The Case for Engaging a Commissioning Agent in the Modern Industrial Sector Patrick Kyne LEED AP An effective strategy to commissioning agents (CxA) to maximize production uptime work collaboratively with design in the operations of modern and construction teams on new production facilities is to subject build projects as independent the systems & equipment to a representatives to ensure unbiased commissioning process executed adjudication and execution of the by an experienced and qualified commissioning process. Commissioning Agent (CxA). With budgets and the bottom There is a significant shift in the line being monitored more than way commissioning of new ever, the design process facilities is now being viewed. is often fast tracked and In the past, many expedited to meet owners and facility production schedules, There is a managers expected increasing the risk significant installation & of costly design gaps testing of equipment shift in the way and consequently and systems construction delays commissioning managed by the which by their general contractor of new facilities nature tend to eat to be sufficient. into the prescribed is now being Today, owners time allowed for viewed are now engaging commissioning. “ 2 Thus, the need challenge that must for an embedded be conquered to stay commissioning competitive. approach in the The role of the design packages commissioning agent prior to issue is now an integral for construction part of it. Executing is becoming the process on large increasingly adopted scale projects in the and is backed up advanced Micro & by LEED with the Nano Technology, LotusWorks’ requirements set out Bio Medical and broad knowledge in their Enhanced Pharmaceutical Commissioning credit and experience sectors has further (EAc3). enhanced LotusWorks allows us to Reliability and knowledge of a wide energy efficiency quickly identify range of building has always been designs and facilitated obstacles before of paramount a high proficiency they become concern for facility in commissioning managers especially major issues in techniques. More in high volume importantly for our the construction manufacturing, the clients, that broad increasing complexity knowledge and phase of building systems experience allows us and the pace of technology change to fully assess and quickly identify means achieving a high score in the obstacles before they become major overall equipment effectiveness is a issues in the construction phase. “ 3 A thorough, comprehensive and holistic commissioning approach is required within these industries because they now more than ever operate with leading edge production technology that offers greater reward but also offers greater risk; unplanned interruptions, therefore, are more costly. While there is always a case for commissioning being an added expense to the overall new build project, clients are now reflecting lower overall costs after engaging the experience of a Clients qualified CxA. u Maximized efficiency in equipment operations and consequential long haul energy savings. u Long term increased production uptime Patrick Kyne LEED AP Successful commissioning agents convey excellent communication skills and add value by leading positive working relationships with all parties involved in the project, engaging attentively and coupling constructive criticism with proven solutions when required. The commissioning are now agent as always has reflecting lower a primary objective Factors that overall costs after of verifying the backup this Owners’ Project engaging the statement are: Requirements and experience of a Basis of Design u Mitigated are delivered and qualified CxA construction delays more. More is due to commissioning input in the leveraging experience and lessons design phase learned from previous projects and how successful execution u Commissioning engagement with was managed where challenges project controls teams to ensure presented themselves. contract language conveys deep into The case for commissioning the contract general requirements agents is now stronger than ever and thereby ensures the process can and the LotusWorks run with all the bases covered to commissioning approach is support the process and the players proving the point successfully at an without objection international level. “ LotusWorks, Building 3, Finisklin Business Park, Sligo, F91 KAP2, Ireland Phone + 353 (0) 71 9169 783 Email [email protected] Fax + 353 (0)71 9169 895 4
© Copyright 2026 Paperzz