4th Plenary Meeting, Stockholm 318216–INERTIA SEVENTH FRAMEWORK PROGRAMME Smart Energy Grids Project Title: Integrating Active, Flexible and Responsive Tertiary Prosumers into a Smart Distribution Grid INERTIA Grant Agreement No: 318216 Collaborative Project 4th Plenary Meeting Lead Partner CNet Date 9-10 September 2013 Place CNet Svenska AB, Stockholm - Sweden Svärdvägen 3b, 182 33 Danderyd, Sweden Ulf Wingstedt Contact Details [email protected] Tel: +46 70 581 99 18 9-10 September 2013 1 CNet 4th Plenary Meeting, Stockholm 318216–INERTIA Agenda – DAY 1 Monday, 9 September 2013 Topic Time 09:00-09:15 09:15-09:50 09:50-10:10 10:10-10:45 10:45-11:00 11:00-11:30 Welcome and meeting arrangements WP8 Project Management o Project Status o Deliverables & Milestones for M12 o List of Important Actions from previous meeting (pending issues) T1.1 Living Lab (task ends M12) o Remaining issues upon task completion o Contributions pending from partners o Status of deliverable D1.1 (in cooperation with T1.3)- detailed planning of remaining efforts towards completion by end of September T1.2 User & Business Requirements (task ends M12) o Remaining issues upon task completion Report on questionnaires gathered per stakeholder/LL members Outcomes of questionnaires analysis Final list of requirements o Contributions pending from partners o Status of deliverable D1.2 - detailed planning of remaining efforts towards completion by end of September Coffee Break T1.3 Pilot Sites Survey and Audits (task ends M12) o Remaining issues upon task completion o CERTH premises Present final plan for integration to existing Equipment/Infrastructures Present final list of devices (DER) to be included in the pilot evaluation phase Present final list of required Sensors, Actuators and metering devices needed o TECNALIA lab Present final pilot realisation plan o Presentation of alternative scenarios for the overall Pilot Topology incorporating both TECNALIA Lab and CERTH Pilot Premises o Status on integration with INDESIT Dishwasher o Contributions pending from partners 9-10 September 2013 2 Responsible partner CNet / ALL CERTH TECNALIA ENG CNet / TECNALIA/ INDESIT CNet 4th Plenary Meeting, Stockholm 318216–INERTIA Status of deliverable D1.1 (M12) (in cooperation with T1.1) Detailed planning of remaining efforts towards completion by end of September T1.4 Architectural Design-Functional and Technical Specifications (task ends M12) o Highlight parts of the architecture and respective document sections that need to be further discussed and approved o Clarify and discuss aspects of proposed MAS architecture (in cooperation with ALMENDE) o Discuss on the role of the IAM in communication between components (in cooperation with TUK) o Present and approve information flow between components (using sample sequence diagrams of both Local and Aggregator Hub) o Discuss issues raised by the need to simultaneously handle actual and simulated prosumers o Specify sections and contributions remaining by corresponding partners o Detailed planning of remaining efforts needed per partner towards completion of deliverable D1.3 by end of September Lunch break T2.1-INERTIA Common Information Model (task ends M12) o Present current state of CIM and IAM development o Integration of component data schemas received from corresponding partners o Specify sections and contributions remaining by partners o Detailed planning of remaining efforts needed per partner towards completion of deliverable D2.1 by end of September T2.2-DER Modelling o Present DER Models prepared, in respect to DERs identified at CERTH pilot (in cooperation with CNet) o Discuss how the DER Models will cover special CERTH needs – e.g. CERTH VRV system o Discuss available DER Models not available within the CERTH premises that can however be utilized within the INERTIA simulated prosumers o 11:30-13:00 13:00-14:00 14:00-14:30 14:30-15:00 9-10 September 2013 3 CERTH / ALL TUK TECNALIA / CNet/ ALMENDE CNet 4th Plenary Meeting, Stockholm 318216–INERTIA Discuss training/adaptation of DER Models, based on actual measurements (in cooperation with ALMENDE) o Discuss Control Operations proposed and how these reflect the control operations of CERTH infrastructure DERs. o Detailed planning of remaining efforts needed per partner towards completion of deliverable D2.4.1 by end of September o Work plan & efforts for the next period T2.3-Occupancy Profiling & Activity Flow Modelling (task ends M12) o State of the Art analysis and conclusions o Present occupancy modelling approach o Present individual and group-based occupancy prediction o Present User Profiling Modelling approach o Status and effort needed towards completion of deliverable D2.2 by end of September T2.4-Local and Global Energy Performance Modelling o Work achieved so far o Present table prepared to organise and revise list of KPIs per categories o Overview of structure of deliverable D2.3.1 o Discussion about the already defined KPIs. o Internal workshop for the short-listing of the INERTIA Performance Indicators o Detailed planning of remaining efforts needed per partner towards completion of deliverable D2.3.1 by end of September o Work plan & efforts for the next period T2.5-Holistic Flexibility Models o Presentation of negotiation and control mechanism of Local Control Hub, to be used by Holistic Flexibility component o Agent representation of different modelling parts of the Local Control Hub o Work plan & efforts for the next period WP7 Overview: T7.2-INERTIA Marketing & Dissemination Plan (task ends M12) T7.3-INERTIA Web Portal - Dissemination Channels & Promotional Material T7.4-Dissemination Activities & Exploitation o Status and update of Dissemination Actions o Detailed planning towards completion of deliverable D7.1 by end of September Open issues and discussion for the 1st day Next Meeting Arrangements o 15:00-15:20 15:20-16:30 16:30-16:50 16:50-17:10 17:10- 9-10 September 2013 4 CERTH ENG / HYPERTECH ALMENDE HYPERTECH / CERTH ALL CNet 4th Plenary Meeting, Stockholm 318216–INERTIA Agenda – DAY 2 Tuesday, 10 September 2013 Topic Time 09:00-09:40 09:40-10:00 10:00-10:30 10:30-10:50 10:50-11:05 11:05-11:40 T3.1-INERTIA Semantic Middleware Specifications (task ends M12) o Work achieved on INERTIA Middleware specification and components o Present ongoing LinkSmart developments and extensions needed within INERTIA o Relation of IAM component with LinkSmart o Discuss LinkSmart Topology & Deployment Issues concerning the incorporation of the two different pilot sites (TECNALIA Lab & CERTH Premises) as well as the handling of the simulated prosumers o Detailed planning of remaining efforts needed per partner towards completion of deliverable D3.1 by end of September o PROTOTYPE development (to be presented during Review by end of November) o Current status of work achieved and planning T3.2- DER Device Managers o Current status overview o Present list of Device Managers, based on DERs identified at CERTH pilot o Work plan & efforts for the next period T3.3-INERTIA Ontology, Inference Rules & Semantic Devices o Current status overview o Present initial prototypical Semantic model of DER, to support demo implementation of the IAM component o Present contributions to be included in deliverable D3.1 by end of September o Work plan & efforts for the next period T3.4- Multi-Sensorial Activity Flow Detection & Modelling in controlled environments o Current status overview o Present initial work on prototype development, for assessment of proposed methodologies o Work plan & efforts for the next period Coffee Break T3.5-Ambient and Personalised UI & User Profiling Mechanism o Current status overview o Present the initial work on the User Profiling 9-10 September 2013 5 Responsible partner CNet / TUK CNet TUK CERTH HYPERTECH CNet 4th Plenary Meeting, Stockholm 318216–INERTIA mechanism (INERTIA User profiling Model) Present the specifications of the Ambient User Interfaces o Issues also covered as part of T2.2 o Work plan & efforts for the next period T4.1-DER Flexibility Analysis, Aggregation and Forecasting Module o Current status overview o Work plan & efforts for the next period T4.2-Grid Coordination & DR Activation Module o Current status overview o To finally define the functionality of Grid Coordination & DR Activation Module as part of the Aggregator Hub architecture o Assignments per partner o Work plan & efforts for the next period T5.2-INERTIA Simulation Test Suite o Current status overview o Assignments per partner o Work plan & efforts for the next period Preparation for the Review Logistics about the Review Preparation of presentations Lunch Break Closure of meeting / Internal meetings o 11:40-12:00 12:00-12:20 12:20-12:40 12:40-13:00 13:00-14:00 14:00- HYPERTECH TECNALIA TECNALIA CERTH ALL Note: Tasks ending on M12 (September 2013) are marked as below: Tasks ending on M12 – September 2013 9-10 September 2013 6 CNet
© Copyright 2026 Paperzz