Town of Barnstable

Town of Barnstable
Administrative Services
Procurement & Risk Management
230 South Street, Hyannis, MA 02601
www.town.barnstable.ma.us
Johanna F. Boucher
Purchasing Agent/Contract Compliance Officer
[email protected]
Tel 508-862-4741
Fax 508-862-4779
April 3, 2014
ADDENDUM #2
To: All registered users for the Request for Proposal entitled “Design Services for Huckins Neck
Road, Hyannis, MA”” dated March 6, 2014.
Due Date: April 14, 2014, no later than 2 pm
Last Date to Submit Questions: March 31, 2014
Please be advised that Addendum #2 is being issued to provide question and answer pertaining to
this RFP (answers in blue):
1.
2.
3.
4.
5.
6.
7.
8.
9.
What are the desired proposed lane and shoulder widths for Huckins Neck Road?
ypical roadway sections shall be determined during the design phase, based on requirements as identified in
"Section C - Technical Scope of Work" of the RFP
Posted speeds zones exist at 25 mph and 30 mph. Are these existing speed limits to serve as the basis of
the proposed design?
Yes, existing speed limits are to serve as the basis of the proposed design.
The RFP includes a requirement for the preparation of a Scenic Road Application. The current Town of
Barnstable Historic District and Scenic Roads map reveals that Phinney’s Lane and Shoot Flying Hill Road
are scenic roads; however, Huckins Neck Road is not. Are intersection improvements desired at Phinney’s
Lane and Shoot Flying Hill Road requiring the preparation of Scenic Road Application?
No, Scenic Road Applications are not an expected requirement. Limits of work will be outside of the
intersections with Phinney's Lane and Shoot Flying Hill Road.
What does the town envision for the scope of work for the proposed landscape/streetscape elements?
No landscape/streetscape improvements are envisioned by the Town. Consultants may propose
improvements if beneficial to the project.
What does the town envision for the scope of work for the proposed roadway lighting? No new lighting
improvements are envisioned by the Town. Consultants may propose improvements if beneficial to the
project.
What does the existing drainage system consist of? Are there any direct discharges? The Town is seeking
for the consultant to identify the various means of existing drainage and to propose the improvements.
Does the scope of work include preparation of the complete bid package or just the plans, estimate (item
list) and special? No, the scope of work does not include preparation of the complete bid package. Please
see Task 4.0 for details regarding the requirements for the bid package.
How will the Town fund the Construction of this project? MassDOT TIP funding, Chapter 90 funds or
other Town funds. At this time, the project is anticipated to be funded with Town funds, howeer, it is
possible that Chapter 90 funds could be used if available.
Page 11, Section B, 1, a - The last sentence of this section mentions a "non-price matrix" and a "price
matrix". Is Appendix "C", on page 27 of the RFP considered to be the "price matrix"? No. We are
requesting a matrix breakdown by task including hours and disciplines for the entire project. In the Non
price proposal, do not include the totals including rates and the total project price. Include the priced
matrix with the Appendix C.
10. Page 27, 3rd paragraph - The last sentence of this paragraph asks that the consultant "Provide a separate
breakdown of the fee related to the water main replacement work." Can the Town provide more
information regarding the scope of this work The last sentence of paragraph 3 on Page 27 is not relative to
this project and should be deleted. See revised Appendix C
11. Page 18, Task 7.0 - Will the Contractor provide markups of field changes for incorporation into the AsBuilt survey?
Yes, markups of all field changes will be provided for incorporation into the as-built survey.
Please acknowledge Addendum 2 on your RFP cover letter. All other terms and
remain the same as previously stated.
Johanna F. Boucher
Purchasing Agent
conditions
APPENDIX C (REV 4/3/14)
FIRM NAME: _______________________________________________
(Submit in a separate envelope, labeled “Price Proposal”)
DESIGN SERVICES
FOR THE IMPROVEMENT OF HUCKINS NECK ROAD, HYANNIS
DEPARTMENT OF PUBLIC WORKS
Attach to this pricing sheet a complete rate structure including all hourly rates by discipline/position and
any other associated charges included in the total lump fee. Also include a breakdown of the fee by task
as outlined in the request for proposal.
The Consultant's fee is subject to downward negotiation. The Consultant will execute the Town's contract
document. Town will not pay for any additional work on this project without the prior written approval.
Attach to this pricing sheet a complete rate structure including all hourly rates by discipline/position and
any other associated charges included in the total lump fee. Also include a breakdown of the fee by
task as outlined in the request for proposal. Provide a separate breakdown of the fee related to the water
main replacement work.
The Consultant's fee is subject to downward negotiation. The Consultant will execute the Town's contract
document. Town will not pay for any additional work on this project without the prior written approval.
TASK 1.0
Preliminary Design (25% Progress Submittal)
We propose the following total lump sum price for the Task 1.0 services as specified in this Request
for Quotation document for Task 1 as follows:
Lump Sum Fee $____________________
TASK 2.0
Initiate Final Design (75% Progress Submittal)
We propose the following total lump sum price for the Task 2.0 services as specified in this Request
for Quotation document for Task 2 as follows:
Lump Sum Fee $ ____________________
TASK 3.0
Permitting and Public Hearing
We propose the following total lump sum price for the Task 3.0 services as specified in this
Request for Quotation document for Task 3 as follows:
Lump Sum Fee $_____________________
TASK 4.0
100% Plans, Specifications and Estimate Design Package
We propose the following total lump sum price for the Task 4.0 services as specified in this Request for
Quotation document for Task 4 as follows:
Lump Sum Fee $ _____________________
TASK 5.0
Meetings and Coordination
We propose the following total lump sum price for the Task 5.0 services as specified in this Request for
Quotation document for Task 5 as follows:
Lump Sum Fee $______________________
TASK 6.0
Construction Reviews and approvals
We propose the following total lump sum price for the Task 6.0 services as specified in this Request for
Quotation document for Task 6 as follows:
Lump Sum Fee $ _______________________
TASK 7.0
As-Built Requirements
We propose the following total lump sum price for the Task 7.0 services as specified in this Request for
Quotation document for Task 7 as follows:
Lump Sum Fee $ _______________________
GRAND TOTAL TASKS 1 through 7 - $_________________________________
Your signature below acknowledges your understanding of these parameters and your willingness to live
within the stated financial constraint of the project.
Company: _____________________________________
Authorized Signature: _____________________________
Print Name and Title: _____________________________
Telephone_______________________________________
Fax: ___________________________________________
Email: _________________________________________
Date:___________________________________________