Activity Design Document (ADD): Activity Name Contents 1: Executive Summary ............................................................ 2 2: Analysis and Strategic Context ........................................... 3 Country, region and sector issues ............................. 3 Stakeholder analysis ............................................... 3 Problem analysis .................................................... 3 Lessons learned ..................................................... 3 Consistency with existing New Zealand and other donor/ multilateral programmes and policy/strategy ... 4 Rationale for New Zealand involvement..................... 4 3: Activity Description ............................................................. 5 Results diagram ..................................................... 5 Activity and inputs.................................................. 5 Form(s) of aid proposed .......................................... 5 Estimated programme budget and timing .................. 5 4: Implementation Arrangements ........................................... 6 Management and governance arrangements and structure ............................................................... 6 Implementation plan .............................................. 6 Results measurement & monitoring and evaluation..... 6 Sustainability issues ............................................... 6 Procurement arrangements ..................................... 6 Overarching policy issues including gender, human rights and environment ........................................... 7 Critical risks and risk management strategies ............ 7 5: Appendices ......................................................................... 8 Appendix A: Results Framework ............................................. 9 Results Diagram ..................................................... 9 Results Measurement Table .................................... 12 Monitoring and Evaluation Workplan ........................ 13 Appendix B: Risk Matrix ........................................................ 14 Appendix C: Detailed Outputs-Based Budget / Cost Estimates17 Appendix D: Description of Programme Activities ................. 18 Appendix E: Programme Management and Implementation Arrangements ................................................... 19 Appendix F: Relevant Analyses ............................................. 20 Activity Design Document Document ID: Page 1 of 20 1: Executive Summary Maximum 4 pages. Please provide a succinct summary of the design in a form that can be treated as a stand-alone document. It should: describe the development challenge and proposed response include a results diagram (planned outputs, and intended short, medium and/or long-term outcomes which contribute to the goal) summarise tasks/activities outline key risks and mitigation recommend the delivery modality outline the expected total whole of life costs and the contribution by New Zealand and others, noting explicitly any contingency that has been included in the total estimate. [???] Activity Design Document Document ID: Page 2 of 20 2: Analysis and Strategic Context Sections 2-4: Maximum 20 pages in total. Less detail is needed if the Activity is low risk than for an Activity that is high risk. For some lower risk Activities you may choose not to use all of the suggested headings. Section 2 should provide a strategic analysis of the situation related to this aid activity providing relevant background information and provide sufficient information so that someone not familiar with the context can understand the issues. [???] Country, region and sector issues Concisely set out the country, region and relevant sector context / challenges. [???] Stakeholder analysis Provide a summary stakeholder analysis (additional detail can be annexed) [???] Problem analysis Explain the specific problem being addressed including gender analysis and other relevant cross-cutting issues. The text should allow readers to comprehend what success would look like for this activity. [???] Lessons learned Highlight any existing or previous similar Activities undertaken by MFAT, other relevant activities are being undertaken by the partner government or other donors, and the principal lessons learned through these and similar thematic activities elsewhere. [???] Activity Design Document Document ID: Page 3 of 20 Consistency with existing New Zealand and other donor/ multilateral programmes and policy/strategy Clearly set out how the activity links to New Zealand’s foreign and aid policy and strategy. It should outline links to and any implications for, existing country or regional programmes. It should also review the activities of other development partners operating in-country and explain how the proposed programme takes these other activities into account. [???] Rationale for New Zealand involvement Explain the reasons why this activity is being proposed and what key development objectives (poverty reduction, service delivery improvement, improved governance framework, etc) will be achieved. It should outline New Zealand’s comparative advantage. [???] Activity Design Document Document ID: Page 4 of 20 3: Activity Description This section should answer the question “what will this activity do, with what resources and over what timeframe?” It should include a results diagram It should explain and justify the forms of aid proposed; detail the individual programme components and provide budget estimates and information of the suggested timing of the aid activity. [???] Results diagram This section should include a results diagram (refer to Appendix A) which describes the Activity’s goal and identifies the desired change occurring over time by logically showing the links between the Activity’s outputs, desired short, medium and/or long-term outcomes. Explanatory notes should be included. [???] Activity and inputs Describe the activities and inputs required to achieve the outputs. [???] Form(s) of aid proposed Briefly outline the forms of aid considered and describe and justify the forms of aid / modalities of assistance proposed, explaining specific arrangements for defining New Zealand’s role in working with other partners. Explain how the activity will work within partner government systems. If the activity will not work within partner government systems, explain why. [???] Estimated programme budget and timing Set out the activity budget, providing a breakdown of expenditure between components and over time and what procurement arrangements will apply to them. A detailed budget should be provided in an Annex. [???] Activity Design Document Document ID: Page 5 of 20 4: Implementation Arrangements This section should set out the main issues and factors affecting how the proposed activity would be delivered on the ground. Management and governance arrangements and structure Explain how the activity is intended to be governed and managed. It should set out in detail the envisaged relationship between NZ, partners, contractors (if relevant), other donors and the partner government. The roles and responsibilities of the active partners in the activity should be outlined. [???] Implementation plan Outline an implementation plan and timeline and/or provide Gantt chart showing critical milestones in the Annex. [???] Results measurement & monitoring and evaluation Provide a brief overview of the results framework and how results will be reported. A Results Measurement Table and a Monitoring and Evaluation Workplan should be appended to the ADD. [???] Sustainability issues At the end of the funding period, outline whether MFAT will exit or transition to a new, follow-up Activity. If transition, include a brief description of what is intended for the new, follow-up Activity, anticipated approach or modality, and partner(s) if known. Outline the issues that are likely to affect the sustainability of Activity outcomes beyond the funding period (e.g. absence of direct donor / programme support, ongoing requirements for TA, budget issues, asset management, institutional arrangements, political instability, social unrest, etc). Describe key steps you will undertake to address these issues. [???] Procurement arrangements If partner systems are proposed as the delivery mechanism for procurement, describe in detail their procurement processes and responsibilities and how this will be monitored. Activity Design Document Document ID: Page 6 of 20 Outline findings of any procurement and/or financial management capacity assessment relevant to the design. Procurement must comply with the New Zealand Government Mandatory Rules for Procurement and New Zealand Aid Programme Contracting Policy. [???] Overarching policy issues including gender, human rights and environment Explain concisely how overarching policy issues such as gender, human rights and environment, have been addressed through the design. The text should provide an explanation of the approach adopted in each case; however, it should not substitute for consideration and discussion of these issues in Sections A & B of the Design Document where the issue is central to the design (gender in particular should be a central consideration in any activity). [???] Critical risks and risk management strategies Outline the most critical risks and explain how these risks will be addressed and managed. A risk matrix should be annexed. [???] Environmental and social impacts Where the Activity has previously been assigned a provisional category A, B, P(A), or P(B) note: - - - Activity Design Document Document ID: The agreed category assigned to the Activity, the scope of any impact assessment and impact management plan, and whether a reassignment from a provisional category assigned at the identification stage is being recommended. A summary of any adverse impacts or risks, and measures designed to avoid or mitigate these Confirmation of the complaints and conflict resolution procedure Any major risks posed by climate variability, climate change and natural hazards, and measures to address these and improve resilience The degree of compliance with relevant Partner Government environmental and social laws and regulations, and measures to strengthen in-country capacity for their implementation Page 7 of 20 5: Appendices The following appendices are required: This section includes the following appendices: Appendix A: Results Framework (Results Diagram, Results Measurement Table, Monitoring and Evaluation Workplan) Appendix B: Risk Matrix Appendix C: Detailed Outputs-Based Budget / Cost Estimates (including costing methodology) Appendix D: Detailed Description of Programme activities (if appropriate) Appendix E: Programme Management & Implementation Arrangements – Organization Chart and other details as appropriate including Roles / Responsibilities of Parties/Stakeholders Appendix F: Relevant analyses (Social, Economic, Environment, Gender, Poverty, Stakeholder, institutional/fiduciary capacity, etc) The following appendices are optional and included if relevant. Delete reference to those that are not required: Implementation Schedule Transition or Exit Planning Position Descriptions / Terms of Reference (if design includes TA) Scope of Services and Basis of Payment (mandatory if being tendered). Other relevant reports and assessments as appropriate Activity Design Document Document ID: Page 8 of 20 Appendix A: Results Framework The results framework below includes a results diagram, results measurement table and a monitoring and evaluation workplan. Results Diagram Either modify this layout and text to create your results diagram, or replace the layout below with a results diagram created in Visio. Goal of the Activity: Long-term outcome Long-term outcome Long-term outcome Medium-term outcome Medium-term outcome Medium-term outcome Medium-term outcome Medium-term outcome Short-term outcome Short-term outcome Short-term outcome Short-term outcome Short-term outcome Long-term outcome(s) Medium-term outcomes Short-term outcomes Output Output Output Output Output Outputs Activity Design Document Document ID: Page 9 of 20 Sample layout Goal of the Activity: Long-term outcome Long-term outcome Medium-term outcome Short-term outcome Short-term outcome Output Output Output Refer to the guideline Developing, Appraising and Approving an Activity Design for the format to use and the standards that apply when developing a results diagram. Activity Design Document Document ID: Page 10 of 20 Outputs/Inputs Table Refer to the guideline Developing, Appraising and Approving an Activity Design for the format to use and the standards that apply. Add additional rows to the table as required. Outputs from the Results Diagram Activities to Delivery Outputs Inputs to Resource Activities Output 1 Output 2 Activity Design Document Document ID: Page 11 of 20 Results Measurement Table Refer to the guideline Developing, Appraising and Approving an Activity Design for the format to use and the standards that apply. Add or delete rows as needed. Results Indicator(s) Baseline Information and Targets Methodology/Data Sources Long-Term Outcomes Medium Term Outcomes Short-Term Outcomes Outputs Activity Design Document Document ID: Page 12 of 20 Monitoring and Evaluation Workplan Refer to the guideline Developing, Appraising and Approving an Activity Design for the format to use and the standards that apply. Notes when completing the table below: Approach: Includes the methods and processes we will use in undertaking the monitoring and evaluation activities Reporting & Deliverables: What and how the information be reported; to whom and by when; How the findings will be shared and used. Monitoring & Evaluation Tasks Approach Timeline Roles and responsibilities Deliverables and Reporting Indicative Costs TOTAL INDICATIVE COSTS $ Funding source $ Funding source $ TOTAL BUDGETED $ Monitoring Evaluation Overall Monitoring and Evaluation Budget Activity Design Document Document ID: Page 13 of 20 Appendix B: Risk Matrix [Insert your Risk Matrix here] Refer to the example below for a sample layout of a risk matrix. Additional rows can be added to the table as needed. Risk Category and Description Potential Impact Likelihood Consequence Risk Profile Proposed Risk Management Responsibility Key to Risk Matrix 1.Risk Category and Description Risk categories include: External e.g. Economic, Political, Natural Event, Security, Organisational e.g. Personnel, Capacity, Policies, Financial e.g. financial management weaknesses, corruption, fraud, cost/exchange rate escalation, lack of funding 2. Potential Impact Describe the impact Activity Design Document Document ID: Page 14 of 20 3.Likelihood Identify the level of likelihood of the risk occurring: Likelihood Description Almost certain Expected to occur in most circumstances Likely Will probably occur in most circumstances Possible 50/50 that it might occur at some time Unlikely Could occur at some time Rare May occur only in exceptional circumstances 4.Consequence Identify the level of consequence if the risk occurs: Descriptor Description (indicative examples) Severe Causes serious harm to Activity beneficiaries, (individual; community, organisation, or country) Serious reputational damage to contributing partners Major Some harm to Activity beneficiaries, (individual; community, organisation, or country) Achievement of Activity objectives significantly compromised Reputational damage to contributing partners Significant financial loss to contributing partners, organisations, communities, individuals Moderate Achievement of Activity objectives compromised Costs escalate more than 30% Significant implementation delays Activity Design Document Document ID: Page 15 of 20 5. Risk Profile Determine the risk profile from the level of likelihood and consequence. Likelihood Almost certain Extreme risk Likely Possible Unlikely Rare Consequence Colour Low risk Moderate Risk level Major Severe Measures required Green Low Normal control and monitoring measures will be sufficient. Orange Medium This requires measures to manage the likelihood or consequence of a risk and active monitoring. Red High Extreme risks are likely to occur and would prevent achievement of outcomes, cause unacceptable cost overruns and/or schedule slippage. Significant reputational damage will occur. Activity Design Document Document ID: Page 16 of 20 Appendix C: Detailed Outputs-Based Budget / Cost Estimates Activity manager to attach the sequenced costed workplan template (Excel file) that is appropriate for the likely implementing partner: either the: - Summary by Output Workplan - Detailed by Output Workplan - Detailed by Input Workplan The workplan is to cover the period of Activity implementation. If the partner is not yet known, use the summary workplan template. [???] Activity Design Document Document ID: Page 17 of 20 Appendix D: Description of Programme Activities (Include if appropriate) This appendix provide a detailed description of programme Activities [???] Activity Design Document Document ID: Page 18 of 20 Appendix E: Programme Management and Implementation Arrangements Include organization chart and other details as appropriate including roles and responsibilities of parties/stakeholders [???] Activity Design Document Document ID: Page 19 of 20 Appendix F: Relevant Analyses (Include relevant analyses: Social, economic, environment, gender, poverty, institutional/fiduciary capacity etc) [???] Activity Design Document Document ID: Page 20 of 20
© Copyright 2026 Paperzz