14_Next-steps-for-GNC-Strategy-Development-and-wrap

Next steps for 2017-2019
GNC Strategy Development
Time line for next steps towards
development of GNC strategy 2017-2019
Action
• Identify issues, strategies
and activities which were
raised in the 3 days GNC
• Review of previous
documents, such as the
RRT/GNC-CT evaluation
report/IASC
document/review
• Formal Evaluation of the
Nutrition cluster work
Time line/by whom
Time line for next steps towards
development of GNC strategy 2017-2019
Action
• Drafting of the strategy,
objectives and activities
• Presentation of the first draft
at a face to face meeting
• Costing of the WP and
identification of lead agency
for fundraising and
implementation
• Finalization and possible
launch in various forums in
Geneva
Time line/by whom
Wrap Up
GNC 2017-2019 Strategy and WP
Development
General
1. Huge amount of work and progress over the past
1-5 years
Streamline working arrangements
AAP framework
IMO toolkit
Transition study
Advocacy Frame work
Surge Support (Coordination/IMO as well as technical
surge)
3. Country presentations really useful
General Cont4. Key remaining issues/gaps/challenges
Need more documentation and guidance on
•
•
•
•
Preparedness (recognizing that UNICEF is working on something)
How to assess wider nutritional need (out of ghetto)
Inter-cluster coordination (ensuring nutrition is in other clusters)
Links between SUN and NC at country level and how NCCs can get
involved
Track technical needs from country level
KM is a priority moving forward- how do we instutionalise
this at the global and national level (leveraging and
building on what NCCs are already doing)
Opportunity for GNC to write something on AAP for GNR
(Jan 2016
Advocacy
• Finalization of the Advocacy Framework based on
comments
• Further development of actions and leadership in
the implementation for specific actions
• Need for the development of monitoring
framework for action to be taken
• Development of the advocacy tool kit –
discussion with IMO/NCCs and country cluster
partners
• Mentoring and support to countries
AAP
• Discussion with the SAG and other partners on
the on the implementation plan
• Agree on lead agencies to support country
implementation
• Link NCC and cluster partner on the CLA/AAP
project and find ways for regular update
• Systematic update of cluster partners on
progress
Knowledge Management
•
•
•
•
Finalization of learning
Summary to be published in field Exchange
Main document on GNC website
Agreement on the need to institutionalize KM global
and country
• Creatives ideas discussed how we could move forward
–
–
–
–
–
Issues identification
Further documentation (NCC/IMO and partners)
Interactive Forum
Real Time learning
Need for KM TF?
• SAG to discuss with relevant bodies
Transition/Work with SUN
• Share report with the countries in which case
studies were conducted (for further
distribution) and also with global partners
– Country specific reports
– Consolidated learning
GNC Role in technical work in support
of country clusters
• Finalize the consultation
• Consolidate the report with recommendation and
submit draft to GNC-SAG for comments
• Share with GNC partners and NCCs for comments
before sign off
• Formalize a TF to discuss recommendation and final
actions to be taken by the GNC on technical issues
• Draft a SOP to clarify how this structure looks like
• Incorporate GNC specific issues in support of
NCC/IMOs in the GNC strategy and WP
• Identify issues that need to be taken up by bodies
outside GNC and mechanisms for communication
Information Management
• Finalization of the dev of remaining tool by end
Nov 2015 and roll out - Currently
– 6 tools are available
– 12 tools – close to finalization
– 9 tools to be developed
• IM training package development and roll out
• Outline of training package drafted
• Training package dev and roll out pending dev of
the 9 tools
• Toolkit review to be based on the feedback from
training and roll out
Inter-Cluster work
• Review what initiative are there on inter
cluster
• Review the key recommended actions from
the meeting
• Get the support of the CDC seconded person
sitting on inter-cluster work based in GCCU
Geneva
• Furthering the work with SUN
Older People
•
•
•
•
Identification of additional methodical issues
Capacity for assessment
Capacity for implementation
How do we organize ourselves better to
advocate for the issue
• How clusters could take this forward
Caseload calculation
• Overarching issues
– Discussion around programme objective
– Prioritization
– Coverage and programme quality
– Impact on programme
• Questions
– Area affecting caseload calculation
– What should be addressed in global guidance
– How to we organize ourselves better address the
issue?
Next steps
•
•
•
•
Finalization of the report
Sharing with the SAG and then all partners
Agreement on timeline for various time in
Roles and responsibilities to move agreed
action
• All meeting documents are uploaded of the
GNC website:
http://nutritioncluster.net/2015-gnc-annualmeeting/
Vote of thanks