CHIEF Sardar ENGINEER(CPC) Sarovar Narmada Nigam Ltd. Gandhinagar DATE-03-07-2017 1 TENDER STATUS AS ON 03-07-2017 (FIGURES IN BRACKET C. E. SHOWS AMOUNT IN RS. CRORES) On web site In Process Agenda submitted Under Approval due to Reasons Approved After 1/4/2017 Total Approved from 1/4/16 to 31/3/17 Rajkot 0 2(103) 1(80) 0 7(409) 10(592) 10(459) Ahmedabad 0 0 0 0 0 0 2(11) Mehsana 0 0 0 0 1(11) 1(11) 0 Patan 0 0 1(72) 0 7(114) 8(186) 4(82) 2(143) 1(6) 0 0 0 3(149) 11(821) Ele & Mech 0 0 0 0 0 0 1(12) Dam & Vadodara 0 0 0 0 3(17) 3(17) 20(590) NMC 0 0 2(120) 0 0 2(120) 5(30) 2(143) 3(109) 4(272) 0 18 (551) 27(1075) 53 (2005) Gandhidham No. (Rs.Cr.) Note: Tenders approved from 01/04/10 to 31/03/11 Tenders approved from 01/04/11 to 31/03/12 Tenders approved after 01/04/12 to 31/03/13 Tenders approved after 01/04/13 to 31/03/14 Tenders approved after 01/04/14 to 31/03/15 Tenders approved after 01/04/15 to 31/03/16 Tenders approved after 01/04/16 to 31/03/17 Tenders approved after 01/04/17 to 31/03/18 : Rs. : Rs. : Rs. : Rs. : Rs. : Rs. : Rs. : Rs. 3310 Crores (69 No.) 2693 Crores (71 No.) 1884 Crores (55 No.) 1503 Crores (38 No.) 0856 Crores (14 No.) 2590 Crores (26 No.) 2005Crores (53 No.) 551 Crores (18 No.) 2 TENDER PROCESS STATUS AS ON 03-07-2017 (FIGURES IN BRACKET SHOWS AMOUNT IN RS. CRORES) Rejected & to be reinvited Tech evaluation in process Tech evaluat ion Comp Financial evaluation in process Financial evaluation Comp (pending due to other reasons) Total Rajkot 0 2(103) 0 1(80) 0 3(183) NMC 0 0 0 2(120) 0 2(120) Ahmedabad 0 0 0 0 0 0 Mehsana 0 0 0 0 0 0 Patan 0 0 0 1(72) 0 1(72) 1(55) 1(6) 0 0 0 2(61) Ele & Mech 0 0 0 0 0 0 Dam & Vadodra 0 0 0 0 0 0 1(55) 3(109) 0 4(272) 0 8(436) C. E. Gandhidham Total Nos. (Rs. Crores) 3 CE(SBC), RAJKOT. Sr. No. 1 2 3 Name Of Work Constructing Under Ground Pipe Line (Ugpl) Of Bavaliyari Sub Distributory (S.D-3) Offtaking From Hebatpur Distributory (Ld10-b) At Ch. 3.676 Km Of Vallabhipur Branch Canal Including Operation, Maintenance & Security For Five Years. (Package-4) Constructing Canal Syphon, Canal Earthwork, Structures, Lining work, Service Road and Gate work for Botad Branch Canal from ch 20.363 to 22.605km passing through Limbadi Bhogavo-II (Vadod) Irrigation Scheme with 5 year O & M period Constructing Under Ground Pipe Line(UGPL) of Kamatalav Distributary (LD-4B) from Ch 20.976 Km to 29.750 Km & it’s 02 Minors offtaking @ ch 64.795 Km of Vallabhipur Branch Canal and Ambli sub Distributary (LD-4B1) from Ch 11.020 Km to 16.290 Km & it’s 03 Minors off taking from Kamatalav Distributary Offtaking @ Ch. 13.765 Km with operation, Maintenance and Security for 5 Years Estimated Cost (Rs.Lacs) Status 8034.74 P&T Minutes of Meeting is awaited 6367.60 Technical bid Evaluation is under process 3924.30 Technical bid Evaluation is under process 4 CE(MAIN CANAL), GANDHINAGAR. Sr. No. 1 2 Name Of Work Strengthening of 3.50 m wide WBM Road on Inspection Path by providing surface treatment of Narmada Main Canal ch.0.00 km to 184.926 km including 5 years Maintenance of the work. Strengthening of 3.50 m wide WBM Road on Inspection Path by providing surface treatment of Narmada Main Canal ch. 184.926 km to 458.318 km including 5 years Maintenance of the work. Estimated Cost (Rs.Lacs) Status 4280.88 Agenda submitted to CS for P&T Committee approval 7691.54 Agenda submitted to CS for P&T Committee approval 5 CE(PATAN) PATAN Sr. No. 1 Name Of Work Providing Flexible Pavement (BITUMINEOUS SURFACE) on Service Road and WBM road on IP side and Surface drains and cross drains, kundi etc,of Kachchh Branch Canal reach CH. 0.0 KM TO CH. 82.30 KM. Including O & M for 5 Years. Estimated Cost (Rs.Lacs) Status 7368.36 P&T Minutes of Meeting is awaited 6 CE(KBC) GANDHIDHAM Sr. No. Name Of Work Estimated Cost (Rs.Lacs) Status 1 Construction Of CAD [Distributories /Direct Minors Including Its Minors (UGPL) And Sub Minors (UGPL)] Offtaking From Wandhia Sub Branch Canal Including O & M For Five(5) Years. 5472.68 Tender is Re-invited & uploaded on Dt-07-06-2017 2 Constructing Rcc Box Type Canal Syphon By Cut Push Method For Drain, National Highway-41 And Water Supply Pipeline Crossing The Wandhiya Sub Branch Canal @ Ch. 10.158 Km & National Highway 27 Crossing Gagodhar Sub Branch Canal @ Ch.49.147 Km 639.79 Tender is Re-invited & uploaded on Dt-07-06-2017 3 Construction of CAD (Distributary including its Minors (UGPL) and Sub Minors (UGPL) of various Distributaries off taking from Kachchh Branch Canal between Ch. 189.977 Km to 243.839 Km including operation & Maintenance work for 5 years (Package- I) 8576.33 Tender is uploaded on Dt-09-06-2017 7
© Copyright 2026 Paperzz