2017. Utility Rates – Sewer 5% proposed increase for 2017 Per Unit User Fee (monthly) Current rates $31.05 2017 Proposed rates $29.82 *Prior increase was implemented June 1, 2016 (retroactive to January 1st) therefore 15% increase was collected over 7 months. Utility Rates – Electrical 4% proposed increase for 2017 Prior increase was effective June 1, 2016 therefore 4.2% increase was collected over 7 months. Residential Current rates Base $17.35 2017 Proposed rates $17.62 Commercial Current rates 2017 Proposed rates Base $21.27 $21.59 Consumption $0.1126 per 1st 1,000 KWHs $0.1238 per KWH thereafter $0.1143 per 1st 1,000 KWHs $0.1256 per KWH thereafter Consumption $0.1117 per KWH $0.1143 per KWH Costs for a Typical Residential Home 2016 2017 $ increase Water $514 /year $539 /year $25/year Sewer $341 /year $358 /year $17/year Electrical $118 /month $122 /month $4/month ($48/year) 2016 Questions??
© Copyright 2026 Paperzz