Clarification on ACK of Bandwidth Request IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0180r1 Date Submitted: 2009-1-5 Source: Gang Shen, Kaibin Zhang, Jimin Liu, Xiaobing Leng Alcatel Shanghai Bell E-mail: [email protected] Venue: Re: Call for Comments on Project 802.16m System Description Document (SDD) Base Contribution: N/A Purpose: To be discussed and adopted by TGm for the 802.16m SDD Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>. Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >. Acknowledgement of bandwidth request in 16m SDD • 16m SDD allows acknowledgement of the reception of bandwidth request 1 Acknowledgement for BR indicators 2 BS BW REQ message 3 Acknowledgement for BW REQ 4 – Acknowledge of BR enables MS to restart BR to recover quickly from a BR failure • UL grant for BW REQ message UL grant UL scheduled transmission with optional piggybacked bandwidth request However, it is not necessary for ABS to response every BR with ACK considering the extra overhead 5 MS – In SDD it states “In step 2 and step 4, ABS may send message to acknowledge the reception Status” (line 20 of page 110) Bandwidth Request indicator ACK of BR in Step 2 • The BR procedure could be a 5-step regular procedure (step 1 to 5) or an optional 3-step one (step 1,4 and 5). – Step 2 is only used in the regular procedure. – Upon detection of the ranging code, the ABS shall issue a CDMA Allocation IE right now • It is not necessary for ABS to send ACK in step 2 – If the AMS receives a CDMA Allocation IE with the code matching its own, it knows BS has correctly received the BR. – So Extra ACK together with CDMA Allocation IE in step 2 is not necessary • It is suggested to remove ACK of BR in step 2 ACK of BR in Step 4 • Step 4 is for UL grant, where ABS allocates the bandwidth for AMS • It is also not necessary for extra ACK in Step 4. – If MS receives the UL grant, thus it knows BS has correctly received the BR. So extra ACK in step 4 together with UL grant is not necessary – ACK should follow the procedure step 3 and before the step 4 to let AMS be informed early • If ABS allocates UL grant immediately, it is not necessary to send ACK of BR – The BS should response the acknowledgement only when needed – ACK is useful when BS receives BR but can not allocate the bandwidth immediately • It is suggested to change to – “ABS send out ACK following Step 3 if ABS does not send UL grant within a period (e.g. next frame).” AMS Activities to Restart BR • SDD has not mentioned AMS activities to restart BR • It is suggested to change to – “If MS does not receive UL grant or ACK within a pre-defined period (e.g. next frame), it then restarts the bandwidth request” Suggested Remedy [Change the following texts in line 20 of page 110 as indicated] “Following Step 3, ABS may acknowledge the reception if ABS can not schedule UL grant to a specified AMS immediately. If MS does not receive UL grant or ACK within a pre-defined period (e.g. next frame), it then restarts the bandwidth request. BS and MS may coordinate to determine the predefined period.” [Change the figure51 on page 110as indicated] Bandwidth Request indicator 1 2 UL grant for BW REQ message 3 Acknowledgement for BW REQ 4 UL grant UL scheduled transmission with optional piggybacked bandwidth request 5 MS BS BW REQ message
© Copyright 2026 Paperzz