Economic Modeling with Emission Constraints 2007 PowerWorld Client Conference New Orleans, Louisiana October 25-26, 2007 Sunil Talati, President Mandhir Sahni, Senior Energy Analyst PwrSolutions Inc. Organization PowerWorld Applications Economic Modeling of Emission Constraints Overview Our Vision Development Outline – Proposed Approach Development Outline - Benefit Matrix Development Outline – End Product Economic Assessment Module Overview Conceptual Flow Diagram Bench-Marking Results & Live Demonstration 2 PowerWorld Applications Strategic/Economic consulting for transmission & generation planning Futuristic Locational Marginal Pricing (LMP) based studies to asses: – Financial Feasibility of planned generation projects – Price Signals for siting purposes – Decisions on acquisition of Transmission Congestion Rights (TCR)/Firm Transmission Rights (FTR) Transmission Assessment Studies – Approximate 200 such studies spanning ERCOT, NYISO, NE-ISO, CAISO, SPP, PJM, WECC & MISO regions conducted Market Accessibility Studies 3 PowerWorld Applications Software Capability: Automated PowerWorld-based power flow & contingency, Available Transfer Capability (ATC), generation interconnection and transmission planning modules In-house, automated hourly-LMP forecasting software with transmission model & SCOPF in PowerWorld Performance evaluation of LMP-forecasting module by historical benchmarking for various energy markets , more prominently PJM Computing Capability: Dedicated in-house parallel processing computing facility for multiple year round analysis 4 Economic Modeling of Emission Constraints – Overview Department of Energy (DOE) – Small Business Innovative Research (SBIR), Phase I awarded under Electricity System Reliability Model Collaborative effort between PwrSolutions & PowerWorld Corporation Issues development seeks to address: Quantitative Assessment of impact of new technologies on: • Economic performance of National Grid • Environmental performance of National Grid • Reliability performance of National Grid • Security-related performance of National Grid 5 Economic Modeling of Emission Constraints – Our Vision Phase I Objectives Connect/Link model nomenclature for all applicable data sources – Access to NEMS Extension of existing integrated model: – Include emission limits associated with operation of specific units – Include economic value of emission limits – Include transient or dynamic transmission interchange – Include variation of transmission interchange based on LMP Development of user-friendly Graphical User Interface (GUI) for non-technical entities 6 Development Outline – Proposed Approach Model Integration Model Updates Model Extension Study Specific Modules Proposed Work Plan Data Directory Integration 7 Development Outline – Benefit Matrix Economic Assessment Module Environmental Assessment Module Security Assessment Module Reliability Assessment Module Federal Agencies 9 9 9 9 State PUCs 9 9 9 9 ISOs / RTOs 9 9 9 9 Utility Companies 9 9 9 9 Power Marketers 9 Large Industrial Customers 9 9 9 9 Consulting Companies 9 9 9 9 Cities 9 9 9 9 Counties 9 9 9 9 Municipalities 9 9 9 8 Development Outline – End Product End-product envisioned encompasses the following capabilities: Economic Assessment Module Environmental Assessment Module Reliability Assessment Module Security Assessment Module Easy to use front-end user interface Demonstrate performance on PJM market Obtain comprehensive understanding of NEMS – Model compatibility with NEMS 9 Economic Assessment Module - Flow Diagram UC Data in PowerWorld Format - DISPATCH COST - PLANT O/P - CLOSED/OPEN - BUS# & ID -TIME PERIOD Hourly Power Transactions Hourly Unit Commitment Hourly Loads For Relevant Regions Transmission Model Hourly Environmental Data Transmission Contingency List O/P RESULTS IN .txt RUN SCOPF/ PRI. LP CALL POWER WORLD NO. LAST HOUR ? YES. BUS LMP GEN LMP ZONAL LMP Forced Outage Information HOURLY LMPS PROCESS TO BE REPEATED FOR ALL HOURS 10 Economic Assessment Module – Preliminary Bench-marking Apr06 Monthly Average LMP 60.00 50.00 LMP 40.00 Actual Backcast 30.00 20.00 10.00 0.00 Beaver Valley MetEd Western Hub ConeMaugh Three Mile Island PenElec Homer City Comparative plot between Actual and Back-cast LMP values at significant points in PJM system for April 2006 11 Hourly Unit Commitment Wind Resource Integration 12 SCOPF Execution Module 13
© Copyright 2026 Paperzz