Economic Modeling with Emission Constraints 2007 PowerWorld

Economic Modeling with Emission Constraints
2007 PowerWorld Client Conference
New Orleans, Louisiana
October 25-26, 2007
Sunil Talati, President
Mandhir Sahni, Senior Energy Analyst
PwrSolutions Inc.
Organization
PowerWorld Applications
Economic Modeling of Emission Constraints
Overview
Our Vision
Development Outline – Proposed Approach
Development Outline - Benefit Matrix
Development Outline – End Product
Economic Assessment Module
Overview
Conceptual Flow Diagram
Bench-Marking Results & Live Demonstration
2
PowerWorld Applications
Strategic/Economic consulting for transmission &
generation planning
Futuristic Locational Marginal Pricing (LMP) based studies
to asses:
–
Financial Feasibility of planned generation projects
–
Price Signals for siting purposes
–
Decisions on acquisition of Transmission Congestion Rights
(TCR)/Firm Transmission Rights (FTR)
Transmission Assessment Studies – Approximate 200 such
studies spanning ERCOT, NYISO, NE-ISO, CAISO, SPP, PJM,
WECC & MISO regions conducted
Market Accessibility Studies
3
PowerWorld Applications
Software Capability:
Automated PowerWorld-based power flow & contingency,
Available Transfer Capability (ATC), generation
interconnection and transmission planning modules
In-house, automated hourly-LMP forecasting software with
transmission model & SCOPF in PowerWorld
Performance evaluation of LMP-forecasting module by
historical benchmarking for various energy markets , more
prominently PJM
Computing Capability:
Dedicated in-house parallel processing computing facility
for multiple year round analysis
4
Economic Modeling of Emission
Constraints – Overview
Department of Energy (DOE) – Small Business
Innovative Research (SBIR), Phase I awarded under
Electricity System Reliability Model
Collaborative effort between PwrSolutions &
PowerWorld Corporation
Issues development seeks to address:
Quantitative Assessment of impact of new
technologies on:
• Economic performance of National Grid
• Environmental performance of National Grid
• Reliability performance of National Grid
• Security-related performance of National Grid
5
Economic Modeling of Emission
Constraints – Our Vision
Phase I Objectives
Connect/Link model nomenclature for all applicable data
sources – Access to NEMS
Extension of existing integrated model:
–
Include emission limits associated with operation of specific units
–
Include economic value of emission limits
–
Include transient or dynamic transmission interchange
–
Include variation of transmission interchange based on LMP
Development of user-friendly Graphical User Interface (GUI)
for non-technical entities
6
Development Outline – Proposed Approach
Model Integration
Model Updates
Model Extension
Study Specific Modules
Proposed Work Plan
Data Directory Integration
7
Development Outline – Benefit Matrix
Economic
Assessment
Module
Environmental
Assessment
Module
Security
Assessment
Module
Reliability
Assessment
Module
Federal Agencies
9
9
9
9
State PUCs
9
9
9
9
ISOs / RTOs
9
9
9
9
Utility Companies
9
9
9
9
Power Marketers
9
Large Industrial Customers
9
9
9
9
Consulting Companies
9
9
9
9
Cities
9
9
9
9
Counties
9
9
9
9
Municipalities
9
9
9
8
Development Outline – End Product
End-product envisioned encompasses the following
capabilities:
Economic Assessment Module
Environmental Assessment Module
Reliability Assessment Module
Security Assessment Module
Easy to use front-end user interface
Demonstrate performance on PJM market
Obtain comprehensive understanding of NEMS – Model
compatibility with NEMS
9
Economic Assessment Module - Flow Diagram
UC Data in PowerWorld
Format
- DISPATCH COST
- PLANT O/P
- CLOSED/OPEN
- BUS# & ID
-TIME PERIOD
Hourly Power
Transactions
Hourly Unit Commitment
Hourly Loads For
Relevant Regions
Transmission
Model
Hourly Environmental
Data
Transmission
Contingency List
O/P
RESULTS
IN .txt
RUN
SCOPF/
PRI. LP
CALL
POWER
WORLD
NO.
LAST
HOUR
?
YES.
BUS LMP
GEN LMP
ZONAL LMP
Forced Outage
Information
HOURLY LMPS
PROCESS TO BE REPEATED FOR ALL HOURS
10
Economic Assessment Module – Preliminary
Bench-marking
Apr06 Monthly Average LMP
60.00
50.00
LMP
40.00
Actual
Backcast
30.00
20.00
10.00
0.00
Beaver Valley
MetEd
Western Hub
ConeMaugh
Three Mile
Island
PenElec
Homer City
Comparative plot between
Actual and Back-cast LMP
values at significant points in
PJM system for April 2006
11
Hourly Unit Commitment
Wind Resource Integration
12
SCOPF Execution Module
13