318-595 Capstone Project Team 4: Staff • Shawn Bentley • EE, Spanish minor • Chris Mueller • EE • Erick Janke • EE • Nic Langlois • EE & Physics • Jack Huynh • EE 318-595 Capstone Project Team 4: Expertise & Experience • Shawn Bentley • Chris Mueller • Erick Janke • Expertise: Industrial Electric Motors, Nanotechnology, Expertise: 2 internships • Expertise: DSP, Materials Engineering Experience: 1 internship • Expertise: Industrial Controls 318-595 Capstone Project Team 4: Expertise & Experience • Nic Langlois • Jack Huynh • Expertise: Microwave Engineering, EMF Experience: Physics research • Expertise: Power System Testing Experience: Industrial Power System Testing 318-595 Capstone Project Team 4: Weekly Availability Worksheet • Shawn Bentley • Time 1: Weekends Time 3: Friday Time 2: Tuesday Time 4:Weeknights • Chris Mueller • Time 1: Weekends Time 3: Weeknights Time 2: Tuesday • Erick Janke • Time 1: Weekends Time 2: Tuesday 318-595 Capstone Project Team 4: Weekly Availability Worksheet • Nic Langlois • Time 1: Weekends Time 1:Weekends • Jack Huynh • Time 3:Weeknights Time 2:Weeknights Time 2: Friday 318-595 Capstone Project Team 4: Weekly Project Meeting Plan • Weekly Meeting 1: EMS, Saturday 5-7PM Owner, Expected Attendees & Purpose: • Weekly Meeting 2: EMS, Sunday 1-3PM Owner, Expected Attendees & Purpose: 318-595 Capstone Project Team 4 : Total Resources • 480 Man hours • $250 for key part availability for material and prototyping 318-595 Capstone Project Team 4 : Decision Making • We will take a vote amongst the group in order to make decisions which influence the project. • If teams cannot make effective decisions according to their agreed upon guideline, they may appeal to their Lab Assistant and upwards to the Prof/Lect • The Prof/Lect has the final say on any team decisions. 318-595 Capstone Project Team 4: Roles • Lead Project Integrator (LPI): Shawn Bentley • Lead System Designer (LSD): Chris Mueller • Lead Presentation Manager (LPM): Nic Langlois • Lead Report Manager (LPM): Jack Huynh • Lead Manufacturing Mgr (LMM): Erick Janke 318-595 Capstone Project Team 4: Project Ideas • Dynamic Aquatic Environmental Control • Electric Window Shading • My Bar (Automated Bartender) • PC based Oscilloscope 318-595 Capstone Project Team 4: Project Idea #1 Dynamic Aquatic Environmental Control • Controls Temperature, pH, conductivity, and oxygen level • Monitors vital environmental conditions of fish tanks • Cost effective, safe, labor saving • Optional computer controlled display 318-595 Capstone Project Team 4: Project Idea #1 D.A.E.C. Power Supply Temp. Sensor Signal Conditioning pH Sensor Conductivity Sensor O2 Sensor Keypad Display Output interface Temperature Signal Conditioning Output interface pH Control Signal Conditioning Output interface Conductivity Signal Conditioning Output interface Aerator Controller Control Control 318-595 Capstone Project Team 4: Project Idea #2 Electric Window Shading • 21st Century Window covering • Residential and Commercial installation • Save energy • Easy to clean 318-595 Capstone Project Team 4: Project Idea #2 Electronic Window Shade Photo Sensor Keypad / Display Microcontroller Power Source Tint Controller 318-595 Capstone Project Team 4: Project Idea #3 My Bar (Automated Bartender) • Provide professional level service to social gatherings at your home, and save money on refreshments by perfectly poured mixed drink • Keypad with a LCD display • Inventory control • Optional computer interface 318-595 Capstone Project Team 4: Project Idea #3 My Bar Bottle Sensor Package User Interface Microcontroller Power Source Dispenser Mechanism CO2 Mechanism 318-595 Capstone Project Team 4: Project Idea #4 PC Oscilloscope • Student test instrument • Cost effective alternative for hobbyists • PC based, 0-10Mhz input freq, 50mV to 50V input level, 8 bit resolution • Time Based or Spectrum Analyzer mode 318-595 Capstone Project Team 4: Project Idea #4 PC based Oscilloscope Power Supply INPUT Signal Signal Conditioning A/D Controller Interface OUTPUT Laptop interface + Display 318-595 Capstone Project Team 4: Evaluation of Project Idea # 1 D.A.E.C • • • • Very interested in the idea and purpose of this product Device could improve habitat conditions on several scales Enough design blocks Idea meets all the expectations and fills all requirements of the class • Project is scalable • Meets financial and time restraints • Given a score of 5 318-595 Capstone Project Team 4: Evaluation of Project Idea #2 Electronic Window Shade • Interesting idea and purpose of this product • Not enough design blocks for our team to satisfy the class requirements • Idea does not meet all the requirements of the class project • The cost of the material required is out of the financial scope • Given a score of 3 318-595 Capstone Project Team 4: Evaluation of Project Idea # 3 My Bar • Interesting idea and purpose of this product • Not enough design blocks for our team to satisfy the class requirements • Idea does not meet all the requirements of the class project • The cost of the material required is out of the financial scope • Project not appropriate for this course • Given a score of 3.5 318-595 Capstone Project Team 4: Evaluation of Project Idea # 4 PC based Oscilloscope • • • • • Interesting idea and purpose of this product Enough design blocks As a group we have minimal experience in RF technology. Idea does not meet all the requirements of the class project The cost of the material required is out of the financial scope • Does not meet time constraints • Given a score of 4 318-595 Capstone Project Business Case • Economic – Total Market Size: $200,000 – Estimated Annual Volume: 100 – Minimum List Price: $2,000 – Maximum Product Material Cost: $300 – Maximum Production Cost: $700 • Marketing – Market Geography: U.S.A. – Market Demography: Fish Owners – Competitors: Jandy, Hayward, Intermatic 318-595 Capstone Project Standard Requirements Environmental • Operating Temperature Range: 50 – 90 OF • Operating Humidity Range: 0 – 100 % R.H. non-condensing • Storage Temperature Range: -10 – 70 OC • Storage Humidity Range: 0 – 100 % R.H. non-condensing • Storage Duration: 1 year 318-595 Capstone Project Standard Requirements Power • Input Voltage Range: 102 – 132 Vac • Maximum Power Consumption: 250 W Life Cycle • Product Life Time: 10 years • Full Warranty Period: 60 days • Service Strategy: Factory Repair 318-595 Capstone Project Performance Requirements Electrical Input • 12 bit • Sampling once / second Control • • • • +/- 2 OF (min 5 OF above ambient) +/- ___ pH +/- ___ uS +/- 5 % O2
© Copyright 2026 Paperzz