A Comparative Analysis on Three Different Supporting Methods to Expand Renewable Energies in Japan Yoshiki Ogawa Toyo University The 40th IAEE Annual Conference June 20, 2017, Singapore 1 Contents of presentation 1. Backgrounds and measures to expand REN 2. Expansion by the RPS system 3. Expansion by the Green E certificate system 4. Expansion by the FIT system 5. Comparison among three different system 6. Concluding remarks 2 Backgrounds and measures to expand renewable energies The target for the introduction of renewable energies 1997 Kyoto Protocol adopted 2001 Maraquesh Agreement adopted The introduction target of renewable energies in 2010: 19.1 Mkl-coe Share of REN in primary energy about 3% (2010) from 1% (1999) Three measures introduced in Japan since 2000 The green electricity certificate system from 2001 (Opposing to the discussions on RPS introduction) The RPS system from 2003 to 2012 The full-scale FIT system from 2012 (The partial FIT system to surplus solar for houses was introduced from 2009 and then integrated.) 3 Mechanism of RPS system and obligators Retail suppliers invite REN electricity. possessing power plant more than 2miilions kW Called as an independent power producer (IPP) Large-scale Power Companies Wholesale supplier Nuclear, Thermal-fired, Renewable Wholesale power producer Companies supplying electricity to electricity Renewable etc. power producer Selling to power compnies Mini Hydro Geothermal Biomass Thermal-fired, Renewable etc. Grid Networks Power compnies possess the grid Solar Wind Specified-scale Power Companies Regulated charge Distributng Distributng Free charge Electricity Demand Regulated sector Home Specified Power Supplier Convenience store, row stores etc. Leberalized sector Small factroy etc. Large or Department store, medium office, building etc. factory etc. Thermal-fired, Specified district Renewable etc. Newcomers, so-called PPP. Supply to electricity demand in liberalized sector Sending and distributng Finite district separated from general electrity demand 4 Increases in renewable electricity by the RPS system 0 Changes in power supply from approved plants by the RPS Law (B kWh) 2 4 6 8 10 12 14 the RPS system started 2003 2004 2005 2006 2007 2008 the surplus FIT system for houses started 2009 2010 2011 Wind Mini-hydro Biomass Solar Specified Solar 5 Players’ structure in the RPS system (Note) : Role, : Participate, : Not participate. 6 Mechanism of Green Electricity Certificate System Approve organization of green certificates Approve or Home use Green electricity production request Green electricity value transfer Sell electricity to power company etc. Green electricity producer Purchase electricity from power company etc. Power company in the producing area Green electricity certificate issuing (Transfer of green value) Power company in the purchasing area Environmental value puchaser Green electricity certificate purchase applicant Applier and certificate issuer Apply Value of environment Value of electricity or Home use 7 Changes in Green Electricity Approved by the Certificate System Power generated (100 GWh) Number of Approve Geothermal Mini-hydro Solar Biomass Wind Number 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 (Fiscal Year) 8 Various Uses of Environmental Values by the Certificate Purchasers Music ON! TV Hall Network Supply wind electricity to all of 5 live houses "Zepp" in the whole country Satellite music channel introduces green electricity Koshigaya City Government (Saitama) Car Sharing Network (Fukuoka) Achieve 60% CO2 reduction target Supply clean electricity for the use in electric cars Asahi Beer Kanagawa Factory 20% of used electricity is supplied Ikeuchi Towel (Imabari) From the factory using 100% wind power, the original towel Sonny Tower (Osaka) 100% wind power building, the first (Source) Document by Nippon Natural Energy Co. 9 Players’ structure in the certificate system (Note) : Role, : Participate, : Not participate. 10 Mechanism of full-scale FIT system from July 2012 Renewable Electricity Producers Sell renewable electricity Supply electricity Electricity Companies Purchase electricity at FIT price in the period decided by government Grant buying expences Pay gathered surcharges Gathering surcharge together with electricity charge Cost Burden Adjustment Organization (Organization for gathering and allocating Set FIT prices and FIT period by respecting opinions from estimate committee for pur-chasing price etc. (every Producers at Electricity Users Determine unit surchrge per kWh (every year) METI Minister Approve renewable plants (Government checks whether the plant can generate stably and efficiently or not. If the plant cannot required conditions, the approval is withdrawn.) Opinions aboout FIT prices and periods Estimate Comittee for purchasing price etc. Government 11 Changes in capacities installed and approved by full-scale FIT system Capacity (GW) 30 25 Capacity (GW) Capacity (GW) Small-size solar for houses Wind 30 Approved after FIT Approved after FIT 25 Introduced after FIT 30 Mini-hydro 25 Approved after FIT Introduced after FIT Introduced after FIT 20 20 20 Introduced before FIT Introduced before FIT Introduced before FIT 15 15 15 10 10 10 5 5 5 0 Capacity (GW) Large-size solar including 30 Mega-solar 25 0 0 2012/06 2013/03 2014/03 2015/03 2016/03 2016/11 2016/11 75.3 Approved after FIT Capacity (GW) Capacity (GW) 30 Geothermal 30 Biomass 25 Approved after FIT 25 Approved after FIT Introduced after FIT Introduced after FIT Introduced after FIT 20 20 20 2012/06 2013/03 2014/03 2015/03 2016/03 2016/11 2016/11 2012/06 2013/03 2014/03 2015/03 2016/03 2016/11 2016/11 Introduced before FIT Introduced before FIT Introduced before FIT 15 15 15 10 10 10 5 5 5 0 0 0 2012/06 2013/03 2014/03 2015/03 2016/03 2016/11 2016/11 2012/06 2013/03 2014/03 2015/03 2016/03 2016/11 2016/11 2012/06 2013/03 2014/03 2015/03 2016/03 2016/11 2016/11 The cost burden of surcharge has increased so sharply. 12 Players’ structure in the FIT system (Note) : Role, : Participate, : Not participate. 13 Comparisons among Three Systems (1) RPS FIT Obligation Exist Government Starter Retail electlici- Renewable Certificate ty company power producer purchaser Producer risk Exist Renewable E competition Retail electlicity company Extra cost burden Exist Government Certificate Not exist Government obligation Surcharge to End-user Not exist Voluntary Not exist Purchaser/issuer guarantee Certificate purchaser 14 Comparisons among Three Systems (2) RPS Total size of 2003-2011 10 TWh electricity FIT Certificate 2012-2016 138.43 TWh 2001-2016 0.3 TWh Complicated Players related to certificate REN Power producer Power supplier Used by various methods Related player Quite simple Power supplier REN Power producer Simple REN Power producer Power supplier End-user Use of Env. value Not used Not used Home use Not accepted Not accepted Accepted 15 Concluding Remarks From the viewpoint of rapid and drastic expansion of renewable electricity, the FIT system would be the most suitable. From the viewpoint of gradual and systematic expansion of renewable electricity, the RPS system would be the most preferable. On the other hand, from the viewpoint of PPP, the green certificate system would be the most excellent, because participants is widely expanded and the advertisement effects is induced largely. Three different supporting systems have individual merits and demerits. We should pursue reasonable and effective improvements for the future by taking excellent merits of other systems. For this purpose, it is important to apply various activities utilizing the environment value of green electricity observed in the green certificate to the RPS and FIT. This is also expected to play a crucial role on the reduction of surcharge burden to people in the FIT. 16 Thank you very much for your kind attentions. Questions or comments ? [email protected] 17
© Copyright 2026 Paperzz