1.INERTIA-4th_PlenaryMeeting_Agenda-Stockholm_v1

4th Plenary Meeting, Stockholm
318216–INERTIA
SEVENTH FRAMEWORK PROGRAMME
Smart Energy Grids
Project Title:
Integrating Active, Flexible and Responsive Tertiary
Prosumers into a Smart Distribution Grid
INERTIA
Grant Agreement No: 318216
Collaborative Project
4th Plenary Meeting
Lead Partner
CNet
Date
9-10 September 2013
Place
CNet Svenska AB, Stockholm - Sweden
Svärdvägen 3b, 182 33 Danderyd, Sweden
Ulf Wingstedt
Contact Details
[email protected]
Tel: +46 70 581 99 18
9-10 September 2013
1
CNet
4th Plenary Meeting, Stockholm
318216–INERTIA
Agenda – DAY 1
Monday, 9 September 2013
Topic
Time
09:00-09:15
09:15-09:50
09:50-10:10
10:10-10:45
10:45-11:00
11:00-11:30
Welcome and meeting arrangements
WP8 Project Management
o Project Status
o Deliverables & Milestones for M12
o List of Important Actions from previous
meeting (pending issues)
T1.1 Living Lab (task ends M12)
o Remaining issues upon task completion
o Contributions pending from partners
o Status of deliverable D1.1 (in cooperation
with T1.3)- detailed planning of remaining
efforts towards completion by end of
September
T1.2 User & Business Requirements (task ends
M12)
o Remaining issues upon task completion
 Report on questionnaires gathered per
stakeholder/LL members
 Outcomes of questionnaires analysis
 Final list of requirements
o Contributions pending from partners
o Status of deliverable D1.2 - detailed
planning of remaining efforts towards
completion by end of September
Coffee Break
T1.3 Pilot Sites Survey and Audits (task ends M12)
o Remaining issues upon task completion
o CERTH premises
 Present final plan for integration to
existing Equipment/Infrastructures
 Present final list of devices (DER) to
be included in the pilot evaluation
phase
 Present final list of required Sensors,
Actuators and metering devices
needed
o TECNALIA lab
 Present final pilot realisation plan
o Presentation of alternative scenarios for the
overall Pilot Topology incorporating both
TECNALIA Lab and CERTH Pilot Premises
o Status on integration with INDESIT
Dishwasher
o Contributions pending from partners
9-10 September 2013
2
Responsible
partner
CNet / ALL
CERTH
TECNALIA
ENG
CNet /
TECNALIA/
INDESIT
CNet
4th Plenary Meeting, Stockholm
318216–INERTIA
Status of deliverable D1.1 (M12) (in
cooperation with T1.1)
 Detailed planning of remaining efforts
towards completion by end of
September
T1.4 Architectural Design-Functional and Technical
Specifications (task ends M12)
o Highlight parts of the architecture and
respective document sections that need to
be further discussed and approved
o Clarify and discuss aspects of proposed MAS
architecture (in cooperation with ALMENDE)
o Discuss on the role of the IAM in
communication between components (in
cooperation with TUK)
o Present and approve information flow
between components (using sample
sequence diagrams of both Local and
Aggregator Hub)
o Discuss issues raised by the need to
simultaneously handle actual and simulated
prosumers
o Specify sections and contributions remaining
by corresponding partners
o Detailed planning of remaining efforts
needed per partner towards completion of
deliverable D1.3 by end of September
Lunch break
T2.1-INERTIA Common Information Model (task
ends M12)
o Present current state of CIM and IAM
development
o Integration of component data schemas
received from corresponding partners
o Specify sections and contributions remaining
by partners
o Detailed planning of remaining efforts
needed per partner towards completion of
deliverable D2.1 by end of September
T2.2-DER Modelling
o Present DER Models prepared, in respect to
DERs identified at CERTH pilot (in
cooperation with CNet)
o Discuss how the DER Models will cover
special CERTH needs – e.g. CERTH VRV
system
o Discuss available DER Models not available
within the CERTH premises that can however
be utilized within the INERTIA simulated
prosumers
o
11:30-13:00
13:00-14:00
14:00-14:30
14:30-15:00
9-10 September 2013
3
CERTH / ALL
TUK
TECNALIA /
CNet/
ALMENDE
CNet
4th Plenary Meeting, Stockholm
318216–INERTIA
Discuss training/adaptation of DER Models,
based on actual measurements (in
cooperation with ALMENDE)
o Discuss Control Operations proposed and
how these reflect the control operations of
CERTH infrastructure DERs.
o Detailed planning of remaining efforts
needed per partner towards completion of
deliverable D2.4.1 by end of September
o Work plan & efforts for the next period
T2.3-Occupancy Profiling & Activity Flow Modelling
(task ends M12)
o State of the Art analysis and conclusions
o Present occupancy modelling approach
o Present
individual
and
group-based
occupancy prediction
o Present User Profiling Modelling approach
o Status and effort needed towards completion
of deliverable D2.2 by end of September
T2.4-Local and Global Energy Performance
Modelling
o Work achieved so far
o Present table prepared to organise and
revise list of KPIs per categories
o Overview of structure of deliverable D2.3.1
o Discussion about the already defined KPIs.
o Internal workshop for the short-listing of the
INERTIA Performance Indicators
o Detailed planning of remaining efforts
needed per partner towards completion of
deliverable D2.3.1 by end of September
o Work plan & efforts for the next period
T2.5-Holistic Flexibility Models
o Presentation of negotiation and control
mechanism of Local Control Hub, to be used
by Holistic Flexibility component
o Agent representation of different modelling
parts of the Local Control Hub
o Work plan & efforts for the next period
WP7 Overview:
T7.2-INERTIA Marketing & Dissemination Plan
(task ends M12)
T7.3-INERTIA Web Portal - Dissemination Channels
& Promotional Material
T7.4-Dissemination Activities & Exploitation
o Status and update of Dissemination Actions
o Detailed planning towards completion of
deliverable D7.1 by end of September
Open issues and discussion for the 1st day
Next Meeting Arrangements
o
15:00-15:20
15:20-16:30
16:30-16:50
16:50-17:10
17:10-
9-10 September 2013
4
CERTH
ENG
/ HYPERTECH
ALMENDE
HYPERTECH /
CERTH
ALL
CNet
4th Plenary Meeting, Stockholm
318216–INERTIA
Agenda – DAY 2
Tuesday, 10 September 2013
Topic
Time
09:00-09:40
09:40-10:00
10:00-10:30
10:30-10:50
10:50-11:05
11:05-11:40
T3.1-INERTIA Semantic Middleware Specifications
(task ends M12)
o Work achieved on INERTIA Middleware
specification and components
o Present ongoing LinkSmart developments
and extensions needed within INERTIA
o Relation of IAM component with LinkSmart
o Discuss LinkSmart Topology & Deployment
Issues concerning the incorporation of the
two different pilot sites (TECNALIA Lab &
CERTH Premises) as well as the handling of
the simulated prosumers
o Detailed planning of remaining efforts
needed per partner towards completion of
deliverable D3.1 by end of September
o PROTOTYPE development (to be presented
during Review by end of November)
o Current status of work achieved and
planning
T3.2- DER Device Managers
o Current status overview
o Present list of Device Managers, based on
DERs identified at CERTH pilot
o Work plan & efforts for the next period
T3.3-INERTIA Ontology, Inference Rules &
Semantic Devices
o Current status overview
o Present initial prototypical Semantic model
of DER, to support demo implementation of
the IAM component
o Present contributions to be included in
deliverable D3.1 by end of September
o Work plan & efforts for the next period
T3.4- Multi-Sensorial Activity Flow Detection &
Modelling in controlled environments
o Current status overview
o Present initial work on prototype
development, for assessment of proposed
methodologies
o Work plan & efforts for the next period
Coffee Break
T3.5-Ambient and Personalised UI & User Profiling
Mechanism
o Current status overview
o Present the initial work on the User Profiling
9-10 September 2013
5
Responsible
partner
CNet / TUK
CNet
TUK
CERTH
HYPERTECH
CNet
4th Plenary Meeting, Stockholm
318216–INERTIA
mechanism (INERTIA User profiling Model)
Present the specifications of the Ambient
User Interfaces
o Issues also covered as part of T2.2
o Work plan & efforts for the next period
T4.1-DER Flexibility Analysis, Aggregation and
Forecasting Module
o Current status overview
o Work plan & efforts for the next period
T4.2-Grid Coordination & DR Activation Module
o Current status overview
o To finally define the functionality of Grid
Coordination & DR Activation Module as part
of the Aggregator Hub architecture
o Assignments per partner
o Work plan & efforts for the next period
T5.2-INERTIA Simulation Test Suite
o Current status overview
o Assignments per partner
o Work plan & efforts for the next period
Preparation for the Review
 Logistics about the Review
 Preparation of presentations
Lunch Break
Closure of meeting / Internal meetings
o
11:40-12:00
12:00-12:20
12:20-12:40
12:40-13:00
13:00-14:00
14:00-
HYPERTECH
TECNALIA
TECNALIA
CERTH
ALL
Note:
Tasks ending on M12 (September 2013) are marked as below:
Tasks ending on M12 – September 2013
9-10 September 2013
6