RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 RIG ATWOOD MANTA RIG MOVE PROCEDURE / VOYAGE PLANNING Move No: 01 From: PPL Shipyard, Singapore To: Songkhla-E Platform Location Block G5/43, Gulf of Thailand Location: LAT: 07o 34’ 18.7”N Long: 100o 37’ 10.0” E ETD: 1st December 2012 Tow type: Extended tow Revision No. Revision Date Draft 22nd November 2012 PAGE OF 1 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 TABLE OF CONTENT 1. INFORMATION 3 1. LOCATION INFORMATION 4 2. RESPONSIBILITIES 5 3. DEPARTING LOCATION 7 4. TOW ROUTE 8 5. ARRIVING DESTINATION LOCATION 12 6. PRELOADING OPERATION 13 7. COMMUNICATION 14 8. MEDIVAC PLAN DURING TOW 14 9. POSITION REPORT 14 10. EMERGENCY CONTACTS 14 Revision No. Revision Date Draft 22nd November 2012 PAGE OF 2 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 1. INTRODUCTION The BMC 400 Pacific class Self Elevating MODU “RIG ATWOOD MANTA” is scheduled to move from PPL Shipyard, Singapore to Block G5/43 offshore Songkhla-E location in the Gulf of Thailand. The departure and arrival coordinates are as follows: Departure co-ordinates PPL Shipyard Latitude: Longitude: 01° 17' 47" N 103° 44' 51" E Arrival co-ordinates Songkhla – E Platform Block G5/43 Latitude: 07° 34' 10.913" N Longitude: 100° 37' 21.542" E The move will be conducted in accordance with “RIG ATWOOD MANTA” Marine Operations Manual. Responsibility of the safety of personnel and integrity of the rig will at all times remain with the OIM (Offshore Installation Manager) during elevated mode and Barge Master during a float mode. A pre-move meeting will be held and will be attended by key personnel involved in the rig move. The meeting will also be attended by the Captains of the towing and anchor handling vessel wherever possible. The purpose of this meeting will be to ensure that all personnel are aware of their job function and responsibilities and to agree on any technical aspects and constrains that may affect the operation. Other discussion in the meeting should include the rig move procedures, voyage plan, charts, site survey reports, tidal height predictions, surface current predictions, navigational hazards, weather prediction and procedures prepared by the AHTS(s). An additional pre-jacking meeting should be held on board the rig before the move to review all pre-move checks and to ensure that all fundamental safety systems on the rig are fully operational. This will include but not limited to ballast pumps, fire pumps, emergency generator and watertight integrity. Comprehensive premove checks will have been undertaken on jacking system, winches and all associated equipment involved in the rig move operation. Stability calculations and loading condition for the intended transit will have been prepared and remain available for review. Weather forecast will be provided by two independent recognizable sources. Updated weather forecast will remain available on a 24 hours basis via email / fax. 4 days weather forecast should commence 4 days prior to the move and should be sent to the rig twice daily. The weather limits for jacking operations are: Wind Speed: 25 Knots Sea state (combination of wind, wave and swell): 1.83 m Survey equipment should be installed and made available before the final approach to the destination location is made. Proper functioning and accuracy of the equipment should be ensured before the final approach. All debris items, pipelines and other sea-bed obstructions should be displayed on the navigational screen before the final approach. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 3 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 2. LOCATION INFORMATION Departure location: PPL Shipyard, Singapore Rig Heading: Water Depth: Seabed Soil Penetration Air Gap Obstructions 317 5.7m Stiff clay from 5 meters Bow 4.8 meter; Port – 4.8 meter; Starboard – 4.8 Meter 2 meters Dock and surrounding installations Arrival location:, Offshore Thailand Block G5/43 Songkhla- E Location Rig Heading: Water Depth: + - 90 degree 20.0 meter (66 ft.) LAT Seabed Soil Very soft clay from 0-3.0 meters Soft clay from 3.0-7.8 meters Firm clay from 7.8-2.5 meters Penetration Air Gap Obstructions Revision No. Revision Date Expected 8.5 to 11.3mtrs 11.5 to 27.4mtrs Anchor chain north of location. Anchor spread from FPSO North side of location. Crude oil line north side of location. Draft 22nd November 2012 PAGE OF 4 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 3. RESPONSIBILITIES 3.1 Offshore Installation Manager (OIM) O.I.M will have full responsibility for the integrity of the unit and the safety of all personnel on board when the rig is in elevated mode. O.I.M will have full responsibility for the integrity of the unit and the safety of all personnel on board when the rig is in a-float mode. When advised by Atwood senior management that the rig has been cleared for departure and having consulted with the Barge Master and Warranty Surveyor, he will decide when it is safe and practicable to commence moving operations within the limits of the units Marine Operations Manual. 3.2 Client / Operator’s representative(s) The Operator Coastal Energy will be represented by the Drilling Supervisor who will remain client’s principal authority on board. He may be accompanied by a Marine Representative from Coastal Energy. He will liaise with OIM / Barge Master as necessary to ensure the operator work plans are implemented properly. He will endorse the completion of all work activities and responsible for accepting the final position of the rig at the new location. He will liaise between the personnel on the rig and Coastal Energy shore-base. All communications between the rig and the operator shall pass through him via the OIM / Barge Master. 3.3 Tow Master The Atwood approved Tow Master will be responsible to the OIM / Barge Master for safely moving the rig from its current location to the next location. The responsibility will commence with confirmation of all preparation checks to a point when the rig has been safely preloaded and elevated to operating air gap. His presence on board will in no way abdicate the rig crew and OIM of their respective duties and responsibilities. He will communicate with the towing vessels and instruct them to ensure safe voyage transition and final positioning of the rig at the destination location. He shall lead the discussion during pre-move meeting and pre-approach platform meeting. He shall co-ordinate with Barge Master on aspects of stability and jacking. He will also inspect the towing vessels to ensure their suitability. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 5 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 3.4 Barge Master Barge Master will maintain good communication with the Operator’s representative on board with regard to statutory permission to approach next location and acceptance of final position. The Barge Master will ensure deployment of sufficient and competent rig crew for the safe and efficient conduct of the move operation. He will ensure that the move is conducted within the outline of the Marine Operations Manual. He will have the prime responsibility of all jacking operations. He will prepare the stability sheets for the transit loading condition and ensure that they are available for review. He will ensure proper and adequate sea fastening / lashing of all loose items for the sea passage. 3.5 Warranty Surveyor The Marine Warranty Surveyor is an independent consultant whose function is to ensure that MODU operation does not exceed an acceptable level of risk. The extent of such risk is defined by the parameters, criteria and limitations set forth by the rig’s design, as included in the Marine Operations Manual. The attendance of the Warranty Surveyor on board is in an advisory role ‘only’. He will issue a Certificate of Approval for the move and will ensure that a Certificate of Approval for the location is in place. He will inspect the towing / anchor handling vessels to ensure their suitability for the operation. 3.6 Masters of Tow Vessels They will be responsible for ensuring that the operations of their vessels are carried out in a safe and efficient manner with due regard to prevailing weather conditions and crew exposure on deck during rig move. The Masters will conduct operations in line with the International Rules for the Prevention of Collision at Sea, relevant marine regulations and good seamanship. They are to immediately advise the Tow Master/ OIM of any concerns regarding the ongoing / planned operations in which they feel that the vessel crew may be subjected to unacceptable risks. In addition, they are to immediately advise of any failure of equipment or machinery where the capabilities of their vessels may be reduced. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 6 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 4. DEPARTING LOCATION 1. Reduce manning of non-essential service personnel as applicable per the Marine Operations Manual and Atwood policy. 2. Retract the cantilever to the stowed position and secure per the Marine Operations Manual. 3. Utilizing the pre-move checks list and Marine Operations Manual, secure the rig for tow. 4. Hold a pre-jack/pre-move meeting with available crew. 5. Once all checks are complete and all leg stations are ready, jack-up 1 foot to confirm proper operations of the jacking system and associated machinery. 6. When suitable weather window has been established and agreed by OIM, Barge Master and GL Noble Denton surveyor, jack down to 3 meter air gap. 7. Connect the harbour tugs as per instructions of the harbour pilots / harbour tow master. The tugs will be connected with soft lines. 8. Lower the hull to 2 meter draft for watertight integrity checks 9. On completion of integrity checks, lower the hull to floating draft. Connect jetting lines to legs (if deemed necessary) and commence freeing legs. 10. Confirm anchors are properly bolstered and secondary securing is in place. 11. When disengaging bottom, raise the bow leg first (2 to 3 feet) and then all legs altogether. Move off location and berth maintaining slow speed until all legs are well clear of the bottom. 12. The unit will depart from its current location at PPL Shipyard under the direction of the harbour pilots & harbour tow master and proceed to a pre-agreed position where the harbour tugs will hand over tow to the designated towing vessel. Continue raising legs till the spud-cans are retracted within the hull. 13. At the pre-agreed position, the rig will be held in position by the harbour tugs to facilitate connection of the designated towing vessel “Magellan 2” to the main towing bridle. Tow vessel “Pacific Bronze” will be connected to the Stbd forward auxiliary tow line. Once the towing vessel is connected, the harbour tugs will be released. 14. The harbour pilot and harbour tow master will disembark soon after the tugs are released. The rig and tow will proceed to the new location on the agreed tow route under directions from tow master. Towing vessel shall log consumables on board at the time of departure. 15. If applicable, continue raising the legs until in the agreed tow position having due regard for any shallow hazards in the area of transit. . 16. Once the legs are in the tow position the rig is to advise the lead tow vessel Master of the overall draft of the rig. 17. Once the rig is underway, all shore base communications will be via Inmarsat phone or facsimile. 18. Integrity checks will be maintained throughout the tow on a regular basis and logged for future reference. Any problems or discrepancies should immediately be relayed to the Barge Master and the Warranty Surveyor. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 7 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 5. TOW ROUTE The tow will proceed from Singapore to the Songkhla-E Platform location with the tow vessel(s) connected as directed by the tow master. The rig will transit on the route as outlined below. W.P. LAT. LONG. PPL Pdn Jr Jr jn Sp 023 024 025 026 027 028 029 030 031 032 033 034 035 036 037 038 01o 17.530’ N 01o 16.850’ N 01o 16.500’ N 01o 12.500’ N 01o 11.610’ N 01o 06.100’ N 01o 02.350’ N 01o 05.050’ N 01o 08.490’ N 01o 09.650’ N 01o 13.600’ N 01o 16.700’ N 01o 35.000’ N 03o 40.000’ N 04o 00.000’ N 04o 40.000’ N 05o 00.000’ N 06o 15.000’ N 07o 15.000’ N 07o 15.000’ N 103o 45.300’ E 103o 44.700’ E 103o 45.100’ E 103o 40.000’ E 103o 36.500’ E 103o 33.100’ E 103o 39.400’ E 103o 43.200’ E 103o 46.550’ E 103o 48.300’ E 103o 56.750’ E 104o 20.000’ E 104o 40.000’ E 104o 40.000’ E 103o 40.000’ E 103o 40.000’ E 103o 30.000’ E 103o 00.000’ E 101o 00.000’ E 100o 42.000’ E Course 220° DIST. 1 ETA NEXT W.P. ARR. TIME DIST TO GO REMARKS 560 PPL Shpyard East Jurong channel Selat Pandan Rasu Buoy N.Nipa TSS Singapore Pulau Cula P.Tekong Helen Mar Reef Karang Banten Teluk jodoh T.Sading Eastern Bank P.Pemanggil 559 132° 1 558 232° 6.5 551.5 256° 4 547.5 212° 6.5 541 120° 7 534 055° 4.5 529.5 045° 4.5 525 057° 2 523 065° 9.5 513.5 082° 23.5 490 048° 27 463 360° 65 398 323° 102 296 360° 40 256 331° 23 233 338° 81 152 297° 134 18 270° 18 Arrival P.Kuanan T.Pilur Kuala Merchong Tompok Putri Saadong Churchill Patches Songkhla Anchorage The total distance between locations is 560 nautical miles and the overall draft of the tow is to be relayed to the Master of the lead tow vessel once the legs are at the required position. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 8 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 Figure – 2 2. CHARTS USED FOR THIS PASSAGE No. Chart Number Chart Correction update 01 3383 2012 – 119,1591,1592 02 3831 2012 – 119,177,1116,3001 03 2403 2012 – 1873,2044,2595,2846,3001 04 2869 2011 – 1341,2182,2510,2510.2511,2676 05 3445 2012 – 3429 06 3446 2012 – 3155 07 3447 2010 – 755,1248,3460,3681,4599 08 3542 2011 – 956,3266 VESSEL NAME : AHT.MAGELLAN 2 : Capt. Mursalim Rahim MASTER : 07 / Dec / 2012 DATE VOY. NO. FROM TO Est. Speed Steaming Est. Speed Steaming Est Speed Steaming : 023 TTL DIST. 560 NM : PPL Pandan, Singapore : Songkla, Thailand : 3.0 Kts ( : Total 7 day 18 hrs 40 mnt Estimated : 3.5 Kts : Total 6 day 16 hrs Estimated : 4 Kts : 5 day 20 hrs Estimated The above tow route will have to be reviewed by the tow master, warranty surveyor, barge master and the towing vessel master. Rig and tow vessels to ensure they are loaded with fuel for at least 20 days tow period to account for unforeseen weather conditions and other possible delays. As per the Marine Operations Manual the bollard pull requirement for a single vessel tow in the region is 150 tons. Two vessels minimum 85 tons bollard pull. Minimum two vessels having a total bollard pull of 250 tons are required for the final approach to the platform soft pin location Revision No. Revision Date Draft 22nd November 2012 PAGE OF 9 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 6. ARRIVING DESTINATION LOCATION Manta 1. When in vicinity of the destination location, a pre-approach meeting will be carried out. The rig will approach as agreed during the pre-move meeting. Permission will be obtained from field MIC before entering the 1000 m zone. 2. At a distance agreed by the Tow Master, Barge Master & Marine Warranty Surveyor from the Songkhla-E platform location, the tug will shorten tow cable and alter course onto approach heading. The final approach will be carried out at the discretion of the Tow Master and Barge Master taking into account the weather, visibility etc. 3. At an agreed distance, by the Tow Master, Barge Master & Marine Warranty Surveyor from the Songkhla-E platform location the rig will commence lowering legs to 30 feet off bottom. Maintain speed of+/- 0.75 knots. An assist tug(s) will be connected to the aft end(s) of the rig at the discretion of the Tow Master. 4. Verify proper operation of survey equipment and lower legs closer to the seabed, +/- 15 feet off bottom, if clear. Carry out manual RPD checks and adjust as necessary. Prepare rig for pinning. 5. The rig will then be maneuvered to within the tolerance limits and stabilized on the required heading. Once stabilized, the rig will be pinned at the designated soft pin location. 6. The rig will then achieve initial penetration at the soft pin location before deploying the four anchors at the recommended angles and prearranged distance. (Note: anchors will be secured on deck (kam- fork or shark jaw in locked position) of the AHTS at all times when crossing pipelines or other subsea obstructions). 7. The rig will then be winched on to the final location in a controlled manner on the anchors. The stern will be manned with radio communications at all times at the final approach. 8. Water depth is to be monitored while moving onto location taking into account tides and bathymetry. It is imperative that accurate information for the tides on the day is made available to the rig and should be sought from the survey company and/or the Operator. 9. When inside the tolerance area and agreement of all parties concerned, lower legs to 3 feet off bottom, ready for pinning. (Note: the rig needs to be positioned in a manner and accuracy that all platform slots can be reached required for the drilling program. 10. Maintain rig speed at less than 0.5 knots, and pin the rig as appropriate. 11. Once the rig is soft pinned, check to ensure the positioning equipment is functioning correctly prior to requesting acceptance from the Operator Representative. 12. Each leg may be raised and lowered to release any residual torque. 13. Once the position is accepted, either the assist or the lead tow vessel will be released. 14. The rig will be jacked to a minimal air gap as recommended by the Warranty Surveyor and will prepare for preloading operation. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 10 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 Penetration curves to paste here. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 11 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 7. PRELOADING OPERATION Once the rig position has been accepted, jack the hull to zero air gap. The preload operation will be carried out with the hull at a positive draft on an ebbing tide. This will allow the tide to fall out from under the hull as the tanks are filled to maintain hull placement as close to water line as possible. The draft will be decided by the Barge Master in consultation with the Warranty Surveyor and taking into account the state and range of tide. Single leg preloading at draft will commence with the bow leg. A leg footing reaction of 9266 tonnes (20,429 kips) is to be maintained during preloading of all legs . Preload will be held for 3 hours (static test) on all legs at minimum airgap. If the leg settles, adjustments will be made to level the hull and the 3 hours hold period will commence again. At no time during jacking should the load exceed 370 MT per pinion. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 12 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 Continuous monitoring of applied preload against achieved penetration should be carried out. This should then be compared to the predicted load penetration curve Once the static holding period for all legs is completed without further settlement, all preload should be dumped. The towing vessel should be released from the bridle and the hull elevated to operational air gap. Level the hull at operational air gap. Engage the fixation system, secure the jacking console and release the leg for drilling operations. Revision No. Revision Date Draft 22nd November 2012 PAGE OF 13 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 8. COMMUNICATION It is imperative that lines of communication and responsibility have been clearly defined and are understood by all concerned. It will be the responsibility of the Barge Master to ensure that these actions are complete prior to commencement of the operation. Specific attention will be made to the interface requirements of passing and recovering the anchors and handling wires between the rig and the anchor handling vessels when anchors and handling wires are being used to move the rig onto location. The Barge Master will accept, or suitably delegate responsibility, to ensure that a competent person is present on the deck while passing or recovering the tow wire and/or anchors to/from the vessel. This person will be equipped with portable VHF communications, and will be in direct contact with the anchor winch operator, the crane operator and the anchor-handling vessel Captain. 9. MEDI-VAC PLAN DURING TOW The Emergency Response Plan for the tow with contact numbers will be used in case of any emergency requiring MEDI-VAC from the vessel during the moving operation. 10. POSITION REPORT Position reports will be given by the lead tug every 6hrs. 11. EMERGENCY CONTACTS MODU Shore Base Contacts Title Name Office Mobile Email Graham Robertson Operations Manager 8565 +66 912290831 [email protected] Ronald Timmerman Operations Superintendent 8566 +66 912290832 [email protected] Benn Hooper Operations Administrator 8545 +66 912290833 [email protected] Rhyian Manibog Manta Secretary TBA +60 863977509 [email protected] Ku Abdullah bin Ku Osman Regional HSE Coordinator +60 (0) 389257471 Atwood Offshore Drilling Limited (Thailand Branch) +60(0)123823133 [email protected] Phone +66 (0)27457305 Fax + 870773234239 Inmarsat + 870773234239 589/143 Central City Tower, 26th Floor, Shorebase Office Location I Address Bangna-Trad Road. Bangna, Bangkok 10260 Thailand Revision No. Revision Date Draft 22nd November 2012 PAGE OF 14 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 MODU Contacts Office Phone Number Phone Number Office OIM +1 281 749- 3040 Radio Room +1 281 749- 3034 lnmarsat + 870773234239 Barge Engineer +1 281 749- 3039 Company Man TBC +1 281 749- 3032 Store Keeper TBC STC I Medic RMS Maint. Sup. +1 281 749- 3035 Company Corporate Contacts Name Title Office Mobile Email Mac Polhamus Vice President, Operations + I 281 749 7804 +I 281-210-8555 [email protected] Terry Bailey Senior Operations Manager + I 281 749 7954 +I 832 766 7954 [email protected] John Gidley Director, HSE + I 28 1 749 7870 +I 832 293 7922 [email protected] Arthur Dutton Operations HSE Manager + I 281 749 7994 +I 281 734 3799 [email protected] Tom Hanrahan Marine Operations Manager +I 281 749 7915 [email protected] Mike Koenig Marine Operations Superintendent +I 281 749 7952 [email protected] Joe Grimes Regulatory Compliance + I 28 1 749 7857 Corporate Office Location I Address Atwood Oceanics 1 5835 Park Ten Place Drive (77084) P.O. Box 218350 (772 18) Houston, Texas USA + I 832 375 4299 [email protected] Phone +I 28 1 -749-7800 Fax +I 28 1 -715-5416 Administration (Flag State) Contact Marshall Islands Flag State Name & Address Revision No. Revision Date (Awaiting information on which area office covers Thailand waters) Draft 22nd November 2012 Phone TBC Fax TBC E-mail TBC Website http://www.register-iri.com PAGE OF 15 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 CEC International EMERGENCY CONTACT LIST CEC International, Ltd. (Thailand Branch) 39th floor Unit 3901-3904 Exchange Tower 388 Sukhumvit Road, Klongtoey, Bangkok 10110 Updated: 18/10/2012 Tel. (66) 2 610 0555 Fax (66) 2 610 0541 Name International call 0 = +66 Title Business Phone ERCName Bangkok Emergency Control Room Mobile Phone E-mail Business Fax 02 6100 535 Operation Conference Room 02 6100 530 02 610 0541 Conference call from outside dial 02 610 0500 then 2580#, Say name then # 02 6100 531 Songkhla Emergency Support Center Mr. Suwat P.ext.666 074 331 031 081 541 7476 [email protected] Mr. Thammasak N. ext. 630 074 331 030 089 669 4066 [email protected] 074 331 029 Guard house ext. 688 John Griffith General Manager 02 610 0599 083 549 3851 [email protected] Ken Hemmerich Operation Manager 02 610 0577 081 921 1061 084 453 5622 [email protected] Rapee Kudisri Drilling Manager 02 610 0591 085 486 7458 [email protected] John Sayre Production Manager 02 610 0515 081 830 5735 [email protected] Ronald The Technical Manager 02 610 0508 081 732 0461 [email protected] Witthaya Khemrach Marine Facilities Manager 02 610 0594 081 302 0032 [email protected] Keith Brazier Facilities/Construction Manager 02 610 0546 081 752 4249 [email protected] Clifford Smith Pavinee Thappenthai Site Construction Superintendent External Affairs Manager 02 610 0507 02 610 0595 089 666 7002 081 558 7511 [email protected] Suvit HSE Manager 02 610 0585 081 688 1013 HSE Officer 02 610 0543 081 385 2321 Putcharaporn Jamras Mualchaipoom 02 610 0541 [email protected] [email protected] [email protected] SKL-A Production Platform "Soraya"(Jackup) Name Soraya production platform Public telephone Internal Phone Mobile Phone Marine VHF Channel 16 – 156.8 MHz & Channel 10 – 156.5 MHz Call Sign: SORAYA 082 428 8250 E-mail Business Fax [email protected] OIM CEC Inter 02-610 0580 NCT Tie Line 580 Operation Supervisor & HSE 02-610 0588 NCT Tie Line 588 [email protected] Work Over Site Manager (WSM) 02-610 0538 NCT Tie Line 538 [email protected] Revision No. Revision Date Draft 22nd November 2012 [email protected] PAGE OF 16 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 SKL-C Production Platform "BuaBan A" (Fixed platform) Name Title Business Phone Mobile Phone VHF ch. 16/10 V-sat tel +44 2031454626 V-sat tel +44 2031454627 Bridge 02-6100 503 OIM 02-6100 509 Visitor 02-6100 514 085-370-4820 Coastal Energy Resolution FSO Control room Operation Supv. 02 610 0567 NCT Tie Line 567 E-mail Business Fax [email protected] ; [email protected] Jarin K 081 813 8897 Woravud 081 321 5001 [email protected] SKL-D Production Platform "Seafox 3" (Jack-up) Name Seafox production platform Field Superintendent Public telephone Internal Phone E-mail Business Fax VHF 16 – Inter. Marine Safety, VHF 17 Working channel VHF 10 – CEC Vessels, VHF 72 - CEC Vessel. Call sign: Seafox Three 02-610 0560 NCT Tie Line 560 - Rainier Verhulst is still the Operations manager +31 6642 18007 Bridge (OIM Office) 02-610 0570 NCT Tie Line 570 Immasat phone number 00 - 881 631 643 474 NCT Tie Line 571 Radio operator Mobile Phone 088-088-1827 [email protected] [email protected] 089 717 1330 [email protected] [email protected] SKL-E Production Platform " Richmond " Name MOPU Superintendent Public telephone Internal Phone Mobile Phone Marine VHF Channel 16 – 156.8 MHz & Channel 10 – 156.5 MHz Call Sign: Seafox Six E-mail Business Fax [email protected] Radio room 02-610 0549 NCT Tie Line 549 089 503 7516 [email protected] HSE 02-610 0573 NCT Tie Line 573 Wasan 090-969-0451 Tanin 085-503-3825 [email protected] EPTI Supv. 02-610 0565 NCT Tie Line 565 STORE ( Anantachai / Taweep ) 02-610 0596 NCT Tie Line 596 [email protected] 081-609-3567; 086-8169428 [email protected] SKL- G Production Platform "Seafox 6" (Jack-up) Name Mossur Maciej/Alex Bozek Public telephone Internal Phone Marine VHF Channel 16 – 156.8 MHz & Channel 10 – 156.5 MHz Call Sign: Seafox Six Bridge (OIM Office) 02-610 0574 NCT Tie Line 574 EPTI Supv. 02-610 0564 NCT Tie Line 564 Revision No. Revision Date Mobile Phone Draft 22nd November 2012 089 503 7516 E-mail Business Fax [email protected] [email protected] [email protected] PAGE OF 17 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 Production contractors Expro PTI Prod. Manager CHRIS CLEVELAND 090 651 0565 Kevin McCartan Region Mgr. Kevin - 084 454 8881 Deo Asst Production Manager Deo - 087 697 2797 Kied - Admin. Manager Kied - 081 830 5281 Kanokpan(Ying) SKL Secretary Ying - 086 888 4431 Mr.Chayaphon Sukvivutnagorn HSE - 088 809 9592 SF6 Workships Netherland SF3 Workfox Netherland Compass Energy Office Singapore [email protected] [email protected] Phathaithep.Anantapeuch@exprogro up.com [email protected] [email protected] [email protected] Gerrit Jan Smans, Operations Director +31 1 04530377 [email protected] Martijn le Duc, NSI +31 6 10295006 [email protected] Mike Barret, Rig Master [email protected] Rainier Verhulst, Ops. Director +31 664 218 007 [email protected] Piet Vliek, Rig Manager +65 93 510 096 [email protected] Guus Lemmers, Rig Manager +31 653 344 772 [email protected] Compass energy +0065-6376-1311 [email protected] Capt. Nitin (HSE) +0065-3116-9171 Adisorn Boonpen Kitiyamas 081-969 6100 Thawat Rattana 081-957 2926 [email protected] Sodexo Amarit Mr. Kittisak Rakthai Ms. Ratchatida Loyjiw 074 338558 074 338543 084 387 7940 084 387 8456 [email protected] [email protected] 085 9104 004 GE Oil & Gas Randy Vissers Project Manager Arkom Khundat GE SKL Sup. Peter Seddon (Base Mgr.) Werawan Nilvanich (Admin.) 081 342 4830 089 967 4343 089 897 8801 085 669 1010 [email protected] [email protected] [email protected] [email protected] EMAS Energy Mr. Suttiban Hongsamart 087 743 7779 [email protected] SCHLUMBERGER Thitikul Nagadhana (Account Mgr) 089-924-9135 [email protected] SPIE Kabkaew Sanlee,Ms. Trinnawan R. 074-496923-4 088-7905717 [email protected] Nalco Industrial Services (Thailand) Teanjuob Mahantassanapong Fax +662 2738834 Tel +662 2738838 [email protected] M‐I SWACO, A Schlumberger Brian Burr +65 97200917 +66 8 1928 3980 [email protected] Revision No. Revision Date Draft 22nd November 2012 PAGE OF 18 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla-E Platform Location Rig Move No: 01 Client: Coastal energy Issue Date: November 2012 Drilling rig "Vicksburg" (Jack-up) Name Atwood Vicksburg Radio Room Brian Lockwood / Czar Acero Tony Wilson Title Business Phone Mobile Phone Immasat phone number: 00 - 870 764 684 341 Marine VHF Channel 72 – 156.625 MHz Call Sign: Atwood Vicksburg - VNWD Public phone number: 02 610 0551 STC / Medic Operations Business Fax [email protected] [email protected] +1 281 749 8702 Superintendent Operations E-mail 089 812 7224 [email protected] [email protected] Larry W. Holloway Manager / Director 02 745 7305 087 984 9882 Michael Van Keuren Rig Administrator 02 745 7305 089 529 0022 Drilling DSM 02 610 0550 [email protected] HWO WSM 02 610 0538 [email protected] Mr. Ben Malina / Director +1.281.784.4700 Office +1.281.731.6880 [email protected] Name / Title Business/Mobile Phone Mobile Phone E-mail SKL-E Tanker Sriracha Eagle Master SRE,CCR 02 610 0532 , 533 + 66 89 896 1900 [email protected] SKL-G Tanker Sriracha Leader Master SRL,CCR 02 610 0575,576 + 66 81 760 5100 [email protected] [email protected] SKL-C Tanker Coastal Energy Resolution Master CER 02 610 0503,509 085-370 4803 [email protected] SKL-A Tanker Sriracha Trader Master SRT SKL-D Tanker Sriracha Master Master SRM 02 610 0568 081-868 6146 [email protected] Master Hawk K 080-868 1953 080-868-9156 [email protected] Master Crest Amethyst Mr.Suarli Suardi 091-085 0760 [email protected] Master Swissco Seal 083-193-2285 Master Spectrum 080-707 8203 081-540 0781 RS - 29 Tug Boat Capt. 29 080 - 673 - 1648 082 - 441 - 9366 RS - 31 Tug Boat Capt. Vichit K. 080 - 567 - 3116 Wild Well Control, Inc www.wildwell.co m Tankers & Marine Vessels Vessel name / purpose Supply boat " Hawk K " Supply boat " Crest Amethyst " HWO crew boat MV.Swissco Seal Main crew boat (Spectrum) Revision No. Revision Date INMARSAT 02 610 0537',085-443 +873 764 884 050 +873 764 884 282 1000 Draft 22nd November 2012 [email protected] om [email protected] [email protected] [email protected];vichit.k@hotmail .com PAGE OF 19 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla Khoweel Location Rig Move No: 01 Client: Coastal energy Mooring Master Issue Date: October 2012 Capt. Nataphol 081-702 0075 PTT diesel contact Khun Thanaphon 089-969 4908 Thome in Songkhla Patrick Chan 088-399 0690 Khun Songkhram 081-376 2810 Khun Oranee 089-4929133 Khun Pongthanat 089-827 7367 080 - 085 6262 [email protected] Business Phone Mobile Phone E-mail SC Marine Supervisor Marine coordinator from SC Thome -Thailand [email protected] Medical evacuations Name SOS/AEA medical evacuations Member 03AACM000023 Title Alarm Center Thailand (24 hrs.) 02 205 7777 02 256 7151 Alarm Center Singapore (24 hrs.) 65 6338 7800 65 6338 7611 Alarm Center Jakarta Indonesia 62 21 750 6001 62 21750 6002 Sr. Business Development Manager 02 2057755 ext. 3607 Admin 074-220300-4 Emergency room 074-221040-4 Mr. David Ball Rajyindee Hospital, Hatyai Bangkok Hospital (Hatyai) 081 875 4792 [email protected] Emergency Room 24/7 Ambulance + nurse Nationwide communication center 24/7 62 21750 6002 074-221039 074 356085 074 272 800 Songkhla Hospital Na-rain-torn Emergency Response Business Fax 074 272 840 074 334 460 (direct) 074 338 100 ext. 1200 Provide ambulance with nurse, rescue and send patience to Songkhla Hospital only. 02 591 9769 02 591 8873 Provide ambulance with nurse, rescue and send patience to any hospital upon request. Marine Police Songkhla Name Title Business Phone Mobile Phone Title / Name Business Fax Mobile Phone E-mail Business Fax 02 239-7918, 55-6 089 674 8656 [email protected] 02 239-7917 65-6-266-1566 65 6 266-2312 Onshore Commander Marine Police Superintendent: Colonel Pramote Prom-rung-rueng 074 311 140 Police Inspector: Major Decha Aupaja 081 898 4679 Oil spill response support agencies and associations Tier 1 - Tier 2 Name Title Business Phone Marine Department Bkk. Emergency Call Center (24 hours) 1199 Marine Department Songkhla Provincial Office Songkhla Royal Thai Navy Songkhla Emergency Call Center (24 hours) Royal Thai Navy Bangkok Directorate of Operations, Bangkok IESG Oil Industry Environmental Safety Group OSRL - EARL Singapore Revision No. Revision Date Draft 25th August 2012 074 311615 074 325804-5 02 472 1897 02 465 0024 65-6-2662312 PAGE OF 20 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla Khoweel Location Rig Move No: 01 Client: Coastal energy Issue Date: October 2012 Oil spill equipment supply contractor - SAFTROL Co. Ltd. 27 Charoennakorn 39 Rd., Klongsarn, Bangkok 10600 Oil Spill Response Support Name Title Mr. Suthi Suksophonsonthi Mr. Thossapon Sukroengruen Mr. Jorm Business Phone Mobile Phone E-mail 081 8020996 [email protected] 081 5501121 [email protected] 02 437 6254 Mobile Phone E-mail Business Fax 081 834 9378 [email protected] 081 826 1750 [email protected] Managing Director Marketing Manager 02 8940577 - 8 Standby specialist Songkhla Business Fax 087 065 5271 Logistics - Bkk./ Songkhla - MMSVS GROUP Logistics & Transportation Support 978 Srinakarin Road, Kwang Suanluang, BKK 10250 Name Title Pongsiri S. General Manager Srisak V. CEO Business Phone 02 322 7979 02 322 7117 Logistics - Sattahip - MMSVS GROUP MML Transport Co., Ltd. C/o Port of Sattahip-Royal Thai Navy, Warehouse #13_2002/1 Moo 2, Tambol Samaesarn, Amphur Sattahip, Chonburi 20180 Thailand Name Jumrieng Naimuang (JJ) Title Business Phone Mobile Phone E-mail Business Fax Operation Manager 038 431 358 081 803 1834 [email protected] 038 431 355 Title Business Phone Mobile Phone E-mail BusinessFax Helicopter SFS Aviation Company Ltd. Name Sikorsky S76 C+ (Daytime-only Medevac services between DD7 and SFS Base at Songkhla Navy Airport.) Phone operational hours (Monday to Saturday from 05:30 to 18:00; Sunday 08:00 to 17:00): +66 (0)7432-6210. Fax: +66 (0)7432-5793 Cell phone 24/7: +66 (0)8-9466-8388 Thawatchai Tangtam [email protected] 02 254 3210 081 804 6915 Title Business Phone Mobile Phone Phil Atkinson [email protected] Weather Information Service Name Offshore Weather Services (OWS) Thai Government Meteorological Department, Weather Information Center (24 hrs) Revision No. Revision Date Draft 25th August 2012 E-mail Business Fax 61-3-988-78613 [email protected] 61-3-988-67216 02-3994012 http://www.tmd.go.th/en/ PAGE OF 21 22 RIG ATWOOD MANTA Rig Move Procedures Singapore to Block G5/43 Songkhla Khoweel Location Rig Move No: 01 Client: Coastal energy Issue Date: October 2012 Revised 22 Oct 2012 Songkhla Governor Mr. KRITSADA BOONYARAT ; T. : 074 - 323 874 ; Mobile : 089 - 203 0480 DMF – Emergency Call Department of Mineral Fuels 21st - 22nd Floor Energy Complex Building B 555/2 Vipavadeerangsit Road 10900 Tel: 02 794 3000 Director General Mr. Songpope Polachan: 02 791 8301 Fax: 02 791 8303 Director of Petroleum Operations and Technology Division Mr. Veerasak: 02 791 8344 mobile: 089 969 0137 Focal point for CEC International Dr. Nuntasak: 02 791 8365 mobile: 081 810 1053 Mr. Porrasak: 081 825 2767 [email protected] Prepared by: Signature Name Position Signature Name Position Signature Name Position Reviewed by: Approved by: Revision No. Revision Date Draft 25th August 2012 PAGE OF 22 22
© Copyright 2026 Paperzz