equilibrium models for electricity market - POLITesi

P OLITECNICO DI M ILANO
D EPARTMENT OF E NERGY
D OCTORAL P ROGRAMME I N E LECTRICAL E NGINEERING
E QUILIBRIUM M ODELS FOR E LECTRICITY M ARKET
Doctoral Dissertation of:
Majid Gholami
Supervisor:
Asst. Prof. Cristian Bovo
Tutor:
Prof. Alberto Berizzi
The Chair of the Doctoral Program:
Prof. Alberto Berizzi
2012 – 25
Firstly, I would like to express my special thanks to Prof. Alberto Berizzi for giving
me the opportunity to study PhD and also for his numerous supports through the duration of my studies.
Secondly, I wish to express my gratitude to my supervisor, Prof. Cristian Bovo who
was abundantly helpful and offered invaluable assistance, support and guidance.
In addition, I wish to express my love and gratitude to my beloved family; for their
understanding & endless love.
Finally, thanks to my friends Javad, Nima and Mona for their kindness and help throughout this journey.
Abstract
T
research consists of two major independent topics; first, Generation Expansion Planning (GEP) models in a realistic framework and second, the islanding
condition in presence of Renewable Energy Sources (RES).
The traditional vertically integrated structure of the electric utility has been deregulated in recent years particularly by adopting the competitive market paradigm in many
countries around the world. For instance, competitions have been emerged in the European power industry according to the EU-electricity guidelines during the last decade.
In addition to these changes in the organization of the electricity market, the EU Emissions Trading Scheme (EU ETS) came into effect in 2005 which will have significant
impacts on electricity industry in Europe.
As the direct result of these novel developments, electric firms assume much more
risk and become highly responsible for their own economic decisions demanding new
models and sufficient tools to cover these new obligations and risks or to formulate
their bidding strategies. On the other hand, it is necessary for the system regulator
to understand how electric firms formulate their expected profit-maximizing bidding
strategy to be able to identify possible market power abuse and limiting such them by
introducing appropriate measures.
In addition, the generation activity is more risky than in the past and so it becomes
important to develop new tools to help decision makers to analyze the investment. As a
result, developing the GEP model in a realistic framework becomes a crucial task. The
purpose of this research is to develop a GEP model in a realistic framework.
This first topic proposes a generation expansion planning model with CO2 emission
and transmission constraints to analyze the possible impacts of the European emission
trading system and transmission constraints on the power sector. The model will also
be improved to analyze the effect of different incentive plans on RES capacity expansion. Further, the proposed model is developed to investigate the influence of already
installed power plants in the generation mix.
The possibility of the applying proposed procedures and models to real systems is
verified by the numerical results with reference to the Italian electricity market (taking
into account the zonal structure) and the EU ETS system as an illustration.
HIS
I
Increasing penetration of RES is the characteristic of modern power systems which
makes their integration a challenging problem. However, RES installed at the HV subtransmission level offer a unique opportunity to benefit the possibility of demanded or
undesired islanding conditions. In this study, a procedure is proposed to evaluate the
viability of the islanded operation which determines the control actions to be performed
for real power balance of the island after islanding. The procedure’s feasibility is shown
via the tests performed on real subtransmission systems.
II
Contents
Table of Contents
VII
List of Figures
IX
List of Tables
XI
1 Introduction
1.1 Background and Problem Statement
1.2 Objective of the Study . . . . . . .
1.3 Methodology . . . . . . . . . . . .
1.4 Achievements and Contributions . .
1.5 Outline of the Thesis . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1
1
2
2
5
5
2 Competitive Electricity Market Models
2.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2 Types of electricity market models . . . . . . . . . . . . . .
2.2.1 Optimization model . . . . . . . . . . . . . . . . . .
2.2.2 Equilibrium market models . . . . . . . . . . . . . .
2.2.2.1 Market Mechanisms Modeled . . . . . . . .
2.2.2.2 Types of Strategic Interactions . . . . . . . .
2.2.2.2.1 Bertrand Strategy . . . . . . . . . .
2.2.2.2.2 Cournot Strategy . . . . . . . . . . .
2.2.2.2.3 Collusion . . . . . . . . . . . . . . .
2.2.2.2.4 Stackelberg . . . . . . . . . . . . . .
2.2.2.2.5 Supply Function Equilibria (SFE) . .
2.2.2.2.6 General Conjectural Variations (CVs)
2.2.2.2.7 Conjectured Supply Function (CSF) .
2.2.3 Simulation Models . . . . . . . . . . . . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
7
8
8
9
9
10
11
11
12
13
13
14
16
17
3 The Kyoto Protocol and European Union Emissions Trading Scheme
3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.2 The Kyoto Protocol . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
19
19
III
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Contents
3.2.1 Kyoto Mechanisms . . . . . . . . . . . . . . .
3.2.1.1 Joint Implementation . . . . . . . . . .
3.2.1.2 Clean Development Mechanism . . . .
3.2.1.3 International Emissions Trading . . . .
3.3 European Union Emissions Trading Scheme (EU ETS)
3.3.1 What the EU ETS covers . . . . . . . . . . . .
3.3.2 How Does the EU ETS Work? . . . . . . . . .
3.3.3 Allocation . . . . . . . . . . . . . . . . . . . .
3.3.3.1 Phase I NAPs . . . . . . . . . . . . . .
3.3.3.2 Phase II NAPs . . . . . . . . . . . . .
3.3.3.3 Post Kyoto . . . . . . . . . . . . . . .
.
.
.
.
.
.
.
.
.
.
.
20
20
20
20
21
21
22
22
22
23
23
4 Generation Capacity Expansion Model
4.1 Generation Capacity Expansion Model . . . . . . . . . . . . . . . . . .
4.1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.1.2 Approaches used to model GEP in the electricity market . . . . .
4.2 A GEP Model with CO2 Emission and Transmission Constraints in an
Oligopolistic Market . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.2 The Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.3 Notations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.3.1 Sets and parameters . . . . . . . . . . . . . . . . . . . .
4.2.3.2 Variables . . . . . . . . . . . . . . . . . . . . . . . . .
4.2.4 Generating Firms Model . . . . . . . . . . . . . . . . . . . . . .
4.2.5 Power Exchange Model . . . . . . . . . . . . . . . . . . . . . .
4.2.6 Market Clearing Conditions . . . . . . . . . . . . . . . . . . . .
4.3 Improving the GEP Model to Analyze the Impacts of Different Incentive
Plans on RES Expansions . . . . . . . . . . . . . . . . . . . . . . . .
4.3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.2 The Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.3 Notations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.3.1 Sets and parameters . . . . . . . . . . . . . . . . . . . .
4.3.3.2 Variables . . . . . . . . . . . . . . . . . . . . . . . . .
4.3.4 Generating Firms Model . . . . . . . . . . . . . . . . . . . . . .
4.3.4.1 Optimization problem of strategic firms . . . . . . . . .
4.3.4.2 Optimization problem of price taking firms . . . . . . .
4.3.5 Power Exchange Model . . . . . . . . . . . . . . . . . . . . . .
4.3.6 Market Clearing Conditions . . . . . . . . . . . . . . . . . . . .
4.4 A GEP Model to Analyze the Impacts of Already Installed Power PlantsConsidering their investment costs- on the Generation Mix . . . . . . .
4.4.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.2 The Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.3 Notations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.3.1 Sets and parameters . . . . . . . . . . . . . . . . . . . .
4.4.3.2 Variables . . . . . . . . . . . . . . . . . . . . . . . . .
4.4.4 Generating Firms Model . . . . . . . . . . . . . . . . . . . . . .
4.5 summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27
27
27
27
IV
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
28
28
29
29
29
31
31
37
37
38
38
38
38
38
39
40
40
42
44
44
44
44
45
45
45
45
45
50
Contents
5 The Italian Electricity Market
5.1 Overview of Italian Electricity Sector . . . . . . . . . . . . . . . . . .
5.2 Electricity Sector Organization . . . . . . . . . . . . . . . . . . . . . .
5.3 The Italian Power Exchange . . . . . . . . . . . . . . . . . . . . . . .
5.3.1 The Spot Electricity Market . . . . . . . . . . . . . . . . . . . .
5.3.2 The Platform for physical delivery of concluded financial contracts
5.3.3 The Forward Electricity Market . . . . . . . . . . . . . . . . .
5.4 Transmission Network . . . . . . . . . . . . . . . . . . . . . . . . . .
51
51
51
52
52
55
55
55
6 Data and Assumptions
6.1 Introduction . . . . . . . . . . . . . . . .
6.2 Generating Firms’ Data . . . . . . . . . .
6.3 Power Plants Data . . . . . . . . . . . .
6.4 Data on Candidate Expansion Units . . .
6.5 Demand Data . . . . . . . . . . . . . . .
6.6 Data on Transmission Network . . . . . .
6.7 Data on CO2 Emissions Allowance Price
.
.
.
.
.
.
.
57
57
57
57
58
58
59
59
. . . .
. . . .
. . . .
. . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
. . . .
61
61
61
61
62
65
65
66
66
67
67
67
67
69
70
71
71
75
75
75
8 Conclusions and Future Works
8.1 Conclusions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.2 Future Works . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
77
77
77
9 Islanding in Sub-transmission grids
9.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.2 Islanding in subtransmission systems . . . . . . . . . . . . . . . . . .
9.3 Finding the feasibility for islanded operation . . . . . . . . . . . . . .
79
79
81
82
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7 Results and Discussion
7.1 Effect of CO2 Emission and Transmission Constraints . . . . .
7.1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . .
7.1.2 Electricity prices . . . . . . . . . . . . . . . . . . . . . .
7.1.3 Effects of Transmission Capacity on Investment Decision
7.1.4 Power Plant Technology . . . . . . . . . . . . . . . . . .
7.1.5 Generation Mix . . . . . . . . . . . . . . . . . . . . . .
7.1.6 Profits of Firms . . . . . . . . . . . . . . . . . . . . . .
7.1.7 CO2 Emissions . . . . . . . . . . . . . . . . . . . . . .
7.2 Effect of Different Incentive Plans . . . . . . . . . . . . . . . .
7.2.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . .
7.2.2 Electricity Prices . . . . . . . . . . . . . . . . . . . . . .
7.2.3 Power Plant Technology . . . . . . . . . . . . . . . . . .
7.2.4 Generation Mix . . . . . . . . . . . . . . . . . . . . . .
7.2.5 Profits of Firms . . . . . . . . . . . . . . . . . . . . . .
7.2.6 CO2 Emissions . . . . . . . . . . . . . . . . . . . . . .
7.2.7 Effects of Incentives on Investment Decision of RES . . .
7.3 Effect of already Installed CCGT on Generation Mix . . . . . .
7.3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . .
7.3.2 Comparison . . . . . . . . . . . . . . . . . . . . . . . .
V
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Contents
9.4 Mathematical Model . . . . . . . . . . . . . . . . . . .
9.4.1 Preliminary Test and results . . . . . . . . . . . .
9.4.1.1 Presentation of the test cases . . . . . . .
9.4.1.2 Tests for Model 1 - Basic load model . .
9.4.1.3 Improving the load model . . . . . . . .
9.4.1.4 Tests for Model 1 - Advanced load model
9.4.1.5 Tests for Model 2 - Basic load model . .
9.4.1.6 Tests for Model 2 - Advanced load model
9.5 Conclusions and Future Works . . . . . . . . . . . . . .
9.5.1 Conclusions . . . . . . . . . . . . . . . . . . . .
9.5.2 Future Works . . . . . . . . . . . . . . . . . . .
Bibliography
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
82
85
85
86
88
89
91
92
97
97
97
97
VI
Contents
VII
List of Figures
2.1 Electricity market modeling approaches. . . . . . . . . . . . . . . . . .
2.2 Mathematical structure of equilibrium models. . . . . . . . . . . . . .
2.3 Market equilibrium as a mixed complementary problem. . . . . . . . .
8
9
10
4.1 Assumed demand curve . . . . . . . . . . . . . . . . . . . . . . . . .
4.2 Transmission cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32
33
5.1 Day-Ahead Market in IPEX . . . . . . . . . . . . . . . . . . . . . . .
5.2 Zonal price algorithm with single price for consumers . . . . . . . . . .
5.3 Average National Single Price PUN (e/MWh) . . . . . . . . . . . . .
53
53
54
6.1 Italian zonal market structure . . . . . . . . . . . . . . . . . . . . . . .
6.2 Zonal structure implemented in the model . . . . . . . . . . . . . . . .
60
60
7.1 . Average electricity price during 2010-2024 at selected Pc in all zones.
7.2 Electricity price during 2010-2024 at P c=0 [e/tCO2 ] in all zones. . . .
7.3 Electricity price during 2010-2024 at P c=10[e/tCO2 ] in all zones. . . .
7.4 Capacity added during 2010-2024 by zone. . . . . . . . . . . . . . . .
7.5 Capacity additions during 2010-2024 (MW). . . . . . . . . . . . . . .
7.6 Percent growth rate of capacity expansion . . . . . . . . . . . . . . . .
7.7 Total cumulative CO2 emission during 2010-2024 at selected CO2 prices.
7.8 Average electricity price during 2010-2024 at selected Pc in all zones .
7.9 Electricity price during 2010-2024 at Pc=10 e/tCO2 in all zones . . . .
7.10 Capacity additions (SCC&SCC+CCS) during 2010-2024 (MW) at selected Pc in all zones . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.11 Capacity additions (onshore and offshore wind power plant) during 20102024 (MW) at selected Pc in different zones . . . . . . . . . . . . . . .
7.12 Capacity additions (solar) during 2010-2024 (MW) at selected Pc in all
zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.13 Generation mix by fuel type at selected carbon prices (TWh) . . . . . .
7.14 profit of strategic firms during 2010-2024 at different Pc . . . . . . . .
62
62
63
63
64
64
67
68
68
IX
69
70
70
71
72
List of Figures
7.15 profit of price taking firms during 2010-2024 at different Pc . . . . . .
7.16 Total cumulative CO2 emission during 2010-2024 at selected CO2 prices
7.17 Capacity added for solar(Pc=0) . . . . . . . . . . . . . . . . . . . . . .
7.18 Capacity added for onshore wind(Pc=0) . . . . . . . . . . . . . . . . .
7.19 Capacity added for offshore wind(Pc=0) . . . . . . . . . . . . . . . . .
7.20 Average electricity price for model 2 and 3 during 2010-2024 at Pc=0 .
7.21 Generation mix by fuel type for model 3 at Pc=0 (TWh) . . . . . . . .
7.22 Generation mix by fuel type for model 2 at Pc=0 (TWh) . . . . . . . .
7.23 Total cumulative CO2 emission (Mt) for model 2 and 3 during 20102024 at Pc=0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
72
73
73
74
74
75
76
76
9.1 Test System A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.2 Data of Test System A used for tests . . . . . . . . . . . . . . . . . .
9.3 Representation of Test System A for tests . . . . . . . . . . . . . . .
9.4 Basic load model - SAS 1 . . . . . . . . . . . . . . . . . . . . . . .
9.5 Advanced load model . . . . . . . . . . . . . . . . . . . . . . . . . .
9.6 Representation of Test System A for tests using advanced load model
9.7 Case 7, Model 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.8 Case 7, Model 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.9 Case 14, Model 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.10 Case 14, Model 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.11 Case 15, Model 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9.12 Case 15, Model 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . .
81
85
86
88
89
91
93
93
94
94
95
95
X
.
.
.
.
.
.
.
.
.
.
.
.
76
List of Tables
6.1 Existing installed capacity of firms [MW] . . . . . . . . . . . . . . . .
6.2 Data for candidate power plants . . . . . . . . . . . . . . . . . . . . .
6.3 Data for candidate RES power plants . . . . . . . . . . . . . . . . . . .
58
58
59
7.1 Capacity additions by technology during 2010-2024 (MW) . . . . . . .
7.2 Generation mix (%) during 2010-2024 at selected CO2 prices . . . . .
7.3 Profit of firms during 2010-2024 at different Pc [1010 e] . . . . . . . . .
65
66
66
9.1
9.2
9.3
9.4
87
90
92
96
Results for Model 1 - Basic load model . . . . . . .
Results for Model 1 - Advanced load model . . . . .
Selected results for Model 2 - Basic load model . . .
Selected results for Model 2 - Advanced load model
XI
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
CHAPTER
1
Introduction
1.1 Background and Problem Statement
The topic of this research is twofold; first, Generation Expansion Planning (GEP) models in a realistic framework and second, the islanding condition in presence of Renewable Energy Sources (RES).
The traditional structure of electric utility which was vertically integrated has been
deregulated in recent years. The replace was a competitive market scheme in many
countries around the world. For instance during the last decade, competitions have
been emerged in European power industry according to the EU-electricity guidelines.
Social welfare maximized in a perfect market and also efficiency of market was the
main objective of EU electricity market liberalization fulfilled by creating the EU internal electricity market. In a market which is perfectively competitive, suppliers’ pricing
and operating decisions do not have significant effects on the market price. However,
oligopoly is governing most of European electricity markets than perfect market competition where profits of electric firms can be increased via strategic bidding, or through
exercising market power in other words. In this context, the system regulator has to recognize how electric firms could raise the prices and consequently erode the consumer’s
benefit of liberalization. Ergo, economists have suggested models to represent the electricity market behavior.
Additionally, introduction of the carbon market and the green certificate market under renewable energy obligations is the most recent developments in European electricity industry. As the direct consequence of interactions of electricity markets, emission
trading market, green certificate market and fuel markets which increases the complexity, participants in EU electricity markets are confronting new challenges since the
electricity industry is one of the major agents of these latest developments which necessitate deployment of new models and adequate tools to cover these new challenges. In
1
Chapter 1. Introduction
this context, developing electricity market models able to simulate the complex interaction of the electricity markets and above mentioned markets becomes an even more
prominent challenge.
In addition to the discussed changes in electricity market organization, the EU ETS
came into effect in 2005 having significant impacts on electricity industry in Europe that
covers several sectors such as power generation as the largest. The carbon "emission
allowance" will introduce a price on CO2 emissions and consequently will change the
variable cost for fossil-fuelled power plants in short run which not only affects the
future investment decisions in the industry, but also changes the competitive price in
the market.
Generation Expansion Planning (hereafter GEP) in oligopolistic markets is discussed incorporating several models but generally they do not take environmental considerations such as CO2 prices into account. In addition, transmission constraints can
affect the GEP considerably. It also has considerable importance to include the transmission network representation in the GEP model. Because the generation expansion
may add to or relieve transmission lines congestions and consequently affect the zonal
prices. Hence, it is a significant task to develop an oligopolistic GEP model for analyzing generation investment decisions under different CO2 reduction targets while
considering the transmission system constraints.
Regarding the activity for islanding in subtransmission grid, modern power systems
are characterized by the increasing penetration of Renewable Energy Sources (RES),
that makes their integration a challenging problem. However, as the most significant
RES are installed at the HV subtransmission level, they also offer an important opportunity to exploit the possibility of wanted or undesired islanding conditions. Therefore, develop an algorithm to check the possibility of islanding condition by means
of renewable generation in a case that the certain region of subtransmission system is
disconnected from the main system becomes a crucial task.
1.2 Objective of the Study
The objective of this study is divided into four parts. First is to develop a generation capacity expansion model with CO2 emission and transmission constraints for analyzing
possible impacts of European emission trading system and transmission constraints on
the Italian power sector in terms of change in electricity prices, generation mix, investment decisions, profits and CO2 emissions. Second is to improve the model to incorporate RES power plants expansion to analyze the effect of different incentive plans on
RES capacity development. Third is to develop the model to investigate the influence
of already installed CCGT power plants on the generation mix. Finally is to develop
a mathematical model for possibility to supply the load by any available resources in
case of disconnected subtransmission system from the transmission network.
1.3 Methodology
An exhaustive review of applied economical models in electricity industry was performed first to find the fittest approach for GEP model. Three model types of "Optimization Models", "Equilibrium Models", and "Simulation Models" were concluded
by [52]. In optimization models, the behavior of only one firm is being considered while
2
1.3. Methodology
in equilibrium and simulation models the behavior of each participant is modeled considering competition among all participants. Most of equilibrium models define market
equilibria as a mixed complementary problem (MCP) within the traditional framework
of mathematical programming which has important computational advantages. The
equilibrium models are different in many ways such as the market mechanisms which
are modeled, assumed type of strategic interaction or game, fidelity to the physics of
power transmission, and computational methods incorporated.As an alternative to equilibrium models, simulation models are introduced for the cases that the problem being
considered is too complex and consequently it is quite impossible to be defined within
the formal equilibrium framework. Unfortunately, they impose significant computational load. In our work, the equilibrium approach is selected to model generation expansion planning as modeling the electricity market for long term without considering
complex technical constraints and cost structures of power plants.
Based on modeled market mechanisms, in our study the market is represented as
power pool (POOLCO type) centralized bidding process which is supervised by the
Transmission System Operator (TSO). In such a market, the generating companies
compete with each other in serving the load, each one aiming to maximize its profit
by strategic bidding in the power pool. It is worth to mention the Italian market has a
hybrid structure in which generators are not mandated to submit energy bids in power
exchange. They are allowed to sign contracts with qualified merchants and customers.
Several methods based on different factors such as price, quantity and supply functions have been developed recently to model the strategic behavior of participants in
the electricity market.
In the Bertrand model, firms try to maximize profit by setting price while competing
on price rather than output quantity. When players maximize their profits by maximizing their market share, Bertrand competition occurs. In this approach, any firm
can capture the entire market by pricing below other competitors. But, since electricity producers have growing marginal costs and limited installed capacity, Bertrand’s
assumptions on behaviors seems to be less realistic [11], [51], [29].
In Conjectured Supply Function (CSF) method, the historical data is used to predict
the behavior of competitors building price and conjectural values. The drawback of
this structure is late adaption to the new changes happening in the market similar to all
algorithms based on historical data [20], [49], [7], [77], [79], [13].
A Supply Function Equilibrium (SFE) is more capable of handling real cases. However, all rivals reactions are predefined in this model and it is possible to confront multiple equilibria or even have no solutions at all [61], [41], [62], [64], [9] , [27], [53],
[63], [28], [16].
Although the Cournot strategy neglects the supply function of competitors, it still
seems to be more flexible than its counterparts and has the adaptation ability to long–
term competitions [80].
In our work, the Cournot approach is chosen to represent strategic interaction of
firms in the electricity market because this approach is more flexible framework for
modeling long-term oligopoistic competition in market than other models [80].
There are few models of electricity markets which consider interactions with tradable permit markets. The modeling of the interaction of pollutant emissions permits
markets with electricity markets is reflected in the literature within three major cate3
Chapter 1. Introduction
gories:
1. While the prices of pollutant emissions permits are exogenous to the model, their
effects on electricity costs are included in production cost curves [31],
2. The model for pollutant emissions market is as perfectively competitive one [56],
3. The pollutant emissions market is modeled as a conjectured price response model
[75].
By giving CO2 emission allowance price exogenous to the model, the first approach
is selected in our model in incorporating emissions trading market into electricity market. This selection is made considering the fact that CO2 prices are determined not
only by electricity markets but also by the flexible mechanisms set up within the international and inter-continental tools such as Kyoto protocol including clean development
mechanism and joint implementation. The second reason is that electricity markets are
determined not only by the Italian electricity market, but also by the different national
implementation of electricity markets in all the European Countries involved. Therefore, the strategy chosen is to give the CO2 price exogenous to the model.
In addition, it is very important to include the transmission network representation
in the GEP model. Although, it increases model complexity and imposes serious limitations on finding a solution for equilibrium, the generation expansion may lead to add
or relieve congestions in transmission lines and consequently affect the zonal prices. In
other words, it can have serious impacts on the GEP.
Few models with generation expansion planning (GEP) take into account environmental considerations such as CO2 prices in oligopolistic markets. In the proposed
models, not only the price of carbon is considered but also it deals with transmission
system constraints. Moreover, the proposed models allow us taking into account RES
expansion planning and also already installed power plants considering their investment
cost. Besides, the scalability of the models for larger systems are considered as they
presented to the Italian power sector.
With reference to Islanding in Sub-transmission grids part in chapter 9, the island
feasibility function is an innovative concept for subtransmission systems, in the smart
grids framework. It was designed to give the possibility to supply load by means of
any available regulating resource, in particular RES generation, in case the subtransmission grid is disconnected from the transmission network. The goal of this function
is to determine, for a given operating condition and a set of triggering events, with
an adequate level of security the control actions that allow a operation of the islanded
subtransmission system, thus avoiding as much as possible the load disconnection.
The procedure has been mathematically expressed as a constrained integer programming problem that, in a basic approach, maximizes the load to be supplied after islanding.
This objective function is subject to some constraints relevant to total regulating
band depending on total load, up (down) regulating band and additional constraints on
the minimum value of regulating up and down bands.
4
1.4. Achievements and Contributions
1.4 Achievements and Contributions
The achievement of this research work is twofold; a GEP model for electricity market
in a realistic framework for analyzing:
• The impacts of EU ETS and transmission constraints on the firm’s investment
decision,
• The impacts of different incentive plans on RES expansions,
• The impacts of already installed CCGT power plants -considering their investment
costs- on the generation mix.
An islanding in sub-transmission grids for analyzing:
• The possibility of islanding in sub-transmission network while it has been disconnected from the bulk power system.
1.5 Outline of the Thesis
The organization of the thesis are as follows: Chapter 2 provides a review of electricity
market models applied to the electricity industry. This followed by overview of the
Kyoto Protocol and EU ETS in Chapter 3. Generation capacity expansion model with
CO2 emission and transmission constraints in an oligopolistic market is described in
detail in Chapter 4. This followed by a description of electricity market of Italy in
Chapter 5. Chapter 6 describes data and assumptions used to simulate GEP in the Italian
electricity market. An analysing the impacts of the EU ETS & transmission constraints,
different incentive plans on RES expansions and also already installed CCGT power
plants on the Italian power sector is presented in Chapter 7. Conclusions from this
work and issues that should be tackled in further work are presented in Chapter 8.
Finally, model for islanding in sub-transmission grids is presented in chapter 9. The
aim of this model is to supply the load by means of renewable generation, even in case
the sub-transmission grid is disconnected from the transmission network.
5
CHAPTER
2
Competitive Electricity Market Models
2.1 Introduction
The traditional vertically integrated system has been deregulated and substituted by
liberalized system in many countries worldwide. The main purpose of Electric industry restructuring is to improve social welfare. Because in perfect competitive market,
where market players (firms) are not capable to influence on the market price, the social welfare can be maximized.However, electricity market structure is more like to
oligopoly than perfect market competition. This is because of [24]:
• There is only a limited number of suppliers (barriers to entry),
• Transmission constraints which separate consumers from effective reach of many
generators,
• Transmission losses which discourage consumers from purchasing power from
distant suppliers.
likewise, in oligopolistic market, the firms are able to alter the price away from competitive level in a profitable way [68]. On the other hand, the firms are able to exercise
the market by:
• Reducing the output or increasing the price of the bid for particular unit,
• Exploiting transmission capacity limits,
• Interaction of pollutant emission permits markets and electricity markets [75].
As a result, the system regulator has to identify how electric firms could drive up the
prices and accordingly erode the consumer’s benefit of liberalization. On account of,
economists have proposed models to represent the electricity market behaviour.
7
Chapter 2. Competitive Electricity Market Models
2.2 Types of electricity market models
The modeling of deregulated power system operations has been the subject of a great
deal of publications. Here, some earlier reviews are represented in order to make some
model attribute based comparisons among main approaches. Such attributes are helpful
in understanding the pros and cons of each modeling approach. A detailed survey of
the power market modeling literature is provided by [52] in which three main trends
of electricity market modeling namely optimization models, equilibrium models, and
simulation models are depicted. Different approaches of electricity market modeling
are illustrated in Figure 2.1 from a structural point of view.
Figure 2.1: Electricity market modeling approaches.
2.2.1
Optimization model
The main focus of optimization models is concentrated on profit maximization for one
competing firm in the market. In such models, the electricity price is provided exogenously or modeled as a function of the firm’s production. Although models with
exogenous prices are simple in principle, electricity price prediction in a pool requires
analysis combining demand forecasts, participant bidding and transmission congestion as stated by [24]. A time series analysis based price forecasting tool is provided
by [38] for competitive electricity markets. The exogenous price models hold the implicit assumption that the market price is not influenced by the bid from one firm that
is implausibly valid for oligopoly markets where this method has seldom been applied
8
2.2. Types of electricity market models
for developing bidding strategies. Despite the fact that optimization models are not appropriate for potential market power analysis in electricity markets, they are deployed
by market participants extensively to develop bidding strategies.
2.2.2
Equilibrium market models
As the most frequently used modeling approach for electricity market analysis in the
literature, equilibrium models describe the overall behavior of the market considering
competition among all participants in the market [52]. Generally, the market equilibrium is defined as a set of prices, producer input and output decisions, transmission
flows, and consumptions that satisfies each market participant’s Karushkhun- Tucker
(KKT) conditions simultaneously while clearing the market. A review of equilibrium
models and also a detailed survey on equilibrium power market models can be found
in [30] and [20] respectively. Also, the formulation and application of electricity market
equilibrium models in [59] is highly impressive. The general structure of equilibrium
models from a mathematical point of view is represented in Figure 2.2. Where πf represents the profit of each firm f∈{1,...., F}; qf are firm f’s decision variables; and hf (qf )
represent firm f’s constraints; and λf and µf are dual variables of constraints hf and gf
respectively.
Figure 2.2: Mathematical structure of equilibrium models.
Shown in Figure 2.3, the complete set of KKT and market clearing conditions defines a mixed complementary problem (MCP), the direct solution of which has important computational advantages as can be solved by many contemporary algorithms
based on advanced nonsmooth Newton methods [50]. It should be notified here that Lf
denotes the Lagrangian function of firms f’s optimization problem.
The variety of market mechanism models, different types of strategic interactions or
games, loyalty to the physics of power transmission, and computational methods used,
lead to fully different equilibrium market models. However, convexity of each player’s
optimization problem is a necessary condition to have a market solution to this type of
problems.
2.2.2.1
Market Mechanisms Modeled
The complexity and also behavior of equilibrium models are highly dependent on the
mechanism modeled for the market. Although several designs are represented for elec9
Chapter 2. Competitive Electricity Market Models
Figure 2.3: Market equilibrium as a mixed complementary problem.
tricity market, they all have common features of decentralized competitive bidding in
energy and reserves auction markets and also some level of access to transmission and
non-discriminatory pricing [42]. The proposed market models vary from highly centralized and controlled POOLCO model to comparatively bilateral and decentralized
ones in the literature. There are differences between mechanisms for market clearing and the ones for market structure (centralized/POOLCO or decentralized/bilateral).
Addressing a POOLCO and a bilateral market in modeling electricity markets are illustrated in models deployed in [20] and [12]. An equilibrium market model with mixed
POOLCO bilateral system is represented at [75]. It is illustrated by [21] that Cournot
competition among firms yields the same results for both bilateral model with arbitrage
and POOLCO market designs. Also it is demonstrated by [20] that both the POOLCO
and bilateral model with arbitrage lead to the same equilibrium price for constant slope
conjectured supply function (CSF) model and identical total sales and returns for each
firm.
2.2.2.2
Types of Strategic Interactions
The interaction type assumed among rival firms and other players are highly effective
on the results of equilibrium market models. Deferent strategies originate from each
firm’s anticipation of rivals reaction to its decisions about either prices or quantities.
Consequently, firms’ strategic behaviors could be modeled considering competition of
price, quantity or supply function.
Bertrand and Cournot strategies, collusion, Stackelberg, General Conjectural Variations (CVs), supply function equilibria (SFE) and conjectured supply function (CSF)
are strategic interactions incorporated in literature on power market modeling most of
which are formulated based on some game theory techniques which study strategic interactions between some players. Given the strategies chosen by the other players, each
player chooses prices or quantities as strategies in electricity markets as strategic games
which will maximize the profit. Explained by the game theory , market equilibrium is
each participant’s strategy that its one-sided variations would result in less profit for
itself [25]. Just as Nash equilibrium, no participant will intend to modify its decision
unilaterally at equilibrium as a property of market solution.
The main features of several strategic interactions adopted in electricity market model10
2.2. Types of electricity market models
ing are addressed in the following subsections in detail. To describe one firm’s behavior
under different strategic interactions, the following notations must be defined first: qf
is the sale or output of firm f, p the equilibrium price, pf the price offered by firm f, q−f
the quantity supplied by firms other than f, p−f the vector of price offered by f’s rival
firms.
Bertrand Strategy Seeking to maximize profit by setting price, firms compete
on price rather than output quantity in the Bertrand model. Having the assumption that
firms produce homogeneous products and are able to supply the entire market demand,
Bertrand competition is often used in the study of duopolies and occurs when players
take market share maximization approach to maximize their profit. The model predicts
that the firm with the lowest costs will supply the entire market. Under Bertrand, the
price and the number of firms in the market are not related. However, this no longer
applies if the firms produce differentiated products or have capacity constrained and
increasing marginal costs, so that they are not able to supply the entire market. In case
of no limitations and transmission costs, the price will fall to marginal costs and the
revenue of firm f with Bertrand strategy will be as follows:
2.2.2.2.1
pqf = pf qf (pf , qf )
(2.1)
As mentioned before, firm f assumes that rivals’ prices stay the same in reaction to
f’s price and also f’s decision variable is pf . Consequently, f is able to sell as much up
to market demand if pf is less than the lowest delivered price among rival producers.
Bertrand’s assumptions on firms’ behaviors appear far from the reality since electricity
producers have increasing marginal costs and limited installed capacity [11]. This is
why this approach has not been popular in electricity market modelings. [51] and [29]
address the application of Bertrand’s approach to electricity markets.
One essential assumption in Cournot model is each firm
tends to maximize profits considering its own output decision not effective on the rivals’. Thus in Cournot game, each firm chooses qf with a known demand curve assuming their rivals’ output is fixed. If p(q) is the inverse market demand function, the
revenue of firm f can be written as;
2.2.2.2.2
Cournot Strategy
pqf = p(qf , q−f )qf
M R = ∂/∂qf (pqf ) = p + qf (∂p/∂qf )
M R = p + qf (∂p/∂q)(∂q/∂qf )
q = qf + q−f
M R = p + qf ∂p/∂q(1 + ∂q−f /∂qf )
(2.2)
Having the assumption of fixed supply for rivals in Cournot game by each firm(∂q−f /∂qf =
0):
M R = p + qf (∂p/∂q) = M C
(2.3)
The optimal quantity level of each firm is obtained by above equation as a function
of the other firm’s quantity resulting mathematical structure of Cournot models to be
11
Chapter 2. Competitive Electricity Market Models
a set of algebraic equations easy to compute. The simplicity and ease of computation
have made the Coutnot solution a popular concept in power market modeling while
one drawback of it is overestimation of observed market price and underestimation
of market quantities. As the model outcome is merely based on quantity competition, the results are highly sensitive to demand elasticity assumptions. Cournot models
in electricity market are applied to a wide range of applications ranging from market
power analysis and influence of transmission networks to hydro thermal coordination.
A more general survey on Cournot models utilized to analyze market power problems
are represneted in [46]. A numerical model is incorporated to illustrate the quantitative
relation between Cournot-equilibrium price, the number of firms, and the size distribution of firms in Swedish electricity market by [10]. Also, Cournot models have been
studied in congestion pricing analysis of transmission networks. [72], [67], and [23],
have used Cournot completion to model electricity markets by representing electricity network solely by power flow conservation-equations. [76], [12] and [21] propose
Cournot models including transmission constraints for realistic networks in which the
transmission system is represented as a linearized DC network. [18] discusses the necessity of assumptions to include transmission constraints in Cournot models. Not only
the Cournot competition has been used for modeling the gaming by thermal electricity generating firms, but also for mix hydro-thermal firms. [69] utilized Dual Dynamic
Programming method to develope medium term market model for mixed hydro-thermal
power market of New Zealand in which the medium term hydro optimization problem
at each stage is superimposed on Cournot market equilibrium. [45] has proposed a
Cournot based modeling framework to analyze the competition between multiple firms
possessing a mixture of hydroelectric and thermal generation resources.
Collusion F and another supplier might maximize their joint profit if collude
which makes the cooperative game theory assumption of "transferable utility" meaning that side payments without transaction costs are possible. Other collusive models
could be obtained through other assumptions. Collusion has been modelled in [74] as
a cooperative Nash bargaining game in which an open access transmission method for
maximizing profits in a power system is described. The method proposed is laid on the
Nash bargaining game for power flow analysis in which each transaction is determined
along with its optimal price to optimize the interests of individual parties which has
been used as cooperative limit-pricing as well [15]. While the research has been conducted to deregulate the generation of electric power, unregulated generators would be
spatial oligopolists because transmission costs would insulate them from competition
from distant producers. Estimating the degree to which unregulated power generators
would be able to exercise market power is the major purpose of this study accomplished
by calculating spatial price equilibria for a hypothetical deregulated power market in
New York state and used also in [22].
A time varying–transition–probability Markov–switching model is incorporated in [37]
in order to analysis the time-series of prices in the Spanish electricity market. Accounting for changes in the conditions of cost and demand that reflect changes in input costs,
capacity availability and hydro power, it demonstrated that time series of prices are
characterized by two substantially different price levels. Incorporating one Cournot
model for contracted firms, optimal deviations of firms have been characterized from a
2.2.2.2.3
12
2.2. Types of electricity market models
collusive agreement and identify trigger variables that could be deployed to discourage
deviations.
A "leader" is assumed in Stackelberg models whose decisions
correctly considers the reactions of "followers" that do not recognize how their reactions affect the leader’s decisions. For instance, if the firm f is the leader and suppliers
other than f are followers, their supply response to p will correctly be anticipated to be
T rue
(p). Then, f’s revenue can be depicted as follows:
q−f
2.2.2.2.4
Stackelberg
T rue
p[qf + q−f
(p)]qf
(2.4)
T rue
(p) results from solving equilibrium conditions, it is often non-smooth.
As q−f
Stackelberg games have other formulations as well. Meanwhile, they have represented
interactions between large power producers or "leaders" and one or more "followers"
that are smaller generators. While this model has been incorporated to analyse electric
transmission pricing policies in the US in [14], a practical and also efficient MPEC–
based procedure for calculating oligopolistic price equilibria for an electric power market has been developed and illustrated in [17]. In [26], an algorithm that optimizes
the generation dispatch for a dominant firm has been applied to Colorado’s electricity market. The results demonstrate that the dominant electricity generation firm can
strategically congest the transmission into a region to collect maximum price. In the
case that the maximum price is not attainable, the dominant firm still receives an average mark up more than 10% over the competitive price. This model is incorporated
to demonstrate how mitigation strategies can decrease prices in a wholesale electricity
generation industry by limiting a dominant firm’s marker power.
2.2.2.2.5 Supply Function Equilibria (SFE) The interesting features of SFE approach introduced by [55] is the firms compete in price and quantity schedule say supply functions rather than only fixed prices and quantities. Hence, the decision variables of each
firm are φf of its bid function qf (p/φf ) in SFE models, rather than simple price or
quantity as in Bertrand and Cournot models. The revenue of firm f can be written as:
X
pqf = p(qf (p/φf ) +
q−f (p/φ∗−f ))qf (p/φf )
(2.5)
−f
The Asterisk in φ∗−f indicates that f treats bid function from other firms as if they
are fixed. From the revenue expression above, SFE calculation needs solving a set of
differential equations instead of typical set of algebraic equations arising in Cournot
and Bertrand models and consequently causes considerable computational challenges
concerning their numerical tractability in addition to non-uniqueness and in some cases
nonexistence of solutions [52]. However, the equilibria in supply function is shown
to be found with restrictive assumptions on the nature of the cost and capacity constraints, the number of firms, or the form of allowed bid functions [61]. Additionally,
as it is very difficult to calculate equilibria for large systems, most of SFE studies have
been designed for very simple systems like 1-4 nodes [20]. Because of the realistic
view of electricity markets by SFE models where functional forms must be specified
for demand, cost, and supply functions, they have been widely used in electricity market analysis despite the problems of dealing with equilibria. To tackle this problem
13
Chapter 2. Competitive Electricity Market Models
in supply function approach, the SFE models reported in the literature have made assumptions on the number of firms and the functional forms of demand, cost and supply
functions [41]. For detailed analysis of possible functional forms for demand, cost and
supply functions, [62] can be referred. Linear demand functions with non-zero intercept and negative slope independent of time have been used in most of the studies on
SFE. Simplest form for marginal cost of firms is the linear marginal cost functions that
are affine marginal costs with zero intercept. As the first study on the application of SFE
for electricity market analysis, [64] adopted the linear marginal cost function but other
studies on SFE have mostly used the affine marginal cost functions (non-zero intercept).
Another considerable issue on the cost is different cost functions among firms. Some
studies such as [64], [9] , [27] have assumed firms symmetric namely all strategic firms
have same cost functions and all have the same capacity limits. Although SFE can be
calculated straightforwardly for symmetric producers with general cost functions, but
firms in electricity markets are not symmetric. Consequently, most recent studies on
SFE have used asymmetric costs and affine marginal cost functions in electricity market
modeling. The simplest form of asymmetric problem is when firms have identical cost
functions but different capacities. This is utilized by [53] in which firms have identical
constant marginal costs but asymmetric capacities showing that there can only be one
SFE when demand is inelastic and capacity constraints bind with a positive probability. Stated by [41], the advantage of affine marginal cost function over more general
ones SFE models is its ability to deal with asymmetric costs with more than two players. [60] incorporated asymmetric costs and affine marginal cost with unequal intercepts
and [64] also tackled the asymmetric duopoly case. [63] has shown the applicability of
affine SFE for asymmetric firms with linear marginal costs in analyzing several issues
in England and Wales market. Equilibrium behavior of firms has been studied by [28] in
the case their costs and their capacities are different proposing a new numerical method
to find asymmetric SFE, incorporating piecewise liner approximations and a discretization of the demand distribution. Most of studies on supply function have deployed
a form for the supply function which is similar to the assumed inverse marginal cost
function form. Despite all the challenges in transmission constraint inclusion in SFE
models as it makes models more complex, SFE models with transmission constraints
are utilized in literature on small networks. SFE approach adopted by [63] illustrates
how the network structure affects the competition in two and four node networks with
two electricity producers and consumers incorporating linear demand and affine supply
functions. Oligopolistic price equilibria were calculated in [16] for general linearized
DC networks using affine supply function with constant slope. A linear asymmetric
SFE model with transmission constraints considering forward contracts was proposed
by [41] to develop firms’ optimal bidding strategies. In [4] the SFE model has been
used for evaluating of market power in the Italian electricity market. In this study a
coevolutionary genetic algorithm is used to compute the oligopolistic price equilibria
of the SFE model.
Some variation into Cournot-based models could be introduced by the CV approach by changing the conjectures that generators
may be expected to assume about their strategic decisions of the competitors, in terms
of the possibility of future reactions (CV). A firm’s conjecture is defined as its belief or
2.2.2.2.6
General Conjectural Variations (CVs)
14
2.2. Types of electricity market models
speculation of how its rivals will show reaction to the change of its output [79]. Each
firm in an oligopolistic market logically maximizes its own benefit considering the reactions of its competitors in conjectural variation model, meaning that each generating
firm in general CV model estimates how rival firms regulate their outputs in response
to firm’s out put(i.e.q−f = q−f (qf ) ). So, the revenue of firm f can be written as:
pqf = p(qf + q−f (qf ))qf
Firm f’s KKT condition to maximize the profit would be:
M R = p + qf ∂p/∂q(1 + ∂q−f /∂qf )
(2.6)
(2.7)
M R = p + qf ∂p/∂q(1 + θ) = M C
(2.8)
Where θ in the equation is the constant CV.
Implied from the equations above, the CVs attempts to model pricing behavior by generalizing the firms reaction to variations in the other firms’ strategic decisions. The fact
that firms’s CVs may have different values shows different market behavior performed
by firms. It is illustrated by Song et al (2003a) that the classic game theory bidding
strategies are special cases of CV based bidding strategies and the system equilibrium
resulted by CV based bidding strategy is actually a Nash equilibrium. In Cournot, each
firm believes that its own output decision will not be effective on its rival’s decisions.
Therefore, θ = 0 resembles the Cournot game while θ = 1 implies the pure competitive
game. If θ represents the actual rivals’ local response, this must be called a "consistent
conjectures" model. Accordingly, the estimates of CV of generating firms could be utilized in order to analyze the market behavior of firms. As discussed by [20], there have
been several critics on CV approach in the industrial economics literature not only due
to its static nature often incorporated in an ad-hoc way to dynamic analyzed games, but
also because of theoretical difficulties in empirical CV estimation for firms in absence
of marginal cost data. However, it is easier to obtained credible cost data for power
generation than in other industries. Some researches by [66], [48] and [7] are devoted
to CV estimation for firms in electricity markets. [66] proposes an iterative based CV
estimation approach able to find parameters fitting the CV based equilibria to historical
results and a statistical time-series model that forecasts parameter evolution over time
where the proposed fitting procedure has been validated for the Spanish electricity market incorporating historical public market data and marginal cost data of firms which
were calculated from detailed methodology based on a cost minimization problem. A
theoretical CV estimation frame work using marginal cost data of firms, market clearing price, market share, and price elasticity of demand has been proposed by [48]. An
empirical methodology is also proposed based on CV estimates to analyze the dynamic
oligopoly behavior of firms which has been used to analyze the Australia National Electricity Market. While, the methodology proposed by [7] is based on residual demand
elasticity fitting by evaluation of CVs on the past data say prices, production, and estimation of firms’ marginal cost which was validated by a case study applied to Spanish
Electricity Market. Another dynamic learning method for generation firms is proposed
by [78] to improve their strategic bidding behavior in a spot market and verified using
simple duopoly and a six-firm market. In the mentioned method, each firm learns dynamically and regulates its conjecture upon its rival’s reflexes to the bidding according
15
Chapter 2. Competitive Electricity Market Models
to available information in the electricity market and makes it optimal generation decision based on the updated CV of its rival. Spanish electricity market is modeled by [56]
using CV approach as well.
2.2.2.2.7 Conjectured Supply Function (CSF) In this case each generating firm speculates
about how rival firms adjust their outputs in response to price changes. Thus, we will
have:
q−f = q−f (p)
(2.9)
Consequently, the revenue of firm f could be as follows:
pqf = p(qf + q−f (p))qf
(2.10)
Concerning how total supply from rival firms will react to the price, a CSF is a function representing beliefs of a firm. Two versions of a linear CSF are discussed by [20] in
which given either the intercept or the slope of conjectured supply response, the other
one must be calculated.
Although the CSF model looks like the SFE method [20], the CSF modeling approach
is totally different from the widely used SFE approach for market modeling. Discussed
in [49] as the fundamental distinction of the SFE and CSF approaches, the conjectured
supply response of competing firms is based on an assumed parameter either slope or
intercept in the CSF while the anticipated supply response of competitors is endogenous in SFE models and is consistent with the competitor’s actual bid function. This
provides SFE with relatively easy to solve MCP formulation, the solutions of which
exist and are unique.
Only a few published power market models are proposed based on the CSF approach.
Bilateral and POOLCO formulations of CSF models for a power market including
transmission constraints are presented in an interesting paper by [20] where the power
network was represented with a linearized DC load flow. Also, a linear supply function
is constructed near equilibrium point on the basis of the CV concept, and the existence
and uniqueness is discussed when either intercepts or slopes of supply function are
fixed. CSF is used to simulate the Spanish electricity market by [7] in which the model
was based on the quantity competition model with estimated residual demand functions
in terms of CSF. To simulate strategic behavior interactions of generating firms in electricity markets with incomplete information, CSF equilibrium based model is presented
by [77] where the CSF equilibrium model is formulated directly from the SFE theory
considering the CV of each participant about the aggregated response of the rivals to
a change in the market clearing price. The CSF based model and classical game theoretic models is also compared by [79]. Concerning how the amount of those services
demanded by the generator will affect the transmission service price, CSF model is
generalized by [13] to include each generator’s conjectures. The NOx emission permit
market of Ozone Transport Commission of U.S. is simulated by [75] incorporating a
model of conjectured price response. [3] presents CSF model for analyzing the price
development in the Italian electricity market under different degrees of competitiveness
in the market.
16
2.2. Types of electricity market models
2.2.3
Simulation Models
In cases such as the medium to long-term that the considered problem is too complex to
be addressed within a formal equilibrium framework, simulation models are an alternative to equilibrium models where investment decisions, hedging strategies and learning
processes become important endogenous variables.
An equilibrium simulation model based on Cournot Nash approach is represented by
[65]. A simulation model based on linear Supply function approach and solved incorporating Monte Carlo method is proposed by [40]. The electricity market simulation
model in [8] calculated the market equilibrium in each of 13 regions of the National
Electricity Reliability Council (NERC) in the United States considering coal and natural gas markets, interregional power trading, the capacity investments, and emissions
taxes. In the proposed simulation model by [19], optimal supply functions are constructed in order to analyse the potential market power in the EW Pool. A simple
dynamic bidding model was presented by [47] based on the Cournot iterative equilibria
concept which has been successfully implemented to obtain optimal bidding strategy
of a fictitious generating company in the Spanish electricity market which comprises
both hydro and thermal units. A simulation model called COSMEE has been adopted
by the [44] to analyse Spanish electricity market which simulates the behaviour of the
electricity market based on simple bids. In this model, technical constraints such as
maximum and minimum power limits and ramp rates for thermal plants and maximum
and minimum power limits and availability of hydro energy for hydro plants, complex
cost structures like start-up costs, and bidding strategies are integrated by the market
participants in their offers. A simulation model providing an optimal supply function to
analyse market power is represented in [19] which provides a more flexible framework
to use actual marginal cost data and asymmetric firms in the model as this approach is
similar to the SFE.
17
CHAPTER
3
The Kyoto Protocol and European Union
Emissions Trading Scheme
3.1 Introduction
Global warming provokes essential debates among environmentalists, politicians, and
industry representatives. Despite the strong consensus in the scientific community on
seriousness of the greenhouse effect, and that humans are adding to concentrations of
greenhouse gases in the atmosphere, much remains unknown about the long-term consequences of anthropogenic activity on the climate.
The most recent international effort to tackle the greenhouse effect was an agreement
among the industrialized nations called Kyoto Protocol to reduce emissions of six
greenhouse gases over a certain period of time.
The Protocol developed three innovative mechanisms to give Parties a certain degree
of freedom to meet their emission reduction targets known as International Emissions
Trading (IET), Joint Implementation (JI) and the Clean Development Mechanism (CDM)
[70]. These mechanisms called "market-based mechanisms" allow developed Parties to
earn and trade emissions credits through implemented projects either in other developed
countries or in developing countries, which they can deploy to meet the commitments.
Started on 1st January 2005, the European Union has established the European Union
Emission Trading Scheme (EU ETS) in this framework [32], [35], [33], [34].
3.2 The Kyoto Protocol
The Kyoto Protocol, adopted in Kyoto, Japan on 11 December 1997 and entered into
force on 16 February 2005, is an international agreement linked to the United Nations
Framework Convention on Climate Change the major feature of which is that it sets
19
Chapter 3. The Kyoto Protocol and European Union Emissions Trading Scheme
binding targets for 37 industrialized countries and the European community for reducing emissions of greenhouse gases (GHG) which amount to an average of 5% against
1990 levels over the five-year period 2008-2012. The essential difference between the
Protocol and the Convention is that the Protocol commits the industrialized countries to
stabilize GHG emissions while the Convention encourages them to do so. Recognition
of the developed countries as the responsible for current high levels of GHG emissions
as a result of more than 150 years of industrial activity, the Protocol places more severe
responsibilities on developed nations under the principle of "common but differentiated responsibilities". Called the "Marrakesh Accords", the detailed rules for Protocol
implementation were adopted at COP 7 in Marrakesh in 2001 [39].
3.2.1
Kyoto Mechanisms
Countries must meet their goals mainly through national measures under the Treaty.
However, the Kyoto Protocol offers an additional option for meeting the goals known
as three market-based mechanisms as follows.
3.2.1.1
Joint Implementation
Defined in Article 6 of the Kyoto Protocol, the mechanism called "joint implementation" allows a country with an emission reduction or limitation commitment under the
Kyoto Protocol to earn emission reduction units (ERUs) from an emission-reduction or
emission removal project in another developing country each equivalent to one ton of
CO2 . This can be counted as meeting its Kyoto goal as well and offers Parties a flexible
and cost-efficient way of fulfilling a part of their Kyoto commitments, while the host
Party will be beneficial of foreign investment and technology transfer.
3.2.1.2
Clean Development Mechanism
Defined in Article 12 of the Protocol, the Clean Development Mechanism (CDM) lets a
country with an emission-reduction or emission-limitation commitment under the Kyoto Protocol to execute emission-reduction plans in developing countries that can earn
saleable certified emission reduction (CER) credits each equal to one tone of CO2 . The
mechanism as a pioneer can be assumed as meeting Kyoto goals. Indeed, CDM is the
first standardized emissions offset instrument (CERs) as a global environmental investment and credit scheme of its kind. In a CDM project, some activities including rural
electrification making use of solar energy, or installing energy-efficient boilers might
be involved. Providing industrialized countries enough flexibility in satisfying their
emission reduction or limitation commitments, this mechanism stimulates sustainable
development and emission reductions.
3.2.1.3
International Emissions Trading
Under the Kyoto Protocol, the parties have accepted limiting or reducing their emissions, including levels of permitted emissions or "assigned amounts", which divided
into "assigned amount units" (AAUs), during the 2008-2012 commitment time frame.
Expressed in Article 17 of the Kyoto Protocol, countries that have emission units to
spare can sell this amount to the other countries that are over their emission limitations.
Therefore, there is a new concept named "carbon market", which refers to the new
20
3.3. European Union Emissions Trading Scheme (EU ETS)
commodity in the form of emission reduction. The principle greenhouse gas is carbon
dioxide, and thus people simply talk about carbon trading.
3.3 European Union Emissions Trading Scheme (EU ETS)
The leading efforts to reduce the greenhouse emissions of mankind activity, which is
a threat to world’s climate, is performed by the European Union. The EU Emissions
Trading Scheme (EU ETS) is developed by the European Union as a basis for the
plan to cost-effectively and considerably reduce the greenhouse gas emission inside the
Union. This scheme has been launched at the beginning of 2005, and is the first international company-level ’cap-and trade’ system for allowing the emission of carbon
dioxide (CO2 ) and other greenhouse gases. This mandatory system is now the generator of any expansion of the international carbon market and is based on the innovative
mechanisms set up under the Kyoto Protocol-international emissions trading, the CDM
and Joint Implementation JI. In EU ETS, a price is put on each emitted tone of carbon;
in this way it runs the investment in low-carbon technologies. In this way, EU ETS
forces the emission costs to company boards, arranging the originality and creativity
of the business community to look for innovative and cost-effective methods to deal
with climate changes. The system has originated new related service providers such
as carbon trading, carbon finance, carbon management and carbon auditing. Under the
EU ETS, the European Union should be allowed to reach its emission reduction target
under the Kyoto Protocol at a cost of below 0.1 % of GDP which is significantly less
than would otherwise be the case. The system will also be key to meeting the EU’s
more ambitious emission reduction targets for 2020 and further into the future.
3.3.1
What the EU ETS covers
The emission trading may include many greenhouse gases and economic sections; however in EU ETS, the emissions which can be measured, reported and verified with
good accuracy are considered. During 2005 to 2007, the first trading time interval, the
scheme focuses on carbon dioxide emissions from high-emitting industries of power
and heat generation and on some energy-intensive industries such as combustion plants,
oil refineries, coke ovens, iron and steel plants and factories making bricks, glass, cement, lime, ceramics, pulp and paper.
During 2008 to 2012, the second trading time interval, the scheme also includes nitrous
oxide emission from the production of nitric acid. Furthermore, from the beginning of
2008, the EU ETS is geographically extended to cover Iceland, Norway and Liechtenstein. Also, in some cases, based on the production capacity, some individual plants
must participate in the system if they are beyond a size threshold. Currently, about
11,000 installations in the EU are included in the system, which is about 50% of overall CO2 emission of the EU and around 40% of total greenhouse gas emissions.
From 2012, CO2 emissions of civil aviation will also be included in the EU ETS, which
means that all flight from, within or to the EU will require allowances to cover the CO2
emissions. Use of emissions trading to cope with the emissions from the aviation section is fully in accordance with the International comitments of EU and with the 2004
assembly of the International Civil Aviation Organization decisions.
The coverage of EU ETS will be extended from 2013. It will cover all installations
21
Chapter 3. The Kyoto Protocol and European Union Emissions Trading Scheme
for capturing, transportation and storage of greenhouse gases, CO2 emissions from
the aluminum, petrochemicals, and ammonia plants, nitrous oxide emissions from the
production of nitric, adipic and glyoxylic acid, and perfluoro carbon emissions from
aluminum plants. On the other hand, if fiscal or other measures can achieve an equivalent reduction in the emission of small installations, the governments are allowed to
exclude them from the EU ETS. Having all these scope changes in the EU ETS, from
2013, the coverage of EU ETS will be extended from about 40% to 43% of total greenhouse emissions of the EU, i.e. the system is expected to have net additional emissions
equal to 120-130 per year.
3.3.2
How Does the EU ETS Work?
At the heart of the ETS that operates on a "cap and trade" basis, is the common trading
’currency’ of emission allowances one of which represents the right to emit one tone of
CO2 and reductions below the limits (caps) will be tradable. National Allocation Plans
(NAPs) prepared by the Member States and approved by the European Commission
set out the amount of allowances allocated to each emitter in the scheme that are made
public. The scarcity demanded for a trading market to emerge is created by the limit
or ’cap’ on the total number of allowances allocated in the ETS. Companies keeping
their emissions below their allowance limit can sell the excess allowances at a price
that is determined by supply and demand at the moment. Those confronting difficulty
in remaining within their emissions limit have to adopt one of the strategies of reducing
their emissions for instance by investing in more efficient technology or using a less
carbon-intensive energy source or buying the extra allowances they need at the market
rate whichever is cheapest. This guarantees that emissions are reduced effectively. In
the time frame from 2008 to 2012, at least 95% during the initial phase and 90% in
the second phase, most allowances are allocated to installations free of charge. As
only plants that are covered by the scheme are given allowances, any other individuals,
institutions, non-governmental organizations and etc are free to buy and sell in the
market in the same way as companies.
3.3.3
Allocation
To be assured of real trading (and also CO2 emissions are reduced), EU governments
must assure that the total amount of issued allowances is less than the amount that
would have been emitted under a business-as-usual scenario. The total quantity to be
allocated by each Member State at each phase is defined in the Member State National
Allocation Plan (NAP). The supervision of the NAP process is conducted by European
Commission deciding if the NAP fulfills the 12 criteria set out in the Annex III of the
Emission Trading Directive (EC, 2003).
3.3.3.1
Phase I NAPs
During Phase I known as grandfathering, most allowances were given freely in all countries that has been criticized as giving rise to windfall profits, being less efficient than
auctioning, and providing poor incentive for novel innovative competition for provision
of clean and renewable energy. Consequently, the EU ETS did not establish a robust
carbon price and the release of the first verified emissions data resulted in a dramatic
22
3.3. European Union Emissions Trading Scheme (EU ETS)
collapse of carbon price. The release of the second year’s verified emissions data caused
the value of an EU allowance (EUA) to drop below half a Euro reflecting the essential
weakness of the scheme to date that the cap was not set sufficiently tight to generate a
carbon price which incentivizes real emissions reductions and abatement investment.
3.3.3.2
Phase II NAPs
During Phase II (2008-2012), twenty-seven EU Member States proposed ’National Allocations Plans’ for distributing allowances to emit CO2 under the EU ETS during
Phase II (2008-2012). But, the national allocation process for Phase II proposed that
with excessively generous allocations demanded by many Member States, the mistakes
of Phase I would be repeated. Hence, the Commission rejected all allocations requested
and proposed a formula to set a maximum level of allowances per Member State that
includes levels of emissions reduction effort demanded by Member States under the
Kyoto agreement.
3.3.3.3
Post Kyoto
A majority of countries agreed on Doha Climate Summit to extend Kyoto protocol into
a second term as it was scheduled to come to an end at late December 2012, which
could have terminated the global carbon market mechanisms established to support.
This second course of obligations is started on January 1, 2013, and will be completed
on December 31, 2020 bridging the gap between the end of the first Kyoto commitment
period and the beginning of the next legally binding climate agreement. Although the
new treaty is not set to take effect until 2020 at the earliest, the mentioned legal binding
agreement will be finished in the Durban Platform track in 2015 ideally.
The second commitment period of the Kyoto Protocol, sets compulsory emissions
cuts only on those industrialized countries that have ratified it while the Durban track
treaty is universally binding for all nations in the U.N. Climate convention. At this
point, only the European Union and a handful of other countries such as Australia,
Norway, and Switzerland have sanctioned the second period and others that participated
in the first period of the protocol, such as Japan, Russia, Canada, and New Zealand have
opted out.
The new agreement grants transfer of excess assigned amount units to the second
commitment period over the objection of many such as the Least Developed Countries
and the Alliance of Small Island States while the treaty tries to limit their environmental
damage. The second term of the protocol warrants that "A country may obtain units
up to two percent of its assigned amount for the first commitment period, from other
parties’ previous period excess reserve accounts into its own". This would limit the
amount of "hot air" that can be carried over into the second commitment period of the
treaty.
The scheduled conclusion of the Ad Hoc Working Group on Long-term Cooperative Action was also a crucial lynchpin for a successful result in Doha. The Long-term
Cooperative Action track as an auxiliary body of the U.N. climate convention was the
major result of the 2007 Bali Action Plan. As this track of the negotiations was originally created to last only two years, parties agreed to close it in 2012 during last year’s
negotiations in Durban.
23
Chapter 3. The Kyoto Protocol and European Union Emissions Trading Scheme
The Long-term Cooperative Action track assisted the convention’s greenhouse gases
limiting target in its five-year lifespan by promoting key work plans including:
• Intensifying alleviation efforts to reduce greenhouse gases,
• Generating new work plans on adaptation to changes,
• Policy development to reduce deforestation and degradation emissions,
• Boosting development of clean energy technology and its transfer,
• Raising funds for more action on all of these activities in developing countries.
Both the timing and the substance of the new negotiation track were focused in the
new track on the Durban Platform for Enhanced Action. The remarkable conclusion
regarding timing was the parties agreed to immediately proceed with substantive discussions meaning that the Durban Platform will be at the heart of the next year’s climate
negotiations in Poland. Two workstreams were created to address the so-called Ambition Gap and to design the new treaty by 2015. A summary of negotiations comes as
follows:
• Although fewer countries signed on, the Kyoto Protocol was reauthorized for another eight years. It now covers only some 12% of global emissions,
• The countries terminated the negotiating track of "Long-term Cooperative Action"
started in 2007 which produced the Copenhagen Accords and the Cancun Agreements. The resulted voluntary pollution-reduction obligations were covering 80%
of global emissions,
• The new negotiating track on the "Durban Platform for Enhanced Action" took
its first steps toward achieving its goals. It was designed last year to produce a
new treaty that is applicable to all parties and covers 100% of global emissions by
2015.
The crucial changes for Phase III of the EU ETS include:
• An EU-wide centralized cap decline on emissions annually by 1.74% of the average annual level of the Phase II cap. The course will be from a departure point of
the mid-point of Phase II and will describe a declining cap from 2013 onwards.
The overall reduction will be 21% below 2005 verified emissions by 2020,
• Adjustments on the EU ETS cap up to the 30% of GHG reduction target when EU
ratifies an international climate agreement in the future,
• A substantial increase in auctioning levels. At least 50% of allowances will be
auctioned from 2013 compared to around 3% in Phase II. While 100% auctioning
will be feasible to the power sector in UK and across most of the EU from 2013,
sectors at significant risk of carbon leakage will receive 100% free allocation up
to their benchmark,
• 12% of the total allowances auctioned will be re-distributed to Member States
which have lower GDP in the interests of solidarity,
24
3.3. European Union Emissions Trading Scheme (EU ETS)
• Access to international project credits from outside the EU will be limited to 50%
of the reductions demanded in the EU ETS,
• Opt out potential of small emitters and hospitals,
• Aviation inclusion in the EU ETS which was introduced from 2012.
25
CHAPTER
4
Generation Capacity Expansion Model
4.1 Generation Capacity Expansion Model
4.1.1
Introduction
The European Union is committed to cut greenhouse gas emissions (GHGs) by 30% of
1990 levels by 2020; other countries are committed to make similar reductions under
a global agreement. Some technical options are available on the supply side, to reduce
GHG and other harmful emissions by the power sector. Therefore, it is important to
analyze what type of power generation technologies will be chosen by companies under different CO2 mitigation targets. Several models look into Generation Expansion
Planning in oligopolistic markets; however, they do not consider the impact of CO2
reduction targets and the transmission constraints together.
Furthermore, as an investment in RES is increasing significantly and is highly dependent to the financial incentive system set forth by the government, consequently the
role of GEP in a realistic framework to analyze the impact of different incentive plans
on RES expansion becomes crucial. Also, in the electricity market there are some
power plants which have been installed many years ago but their investment cost have
not been recouped yet, to consider this kind of power plants and their role to change
the future scenario in terms of generation mix, a GEP model able to consider above
mentioned issue becomes prominent challenge.
4.1.2
Approaches used to model GEP in the electricity market
Several models tackle generation expansion planning (GEP) in oligopolistic markets.
The Cournot game as an open-loop model extends the Cournot model to include investments in new generation capacities which can be interpreted as describing investments
in an oligopolistic market [36]. In such a market, the capacity is simultaneously built
27
Chapter 4. Generation Capacity Expansion Model
and sold in long-term contracts when there is no spot market. For a simplified Finnish
electricity market, a dynamic-stochastic Nash-Cournot model has been proposed [58]
where the Base and peak load market segments and two groups of production technologies were characterized in a context of stochastic demand growth. The oligopolistic
equilibrium in an open loop information structure was computed incorporating two algorithms. To formulate a GEP model that may characterize expansion planning in a
competitive framework, particularly in pool-dominated generation supply industries,
Cournot model has been used in oligopoly behavior in [6]. To analyze generation investment and market participation decisions of candidate expansion units that vary in
costs and forced outage rates, numerical experiments are carried on a test system. Simulations with the computational, game-theoretic, recursive dynamic model developed
in [73] imply that the result of perfect competition will be lower prices and the environment is benefited in the form of lower acid and smog emissions. An oligopolistic
Generation Expansion Planning model has been presented in [5]. This model is used
to analyze the possible long term effects of CO2 prices that originate from the EU ETS
on the Italian electricity market. A model is presented in [54] to investigate the interaction between competition and transmission congestion on power generation expansion,
which is modeled as a Cournot competition game. To comply with power flow margins, network transmission constraints are included in the optimal generation expansion
problem, and finally, test results from a five-bus power network and the IEEE 24-bus
system are presented and discussed. In [71], a two-tier matrix game model has been
presented. A novel solution algorithm is developed, that incorporates risk due to volatilities in profit. This solution is intended to be used by generators to make multi-period,
multi-player generation capacity expansion decisions. In [57] , the oligopolistic model
has been utilized for simulating the growth and operation of the generating firms, which
provides some estimation of the influence of the European carbon trading directive in
the Spanish electricity market.
Among the reviewed models, only a few of them ( [73], [5], [57]) take into account the
environmental considerations such as CO2 prices. However, there is an assumption in
most of these models that firms make their GEP decisions based on the Cournot model.
4.2 A GEP Model with CO2 Emission and Transmission Constraints in
an Oligopolistic Market
4.2.1
Introduction
The significant growth of greenhouse gas (GHG) emissions from the power sector has
led policy makers to engage in a wide ranging debate over different GHG mitigation
polices. There is a number of technical options for reducing GHG and other harmful
emissions from the power sector. These can be divided into two groups: supply and
demand-side options. Among these two options, the greatest potential for large-scale
cuts is expected to come from supply-side options.
As the generation expansion may lead to add or relive congestions in transmission lines,
which consequently can affect the zonal prices, it is very important to include the transmission network representation in the GEP model. The main purpose of this study is
therefore to develop an oligopolistic GEP model for analyzing generation investment
decisions under different CO2 reduction targets, taking into account both the trans28
4.2. A GEP Model with CO2 Emission and Transmission Constraints in an Oligopolistic
Market
mission system constraints and the presence of bilateral contracts among some market
players, in addition to the pool market mechanism. The proposed model can also be
used to analyze the long-term implications of different GHG mitigation policies like
emissions trading and carbon tax.
4.2.2
The Model
The GEP problem goal is to define the generation technology options to meet the growing energy demand over a planning period, their location and the time they should be put
in service. In centralized electricity markets, the GEP is typically studied as a least cost
expansion plan. However, in the deregulated framework, some models have been proposed for studying the investment decisions by generating companies in oligopolistic
electricity markets, taking into account either environmental constraints (particularly,
CO2 emissions) or physical transmission limits that impact on electricity prices and
quantities. In our study the Cournot game has been used to represent an oligopolistic
electricity markets. But, it differs from the classic Cournot model in that it incorporates both CO2 emission costs, and transmission constraints, through the differentiated
nodal prices. The model formulated for GEP has three components: a) generating
firms’ model, b) TSO model, c) market clearing conditions. The mathematical formulation of model for each of these three components follows by the introductions to
notations given below.
4.2.3
Notations
4.2.3.1
Sets and parameters
T time horizon considered in the GEP [years]
Dt discount factor for year t
LBt number of load blocks in year t
Ef number of existing thermal plants of firm f
Btb duration of load block b in year t [h]
M CEf e Marginal cost of the e-th existing thermal plant of firm f [e/ MWh]
P ct price of CO2 in year t [e/tCO2 ]
EEf e Emission factor of the existing e-th thermal plant of firm f [tCO2 /MWh]
Hf number of existing hydro plants of firm f
M CHf h Marginal cost of the h-th existing hydro plant of firm f [e/MWh]
P Mf number of existing pump plants of firm f
M CP Mf pm Marginal cost of the pm-th existing pumping storage plant of firm f [e/MWh]
Cf number of already committed thermal plants of firm f
V Cf c Commissioning year of plant c of firm f
M CCf c Marginal cost of the c-th commissioned thermal plant of firm f [e/MWh]
29
Chapter 4. Generation Capacity Expansion Model
ECf c Emission factor of commissioned c-th thermal plant of firm f [tCO2 /MWh]
ENf number of new thermal plants of firm f
M CENf n Marginal cost of the n-th new thermal plant of firm f [e/MWh]
EEf n Emission factor of the new n-th thermal plant of firm f [tCO2 /MWh]
CCf n Capital cost of the new thermal generator n of firm f [e/MW]
SVf n Salvage value of new thermal generator n of firm f [e/MW]
IEf e bus number the e-th existing thermal plant of firm f is connected to
IHf h bus number the h-th hydro plant of firm f is connected to
IP Mf pm bus number the pm-th pumping storage plant of firm f is connected to
ICf c bus number the c-th already commissioned thermal plant of firm f is connected to
IENf n bus number the n-th new thermal plant of firm f is connected to
p0itb Price assumed to describe the demand at bus i in load block b of year t [e/MWh]
itb Slope of the demand curve in load block b of year t [e/(M W 2 h)]
F number of firms
0
qitb
Quantity assumed to describe the demand at node i in load block b of year t [MW]
GEf et Maximum capacity of thermal plant e of firm f in year t [MW]
HFt Factor used to calculate the allowed power production from hydro plants in year t
GHf ht Capacity of hydro plant h of firm f in year t [MW]
P M Ft Factor used to calculate the allowed power production from pumping storage
plants in year t
GP Mf pmt Maximum capacity of pumping storage plant pm of firm f in year t [MW]
GCf ct Maximum capacity of the c-th already commissioned thermal plant of firm f in
year t [MW]
M AXf ti Maximum capacity that can be installed by firm f in bus i during year t [MW]
N Number of busses
P T DFki Power transfer distribution factor of a unit power injection at an hub bus and unit
withdrawal at bus i on the transmission interface k
Tk Upper limit of interface k [MW]
30
4.2. A GEP Model with CO2 Emission and Transmission Constraints in an Oligopolistic
Market
4.2.3.2
Variables
af itb Net amount of power sold by arbitrages at bus i in load block b of year t, anticipated by firm f [MW]
qef etb power generated by the e-th existing thermal plant of firm f during the load block
b of year t [MW]
qhf htb power generated by the h-th existing hydro plant of firm f during the load block b
of year t [MW]
qpmf pmtb generation from the pm-th existing pumping storage plant of firm f during the load
block b of year t [MW]
qcf ctb power generated by the c-th commissioned thermal plant of firm f during the load
block b of year t [MW]
qenf ntb Power generated by the n-th new thermal plant of firm f during the load block b
of year t [MW]
xf n Installed capacity of new generator n of firm f [MW]
pitb , qitb Price and quantity at bus i in load block b of year t [MW]
pf itb price, anticipated by firm f, of electricity at node i in load block b of year t
[e/MWh]
witb Transmission charge to move power from hub to bus i in load block b of year t
[e/MWh]
yitb Power delivered from the hub to bus i in load block b of year t [MW]
vnf n Commissioning year of new thermal plant n of firm f
4.2.4
Generating Firms Model
The market clearing mechanism here considered is the centralized bidding process supervised by an Independent Market Operator. The market is modeled for T years. Each
year t can be divided into periods (e.g., seasons) and load levels (e.g., peak hours, offpeak hours, etc.). In general, LBt load blocks during year t are assumed. The price in
each load block b of every node i is modeled as a linear function of the net quantity at
that bus (see also figure 4.1):
0
)
pitb = p0itb − itb (qitb − qitb
(4.1)
The goal of each generating firm f is to maximize its profit by strategically deciding
both its production pattern in the short-run and its investments on new capacity in the
long-run. The profit of firm f is given by sales minus costs for the following set of
plants and for the time horizon T : existing thermal (P Ef ), hydro (P Hf ), pumped
storage (P P Mf ), already committed plants (i.e., not considered as variable for the
GEP; P Cf ), new thermal plants (defined by the GEP solution; P ENf ); capital costs
31
Chapter 4. Generation Capacity Expansion Model
Figure 4.1: Assumed demand curve
(SCf ) and salvage (F Sf ) are considered.
Among the costs, it is important to take into account the EU ETS mechanism (as it
has been explained in chapter 3.3) to achieve the EU GHG emission reduction targets.
Generating companies are exposed to the impacts of the EU ETS. It would be very
hard to directly include the CO2 market mechanism in the Cournot-based GEP model,
because CO2 prices:
1. Are determined not only by electricity markets but, e.g., also by the flexible mechanisms set up within the Kyoto protocol (Clean Development Mechanism and
Joint Implementation) that are international and inter-continental tools,
2. For what electricity markets are concerned, they are determined, of course, not
only by the Italian electricity market, but also by the different national implementation of electricity markets in all the European Countries involved.
This is because it would be very difficult to model the interactions among such
different markets to include them in the GEP model. Therefore, we choose to give
the CO2 price P ct exogenous to the model. For the generation firms, the optimization
model is:
h
i
max P Ef + P Hf + P P Mf + P Cf + P ENf − SCf + F Sf
where:
32
(4.2)
4.2. A GEP Model with CO2 Emission and Transmission Constraints in an Oligopolistic
Market
P Ef =
T
hX
Dt
t=1
P Hf =
T
hX
Dt
T
hX
XX
Btb (pf itb − M CHf h )qhf htb
Dt
XX
Btb Dt
LBt
X
c=1 t=V Cf c
T
h EN
Xf X
SCf =
F Sf =
X
n=1
EN
h f
X
(pf itb − M CCf c − P ct ECf c )qcf ctb
i
(4.3)
b=1
Btb Dt
n=1 t=vnf n
h ENf
Btb (pf itb − M CP Mf pm )qpmf pmtb
i
b=1 pm=1
cf
T
hX
X
P ENf =
i
i
b=1 h=1
LBt P Mf
t=1
P Cf =
Btb (pf itb − M CEf e − P ct EEf e )qef etb
b=1 e=1
LBt Hf
t=1
P P Mf =
Ef
LBt X
X
LBt
i
X
(pf itb − M CENf n − P ct EEf n )qenf ntb
b=1
Dt CCf n xf n f or t = vnf n
DT SVf n xf n
i
i
n=1
In 4.1, the subscript i is relevant to the bus each considered power plant is connected
to. Therefore, i is obtained from the matrix IE for thermal plants, IH for hydro plants,
IP M for pumping storage plants, IC for committed plants, IEN for new thermal
power plants, respectively. It is worth noticing that according to 4.3, the CO2 prices
emerge from the CO2 market.
The objective function above is subject to the constraints described in the following.
• Locational marginal price constraints
Each firm f anticipates a price for node i; at the equilibrium, both the differences
in node prices must equal transmission costs, referring to a hub node, h, and pf itb
for the different firms must be equal to the actual price (see also figure 4.2):
∀i 6= h, f, t, b (µlmpf itb )
pf itb = pf htb + witb
Figure 4.2: Transmission cost
33
(4.4)
Chapter 4. Generation Capacity Expansion Model
As pf itb must also fulfill equation 4.1, replacing qitb in equation 4.1 with the net
injection in the node i (see also equation 4.32), gives:
pf itb =
p0itb
Ek
Hk
F X
F X
X
X
− itb (
qeketb +
qhkhtb
k=1 e=1
+
Mk
F P
X
X
qpmkpmtb +
k=1 pm=1
k=1 h=1
Ck
F X
X
qckctb +
k=1 c=1
F EN
X
Xk
(4.5)
0
qnkntb − qitb
)
k=1 n=1
qckctb = 0 f or t < V Ckc ,
qnkntb = 0 f or t < V Nkn .
(4.6)
According to the Cournot approach, in this study it has been assumed that the
suppliers will not change their sales in reaction to f’s sales decision.
• Capacity limits
The power generated by a plant cannot exceed the installed capacity:
qef etb ≤ GEf et
∀f, e, t, b
qhf htb ≤ HFt GHf ht
qpmf pmtb ≤ P M Ft GP Mf pmt
qcf ctb ≤ GCf ct
qenf ntb ≤ xf n
(µpef etb )
∀f, h, t, b
(µphf htb )
∀f, pm, t, b
(µppmf pmtb )
(4.7)
(4.8)
(4.9)
∀f, c, t ≥ V Cf c , b
(µpcf ctb )
(4.10)
∀f, n, t ≥ V Nf n , b
(µpnf ntb )
(4.11)
• Maximum installed capacity limits of new plants
The total new capacity installed of the new plant n should satisfy the maximum
level allowed for each firm f at each bus i the new plant n is connected to:
xf n ≤ M AXf ti
∀f, n, t
(µICf nt )
(4.12)
• Arbitrage balance
The purchase and sale of power in order to profit from a difference in the price
consist arbitrage function. Here, it is modeled by the power transfers from or to
the hub node which is arranged by the TSO. Arbitragers are assumed to be neither
producers nor consumers: hence, their energy balance must be zero:
N
X
Btb af itb = 0
t=1
34
∀f, t, b
(µaf tb )
(4.13)
4.2. A GEP Model with CO2 Emission and Transmission Constraints in an Oligopolistic
Market
• Non negativity constraints
All the following variables must be non-negative:
qef etb , qhf htb , qpmf pmtb , qcf ctb , qenf ntb , xf n ≥ 0
(4.14)
The KKT optimality conditions for firm f:
· For
qef etb ,
∀f, e, i 6= hub, t, b
0
)
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
− M CEf e − P ct EEf e ) − µpef etb + µlmpf itb itb ≤ 0; qef etb ≥ 0
(4.15)
· For
qef etb ,
∀f, e, i = hub, t, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
µlmpf itb itb ≤ 0; qef etb ≥ 0
− M CEf e − P ct EEf e ) − µpef etb −
i6=h
(4.16)
· For
qhf htb ,
∀f, h, i 6= hub, t, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CHf h ) − µphf htb + µlmpf itb itb ≤ 0; qhf htb ≥ 0
(4.17)
· For
qhf htb ,
∀f, h, i = hub, t, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
− M CHf h ) − µphf htb −
µlmpf itb itb ≤ 0; qhf htb ≥ 0
i6=h
(4.18)
· For
qpmf pmtb ,
∀f, pm, i 6= hub, t, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CP Mf pm ) − µppmf pmtb + µlmpf itb itb ≤ 0; qpmf ptb ≥ 0
(4.19)
· For
qpmf pmtb ,
∀f, pm, i = hub, t, b
35
Chapter 4. Generation Capacity Expansion Model
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
− M CP Mf pm ) − µppmf pmtb −
µlmpf itb itb ≤ 0; qpmf ptb ≥ 0
i6=h
(4.20)
· For
∀f, c, i 6= hub, t ≥ vc, b
qcf ctb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CCf c P ct ECf c ) − µpcf ctb + µlmpf itb itb ≤ 0; qcf ctb ≥ 0
(4.21)
· For
∀f, c, i = hub, t ≥ vc, b
qcf ctb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
µlmpf itb itb ≤ 0; qcf ctb ≥ 0
− M CCf c P ct ECf c ) − µpcf ctb −
i6=h
(4.22)
· For
qenf ntb ,
∀f, n, i 6= hub, t ≥ vn, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CENf n P ct EEf n ) − µpnf ntb + µlmpf itb itb ≤ 0; qenf ntb ≥ 0
(4.23)
· For
qenf ntb ,
∀∀f, n, i = hub, t ≥ vn, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
− M CENf n P ct EEf n ) − µpnf ntb −
µlmpf itb itb ≤ 0; qenf ntb ≥ 0
i6=h
(4.24)
· For
xf n ,
∀f, n, i, t ≥ vn
− (Dt=vnf n CCf n − Dt SVf n ) + µpnf ntb − µICf nt ≤ 0; xf n ≥ 0
· For
af itb ,
∀f, i 6= hub, t, b
− (Dt Btb itb T ot − all − genf tb ) + µlmpf itb itb − Btb µaf tb = 0
· For
af itb ,
(4.25)
(4.26)
∀f, i = hub, t, b
− (Dt Btb itb T ot − all − genf tb ) −
X
i6=h
36
µlmpf itb itb − Btb µaf tb = 0 (4.27)
4.2. A GEP Model with CO2 Emission and Transmission Constraints in an Oligopolistic
Market
4.2.5
Power Exchange Model
The market model considered in this study is based on a nodal system. This is done by
assuming each zone as a node. According to nodal pricing approach, each constrained
area has its own electricity price. Due to changes in physical constraints related to
change in production and consumption, prices may differ between nodes.
Like producers, the TSO goal is to maximize its profits. These come from providing transmission services, subject to transmission capacity constraints. The following
assumptions are made to make computation of equilibria feasible:
• The transmission system is linearized,
• All generating firms and arbitragers make decisions under the assumption that
their actions will not affect the transmission fees received by the TSO,
• Pricing of transmission services is based on the nodal model.
The transmission system has been represented as a linearized "DC" network power
flow model, e.g. constant "power transfer distribution factors" (P T DFki ) describe how
many MW of flow occur on a particular transmission interface k in response to an
assumed injection of 1 MW at hub node and withdrawal of 1 MW at node i. The DC
model’s linearity permits usage of the principle of superposition, which simplifies load
flow calculations for market models compared to the complete nonlinear AC load flow
model. More, this linear property makes the choice of hub node arbitrary.
Hence,the TSO optimization problem is:
N
T X
LBt X
X
witb Btb yitb
(4.28)
t=1 b=1 i=1
subject to:
N
X
P T DFki yitb ≤ Tk
∀k, t, b
(µtrktb )
(4.29)
i=1
The KKT conditions for GME become:
· For
yitb ,
∀f, i 6= hub, t, b
Btb witb −
N
X
P T DFki µtrktb = 0
(4.30)
i=1
4.2.6
Market Clearing Conditions
At the equilibrium, the following balance must hold between the transmission services
provided by the grid and the services anticipated or demanded by the arbitragers:
af itb = yitb
∀f, i 6= hub, t, b
(4.31)
In addition, the market clearing conditions ensure, at each bus, the balance between
power generation and demand, which is assumed price responsive:
37
Chapter 4. Generation Capacity Expansion Model
qitb =
F
X
T ot − genf itb + af itb
∀i, t, b
(4.32)
f =1
T ot − genf itb
Ef
Hf
P Mf
Cf
ENf
X
X
X
X
X
=(
qef etb +
qhf htb +
qpmf pmtb +
qcf ctb +
qnf ntb )
e=1
pm=1
h=1
c=1
n=1
(4.33)
Collecting the first order KKT optimality conditions of the different optimization
problems (generation firms, TSO) together with market clearing conditions define the
equilibrium. The equilibrium problem can be defined as a Linear Complementarity
Problem, which allows solving simultaneously the optimization problems of each generating company and the TSO, considering both transmission and emissions constraints.
It has to be mentioned that if the market solution exists, it satisfies the optimal condition
for each market players and market clearing condition; therefore, it has the property that
no participants will want to change their decision unilaterally (as in Nash equilibrium).
The model is implemented in GAMS and solved using the MILES solver.
4.3 Improving the GEP Model to Analyze the Impacts of Different Incentive Plans on RES Expansions
4.3.1
Introduction
As a response to a number of global challenges and concerns like climate change and
increasing energy demand, investments on RES are increasing significantly these days
and the role of mechanisms which are supporting development acceleration of the RES
becomes more inevitable. Consequently, countries around the world set forth the terms
for providing incentives to encourage the development and deployment of RES to reach
their goals. The main objective of RES financial incentives is to create a legal environment which stably promotes the use of renewable sources. Providing fair compensation for the investment costs and ongoing financial support over the whole life of the
projects are two main principle bases for this. The need for an appropriate GEP model
becomes crucial when analyzing how different incentive plans can affect the renewable
expansion notably in the wind and PV segments.
4.3.2
The Model
Unlike the previous model, generation firms of the optimization problem are divided
into two categories of strategic firms which are able to drive up the prices, and Price
taking firms which are not. Moreover, strategic firms are capable of installing new
capacity on onshore and offshore wind power plants in this proposed model, while the
price taking firms could invest a new capacity on solar power plants. New sets and
variables of this model follow by the introduction to notations below.
4.3.3
Notations
4.3.3.1
Sets and parameters
F number of strategic firms
38
4.3. Improving the GEP Model to Analyze the Impacts of Different Incentive Plans on
RES Expansions
F P number of price taking firms
M CEPf pep Marginal cost of the ep-th existing thermal plant of firm fp [e/ MWh]
EN Pf p number of new solar plants of firm fp
CCf pnp Capital cost of the new solar panel np of firm fp [e/MW]
SVf pnp Salvage value of new solar panel np of firm fp [e/MW]
EWf number of new onshore wind of firm f
CCf w Capital cost of the new onshore wind turbine w of firm f [e/MW]
SVf w Salvage value of new onshore wind turbine w of firm f [e/MW]
EW Of number of new offshore wind of firm f
CCf wo Capital cost of the new offshore wind turbine wo of firm f [e/MW]
SVf wo Salvage value of new offshore wind turbine wo of firm f [e/MW]
IEN Pf pnp bus number the np-th new solar panel of firm fp is connected to
IEWf w bus number the w-th new onshore wind of firm f is connected to
IEW Of wo bus number the wo-th new offshore wind of firm f is connected to
M AXt Maximum capacity that can be installed by firms during year t [MW]
AF W availability factor of onshore wind turbine
AF W O availability factor of offshore wind turbine
AF SO availability factor of solar panel
4.3.3.2
Variables
qepf peptb power generated by the ep-th existing thermal plant of firm fp during the load
block b of year t [MW]
qepnpf pnptb Power generated by the np-th new solar plant of firm fp during the load block b of
year t [MW]
qewf wtb Power generated by the w-th new onshore wind plant of firm f during the load
block b of year t [MW]
qewof wotb Power generated by the wo-th new offshore wind plant of firm f during the load
block b of year t [MW]
xpf pnp Installed capacity of new generator np of firm fp [MW]
xwf w Installed capacity of new generator w of firm f [MW]
xwof wo Installed capacity of new generator wo of firm f [MW]
vnpf pnp Commissioning year of new plant np of firm fp
vwf w Commissioning year of new plant w of firm f
vwof wo Commissioning year of new plant wo of firm f
39
Chapter 4. Generation Capacity Expansion Model
4.3.4
Generating Firms Model
4.3.4.1
Optimization problem of strategic firms
In order to analyze how capacity expansion of renewable energy would be change with
different incentive plans, the terms for new onshore wind plants (defined by the GEP
solution; P EWf ) & new offshore wind plants (defined by the GEP solution; P EW Of )
and also their capital costs and savages have been added to the previous maximization
problem (see part 4.2.4).
max[P Ef + P Hf + P P Mf + P Cf + P ENf + P EWf + P EW Of
− SCf − SCWf − SCW Of + F Sf + F SWf + F SW Of ]
P EWf =
T
h EW
Xf X
Btb Dt
w=1 t=vwf w
P EW Of =
h EW Of
X
T
X
LBt
X
(pf itb + incentive f or onshore wind)qewf wtb
SCWf =
F SWf =
w=1
EW
h f
SCW Of =
F SW Of =
X
Btb Dt
LBt
X
(pf itb + incentive f or of f shore wind)qewof wotb
b=1
Dt CCf w xf w f or t = vwf w
DT SVf w xf w
w=1
h EW Of
X
wo=1
EW
h Of
X
i
b=1
wo=1 t=vwof wo
h EW
Xf
(4.34)
i
i
Dt CCf wo xf wo f or t = vwof wo
DT SVf wo xf wo
i
i
wo=1
(4.35)
The terms above is subjected to the previous constraints (part 4.2.4) and also some
new constraints as follows:
• Capacity limits
The power generated by a plant cannot exceed the installed capacity:
qewf wtb ≤ AF W xf w
qewof wotb ≤ AF W O xf wo
∀f, w, t ≥ vwf w , b
∀f, wo, t ≥ vwof wo , b
(µpwf wtb )
(µpwof wotb )
(4.36)
(4.37)
• Maximum installed capacity limits of new plants
The total new capacity installed of the new plant n should satisfy the maximum
level allowed for each firm f at each bus i the new plant n is connected to:
40
i
4.3. Improving the GEP Model to Analyze the Impacts of Different Incentive Plans on
RES Expansions
xf w ≤ M AXf ti
xf wo ≤ M AXf ti
∀f, w, t
∀f, wo, t
(µICWf wt )
(4.38)
(µICW Of wot )
(4.39)
• Maximum installed capacity limits of onshore and offshore wind plants in each
year in advance
The total new capacity installed of the new onshore and offshore wind plants in
each year ahead can not be exceed than assumed threshold value:
EF EW
X
Xf
xf w ≤ M AXt
∀f, w, t
xf wo ≤ M AXt
∀f, wo, t
(µwt )
(4.40)
f =1 w=1
Of
EF EW
X
X
(µwot )
(4.41)
f =1 wo=1
• Non negativity constraints
All the following variables must be non-negative:
qewf wtb , xf w , qewof wotb , xf wo ≥ 0
(4.42)
The KKT optimality conditions for strategic firm f:
· For
qewf wtb ,
∀f, w, i 6= hub, t ≥ vw, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
+ incentive f or onshore wind) − µpwf wtb + µlmpf itb itb ≤ 0; qewf wtb ≥ 0
(4.43)
· For
qewf wtb ,
∀f, w, i = hub, t ≥ vw, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
+ incentive f or onshore wind) − µpwf wtb −
µlmpf itb itb ≤ 0; qewf wtb ≥ 0
i6=h
(4.44)
· For
qewof wotb ,
∀∀f, wo, i 6= hub, t ≥ vwo, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
+ incentive f or of f shore wind) − µpwof wotb + µlmpf itb itb ≤ 0; qewof wotb ≥ 0
(4.45)
41
Chapter 4. Generation Capacity Expansion Model
· For
qewof wotb ,
∀∀f, wo, i = hub, t ≥ vwo, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
+ incentive f or of f shore wind) − µpwof wotb −
µlmpf itb itb ≤ 0; qewof wotb ≥ 0
i6=h
(4.46)
· For
∀f, w, i, t ≥ vw
xwf w ,
− (Dt=vwf w CCf w − Dt SVf w ) +
T
LBt
X
X
µpwf wtb AF W
(4.47)
t=vwf w b=1
− µICWf wt ≤ 0; xwf w ≥ 0
· For
∀f, wo, i, t ≥ vwo
xwof wo ,
T
X
− (Dt=vwof wo CCf wo − Dt SVf wo ) +
LBt
X
µpwof wotb AF W O
t=vwof wo b=1
(4.48)
− µICW Of wot ≤ 0; xwof wo ≥ 0
4.3.4.2
Optimization problem of price taking firms
The optimization problem of price taking firms consist of terms for existing plants
(defined by the GEP solution; P Ef p ) & new solar plants (defined by the GEP solution;
P ENf p ) and also capital costs (SCf p ) and salvage (F Sf p ) of the new solar plants.
So, it becomes (in this case it has been considered that the price taking firms are able
to invest in solar power plant):
h
i
max P Ef p + P ENf p − SCf p + F Sf p
(4.49)
where:
P Ef p =
T
hX
Dt
t=1
P ENf p =
fp
LBt EP
X
X
Btb (p?i − M CEPf pep − P ct EEPf pep )qepf peptb
b=1 ep=1
Pf p
h EN
X
T
X
Btb Dt
np=1 t=vnpf pnp
SCf p =
Pf p
h EN
X
i
LBt
X
(p?i
+ incentive f or solar)qepnpf pnptb
i
b=1
Dt CCf pnp xpf pnp f or t = vnpf pnp
i
np=1
F Sf p =
Pf p
h EN
X
DT SVf pnp xpf pnp
i
np=1
(4.50)
42
4.3. Improving the GEP Model to Analyze the Impacts of Different Incentive Plans on
RES Expansions
Where p?i is the price at node i [e/MWh]. Each price taking supplier treats p?i as
fixed (or exogenous) to its optimization problem. Because, they believe that they have
no market power. For this reason, we put an asterisk ? on the variable. The objective
function in 4.49 is subject to following constraints:
• Capacity limits
The power generated by a plant cannot exceed the installed capacity:
qepf peptb ≤ GEPf pept
qepnpf pnptb ≤ AF SO xpf pnp
∀f p, ep, t, b
(µpepf peptb )
∀f p, np, t ≥ vnpf pnp , b
(4.51)
(µpnpf pnptb )
(4.52)
• Maximum installed capacity limits of new plants for each firm
The total new capacity installed of the new plant np should satisfy the maximum
level allowed for each firm f p at each bus i the new plant np is connected to:
xpf pnp ≤ M AXf pti
∀f p, np, t
(µICPf pnpt )
(4.53)
• Maximum installed capacity limits in each year in advance
The total new capacity installed of the new plant np can not be exceed than assumed threshold value:
Pf p
EF
X
XP EN
xpf pnp ≤ IXt
∀t
(µIXt )
(4.54)
f p=1 np=1
• Non negativity constraints
All the following variables must be non-negative:
qepf peptb , qepnpf pnptb , xpf pnp ≥ 0
(4.55)
The KKT optimality conditions for firm fp:
· For
qepf peptb ,
∀f p, ep, i, t, b
Dt Btb (p?i − M CEPf pep − P ct EEPf pep ) − µpepf peptb ≤ 0; qepf peptb ≥ 0
(4.56)
· For
qepnpf pnptb ,
∀f p, np, i, t ≥ vnp, b
Dt Btb (p?i + incentive f or solar) − µpnpf pnptb ≤ 0; qepnpf pnptb ≥ 0 (4.57)
43
Chapter 4. Generation Capacity Expansion Model
· For
xpf pnp ,
∀f p, np, i, t ≥ vnp
T
X
− (Dt=vnf n CCf pnp − Dt SVf pnp ) +
LBt
X
µpnf ntb AF SO − µICPf pnpt
t=vnpf pnp b=1
− µIXt ≤ 0; xpf pnp ≥ 0
(4.58)
4.3.5
Power Exchange Model
It is exactly the same as part 4.2.5.
4.3.6
Market Clearing Conditions
At the equilibrium, the following balance must be hold:
∀f, i 6= hub, t, b
af itb = yitb
(4.59)
In addition, the market clearing conditions ensure, at each bus, the balance between
power generation and demand, which is assumed price responsive:
qitb =
F
X
T ot − genf itb +
f =1
FP
X
T ot − genf pitb + af itb
P Mf
Hf
Ef
X
X
X
qpmf pmtb
qhf htb +
qef etb +
=(
e=1
+
(4.60)
f p=1
T ot − genf itb
Cf
X
∀i, t, b
qcf ctb +
c=1
pm=1
h=1
ENf
EWf
EW Of
X
X
X
qnf ntb +
n=1
qewf wtb +
w=1
EPf p
T ot − genf pitb = (
X
(4.61)
qewof wotb )
wo=1
EN Pf p
qepf peptb +
ep=1
X
qnpf pnptb )
(4.62)
np=1
The equilibrium problem can now be defined as a Linear Complementarity Problem
by collecting the previous and new KKT conditions of strategic firms (equation 4.15 –
equation 4.27) & (equation 4.43 – equation 4.85) and also price taking firms by using
(equation 4.56 – equation 4.58) with grid owner’s KKT conditions (equation 4.30)
together with the market clearing conditions (equation 4.59 – equation 4.62).
4.4 A GEP Model to Analyze the Impacts of Already Installed Power
Plants-Considering their investment costs- on the Generation Mix
4.4.1
Introduction
In the electricity market there are some power plants that have been installed many
years ago but their investment costs have not been recouped yet. Recovering the investment cost of these power plants in the long run which not only affects the generation
44
4.4. A GEP Model to Analyze the Impacts of Already Installed Power
Plants-Considering their investment costs- on the Generation Mix
mix, but also changes the future investment decisions. In this context, developing GEP
models able to consider above mentioned issue becomes prominent challenge.
4.4.2
The Model
CCGT power plants which have been installed many years ago but their investment
costs have not been recouped yet are considered in this model. Belonging to strategic
firms, they have been excluded from the set of existing power plants forming a separate
set. Also, a new nonlinear constraint is introduced for these power plants as total profit
of them should be more than part of their investment costs. New sets and variables of
this model follow by the introduction to the notations given below.
4.4.3
Notations
4.4.3.1
Sets and parameters
ECf number of existing CCGT plants of firm f
EECf ec Emission factor of the existing ec-th CCGT plants of firm f [tCO2 /MWh]
IECf ec bus number the ec-th existing CCGT plants of firm f is connected to
GECf et Maximum capacity of CCGT plant ec of firm f in year t [MW]
4.4.3.2
Variables
qecf ectb power generated by the ec-th existing CCGT plants of firm f during the load block
b of year t [MW]
4.4.4
Generating Firms Model
In order to analyze the impacts of already installed CCGT power plants -considering
their investment costs- on the generation mix, the term below has been added to the
previous maximization problem of strategic firms in subsection 4.3.4.1.
P ECf =
T
hX
t=1
Dt
LBt EC
X
Xf
Btb (pf itb − M CECf ec − P ct EECf ec )qecf ectb
i
(4.63)
b=1 ec=1
The term above is subjected to some new constraints:
• Capacity limits
The power generated by a plant cannot exceed the installed capacity:
qecf ectb ≤ GECf ect
∀f, ec, t, b
(µpecf ectb )
(4.64)
• Constraint to cover the investment cost
Total profit of CCGT power plants which have been installed many years ago
should be higher than part of their investment cost:
45
Chapter 4. Generation Capacity Expansion Model
T
hX
t=1
Dt
LBt
X
i
Btb (pf itb − M CECf ec − P ct EECf ec )qecf ectb ≥ C ∀f, ec (λf ec )
b=1
(4.65)
• Non negativity constraints
All the following variables must be non-negative:
qecf ectb ≥ 0
(4.66)
Hence, the KKT optimality conditions for firm f become:
· For
∀f, ec, i 6= hub, t, b
qecf ectb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CEf e − P ct EEf e ) − µpef etb + µlmpf itb itb
+ λf ec
T
X
Dt
LBt
X
t=1
Btb (pf itb − M CECf ec − P ct EECf ec ) ≤ 0; qecf ectb ≥ 0
b=1
(4.67)
· For
∀f, ec, i = hub, t, b
qecf ectb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
µlmpf itb itb
− M CEf e − P ct EEf e ) − µpef etb −
i6=h
+ λf ec
T
X
Dt
LBt
X
t=1
Btb (pf itb − M CECf ec − P ct EECf ec ) ≤ 0; qecf ectb ≥ 0
b=1
(4.68)
· For
qef etb ,
∀f, e, i 6= hub, t, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CEf e − P ct EEf e ) − µpef etb + µlmpf itb itb
− λf ec
T
X
t=1
Dt
LBt
X
Btb itb qecf ectb ≤ 0; qef etb ≥ 0
b=1
(4.69)
· For
qef etb ,
∀f, e, i = hub, t, b
46
4.4. A GEP Model to Analyze the Impacts of Already Installed Power
Plants-Considering their investment costs- on the Generation Mix
0
)
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
X
− M CEf e − P ct EEf e ) − µpef etb −
µlmpf itb itb
i6=h
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qef etb ≥ 0
b=1
(4.70)
· For
∀f, h, i 6= hub, t, b
qhf htb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CHf h ) − µphf htb + µlmpf itb itb
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qhf htb ≥ 0
b=1
(4.71)
· For
∀f, h, i = hub, t, b
qhf htb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
µlmpf itb itb
− M CHf h ) − µphf htb −
i6=h
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qhf htb ≥ 0
b=1
(4.72)
· For
qpmf pmtb ,
∀f, pm, i 6= hub, t, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CP Mf pm ) − µppmf pmtb + µlmpf itb itb
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qpmf ptb ≥ 0
b=1
(4.73)
· For
qpmf pmtb ,
∀f, pm, i = hub, t, b
47
Chapter 4. Generation Capacity Expansion Model
0
)
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
X
− M CP Mf pm ) − µppmf pmtb −
µlmpf itb itb
i6=h
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qpmf ptb ≥ 0
b=1
(4.74)
· For
∀f, c, i 6= hub, t ≥ vc, b
qcf ctb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CCf c P ct ECf c ) − µpcf ctb + µlmpf itb itb
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qcf ctb ≥ 0
b=1
(4.75)
· For
∀f, c, i = hub, t ≥ vc, b
qcf ctb ,
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
µlmpf itb itb
− M CCf c P ct ECf c ) − µpcf ctb −
i6=h
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qcf ctb ≥ 0
b=1
(4.76)
· For
qenf ntb ,
∀f, n, i 6= hub, t ≥ vn, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
− M CENf n P ct EEf n ) − µpnf ntb + µlmpf itb itb
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qenf ntb ≥ 0
b=1
(4.77)
· For
qenf ntb ,
∀f, n, i = hub, t ≥ vn, b
48
4.4. A GEP Model to Analyze the Impacts of Already Installed Power
Plants-Considering their investment costs- on the Generation Mix
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
− M CENf n P ct EEf n ) − µpnf ntb −
µlmpf itb itb
i6=h
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qenf ntb ≥ 0
b=1
(4.78)
· For
qewf wtb ,
∀f, w, i 6= hub, t ≥ vw, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
+ incentive f or onshore wind) − µpwf wtb + µlmpf itb itb
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qewf wtb ≥ 0
b=1
(4.79)
· For
qewf wtb ,
∀f, w, i = hub, t ≥ vw, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
µlmpf itb itb
+ incentive f or onshore wind) − µpwf wtb −
i6=h
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qewf wtb ≥ 0
b=1
(4.80)
· For
qewof wotb ,
∀f, wo, i 6= hub, t ≥ vwo, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
+ incentive f or of f shore wind) − µpwof wotb + µlmpf itb itb
− λf ec
T
X
Dt
t=1
LBt
X
Btb itb qecf ectb ≤ 0; qewof wotb ≥ 0
b=1
(4.81)
· For
qewof wotb ,
∀f, wo, i = hub, t ≥ vwo, b
0
Dt Btb (p0itb − itb (2T ot − genf itb + T ot − gen − f rivalf itb + af itb − qitb
)
X
+ incentive f or of f shore wind) − µpwof wotb −
µlmpf itb itb
i6=h
− λf ec
T
X
t=1
Dt
LBt
X
Btb itb qecf ectb ≤ 0; qewof wotb ≥ 0
b=1
(4.82)
49
Chapter 4. Generation Capacity Expansion Model
· For
∀f, n, i, t ≥ vn
xf n ,
− (Dt=vnf n CCf n − Dt SVf n ) + µpnf ntb − µICf nt ≤ 0; xf n ≥ 0
· For
(4.83)
∀f, w, i, t ≥ vw
xwf w ,
− (Dt=vwf w CCf w − Dt SVf w ) +
LBt
T
X
X
µpwf wtb AF W
t=vwf w b=1
(4.84)
− µICWf wt ≤ 0; xwf w ≥ 0
· For
∀f, wo, i, t ≥ vwo
xwof wo ,
T
X
− (Dt=vwof wo CCf wo − Dt SVf wo ) +
LBt
X
µpwof wotb AF W O
t=vwof wo b=1
(4.85)
− µICW Of wot ≤ 0; xwof wo ≥ 0
· For
∀f, i 6= hub, t, b
af itb ,
− (Dt Btb itb T ot − all − genf tb ) + µlmpf itb itb − Btb µaf tb
− λf ec
T
X
Dt
t=1
· For
af itb ,
LBt
X
(4.86)
Btb itb qecf ectb = 0
b=1
∀f, i = hub, t, b
− (Dt Btb itb T ot − all − genf tb ) −
X
µlmpf itb itb − Btb µaf tb
i6=h
− λf ec
T
X
t=1
Dt
LBt
X
(4.87)
Btb itb qecf ectb = 0
b=1
The equilibrium problem can now be defined as a None–Linear Complementarity Problem by collecting new KKT conditions of strategic firms by using equations
(4.67 – 4.87) and also price taking firms by using(4.56 – 4.58) with grid owner’s KKT
conditions(4.30) together with the market clearing conditions(4.59 – 4.62).
4.5 summary
This chapter consists of three major parts. In the first part, the GEP model with CO2
emission and transmission constraints in an oligopolistic market is discussed. Afterwards, a GEP model which is able to analyze the impacts of different incentive plans
on RES expansions is proposed. Finally in the last part, a GEP model is addressed that
is able to analyze the effects of already installed power plants on the generation mix
considering their investment costs.
50
CHAPTER
5
The Italian Electricity Market
5.1 Overview of Italian Electricity Sector
Fossil fuels are the main source of electric power production in Italy, which is a specific
situation in Italy compared to the rest of European countries: in most of them the main
source of electricity production is nuclear and coal power and renewable energies [43].
In 2011, the total electricity production in Italy was approximately 291.5 TWh which
was composed of 74.96% from thermal power plants, 16.36% from hydro power plants
and 8.68% from other RES [2]. Also, there are electricity imports for the case of
supply shortfalls in the country which are mostly imported from Switzerland, France,
and Slovenia. Since 1988, the nuclear power sources have been banned in Italy (unlike
some other European countries like France and Sweden). As a result of this ban and
also lack of any significant competition, the electricity prices are high in Italy.
5.2 Electricity Sector Organization
The deregulation of power system in Italy has gradually performed, which is brought
into rule in Europe by the Directive 96/92/EC [1] and in Italy by the new "Electric Law",
named the Bersani Decree 79/99 of 31 /3/1999. Three major remedies are suggested in
Bersani Decree to promote the competition:
• New power plants are constructed faster,
• From 1 January 2003, every company must respect to have a maximum market
share of 50% of all power generated or imported to Italy, directly or indirectly,
• Power imports from neighboring countries are liberalized.
51
Chapter 5. The Italian Electricity Market
Although, more than 50% of the market share is captured by competing power generation companies, ENEL still significantly controls the electricity generation. Therefore,
as established in decree n. 79/99, there are clear evidences of oligopoly control in power
generation in Italy. In April 2004, after a three year delay, the Italian power exchange
(IPEX) was finally launched. More fluid management of electricity demand and supply and a measure of transparency are provided in the IPEX. The previous liberalized
market had the lack of these considerations: it was entirely based on bilateral contracts
and administered balancing mechanism.
Since ENEL has large share of mid-merit plants, hydropower and peak plants and also it
is practically exclusive pumping storage company. These factors give ENEL the power
to be able to set the price in large areas of internal market of the zonal market [2].
So, Italy’s energy sector regulator, l’Autorita per l’energia elettrica e il gas (AEEG)
introduced close monitoring procedures to keep the market changes under control, because of the latest increased price distortions in the market. The power prices in Italy
have had a declining trend, although they are still much higher than the other European
exchanges.
5.3 The Italian Power Exchange
The system of the Italian electricity market (IPEX) is organized as a Pool. It is managed
by a market operator (Gestore del Mercato, GME). GME is responsible for collecting
bids, specifying the merit order for electricity dispatching, and for all subsidiary services. The electricity Pool was initially scheduled to come into effect in January 2001,
but practically it started its operations, as a one-side market, at the end of March 2004.
The responsibility for guaranteeing the supply of electricity to a group of pre-occupied
customers was on a single buyer that was founded in 1999. In January 2005, demandside bidding system was introduced. Eligible buyers and wholesalers of electricity are
able to have bilateral contracts for the power exchange with power generators, because
the IPEX is not mandatory. The Electricity Market consists of the Spot Electricity Market (MPE), of the Platform for physical delivery of financial contracts concluded on
IDEX (CDE) and of the Forward Electricity Market (MTE).
5.3.1
The Spot Electricity Market
The Spot Electricity Market in turn is consisted of:
• MGP (Mercato del Giorno Prima): Day – Ahead Market
• MI (Mercato Infragiornaliero): Intra – Day Market
• MSD (Mercato dei Servizi di Dispacciamento): Ancillary Services Market
In the hosting of a large part of power sale and buy is performed in the MGP (see
figure 5.1). The criterion of economic merit order controls the acceptance of offers and
bids. In this criterion the transmission capacity limitations, using a power transmission
system zonal model, are considered. The seller bids are valued at the marginal clearing
price of their belonging zone. On the other hand, the accepted demand bids are valued
at the "Prezzo Unico Nazionale" (PUN - national single price), which, indeed, averages
the prices of geographical zones, weighted respect to the power quantities purchased
52
5.3. The Italian Power Exchange
in those zones. Figures 5.2 and 5.3 illustrate the zonal price algorithm and variation of
PUN over year 2012 respectively.
Figure 5.1: Day-Ahead Market in IPEX
Figure 5.2: Zonal price algorithm with single price for consumers
53
Chapter 5. The Italian Electricity Market
Figure 5.3: Average National Single Price PUN (e/MWh)
Under MI, the Market Participants are allowed to submit additional supply offers or
demand bids to modify the schedules which are resulted from the MGP. The MI takes
place in four sessions: MI1, MI2, MI3 and MI4.
• The sitting of the MI1 takes place after the closing of the MGP. It opens at 10:45
a.m. of the day before the day of delivery and closes at 12:30 p.m. of the same
day. The results of the MI1 are made known within 1:00 p.m. of the day before
the day of delivery.
• The sitting of the MI2 opens at 10:45 a.m. of the day before the day of delivery
and closes at 2:40 p.m. of the same day. The results of the MI2 are made known
within 3:10 p.m. of the day before the day of delivery.
• The sitting of the MI3 opens at 4:00 p.m. of the day before the day of delivery and
closes at 7:30 a.m. of the day of delivery. The results of the MI3 are made known
within 8:00 a.m. of the day of closing of the sitting.
• The sitting of the MI4 opens at 4:00 p.m. of the day before the day of delivery
and closes at 11:45 a.m. of the day of delivery. The results of the MI4 are made
known within 12:15 p.m. of the day of closing of the sitting.
The criterion to select the offer and demand bids in MI market is the same as the
criterion in MGP, except for the accepted demand bids, which are valued at the zonal
price.
In the MSD, the necessary resources to guarantee the proper level of power system
security are purchased by the Italian Transmission System Operator (Tema S.p.A.).
This means that, Terna operates as the principal counterparty in the MSD, and accepted
offers/bids are valued at the offered price (pay-as-bid). The MSD is consisted of ex-ante
MSD (a scheduling stage) and the Balancing Market (MB).
54
5.4. Transmission Network
5.3.2
The Platform for physical delivery of concluded financial contracts
Financial electricity derivatives are traded in IDEX which is the derivatives section of
Borsa Italiana S.p.A. CDE is the platform where financial electricity derivatives contracts concluded on IDEX are executed. The contracts executed on CDE are those for
which the Participant has requested to exercise the option of physical delivery of the
underlying electricity in the Electricity Market (ME) all Participants of which are automatically admitted to the CDE. However, physical delivery in the ME is only requested
by Participants holding an electricity account on the Electricity Account Registration
Platform (PCE). Physical delivery takes place by registering an electricity purchase/sale
transaction, of which GME becomes the counterparty. The transaction, having a sign
corresponding to the delivered contracts, is registered on the electricity accounts that
the Participant holds on the PCE.
5.3.3
The Forward Electricity Market
Forward electricity contracts with delivery and withdrawal obligation are traded in a
venue called the Forward Electricity Market.
• All Electricity Market Participants are admitted automatically to the MTE.
• Trading in the MTE is on a continuous basis.
• In the MTE, the tradable contracts are Base-Load and Peak-Load, with monthly,
quarterly and yearly delivery periods. (Technical Rule no. 01 rev4 MTE). Cascading mechanism is used to regulate the contracts with quarterly and yearly delivery
periods.
• Market Participants register orders where they specify the type and period of delivery of the contracts, the number of contracts and the price at which they are
willing to purchase/sell.
• After the trading period, the contracts with monyhly delivery are registered as
corresponding transactions onto the PCE, after the adequacy verifications that are
referred to in the PCE Rules.
• Also Over-the-counter (OTC) contracts may be registered in the MTE.
• GME acts as a central counterparty.
the sessions will be held from Monday to Friday, from 09:00 to 17:30, except on the
next-to-the-last day of open market of each month, when the closing time is advanced
at 14:00 for operational reasons.
5.4 Transmission Network
More than 90% of Italy’s National Electricity Transmission is owned, developed and
maintained by Terna, which was founded in 1999 as a separate company (100% owned
by Enel S.p.A, Italy’s incumbent). In the meantime, the grid management was consigned to a public operator named GRTN, which is controlled by the Ministry of Finance. Therefore, the organizational model of power transmission network in Italy was
55
Chapter 5. The Italian Electricity Market
basically on Independent System Operator (ISO) model. In this model the ownership
and the managing of the network were separated. However, Terna and GRTN were
merged on 1st of November, 2005, i.e. the organizational model of Italy is now similar to the other European countries. This model is based on a Transmission System
Operator (TSO) model, which owns and manages at the same time.
It’s worth mentioning that, nowadays the major shareholder of Terna is Cassa Depositi e Prestiti, with 29.85% of shares. The remaining nearly 70% is divided between
institutional and retail investors. Among the principal shareholders of the company:
Romano Minozzi with 5.4%, and Assicurazioni Generali with 2.0%.
56
CHAPTER
6
Data and Assumptions
6.1 Introduction
The input data required are relevant to generating firms in the electricity market, power
plant characteristics of each firm (costs and CO2 emissions data), demand, transmission network data and investment costs. To reduce the size of the problem a number
assumption has been made on firms and power plants’ data; this allows the solver to
conveniently handle the problem. The data and assumptions made are discussed in
detail in the following sections.
6.2 Generating Firms’ Data
In our study, the five largest generating firms namely Enel, E.on, Edison, A2A and
Edipower are considered as strategic firms in the Italian electricity market; the other
firms are aggregated to one single price taker firm. Also, for second and third model
an another price taker firm is introduced which has the ability to invest in solar power
plant.
6.3 Power Plants Data
Table 6.1 shows the values adopted for the existing installed capacity by technology.
It should be mentioned here that two coal power plants belonging to Firm 1 with the
capacity of 1700, 1980 MW will be put in operation in 2012 and 2013 respectively.
Firm 3 will start projects on CCGT and coal power plants with capacity of 410 and 780
MW respectively on 2012 and 2013.
57
Chapter 6. Data and Assumptions
Table 6.1: Existing installed capacity of firms [MW]
GenCo
Firm1
Firm2
Firm3
Firm4
Firm5
Firm6
Oil
3249
1373
362
109
1237
0
CCGT
9249
4749
4528
1466
0
7384
Coal
4647
1209
321
0
0
0
Import
0
320
135
0
0
6983
Pump
7073
0
299
0
0
0
GT
3302
0
0
47
0
0
Bilateral
2395
922
1888
540
0
8776
Hydro
6258
834
377
1868
0
502
Total
36173
9407
7910
4030
1237
23645
6.4 Data on Candidate Expansion Units
The data on expansion units considered are presented in table 6.2. Currently, some coal
power plants are in operation; for the expansion, however, only Super Critical Coal
(SCC) plants are considered. In the tests, only the five largest companies are allowed
to build new power plants based on technologies considered in table 6.2; moreover, the
maximum new capacity per technology that firms are able to invest is assumed to be
4000 MW in each years in advance. plus, 2014 is the year that the firms could invest
on new capacity according to table 6.2.
Table 6.2: Data for candidate power plants
Technology
CCGT
CCGT + CCS
SCC
SCC + CCS
Capacity cost [e/kW]
600
900
1250
1900
Variable cost [e/MWh]
53.79
65
17.75
45
CO2 emission rate [tCO2 /MWh]
0.36
0.04
0.90
0.098
In addition, for the second and third model as described in sections 4.3 and 4.4, the
firms are able also to invest on RES power plants. The data on RES expansion units
that has been used in these models is depicted in 6.3. Also, it should be mentioned that
in our assumption the firms are able to invest on RES power plants from 2011.
Moreover, as electricity production by wind plants depend to a large extent on wind
conditions, choosing the right site is critical to achieve economic viability. Hence, due
to mentioned issue, in our study firms are able to invest in offshore and onshore wind
power plants only in zones 4, 5 and 6 which have a good wind conditions. On the other
hand, in our study, there isn’t such a limitation for solar investment .
Furthermore, maximum new capacity that the firms are able to invest on onshore
wind power plant in each year in advance is assumed to be 500 MW except year 2011
which is 5850 MW. However, these values for offshore wind and solar are 100 MW and
500 MW respectively in each year in advance.
6.5 Demand Data
However, the load curve over each year consists of a number of blocks due to variations
in electrical power demand, but in our study it has been considered as a single block.
Since, our study considers 15 years planning period, hereupon, the equilibrium problem
58
6.6. Data on Transmission Network
Table 6.3: Data for candidate RES power plants
Technology
Onshore wind
Offshore wind
Solar
Incentive [e/MWh]
87.5
122.6
100
Capacity cost [e/kW]
1200
1800
3000
Availability
15%
40%
20%
is too large already. Hence, in order to reduce the size of the problem and consequently
allows the solver to conveniently handle the problem the load of each year is represented
by a single block.
Moreover, a common demand elasticity =0.2 e/M W 2 h is assumed while the price
0
) that model the price dependence on quantity at each
and quantity pairs (p0itb and qitb
node are computed from historical data, which has been updated taking into account an
inflation rate (3%) and an yearly increase factor respectively.
6.6 Data on Transmission Network
Geographically, the Italian electricity market is scattered into several areas. Each area
identifies a delimited grid area in which congestions are less frequent that is connected
through a critical section with other neighboring areas. The TSO defines these areas
and makes frequent modifications to the geographical boundaries of a zone either by
unification two zones or splitting an existing zones depending on the observed congestion.
Figure 6.1 represents the Italian zonal market structure; neighboring markets (Austria, France, etc.) are represented as foreign zones as well as some production poles
(Brindisi, Foggia, etc.) that are limited by structural congestions.
Actually, some congestions between zones are observed only in few exceptional
operating conditions; according to the practice from the Italian TSO, the system is
finally reduced to six zones, four in continental Italy (North, Center-North, CenterSouth, and South) and one each for Sardinia and Sicily (see figure 6.2).
The data for inter-zonal transmission limits were obtained from Terna [2]. The market is modeled by a linearized DC network using Kirchhoff’s laws and Power Transfer
Distribution Factors (PTDFs). In our model, Sardinia has been chosen as a hub node
since the linear property of DC models makes the choice of hub node arbitrary. Also,
network expansion has been considered negligible during the 15 years planning period.
6.7 Data on CO2 Emissions Allowance Price
As described in the section 4.2.4, CO2 price is given exogenously to the model. Six
different CO2 prices are considered in this study, namely 10, 20, 30, 40, 50 and 60
e/tCO2 and compared with the base case characterized by a zero CO2 price. It should
be noted that, the actual CO2 price during 2010 was approximately 16 e/tCO2 .
59
Chapter 6. Data and Assumptions
Figure 6.1: Italian zonal market structure
Figure 6.2: Zonal structure implemented in the model
60
CHAPTER
7
Results and Discussion
7.1 Effect of CO2 Emission and Transmission Constraints
7.1.1
Introduction
The GEP model has been carried out for investigating the impacts of both EU ETS
and transmission constraints on the Italian electricity sector in terms of changes in
electricity prices, generation mix, investment decisions, profits and CO2 emissions.
Six different CO2 prices are considered in this study, namely 10, 20, 30, 40, 50 and 60
[e/tCO2 ] and compared with the base case characterized by a zero CO2 price.
7.1.2
Electricity prices
The introduction of a CO2 price changes the short-run marginal cost of power plants
and hence the electricity prices. Figure 7.1 shows the average electricity prices during
the planning period in each zone as Pc increases. Due to the Italian system structure
adopted in the simulation, the average prices of the zones 2, 3 and 4 are the same, because no congestions are present. Figure 7.1 depicts the average electricity price on the
time horizon considered: increasing Pc results in higher zonal prices, with a different
impact depending on the share of the different generation technologies in each zone.
The yearly prices for P c=0 [e/tCO2 ] and for P c=10 [e/tCO2 ] are shown in figure 7.2
and 7.3 respectively. Both figures show that in 2014 a significant change occurs, related
to the change of the marginal technology that results in reduced prices. Moreover, it
is worth noticing that for P c=10[e/tCO2 ], after 2014 the electricity price is unique,
showing that the locational price signals are strong enough to force producers to build
capacity where necessary, thus reducing the occurrence of congestions. Actually, looking at 7.4, it is clear that, in 2014, generation companies are in the conditions to invest
in new generation.
61
Chapter 7. Results and Discussion
Figure 7.1: . Average electricity price during 2010-2024 at selected Pc in all zones.
Figure 7.2: Electricity price during 2010-2024 at P c=0 [e/tCO2 ] in all zones.
7.1.3
Effects of Transmission Capacity on Investment Decision
The capacity of transmission lines between zones plays an important role on investment
decision due to its influence on prices.
Figure 7.5 depicts the total cumulated capacity of each zone from 2010 to 2024, for
different Pc. The technology of new power plants installed is not considered so far.
Figure 7.5 shows that, in all zones, the installed capacity (initially, SCC plants)
decreases up to a P c=50 [e/tCO2 ], due to the increasing of costs associated to the CO2
emissions. At this value, the SCC+CCS solution becomes attractive and this results in
62
7.1. Effect of CO2 Emission and Transmission Constraints
Figure 7.3: Electricity price during 2010-2024 at P c=10[e/tCO2 ] in all zones.
Figure 7.4: Capacity added during 2010-2024 by zone.
the capacity increase (new SCC + CCS power plants). This does not occur for zones
5 and 6, because of their initial low levels of generation, as also Figure 7.6 depicts.
In order to better understand which zone has more potential for investments in future years, figure 7.6 indicates the capacity expansion growth rate during 2010-2024
(related to the estimated demand in 2024), for different Pc.
Zone 5 and 6 show the larger percent growth rate: zone 5 does not have, in 2010,
enough generation to supply the 2024 demand; moreover, the weak interconnection to
63
Chapter 7. Results and Discussion
Figure 7.5: Capacity additions during 2010-2024 (MW).
Figure 7.6: Percent growth rate of capacity expansion
the other zones makes it very difficult to import energy.
It is interesting to investigate some features of zones 2, 3 and 4 (combined in a single
curve because there are not congestions among them) that are not apparent from Figure
7.6. Zone 2 shows, at P c=20 [e/tCO2 ] and P c=30 [e/tCO2 ], a remarkable growth rate
because it will compensate the low growth of zone 3 exploiting the transmission capability between zones 2 and 3. At P c=60 [e/tCO2 ], the growth rate of zone 4 actually
increases because zone 4 exports to zones 2 and 3, thanks to the strong interconnections.
Zone 1 shows the highest capacity expansion in absolute values during all the consid64
7.1. Effect of CO2 Emission and Transmission Constraints
ered years, but it is offset by the high demand in 2024.
7.1.4
Power Plant Technology
Table 7.1 presents the capacity additions in each zone during 2010-2024 by technologies as a function of CO2 prices. During the planning period, CCGT and CCGT with
CCS power plants are not selected by the model, due to the lower variable cost of the
SCC or SCC + CCS technologies.
Table 7.1: Capacity additions by technology during 2010-2024 (MW)
zone
1
1
2
2
3
3
4
4
5
5
6
6
hhhh
hhCO
2 Price e/tCO2
hh
hhhh
h
h
Technology
SCC
SCC + CCS
SCC
SCC + CCS
SCC
SCC + CCS
SCC
SCC + CCS
SCC
SCC + CCS
SCC
SCC + CCS
0
10
20
30
40
50
60
16639
0
9224
0
5299
0
7369
0
6544
0
3265
0
15637
0
4960
0
8632
0
7369
0
6061
0
2879
0
13504
0
9296
0
3570
0
6934
0
5571
0
2942
0
13209
0
8398
0
2564
0
6503
0
4826
0
2477
0
5044
0
1225
0
4260
0
5423
0
4216
0
2104
0
0
4814
0
1435
0
3512
0
4997
0
3938
0
1840
0
8958
0
3915
0
4369
0
6409
0
3677
0
1427
Table 7.1 shows that, in the base case, the model defines the addition of a total
amount of 48 GW of SCC technology, due to the low variable cost. Increasing Pc up
to 40 [e/tCO2 ], the SCC additions in zones 1, 4, 5 and 6 decrease, due to the increased
cost. The scenario seems to be different, but it is not, for zones 2 and 3, that actually
are to be considered together because of the strong interconnection capability.
Pc=50 [e/tCO2 ] is the limit for the complete replacement of SCC additions by SCC +
CCS.
7.1.5
Generation Mix
CO2 price will increase the variable cost for fossil fueled power plants. Therefore, the
generation mix is likely to change to less CO2 intensive technologies. Table 7.2 shows
the cumulated generation in the considered period (2010-2024) and percent shares of
generation which is different for different Pc. As can be seen from Table 4, at Pc
up to 30 [e/tCO2 ] there is no significant change in the generation mix. At Pc=40
[e/tCO2 ], the generation of electricity from existing CCGT becomes cheaper than investing in new SCC. At Pc=50 [e/tCO2 ], although the share of electricity generation
from CCGT remains almost the same, there is a switch from generation from SCC to
SCC + CCS. At Pc>60 [e/tCO2 ], it is cheaper for firms to invest more on SCC+CCS.
Furthermore, the picture is complete observing that the generation from existing conventional coal plants is significantly reduced for Pc>50 [e/tCO2 ].
65
Chapter 7. Results and Discussion
Table 7.2: Generation mix (%) during 2010-2024 at selected CO2 prices
hhhh
hhCO
2 Price e/tCO2
hh
hhh
hh
h
0
10
20
30
40
50
60
4.13
15.19
0.55
14.1
0
4.39
12.32
49.32
0
7817.1
4.1
15.74
0.46
14.57
0
4.56
12.77
47.8
0
7543
4.24
16.40
0.26
15.2
0
4.75
13.31
45.84
0
7236.1
4.95
16.83
0.06
15.85
0.03
4.95
13.89
43.44
0
6935.6
22.04
16.56
0
16.55
0.74
5.17
14.50
24.44
0
6644.4
23.17
14.63
0
17.03
0.76
5.15
14.92
0
24.34
6458.5
8.29
2.91
0
17.29
10.38
4.92
15.15
0
41.06
6357.7
Technology
CCGT
OIL
COAL
HY DRO
P U M P IN G ST ORAGE
BILAT ERAL
IM P ORT
SCC
SCC + CCS
total(T W h)
7.1.6
Profits of Firms
Table 7.3 depicts the effect of Pc on the total profit of firms over 2010-2024. The
capacity of Firm 1, which has the highest market share, is mainly based on CCGT , coal
and hydro power plants; therefore, initially, it is not forced to invest in new capacity,
also because it benefits in some price setting power thanks to transmission constraints.
Therefore, its profit is almost constant up to Pc=50 [e/tCO2 ] and then decreases. Firms
2, 3, 4, and 5 invest in new generation capacity. Their profits decrease for Pc up to 40
[e/tCO2 ] but they tend to increase at Pc=50 [e/tCO2 ] and above as firms switch their
capacity additions from SCC to SCC + CCS. The profit of the Firm 6, which owns
only existing CCGT plants, increases with CO2 prices up to Pc=50 [e/tCO2 ].
Table 7.3: Profit of firms during 2010-2024 at different Pc [1010 e]
Pc [e/tCO2 ]
0
10
20
30
40
50
60
7.1.7
Firm1
5.44
5.45
5.48
5.46
5.36
5.00
4.74
Firm2
3.61
3.36
3.10
2.86
2.04
2.16
3.09
Firm3
3.48
3.17
2.90
2.64
1.68
1.79
2.85
Firm4
3.33
3.16
2.96
2.77
2.44
2.84
3.16
Firm5
2.92
2.66
2.38
2.11
1.84
2.39
2.50
Firm6
4.62
4.80
4.98
5.19
5.48
5.59
5.53
CO2 Emissions
The purpose of the EU ETS is to reduce the EU GHG emissions. Therefore, it is of
interest to check the change in CO2 emissions at different CO2 prices. Figure 7.7
shows the cumulative CO2 emissions during the planning as a function of the CO2
price. There is only a marginal decrease in CO2 emissions up to Pc=20[e/tCO2 ], while
at Pc=30 [e/tCO2 ] a 16.2% mitigation in CO2 emission occurs, with respect to the base
scenario. This reduction becomes more significant as Pc increases: at Pc=60 [e/tCO2 ],
the reduction is 83%. The large reduction in CO2 emissions at higher CO2 prices of 50
[e/tCO2 ] and above is due to replacement of high CO2 intensive electricity generation
of conventional coal and SCC plants by less CO2 intensive technologies SCC +CCS.
66
7.2. Effect of Different Incentive Plans
Figure 7.7: Total cumulative CO2 emission during 2010-2024 at selected CO2 prices.
7.2 Effect of Different Incentive Plans
7.2.1
Introduction
The second GEP model is applied to the Italian electricity market to investigate the impacts of different incentive plans on the Italian electricity sector in terms of changes in
electricity prices, investment decisions, profits of different companies, and CO2 emissions. It should be mentioned here that, firstly the real incentive value of Italy according
to the table 6.3 is applied and then some assumption is organized to observe the possible
changes in RES expansion.
Seven different CO2 prices of 0, 10, 20, 30, 40, 50, and 60 e/tCO2 are considered
in this study. Unlike previous test, the electricity sales through bilateral contracts and
imports by each firm are not considered here in order to reduce the size of the problem.
7.2.2
Electricity Prices
Obviously as the price of CO2 emission, which has been considered exogenous in our
model, rises, it leads to increment of marginal cost in each firm and consequently will
give rise to market price at each node. Our evaluated results coincide with the same
fact. On the figure 7.8 the average electricity prices during the planning period are
depicted at each node.
Moreover, the yearly prices for different Pc demonstrate this fact that in 2014 an
important change happens, related to the change of the marginal technology (since,
in 2014, sterategic firms are in the conditions to invest in new generation on SCC or
SCC+CCS depending on the different assumed CO2 prices) that results in reduced
prices after 2014. Just a sample, figure 7.9 depicts the yearly prices for Pc=10 e/tCO2 .
7.2.3
Power Plant Technology
Figure 7.10 presents capacity additions (SCC&SCC+CCS) during 2010-2024 at selected CO2 prices in all nodes. It is also worth mentioning that the CCGT and CCGT
67
Chapter 7. Results and Discussion
Figure 7.8: Average electricity price during 2010-2024 at selected Pc in all zones
Figure 7.9: Electricity price during 2010-2024 at Pc=10 e/tCO2 in all zones
with CCS power plants are never selected by the model during planning period, due to
the lower variable cost of the SCC or SCC+CCS technologies. As it can be observed
on the figure, as long as carbon price stays below 40 e/tCO2 , firms tend to use super
critical coal power plants due to their low marginal and capacity costs. However, as
soon as the price of the carbon reaches to 50 e/tCO2 firms incline toward switching
from super critical coal to super critical coal with paired CCS power plants. In such
cases, emission factor overweighs the low marginal and capacity costs of the former
68
7.2. Effect of Different Incentive Plans
power plant. Since, super critical coal power plants with paired CCS have much less
emission factor in comparison with super critical coal type.
Figure 7.10: Capacity additions (SCC&SCC+CCS) during 2010-2024 (MW) at selected Pc in all zones
Also, figure 7.11 shows capacity additions (onshore and offshore wind power plant)
during 2010-2024 at selected CO2 prices in each node. Since, zone 5 has the highest
electricity prices during 2011-2013; it is more profitable for firms to invest in zone 5 in
the mentioned years rather than other zones. As soon as the firms could invest on the
clean coal technologies (which it happens in 2014), the price signals are getting unique
and sufficient enough to drive the producers in building capacity where necessary.
Figure 7.12 demonstrates capacity additions (solar) during 2010-2024 at selected
CO2 prices in all nodes. As it can be seen in the figure, the capacity addition for this
kind of power plant reaches its maximum assumed value which is 500 MW in each year
in advance in all CO2 prices except for the base case. It is worth noting that, for the
base case scenario, only in years 2023 and 2024 there were no solar capacity addition.
For the reason that, the investment cost of solar in these mentioned years can not be
recouped due to its availability factor, incentive value and also the low value of market
price.
7.2.4
Generation Mix
Introducing CO2 price, the production cost of firms will change. Consequently generation mix will be affected due to the tendency of firms to utilize technologies which
have less carbon emission. Figure 7.13 demonstrates the generation mix by fuel type at
69
Chapter 7. Results and Discussion
Figure 7.11: Capacity additions (onshore and offshore wind power plant) during 2010-2024 (MW) at
selected Pc in different zones
Figure 7.12: Capacity additions (solar) during 2010-2024 (MW) at selected Pc in all zones
selected Pc (0, 20, 40 and 60 e/tCO2 ) in the considered time horizon. At low levels of
carbon price (up to 10 e/tCO2 ) there is no drastic change in generation mix. However,
as soon as the price reaches 20 e/tCO2 the role of CCGT power plant becomes more
significant. At price 50 e/tCO2 , CCGT remains almost the same however the use of
SCC with paired CCS power plants start emerging. As the price continues rising, taking
advantage of SCC with CCS power plants becomes dominant.
7.2.5
Profits of Firms
Figures 7.14 and 7.15 demonstrate the effect of carbon emission price on the total profit
gain for different firms (strategic and price taking) over the years 2010-2024. It should
be noticed here that all the price taking firms in Italy are accumulated under the name
PT firm 1. Hence in our model no ability of capacity addition is considered for this
70
7.2. Effect of Different Incentive Plans
Figure 7.13: Generation mix by fuel type at selected carbon prices (TWh)
firm. On the contrary, PT firm 2 is considered as an another price taking firm which is
able to install new capacity on solar.
Firm 1 which due to its resistivity to capacity addition it’s profit keep almost constant
until the price reaches to 40 e/tCO2 and then decreases. However, firm 2, 3, 4 and
5 show different behavior due to their investment in new generation capacity. The
profit of PT firm 1 continues growing until the price reaches to 40 e/tCO2 . Because
increasing the price of market benefits this firm more than the amount which marginal
and emission factor cost. However, its profit tends to decrease at 50 e/tCO2 and above
as strategic firms switch their capacity additions from SCC to SCC+CCS.
Also, as it is evident from 7.15, while the price of CO2 emission rises, it leads to
rise in market price and consequently will give rise the profit for PT firm 2.
7.2.6 CO2 Emissions
By introducing CO2 emission price in our model, firms show a tendency to decrease
the CO2 emission in order to gain more profit. Hence, the study of this behavior in
the years ahead seems to be interesting. As it is shown in figure 7.16, while price of
the CO2 emission equals 40 e/tCO2 , there is a 24.5% mitigation in CO2 emission
with respect to reference price (Pc=0). This reduction becomes more noticeable as the
CO2 emission price grows. Namely, increasing the CO2 emission price from 50 to 60
e/tCO2 lowers emission from 54.2% to 68.7%.
7.2.7
Effects of Incentives on Investment Decision of RES
Few tests have been organized in order to analyze the impact of different incentive
plans on renewables expansion. Accordingly, for the base case scenario, the value of
incentives for all RES have been decreased 15%, 25% and 50% with respect to the real
incentives.
71
Chapter 7. Results and Discussion
Figure 7.14: profit of strategic firms during 2010-2024 at different Pc
Figure 7.15: profit of price taking firms during 2010-2024 at different Pc
Figure 7.17 shows the capacity added for solar at Pc=0 for different incentives scenario. It is showing that the capacity added by solar decreased drastically, whereas
incentives of the RES decreased up to 15%.
It is interesting to survey some features of solar capacity addition that are not evident
72
7.2. Effect of Different Incentive Plans
Figure 7.16: Total cumulative CO2 emission during 2010-2024 at selected CO2 prices
from figure 7.17. In case of 15% decrement in incentives, the capacity addition of solar
happened only in 2011 and 2012 and afterwards it was not profitable for price taker
firm to invest on solar. This is because of its high investment cost and low value of
availability factor. It should be mentioned here that the solar power plant never selected
by the model when the value of incentive decreases up to 25%.
Figure 7.17: Capacity added for solar(Pc=0)
On the figure 7.18 the capacity added for onshore wind at Pc=0 for different incentives scenario is presented. It should be noticed here that, while there is 25% decrement
in incentives, the capacity added by this kind of power plant is remained the same
in comparison with the real incentives scenario. Although, as far as the decrement
reaches to 50%, capacity addition by onshore wind power plant happened only during
2011-2013 and after that it is more profitable for firms to invest in clean coal technology
rather than onshore power plant.
As it is shown in the figure 7.19, by decreasing the value of incentives up to 50%,
wind offshore power plant is still more favorable to invest in comparison with onshore
73
Chapter 7. Results and Discussion
Figure 7.18: Capacity added for onshore wind(Pc=0)
wind. Because despite the fact that the capital cost of the wind offshore power plant
is higher than the onshore power plant, however the incentive and availability factor of
offshore makes it more profitable to invest rather than onshore power plant. It should
be paid attention that the capacity additions are highly dependent to the market price
which is set by the GEP model.
It is worth considering that, as the value of incentives decreased up to 50%, the solar
power plant never selected by the model and also the installed capacity for onshore
power plant drastically decreased, hence producers install offshore wind power plants
where required.
Figure 7.19: Capacity added for offshore wind(Pc=0)
74
7.3. Effect of already Installed CCGT on Generation Mix
7.3 Effect of already Installed CCGT on Generation Mix
7.3.1
Introduction
There are power plants in the electricity market that have been installed many years ago
but their investment costs have not been recouped yet. In this context, recovering the
investment cost of these power plants in the long run could change the generation mix
and also the future investment decisions.
In this test, a base case scenario is assumed. Because, at Pc=0, existing CCGTs are
producing less electricity in 2014 to 2024 when the firms have the ability to invest a
new capacity according to the table 6.2. Consequently, in order to observe the effects
of already installed CCGT power plants on the generation mix & future investment
decisions, it would be easier to compare this model with the previous one for the base
case scenario. It should be mentioned that in this test, the already installed CCGT
power plants have to recoup 10% of their investment cost during the planning period.
7.3.2
Comparison
Figure 7.20 depicts the average electricity prices during the planning period at Pc=0 for
models 2 and 3 at each node. Take a look at the figure reveals that the average prices of
this model are higher than the previous one on account of the constraint 4.65 must be
fulfill for already installed CCGT power plants.
Figure 7.20: Average electricity price for model 2 and 3 during 2010-2024 at Pc=0
Also, figures 7.21 and 7.22 show the changes in generation mix over the planning
period at Pc=0 for models 3, 2 respectively. As it is recognizable in the figure 7.21,
unlike the generation mix shown in figure 7.22, the CCGT power plants (in our study
they are already installed power plants that should recoup 10% of their investment cost
during planning period) came to the service to recoup their investment cost even after
year 2014 while strategic firms are able to invest on clean coal technology. Accordingly,
the capacity added by SCC power plants are decreased.
On the figure 7.23 the cumulative CO2 emissions during the planning period at Pc=0
for both models is depicted. As it can be seen from the figure, while price of the CO2
emission equals 0 e/tCO2 , the total cumulative CO2 emission in model 3 is less than
the model 2. Since, the model force CCGT power plants to come to the service which
has the lower emission rate in comparison with SCC power plants, consequently total
cumulative CO2 emission has been decreased.
75
Chapter 7. Results and Discussion
Figure 7.21: Generation mix by fuel type for model 3 at Pc=0 (TWh)
Figure 7.22: Generation mix by fuel type for model 2 at Pc=0 (TWh)
Figure 7.23: Total cumulative CO2 emission (Mt) for model 2 and 3 during 2010-2024 at Pc=0
76
CHAPTER
8
Conclusions and Future Works
8.1 Conclusions
This study presents an oligopolistic GEP model in the presence of transmission constraints for analyzing generating firms’ investment decisions under different CO2 reduction targets. In addition, a model that allows the assessment of the impacts of the
different incentive plans on RES expansions is also presented. Finally, a model which
able to consider the already installed power plants that have been installed several years
ago but their investment costs still not recouped is given.
Although many models exist that look into GEP in oligopolistic markets, there are
only few GEP models that take into account environmental considerations. Moreover,
there are no detailed models that take into account consideration both transmission constraints and emission constraints. Due to the fact that the generation capacity expansion
may lead to add or relieve congestions in transmission, it is very important to include
the transmission network representation in the GEP models.
In this study, a rigorous GEP model has been developed that can analyze impacts of
different GHG mitigation polices such as emission reduction targets & emission trading
and different incentive plans on the investment decisions in transmission constrained
oligopolistic markets. Moreover, the model is able to consider the effects of already
installed power plants-by considering their investment cost-on the generation mix.
The ability of the proposed models are demonstrated with reference to the transmission constrained Italian electricity market and to the European emission trading system,
showing the possibility to model real markets and systems.
8.2 Future Works
Future research may focus on following two areas:
77
Chapter 8. Conclusions and Future Works
• Future research may carry out to integrate the existing uncertainties over the load
and commodity prices via implementing stochastic model.
• Future research may include improvement of mathematical models in order to give
algorithm the capability to converge using less computational burden.
78
CHAPTER
9
Islanding in Sub-transmission grids
9.1 Introduction
The main idea of the research project is to define the possibility, for the subtransmission
network or a part of it, to survive to a disconnection from the bulk power system. It
means that the behavior of the frequency in transient from normal operation to islanding
should be under tolerance of the protection settings of the subtransmission system. By
defining the control variables in mathematical model and evaluate them by simulation
the behavior of the frequency can be controlled.
In general, disconection of subtransmission system from the bulk power system can
be due to:
Intentional actions This is the case of local systems that are designed for islanded
operations. A couple of examples can be provided:
• Industrial areas where local generation is in operation, that can separate from
the remaining part of the transmission system in case of perturbations in the
bulk power system (e.g., in case of risk of blackout). Typically, the interconnection is made by means of a single breaker that, in case problems of frequency or voltage are detected, automatically opens and trigger a procedure
to balance the industrial load, for example by shedding not essential loads.
As the local system is designed for that kind of operation, the most frequent
operating conditions are known, the technical features of the generators and
the turbines are known and the procedure is likely to be successful.
• Transmission system areas that can trigger islanded conditions in case of large
frequency perturbations in the transmission system, according to well defined
System Protection Schemes and contingency plans. This possibility is not
79
Chapter 9. Islanding in Sub-transmission grids
considered in the current Italian contingency plan, where all generators at all
voltage levels are expected to contribute to the balance of the system during
the perturbation (although in different ways based on the frequency relays
settings); in some Countries, however, islanding is considered a countermeasure to "save" a part of the load in some specific balanced areas, that can be
detected on line by means of adaptive schemes. In this case, the contingency
plan and the set of devices able to start islanding procedures must be carefully
designed, as the operating conditions of the bulk power system at the moment
of the event is not known a priori and can be very different from time to time.
Moreover, at the transmission level, the intentional islanding procedure must
be activated by the opening of many breakers, not by a single breaker operation. This makes it necessary to include in the analysis complex time-domain
simulations to check the feasibility of the islanded operation.
• A third possibility is the intentional islanded operation of a part of a system
due to reconfiguration of the system in the absence of any particular critical
condition. In this case, all the control actions are taken according to specific,
detailed and tested procedures aimed at avoiding technical problems and imbalances.
Unintentional operation A different situation can occur if the islanding is started by
the operation of a breaker due to the triggering of the protections system. For
example, this is the case in radial distribution systems where, due to a fault and the
consequent operation of a breaker, the terminal part of a feeder becomes islanded
and, if generation is available, can continue the operation in case the generation is
able to balance the load.
In more complex topological schemes, e.g., in case of subtransmission or even
transmission meshed systems, this type of unwanted islanded operation becomes
more and more unlikely to occur due to the fact that the simultaneous operation
of two or more (depending on the meshing of the grid) breakers should start the
islanding; this could occur in case of simultaneous multiple faults, which is clearly
more and more unlikely. Moreover, in this case, it is also difficult to design the
islanding system, because not only the operating conditions - after the islanding
- can be very variable in time and therefore difficult to predict, but also the faults
that cause the opening of breakers influence the overall dynamic of the system,
thus making very difficult to design an automatic system able to guarantee the
success of the islanding procedure for all the starting events.
The present research deals with the possibility to operate a part of the subtransmission 132/150 kV system that, following the operation of the breakers, results in islanded
conditions. In particular, the generation from RES is to be exploited to check the ability
of the currently available technologies in providing the necessary regulating capability.
In other words, in the present study, the dynamic behaviour of the system that resulted
in the islanded conditions is neglected.
80
9.2. Islanding in subtransmission systems
9.2 Islanding in subtransmission systems
In order to exploit islanding in the subtransmission systems, it is necessary to investigate on the topology of that systems and on its regulating resources. Currently, subtransmission feeders are connected to the higher voltage levels (transmission system)
through some connection points at the substations. The connection points can be two
or more, depending on the structure of the system. For example, in the test system A,
reported in figure 9.1, two connection points are present: therefore, it is necessary that
two breakers operate, in order to give the conditions for an islanded situation.
Figure 9.1: Test System A
Regardless the reasons that resulted in an islanding (more or less extend in the
space), in the "old" approach, once a part of the subtransmission system experiences
the islanding, the probability that it survives depends on the ability to balance the load
and generation as well as on the voltage control features, without resulting in further
operation of the protection system that could further jeopardize the islanded system.
All the above mentioned parameters in today subtransmission systems are not typically controlled or designed for such events, and therefore, the probability of successful
operation of the islanded system following the initial events is in any case very low, in
some way random, due to the uncertainties on loads, generation and so on.
In the following sections, an innovative function of the proposed Substation Automation System (SAS) is presented, to increase the probability of successful islanding
by means of possible control actions available on both the generation and the load side.
The described procedure is carried out every 5 to 15 minutes to generate a table
81
Chapter 9. Islanding in Sub-transmission grids
where, for each set of N breakers opening, that could result in an islanded operation,
the set of control actions to be carried out is defined. In case of any islanded operation,
therefore, each SAS must actuate them, thus maximizing the probability of successful
islanded operation.
9.3 Finding the feasibility for islanded operation
The SAS island feasibility function is an innovative concept in the Smart Grids framework. It was studied to give the possibility to supply load by means of any regulating
resource, in particular renewable generation, even in case the subtransmission grid is
(partially) disconnected from the transmission network. The goal of this function is to
determine, for a given operating condition and a set of triggering events, the possibility for islanded operation of the 132/150 kV subtransmission system. Also, in case of
feasibility, the procedure determines the control actions to be put in place.
The island feasibility function has a preventive character and it requires the definition of:
• a monitored area;
• a master SAS in that area to run the procedure every 10-15 minutes.
In this regard, the master SAS will:
• receive information from the other SASs of the monitored area; in particular
– the generation and load profile;
– the continuously up and down controllable resources;
– the discrete up and down controllable resources, according to different step
sizes (load shedding, generation shedding);
• elaborate information and determine, for each set of possible triggering events, if
islanding is feasible from a steady-state perspective; in case of positive answer,
the SAS will also have to determine the set of control actions to be taken if the
events will occur;
• communicate to the other area SASs the complete matrix reporting the results
(what-to-do-if);
• in case the area becomes islanded, the master SAS will communicate the borders
of the area that became islanded and each SASs will act according to the matrix
above defined.
9.4 Mathematical Model
The procedure can be mathematically expressed as a constrained integer programming
problem that, in a basic approach, maximizes the load to be supplied after islanding:
max Load = max
NLi
SAS X
h NX
i=1 j=1
where
82
αij Cij
i
(9.1)
9.4. Mathematical Model
• NSAS is the total number of SASs in the investigated area;
• NLi is the number of loads controlled by the i-th SAS;
• αij is a binary variable resulting from the solution of problem (9.1). Its meaning
is as follows: it is 0 if the load j connected to the i-th SAS is to be disconnected to
make the islanded operation feasible, 1 in case it remains connected;
• Cij is the load j connected to the i-th SAS.
In the following, this model will be referred to as Model 1.
Solving Model 1, due to the particular problem studied, multiple solutions can be
found for the same load level; in that case, it should be better to select the solutions
where larger generation and regulating resources (voltage support and larger inertia,
and consequently expected better dynamic response) are left in operation. Therefore, a
second model, Model 2, is recommended, with a better objective function, which also
includes the generation in the maximization of the objective function:
NLi
NEi
NDi
N
N
SAS X
SAS X
SAS X
h
i
NX
X
X
E
max Load+Generation = max
αij Cij +
γim Pim +
βik PikD
i=1 j=1
i=1 m=1
i=1 k=1
(9.2)
where:
• NEi is the number of non-regulating generators that can be controlled by the i-th
SAS;
E
• Pim
is the actual output of the m-th non-regulating generator connected to the i-th
SAS;
• NDi is the number of regulating generators that can be controlled by the i-th SAS;
• PikD is the actual output of the k-th regulating generator connected to the i-th SAS;
• γim and βik are binary control variables relevant to non-regulating and regulating
generators, respectively, with the same meaning as αij .
Both the above objective functions are subject to the following set of constraints:
• Island total regulation band: The purpose of this constraint is to allow the island
to compensate in the long-term the most likely load fluctuations with regulating
generation. Such fluctuations are assumed to be proportional to the total load in
operation.
NDi
N
SAS X
X
i=1 k=1
+
βik Dik
−
NDi
N
SAS X
X
−
βik Dik
≥ ξ Load
(9.3)
i=1 k=1
where
– Po is the Actual power of the k-th regulating generator connected to the i-th
SAS;
83
Chapter 9. Islanding in Sub-transmission grids
– Pmax is the maximum power of the k-th regulating generator connected to the
i-th SAS;
– Pmin is the minimum power of the k-th regulating generator connected to the
i-th SAS;
+
– Dik
> 0 is the available up-band for k-th generator of i-th SAS (Pmax − Po );
−
– Dik < 0 is the available down-band for k-th generator of i-th SAS (Pmin −Po );
– ξ is a user-defined constant that quantifies the total necessary regulating band.
• Further constraints on up and down bands can be considered, that can, in some
cases, overlap the above constraint:
– additional constraints on the minimum up and down band:
NDi
N
SAS X
X
+
+
βik Dik
= Dtot
≥ τ Load
(9.4)
−
−
βik Dik
= Dtot
≤ −τ Load
(9.5)
i=1 k=1
NDi
N
SAS X
X
i=1 k=1
Where τ is a user-defined constant; a couple of different real power values in
MW could be specified instead of τ Load, making the band asymmetrical.
– additional constraints on up and down bands: these constraints determine the
amount of controllable generation that can mitigate the instantaneous imbalance between load and generation that appears after the islanding and after
the control actions have been applied. The purpose of this constraint is to
allow that,
+
∗ an up regulating band Dtot
is available if, after all control actions actuation, the island load is higher than generation, and
−
∗ a down regulating band Dtot
is available if, after all control actions actuation, the island load is lower than generation.
NDi
N
SAS X
X
+
+
βik Dik
= Dtot
≥ σ ∆I
(9.6)
−
−
βik Dik
= Dtot
≤ σ ∆I
(9.7)
i=1 k=1
NDi
N
SAS X
X
i=1 k=1
Where σ > 1 is a user-defined parameter and defines the security margin
with respect to the imbalance that would appear after islanding and after the
control actions determined, with:
∆I = Load−Generation =
NLi
N
SAS X
X
i=1 j=1
NEi
N
SAS X
X
αij Cij −
NDi
N
SAS X
X
E
βik PikD
γim Pim −
i=1 m=1
i=1 k=1
(9.8)
It is worth noticing that:
84
9.4. Mathematical Model
+
∗ if ∆I > 0, the constraint (9.6) is satisfied by a suitable Dtot
and the
−
constraint (9.7) is automatically fulfilled, because Dtot
is a negative value;
−
∗ if ∆I < 0, the constraint (9.7) is satisfied by a suitable Dtot
, while con+
straint (9.6) is automatically fulfilled, because Dtot is a positive value;
Conceptually, constraints (9.6) and (9.7) are different from (9.3), (9.4) and
(9.5), because they are dealing with the short-term transient consequent to
the islanding, while the constraints introduced before are more oriented to
the long-term operation of the island.
The above optimization problem is a mixed-integer programming (MIP), because it involves binary variables, which can be solved by the CPLEX solver
in GAMS.
9.4.1
Preliminary Test and results
9.4.1.1
Presentation of the test cases
Tests have been performed on the test system A in order to highlight:
∗ differences in the mathematical model (objective functions);
∗ the most suitable solver for the solution of the optimization problem;
∗ the most appropriate values of the different user-defined parameters τ, σ
and ξ.
The values of the parameters above mentioned are necessary for the follow-up
of the research: they actually will be chosen based on the dynamic response
of the islanded system.
The test system adopted is Test System A; its main features in terms of loads
and generators are described in Figure 9.2.
Figure 9.2: Data of Test System A used for tests
Figure 9.2, in particular, shows, for each SAS, generators connected, their
actual production and communicated regulating bands (D+ and D− ), loads
(actual consumption) and their availability to shed a part of the load (E + ),
Distribution System Operator (DSO) resources, using the same notation.
85
Chapter 9. Islanding in Sub-transmission grids
9.4.1.2
Tests for Model 1 - Basic load model
Figure 9.3 shows a representation of the system, where all physical and logic
variables are highlighted, adopting the following meaning:
∗
∗
∗
∗
j variable corresponding to non-controllable loads;
l variable corresponding to controllable loads;
m variable corresponding to non-controllable generators;
k variable corresponding to controllable generators.
Figure 9.3: Representation of Test System A for tests
Adopting the above described test system, many tests have been performed
in order to check the capability of the proposed procedure, and the ability of
the chosen solver (GAMS, with the CPLEX solver).
In particular, 36 cases have been run on this system, to evaluate the numerical
properties with respect to the parameters:
∗ ξ: the total up-band and total down-band are changed in the range: 0.10.2-0.3-0.4
∗ σ: the up- or down- band according to the initial imbalance are changed
in the range: 1.05-1.15-1.25,
∗ τ : the total minimum band is changed in the range: 0.05-0.1-0.15.
The results in table 9.1 show that the procedure works fine and finds the solution when it is possible. In almost all cases, the islanding is feasible according
to the assumption of steady-state conditions (this does not mean that dynamic
86
9.4. Mathematical Model
Table 9.1: Results for Model 1 - Basic load model
Case
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
ξ
σ
τ
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
0.05
0.05
0.05
0.05
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.05
0.05
0.05
0.05
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.05
0.05
0.05
0.05
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
NCL
MW
70.1
66.9
41.1
35
38
38
35.7
35
—
—
—
—
71.5
69
40.4
35
38
38
38
35
—
—
—
—
70.9
69.9
37.5
32
38
38
38
35
—
—
—
—
CL
MW
2
3
1
0
2
2
4
0
—
—
—
—
0
1
1
0
2
2
2
0
—
—
—
—
0
0
4
3
2
2
2
0
—
—
—
—
TL
MW
72.1
69.9
42.1
35
40
40
39.7
35
—
—
—
—
71.5
70
41.4
35
40
40
40
35
—
—
—
—
70.9
69.9
41.5
35
40
40
40
35
—
—
—
—
87
NCG
MW
42.1
30
0
0
0
0
0
0
—
—
—
—
30
30
0
0
0
0
0
0
—
—
—
—
30
30
0
0
0
0
0
0
—
—
—
—
CG
MW
26.2
38.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
TG
MW
68.3
68.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
68.3
68.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
68.3
68.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
∆I
MW
3.8
1.6
3.8
-3.3
1.7
1.7
1.4
-3.3
—
—
—
—
3.2
1.7
3.1
-3.3
1.7
1.7
1.7
-3.3
—
—
—
—
2.6
1.6
3.2
-3.3
1.7
1.7
1.7
-3.3
—
—
—
—
fobj
MW
72.1
69.9
42.1
35
40
40
39.7
35
NF
NF
NF
NF
71.5
70
41.4
35
40
40
40
35
NF
NF
NF
NF
70.9
69.9
41.5
35
40
40
40
35
NF
NF
NF
NF
Chapter 9. Islanding in Sub-transmission grids
problems will prevent actually the islanding). Only when τ = 1.15 it is not
possible to successfully operate the island due to the too hard constraint. This
means that that parameter can be critical in some situations, at least for the
studied test system A.
In Table 9.1, the following legenda is adopted:
NCL Non Controllable Load
CL Controllable Load
TL Total Load
NCG Non Controllable Generation
CG Controllable Generation
TG Total Generation
∆I Imbalance after islanding
fobj Objective function
Typically, the feasibility problem is solved in computation times around 100
ms, and this make the procedure suitable for on line applications.
9.4.1.3
Improving the load model
The proposed tests actually make an implicit assumption, i.e., that each load
is controlled by only one binary variable.
Figure 9.4 shows the Basic load model, with reference to the load adopted in
test system A at SAS 1. It is made by a 30 MW non controllable load (only
emergency disconnection) and by a 3 MW controllable load. According to
the basic load model, the feasibility procedure can decide to control the load
at SAS 1 for the following values: 3 - 30 - 33 MW. In this case, the control
variables relevant to each step are completely independent.
Figure 9.4: Basic load model - SAS 1
Actually, the above model is not realistic, as in real power systems typically
the scheme of loads are as in figure 9.5: the controllable load can be shed
(3 MW) and in case of emergency the total load is disconnected, including
the controllable part. In the latter case, the control variables j and l are not
completely independent, in the sense that if j = 0, then the value of l is
meaningless (see also equation 9.9).
L = αj (N CL + αi CL)
88
(9.9)
9.4. Mathematical Model
The latter model introduces a difficulty, in the mathematical model, because
it is necessary to model the load using products between the binary variables:
therefore, the problem becomes a Mixed Integer Non Linear Programming
(MINLP) problem. This makes it impossible to adopt CPLEX as a solver:
the solver COINBONMIN is therefore adopted using the second realistic load
model. The results presented in the following are relevant to that solver. The
same considerations apply for the DSO models.
Figure 9.5: Advanced load model
According to the second load model, called Advanced load model, variables
have been re-defined, for studying the test system A, as represented in figure
9.6. Moreover, variables relevant to DSOs have been highlighted explicitly,
according to the following description:
∗
∗
∗
∗
∗
∗
∗
j variable corresponding to non-controllable loads;
l variable corresponding to controllable loads;
m variable corresponding to non-controllable generators;
k variable corresponding to controllable generators;
f variables corresponding to non-controllable loads of DSOs;
p variables corresponding to controllable loads of DSOs;
s variables corresponding to controllable generators for load DSO.
9.4.1.4
Tests for Model 1 - Advanced load model
The same 36 cases run adopting the advanced load model have been studied,
and the results are shown in table 9.2, where total values are shortly given.
As already mentioned, this kind of maximization problem is not linear anymore and CPLEX solver is not able to solve it. Therefore, it is necessary to
use COINBONMIN.
The computational time is about a couple of seconds, i.e., 16-18 times greater
than the computational time of the previous model (Basic Load Model).
89
Chapter 9. Islanding in Sub-transmission grids
Table 9.2: Results for Model 1 - Advanced load model
Case
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
ξ
σ
τ
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
0.1
0.2
0.3
0.4
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
0.05
0.05
0.05
0.05
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.05
0.05
0.05
0.05
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.05
0.05
0.05
0.05
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
NCL
MW
67.6
67.5
42
32.5
39.7
39.7
39.7
29.6
—
—
—
—
70.7
65.5
41.7
32.5
39.7
39.7
39.7
29.6
—
—
—
—
68.5
67.5
40.5
32.5
39.7
39.7
39.7
29.6
—
—
—
—
CL
MW
4
3
0
0
0
0
0
2
—
—
—
—
1
4
0
0
0
0
0
2
—
—
—
—
3
2
1
0
0
0
0
2
—
—
—
—
TL
MW
71.6
69.5
42.1
32.5
39.7
39.7
39.7
31.6
—
—
—
—
71.7
69.5
41.7
32.5
39.7
39.7
39.7
31.6
—
—
—
—
71.5
69.5
41.5
32.5
39.7
39.7
39.7
31.6
—
—
—
—
90
NCG
MW
29.6
29.6
0
0
0
0
0
0
—
—
—
—
30
29.6
0
1
0
0
0
0
—
—
—
—
30
30
0
0
0
0
0
0
—
—
—
—
CG
MW
38.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
38.3
38.3
38.3
37.3
38.3
38.3
38.3
38.3
—
—
—
—
36.3
38.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
TG
MW
67.9
67.9
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
68.3
67.9
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
66.3
68.3
38.3
38.3
38.3
38.3
38.3
38.3
—
—
—
—
∆I
MW
3.7
1.6
3.7
-5.8
1.4
1.4
1.4
-6.7
—
—
—
—
3.4
1.6
3.4
-5.8
1.4
1.4
1.4
-6.7
—
—
—
—
5.2
1.2
3.2
-5.8
1.4
1.4
1.4
-6.7
—
—
—
—
fobj
MW
71.6
69.5
42
32.5
39.7
39.7
39.7
31.6
NF
NF
NF
NF
71.7
69.5
41.7
32.5
39.7
39.7
39.7
31.6
NF
NF
NF
NF
71.5
69.5
41.5
32.5
39.7
39.7
39.7
31.6
NF
NF
NF
NF
9.4. Mathematical Model
Figure 9.6: Representation of Test System A for tests using advanced load model
9.4.1.5
Tests for Model 2 - Basic load model
This section presents the results obtained using the MIP procedure, based on
the basic load model, to solve problem 9.2. The possible drawback, adopting
the optimization model 9.1, is that the same amount of load can be supplied
by different combinations of generators; in that case, the preferred solution
should be the one that ensures more regulating resources, i.e., more generation in operation. This is why the objective function in 9.1 has been modified
to define the problem 9.2.
Actually, the results obtained are in most cases equal to the results obtained
with problem 9.1, due to the data structure adopted.
However, in five cases the solutions are different. In particular, in two cases
the solution of problem 9.2 is better, as expected, and, unfortunately, in three
cases the solution is worse.
The solutions of these cases are shown in table 9.3, only for the different
results.
The results should be compared with those in table 9.1: for example, case 7
in table 9.3 results in an increased amount of load as compared with case 7
in table 9.1. However, this actually highlights that actually the solution found
by the MIP problem 9.1 is not the global optimum, but a local optimum. The
same holds for Case 15.
Cases 13, 25 show another critical issue with the MIP problem 9.2: in such
91
Chapter 9. Islanding in Sub-transmission grids
Table 9.3: Selected results for Model 2 - Basic load model
Case
7
15
13
25
27
ξ
σ
τ
0.3
0.3
0.1
0.1
0.3
1.05
1.15
1.15
1.25
1.25
0.1
0.05
0.05
0.05
0.05
NCL
MW
38
38.6
70.5
70.5
41.4
CL
MW
2
3
0
0
0
TL
MW
40
41.6
70.5
70.5
41.4
NCG
MW
0
0
30
30
0
CG
MW
38.3
38.3
38.3
38.3
38.3
TG
MW
38.3
38.3
68.3
68.3
38.3
∆I
MW
1.7
3.3
2.2
2.2
3.1
fobj
MW
78.3
79.9
138.8
138.8
79.9
cases, not only the supplied load is less than in the corresponding table 9.1,
but also the solution point is not a global optimum, as the objective function
in table 9.3 is lower than the sum of the total load and generation in table 9.1.
Finally, case 27 shows that the load supplied is lower than in table 9.1, but the
optimization worked properly as the objective function in table 9.3, is higher
than the sum of the total load and generation in table 9.1.
This is a typical issue in the field of the optimization with discrete variables:
the algorithms based on gradients and derivatives do not guarantee that the solution obtained is actually a global optimum; this drawback could be solved
using Genetic Algorithms or similar tools. However, the latter methods usually take a large computation time, not suited for the proposed application.
It is worth noticing, however, that the solutions obtained by the two approaches (problems 9.1 and 9.2) are in most cases identical, and only in few
cases different; in the latter cases, moreover, the solutions obtained are quite
close. Therefore, both the above presented methods are to be considered quite
efficient and should be considered for implementation in a prototype.
The following figures depict some of the studied cases to show which is the
physical meaning of the different variables and what 0s and 1s imply on the
islanded system operation.
They are relevant to case 7 (figure 9.7 for model 1 and figure 9.8 for model
2), to case 14 (figure 9.9 for model 1 and figure 9.10 for model 2), case 15
(figure 9.11 for model 1 and figure 9.12 for model 2). All figures refer to the
Basic load model.
9.4.1.6
Tests for Model 2 - Advanced load model
The same type of comparison has been carried out using the Advanced load
model, i.e., the MINLP problem. Also in this case, the results have been in
most cases the same for problems 9.1 and 9.2.
Only in three cases, model 2 gave better results compared to model 1. These
are shown in table 9.4.
In the first two cases, both the supplied load and generation are higher than in
table 9.2, while in the third case the supplied load is higher but the generation
is the same. This means that model 1 found a local optimum.
92
9.4. Mathematical Model
Figure 9.7: Case 7, Model 1
Figure 9.8: Case 7, Model 2
93
Chapter 9. Islanding in Sub-transmission grids
Figure 9.9: Case 14, Model 1
Figure 9.10: Case 14, Model 2
94
9.4. Mathematical Model
Figure 9.11: Case 15, Model 1
Figure 9.12: Case 15, Model 2
95
Chapter 9. Islanding in Sub-transmission grids
Table 9.4: Selected results for Model 2 - Advanced load model
Case
1
2
26
ξ
σ
τ
0.1
0.2
0.2
1.05
1.05
1.25
0.05
0.05
0.05
NCL
MW
70.9
68.6
69.7
CL
MW
1
1
0
TL
MW
71.9
69.6
69.7
96
NCG
MW
30
30
30
CG
MW
38.3
8.3
38.3
TG
MW
68.3
68.3
68.3
∆I
MW
3.6
1.3
1.4
fobj
MW
140.2
137.9
138
9.5. Conclusions and Future Works
9.5 Conclusions and Future Works
9.5.1
Conclusions
This study presents an algorithm to check the possibility of islanding condition with penetration of renewable generation in a case that the certain region
of subtransmission system is disconnected from the main system, to guarantee the secure islanded operation. The method involves the switching control
action plan, dependent on the type of disconnection, by means of the solution
of an optimization problem carried out off-line.
In this study, two load models have been considered namely basic load model
and advance load model. In basic load model, each load is controlled individually which makes the problem becomes Mixed Integer Programming (MIP)
problem. But for the advance load model which is more realistic, one load is
dependent to another which makes the problem becomes Mixed Integer Non
Linear Programming (MINLP) problem.
The ability of the proposed model is demonstrated with reference on real
subtransmission system, showing the possibility of model to find feasibility
of islanding.
9.5.2
Future Works
The future work may carry out to assess the above parameter values (σ, ξ, τ )
by performing some dynamic simulations that can give answers on the probability that, according to the parameters chosen, the load island can survive
from disconnection of the main grid. In order to perform this analysis, once
the GAMS procedure is carried out, the results (in terms of generation/loads
to be disconnected in case of islanding) should be transferred to DigSilent and
a dynamic simulation ought to carried out. In this case, the dynamic simulations allow us to understand whether the parameters proposed are reasonable
or not. Moreover, it would be possible to introduce some new constraints in
order to have a secure islanding operation.
97
Bibliography
[1] Decreto Legislativo 16 Marzo 1999, n. 79. Attuazione della direttiva 96/92/CE recante norme
comuni per il mercato dell’energia elettrica. Gazzetta Ufficiale 31/3/1999, Serie generale n.75 (in
Italian).
[2] Statistical data on Italian electricity market published by Italian TSO (Terna SpA), available on
www.terna.it.
[3] A.Abeygunawardana, A.Berizzi, C.Bovo and M.Innorta. A conjectural supply function for the
italian electricity market. Univercities Power Engineering Conference (UPEC), pages 1–5, 2008.
[4] A.Abeygunawardana, C.Bovo and A.Berizzi. Market power analysis in the italian electricity
market using a supply function equilibrium model. Univercities Power Engineering Conference
(UPEC), pages 1–5, 2009.
[5] A.Abeygunawardana, C.Bovo and A.Berizzi. Implications of co2 prices on the generation capacity expansion in the italian electricity market. Conference of IEEE 45TH International Univercities Power Engineering, 31st august–3rd September, 2010.
[6] A.Chung, F.Wu and P.Varaiya. game theoretic model for generation expansion planning: problem
formulation and numerical comparisons. IEEE Transactions on Power Systems, 16(4):885–891,
2001.
[7] A.GraciaAlcalde, M.Ventosa, M.Rivier, A.Ramos and G.Relano. Fitting electricity market models: a conjectural variations approach. Proceedings of 14th Power Systems Computation Conference (PSCC), Seville, Spain, 24–28 June, 2002.
[8] A.Paul and D.Burtraw. The rff haiku electricity market model, resources for the future. Washington, D.C, 2002.
[9] A.Rudkevich, M.Duckworth and R.Rosen. Modeling electricity pricing in a delegulated generation industry: the potential for oligopoly pricing in a poolco. Energy Journal, 19(3):19–48,
1998.
[10] B.Andersson and L.Bergman. Market structure and the price of electricity: an ex–ante analysis
of the deregulated swedish electricity market. The Energy Journal, 16(2):97–109, 1995.
[11] B.Hobbs. Network models of spatial oligopoly with an application to deregulation of electricity
generation. Operations Research, 34(3):395–409, 1986.
[12] B.Hobbs. Linear complementarity models of nash–cournotcompetition in bilateral and poolco
power markets. IEEE Transactions on Power Systems, 16(2):194–202, 2001.
[13] B.Hobbs and F.Rijkers. Strategic generation with conjectured transmission price responses in a
mixed transmission pricing system – part i: formulation. IEEE Transactions on Power Systems,
19(2):707–717, 2004.
[14] B.Hobbs and K.Kelly. Using game theory to analyze electric transmission pricing policies in the
us. European Journal of Operational Research, 56(2):154–171, 1992.
[15] B.Hobbs and R.Schuler. Assessment of the deregulation of electric power generation using network models of imperfect spatial competition. Papers Regional Science, 57(1):75–89, 1985.
99
Bibliography
[16] B.Hobbs, C.Metzler and J.Pang. Strategic gaming analysis for electric power networks: an mpec
approach. Proceedings of the IEEE Power Engineering Society 1999 Winter Meeting, New York,
NY, 31 January – 4 February, 1999.
[17] B.Hobbs, C.Metzler and J.Pang. A game theory simulator for assessing the performances of
competitive electricity markets. Transactions on Power Systems, 15(2):638–645, 2000.
[18] B.Willems. Modeling cournot competition in an electricity market with transmission constraints.
The Energy Journal, 23(3):95–125, 2002.
[19] C.Day and D.Bunn. Divestiture of generation assets in the electricity pool of england and
wales: a computational approach to analyzing market power. Journal of Regulatory Economics,
19(2):123–141, 2001.
[20] C.Day, B.Hobbs and J.Pang. Oligopolistic competition in power networks: a conjectured supply
function approach. IEEE Transactions on Power Systems, 17(3):597–607, 2002.
[21] C.Metzler, B.Hobbs and J.Pang. Nash–cournot equilibria in power markets on a linearized dc
network with arbitrage: formulation and properties. Networks and Spatial Economics, 3:123–
150, 2003.
[22] C.Wolfram. Strategic bidding in a multiunit auction: an empirical analysis of bids to supply
electricity in england and wales. Rand Journal of Economics, 29(4):703–725, 1998.
[23] D.Chattopadhyay. Multicommodity spatial cournot model for generator bidding analysis. IEEE
Transactions on Power Systems, 19(1):267–275, 2004.
[24] D.David and F.Wen. Strategic bidding in competitive markets: A literature survey. IEEE PES
Summer Power Meeting, Seattle, USA, pages 2168–2173, 2000.
[25] D.Fundenberg and J.Tirole. Game theory. Cambridge MIT Press, 5, 1996.
[26] D.Quick and J.Carey. An analysis of market power mitigation strategies in colorado’s electricity
industry. Energy Journal, 22(3):55–77, 2001.
[27] E.Anderson and A.Philpott. Using supply functions for offering generation into an electricity
market. Operations Research, 50(3):477–489, 2002.
[28] E.Anderson and H.Xu. Supply function equilibrium in electricity spot markets with contracts and
price caps. Journal of Optimization Theory and Applications, 124(2):257–283, 2005.
[29] E.Bompard, E.Carpaneto, G.Ciwei, R.Napoli, M.benin, M.gallanti and G.Migliavacca. A game
theory simulator for assessing the performances of competitive electricity markets. Electric Power
Systems Research, 78(2):217–227, 2008.
[30] E.Kahn. Numerical techniques for analyzing market power in electricity. The Electricity Journal,
11(6):34–43, 1998.
[31] E.Mansur. Environmental regulation in oligopoly markets: A study of electricity restructuring.
University of California Energy Institute, California, Power Paper PWP–088, 2004.
[32] European Commission. Directive 2003/87/EC of the European Parliament and of the council–
Establishing a scheme for greenhouse gas emission allowance trading within the Community and Amending Council Directive 961EC. EC, 2003. available online at http://eurlex.europa.eu/pri/en/oj/dat/2003/l_275/l_27520031025en00320046.pdf.
[33] European Commission. Commissions decision of 29/01/2004 establishing guidelines for the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC. EC, 2004.
available online at http://ec.europa.eu/.
[34] European Commission.
Directive 2004/101/EC, establishing a scheme for greenhouse
gas emission allowance trading within the Community, in respect of the Kyoto Protocol’s
project mechanisms Text with EEA relevance. EC, 2004. available online at http://eurlex.europa.eu/LexUriServ/LexUriServ.do?uri=CELEX:32004L0101:EN:HTML.
[35] European Commission. Guidance to assist Member States in the implementation of the criteria listed in Annex III to Directive 2003/87/EC. EC, 2004. available online at http://eurlex.europa.eu/en/index.htm.
[36] F.Murphy and Y.Smeers. Generation capacity expansion in imperfectly competitive restructured
electricity markets. Operations Research, 53(4):646–661, 2005.
[37] F.Natalia and T.Juan. Price wars and collusion in the spanish electricity market. International
Journal of Industrial Organization, 23(3–4):155–181, 2005.
[38] F.Nogales, J.Contreras, A.Conejo and R.Espinola. Forecasting next-day electricity prices by time
series models. IEEE Transactions on Power Systems, 17(2):342–348, 2002.
100
Bibliography
[39] Framework convention on climate change. Conference of the parties on its seventh session, 2001.
available online at http://unfccc.int/resource/docs/cop7/13.pdf.
[40] F.Wen and A.david. Optimal bidding strategies for competitive generators and large consumers.
Electrical Power and Energy Systems, 23(1):37–43, 2001.
[41] H.Niu and R.Baldick and G.ZHU. Supply function equilibrium bidding strategies with fixed
forward contracts. IEEE Transactions on Power Systems, 20(4):1859–1867, 2005.
[42] H.Yamin and S.Shaheidehpour. Self scheduling and energy bidding in competitive electricity
markets. Electric Power Systems Research, 71(3):203–209, 2004.
[43] IEA. key world energy statistics, 2012. available online at http://www.iea.org/stats/.
[44] I.OteroNovas, C.Meseguer, C.Batlle and J.Alba. A simulation model for a competitive generation
market. IEEE Transactions on Power Systems, 15(1):250–256, 2000.
[45] J.Bushnell. Water and power: hydroelectric resources in the era of competition in the western us.
University of California Energy Institute, 1(34), 1998.
[46] J.Bushnell, C.Day and M.Duckworth. An international comparison of models for measuring
market power in electricity. Energy Modeling Forum Stanford University, 1999.
[47] J.Contreras, O.Candiles, J.De la Fuente and T.Gomez. A cobweb bidding model for competitive
electricity markets. IEEE Transactions on Power Systems, 17(1):148–153, 2002.
[48] J.Liu, T.Lie, K.Lo. An empirical method of dynamic oligopoly behavior analysis in electricity
markets. IEEE Transactions on Power Systems, 21(2):499–506, 2006.
[49] J.Pang, B.Hobbs and C.Day. Properties of oligopolistic market equilibria in linearized dc power
networks with arbitrages and supply function conjectures. Proceeding of the IFIP TC7 20th
Conference on System Modeling and Optimization, Trier, Germany, pages 113–130, 2003.
[50] M.Ferris, J.Pang. Engineering and economic applications of complementarity problems. SIAM
Rev, 39(4):669–713, 1997.
[51] M.Kopsakangas Savolainen. Quantity versus price competition in the deregulated finnish electricity markets. Finnish Economic Papers, 16(2), 2003.
[52] M.Ventosa, A.Baillo, A.Ramos and M.River. Electrcity market modeling trends. Energy Policy
33, pages 897–913, 2005.
[53] P.Holmberg. Unique supply function equilibrium with capacity constraints. Energy Economics,
30(1):148–172, 2008.
[54] P.Kaymaz, J.Valenzuela and C.Park. Transmission congestion and competition on power generation expansion. IEEE Transactions on Power Systems, 22(1):156–163, 2007.
[55] P.Klemperer and M.Meyer. Supply function equilibria in oligopoly under uncertainty. Econometrica, 57(6):1243–1277, 1989.
[56] P.Linares, F.Santos, M.Ventosa and L.Lapieda. Impacts of the european emissions trading scheme
directive and permit assignment methods on the spanish electricity sector. The Energy Journal,
27(1):79–98, 2007.
[57] P.Linares, F.Santos, M.Ventosa and L.Lapiedra. Impacts of the european emissions trading
scheme directive and permit assignment methods on the spanish electricity sector. Journal of
Energy, 27(1):79–98, 2006.
[58] P.Pineau and P.Murto. An oligopolistic investment model of the finish electric market. Annals of
Operations Research, 121(1):123–148, 2003.
[59] R.Baldick. Computing the electricity market equilibrium: uses of market equilibrium models.
Power Systems Conference and Exposition, Altanta, GA, 29 October 29–1 November, 2006.
[60] R.Baldick. Computing the electricity market equilibrium: uses of market equilibrium models.
Power Systems Conference and Exposition IEEE PES, 2006.
[61] R.Baldick and W.Hogan. Capacity constrained supply function equilibrium models of electricity
markets: stability, non–decreasing constraints, and function space interactions. University of
California Energy Institute, 2001.
[62] R.Baldick, R.Grant and E.Kahn. Theory and application of linear supply function equilibrium in
electricity markets. Journal of Regulatory Economics, 25(2):143–167, 2005.
[63] R.Green. Increasing competition in the british electricity spot market. IEEE Transactions on
Power Systems, 44(2):205–216, 1996.
[64] R.Green and D.Newbery. Competition in the british electricity spot market. Journal of Political
Economics, 100(5):929–953, 1992.
101
Bibliography
[65] S.Borenstein, J.Bushnell and C.Knittel. Marekt power in electricity markets: beyond concentrations measures. Enrgy Journal, 20(4):65–87, 1999.
[66] S.De Haro, P.Martin, J.Ardiz and J.Caro. Estimating conjectural variations for electricity market
models. European Journal of Operational Research, 181(3):1322–1338, 2007.
[67] S.Oren. Economic inefficiency of passive transmission rights in congested electricity systems
with competitive generations. The Energy Journal, 18(1):63–83, 1997.
[68] S.Stoft. Power system economics: Designing market for electricity. IEEE Press, Wiley–Inter
science, 2002.
[69] T.Scott and E.Read. Modelling hydro reservoir operation in a deregulated electricity market.
International Transactions in Operational Research, 3(4):243–253, 1996.
[70] United Nations Framework Convention on Climate Change. Kyoto Protocol to the United
Nations Framework Convention on Climate.
UNFCCC, 1998.
available online at
http://unfccc.int/resource/docs/convkp/kpeng.html.
[71] V.Nanduri, T.Das and P.Rocha. Generation capacity expansion in energy markets using a twolevel game theoretic model. IEEE Transactions on Power Systems, 24(3):1165–1172, 2009.
[72] W.Hogan. A market power model with strategic interaction in electricity networks. The Energy
Journal, 18(4):107–141, 1997.
[73] W.Lise and G.Kruseman. Long-term price and environmental effects in a liberalized electricity
markets. Journal of Energy Economics, 30(2):230–248, 2008.
[74] X.Bai, S.Shahidehpour, V.Ramesh and E.Yu. Transmission analysis by nash game method. IEEE
Transactions on Power Systems, 12(3):1046–1052, 1997.
[75] Y.Chen and B.Hobbs. An oligopolistic power market model with tradable nox permits. IEEE
Transactions on Power Systems, 20(1):119–129, 2005.
[76] Y.Smeers and J.Wei. Spatially oligopolistic model with opportunity cost pricing for transmission
capacity reservations – a variational inequality approach. CORE Disscussion, (1997017), 1997.
[77] Y.Song, Y.Ni, F.Wen and F.Wu. Analysis of strategic interactions among generation companies
using conjectured supply function equilibrium model. Power Engineering Society General Meeting, IEEE, 2:849–853, 13–17 July 2003.
[78] Y.Song, Y.Ni, F.Wen and F.Wu. Conjectural variation based learning model of strategic bidding
in spot market. International Journal of Electrical Power and Energy System, 26(10):797–804,
2004.
[79] Y.Song, Y.Ni, F.Wen, Z.Hou and F.Wu. Conjectural variation based bidding strategy in spot
markets: fundamental and comparison with classical game theoretical bidding strategies. Electric
Power Systems Research, 67(1):45–51, 2003.
[80] Z.Younes and M.Ilic. Generation strategies for gaming transmission constraints: will the deregulater electric market be an oligopoly. Decision Support System, 24(3–4):207–222, 1999.
102