Working Structure and methods for CJK N-iDs Working Group Chae Sub Lee([email protected]) TTA, Korea Contents 1. Terms of Reference 2. Target Activities 3. Work Group Structure 4. Work Process 2 1. Terms of Reference Title of Working Group: Network aspects of IDs (N-iDs WG) ToR – Encouraging members’ activity on N-iD standards – Collaboration for global standard activity: ITU SGs and other groups such as JTC1 SCs – Development of CJK requirements and contributions – Sharing information and experiences – Other collaboration issues which should be identified by the meeting 3 2. Target Activities Sharing information and experiences – Business Models and Case studies – Services types and Applications Development of CJK requirements – Service and Application requirements – Requirements for Global Identifications – Requirements for Network aspects – Interoperability requirements – Harmonization and collaboration aspects 4 2. Target Activities Development of CJK Deliverables – Upon common urgent subjects – Deliverables incorporating common views – In line with plans of international bodies Collaboration for global standard activity – ITU SGs, N-ID JCA and other groups such as JTC1 SCs, EPCglobal etc. – Bring CJK deliverables into relevant groups and make international standards together – Extend on site collaboration during meetings and/or events 5 3. Work Group Structure Position of N-iDs in CJK and overall WG Structure CJK PL. Coordination B3G WG Coordination NiDs WG NGN WG Management (1CH+2VC) TG 1 TG n (Task Group 1) (Task Group n) 6 3. Work Group Structure Roles and mandates of N-iD WG Structure Roles Mandates Chair (1) Leader of the group Report to CJK Plenary and coordinate Coordination with other WG like NGN, B3G Overall management for the N-iDs WG Vice Chairs (2) Coordination with ITU and JTC1 State-of-art in ITU, JTC1 and other SDOs Monitoring activity of Task Groups Task Group Leaders Form a strategy building team for harmonization with inside/outside Responsible for specific subjects Develop deliverables which identified by members Report to N-iDs WG for approval of results 7 4. Work Process Working Method Maximize On-Line Activity: E-mail and Conference etc. Face-Face meeting: Use CJK Plenary and NGN WG. If needed, then organize separate F2F meeting with invitation Before ITU-T meeting, prior coordination meeting could be organized (similar as CJK NGN-WG) Decision should be consensus based Resulted deliverables will bring to international organizations to progress as international requirements and standards SBT (Strategy Building Team) will develop the roadmap for international harmonization including deliverables plan 8 4. Work Process Working Method of N-iD WG NGN-GSI NGN-GSI Draft a2 ITU-T (JTC1) •Drafts •Contributions SG16 SG16 Draft b2 •Drafts •Contributions JTC1 JCA Kick CJK Off (10月) Draft c2 Draft a1 Draft a2+ Draft b1 Draft b2+ Draft c1 Draft c2+ 1st Deliverables 2nd Deliv. Strategy1 Strategy2 9 4. Work Process SG 13 SG 16 SG 17 N-ID JCA Vision+ Target Meeting Results 2 and Deliverables SG 11 Naming, Addressing, Routing etc. Meeting Results 1 and Deliverables CJK N-iD Working Group SG 2 Signaling and Control Meeting Results 5 and Deliverables Example of working together in ITU-T SGs and JCA Architecture, Network capability, use of NGN Multimedia application Security aspects Overall Coordination Activities Plan for Strategies and Deliverables 10
© Copyright 2025 Paperzz