UNCONFIRMED MINUTES

NUCAP MANAGEMENT COUNCIL
FEBRUARY 2013
CONFIRMED MINUTES
CONFIRMED MINUTES
FEBRUARY 19, 2013
WESTIN PARK CENTRAL
DALLAS TX USA
These minutes are not final until confirmed by the NUCAP Management Council in writing or by
vote at a subsequent meeting. Information herein does not constitute a communication or
recommendation from the NUCAP Management Council and shall not be considered as such by any
agency.
TUESDAY, 19-FEB-13
1.0
OPENING COMMENTS
1.1
Call to Order / Quorum Check
The NUCAP Management Council (NuMC) was called to order at 2:00 p.m., 19-FEB-13 by Pascal
Blondet, NuMC Vice Chair.
It was verified that only SUBSCRIBER MEMBERS were in attendance during the meeting.
A quorum was established with the following representatives in attendance:
Subscriber Members/Participants Present (* Indicates Voting Member)
*
*
*
*
*
*
*
*
*
*
*
NAME
Pascal
Richard
Christian
Amie
John
Scott
Robert
Serge
Jeff
Steve
Robin
Fabrizio
Mark
Davide
Stanley
Kevin
Blondet
Blyth
Buck
Emerson
Haddock
Iby
Koukol
Labbé
Lott
McGinn
McGuckin
Quadrini
Rechtsteiner
Salerno
Trull
Ward
COMPANY NAME
Airbus
Rolls-Royce
SAFRAN Group
Spirit AeroSystems
BAE Systems
Hamilton Sundstrand - UTAS
Honeywell
Héroux-Devtek
The Boeing Company
Honeywell
Bombardier Aero
AgustaWestland
GE Aviation
Alenia Aermacchi
Honeywell
Goodrich
PRI Staff Present
John
Rebekah
Mike
Connie
Scott
Jim
Justin
Barrett
Braun
Graham
Hess
Klavon
Lewis
McCabe
1
Vice Chairperson
NUCAP MANAGEMENT COUNCIL
FEBRUARY 2013
CONFIRMED MINUTES
1.2
Introductions
Introductions were made and new attendees were identified.
1.3
Routing of Attendance Listing
The attendance roster was routed at this time.
1.4
Code of Ethics & Conflict of Interest
Pascal Blondet reviewed the Code of Ethics & Conflict of Interest statements outlined in the
Attendees Guide.
1.5
Approval of Previous Meeting Minutes
The minutes from the October 2012 meeting were approved as written.
2.0
ACTION ITEM (AI) REVIEW - CLOSED
Open RAIL items were reviewed.
AI #173 – Closed - Discussed during Agenda Item 3.0
AI #175 – Closed - Discussed during Agenda Item 5.1
AI #179 – Closed - Discussed during Agenda Item 5.3
AI #177 and #178 remained Open.
For additional details, please see the attached spreadsheet.
RAIL NuMC
2013-03-06.xls
Report-Out of AI #180
During the October 2012 NuMC Meeting, John Barrett was tasked to review two identified audits
whose assigned merit status were in question. (148595 & 142751). Based on the results of this
review – appropriate corrective action shall be taken and communicated to the NuMC.
John looked into the error in the original Merit that was set by the Staff Engineer and looked at
several other audits with and without Merit in the NUCAP program and believes that the error was
isolated. Since the completion of the Merit screen is a manually controlled process by the Audit
Report Reviewer (ARR), it is possible that human errors may occur. The Nadcap and NUCAP
program provide for Subscriber review of this element as well as the review of the audit report and
NCR corrective actions. Infrequently errors are detected by this review and fed back to the ARR.
Subscribers who are Reviewers are reminded to include the verification of the accuracy of the Merit
screen during their review of any audit report in eAuditNet.
Further, there have been some enhancements promoted by PRI Staff to error proof the Merit
screen where possible, but could reduce the opportunities for human error.
2
NUCAP MANAGEMENT COUNCIL
FEBRUARY 2013
CONFIRMED MINUTES
3.0
NUMC METRICS – CLOSED
Rebekah Braun presented an overview of the NuMC Metrics.
3.0 NUCAP Metrics
Summary 2013-2-15.ppt
4.0
SCOPE EXCEPTION REPORTING - CLOSED
It was noted the all NUCAP Applicant’s have zero (0) open Scope Exceptions with the exception of
those presenting a status report in this meeting. Rebekah Braun presented some reminders on the
Scope Exception Process.
4.0 Scope
Exceptions.ppt
Scope Exceptions can be found on eAuditNet under Task Group – NUCAP Reviewers – NUCAP
Scope Exceptions.
The following NUCAP Applicant Scope Exceptions were reported to the NuMC:
BAE Systems
4.2 Scope Exception
Report BAE Systems 2013-Feb BAE.ppt
Premium Aerotec GmbH
4.4 Scope Exception
Status Report Premium AEROTEC GmbH 2013-02.pptx
Rolls-Royce plc/Corp/GTS
4.1 NuMC Scope
Exception Report - Feb 2013 RR.ppt
SAFRAN Group
Hispano-Suiza
Snecma
5.0
NEW BUSINESS - CLOSED
5.1
Program Documentation Revisions
4.3 Scope Exception
Reporting SAFRAN to NuMC 2013 02 15V3.ppt
Comments that were submitted during the ballots for PD 3000, PD3001 and PD3100 were
discussed and resolved. Additional revisions were made to PD 3000 and PD 3001 as a result of
ballot comment resolution.
5.1 Comment
Resolution.xlsx
ACTION ITEM – PRI to circulate PD 3000 and PD 3001 for a 14-Day Affirmation Ballot to the NuMC
Committee. (Due Date: 29-Mar-13)
3
NUCAP MANAGEMENT COUNCIL
FEBRUARY 2013
CONFIRMED MINUTES
Additionally, Pascal Blondet provided a report on the Status/Feedback from the EASA Observation
of a NUCAP Option B Headquarters Audit. The following point was raised by EASA during their
observation; Nadcap currently has a process in place that defines the necessary actions to take
when a Subscriber notifies PRI of potential product impact (NOP-006 – Supplier Advisory Process),
but Nadcap does not define the Subscriber responsibility to notify Nadcap for these situations. The
Nadcap program allows for Subscribers to notify PRI of potential product impact issues that are
observed outside of a Nadcap audit but does not mandate that Subscribers to do this.
5.1 EASA Update
NUCAP Council - Pascal.pptx
ACTION ITEM – PRI to send the EASA Level 3 Finding that was documented by EASA during their
Observation of an Option B NUCAP audit to the NMC for further discussion. (Due Date: 3-Jun-13)
5.2
Program Status Update
5.2 NUCAP Program
Status Update.ppt
Rebekah Braun provided a report on the Program Status of NUCAP. The attached presentation
included a report on changes to the NUCAP PRI staff support team due to John Barrett’s
retirement, data on the program, audits and participating companies and an overview of the
changes to NUCAP pricing and payment policies.
In addition, Fabrizio Quadrini from AgustaWestland provided a business summary of
facilities/processes that would be included in their future NUCAP scope in addition to their Site
Matrix. The following members have volunteered to participate as a Review Team Members for
AgustaWestland:
Kevin Ward - Goodrich
Steve McGinn - Honeywell
Serge Labbé - Héroux-Devtek
Robin McGuckin - Bombardier
5.3
Sub-team Update – Should the NuMC be a subset of the NMC?
5.3 NuMC Subset of
NMC.pptx
The question was asked during the October 2012 NuMC meeting; should the NuMC be a subset of
the NMC? A sub-team was created to discuss the points and provide a recommendation. Due to
the differences in the structure of the Nadcap and NUCAP programs and the fact that any changes
in reporting structure will do little to change the Subscriber or PRI resources to support the
program, but would present major challenges to its operation and compliance, it was recommended
that no change in structure or reporting is appropriate at this time. It was then decided that no
changes will be made.
5.4
NUCAP Leadership Changes
Pascal Blondet has volunteered to assume the position of Chair in the absence of Laurie Strom
who announced that she is stepping down at the October 2012 meeting. It was proposed that
Frank Mariot take over as Vice Chair. A motion was raised and seconded to approve Frank Mariot
as the Vice-Chair. The approval was unanimous and Frank Mariot’s appointment is subject to
approval by the PRI Board of Directors at their next planned meeting in February 2013
4
NUCAP MANAGEMENT COUNCIL
FEBRUARY 2013
CONFIRMED MINUTES
6.0
ADJOURNMENT
The meeting was adjourned at 4:45 pm.
Minutes prepared by:
Rebekah Braun – [email protected]
Rolling Action Item List -
RAIL NuMC
2013-03-06.xls
***** For PRI Staff use only: ******
Are procedural/form changes required based on changes/actions approved
during this meeting? (select one)
YES*
NO
*If yes, the following information is required:
Documents requiring
revision:
Who is responsible:
5
Due date: