Town of Barnstable Administrative Services Procurement & Risk Management 230 South Street, Hyannis, MA 02601 www.town.barnstable.ma.us Johanna F. Boucher Chief Procurement Officer [email protected] Tel 508-862-4741 Fax 508-862-4779 June 15, 2017 ADDENDUM #2 To: All registered users for the Request for Proposal entitled “PROFESSIONAL ENGINEERING SERVICES FOR THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) PERMIT COMPLIANCE” dated May 24, 2017 Due Date: June 20, 2017, no later than 2 pm Last Date for Questions: June 12, 2017, Noon Please be advised that Addendum #2 is being issued to provide questions and answers pertaining to this RFP as follows: 1. The RFP mentions some on-going efforts to inventory stormwater infrastructure, does that scope of work cover the whole town or is it limited to the MS4 regulated area of town? Was that scope of work structured to meet MS4 requirements? Are condition assessments being performed as part of this work or is it simply inventory and location? How is the field data collected? If asset management software is being used for this work, what program does the Town use? Response: The Town’s efforts to begin to inventory stormwater infrastructure is occurring throughout the Town; however, it is being conducted on an “opportunity” basis when staff or consultants are visiting sites for other reasons. No, the scope was not structured specifically for MS4; however, the information collected is expected to have some relevance to MS4 requirements. Condition assessments were part of some of the initial the inventory effort – again, as opportunities arose. At this time the information is stored in the Town GIS. The selected MS4 consultant will need to as part of their work review the existing data, make a determination if/how much additional field work is needed, and conduct said field work. 2. The 2003 MS4 permit did not require that written documents be developed for the Stormwater Management Program or IDDE Program, but these documents may have been prepared at some point in the past. Does the Town have a written Stormwater Management Program or IDDE Program in compliance with the 2003 permit? Response: Yes, it is posted online at http://www.town.barnstable.ma.us/bids/adendums/Addendum%202%20Attachment%20B%20N 1 OI%207%202003.pdf . The latest progress report is posted online at https://www3.epa.gov/region1/npdes/stormwater/assets/pdfs/ma/reports/2017/Barnstable17.pdf . 3. One of the items that must be addressed under FY2018 is “inspecting existing Town-owned stormwater structural Best Management Practices (BMPs). Table 1 and Table 2 provide a list of known MS4 infrastructure, however do not reference the number of existing structural BMPs within Barnstable. Can the Town provide an estimated number of BMPs to be inspected? Response: A preliminary inventory (conducted by volunteers) in 2015 identified approximately 30 BMPs. The Town suspects this list is not complete. The actual number will likely vary from this estimate. 4. What specifically is being delivered with the system inventory that is now being completed? Response: The attached print of a portion of the Town’s stormwater GIS map provides an example of the information being collected. The selected consultant, as part of their work, will be responsible for analyzing what has been collected to date and determining if more is needed and performing that work. 5. What is the schedule for that inventory to be completed? Response: Uncertain at this time. 6. Does the system inventory include outfall inspections? Response: To some extent it does, but there has not been a comprehensive inventory and assessment. The MS4 consultant will have to perform additional inventory and assessment if/as needed. 7. Are “junctions” shown on Tables 1 and 2 interconnections with other systems? Response: As currently used in the GIS, junctions appear to be unknown connections. 8. Is the $87,000 budget listed for this project only for Year 1? Response: Yes. 9. Does the scope of services include IDDE field work? The scope of services implies that that will be done in FY2018, but the Price Submittal Form only carries a line item for creation, approval and submission of an IDDE plan that implies no field work. Response: The MS4 consultant will have to perform IDDE field work if/as necessary to accomplish the MS4 objectives – for example, to gather data needed to create the IDDE plan. 10. What education/outreach programs should be budgeted? These can range to recycling educational materials to developing Barnstable specific materials to public meetings and web based approaches. 2 Response: This is subject to further discussion and evaluation. Please propose programs you would recommend. 11. Please confirm the submission deadline, the cover states proposals due June 20, 2017 at 2 PM; page 17 says proposals due May 31, 2017. Response: Proposals Due 6/20/17, 2pm. 12. The RFP states that DPW has a budget for FY2018 to hire a consultant. Can you provide the overall budget for MS4 services for the Town to implement the permit requirements for FY2018? Response: It is assumed the questioner is not referring to this planning/technical services that are the subject of this RFP, but operational actions to address identified problems. In that case, those items that have to be addressed in Phase I will be done by Town Staff or others, and come from other budgets. 13. What is the funding Source for this project? Response: CIP Please acknowledge Addendum 2 on your RFP cover letter. All other terms and conditions remain the same as previously stated. Johanna F. Boucher Chief Procurement Officer 3
© Copyright 2026 Paperzz