FILE REFERENCE: XXXX/YYYY/ZZ Utility Management Plan PROJECT NUMBER PROJECT TITLE LOCATION & STATE PROJECT SPONSOR: Insert Here Utility Management Plan The parties agree to support the timely delivery of each step in the Commissioning, Handover and Takeover Process for this project and the Utility Management Plan. Project Representative NAME Regional Representative NAME Sponsor Representative NAME POSITION POSITION POSITION DATE DATE DATE Version 5 Date 4 Dec 2007 Page 1 This template is to be used as a guide as part of the Commissioning Handover Takeover process, it is not exhaustive and individual project requirements need to be included. Table of contents 1. Key Stakeholders 2. The following officers are responsible for approval and sign off on the takeover report and final completion of the commissioning, handover and takeover process for this project. IAD Representative Project Manager Contract Administrator Regional Representative CMC Representative User Representative Builder/Contractor: Representative Other Representative Name: Position: / Name: Position: Name: Position: Name: Position: Name: Position: Name: Position: Name: Position: Introduction/Summary (overall purpose and description of the utility management plan) 3. General Building Information (brief outline of the project, building use and timeline summary with cross reference to functional design brief and final design documentation). 4. Owner/Operator Staff Training and Handover (summary of training programs and documentation, identification of personnel to be trained and instructed and setting of key dates for the building occupants and those responsible for operating and maintaining the building). 5. Building Tuning (summary of program dates and tasks to be carried out during the Defects Liability Period including identification of responsibilities, output to Post Occupancy Evaluations (POE) and recording documentation). 6. Version 5 Date 4 Dec 2007 Page 2 Reference Documents (Documents appended to or referenced by the user in the management of the building) 7. Energy Management Plan (how energy will be used efficiently and maintained, audited and monitored, use of cost effective measures and strategies to improve energy usage to comply with the Australian Government’s energy policy “Energy Efficiency in Government Operations (EEGO)”). 8. Summary of Utility Supplier and Energy Source Information 9. Utility Supplier Name Baseline Year Proportion of Main Total Energy Categories (%) (eg. Office equipment, heating, cooling) Electricity Gas LPG Oil Diesel Other Heating, Ventilation and Cooling (eg high efficiency chillers with COP of 5 or more, chilled beam technology, natural ventilation, and variable speed drives on pumps and fans) 10. Lighting (eg T5 lamp-based light fittings, daylight switching of luminaries, movement sensor controls) 11. Office Equipment (eg all monitors LCD, PC energy saving function activated, only Energy Star equipment used). 12. Other (Provide similar details for water and/or waste saving measures if part of EMP scope). 13. Version 5 Date 4 Dec 2007 Page 3 Water Efficiency (establish a water management plan to improve and ensure efficient water usage with an agreed water reduction target). 14. Waste Reduction (establish a waste management plan to improve and ensure reduction of waste production). 15. Schedule of Key Building and System Attributes 16. Version 5 Date 4 Dec 2007 Page 4
© Copyright 2026 Paperzz