 Increase ROI of test and measurement equipment
 Assists in equipment refresh with minimum disruption
 Reduces risk of obsolete equipment
 Concise product life cycle data bi-annually
 Allow recommendations for maximizing efficiency,
performance of new and existing equipment
 Reduces cost, risk and schedule impact
s1
Managing obsolesence. Easy as 1-2-3 !
Supply us with your asset list
And we will supply you with
data on those assets!
s1
Sample Summary of Assets
Current Test Assets - # of Units (5/7/08)
Discontinuance
not announced,
155, 39%
Out of Support
Life presently,
194, 48%
Top 10 Product Groups / EOS
Asset List 5/7/08
Out of Support
life next 4 years,
51, 13%
1000
900
800
700
600
500
400
300
200
100
0
POWER
SUPPLY
Spectrum
Analyzer
Counter
Total
Amplifier
s1
EOS
Waveform
Gen
Sample of Detail IMPS Report
INSTRUMENT MIGRATION PLANNING SERVICE
(4/17/08)
Customer
Supplied
Product
Number
Model No.
Qty
Category
Description
3478A
3478A
115
Multimeter
Multimeter
8481A
8481A
107
Power
Sensor
Power Sensor - High
34401A
34401A
103
Multimeter
Digital Multimeter 6.5 digit
8112A
8112A
71
Pulse Gen
438A
438A
61
8116A
8116A
8566B
Discontinuanc End Support
e Date
Life
Comments
12/1/1995
6/1/2001
34401A
4/1/2008
4/1/2009
Replace with N8481H
Discontinuance date not announced, product
supported.
GENERATOR PULSE
11/1/1996
4/30/2002
81101A
Power
Meter
Power Meter
7/1/1998
7/1/2003
E4419B
56
Func Gen
Function Generator
1/1/1997
5/1/2002
33250A
8566B
54
Spec Anal
High Performance mw Spectrum
Analyzer
7/1/1997
11/1/2002
E4440A, 46A, 48A
34970A
34970A
50
Data Acq
Data acquisition/switch unit
436A
436A
44
Power
Meter
Power Meter
7/1/1998
10/1/2003
E4418B
3468A
3468A
44
Multimeter
Meter Multi
11/1/1995
3/1/2001
34401A, 34410A, 34411A, 3458A, L4411A
8484A
8484A
43
Power Sensor - Low
9/1/1994
9/1/2004
8481D
66102A
66102A
37
8485A
8485A
34
11664E
11664E
33
Power
Supply
Power
Supply
Power
Sensor
Discontinuance date not announced, product
supported.
Discontinuance date not announced, product
supported.
DC POWER MODULE
Power Sensor
RF DETECTOR
10/1/2008
10/3/2009
Replace with N8485A
9/1/1995
8/31/2000
RF Microwave Test products
s1
Instrument Migration Planning Service
Collaborative Offerings
Test
Equipment
Replacement
Engineering
Support
Cost
of
Ownership
Analysis
Integrated
System
Modernization
Service
s1
Test Equipment Replacement Engineering
Support
Support Examples
Develop a replacement strategy that
best meets the Customers needs:
- Code Compatibility
- Measurement Functionality
- Consolidation via Increased Utility
Division Resources
TPS
Migration
Tools
AEO & Division Support
- Code migration
- User training
- Application assistance
Virtual Rack® Integration Framework
s1
Cost Of Ownership Analysis
Current COO
Equipment
Depreciation/Cost
Operational
Efficiency /
Test Time
Supportability and
Maintainability
Costs
New COO
Improved
Operational
Efficiency /
Technology
Capability
Supportability and
Maintainability
Costs
Equipment
Depreciation
Software Migration
Cost
s1
Cost Of Ownership Analysis
Sample COO Analysis Report
Units per Month
100
WIP
10
Test Step 1
Current
Proposed
Number of Test Stations
1
1
Number of test fixtures per station (#)
1
1
Number of DUTs/fixture
1
1
Number of Test Stations per Operator
1
1
DUT Set-up Time (Mins)
5
5
DUT Test Time (Mins)
22
10
DUT Removal Time (Mins)
5
5
Maintence and Support people per shift
0.5
0.25
Cost of Consumables per # Units
$127
$55
Number of Test Stations
Number of Units for Consumables
200
200
WIP
Percent of total value in DirectNumber
Material of test fixtures
17% per station (#)
Depreciation/month
$138
$253
15
Number of DUTs/fixture
Average Repair Material used per Month
$0
Number of Test Stations per Operator
Percentage of Scrap that is Recoverable
0%
DUT Set-up Time (Mins)
Test Station Capacity per Week
153
245
DUT Test Time (Mins)
Test Station Utilization
21%
13%
Test Step 2
Units per Month
100
Units per Month
99
Units per Month
100
Current
1
1
1
1
10
45
DUT Removal Time (Mins)
2
Step 3
Maintence and Support people Test
per shift
0.3
Number of Test Stations
Cost of Consumables per # Units
$150
Proposed
1
1
1
1
5
22
2
0.3
50
WIP
Number of test fixtures per station (#)
Number 15
of Units for Consumables
100
Number of DUTs/fixture100
Percent of total value in Direct Material
17%
Number of Test Stations
per Operator
Depreciation/month
$1,355
$1,760
DUT Set-up Time (Mins)
DUT
Test Time (Mins) $0
Average Repair Material used per
Month
DUT Removal Time (Mins)
Percentage of Scrap that is Recoverable
0%
people per shift169
Test Station Capacity per WeekMaintence and Support 86
Cost of Consumables per
# Units
Test Station Utilization
42%
21%
Number of Units for Consumables
Percent of total value in Direct Material
Depreciation/month
Average Repair Material used per Month
Percentage of Scrap that is Recoverable
Test Station Capacity per Week
Test Station Utilization
Units per Month
99
Current
1
1
1
1
10
60
2
0.3
$200
100
17%
$1,100
$0
0%
68
52%
Proposed
1
1
1
1
7
45
2
0.3
$150
100
$2,200
91
39%
Current Cost
Proposed Cost
Total Cost
Of Test
Total Cost
Of Test
$66,879
Cost Per
Unit
$681.70
Total Overhead Cost/Month:
Overhead Cost Per Unit:
Cost Matrix
Total COT
Cost of Test
Test
Step 1
$5,784
$5,505
$45,057
Cost Per
Unit
$459.27
Total Overhead Cost/Month:
Overhead Cost Per Unit:
$35,000
$356.76
Test Step 2
$11,911
$11,484
Units per Month
98
Test Step 3
$14,184
$13,760
Cost Matrix
Total COT
Cost of Test
s1
$21,667
$220.85
Test Step Test Step Test Step
1
2
3
$3,842
$7,391
$12,158
$3,563
$6,963
$11,734
Integrated System Modernization
Service
Inputs
Product
Road
Maps
Firmware
Revision
Requirements
Design solutions
to meet new
requirements.
New Test
Requirements
Optimize test
system speed
performance and
thru put.
Minimize software
and hardware
conversion
impacts.
Known Issues
Lessons Learned
Program
Schedule
Existing
Products
New Options
s1
Integrated System Modernization
Service
Output
s1
IMPS Deliverables are customized to each
Customer situation
Service Offerings
Test Equipment Replacement Engineering Support
Cost of Ownership Analysis
Integrated System Modernization Service
Benefits
Concise product life cycle data semi-annually
Recommendations for maximizing efficiency and performance
Recommendations to minimize cost, risk and schedule impact
s1
For more information, contact your local Agilent representative.
s1