Curriculum- Vitae Candidate Details Proposed candidate : Kang, Se

Curriculum- Vitae
Candidate Details
1. Proposed candidate
: Kang, Se Geun (English name : Martin Kang)
2. Point of Origin
: Korea
3. Residential address
: 102-2003, Go Hyun E-Pyunhan APT, 4500-45 ,
Geoje–daero, Geoje-si Gyeongnam, S.Korea
4. Date of birth
: 04th.Feb.1980
5. E-mail
: [email protected]
6. Contact No.
: +82-10-6495-4732
7. Languages known
: English (Fluent)
8. Computer skill
: MS Word, MS Excel, Power point, Visual Basic, Internet
9. Interest
: Studying the international and code
Active sports (Baseball, Basket ball, Swimming)
Reading a book, Do It Yourself for remote control vehicle
10. Present occupation
: EEHA inspector / INPEX Ichthys Project
Summary

Plenty of experience in offshore projects (11years) / Project Quality coordination of E&I MC
inspection, EEHA & Compex Ex equipment inspection, System commissioning and Integration test,
Factory acceptance test, Final inspection and RI inspection.

Experience in both Shipyard and Client company as a SHI shipyard lead E&I QM and a Client
inspector / Good experience to understand and coordinate both side effectively.
* 1 Projects experience as a Company Inspector.
* 11 Series Project experiences in SHI shipyard as a SHI lead E&I QM.

Experience in Quality and Progress coordination as a Client E&I inspector and a Shipyard E&I
quality Lead.
-NCR, Punch control, Carry over Works, Manpower control, PIM, Audit and FAT.

1 year work experience in Norway to control Vendor quality for E&I Item & Drilling Packages as a
SHI Norway site QM coordinator (NOV, Aker Solution, ABB etc,.)

Experience in many kinds of E&I equipment MC inspection.
- Powell & ABB HV & LV SWBD , HV & LV TR, HV&LV Motors, Heater, Heat tracing, Many type of
Instrument(FT,TT,PT,PDT,LT etc), Tubing, MC inspections.

Comprehensive knowledge and 7 year experience of EEHA & COMPEX Ex inspection &
installation and maintenance(Ex d, e, i, n, m & p)
CV- Kang, Se Geun
Page 1 of 11
- Refer to the attached EEHA(Extend Training) certificate.

Experience in RFCC, Walkthrough and SMCC document review, preparation and attending
Commissioning Test.

Work experience as SHI warranty engineer for drillship after sail away.
-Control carryover works, Outstanding punch and comment, Claim Report.

Comprehensive knowledge and experience in using Progress control & Document control System
(CoreWorx, ICAPS, ProCoSys System, SAP, FOCUS, PCS system, ERP, E-Room and so on)
Relevant Certificate
Num.
1
2
3
4
5
6
7
Certificate title
EEHA Certificate of training and assessment (Cert. No : INS009)
ISO 9000 QMS (Quality Management System) Auditor
FROSIO level 3 Certificate (Cert. No : 5533)
Carrier certificate of Samsung Heavy Industries for Offshore QM
Plaque of appreciation
Defensive Driving License
Attended Samsung Heavy Industries HSE training program
Page on CV
#8
#9
# 10
# 10
# 11
Educational Qualification
 Graduated in Dae Yeon high school, S.Korea

Graduated in Naval Architecture & Ocean Engineering, from Pusan National University, S.Korea
Experience with Code and Rule

API

ASME

ASTM

AWS

AS/NZS

ATEX

EN

IEC

ISO

NACE

NORSOK

SSPC

ABS Modu / DNV
CV- Kang, Se Geun
Page 2 of 11
Details of Work Experience
Duration: July. 2016 – Dec. 2016
Company: INPEX ICHTHYS
Position: EEHA inspector
Project: INPEX CPF_ SAMSUNG
Job Scope:
 Ex initial & detail inspection : E&I items on Package and Field installation items. Document
review & preparation for Inspection. Trouble shooting for Ex inspection.
 Pre-Commissioning Inspection : Electrical MC Inspection / SWBD, MCC and ASDS Control
Panels, UPS system, Heat tracing, Cable tray, ITR review and confirmation
 Monitoring and patrol: Working condition and proper installation for E&I equipment. Reporting for
quality improvement and preventing problems.
- 3D Modeling review (PDMS / NAVISWORKS)
Duration: Dec. 2015 - Jun. 2016
Company: Samsung Heavy Industries co., ltd
Position: Lead SHI Offshore E&I QM/QA and ICAPS Coordinator.
Project: TOTAL EGINA FPSO Project
Job Scope:
 Inspection : E&I MC Inspection, Process inspection, E&I panel installation inspection, PSV and
Instrument calibration test, Receiving inspection, Pre-commissioning inspection, HV and MV cable
Hi-Pot test, MCT water leak test and so on
 Training coordination: HV and MV cable termination, Ex-cable gland and barrier type cable gland,
MCT installation, Tubing installation and so on.
 Worker Education : Regular quality education for workmanship improvement
 Documentation : RFCC and SMCC Document approval review and Final Dossier
 Quality Control : Overall punch control, NCR control, QMR control, Other quality meetings,
process management meeting, PIM and Audit. Witness of FAT for Singapore and Germany, France.
 Monitoring and patrol: Working condition and proper installation for E&I equipment.
Duration: Dec. 2013 - Dec. 2015
Company: Samsung Heavy Industries co., ltd
Position: Lead SHI Offshore E&I QM/QA
Project: MAERSK Maersk Drillship Project
Job Scope:
 Ex-equipment inspection & coordination : E&I, Machinery, Drilling equipment.
CV- Kang, Se Geun
Page 3 of 11
 Inspection and test: E&I MC inspection, Machinery MC inspection, Process inspection, E&I panel
installation inspection, PSV and Instrument calibration test, Receiving inspection, Commissioning
test for E&I system(VFD, MCC, F&G and Drilling system, NOV drilling equipment test, Sea trial test
and System integration test (SIT)
 Training coordination : Ex-cable gland and barrier type cable gland
 Documentation : SMCC Document approval review
 Quality Control : Punch control, NCR control, QMR control Audit, FAT.
Duration: Jan. 2013 - Nov. 2013
Company: Samsung Heavy Industries co., ltd
Position: Lead SHI Offshore E&I QM/QA
Project: STATOIL Valemon Project
Job Scope:
 Ex-equipment inspection & coordination : E&I, Machinery, Drilling equipment.
 Inspection and test: E&I MC inspection, Machinery MC inspection, Process inspection, E&I panel
installation inspection, PSV and Instrument calibration test, Receiving inspection, Commissioning
test for E&I system(VFD, MCC, F&G and Drilling system.
 Training coordination : Ex-cable gland and barrier type cable gland
 Documentation : SMCC Document approval review.
 Quality Control : Punch control, NCR control, QMR control Audit, FAT
Duration: Jan. 2012 - June. 2013
Company: Samsung Heavy Industries co., ltd
Position: Lead SHI Offshore E&I QM/QA
Project: CHEVRON Jack & St. Malo. Project
Job Scope:
 Inspection : E&I MC Inspection, Process inspection, E&I panel installation inspection, PSV and
Instrument calibration test, Receiving inspection, Pre-commissioning inspection, HV and MV cable
Hi-Pot test, MCT water leak test and so on
 Training coordination: HV and MV cable termination, Ex-cable gland and barrier type cable gland,
Brattberg MCT installation, Swagelok and O’brien tubing installation and so on.
 Worker Education : Regular quality education for workmanship improvement.
 Documentation : RFCC and SMCC Document approval review and Final Dossier.
 Quality Control : Punch control, NCR control, QMR control, Other quality meetings, process
management meeting, PIM and Audit ,FAT.
CV- Kang, Se Geun
Page 4 of 11
 Monitoring and patrol: Working condition and proper installation for E&I equipment.
Duration: Jun. 2011 - July. 2011
Company: Samsung Heavy Industries co., ltd
Position: Warranty engineer for drillship Topside
Project: PACIFIC DRILLING PDC Drillship / Mistral project
Job Scope:
 Warranty report : Checking and coordinating client claim reports
 Warranty meeting : Regular status meeting and SHI claim reports status and National Oilwell
Varco. Claim report status meeting
 Documentation : Vendor claim report control, NOV claim report control, SHI claim report control
and drawing control.
 Monitoring : Regular site surveillance
Duration: July. 2010 - Dec. 2012
Company: Samsung Heavy Industries co., ltd
Position: Lead SHI Offshore E&I QM/QA
Project: PACIFIC DRILLING PDC Drillship (3 vessels) / Santa Ana & Scirocco & Mistral Project
Job Scope:
 Ex-equipment inspection & coordination : E&I, Machinery, Drilling equipment.
 Inspection and test: E&I MC inspection, Machinery MC inspection, Process inspection, E&I panel
installation inspection, PSV and Instrument calibration test, Receiving inspection, Commissioning
test for E&I system(VFD, MCC, F&G and Drilling system, NOV drilling equipment test, Sea trial test
and System integration test (SIT)
 Training coordination : Ex-cable gland and barrier type cable gland
 Documentation : SMCC Document approval review
 Quality Control : Punch control, NCR control, QMR control Audit, Witness of DCR FAT for Norway.
Duration: Jan. 2009 - Jun. 2010
Company: Samsung Heavy Industries co., ltd
Position: Offshore E&I QM/QA
Project: OCEAN RIG Ocean rig Drillship (2 vessels)
Job Scope:
 Inspection and test: E&I MC inspection, Process inspection, E&I panel installation inspection, PSV
and Instrument calibration test, Commissioning test for E&I system(VFD, MCC, F&G and Drilling
system and so on)
CV- Kang, Se Geun
Page 5 of 11
 Worker Education : Regular quality education for quality improvement
 Documentation : SMCC Document approval review
 Quality Control : Punch control, NCR control, Other quality meetings. Witness of FAT for USA.
 Monitoring : Working condition and proper installation
Duration: Nov. 2007 - Jun. 2009
Company: Samsung Heavy Industries co., ltd
Position: Offshore E&I QM/QA
Project: CHEVRON NEXUS FPSO Project
Job Scope:
 Inspection and test: E&I MC inspection, Process inspection, E&I panel installation inspection, PSV
and Instrument calibration test, Commissioning test for E&I system(VFD, MCC, F&G and Drilling
system and so on)
 Worker Education : Regular quality education for quality improvement
 Documentation : SMCC Document approval review
 Quality Control : Punch control, NCR control, Other quality meetings, Witness of FAT for China.
 Monitoring : Working condition and proper installation
Duration: Dec. 2006 - Dec. 2007
Company: Samsung Heavy Industries co., ltd
Position: Offshore E&I QM/QA
Project: CHEVRON TAKULA GAS Processing Platform Project
Job Scope:
 Inspection and test: E&I MC inspection, Process inspection, E&I panel installation inspection, PSV
and Instrument calibration test, Commissioning test for E&I system(VFD, MCC, F&G and Drilling
system and so on)
 Worker Education : Regular quality education for quality improvement
 Documentation : DMCC Document approval review
 Quality Control : Punch control, NCR control, Other quality meetings
 Monitoring : Working condition and proper installation
CV- Kang, Se Geun
Page 6 of 11
Duration: Feb. 2006 - Nov. 2006
Company: Samsung Heavy Industries co., ltd
Position: Offshore QM/QA
Project: SHELL SAKALIN Fixed Platform , Lun-A,PA-B Topside Project
Job Scope:
 Inspection and test: E&I DMCC(Discipline Mechanical Completion) inspection, Process
inspection, E&I panel installation inspection, PSV and Instrument calibration test.
 Worker Education : Regular quality education for quality improvement.
 Quality Control : Punch control, NCR control, Other quality meetings.
 Monitoring : Working condition and proper installation.
CV- Kang, Se Geun
Page 7 of 11
 Attachment
1. EEHA Certificate of training and assessment to AS/NZS 4761.1
(Integrity, Visual & Detailed inspection assessment) – Cert. No. : INS009
CV- Kang, Se Geun
Page 8 of 11
2. ISO 9000 QMS Auditor
CV- Kang, Se Geun
Page 9 of 11
3. FROSIO level 3 Certificate – Cert. No. : 5533 (Renewal Certificate)
4. Carrier of certificate
CV- Kang, Se Geun
Page 10 of 11
5. Plaque of Appreciation
Hereby certify the above statement to be true and correct in every detail.
Kang, Se Geun
CV- Kang, Se Geun
Page 11 of 11