OHS MANAGEMENT GUIDELINE RMIT SGGuideline Number: 3.1Appendix A Title: Risk Assessment Issue Date: 6-01-06 Risk Assessment Team (include name and position): 1. 2. 3. 4. Date: 5. 6. 7. 8 Portfolio: School: / / Type of hazard (please tick and refer to relevant procedure if appropriate): Chemical (RMIT-xx-00x) Electrical (RMIT-xx-00x) Work Environment (noise (RMIT-xx- Mechanical (plant/ equipment RMIT-xx-00x) Biological Radiation (RMIT-xx-00x) Manual handling (RMIT-xx-00x) Vibration Other 00x), slip/ trip/ falls, temperature etc) Description of Hazard (include reason for assessment): Location of Hazard: Risk Assessment (rate the consequence, exposure and probability associated with the hazard): FACTOR 1. CONSEQUENCE Most probable result of the potential accident. CLASSIFICATION a. b. c. d. e. f. Catastrophe; numerous fatalities; major disruption of activities Disaster; multiple fatalities; Very serious; Fatality; Serious; serious injury (amputation, permanent disability); Important; disabling injury; Noticeable; minor cuts, bruises, bumps; minor damage RATING 100 50 25 15 5 1 2. EXPOSURE Hazard exposure occurs: The frequency of exposure to the hazard. a. b. c. d. e. f. Continuously (or many times daily) Frequently (approximately once daily) Occasionally (from once per week to once per month) Infrequent (from once per month to once per year) Rarely (it has been known to occur) Very rarely (not known to have occurred) 10 6 3 2 1 0.5 3. PROBABILITY Complete accident sequence: Likelihood that the consequence will occur once the individual is exposed to the hazard. a. b. c. d. e. f. Almost certain likely or expected result; 1 in 10 chance Quite possible/not unusual; 1 in 10 to 1 in 100 chance Would be an unusual sequence or coincidence; 1 in 100 to 1 in 1000 chance Would be a remotely possible coincidence 1 in 1000 to 1 in 10,000 chance Has never happened after many years of exposure, but is conceivably possible; 1 in 10 000 to 1 in 100,000 Practically impossible sequence (has never happened) 1 in 100,000 chance or lower 10 6 3 1 0.5 0.1 Hard copies of this document are uncontrolled copies \\Its-gn-blg57\shared\People and Culture\OH &S\ Guidelines\Hazard Management\Risk Assessment Form RMIT-SG-3.1 Appendix A.doc OHS MANAGEMENT GUIDELINE CONSEQUENCE EXPOSURE X Risk Score: PROBABILITY X RISK SCORE = RISK SCORE DEFINITION ACTION 500 300- 499 150- 299 Very high risk High risk Substantial risk 60- 149 Moderate risk 10- 59 Low risk Immediate action required. HIGH PRIORITY. Management attention needed. Hazards must be considered as NOT adequately controlled. Management attention needed. Hazards must be considered as NOT adequately controlled. Hazard must be examined against current standards to determine whether the hazard is adequately/ not adequately controlled. Manage by routine procedures. Risk Control Identification (to determine appropriate risk control measures(s) sequentially go through the hierarchy of controls): Practicability Test Hierarchy of Risk Controls Yes No Comment 1. Eliminate Is it possible to eliminate the hazard? 2. Reduce Is it possible to reduce the level of risk posed by the hazard by (priority order): Substitution (using less hazardous alternatives) Isolation (separating the operator from the risk) Engineering controls (re-designing plant or equipment). 3. Administration Is it possible to reduce the level of risk posed by the hazard by changing operating procedures, training, supervision, providing information etc 4. Personal Protection Is it possible to reduce the level or risk posed by the hazard by wearing personal protective equipment and clothing? Risk Control Action Plan (include short term and long term risk control measures): Recommended Risk Control to be Implemented Responsibility Timeline Completed (date/ initials) Revised Risk Score (re-score the hazard risk score once recommended risk control measure(s) are implemented): CONSEQUENCE Risk Score: EXPOSURE X PROBABILITY X RISK SCORE = Hard copies of this document are uncontrolled copies \\Its-gn-blg57\shared\People and Culture\OH &S\ Guidelines\Hazard Management\Risk Assessment Form RMIT-SG-3.1 Appendix A.doc OHS MANAGEMENT GUIDELINE RISK SCORE DEFINITION ACTION 500 300- 499 150- 299 Very high risk High risk Substantial risk 60- 149 Moderate risk 10- 59 Low risk Immediate action required. HIGH PRIORITY. Management attention needed. Hazards must be considered as NOT adequately controlled. Management attention needed. Hazards must be considered as NOT adequately controlled. Hazard must be examined against current standards to determine whether the hazard is adequately/ not adequately controlled. Manage by routine procedures. Signed: Manager: Employee: HSR: Hard copies of this document are uncontrolled copies \\Its-gn-blg57\shared\People and Culture\OH &S\ Guidelines\Hazard Management\Risk Assessment Form RMIT-SG-3.1 Appendix A.doc
© Copyright 2026 Paperzz