Session 37, March Plenary Closing Minutes

doc.: IEEE 802.22-12/0019r00
March 2012
November Plenary Opening Report
IEEE P802.22 Wireless RANs
Authors:
Name
Company
Apurva N. Mody BAE Systems
Date: 2012-03-11
Address
Phone
email
P. O. Box 868,
MER 15-2350,
Nashua, NH 03061
1-404-8190314
apurva.mody@baesyst
ems.com
apurva_mody@yahoo.
com
Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in
this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.
Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE
Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit
others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22.
Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the
statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to
patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard
is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair
Apurva N. Mody < [email protected] > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a
draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at [email protected].
>
Submission
Slide 1
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
Outline
•
•
•
•
•
•
•
IEEE 802.22 WG Agenda
IEEE P802.22 – Progress Report
IEEE P802.22.1 – Progress Report
IEEE P802.22.2 – Progress Report
Letters of Assurance
Past and Future Meetings
Likely WG Motions at the March EC Meeting
Submission
Slide 2
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
IEEE P802.22 WG Agenda
• Opening Plenary
• Motions at the EC - Request the chair to make the following motions to the EC
– Request for P802.22b Press Release to be Approved
• IEEE P802.22 – Project Completed. Standard published on July 1st, 2011.
• IEEE P802.22.1 – Project Completed. Standard published on November 1st
2010
• Opening Plenary
• Tutorial – Introduction to IEEE Std. 802.22-2011 and its Amendment PAR for
P802.22b: Broadband Extension and Monitoring
• Mid-week plenary
• IEEE P802.22.2 – Sponsor Ballot #1 is on-going.
• Closing Plenary (Moved to Thursday Evening)
• EC Meeting
Submission
Slide 3
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
IEEE P802.22 Progress Report
• IEEE802.22-2011 Standard was published on July 1st 2011.
• We would like to sincerely thank the 802.22 members and
contributors, Members of the IEEE 802 Executive Committee,
Members of the IEEE SA RevCom, Members of the IEEE SA
Board and the IEEE SA Staff.
Submission
Slide 4
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
IEEE P802.22.2 Progress Report
• P802.22.2 Sponsor Ballot Ballot 1.0 was launched.
• There was an error from the IEEE SA Staff that resulted in the ballot starting
nearly 10 days after its scheduled start of Feb. 10th and will finish on March
20th instead of the scheduled March 11th.
• This will also have an impact on the project completion
Return
Total # # Respondents
Ratio
68 Votes
66% as of
Received as of March 11th
102 March 11th 2012
2012
Submission
Slide 5
Approve
Ratio
96% (as
of March
11th 2012)
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
IEEE P802.22 Letter of Assurance
• The LoAs can be found on the website at www.ieee802.org/22
as well as on the IEEE SA website
Submission
Slide 6
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
Future Sessions
IEEE 802.22 Future Sessions are planned as follows
Submission
Session
Dates
Location
Interim
Jan 15 – 20, 2012
Jacksonville, FL
Plenary
March 11-16, 2012
Waikoloa, Hawaii
Interim
May 13-18, 2012
Atlanta, GA
Plenary
July 15-20, 2012
San Diego, CA
Interim
Sep 16-21, 2012
Indian Wells, CA
Plenary
Nov 11-16, 2012
San Antonio, Tx
Slide 7
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
Likely P802.22 WG Motions to the EC(2)
1. Request to Approve the P802.22b PAR Approval Press Release
Submission
Slide 8
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
802.22 Sponsored Tutorial
There are no 802.22 Tutorials for this session
Submission
Slide 9
Apurva N. Mody, BAE Systems
doc.: IEEE 802.22-12/0019r00
March 2012
References
• IEEE 802.22 WG Agenda, March Plenary, Waikoloa, Hawaii.
https://mentor.ieee.org/802.22/dcn/12/22-12-0016-02-0000-march-plenary-workinggroup-agenda.xls
Submission
Slide 10
Apurva N. Mody, BAE Systems