#98317 Question: 1. I’m not sure if you are aware that Mn/DOT’s selection of the Signing Design – Level 2 prequalification level will result in Mn/DOT receiving a maximum of 3 LOIs since there are only 3 firms on this list. There is also a chance that Mn/DOT will receive less than 3 LOIs since the three firms on this list are in the midst of completing major work for Mn/DOT (HDR-Cayuga, Jacobs-169/494 & Cayuga, SRF-Dresbach & 610) and may choose to not submit due to the lack of availability of staff. Please consider revising the Pre-Qualified Vendors List for this project so Mn/DOT may receive LOIs from a number of highly qualified firms available to perform this work. Answer: 1. Please refer to the following language in the announcement: “If responders are not pre-qualified for all work types needed for a project, they must make arrangements to subcontract with firms that are pre-qualified for those work types. If applicable, the responder must identify, in the letter of interest, their subcontractor and which work type the subcontractor will be completing.” Question: 2. 3. 4. 5. 6. 7. Are you expecting signal work at CSAH 34 and CSAH 80? Is there any bridge work anticipated in the project? What is the proposed section on CSAH 34? Urban? Number of Lanes? Turn Lanes? Can we get a copy of the project layout? When will the Level 1 layout for the STATE portion of the project and the General Layout for the COUNTY portion of the project be available for the successful responder? Are the layouts available for review by responders now, even in draft form? Answer: 2. No 3. No Bridge work is anticipated; however, we will be updating the bridge guard rail over T.H. 10 in all four quadrants. 4. Below are the typical sections on CSAH 34. There will be turn lanes off CSAH 34 onto the on ramps to TH 10 and at least one side road. #98317 #98317 #98317 5. 6. 7. The interchange layout is stored on our ftp site. You can get to the ftp site by right clicking on your start button in the lower left corner of the desktop and pasting in the following link: ftp://ftp2.dot.state.mn.us/pub/outbound/D4Design. Go to the folder marked “Perham Interchange & CSAH 34” to retrieve the draft layout (4p560742_gm1-test4.pdf). Our hopes are to have the Level 1 layout County general layout done and available for the successful responder (interchange). Covered in answers 4 and 6 above.
© Copyright 2025 Paperzz