SEAMEWE-3 SC`s GUIDE

SEAMEWE-3 SC’s GUIDE
(FINAL)
(Don’t leave office/station without it)
Updated by SEAMEWE-3 ORLO
Dated May 2008
Content Page
Section Title
1
Terms Of Reference for STEP
COORDINATOR(SC)
2
STEP Coordinators (SC) appointed by
SEAMEWE-3 RC
3
Non-Terminal Parties and Facility Providers
(Involved RCOs)
4
SEAMEWE-3 Restoration Implementation
Procedure
5
SEAMEWE-3 Restoration Forms
6
SEAMEWE-3 RET Form
7
SEAMEWE-3 SC’s Guide to troubleshooting
restoration paths
8
PROCEDURE: “Manually Release SNCP
switch”
9
History of main problems, solutions and
feedback gathered
Page 1 of 38
265334063
Page
2
3-11
12
12-14
15-26
27-28
29-30
31-33
34-35
Remarks
1. Terms Of Reference for STEP COORDINATOR(SC)

Upon receipt of the ‘Go-Ahead Order To Implement Restoration’ (i.e. Form 1) from the
SMW-3 NOC to all affected SCs and facility providers, the SC shall assume
responsibility of their nominated steps and log into Conference Bridge at Tel: (65) 6 668
7200, Code: 111489#.

The SC should remain on the Conference Bridge providing regular updates and coordinating the involved parties, until all their steps are restored. If necessary, the SC may
contact external facility providers or other SCs outside of the Conference Bridge to
further investigate any problem. A general guide to facilitate the investigation is provided
as in Section 7.

SMW-3 NOC shall use the Conference Bridge to receive updates from the SC(s) and
assume overall control as and when required. There is no concrete evidence correlating
STEP and restore speed. A timeline of 10 mins is recommended to trouble-shoot a
problematic STEP, before moving on to the next problematic STEP, and return to attend
it later. This is to avoid staying too long in one problematic STEP, and not able to
provide the needed assistance to the other STEPs.

SC shall follow the reporting procedure of STEPS restored using the Restoration Forms
which are agreed by the RC as in Section 5.
Note:
In RET case, SCs, of course, do not require SMW-3 NOC to inform them of SNCP switching. SC shall
be responsible to collect the BER & RTD test results and ODF termination checks of involved stations.
IF BER is bad, SC shall liaise with providers to troubleshoot. SC shall then complete the RET Form as in
Section 6, and submit to ORLO office.
Page 2 of 38
265334063
2. STEP Coordinators (SC) appointed by SEAMEWE-3 RC
(Please refer to the latest URM Plans as in the website for the final appointment of SC,
and subsequent updates)
SMW-3
SEG.
(Path No.)
Path
SC
Contactable
Personnel/
RCO
S1
P1
P1,P15
P3
P6
P9
P10
OKIW-SHTO
OKIW-TUAS
OKIW-SHGA
HGKG-OKIW
HGKG-KEOJ
KEOJ-SHTO
KDDI
RCO:Tokyo
ITMC
Duty Engr.
KT
P11
SHGA-SHTO
CT
P12
P13
P7
SHTO-TCHG
FSHN-SHTO
TCHG-SHGA
CHT
RCO:Seoul/K
ITMC
Duty
Engr.
Chongming
C/S
Duty Staff
Toucheng C/S
Duty Staff
82-2-725-4221(O)
82-2-725-4222(O)
82-2-725-4224(F)
86-215-9470054(O)
86-215-9471231(O)
86-215-9470047(F)
886-3-977-2252(O)
886-3-977-2294(F)
P14
HGKG-SHTO
SINGTEL
P78
FSHN-HGKG
CHT
P14
P15,P37
P15
HGKG-SHTO
SATN-SHTO
SHTO-TUAS
SINGTEL
ORCO: SMW3 NOC Duty
Staff
Fangshan C/S
Duty Staff
ORCO: SMW3 NOC Duty
Staff
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
886-8-876-1494(O)
886-8-876-1386(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
P1 ,P15
OKIW-TUAS
KDDI
RCO:Tokyo
ITMC
Duty Engr.
81-3-3347-5715(O)
81-3-3347-5720(F)
P15,P36
PENG-SHTO
SINGTEL
ORCO: SMW3 NOC Duty
Staff
Penang C/S
Duty Staff
P16
DANG-SHTO
VTI
Danang ITMC
Duty Staff
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
604-579-1104(O)
604-579-1101(O)
604-579-1533(F)
84-511-850006(O)
84-511-895489(O)
84-511-850048(F)
P17
SHTO-TAIP
CT
P18
P14,P18
BTGA-SHTO
BTGA-HGKG
PLDT
Shantou C/S
Duty Staff
Batangas C/S
Duty Staff
P19
SHTO-TUGK
JTB
P21
MERS-SHTO
TM
S2
Page 3 of 38
265334063
Tungku C/S
Duty Staff
RCO:Int’l
NETCARE
Duty Staff
Contact
No.(24Hrs)
(O) – Office
(F) – Fax
81-3-3347-5715(O)
81-3-3347-5720(F)
86-754-7870035(O)
86-754-7870034(F)
63-2-732-6704(O)
63-2-732-6705(O)
63-2-732-6706(O)
63-2-732-6709(F)
673-2-228-628(O)
673-2-228-629(F)
603-2020-5412(O)
603-2020-5413(O)
603-2020-5414(O)
603-2020-5415(O)
S3
S4
HGKG-TUAS
HGKG-MBAI
SINGTEL
P24
P25
DANG-TUAS
TAIP-TUAS
SINGTEL
P26
BTGA-TUAS
PLDT
P27
TUGK-TUAS
SINGTEL
P29
MERS-TUAS
TM
P79
DANG-HGKG
VTI
Danang ITMC
Duty Staff
84-511-850006(O)
84-511-895489(O)
84-511-850048(F)
P30
JKTA-TUAS
INDOSAT
Ancol C/S
Duty Staff
P31
PERT-TUAS
REACH
(GNL)
P32
JKTA-PERT
REACH
(GNL)
P84
P84, P73
PENM-TUAS
NDEN-TUAS
SINGTEL
RCO:
Melbourne
GOC
RCO:
Melbourne
GOC
ORCO: SMW3 NOC Duty
Staff
62-21-692-3756(O)
62-21-381-0872(O)
62-21-692-8383(F)
61-3-8549-0294(O)
61-3-9543-9642(F)
P86
GOON-TUAS
P33
P33,47
P33, 23
P34
MBAI-TUAS
FUJA-TUAS
HGKG-MBAI
MTLA-TUAS
SINGTEL
SINGTEL
Page 4 of 38
265334063
603-2020-1024(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
63-2-732-6704(O)
63-2-732-6705(O)
63-2-732-6706(O)
63-2-732-6709(F)
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
RCO:Int’l
603-2020-5412(O)
NETCARE
603-2020-5413(O)
Duty Staff
603-2020-5414(O)
603-2020-5415(O)
603-2020-1024(F)
P23
P23, P33
ORCO: SMW3 NOC Duty
Staff
ORCO: SMW3 NOC Duty
Staff
Batangas C/S
Duty Staff
ORCO: SMW3 NOC Duty
Staff
ORCO: SMW3 NOC Duty
Staff
61-3-8549-0294(O)
61-3-9543-9642(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
P35
COCH-TUAS
VSNL
Mumbai
Cable Station
Cochin Cable
Station
P36
P15,36
PENG-TUAS
PENG-SHTO
TM
P37
P37,15
SATN-TUAS
SATN-SHTO
SINGTEL
P39
(indirect
P33 +45)
P40
MEDN-TUAS
SINGTEL
MBAI-MTLA
MTLA-MZRA
MTLA-PENM
SLT
P41
COCH-MBAI
COCH- ALEX
VSNL
P41,P46,
P58,P64
COCH-MZRA
SINGTEL
P41, 90
COCH-MZRA
SINGTEL
P42
MBAI-PENG
VSNL
P43
MBAI-SATN
VSNL
P40,46,58,64
P40, 88
FT
Page 5 of 38
265334063
VSNL RCO
Team
Penang C/S
Duty Staff
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
604-579-1104(O)
604-579-1101(O)
604-579-1533(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
94-1-717674(O)
94-1-717676(F)
33-1-4993-8574(O)
33-1-4993-7800(F)
ORCO: SMW3 NOC Duty
Staff
ORCO: SMW3 NOC Duty
Staff
Mt.
Lavinia
C/S Duty Staff
RCO:
Paris
INOC
Duty
Staff
Mumbai
00-91-22Cable Station
66592398(Tel)
00-91-2266592399(Fax)
Cochin Cable 00-91-484Station
659010(Tel)
00-91-4842421164(Fax)
VSNL RCO 00-91-22-66592279
Team
(Tel)
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
Mumbai
00-91-22Cable Station
66592398(Tel)
00-91-2266592399(Fax)
Cochin Cable 00-91-484Station
659010(Tel)
00-91-4842421164(Fax)
VSNL RCO 00-91-22-66592279
Team
(Tel)
Mumbai
Cable Station
00-91-2266592398(Tel)
00-91-2266592399(Fax)
Cochin Cable 00-91-484-
Station
P33,46,58,
64
MZRA-TUAS
SINGTEL
P81
COCH-MTLA
VSNL
VSNL RCO
Team
ORCO: SMW3 NOC Duty
Staff
Mumbai
Cable Station
Cochin Cable
Station
S5
SINGTEL
VSNL RCO
Team
ORCO: SMW3 NOC Duty
Staff
P84
P84, 73
PENM-TUAS
NDEN-TUAS
P86
GOON-TUAS
P33,47
P41,P90
P41,46,58,
64
FUJA-TUAS
COCH-MZRA
COCH-MZRA
SINGTEL
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
P40,46,58,64
MTLA-MZRA
SLT
P85
MBAI-SBRA
VSNL
Mt.
Lavinia
C/S Duty Staff
Mumbai
Cable Station
Cochin Cable
Station
P88
MBAI-PENM
VSNL
VSNL RCO
Team
Mumbai
Cable Station
Cochin Cable
Station
P89
MBAI-GOON
VSNL
VSNL RCO
Team
Mumbai
Cable Station
Cochin Cable
Page 6 of 38
265334063
659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
94-1-717674(O)
94-1-717676(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484-
Station
P90
MBAI-MZRA
VSNL
VSNL RCO
Team
Mumbai
Cable Station
Cochin Cable
Station
P47
FUJA-MBAI
ETISALAT
P53,58,60,
71,72
GOON-KCHI
BT
P101
FUJA-GOON
BT
P40,88
MTLA-PENM
FT
P93
ALEX-FUJA
ETISALAT
P91
JEDD-MBAI
STC
P92
P41 ,92
P94
P50
ALEX-MBAI
ALEX-COCH
ALEX-KCHI
MBAI-MASQ
T. EGYPT
PTCL
VSNL
VSNL RCO
Team
RCO: Mumbai
ITMC
Duty
Staff
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Paris
INOC
Duty
Staff
Fujairah C/S
Duty Staff
Jeddah C/S
Duty Staff
Alexandria
C/S Duty Staff
Mumbai
Cable Station
Cochin Cable
Station
P54
DJIB-MASQ
ETISALAT
P51
P49
P46
FUJA-KCHI
KCHI-MBAI
DJIB-MBAI
PTCL
PTCL
VSNL
Page 7 of 38
265334063
VSNL RCO
Team
RCO: Mumbai
ITMC
Duty
Staff
Mumbai
Cable Station
659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
91-22-2667998(O)
91-22-2695537(O)
91-22-2667999(F)
91-22-2695532(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
33-1-4993-8574(O)
33-1-4993-7800(F)
971-9-2222-995(O)
971-9-2226-201(F)
966-2-648-5248(O)
966-2-649-3706(F)
20-34-910-605(O)
20-34-947-2222(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
91-22-2667998(O)
91-22-2695537(O)
91-22-2667999(F)
91-22-2695532(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
S6
P48
DJIB-FUJA
ETISALAT
P100
P33,46,58,
64
P72,84
P15,72,84
P64, 93
KCHI-JEDD
MZRA-TUAS
PTCL
SINGTEL
P84
P84, 73
PENM-TUAS
NDEN-TUAS
P86
GOON-TUAS
P41,46,58,
64
P41,90
P56
COCH-MZRA
SINGTEL
COCH-MZRA
DJIB-JEDD
STC
P40,46,58,64
MTLA-MZRA
SLT
P85
MBAI-SBRA
VSNL
GOON-TUAS
GOON-SHTO
FUJA-MZRA
T.Italia
(Sparkle
TIS)
SINGTEL
Cochin Cable 00-91-484Station
659010(Tel)
00-91-4842421164(Fax)
VSNL RCO 00-91-22-66592279
Team
(Tel)
RCO: Mumbai 91-22-2667998(O)
ITMC
Duty 91-22-2695537(O)
Staff
91-22-2667999(F)
91-22-2695532(F)
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
RCO:
Palermo/L*I
INOC
Duty
Staff
ORCO: SMW3 NOC Duty
Staff
39-091-378-000(O)
39-091-378-319(F)
ORCO: SMW3 NOC Duty
Staff
Jeddah C/S
Duty Staff
Mt.
Lavinia
C/S Duty Staff
Mumbai
Cable Station
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
966-2-648-5248(O)
966-2-649-3706(F)
94-1-717674(O)
94-1-717676(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484-
Cochin Cable
Station
P88
MBAI-PENM
VSNL
VSNL RCO
Team
Mumbai
Cable Station
Cochin Cable
Station
P89
MBAI-GOON
VSNL
VSNL RCO
Team
Mumbai
Cable Station
Cochin Cable
Page 8 of 38
265334063
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
Station
S8
P90
MBAI-MZRA
VSNL
P57
JEDD-SUEZ
STC
P53,58,60,
71,72
GOON-KCHI
BT
P101
P102
FUJA-GOON
GOOD-JEDD
BT
P40, 88
MTLA-PENM
FT
P93
ALEX-FUJA
ETISALAT
P91
JEDD-MBAI
STC
P92
P41 ,92
P94
P58
ALEX-MBAI
ALEX-COCH
ALEX-KCHI
ALEX-DJIB
T. EGYPT
P59
ALEX-JEDD
T. EGYPT
P100
P33,46,58,
64
P72,84
P15,72,84
P64, 93
KCHI-JEDD
MZRA-TUAS
PTCL
SINGTEL
P84
P84, 73
PENM-TUAS
NDEN-TUAS
P86
GOON-TUAS
P60
ALEX-SBRA
GOON-TUAS
GOON-SHTO
FUJA-MZRA
PTCL
T. EGYPT
T.Italia
(Sparkle
TIS)
SINGTEL
PTC
Page 9 of 38
265334063
659010(Tel)
00-91-4842421164(Fax)
VSNL RCO 00-91-22-66592279
Team
(Tel)
Mumbai
00-91-22Cable Station
66592398(Tel)
00-91-2266592399(Fax)
Cochin Cable 00-91-484Station
659010(Tel)
00-91-4842421164(Fax)
VSNL RCO 00-91-22-66592279
Team
(Tel)
Jeddah C/S
966-2-648-5248(O)
Duty Staff
966-2-649-3706(F)
RCO:
44-1691 666777(O)
Oswestry
44-1691-658452(F)
NMC(BT/
RCO)
RCO:
44-1691 666777(O)
Oswestry
44-1691-658452(F)
NMC(BT/
RCO)
RCO:
Paris 33-1-4993-8574(O)
INOC
Duty 33-1-4993-7800(F)
Staff
Fujairah C/S
971-9-2222-995(O)
Duty Staff
971-9-2226-201(F)
Jeddah C/S
966-2-648-5248(O)
Duty Staff
966-2-649-3706(F)
Alexandria
20-34-910-605(O)
C/S Duty Staff 20-34-947-2222(F)
Alexandria
C/S Duty Staff
Alexandria
C/S Duty Staff
20-34-910-605(O)
20-34-947-2222(F)
20-34-910-605(O)
20-34-947-2222(F)
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
RCO:
Palermo/L*I
INOC
Duty
Staff
ORCO: SMW3 NOC Duty
Staff
39-091-378-000(O)
39-091-378-319(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
RCO: Linda a 351-214-147280(O)
Velha
Duty 351-214-147281(O)
Staff
351-214-141355(F)
P40,46,58,64
MTLA-MZRA
SLT
P85
MBAI-SBRA
VSNL
Mt.
Lavinia
C/S Duty Staff
Mumbai
Cable Station
Cochin Cable
Station
P41,46,58,
64
P41,90
COCH-MZRA
P88
MBAI-PENM
SINGTEL
COCH-MZRA
VSNL
Page 10 of 38
265334063
VSNL RCO
Team
ORCO: SMW3 NOC Duty
Staff
Mumbai
Cable Station
351-214-146535(F)
94-1-717674(O)
94-1-717676(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
Cochin Cable 00-91-484Station
659010(Tel)
00-91-4842421164(Fax)
VSNL RCO 00-91-22-66592279
Team
(Tel)
P89
MBAI-GOON
VSNL
Mumbai
Cable Station
Cochin Cable
Station
P90
MBAI-MZRA
VSNL
VSNL RCO
Team
Mumbai
Cable Station
Cochin Cable
Station
P98
GOON-MZRA
BT
P53,58,60,
71,72
GOON-KCHI
BT
P101
P102
FUJA-GOON
GOON-JEDD
BT
P40, 88
MTLA-PENM
FT
P61
ALEX-MARM
TURK T.
P95
ALEX-PENM
FT
P96
ALEX-GOON
BT
P62
ALEX-CHNA
T. EGYPT
P63
ALEX-YRKP
CYTA
P64
(inclusive
P66)
ALEX-MZRA
T. ITALIA
RCO:
39-091-378-000(O)
Palermo/L*I
39-091-378-319(F)
INOC
Duty
Staff
P65
CHNA-MZRA
T. ITALIA
RCO:
Page 11 of 38
265334063
VSNL RCO
Team
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Paris
INOC
Duty
Staff
RCO: Istanbul
ITMC
Duty
Staff
RCO:
Paris
INOC
Duty
Staff
RCO:
Oswestry
NMC(BT/
RCO)
Alexandria
C/S Duty Staff
RCO: CYTA
ITMC
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
00-91-2266592398(Tel)
00-91-2266592399(Fax)
00-91-484659010(Tel)
00-91-4842421164(Fax)
00-91-22-66592279
(Tel)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
33-1-4993-8574(O)
33-1-4993-7800(F)
90-212-5209898(O)
90-212-5122850(F)
33-1-4993-8574(O)
33-1-4993-7800(F)
44-1691 666777(O)
44-1691-658452(F)
20-34-910-605(O)
20-34-947-2222(F)
357-22-702778(O)
357-22-515355(F)
39-091-378-000(O)
S9
P59, 64
JEDD-MZRA
Sparkle
(TIS)
P68
MZRA-SBRA
T. ITALIA
P69,
P69,71,73
MARM-SBRA
MARM-NDEN
PTC
P70
SBRA-TETU
PTC
RCO:
Velha
Staff
P83
CHNA-YRKP
CYTA
RCO:
ITMC
P33,46,58,
64
P72,84
P15,72,84
MZRA-TUAS
SINGTEL
ORCO: SMW- 65-6836-3079(O)
3 NOC Duty 65-6836-3080(O)
Staff
65-6734-6903(F)
P66,68,71,
73
NDEN-YRKP
(See Note 1)
CYTA &
T-systems
RCO: CYTA 357-22-702778(O)
ITMC
357-22-515355(F)
GOON-TUAS
GOON-SHTO
P97
P64,93
MZRA-PENM
FUJA-MZRA
T.Italia
Sparkle
(TIS)
P84
P84, 73
PENM-TUAS
NDEN-TUAS
SINGTEL
P86
GOON-TUAS
P71
PENM-SBRA
FT
Page 12 of 38
265334063
Palermo/L*I
INOC
Duty
Staff
RCO:
Palermo/L*I
INOC
Duty
Staff
RCO: Linda a
Velha
Duty
Staff
39-091-378-000(O)
39-091-378-319(F)
351-214-147280(O)
351-214-147281(O)
351-214-141355(F)
351-214-146535(F)
Linda a 351-214-147280(O)
Duty 351-214-147281(O)
351-214-141355(F)
351-214-146535(F)
CYTA 357-22-702778(O)
357-22-515355(F)
Norden C/S
Duty Staff
RCO:
Palermo/L*I
INOC
Duty
Staff
ORCO: SMW3 NOC Duty
Staff
RCO:
INOC
Staff
39-091-378-319(F)
49-4931-92700(O)
49-4931-927015(F)
39-091-378-000(O)
39-091-378-319(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
Paris 33-1-4993-8574(O)
Duty 33-1-4993-7800(F)
S10
P89
MBAI-GOON
BT
P71, 72
GOON-SBRA
BT
P98
GOON-MZRA
BT
P53,58,60,
71,72
GOON-KCHI
BT
P101
P102
FUJA-GOON
GOON-JEDD
BT
P40, 88
MTLA-PENM
FT
P66,68,71,
73
P95
NDEN-YRKP
T-systems
ALEX-PENM
FT
P96
ALEX-GOON
BT
P97
MZRA-PENM
T.Italia
Sparkle
(TIS)
P72
GOON-PENM
BT
P86
GOON-TUAS
SINGTEL
P73
P69,71,73
NDEN-PENM
MARM-NDEN
DTAG
P75
OSTD-PENM
BICS
P89
MBAI-GOON
BT
Page 13 of 38
265334063
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Paris
INOC
Duty
Staff
Norden C/S
Duty Staff
RCO:
Paris
INOC
Duty
Staff
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Palermo/L*I
INOC
Duty
Staff
RCO:
Oswestry
NMC(BT/
RCO)
ORCO: SMW3 NOC Duty
Staff
Norden C/S
Duty Staff
44-1691 666777(O)
44-1691-658452(F)
RCO:
Belgacom
ITMC
Duty
Staff
RCO:
Oswestry
NMC(BT/
RCO)
32-25-405-200(O)
32-25-406-885(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
33-1-4993-8574(O)
33-1-4993-7800(F)
49-4931-92700(O)
49-4931-927015(F)
33-1-4993-8574(O)
33-1-4993-7800(F)
44-1691 666777(O)
44-1691-658452(F)
39-091-378-000(O)
39-091-378-319(F)
44-1691 666777(O)
44-1691-658452(F)
65-6836-3079(O)
65-6836-3080(O)
65-6734-6903(F)
49-4931-92700(O)
49-4931-927015(F)
44-1691 666777(O)
44-1691-658452(F)
P71, 72
GOON-SBRA
BT
P98
GOON-MZRA
BT
P53,58,60,
71,72
GOON-KCHI
BT
P101
P102
FUJA-GOON
GOON-JEDD
BT
P66,68,71,
73
NDEN-YRKP
(See Note 1)
CYTA &
T-systems
P96
ALEX-GOON
BT
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO:
Oswestry
NMC(BT/
RCO)
RCO: CYTA
ITMC
44-1691 666777(O)
44-1691-658452(F)
Norden C/S
Duty Staff
RCO:
Oswestry
NMC(BT/
RCO)
49-4931-92700(O)
49-4931-927015(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
44-1691 666777(O)
44-1691-658452(F)
357-22-702778(O)
357-22-515355(F)
Notes:1. 2 Admins. will assume the role of SCs for different routes. For details, see URM plan.
Page 14 of 38
265334063
3. Non-Terminal Parties and Facility Providers (Involved RCOs)
Admin
AT&T (for China US CN &
Columbus III)
TELEFONICA
Station
Conyers
Telephone
1 770 785 3600
Facsimile
1 770 785 3649
Alcobendas ITMC
Estepona c/s
Santander
34 916 579 988
34 952 800 250
34 942 205734
34 916 615 369
34 952 793 269
34 942 344578
SAT-3/WASC/SAFE
Melkbosstrand c/s
27 21 553 2236
(ORCO)
Alexandria C/S Duty Staff 20-34-910-605(O)
20-34-947-2222(F)
RCO: CYTA ITMC
357-22-702778(O)
357-22-515355(F)
ALETAR
UGARIT
Page 15 of 38
265334063
27 21 553 2463
4. SEAMEWE-3 Restoration Implementation Procedure
Page 16 of 38
265334063
Page 17 of 38
265334063
5. SEAMEWE-3 Restoration Forms
Form 0
SEAMEWE-3
CABLE FAILURE/DEGRADATION ADVICE
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Fax. +65-6738-5549
Fax. +65-6734-6903
From: _______________________
(Relevant Terminal Parties of SEAMEWE-3)
Fax: ______________
Tel: _______________
Date: _______________________
Time(UTC): _________
1.
The
following
traffic
paths
have
failed/degraded
on
___________
at
___________UTC. The suspected cause of the fault is
_____________________________________________________________________
_____________________________________________________________________
___________________________________________________
Affected traffic paths:
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
_____________________________________________________
________________________________________________________
Page 18 of 38
265334063
Form 1(1/3)
SEAMEWE-3
GO-AHEAD ORDER TO IMPLEMENT RESTORATION
To:
SEAMEWE-3 Terminal Parties, STEP Co-ordinators(SCs) & Facility Providers
Copy: SEAMEWE-3 Owners (For Info.)
From: SEAMEWE-3 ORLO (SingTel)
Fax. +65-6738-5549
ORCO (SingTel)
Fax. +65-6734-6903
Date:
_______________________
1.
A fault has developed in the SEAMEWE-3 Cable System Segment _____ between
_________________________
Time(UTC): _________
and
_____________
on
___________
at
___________UTC. Suspected cause: _____________________________________
____________________________________________________________________.
2.
The following traffic paths have been affected (Path ID may be stated here for the initial
quick reporting. The details will be reported in Form 2):
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
________________________________________________________
3.
4.
________________________________________________________
Please go ahead to implement Restoration Plan Reference: SMW-3 (S_______) Issue
_______________________ and log into SMW-3 Conference Bridge at
Tel: +65 6668 7200, Code: 111489#. For this most updated plan, you may visit the
SMW-3 NA’s website at http://www.smw3.com (User ID: smw3na; Password: singtel).
Upon successful restoration of the above affected traffic paths, ORCO will issue another order
(FORM 2) if necessary to transfer remaining unaffected traffic paths to respective restoration
steps to facilitate cable repair.
(IMPORTANT: Please see next page for the quick CHECKLIST for SC during
restoration implementation)
Page 19 of 38
265334063
Form 1(2/3)
Quick CHECKLIST for SC during restoration implementation.
Have you done the following?
a. During restoration implementation:
-
Implement the Restoration Plan based on above reference, and log into
SMW-3 Conference Bridge at Tel: +(65) 6668 7200, Code: 111489#.
-
A copy of the SEAMEWE-3 SC’s Guide is now with you.
-
Report to ORCO using FORM 3 concerning the successful restoration time
of the above steps.
b. When the failure occurs, SNCP switched by NOC but restoration not
working:
- Identify a “tracer” reference circuit inside the STEP if necessary
The “Tracer” reference circuit is____________________________
- Contact the relevant stations one by one to see if the path is correctly
connected.
- Make sure SNCP is correctly switched out by looking at cable station’s SH.
Contact relevant stations, where necessary.
- If all above fails, then request one by one the stations to loop back and
at each step, check with the NMS centre managing the “tracer” circuit whether
AIS alarm is cleared. It is not necessary to call NOC.
Remember that at any point of disconnect, receive port will have LOS alarm,
and generate AIS backwards to all stations which will receive the AIS alarm.
Don’ts
- When asking for Loopback, don’t use the words like “give me” a loopback. On the
phone, “me” is often misunderstood, always identify the station, e.g. “give a
loopback towards Shantou cable station”.
- Don’t call the NOC to check whether Alarm is cleared or not during the
troubleshooting process. Use a local “tracer circuit” or else contact the centre
managing the NMS of the controlling station at the far end terminals. If everyone
calls the NOC to check if alarm is cleared or not, then the purpose of decentralizing
the restoration is defeated.
Page 20 of 38
265334063
Form 1(3/3)
SMW-3 Connectivity Diagram (Updated as of 16 May 2008)
Source: SMW-3 NA's Website.
Page 21 of 38
265334063
Form 1(Example)
SEAMEWE-3
GO-AHEAD ORDER TO IMPLEMENT RESTORATION
To:
SEAMEWE-3 Terminal Parties, STEP Co-ordinators(SCs) & Facility Providers
Copy: SEAMEWE-3 Owners (For Info.)
From: SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Fax. +65-6738-5549
Fax. +65-6734-6903
Date: 2 Jan 2002
Time(UTC):1600UTC
1.
A fault has developed in the SEAMEWE-3 Cable System Segment S2 between
Shantou and Tuas on 2 Jan 02 at 1545UTC.
Suspected cause: Cable cut. Still
investigating.
2.
The following traffic paths have been affected(Path ID may be stated here for the initial
quick reporting. The details will be reported in Form 2):
P15-Shantou-Tuas, P14-Shantou-DWB(S2), P23-Tuas-DWB,
P16-Shantou-Danang, P24-Tuas-Danang, P17-Shantou-Taipa,
P25-Tuas-Taipa, P79-Danang-DWB, P21-Shantou-Mersing,
P29-Tuas-Mersing, P18-Shantou-Batangas, P26-Tuas-Batangas,
P19-Shantou-Tungku, P27-Tuas-Tungku, P80-Batangas-Tungku
3.
Please go ahead to implement Restoration Plan Reference: SMW-3 (S2) Issue
200X.X and log into SMW-3 Conference Bridge at Tel: +65 6668 7200, Code:
111489#. For this most updated plan, you may visit the SMW-3 NA’s website at
http://www.smw3.com (User ID: smw3na; Password: singtel).
4.
Upon successful restoration of the above affected traffic paths, ORCO will
issue another order (FORM 2) if necessary to transfer remaining unaffected
traffic paths to respective restoration steps to facilitate cable repair.
Page 22 of 38
265334063
Form 2
SEAMEWE-3
RESTORATION IMPLEMENTATION SCHEDULE/COMPLETION REPORT
To:
SEAMEWE-3 Terminal Parties, STEP Co-ordinators(SCs) & Facility Providers
Copy to: SEAMEWE-3 Owners (For Info.)
From: SEAMEWE-3 ORLO/ORCO (SingTel)
Date:___________________
Fax.+65-6738-5549/+65-6734-6903
Time (UTC):________________
Please implement the restoration plan for the following bearers.
This is an update/Rest. Completion Report compiled from feedback received (Form 3)
SNCP
Scheduled
Actual
Switching
Date/Time
Restored
Step
Bearer
Date/Time
For Rest’n
Date/Time
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
______
_______________________________
___________
____________
__________
Page 23 of 38
265334063
Form 3
SEAMEWE-3
RESTORATION COMPLETION ADVICE
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Fax. +65-6738-5549
Fax. +65-6734-6903
From: ________________________________
Fax: ______________
Tel: _______________
STEP Co-ordinator(SC) of ___________________________________________________
(IMPORTANT: Please indicate clearly the STEP(s) involved)
Date:
_______________________
Time (UTC): ___________
1.
This is to confirm that the following bearers have been restored:
Step
Bearer
Carrier
Radiated
Date/Time
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
______
_______________________________________
____________
___________
Restored
Date/Time
Form 4a
Page 24 of 38
265334063
SEAMEWE-3
CABLE DEPOWERING/POWER RECONFIGURE REQUEST
To:
MLO/OPCO of relevant Segment S____
Fax. __________________
Tel. ___________________
From: ORCO (SingTel)
Fax. +65-6734-6903
Date: _______________________
Time (UTC): ___________
1.
The SEAMEWE-3 System Restoration has been completed.
2.
The SEAMEWE-3 Cable System is now handed over to MLO(Maintenance Liaison
Officer)/OPCO (Overall Power Control Officer). Please proceed to de-power the
cable and re-configure the power, in accordance with the power control safety
procedures and messages.
Page 25 of 38
265334063
Form 4b
SEAMEWE-3
POWER CONFIGURATION STATUS
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Fax. +65-6738-5549
Fax. +65-6734-6903
From: ________________________________
MLO/OPCO of relevant Segment S____
Fax: ______________
Tel: _______________
Date: _______________________
Time(UTC):__________
1.
Please be advised that the current status of power configuration is as follows:-
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Page 26 of 38
265334063
Form 4c
SEAMEWE-3
REPAIR COMPLETION ADVICE
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Fax. +65-6738-5549
Fax. +65-6734-6903
From: ________________________________
MLO/OPCO of relevant Segment S____
Fax: ______________
Tel: _______________
Date: _______________________
Time(UTC):__________
1.
Please be advised that the final splice operation on Segment S____________ and
power up tests have been successfully completed on __________________ at
______________UTC.
2.
Please proceed to normalize traffic on______________________________________
3.
Remarks, if any
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Page 27 of 38
265334063
Form 5
SEAMEWE-3
SEAMEWE-3 NORMALISATION SCHEDULE/NORMALISATION REPORT
To:
SEAMEWE-3 Terminal Parties, STEP Co-ordinators(SCs) & Facility Providers
Date:
_____________
Copy:
SEAMEWE-3 Owners (For Info.)
From:
SEAMEWE-3 ORLO/ORCO (SingTel)
Fax. +65-6738-5549/65-6734-6903
SEAMEWE-3 Cable repair is expected to be completed on __________________ at
________UTC. Please Normalize according to the following schedule.
This is a Normalization Report compiled from submissions received (Form 6).
Power re-configuration is completed.
schedule.
We will normalize according to the following
Scheduled
Actual
Date/Time For
Normalized
Step
Bearer
Normalization
Date/Time
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
______
_________________________________
____________
__________
Page 28 of 38
265334063
Form 6
SEAMEWE-3
NORMALISATION ADVICE
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Fax. +65-6738-5549
Fax. +65-6734-6903
From: ________________________________
Fax: ______________
Tel: _______________
STEP Co-ordinator(SC) of _____________________________________________
_____________________________________________________________________
(IMPORTANT: Please indicate clearly the STEP(s) involved)
Date: _______________________
1.
Time (UTC): ___________
We confirm that the following traffic paths have been normalized as indicated
Normalized
Carrier Removed
Step
Bearer
Date/Time
Date/Time
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
______
_______________________________
___________
______________
Page 29 of 38
265334063
6. SEAMEWE-3 RET Form
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Copy: ____________________________
(Please also copy to your counterpart)
From: ____________________________
Fax. +65-6738-5549
Fax. +65-6734-6903
Fax:_______________
Fax: _______________
Tel:________________
STEP Co-ordinator(SC) of ________________________
(IMPORTANT: Please indicate clearly the STEP(s) involved)
Date: _________________
Time (UTC): _________
Note:- If test parties have other preference for the test date/time, please liaise and arrange
among yourselves, and update ORLO accordingly. If restoration routes involve more than 3
test parties, please use the SMW-3 Conference Bridge (Tel: +65-6668-7200. Code: 111489#) with
SMW-3 NOC to assist in coordinating the initial set-up.
In RET case, SCs, of course, do not require SMW-3 NOC to inform them of SNCP switching.
SC shall be responsible to collect the BER test results and ODF termination checks of involved
stations. IF BER is bad, SC shall liaise with providers to troubleshoot. SC shall then complete
the RET Form, and submit to ORLO office.
Rest’n
Step
Restored
VC4 Bearer
*IMPORTANT:
Does the physical
ODF/DDF to
SMW-3 TM/ADM
connect’n at both
(See Note)
ends conform to the RET Start
latest issue of URM Date/Time(UTC)
plan ?
[Yes(Y) or No(N)]
(Y / N)
(Y / N)
(Y / N)
(Y / N)
(Y / N)
(Y / N)
(24Hr)
End-to-End
Continuity
Established
Date/Time
(UTC)
Test
Result/
Remark
(Y / N) (Y / N)
*IMPORTANT: SC, please circle clearly the indication, after checking with your
counterpart.
Page 30 of 38
265334063
(Example of NEW Format for RET Form)
To:
SEAMEWE-3 ORLO (SingTel)
ORCO (SingTel)
Copy: Mr. Lee
(Please also copy to your counterpart)
From: Mr. Wannabe/Tokyo ITMC(KDDI)
Fax. +65-6738-5549
Fax. +65-6734-6903
Fax:86-754-7870034
Fax: 81-3-3347-5720
Tel: 81-3-3347-5715
STEP Co-ordinator(SC) of S1-STEPs 1.1, and 1.2
(IMPORTANT: Please indicate clearly the STEP(s) involved)
Date: 11 Dec 01
Time (UTC): 0800
Note:- If test parties have other preference for the test date/time, please liaise and arrange
among yourselves, and update ORLO accordingly. If restoration routes involve more than 3
test parties, please use the SMW-3 Conference Bridge (Tel: +65-6668-7200. Code: 111489#) with
SMW-3 NOC to assist in coordinating the initial set-up.
In RET case, SCs, of course, do not require SMW-3 NOC to inform them of SNCP switching.
SC shall be responsible to collect the BER test results and ODF termination checks of involved
stations. IF BER is bad, SC shall liaise with providers to troubleshoot. SC shall then complete
the RET Form, and submit to ORLO office.
*IMPORTANT:
Does the physical
ODF/DDF to
SMW-3 TM/ADM
connect’n at both
(See Note)
ends conform to the RET Start
latest issue of URM Date/Time(UTC)
plan ?
[Yes(Y) or No(N)]
(24Hr)
End-to-End
Restored
Continuity
Rest’n VC4 Bearer
Established
Step
Date/Time
(UTC)
Test
Result/
Remark
S1OKIW-SHTO KDDI
CT
10 Dec 01/
10 Dec 01/
KDDI
STEP
VC4S1
( Y / N ) ( Y / N ) 0200
0300
confirmed
1.1
with CT
that the
test result
is
GOOD
S1OKIW-SHTO KDDI
CT
10 Dec 01/
10 Dec 01/
KDDI
STEP
VC4S2
( Y / N ) ( Y / N ) 0200
0330
confirmed
1.2
with CT
that the
test result
is
GOOD
*IMPORTANT: SC, please circle clearly the indication, after checking with your
counterpart.
Page 31 of 38
265334063
7. SEAMEWE-3 SC’s guide to troubleshooting restoration paths
1.
Step Co-ordinators can help speed up troubleshooting of restoration paths which
doesn’t work. The most common reasons are due to Bad Loop (forgotten to
normalize loopback somewhere in the restoration path), Open Circuit (wrong
patch of ports not following URM), and Software Disconnect(wrong matrix
connection in DXC, resulting in C2 Signal Label HO unequipped).
2.
DO’s
a. Before the failure occurs (PLEASE REFER TO DIAGRAM next page):
- Identify (phone/names) all relevant 24x7 manned stations controlling the
relevant SDH equipment.
- If possible/practicable, do a sketch of the restoration path, with the aid of the
sample attached. Label all ports.
- Be familiar with URM Plan reference to the relevant ports for interconnecting
points. (Don’t call NOC to check)
- Identify a “tracer” reference circuit inside the STEP if necessary. For example
if the restored bearer is Tuas Shantou VC4 and consists of mix of many E1s,
VC3, from various WDMTS, etc., then the SC need to trace back a VC3 or E1
from the terminating Shantou data Centre or ITMC, and locate the NMS control
centre for such circuit so that when doing loopbacks or circuit checking, it is
sufficient to contact the end stations to find out status instead of flooding the
SEAMEWE3 NOC/Singtel to find out if the TM port is clear of alarms.
b. When the failure occurs, SNCP switched by NOC but restoration not working:
- Contact the relevant stations one by one to see if the path is correctly connected.
- Make sure SNCP is correctly switched out by looking at cable station’s SH.
Contact relevant stations, where necessary.
- If all above fails, then request one by one the stations to loop back and at each
step check with the NMS centre managing the “tracer” circuit whether AIS alarm
is cleared. It is not necessary to call NOC.
Remember that at any point of disconnect, receive port will have LOS alarm, and
generate AIS backwards to all stations which will receive the AIS alarm.
DON’T’s
- When asking for Loopback, don’t use the words like “give me” a loopback. On
the phone, “me” is often misunderstood, always identify the station, e.g. “give a
loopback towards Shantou cable station”.
- Don’t call the NOC to check whether Alarm is cleared or not during the
troubleshooting process. Use a local “tracer circuit” or else contact the centre
managing the NMS of the controlling station at the far end terminals. If
everyone calls the NOC to check if alarm is cleared or not, then the purpose of
decentralizing the restoration is defeated.
Page 32 of 38
265334063
Restoration Troubleshooting for SHANTOU TUAS TRAFFIC(Example)
Shantou DOMESTIC Network
IN-SYSTEM SHANTOU-OKI
Identify either Port A or B and observe clearing of
AIS alarm of tracer traffic* through LOCAL NMS of
local SDH.
TM
ADM
A
1641
DXC
OTHER
DXC
ITMC/ Data
Centre
ADM
a
1641
DXC
ADM
ADM
ADM
b
1
STEP 1-G Shantou Tuas
VC4S14
TM27/09-02
2
3
ADM
6
5
4
OTHER
DXC
7
5-11-1
5
4-15-2
ADM
APCN
ADM
4
TM14/11-01 TM08/11-01
ADM
TM
Singapore
Terrestrial
Forc
e
SNC
TM P
8
ADM
1641
DXC
ADM
OTHER
DXC
TM 3
1641
DXC
Cable
CUT
Tuas DOMESTIC Network
Singapore
ITMC/ Data
Centre
ADM
TM
Force
SNC
ADMP
TM
ADM
B
See Notes for
Shantou
2
1
DOMESTIC
JAPAN LINK
Submarine
link SMW3
ADM
6
ADM
7
CR4A/F2/S1/F2 CR4A/F1/S1/P2
OTHER
DXC
8
TM02/09-02
1. The important start/end Ports are No. 1 , No. 8. SMW3 NOC through RM can see alarm status of these Ports and able to systemetically
diagnose restoration problem by requesting loopback at other Ports, moving upstream and monitoring the alarm condition of No. 1 / 8.
2. Step coordinators do not have visibility of No. 1 & 8, and they should not contact NOC for checking, otherwise it defeat the purpose of
“decentralising” the restoration process to increase speed.
3. Instead Step Coodinators should trace back one step to the local traffic originating point (A) or (B). If the Step involved is a whole VC4
the Port A or B is monitored easily by contacting local NMS for domestic network. If the Step involved is a re-constituted traffic at 1641
DXC, then a pre-determined “tracer” traffic (VC3 or VC12 traffic inside the Step) originating further back from their ITMC or Data Centre
should be used as circuit status check in lieu of the No. 1 & No. 8 reference which are only visible from SMW3 NOC’s RM.
Page 33 of 38
265334063
8. PROCEDURE: “Manually Release SNCP switch” (Revised
Version)
If a station is isolated from Tuas RM, you have to follow this scheduling to release the
SNCP switch for each trail on the relevant ADM.
1°) On 1353SH, select the relevant ADM part of restoration scheme, then from the menu «
Supervision », item « Access State », select « Local » to give the permission for management
on the ADM by the Craft Terminal.
2°) Connect the Craft Terminal on the relevant ADM.
3°) Select icon « NECTAS » Enter login and password.
4°) On the Craft Terminal select the line « M:0-S:0 1664M21 ». This line is automatically
shown if there are alarms on the ADM. If there are no alarm, to open this line select « View »
and choice « All elements » one click.
5°) On the Craft Terminal, from the menu « Application_Choice »,
select the item « 5) Alarms, Status & Remote Control »
6°) From the window « AS&C - 1664SM - M:0-S:0 », select menu « Remote_Control »,
then select the item « All ».
7°) Opening Window Display Remote Control. Select your command.
« Force West PPS Trib » to force in west and lock in west.
« Force East PPS Trib » to force in east and lock in east.
« Clear force PPS Trib » to release the locking state. This command doesn’t affect the switch.
8°) For each protected trail, select the relevant tributary and click on « ok ».
Case 1: Restoration activation : in case of cable fault and if 1353RM (in Tuas) can not
activate restoration:
« Clear force PPS Trib » on port A or B (in order to release the switch)
Traffic is now switched on the restoration route!!
(See Note for KDDI’s comment on Case 1)
Case 2: Restoration activation : in case of planned restoration before cable fault repair and
if 1353RM (in Tuas) can not activate restoration:
« Clear force PPS Trib » on port A or B (in order to release the switch)
« Force East PPS Trib » on port A or B
Traffic is now forced on the restoration route!!
Case 3: Normalization of traffic back in SMW3 : after cable fault repair and if 1353RM (in
Tuas) can not normalize traffic:
« Clear force PPS Trib » on port A or B (in order to release the switch)
« Force West PPS Trib » on port A or B
Traffic is now back to SMW3!!
9°) Back on 1353SH, you have to disable the management on this ADM by the Craft
Terminal, using the menu « Supervision », item « Access State », select « OS ».
Here follows a correspondence table between the STM1 you have to switch on the
RM, using the reporting of the trail and the table used by the Craft Terminal.
Page 34 of 38
265334063
For example, if you want to release the SNCP switch for the ho-trail using the
resource “djib-suez_S06F1L1_A01/sr1sl04/ElTribStm1#01”, you should select the
“ Port A Tributary 3” on this ADM from the Craft Terminal.
On the RM On the Craft Terminal
“ADM_name”/sr1sl02/ElTribStm1#01 Port A Tributary 1
“ADM_name”/sr1sl02/ElTribStm1#02 Port B Tributary 1
“ADM_name”/sr1sl03/ElTribStm1#01 Port A Tributary 2
“ADM_name”/sr1sl03/ElTribStm1#02 Port B Tributary 2
“ADM_name”/sr1sl04/ElTribStm1#01 Port A Tributary 3
“ADM_name”/sr1sl04/ElTribStm1#02 Port B Tributary 3
“ADM_name”/sr1sl05/ElTribStm1#01 Port A Tributary 4
“ADM_name”/sr1sl05/ElTribStm1#02 Port B Tributary 4
“ADM_name”/sr1sl08/ElTribStm1#01 Port A Tributary 5
“ADM_name”/sr1sl08/ElTribStm1#02 Port B Tributary 5
“ADM_name”/sr1sl09/ElTribStm1#01 Port A Tributary 6
“ADM_name”/sr1sl09/ElTribStm1#02 Port B Tributary 6
“ADM_name”/sr1sl10/ElTribStm1#01 Port A Tributary 7
“ADM_name”/sr1sl10/ElTribStm1#02 Port B Tributary 7
“ADM_name”/sr1sl11/ElTribStm1#01 Port A Tributary 8
“ADM_name”/sr1sl11/ElTribStm1#02 Port B Tributary 8
Page 35 of 38
265334063
Notes:
1. KDD’s comments on Case 1:
KDDI could confirm the above procedure with KDDI Okinawa staff during the SMW-3
Refresh Training in Okinawa cable station end 2002. However, KDDI had a comment on the
Case 1 (Restoration activation: in case of cable fault and if 1354RM (vice 1353RM) (in Tuas)
can not activate restoration.
According to the SC's Guide, traffic is switched on the restoration route just after invoking
the "Clear Force" command. Yes, that is correct. KDDI could confirm the temporary facility
configuration using the vacant SIE ports and SDH analyzers.
However, if restoration route is interrupted and there is no alarm on the original route, traffic
is automatically switch back to the Original route even if SNCP is set up to the "Not
revertive" mode since the SNCP status is just "No operator request".
Therefore, is it required to invoke the "Force East" command just after invoking the "Clear
Force" command in order to keep the traffic on the restoration route.
Page 36 of 38
265334063
9. History of main problems, solutions and feedback gathered
9.1. (From 1999- 2001)
From time to time, the SMW3 NOC has been called upon by terminal parties to provide the
following at their remote end:
a. Divergence of traffic from working card in the 1:8 system to the protection card
As the SDH equipment belongs to the terminal parties, they are rightfully responsible for
their functionality and status. Thus, SMW3 NOC would like to seek the cooperation of the
terminal parities to attend to these issues on their end. This issue has been agreed in previous
O&M SC meeting.
b. Configuration of card from 140MB-to-STM1 (vice versa)
Please refer to reason above.
c. Setting Performance Monitoring (PM)
Setting up PM takes up considerable processing resource of the SMW3 RM (Regional
Manager) as it needs to poll the monitored remote NEs every 15 minutes for results. With the
increasing traffic capacity handled by SMW3 RM, PM would reduce the efficiency of the
RM further. This would have a negative impact especially on the restoration activities that
need to be carried out in the event of a cable failure.
SMW3 NOC wish to seek the understanding from the terminal parties to activate PM
sparingly. If a request has to be made to set up PM on SMW3 system, terminal parties are
requested to advise SMW3 NOC on the duration of monitoring so that NOC may remove the
PM when it is no longer needed.
d. EML (Element Management Level) Problem
During the S10.1 failure (29 Jun – 15 Jul 01), SMW-3 NOC experienced EML problem in
accessing to the ADMs in Goonhilly and Norden. As a result, LCT (Local Craft Terminal)
had to be used, and delay was experienced. We have checked with Tuas cable station on this
EML problem. This was mainly due to the 1353SH not responding to the RM. Subsequently,
the following day, Tuas coordinated with Norden cable station to reboot the 1353SH to
ensure that the ADM access state was in OS (Operation System) mode, after the manual
SNCP switching. The EML was then aligned from Tuas’ RM.
Based on ASN's advice, the 1353SH was not responding probably due to insufficient
memory. ASN has advised all the cable stations to clear their alarms in the 1353SH, and
refrain from accumulating. If these are not cleared, then the memory resources could be
drained off easily in the 1353SH, and caused this EML unreachable.
Learning from the above incident, we would like to urge all members to convey this message
to your operation staff, and ensure that the above housekeeping is performed accordingly.
Page 37 of 38
265334063
e. Procedure for Manually Release SNCP switch
At the same time, please also ensure that a copy of the Procedure for Manually Release
SNCP switch is made available in the respective stations/RCOs, and staff are well versed
with the steps involved. This will definitely expedite the whole restoration process in the
event that RM is unable to access to the ADM, and manual SNCP switching via LCT has to
be performed.
-End-
Page 38 of 38