Leaders’ Committee DCLG consultation on changes to the Mayor of London Order 2000 Report by: Damian Price Date: 10 October 2006 Contact Officer: Damian Price Telephone: 020 7934 9909 Item no: 4 Job title: Transport and Planning Section Manager Email: [email protected] Summary The Government published a policy statement setting out final proposals for additional powers and responsibilities for the Greater London Authority (GLA) on 13 July 2006. A further consultation was launched on 10 August on powers for the Mayor of London to decide planning applications of major strategic importance. The consultation proposes a number of changes to the definition of a strategic application. It also proposes a policy test that is to be undertaken by the Mayor to identify when he would take over decision making of a strategic application. The ALG has a number of concerns about the Mayor gaining powers to grant approval for strategic applications. The proposed ALG response to the consultation is set out in Appendix Two. Recommendations Leaders are asked to: Comment on the draft ALG response to the consultation on the proposed changes to the Mayor of London Order 2000 Agree that the final response will incorporate any comments agreed by ALG Leaders at this meeting and be cleared under ALG urgency procedures. DCLG consultation on changes to the Mayor of London Order 2000 Background 1. On Thursday 13 July, the Department for Communities and Local Government (DCLG) published its final proposals for additional powers and responsibilities for the Mayor and London Assembly. As part of the additional powers in planning, the DCLG stated: ‘We believe that the Mayor should have discretion to decide a small number of the most strategically important planning applications in London so as to ensure decision-making takes place at the most appropriate level and regional planning policies are fully taken into account.’ 2. Currently, the Mayor has the power to direct refusal over a defined set of strategic applications. The full list of criteria for a strategic application is defined in the Town and Country Planning Order (Mayor of London) 2000 and is set out in Appendix One. The Mayor can direct refusal if the application is: contrary to the spatial development strategy or prejudicial to its implementation otherwise contrary to good strategic planning in Greater London 3. The DCLG announcement on 13 July stated that it would consult further on measures that would enable the Mayor to take over a strategic planning application, if he feels justified. He will then have the power to grant permission for that application. Where he does not take over a strategic application, he will retain the power to direct refusal. He also gains the power to take over all applications for waste facilities that he determines are strategic. 4. Cllr Merrick Cockell, Chairman of the ALG met with Ruth Kelly MP, Secretary of State for Communities and Local Government on 13 July 2006 at which the Review of the Mayor’s Powers was discussed. The Chairman expressed concern over the potential concentration of planning powers in the hands of an individual, as opposed to a planning committee in a borough where decisions are taken openly. He also raised concerns over whether the Mayor’s housing policies could inappropriately influence his planning decisions. 5. The Secretary of State emphasised that the extent of the new planning powers depended upon the definition of strategic, which is part of the current consultation. She also said that the Government was clear that the Mayor could not both promote a scheme and be the planning authority for it. Also, the Mayor of London should only be involved in broad strategy, not ‘sites on specific streets’. DCLG Consultation on Changes to the Mayor of London Order 2000 6. On 10 August 2006, the DCLG published a further consultation document as part of the process to identify the arrangements under which the Mayor could take over powers to grant approval for strategic planning applications. A more detailed extract from the consultation document is attached as Appendix One. The consultation paper sets out the Government’s preferred approach on three key aspects of the new arrangements: The thresholds which define applications as being of potential strategic importance and must be referred to the Mayor; A policy test which the Mayor would need to apply to those applications he reviews to decide whether his intervention would be justified. He would be required to give reasons when he decided to take on the application; and Changes to some of the processes and procedures for referral of applications to the Mayor. Amendments to the thresholds 7. The table below sets out the proposed amendments to be considered for the thresholds (the current definition of a strategic application is set out in full in Appendix One): Waste Applications: Hazardous waste at 5,000 tonnes throughput per year Non-hazardous waste at 50,000 tonnes per year Sites for non-hazardous waste >1 hectare For waste applications that are departures from the Development Plan Documents the thresholds will be: Hazardous waste at 2,000 tonnes throughput per year Non-hazardous waste at 20,000 tonnes per year Sites for non-hazardous waste >0.5 hectare Tram stations: Applications for tram stations will be added to the category 2C in appendix One Metropolitan Open Land (MOL) All departure applications for construction of a building on MOL The Policy Test 8. The DCLG consultation on changes to the Mayor of London Order 2000 sets out a policy test that the Mayor will have to apply when considering if he is going to take over a planning application. 9. In the Mayor’s view, he must be confident that: the planning application raises issues of a nature and scale that would significantly impact on the implementation of specific London Plan policies; and The issues raised by the application have significant effects that go wider than a single borough 10. To justify taking over an application the Mayor would need to demonstrate clearly that both criteria are satisfied and that in making his decision he has taken into account: The borough’s analysis of the Development Plan policies relevant to the application and how it intends to apply relevant London Plan policies; The borough’s record in dealing with previous applications which have raised strategic planning issues; and Any precedent an application is likely to establish for implementing London Plan policies. Proposed Changes to Procedures 11. The revised procedures also outline the following courses of action that the Mayor can take when a planning application meets a certain threshold: Notify the borough that he is happy for them to make the decision on the application without further reference to him (the Mayor has this power currently); or Notify the borough that he wishes to be consulted again after the borough has considered their approach to the strategic issues raised by the application. This is to allow him to decide whether he should take over determination of the application by applying a policy test (this is a new power for the Mayor);or Notify the borough that he is content for them to make the decision on the application but that he wants to be consulted again when the Council’s intention is known. This is to allow him to consider whether he should direct the borough to direct refusal of the application (the Mayor has this power currently). 12. The outcomes, dependent on the course of action that the Mayor could take, are as follows: If the first bullet point happens, the Mayor will have no further involvement in the planning application. If the second bullet point happens, the Mayor would decide whether or not to take over the application by applying the policy test (This is new stage 2). If the third bullet point happens, in keeping with the current arrangements, the borough will consider the application in the normal way and, if they intend to grant planning permission, they must give the Mayor the opportunity to decide whether to direct them to refuse the application. ALG Response to the consultation 13. The ALG has consulted boroughs and collated views into the draft ALG response. Six borough responses have been received. The draft ALG response was also discussed with officers from LB Greenwich, LB Haringey, LB Hounslow, LB Havering and LB Tower Hamlets through the special working group set up to take forward ALG lobbying initiatives on this issue. The draft response has also been discussed through the ALG’s Officer Advisory Panel on Planning Group and through the Association of London Borough Planning Officers (ALBPO). The proposed draft ALG response to the consultation is attached in Appendix Two. The closing date for responses to the consultation is 2 November 2006. The final ALG report will be signed off through ALG urgency procedures to incorporate any further feedback. Draft ALG response to the consultation on changes to the Mayor of London Order 2000 14. The ALG has a number of significant concerns over the proposals set out in the consultation document. The main points are set out in this report below. The proposed draft ALG response to the consultation is attached as Appendix Two. General Comments 15. It is not necessary or appropriate to give the Mayor the power to grant approval for certain strategic applications. The proposal to transfer additional development control powers to the Mayor would tip the emphasis towards strategic considerations and away from local considerations. There seems to be no advantage in moving the planning decision making process further away from an established system. It would also further remove local communities from the decision making process and reduce democratic accountability. The impact that the transfer of development control powers to the Mayor will further increase the complexity of the planning system and create delays at a time when the Government wants to streamline the planning system and improve delivery There has been no analysis of the effectiveness and value for money of the Mayor’s current involvement in planning applications. The ALG does not consider that the case has been proven for additional planning powers for the Mayor. ALG comments on proposed change in thresholds for the definition of a strategic application 16. The ALG does not agree with the Government’s proposals on amendments to the thresholds for referral of planning applications to the Mayor. Specifically, the proposals for waste applications would mean that the Mayor could have responsibility for many facilities that are purely local in nature. The ALG believes that it may be appropriate to consider raising other thresholds to ensure that boroughs are able to balance strategic aims with local policy objectives to best meet the needs of their local areas. ALG comments on the proposed Policy Test 17. The proposed policy test is extremely vague over where the Mayor could intervene and take over a planning application. It is also subjective with a significant amount of emphasis on the Mayor’s own interpretation of the situation. 18. There is a need to ensure that any policy tests incorporates the following issues: There is a counter-balance to protect boroughs’ interests. There is currently no requirement for the Mayor to consider the impact of the proposed development on the borough’s own Development Plan Document. There is a need for a robust and transparent policy process. The current definition of the policy test is too vague and open to misinterpretation by the Mayor. There is a need for an appropriate mechanism for boroughs to challenge the Mayor’s decision. As the proposals stand, the only way to challenge the Mayor’s decision would be through the courts. There is a need for a narrower definition of the policy tests. The DCLG has stated that it considers that the Mayor would only take over a small number of applications. The Secretary of State for Communities and Local Government is said in the 13 July 2006 meeting with the Chairman of the ALG that the Government wanted the Mayor to be concerned only with broad strategy and not ‘specific streets’. However, the policy tests are sufficiently subjective (and broad) for the Mayor to take over a wide range of planning applications. The focus of the policy test should be on the strategic importance of the development itself for implementation of the London Plan and not for application of individual London Plan policies. ALG would therefore propose for further discussion the following modified version of the policy test: ”Does the planning application propose a development which raises strategic issues of a nature and scale that are of special importance for the implementation of the London Plan, and which will have important effects on more than one borough?” Removal of the element that allows the Mayor to take into account a borough’s past record in dealing with planning applications. This is inappropriate and not a policy issue. ALG comments on the proposed changes to dealing with procedures 19. The ALG does not feel that the new procedures are the correct mechanism for handling planning applications in London. There are a number of concerns related to the proposed policy test which will have an impact on the subsequent process and these are listed above. Further concerns on the process are: The current proposals do not provide for such an open and transparent process of decision-making as happens with all other planning authorities. I.e. where decisions are made in public, with a right of representation for all stakeholders and appropriate right of appeal. If the borough is still responsible for the consultation process but the Mayor is responsible for making the decision, this could undermine the credibility of borough-led consultations. The new policies and procedures put the onus on London boroughs to outline to the Mayor the strategic issues raised by an application. It should be the role of the Mayor to initially identify why he feels justified in taking over the decision making role of an application taking into account the issues listed in paragraph 18. There then should be scope for a borough to challenge this. 20. The ALG suggests that when the borough makes an assessment of strategic issues, it should also indicate whether at that stage the borough is (a) likely to approve the application subject to conditions and a legal agreement, (b) likely to refuse the application or (c) as yet undecided. Since the Mayor is already able to direct refusal on applications referred to him, he should not be able to take over applications which the borough indicates that it is likely to approve 21. The full text of the ALG’s proposed draft response is included in Appendix Two. Next Steps 22. Following discussions of the ALG response by Leaders, the final ALG response will be signed off through ALG urgency procedures. This will be promoted as part of the ALG lobbying strategy on the review of powers for the Mayor of London. 23. Borough Leaders have been invited to a breakfast seminar at the ALG, hosted jointly with London First, to discuss planning issues, including the planning elements of the review of GLA powers, on Thursday 12 October at 8.30am. Recommendations Leaders are asked to: Comment on the proposed draft ALG response to the consultation on the proposed changes to the Mayor of London Order 2000 Agree that the final response will incorporate any comments agreed by ALG Leaders at this meeting Agree that the final response be endorsed through ALG urgency procedures Financial Implications for ALG There are no financial implications for the ALG Legal Implications for ALG There are no legal implications for the ALG Equalities Implications for ALG There are no equalities implications for the ALG. Background Papers ALG response to the Government’s consultation paper on additional powers and responsibilities for the Mayor and Assembly, February 2006 Appendix One The Greater London Authority: The Government’s Final Proposals for Additional Powers and Responsibilities for the Mayor and Assembly A Consultation Paper on changes to the Mayor of London Order 2000 August 2006 The following extract outlines in full the proposed changes in the Government’s consultation paper. Part A: The Consultation Document Planning applications are submitted to the borough in the first instance. If an application meets one of the thresholds in the Order the borough must send the Mayor a copy of the application as soon as reasonably practicable after its receipt. In practice, consultation with the Mayor will normally occur at the same time as other statutory consultees. The Mayor then has the same opportunity as other statutory consultees to submit representations on the application – 21 days. This is known as stage 1. During this time the Mayor can also do one of two things; i. He can inform the borough he is happy for them to make the decision on the application without further reference to him; or ii. He can inform the borough that he wants to be notified of the borough’s decision on the application in order to decide whether to direct the borough to refuse the application. If the Mayor wants to be notified of the borough’s decision, the borough may not grant permission for a period of 14 days from the date the notification is received by the Mayor. This is known as stage 2. Within this 14 day period, the Mayor may direct the borough to refuse the application. Any such direction must be accompanied by a statement of reasons, and must be copied to the Secretary of State. Revised procedures Planning applications will continue to be submitted to the borough in the first instance. Building on the current system, if an application meets a threshold, defining it as being of potential strategic importance, we propose that the Mayor should choose one of three options after receiving it (new stage 1): a) Notify the borough that he is happy for them to make the decision on the application without further reference to him (the Mayor has this power currently); or b) Notify the borough that he wishes to be consulted again after the borough has considered their approach to the strategic issues raised by the application. This is to allow him to decide whether he should take over determination of the application by applying a policy test (this is a new power for the Mayor); or c) Notify the borough that he is content for them to make the decision on the application but that he wants to be consulted again when the Council’s intention is known. This is to allow him to consider whether he should direct the borough to direct refusal of the application (the Mayor has this power currently). Outcomes • If a) happens, the Mayor will have no further involvement in the planning application. • If b) happens the Mayor would decide whether or not to take over the application by applying the policy test • If c) happens, in keeping with the current arrangements, the borough will consider the application in the normal way and, if they intend to grant planning permission, they must give the Mayor the opportunity to decide whether to direct them to refuse the application. Consultation and enforcement We propose that boroughs will be responsible for undertaking consultation on planning applications taken over by the Mayor. We also propose they should be responsible for enforcing planning obligations and conditions that are attached to planning permissions issued by the Mayor. This is because boroughs already have established consultation mechanisms and standards in place and enforcement teams. Fees We will be considering the issue of planning application fees over the summer in light of the new arrangements in conjunction with boroughs and the Mayor. Reserved matters applications and listed building consent applications. If a planning application that the Mayor takes over is in outline, we propose the Mayor will also be responsible for subsequently deciding the reserved matters application(s). Similarly, if a planning application is accompanied by a listed building consent application, this should also fall to the Mayor to determine, subject to the normal procedures involving English Heritage. POTENTIAL AMENDMENTS TO THE TOWN AND COUNTRY PLANNING (MAYOR OF LONDON) ORDER 2000 The Government proposes that the thresholds set out in the Mayor of London Order 2000 should remain as currently set out other than in the following respects. The existing Order is attached below. Part II, Category 2A Waste facilities We propose three main thresholds triggering referral to the Mayor. Applications for waste facilities for: • hazardous waste at 5,000 tonnes throughput per year • non-hazardous waste at the current 50,000 tonnes per year • sites for hazardous or non-hazardous waste over 1 hectare We propose to provide for the Mayor to see applications for waste facilities that do not accord with the development plan (departures). This is because the acceptability in principle of a waste use in that location has not been established. We propose lower thresholds to trigger referral to the Mayor for these matters: • hazardous waste at 2,000 tonnes throughput per year • non-hazardous waste at 20,000 tonnes per year • sites for hazardous or non-hazardous waste over 0.5 hectare These thresholds will also be used to refer applications that seek to change existing or allocated waste sites to non-waste uses and depart from the development plan. We also propose these thresholds should be used to refer applications for residential or mixed use development which do not accord with the development plan and which abut existing or allocated waste facilities. This is necessary to ensure that non-waste uses that could prejudice the waste use are fully considered against strategic policies. Part II, Category 2C Tram stations – We propose that planning applications for tram stations are referred to the Mayor by being included in category 2C of part II. Part III, Category 3D Metropolitan Open Land – Metropolitan Open Land (MOL) is a London Plan policy rather than a national policy. Therefore, it is principally the responsibility of the Mayor to see it enforced. Currently, the Mayor only sees planning applications for development on MOL if, amongst other things, they are departures and involve construction of a building over 1000 square metres. Given the strategic importance of MOL, we propose that the Mayor should see all departure applications for construction of a building or buildings on MOL or for a material change of use in such existing buildings. Question One Do you agree with the Government’s proposals on thresholds for referral of planning applications to the Mayor? POLICY TEST The Government expects that decisions on planning applications should normally be made by boroughs. London boroughs will continue to be responsible for deciding the vast majority of planning applications in the capital, including most applications of strategic importance. The Mayor should take over no more than a limited number of strategic planning applications in any given year that raise issues of London-wide or sub-regional importance. The Mayor will be required to apply criteria to decide whether he would be justified in taking over the decision making on an application referred to him. We want the criteria to be as robust and clear-cut as possible, so as to minimise disputes between the Mayor and the boroughs. We propose the following two criteria that could be set out in a circular or in a Ministerial Statement. The Criteria In the Mayor’s view: • Does the planning application raise issues of a nature and scale that would significantly impact on the implementation of specific London Plan policies? and • Do the issues raised by the application have significant effects that go wider than a single borough? To justify taking over an application to secure implementation of the relevant London Plan policies, the Mayor would need to clearly demonstrate that both criteria are satisfied and that in making his decision he has taken into account: • The borough’s analysis of the Development Plan policies relevant to the application and how it intends to apply relevant London Plan policies; • The borough’s record in dealing with previous applications which have raised strategic planning issues; and • Any precedent an application is likely to establish for implementing London Plan policies. The Mayor would have to publish the reasons for his decision. The Government expects that any disagreements between boroughs and the Mayor, or applicants and Mayor, about the application of the policy test should be resolved through discussion. However, the option of legal challenge would be available in the event that agreement could not be reached. We do not propose a role for the Secretary of State in arbitrating on any dispute. Question Two Do you consider this test provides a clear basis for the Mayor to decide whether he should take over a planning application? POTENTIAL CHANGES TO PROCEDURES The flow diagram below illustrates the new processes for planning applications. New Stage 1 We propose the Mayor should have 21 days from the date he receives the application and other paperwork to respond to the borough. This is new stage 1. This would be in keeping with current arrangements for statutory consultees under the General Development Procedure Order 1995. The Government accepts that these timescales are challenging. However, this is the case for other consultees and is necessary to ensure that decisions on applications are made in good time. Where the Mayor decides that a planning application may raise issues that could warrant him taking over the decision making of it, he will notify the borough of this by the end of new stage 1. The borough will then be required to set out their approach to the strategic issues raised by the application in the context of the London Plan policies. We propose the borough should have a 6 week period to make this assessment and to send their view to the Mayor. So as to minimise delay, we propose this 6 week period would start from the date the borough receives the application. This will mean that the strategic implications of a planning application above the thresholds, as set by the London Plan, will always be amongst the first set of issues considered by the borough irrespective of any action the Mayor may subsequently take. We consider this justified because the London Plan is part of the development plan and therefore must be taken into account even if the decision remains with the borough. New Stage 2 Once the Mayor receives the borough’s assessment of the strategic issues raised by an application he would decide whether he would be justified to take over jurisdiction of it (new stage 2). It is crucially important that the Mayor’s decision at stage 2 is soundly based. We propose the Mayor should have 21 days to make his decision and inform the borough. Decision stages There are three possible outcomes: • If at new stage 1 the Mayor has not intervened in a planning application, the decision to grant or refuse planning permission will be made by the borough. • If at new stage 2 the Mayor can demonstrate that all parts of the policy test have been met he will take over the planning application and decide to grant or refuse planning permission. • If at new stage 1 or at new stage 2 the Mayor decides the application does not raise issues that may warrant him taking over the decision making of it, he may still ask to be notified when the borough has reached a decision on the application. This would enable the Mayor to exercise his power to direct the borough to refuse the application. As now, we propose the Mayor should have 14 days to make this decision. The countdown of the 14 days would start as soon as the Mayor receives the application and associated papers. Retaining the 14 day period for this stage will provide for the Secretary of State to take account of the Mayor’s decision in deciding whether to exercise her power to call-in applications for her determination. Question Three Do you agree with the new procedures for handling planning applications in London? Summary of questions 1. Do you agree with the Government’s proposals on thresholds for referral of planning applications to the Mayor? 2. Do you consider the policy test provides a clear basis for the Mayor to decide whether he should take over a planning application? 3. Do you agree with the new procedures for handling planning applications in London? Part B: The Town and Country Planning (Mayor of London) Order 2000 Defining a strategic application as set out by the current Mayor of London Order 2000 PART I: LARGE SCALE DEVELOPMENT Category 1A 1. Development which (a) comprises or includes the provision of more than 500 houses, flats, or houses and flats; or (b) comprises or includes the provision of flats or houses and the development occupies more than 10 hectares. Category 1B 1. Development (other than development which only comprises the provision of houses, flats, or houses and flats) which comprises or includes the erection of a building or buildings (a) in the City of London and with a total floorspace of more than 30,000 square metres, or (b) in Central London (other than the City of London) and with a total floorspace of more than 20,000 square metres, or (c) outside Central London and with a total floorspace of more than 15,000 square metres. 2. In paragraph 1 "Central London" means the area bounded by the outer edge of the red line on a map entitled "Map of Central London referred to in the Town and Country Planning (Mayor of London) Order 2000" of which prints, dated 25th May 2000 and signed by a Director in the Department of the Environment, Transport and the Regions, are deposited and available for inspection at (a) the principal office of Secretary of State for the Environment, Transport and the Regions; (b) the Government Office for London; (c) the principal office of the Mayor; and (d) the principal office of the local planning authority for each London borough. Category 1C 1. Development which comprises or includes the erection of a building in respect of which one or more of the following conditions is met (a) the building is more than 25 metres high and is adjacent to the River Thames, (b) the building is more than 75 metres high and in the City of London, (c) the building is more than 30 metres high and outside the City of London. 2. A building is adjacent to the River Thames for the purposes of paragraph 1(a) - (a) if the building is wholly or partly on a site which falls within an area identified as a Thames Policy Area in the development plan, or (b) where no such area is so identified in respect of the relevant part of the River Thames, if the building is wholly or partly on a site which falls within the Thames Policy Area being the area bounded by the outer edge of the red line on the set of maps numbered 1 to 3 entitled "Maps of the Thames Policy Area referred to in the Town and Country Planning (Mayor of London) Order 2000" of which prints, dated 25th May 2000 and signed by a Director in the Department of the Environment, Transport and the Regions, are deposited and available for inspection at (i) the principal office of Secretary of State for the Environment, Transport and the Regions; (ii) the Government Office for London; (iii) the principal office of the Mayor; and (iv) the principal office of the local planning authority for each London borough. 3. Any part of a building below ground level shall be ignored for the purposes of paragraph 1. Category 1D 1. Development which comprises or includes the alteration of an existing building where (a) the development would increase the height of the building by more than 15 metres; and (b) the building would, on completion of the development, be higher than a relevant threshold set out in paragraph 1 of Category 1C. PART II: MAJOR INFRASTRUCTURE Category 2A 1. Development which comprises or includes mining operations where the development occupies more than 10 hectares. 2. In paragraph 1 "mining operations" means the winning and working of minerals in, on or under land, whether by surface or underground working. Category 2B 1. Waste development to provide an installation with capacity for a throughput of more than 50,000 tonnes per annum of waste produced outside the land in respect of which planning permission is sought. 2. In paragraph 1 "waste development" means any operational development designed to be used wholly or mainly for the purpose of, or a material change of use to, treating, keeping, processing or disposing of refuse or waste materials. Category 2C 1. Development to provide (a) an aircraft runway; (b) a heliport (including a floating heliport or a helipad on a building); (c) an air passenger terminal at an airport; (d) a railway station; (e) a tramway, an underground, surface or elevated railway, or a cable car; (f) a bus or coach station; (g) an installation for a use within Class B8 (storage or distribution) of the Schedule to the Use Classes Order where the development would occupy more than 4 hectares; (h) a crossing over or under the River Thames; or (i) a passenger pier on the River Thames. 2. Development to alter an air passenger terminal to increase its capacity by more than 500,000 passengers per year. Appendix Two DRAFT RESPONSE TO THE DCLG CONSULTATION ON CHANGES TO THE MAYOR OF LONDON ORDER 2000 London Councils was formerly known as the Association of London Government. The new name, effective from 1 October 2006, was chosen to reflect more accurately the membership. General Comments London Councils does not believe it is necessary or appropriate to give the Mayor the power to grant approval for certain strategic applications. London Councils has a number of serious concerns about any extension of the Mayor’s planning powers, and has already raised them in its response to the Government consultation: ‘The Greater London Authority – The Government’s proposals for additional powers and responsibilities for the Mayor and the Assembly’. They are outlined below: 1. London boroughs are best placed to weigh up local needs and sensitivities when considering big planning applications. The proposal to transfer additional development control powers to the Mayor would tip the emphasis towards strategic considerations. The boroughs have tried and tested processes to consult with residents and businesses, to ensure that big decisions affecting a local community are taken within that community. There seems to be no advantage in moving the decision-making process further away from an established system. 2. Giving the Mayor responsibility for making the big planning decisions would place too much control in the hands of one single individual. It would further remove local communities from the decision-making process and reduce democratic accountability. 3. Any transfer of development control powers to the Mayor will make the planning system more complex, and will create delays at a time when the Government wants to streamline the planning system. The Government and local planning authorities across the country have spent considerable time in overhauling the planning system through the Planning and Compulsory Purchase Act 2004. The objectives of the reform were to simplify the system and speed up delivery. This new system is still bedding down and further major changes will create confusion and hamper attempts to meet these objectives. 4. London Councils has concerns about the effectiveness and value for money of the Mayor’s current involvement in planning applications. Until an analysis of his performance is carried out it would be wrong to even consider giving him additional powers. 5. In contrast, London local authorities are performing well, both in terms of their Best Value Performance Indicators for the speed of dealing with major planning applications and for delivering on housing targets. The latest figures (both for the quarter, and the year, ending 31 March 2006) show that 24 of the 33 London councils met the target of dealing with 60 per cent of major applications within 13 weeks. Overall, the London average for dealing with major applications within 13 weeks was 68 per cent. On housing targets, statistics for 2004/05 (the latest available) show that London delivered 27,364 homes, 119 per cent of the target. The Panel Inspectors Report on the Early Alterations to the London Plan confirmed that the London boroughs are doing their part in facilitating housing delivery in the capital. The Panel noted that “It seems that the Mayor and the boroughs are equally committed to meeting the higher level of housing provision demanded by the Draft Early Alterations,” and “It seems that the position flowing from the March 2006 Housing Survey shows the healthiest pipeline of planning permissions for a considerable time. The Mayor confirms this to be the case.” (Taken from the ‘Draft Early Alterations to the London Plan Examination in Public 2006 Panel Report’ published 19 September 2006). Further information on boroughs; planning performance is attached as Annexe A’. 6. London Councils is concerned that such improvements will be set back by the proposals contained in this consultation. 7. When applications have been referred to the Mayor under the current regulations, there have been only a small number of cases where the boroughs and the Mayor have failed to reach agreement. In many of those cases (where the Mayor has directed refusal), the borough’s position has been upheld on appeal. It would be disproportionate and unjustified to give the Mayor the discretion to take over potentially a large number of planning applications, when the evidence that important strategic developments for London are being frustrated, due to inappropriate refusals of permission by the boroughs, is very limited or non-existent. Response to consultation questions Consultation Q1: Do you agree with the Government’s proposals on thresholds for referral of planning applications to the Mayor? 8. London Councils does not agree with the Government’s proposals on thresholds for referral of planning applications to the Mayor. London Councils would in particular like to highlight an anomaly that could occur. With the current definition of a strategic application and the setting of thresholds, a developer may put forward a scheme of just under the upper limit that, after initial discussions with the local authority, appears unlikely to get approval from the local authority. The developer could then withdraw the application and amend the scheme design to take it above the threshold. Thus bypassing the local authority and going straight to the Mayor. If the new arrangements allow developers to take advantage of the system in this way, the effect will be to undermine the authority of boroughs and create further delays. 9. London Councils has the following comments to make specifically on the proposed changes to thresholds: Proposed thresholds for dealing with waste applications 1 10. The decision to introduce thresholds at which waste planning applications should be referred to the Mayor now means that the Mayor could have responsibility for many facilities which are purely local in nature. It should be noted that the DCLG announcement on the proposals for extra powers for the Mayor stated that, on waste planning: 1 Hazardous waste at 5,000 tonnes throughput per year; Non-hazardous waste at 50,000 tonnes per year; Sites for hazardous or non-hazardous waste over 1 hectare And for departures from borough Development Plan documents: Hazardous waste at 2,000 tonnes throughput per year; Non-hazardous waste at 20,000 tonnes per year; Sites for hazardous or non-hazardous waste over 0.5 hectare ‘Effective planning for waste facilities in London is critically important. The Government intends that the Mayor should have discretion to decide those planning applications for waste facilities which are strategically important and critical to implementing his waste strategy.’ 11. However, according to the London Councils’s ‘Meeting the Waste Challenge – A Guide to Waste Planning in London’ document, compiled in association with GOL, London Remade and the Environment Agency, the average size of most waste management facilities would be 0.8 hectares or greater (the average indicative size of a small Materials Recovery Facility (according to the London Councils’s Meeting the Waste Challenge). Thus, if the waste application definitions are revised as suggested in the consultation, the Mayor could be the determining authority for a significant proportion of waste applications. This does not meet the intention of the DCLG as outlined above. It should be up to the local planning authority to determine the location of facilities that serve local communities. Therefore, the thresholds should be based on the average size for each different type of facilities (and this will differ according to the type of facility). London Councils requests that further work is done to identify and classify facilities according to size and type in order to ensure that, if thresholds are set, it is only for applications of a strategic nature. 12. London Councils does not believe that the thresholds proposed for waste applications that are departure from Development Plan Documents (DPD) is appropriate. These thresholds should actually be higher than those proposed for the main thresholds. This is because the Mayor has the opportunity to review the borough development plan through the established planning process. The borough plan must be in general conformity with the London Plan. Therefore, any applications that are departures from the DPD, unless they are particularly strategic, should be for the borough to determine, within the framework set out by its accepted development plan. 13. Strategic policy to achieve the waste objectives for London should be established and tested by the London Plan process, rather than by transferring planning applications to the Mayor. Proposed thresholds for dealing with tram station applications 14. London Councils does not consider that all tram stations are strategic. Only tram stations located as part of interchanges are strategic to the transport network. As such, only these stations should be classed as strategic. Proposed thresholds for dealing with Metropolitan Open Land (MOL) applications 15. London Councils does not consider that there is a need to for threshold to be removed and all applications on MOL be transferred to the Mayor. All boroughs are well aware of the designation for MOL and the need for MOL to be protected. There is no strategic justification for this change. 16. London Councils also considers that may be appropriate to consider raising the threshold in other areas of planning to ensure that the Mayor’s involvement is only at the highest strategic level. The DCLG is urged to work with the London Councils and GLA to consider where such changes may be appropriate. Other concerns on using thresholds 17. London Councils is extremely concerned over the impact of the decision to give the Mayor power to grant approval to tall buildings over a certain height (25m if adjacent to the River Thames, 30m in the City of London and 75m elsewhere). The Mayor’s preference for tall buildings is well documented. There have been a number of recent cases where the local authority has refused a planning application for a tall building because it was completely inappropriate to the surrounding area (Lot’s Road in Chelsea and Lovell’s Wharf in Greenwich). It is understood that had the Mayor had the power to grant approval in these cases, he would have done so. However, this would have resulted in a development completely inappropriate for the local community. 18. The Mayor currently has the power to direct refusal of schemes involving tall buildings, since such buildings could undermine the achievement of other strategic planning objectives, such as the preservation of important views across London. However, it is not clear what strategic objectives could be advanced by giving the Mayor power to approve, over the opposition of local authorities, schemes which are considered strategic because of building height. Such schemes may not exceed the strategic thresholds for housing units or floor space. 19. The DCLG should also consider whether other specific thresholds within the Mayor of London Order 2000 need to be amended to reflect other changing circumstances. London Councils believes that it may be appropriate to consider raising other thresholds to ensure that boroughs are able to balance strategic aims with local policy objectives to best meet the needs of their local areas. For example, it may be appropriate to consider whether the commercial development threshold outside central London should be raised from its present 15,000 square metres. London Councils has expressed concerns to the GLA in its consultation on Sub Regional Development Frameworks and on the early alterations to the London Plan that the Mayor is not giving enough emphasis and encouragement to economic growth and development in parts of outer London. Whilst the London Councils agrees that central London is of great importance in economic terms, growth in outer London economies also needs to be encouraged. The Assembly version of the Further Alterations to the London Plan has not allayed these concerns. The proposal to reclassify ‘suburb’s as ‘residential areas’ increases concern that the Mayor is not doing enough to encourage economic development in parts of outer London, without which there will be an increase in journeys to work which is fundamentally unsustainable. Therefore the increasing of the threshold for commercial development may help to redress this. London Councils suggests that the Mayor should be encouraged to include this issue for review within the next round of Sub Regional Development Frameworks. This will help to take forward further research to identify whether such a change would be appropriate. The Policy Test Consultation Q2: Do you consider this [policy] test provides a clear basis for the Mayor to decide whether he should take over a planning application? 20. The proposed policy test is extremely vague over where the Mayor could intervene and take over a planning application. It is also subjective with a significant amount of emphasis on the Mayor’s own interpretation of the situation. Need for a counter-balance to protect borough interests 21. The first policy test 2 that the application could significantly impact on the implementation of specific London Plan policies has no counter-balance. For example, a borough may turn down a planning application for housing development that does not provide sufficient mix and type of housing to meet that borough’s housing requirements. However, if the Mayor feels that this application is needed to ensure his housing targets – based solely on unit numbers and not appropriate type of housing – will be met, is he able to take on the decision making for such an application? It appears that the Mayor’s interpretation of what is a ‘significant impact on specific London Plan policies’ will have greater weight that a borough’s own determination of what is appropriate for their own area – in the example above, a suitable mix of housing type and size. Additionally, the Mayor should be asked to consider the impact of the proposed application on both the London Plan and the borough’s own Development Plan Document. This will help to ensure that the Mayor is considering all aspects of the planning system. Need for a robust and transparent policy process 22. The second test is whether an application has significant effects wider than a single borough. Firstly, many applications on or near to borough boundaries will impact across administrative borders. Secondly, environmental and transport impacts will affect more than one borough for many applications. This test is too vague and open to misinterpretation by the Mayor. Whilst it is understood that the Mayor will have to publish his rationale for taking over an application, the London Councils is concerned that this could be too late in the process. A robust and transparent policy test is needed from the outset. A definition of what constitutes ‘significant impact’ is necessary in order to make the process more transparent. Need for a more appropriate mechanism for boroughs to challenge the Mayor 23. The only way to challenge the Mayor’s decision would be through the courts. The arrangements are likely to lead to potential judicial reviews, especially where both the local planning authority and the public are opposed. The requirement that the Mayor should not have previously shown support for the project is also likely to be open to interpretation and a source of challenge. This therefore gives rise to further concerns over the appropriateness of these tests. London Councils also believes that the proposal to leave judicial review as the only way to challenge the Mayor’s decision to take over an application, rather than giving a role to the Secretary of State or some other arbiter, should be re-considered. Need for a narrower definition of applications that could be taken over by the Mayor 24. The DCLG has stated that it considers that the Mayor would only take over a small number of applications. The Secretary of State for Communities and Local Government said in the 13 July 2006 meeting with the Chairman of the London Councils that the Government wanted the Mayor to be concerned only with broad strategy and not ‘specific streets’. However, the policy tests are sufficiently subjective (and broad) for the Mayor to take over a wide range of planning applications. Additionally, as the Mayor does not currently have the Development Control capability to deal with such applications, he will have to establish this function within the GLA. As a result, after setting up such a function, he may well be more inclined to make use of it and take over an increasingly larger number of applications. This could include cases where, although the local planning 2 Does the planning application raise issues of a nature and scale that would significantly impact on the implementation of specific London Plan policies? authority is supportive of the application, the Mayor wishes to take it over in order to control the content of any Section 106 agreement, which the local authority would nevertheless be required to enforce. This is completely inappropriate and the subsequent policy test must ensure that this eventuality is precluded. 25. London Councils considers that the policy test should be amended to reflect more accurately the stated objective of extending the Mayor’s development control powers in paragraph 3.3.10 of DCLG’s July Policy Statement. This objective was to “to decide a small number of the most strategically important planning applications in London so as to ensure decision-making takes place at the most appropriate level and regional planning policies are fully taken into account.” This means that the focus of the policy test should be on the strategic importance of the development itself for implementation of the London Plan, and not for the application of individual London Plan policies. There are over 180 policies listed in the index to the London Plan. As currently drafted the policy test would allow the Mayor to take over an application if it would significantly impact on the implementation of any of them. 26. All applications of sufficient size to be referred to the Mayor will inevitably have significant effects for the implementation of the London Plan. If it is genuinely the intention that the Mayor should only take over a small number of applications, the policy should distinguish those which are of special importance from those where the strategic considerations can be considered by the borough in the usual way. Finally, since the intention in paragraph 29 of the consultation paper appears that both aspects of the test should be met, for clarity they should be combined. 27. London Councils would therefore propose for further discussion the following modified version of the policy test: ”Does the planning application propose a development which raises strategic issues of a nature and scale that are of special importance for the implementation of the London Plan, and which will have important effects on more than one borough?” Need for more explanation of how a borough’s record in dealing with applications would be taken into account 28. The reference to a borough’s record in dealing with previous applications is unclear. Does this refer to speed of dealing with the application or the actual outcome? This must be clarified. It is certainly not appropriate to use a borough’s previous ‘track record’ as this is not a recognised or appropriate mechanism for determining regional government involvement in the planning system. No applications are identical and there are a number of variables with each one. The type of applications which would justify being taken over by the Mayor will almost always be unique. Therefore, it is not appropriate to deal with an application solely on how the authority has dealt with similar applications previously as there will be always be elements unique to a particular application. Changes to procedures Consultation Q3: Do you agree with the new procedures for handling planning applications in London? 29. London Councils does not feel that the new procedures are the correct mechanism for handling planning applications in London. Firstly, the policy test as outlined above does not provide a clear path for where the Mayor should take over an application. Further concerns include: If the Mayor is to make decisions on certain strategic applications like a local planning authority, he should be expected to act like a local planning authority. He should make his planning decisions in public, with a right of representation for all concerned stakeholders. His decisions should be based on a published report which is open to scrutiny and which demonstrates how he has taken account of all the relevant development plan policies, and of responses to consultation on the application. The current proposals do not provide for such an open and transparent process of decision-making. This is contrary to the objectives of the Planning and Compulsory Purchase Act 2004. Furthermore, under current call-in arrangements, there is scope for the Secretary of State to resolve contentious cases under the scrutiny of a public inquiry. The proposed arrangements for London would remove this transparency from the most important and contentious planning applications, by allowing them to be determined by one individual (currently in private) with no external challenge. This will inevitably lead to more calls from local planning authorities and others for such applications to be called in by the Government. This is likely to delay rather than expedite decisions. The proposed arrangements could mean that different applications on the same site would be determined by different authorities, increasing confusion and possible conflict. Additionally, the DCLG announcement states that consultations for applications taken over by the Mayor will still be carried out by the London borough. Should the Mayor have involvement in more applications as a result of a lowering of the strategic threshold, boroughs will have to carry out more consultations for applications where they are not the decision making body. This could undermine the credibility of borough-led consultations and be a further pressure on borough resources 30. London Councils is concerned that the new policies and procedures put the onus on London boroughs to outline to the Mayor the strategic issues raised by an application. It should be the role of the Mayor to initially identify why he feels justified in taking over the decision making role of an application. There then should be scope for a borough to challenge this. It is not appropriate for the Mayor to take over an application because he thinks that the borough may be minded to refuse it, based on their track record. London Councils suggests that the borough assessment of strategic issues should also indicate whether at that stage the borough is (a) likely to approve the application subject to conditions and a legal agreement, (b) likely to refuse the application or (c) as yet undecided. Since the Mayor is already able to direct refusal on applications referred to him, he should not be able to take over applications which the borough indicates that it is likely to approve. 31. The Mayor’s potential involvement in Section 106 agreements could actually mean several additional parties to an agreement if the GLA functional bodies such as TfL were individually to be involved. It would further unnecessarily complicate what can currently be a main source of delay in determining planning applications. Additional legal costs arising from more complex agreements would be a further cost on development. 32. The Government has been moving progressively towards a cost recovery basis for planning fees. This position has not been reached yet, but it is essential that any review of fees should reflect the costs of implementing the new arrangements. Even if an application is called in by the Mayor, the costs likely to be incurred by the local planning authority are likely to be at least as high as if they had determined the case themselves. They should not, therefore, lose any of the fee. 33. There is concern that the processes put forward will add to the time taken for decision making on strategic planning applications. Boroughs and other stakeholders have been working hard to speed up delivery of the planning system. Conclusion 34. The proposals are not sufficiently transparent or specific to ensure that these changes to the planning system will work fairly, with sufficient local accountability. 35. For these reasons, the London Councils suggests that the DCLG should enter into discussions with the London Councils and the London boroughs to identify how these could be developed further to best meet the needs of the planning system. Annexe A London Borough’s performance in planning 1 Turn around of planning applications The Department for Communities and Local Government has set the following targets for local authorities in dealing with planning applications: 60% of major applications to be dealt with in 13 weeks 65% of minor applications to be dealt with in 8 weeks 80% of all other applications to be dealt with in 8 weeks London’s performance for the quarter ending 31 March 2006 is as follows: Overall proportion of major applications dealt with inside the 13 week deadline: 68% (24 boroughs met the target) Overall proportion of minor applications dealt with inside the 8 week deadline: 77% (31 boroughs met the target) Overall proportion of other applications dealt with inside the 8 week deadline: 89% (28 boroughs met the target) This is a continuing trend, with the figures for the year ending 31 March 2006 for the London boroughs overall as follows: Overall proportion of major applications dealt with inside the 13 week deadline: 68% (24 boroughs met the target) Overall proportion of minor applications dealt with inside the 8 week deadline: 78% (33 boroughs met the target) Overall proportion of other applications dealt with inside the 8 week deadline: 88% (29 boroughs met the target) 2 Housing delivery Housing Completion for 2003/4 Conventional Supply Non Self Contained Provision Vacants Returning to Use Total Current London Plan Target Performance against Target 21,045 1,276 3,585 25,906 23,000 113% Housing Completion for 2004/5 Conventional Supply Non Self Contained Provision Vacants Returning to Use 22,885 2,591 1,888 Total London Plan Target 23,000 Performance against London Plan Target 27,364 119% Figures for the pipeline of planning approvals are as follows: Net Approvals for 2003/04 were 41,439 (197% of the GLA guideline figure) Net Approvals for 2004/05 were 51,477 (245% of the GLA guideline figure)
© Copyright 2026 Paperzz