PROCUREMENT DIVISION DIVISION DES ACHATS COMMERCIALLY SENSITIVE To : ALL BIDDERS Subject : Request for Proposal (RFP) The Provision of of Supply and Installation of Bullet Proof Glass in Security Towers and Bunkers in Support of HKIA, Kabul, AFGHANISTAN Date : 23 June 2017 Collective Number : RFP NMO170068 Important Timelines : Please refer to the RFP INVITATION LETTER RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 1 of 8 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM AMENDMENT RECORD REVISION / AMENDMENT PART / PARAGRAPH Version 2.0 All DATE OF ISSUE 23 June 2017 REMARKS RFP Release RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 2 of 8 EXHIBIT II - CONTRACTUAL COMPLIANCE FORM The Bidder shall complete the form as required: 1. DEGREE OF ACCEPTANCE OF NSPA TERMS & CONDITIONS Bidder is to confirm their acceptance of the following. Please refer to paragraph 3 where deviations/exceptions to NSPA terms and conditions are proposed. 1.1. Performance Bond The bidder confirms that he will provide a Performance Bond issued by a primary bank acceptable to NSPA, for 10 (ten) % of the anticipated base contract period value in accordance with Part I of the RFP (Bidding Instructions and Administrative Requirements) and Part II of the RFP (Draft Contract): 1.2. Yes No Terms and Conditions In presenting this offer, the bidder confirms acceptance of all NSPA terms and conditions as well as the requirements stipulated in the SOW. 1.3. Instructions to NSPA Contractors Deployed on NATO Operations The bidder confirms that he has read and understood the above NSPA Instruction and confirms his full compliance to the Instructions. 2. Comments to the conditions stipulated in paragraph 1: 2.1 The bidder may provide comments to the conditions stipulated in paragraph 1 above. 2.2 NSPA will consider all comments; however, NSPA may award a contract on the basis of the Contractor’s acceptance of the conditions stipulated in paragraph 1 and the Bidder’s confirmation on page 8. 2.3 Please insert any comments in the following table and attach additional documentation if needed: Document Paragraph Comment RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 3 of 8 3. Alternate Proposal 3.1 If deviations to the conditions stipulated in paragraph 1 or to the Technical Requirements are proposed, the Bidder shall submit an alternate proposal, clearly marked as such, in addition to a proposal that is fully compliant with all requirements. 3.2 The exceptions/deviations that are the basis for an alternate proposal are to be included in the following table (attach additional documentation if required). The Bidder is requested also to provide the financial impact of the alternate proposal if any as well as the impact to other elements of the RFP should this alternate proposal be considered. 3.3 NSPA will not consider an alternate proposal if a proposal compliant with all RFP requirements is not submitted or is deemed non-compliant. Document Paragraph Comment 3.4 The Bidder is to attach the financial impact of the alternate proposal. If the alternate proposal contains no financial changes, the bidder is requested to confirm this. 3.5 There is no obligation on the part of NSPA to evaluate or consider an alternate proposal. 4 COMPANY DETAILS 4.1 The Contractor represents that he operates as an individual a non-profit organization a corporation incorporated in: ____________________________ (Bidder to indicate country) 4.2 Please also provide your bank account details iaw. Part 4 and 45 of the Draft Contract (RFP Part II): ______________________________________________ ______________________________________________ ______________________________________________ RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 4 of 8 5 SUBCONTRACTS 5.1 Further to Part 17 of the Draft Contract (RFP Part II), nominate subcontractors as required below: Name and Address % of subcontracting Work to Be Performed …% …% 5.2 List nominated local subcontractors below: Name and Address % of subcontracting Work to Be Performed …% …% 6 INSURANCE Further to the Draft Contract (RFP Part II), please detail your insurance proposal and provide a sample of your proposed insurance cover. ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ 7 SECURITY Further to the Draft Contract (RFP Part II), please detail the identities and NATO clearances of the members of his staff who may require access under the contract to NATO classified information and/or facilities. ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 5 of 8 8 WARRANTY Further to the General Provisions for Fixed-Price Contracts (Services) at the end of the Draft Contract (RFP Part II), please detail your warranty proposal. ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ 9 STATUS OF FORCES AGREEMENT COMPLIANCE Further to the Draft Contract (RFP Part II), please detail how your firm intends to meet the requirements of the Status of Forces Agreement (SOFA) between NATO and the Government of the Islamic Republic of Afghanistan, including but not limited to obtaining the required AISA licence and visas for personnel. ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ 10 CONTRACT ADMINISTRATION Further to Part 46 of the Draft Contract (RFP Part II), nominate officials designated by the Contractor to administer this Basic Contractual Instrument are: 10.1 The name of the official designated to act as the overall project manager: Attn : ____________________________________ Telephone : ____________________________________ Fax : ____________________________________ Mobile : ____________________________________ Email : ____________________________________ RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 6 of 8 10.2 10.3 10.4 The name of the official designated to act as the deputy project manager: Attn : ____________________________________ Telephone : ____________________________________ Fax : ____________________________________ Mobile : ____________________________________ Email : ____________________________________ The name of the official designated to administer contractual matters: Attn : ____________________________________ Telephone : ____________________________________ Fax : ____________________________________ Mobile : ____________________________________ Email : ____________________________________ The name of the officials designated to administer technical matters: Attn : ____________________________________ Telephone : ____________________________________ Fax : ____________________________________ Mobile : ____________________________________ Email : ____________________________________ 11 BIDDER’S ASSUMPTIONS The bidder is to list any assumptions. NSPA notes the bidder’s assumptions however, they must be agreed between NSPA and the Contractor before they will be incorporated into the Contract. ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ ______________________________________________ RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 7 of 8 12. The Bidder confirms acceptance of the information stated in paragraphs 1 through 10 and confirms compliance and acceptance with paragraphs 1.1, 1.2 and 1.3 above: NAME OF COMPANY: ____________________________ NAME OF REPRESENTATIVE: ____________________________ TITLE OF REPRESENTATIVE: ____________________________ DATE: ____________________________ SIGNATURE: ____________________________ RFP NMO170068 EXHIBIT II – CONTRACTUAL COMPLIANCE FORM Version 2.0 COMMERCIALLY SENSITIVE NATO UNCLASSIFIED Page 8 of 8
© Copyright 2026 Paperzz