Paving Potpourri 2015 Spec Changes and More! Bob Dyer Lynn Peterson Assistant State Construction Engineer Secretary of Transportation WAPA Joint Training March 2015 Spec Changes – Done Deal • Eliminate Anti-Strip in temp HMA • RAP/RAS Current RAP/RAS will be an amendment in April 2015 • Density Acceptance by Cores Bid item for projects we want Contractor to core Date, time and initials of last edit 2 Spec Changes – Done Deal • Pavement Smoothness January 2015 GSP • Mix Design Approval with QPL April 2015 Date, time and initials of last edit 3 Spec Changes – Done Deal Test Frequency As of January 2015 • Mix Sublot size From 1/800T to 1/1000T • Density Sublot size From 1/80T to 1/100T Date, time and initials of last edit As of April 2015 HMA Mix HMA Project Quantity (tons) Sublot Size (tons) <20,000 20,000 to 30,000 >30,000 1,000 1,500 2,000 HMA Density HMA Project Quantity (tons) Sublot Size (tons) <20,000 20,000 to 30,000 >30,000 100 150 200 4 Spec Changes – Coming but not Finalized • Increase in RAP Percent Nationally 0-15% OK; 15-25 drop a binder grade; >25 detailed mix design (like what we do now) • HMA On bridge decks Should be something (GSP or amendment) by August 2015 Date, time and initials of last edit 5 HMA Points of Emphasis • Old Way • Today’s Way: Pass/Fail with tolerance on an individual test Statistical Evaluation Date, time and initials of last edit 6 HMA Points of Emphasis • Standard Spec 3-04 • • • Fine Aggregate Angularity Sand Equivalent Coarse Aggregate Fracture 7 Hot Mix Asphalt, Asphalt Binder & Crude Oil Indices 600 Asphalt Binder 500 Crude Oil 400 300 200 Hot Mix Asphalt 100 0 Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 2002 2003 Base: 2002 = 100 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Hot Mix Asphalt Unit Bid Price $ / TON $90 $80 $70 $60 $50 Trendline $40 $30 $20 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Government Regulation and Taxes Government Regulation and Taxes Bob Dyer Assistant State Construction Engineer, Roadway [email protected] 360.705.6980 12
© Copyright 2025 Paperzz