4th Railway Package – Implementation of the Technical Pillar Challenges Ahead for the Polish Railway Sector 20 April 2017, Warsaw Josef Doppelbauer, ERA Executive Director Objectives of the Technical Pillar of the 4RP “Safety First” Facilitate the completion of the Single European Railway Area - removing the remaining technical barriers 2 The Interoperability Vision The legacy of national monopolies with national rules means that where rail could be most competitive (long distance freight and medium distance high speed passenger), fragmentation undermines competitive position of railways (“95% of our traffic is national”) One set of rules (= network) 3 Key Elements of the Technical Pillar The Agency will issue single EU-wide vehicle authorisations and safety certificates to train manufacturers and railway undertakings The Agency will be in a position to issue an approval required for the NSA authorisation of ERTMS trackside projects (a binding opinion on ERTMS trackside specifications) All applications to the above processes will be handled by the so-called One-Stop-Shop developed by the Agency • Covering applications at the Agency, but all national applications for Safety Certification, Vehicle authorisation, and trackside/infrastructure authorisation as well 4 Timeline Phase 2 - Check Phase 1 – Plan / Do Phase 3 - Act Transposition in MS EC Working Group on 4RP implementation Learning cases Establisment of learning case phase SSC process VA process Revision of the CSM on Ca and Supervision Practical Arrangements for SSC Guide for SSC Practical Arrangements for VA Guide for VA EC model for declaration of verification ERTMS approval process Cooperation Agreement framework Cooperation Agreement – Preparatory work ICS draft specs Definition of fees&charges Apportionment of fees&charges ERA Internal Procedure for fees&charges ICS Dev ICS Spec/Dev Board of appeal (definition) ERA / NSAs delivering 4RWP Dissemination/training of new processes Specific Cooperation Agreements Agency internal staff competency Establishment of a Pool of Experts Definition Hard & soft skills (ERA/NSAs) Internal procedures for VA Internal procedures for ERTMS approval Guide for ERTMS Approval Study on fees & Charges Internal procedures for SSC Shadow Running Shadow Running (ERA/NSAs) (ERA/NSAs) Shadow Running (ERA/NSAs) Shadow Running ICS Dev/Operation ICS Operation Board of appeal (establishment) BoA effective Liability Integrated Management System (IMS in ERA) 2016 e.i.f. of legal text 15/06/2016 IMS including 4RWP processes (in ERA) 2017 2018 Mgt Board Consultation 2019 Adoption by Mgt Board 15/06/2019 2019 EC legal act Member States are encouraged to appoint their own programme managers 5 The Success of the Technical Pillar Needs Full Commitment of All Actors Commission Member States Agency and NSAs • Adopt Implementing Acts during transition period for: - practical arrangements for vehicle authorization and safety certificates - principles specifying fees and charges payable to the Agency (12 legal acts in total, to be adopted during transition period) • Put in place national legislation to transpose the 4th railway package by 15 June 2019 • Conclude cooperation agreements before end of transition period 6 Future Cooperation Agency - NSAs (to be signed with all NSAs) • Description of the tasks • Conditions for deliverables and applicable time limits • Applicants’ fees distribution between Agency and NSAs • Without prejudice to the Agency’s full responsibility for its decisions Tasks remaining under Member State responsibility • Vehicle authorisation and safety certification for national traffic (if applicant decides so) • Authorisation of railway infrastructure • Supervision (NSA) • Accident investigation (NIB) Cooperation agreements 7 What has the Agency done for us? 8 The New Vehicle Authorisation 1 Authorisation National by Authorities ERA 9 SERA Conference Series • A pan-European event series to go along with the transition of the 4RP into national law • An open discussion on expectations and realities of the new processes among the key players of the rail sector • Hosted by the Commission with ERA, in collaboration with MS and NSAs, and sector representatives (RUs, RMs, IMs, NoBos etc.) • What we expect from MS: • Invitation lists • Discussion topics 10 We are Shaping the Future of Rail in Europe! Single European Railway Area (SERA) safe :: connected :: affordable 11
© Copyright 2026 Paperzz