Unclassified/Pre-decisional/FOUO DRAFT DoD Architecture Framework Application DoD CIO Architecture and Interoperability Directorate Briefing to JTSO Director May 2013 DISTRIBUTION STATEMENT D: Distribution authorized to DoD and DoD contractors only. Critical Technology (4/10/2007). Other U.S. requests shall be referred to the DoD CIO, Architecture and Interoperability Directorate WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751 Et. Seq.) or Executive Order 12470. Violations of these export laws are subject to severe criminal penalties. DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document. Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Agenda • Why DoDAF? • • • DoDAF Basics Re-cap brief on IDT architecture development Reification, allocation, and traceability across the development levels Summary from a JIE perspective • 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 2 Unclassified/Pre-decisional/FOUO DRAFT Why DoDAF? • Tbs – standarization across Components, enterprise analytics, reuse of data across core processes, line-of-sight from rqmts to implementations to resourcing Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT DoDAF Basics • Tbs from plenaries, NATO briefs, capability tutorial, etc. Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Re-cap Feb 2013 DoD CIO A&I brief on IDT architecture development Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT SoS Functional Allocation Theory SoS Spec Function 1 Function 2 Function 3 Black lines = ideal + Orange = reality System 1 FoS 1A FoS 1B FoS 1C System 2 FoS 2A FoS 2B FoS 2C System 3 Black lines = ideal FoS 3A + Orange = reality FoS 3B FoS 3C Orange is sometimes inevitable but should be avoided otherwise 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 6 Unclassified/Pre-decisional/FOUO DRAFT As Applied to JIE “Spec Tree” Requirements documents* * See notes for list JIE ICD IDEAL JIE EA Corrections and improvements IDT Tech Archs Component System/Service Specs for RFPs, working capital fund taskers, etc. 25 Feb 2013 Joint & Service Doctrine, TTP, training, etc. Test and compliance plans and procedures Unclassified/Pre-decisional/FOUO DRAFT 7 Unclassified/Pre-decisional/FOUO DRAFT Focus at each tier Requirements documents System SoS SoS Elements FoS of SoS Elements 25 Feb 2013 Component System/Service Specs for RFPs, working capital fund taskers, etc. End-state objectives are paramount JIE ICD JIE EA+RA’s In SoSE, interfaces and common components are paramount IDT Tech Archs Joint & Service Doctrine, TTP, training, etc. Test and compliance plans and procedures Unclassified/Pre-decisional/FOUO DRAFT Adherence to the the SoS element specifications is paramount 8 Unclassified/Pre-decisional/FOUO DRAFT Aligned JIE Spec Tree 1. The ICD X EA layer is collapsed and mappings no longer exist 2. Many-to-manys (orange lines) from EA Op Acts to RAs to IDT no longer exist 3. EA X RA Op Acts mapping no longer exists 4. EA/RA X IDT Op Acts mapping no longer exists 25 Feb 2013 JIE EA (JIE ICD Arch is a subset) Op Act 1 Op Act 2 Op Act 3 JIE RA x JIE RA y JIE RA z IDT TA 1 FoS 1A FoS 1B FoS 1C IDT TA 2 FoS 2A FoS 2B FoS 2C Unclassified/Pre-decisional/FOUO DRAFT IDT TA 3 FoS 3A FoS 3B FoS 3C Only orange lines left are those due to legacy 9 Unclassified/Pre-decisional/FOUO DRAFT Recommended Streamlining ICD 1. JIE ICD to JIE EA JIE RA CV-2/6 CV-2/6 Hierarchy Desired Effects Desired Effects Metrics Tasks Task Metrics Conditions Condition Metrics OV-4 OV-4 OV-2 OV-2 OV-5a OV-5a CV-1 CV-3 CV-4 Should be equal Should be equal, the orgs involved in the operation of the JIE Should be equal, interaction between the orgs identified in OV-4 Should be equal, activities to operate the JIE All CV-1 data is contained in CV-2/6 Should match IMS Should match IMS 2. JIE EA Op Acts one-to-one with RAs which are one-to-one IDTs 3. RA Op Acts = JIE EA Op Acts for their branch 4. IDT System Functions respond to RA Op Acts 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 10 Unclassified/Pre-decisional/FOUO DRAFT Notional Interface Matrix SSA NNT CDC SSA CDC status relevant to Security protocols across SSA. SSA msgs to alter netw orks CDC ops NNT Netw ork status and CDC config and resource requests. CDC netw ork status. EOC OOB UC IdAM SSA alterts and status to SSA status and alerts SSA alerts and state SSA controls on UC ops. operators. SSA necessitating OOB aciton. change orders. IdAM UC status. configuration cmds. OOB actions. status CDC EOC OOB UC IdAM In other words, it can be done at the SoS (EA/RA) level 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 11 Unclassified/Pre-decisional/FOUO DRAFT CDC EOC OOB x x x x x Monitor the JIE x x x x x 2.1.1 Monitor the JIE Security x 2.1.2 Monitor the JIE Performance x x x 2.1.3 Monitor Operational Events 2.1.4 Monitor Equipment Health & Status x x 2.1.5 Monitor Communications Links and Networks x 1 2 2.1 2.2 2.2.1 2.2.14 PARK x x Manage JIE Operations Manage NetOps x Provide Services Infrastructure x x 2.2.2 Detect/Diagnose Issues x 2.2.3 Perform System Administration x 2.2.4 Perform Configuration Management x 2.2.5 Manage Workforce 2.2.6 Manage Enterprise Services x 2.2.7 Perform Centralized Data Management x x x Manage JIE Performance and Effectiveness x 2.3.1 Manage IE Performance x 2.3.2 Manage JIE Effectiveness x 2.4 Operate Service Desk x 2.4.1 Collect and Track Incidents/Events x 2.4.2 Evaluate Incidents/Events x 2.4.3 Assign Incidents/Events x 2.4.4 Resolve Incidents/Events x 2.4.5 Report Resolution x 2.3 IdAM NNT Provide JIE Infrastructure & Services Manage and Operate the JIE JIE EA_Name JIE EA_ID UC SSA Functional Allocation EA to IDTs In other words, it can be done at the SoS (EA/RA) level but may need to go below tier 3 in some cases 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 12 Unclassified/Pre-decisional/FOUO DRAFT IDT Arch Scoping: DoDAF “Fit for Purpose” SSA NNT CV OV * In DoDAF 2, operators are part of the system or service SV/SvcV-1/2 CDC EOC Components of SSA and their interfaces SV-5a SV/SvcV-5b SV/SvcV-6 Data interfaces Network laydowns, interfaces, associated standards Facility laydowns and layouts, interfaces Componentry and interfaces Functions perfomed by operators and network interconnection systems, leverage JCSFL Internal functional flows of NNT. Functions performed by operators at the CDC covered by EOC. Functions performed by OOB functions and operators and systems and functional flow, leverage services in managing the JCSFL. EOC, leverage JCSFL Data interfaces Metrics associated with NNT Metrics associated with CDC Rules for operators and systems/services Rules for operators and systems/services Same as EOC State transition logic for SSA Threads for different use cases of SSA. Could be SV/SvcV-10c integrated with SV/SvcV10b. StdV-1 Detail from RA DIV-1, 2, & 3 Network, interfaces, components Components, interfaces Components, interfaces Functional architecture of UC SFs and functional flow, IdAFM services and leverage JCSFL systems, leverage JCSFL Traceability of SFs to RA activities Data interfaces StdV-2 IdAM Traceability of Systems and Services to RA activities Metrics associated with SV/SvcV-7 SSA SV/SvcV-10b UC None needed. Done in RA's. (In DoDAF 2, SV/SvcV includes operators.) Functional architecture SV/SvcV-4 (SFs and functional flows) of SSA. Use JCSFL. SV/SvcV-10a OOB None needed, done in RA's. Just need to show traceabilities. e.g., for failovers, COOP. Coord / reuse from EOC Threads for different use cases of NNT Data interfaces Metrics associated with EOC operators and systems/services To become p/o doctrine, TTP, etc. State transition logic for EOC Threads for different use Use cases could be cases of EOC. Could be integrated with 10b. Coord integrated with SV/SvcV/ reuse from EOC. 10b. Data interfaces Metrics associated with OOB (e.g., survivability) OOB rules For different threat scenarios, state transition and logic. Coord / reuse from EOC. . Coord / reuse from EOC.Use cases / thread possibly integrated with 10b. Coord / reuse from EOC. Network standards related to SV/SvcV-1/2, 4, 10a, and Detail from RA OOB standards 10c. Not needed for Inc 1 or future increments unless change anticipated. Data interfaces Data interfaces Metrics associated with Metrics associated with UC, IdAM, e.g., %error, e.g., QoS timeliness Detail from RA Detail from RA IdAM logic Use cases for UC services IdAM use case sequences; could be integrated with 10b Detail from RA Detail from RA As needed for SoS As needed for SoS As needed for SoS As needed for SoS As needed for SoS As needed for SoS As needed for SoS interface specification and interface specification and interface specification and interface specification and interface specification and interface specification and interface specification and for functional architecture. for functional architecture. for functional architecture. for functional architecture. for functional architecture. for functional architecture. for functional architecture. If standards suffice, point If standards suffice, point If standards suffice, point If standards suffice, point If standards suffice, point If standards suffice, point If standards suffice, point to specific StdVs. to specific StdVs. to specific StdVs. to specific StdVs. to specific StdVs. to specific StdVs. to specific StdVs. Fit-for-purpose (FFP) architecture tailored to the focus of the IDT 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 13 Unclassified/Pre-decisional/FOUO DRAFT Next Steps 25 Feb 2013 IDT Arch Scoping Shared Architecture Data RA/IDT Boundaries Next Steps: Align ICD and EA Align EA and RAs Functional allocation EA to IDTs Reload allocated EA into IDT tool / DB Functional IDT interfaces / boundaries EA level IDT Interfaces / boundaries refinement CV metrics EA level CV X SV/SvcV metrics IDT level Master vignettes (OV-6bc) EA level Master cross-IDT vignettes (SVSvcV-10bc) Master AV-2 EA level Master AV-2 IDT level Streamlined Spec Tree Risk Mitigator x x Who EA team / J6 EA team EA team x x IDT High x EA team High x IDTs Low EA team IDT team High Med x EA team Med x IDTs Med x x EA team IDTs Med Med x x x x Unclassified/Pre-decisional/FOUO DRAFT Priority Med Low High 14 Unclassified/Pre-decisional/FOUO DRAFT Reification, allocation, and traceability across the development levels Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Reification • By extension (specialization) or decomposition Artifact11 Artifact12 Artifact13 Artifact 1 Artifact 2 Artifact 3 Artifact 4 x x x x x x Artifact D Artifact C Artifact B Artifact1 Artifact A DM2 supersubtype or whole-part • By mapping or allocation x DM2 overlap Reification in DoDAF is formally superSubtype, wholePart, or ovelap 25 Feb 2013 16 Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Reification of Activities “Work, not specific to a single organization, weapon system or individual that transforms inputs (Resources) into outputs (Resources) or changes their state.” • • • • In architectures, Activities are structures (see diagram to right) Hence, to reify them means to reify the structure For example, in an OV-5a, “Activity-1.1 reifies Activity-1”, means it reifies Activity-1’s structure: – – – – – – Activity-1 consumedResources-A1.i producedResources-A1.j Rules-A1.k Performers-A1.l Measures-A1.m – – – superSubtype, wholePart, or overlap Where “reify” means: Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Reification of Capabilities “The ability to achieve a Desired Effect under specified [performance] standards and conditions through combinations of ways and means [rules, activities, and resources] to perform a set of activities.” • • • • In architectures, Capabilities are structures (see diagram to right) Hence, to reify them means to reify the structure For example, in an CV-2, “Capability-1.1 reifies Capability-1” means it reifies the Capability-1 structure: – – – – – – Capability-1 desiredEffects-C1.i Tasks-C1.j Rules-C1.k Conditions-C1.l Measures-C1.m – – – superSubtype, wholePart, or overlap Where “reify” means: Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Reification of Resource Flow “The behavioral and structural representation of the interactions between activities (which are performed by performers) that is both temporal and results in the flow or exchange of things such as information, data, materiel, and performers...” • • For example, in an SV-1, each element of a reified resource flow must be a reification of elements from ordinate resource flows More complex reiying across allocation levels (e.g., OVSV) because of typical many-many allocations – – Some flows get rolled-up New ones get created Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT The Reification can be in the form of different types of artifacts Capability desiredEffect measure 1 Capability desiredEffect measure 11 Capability desiredEffect measure 111 Capability desiredEffect measure 2 Capability desiredEffect measure 21 Capability desiredEffect measure 211 Performer measure a e.g., CV-x Data Performer measure a Performer measure a e.g., SV/SvcV-7 Data x x X x x X x x X x x X The mapping is at the leaf level but some mapping to the “parents” is implied This is the traditional MOE to MOP relationship Unclassified/Pre-decisional/FOUO DRAFT The Reification (and hence traceability) span from requirements to implementation X CV-x X X Activity-b11 Activity-b1 Activity-b Activity-a11 Notional example SvcV-4 Organization-i Organization-i1 Organization-i11 Organization-j Organization-j1 Organization-j11 System-x1 System-x1 System-x11 System-y System-y1 System-y11 SV-1 SvcV-3 Service-b1 Service-b11 OV-2/4/3/5 Service-b Service-a SvcV-5 Service-a11 ServiceFunction-x1 ServiceFunction-x1 ServiceFunction-x11 ServiceFunction-y ServiceFunction-y1 ServiceFunction-y11 Service-a1 Activity-a1 SvcV-7 Activity-a Capability-1 Capability-11 Capability-111 Capability-2 Capability-21 Capability-211 Notionally, for JIE, the upper pieces tend to flow from the ICD & EA through the RA’s to the SA’s and eventual implementations ICD/ EA X X RAs Notional example SAs Activity-b11 Activity-b1 Activity-b Activity-a11 Activity-a1 X Activity-a Capability-1 Capability-11 Capability-111 Capability-2 Capability-21 Capability-211 Component implementations Organization-i Organization-i1 Organization-i11 Organization-j Organization-j1 Organization-j11 Service-b11 Service-b1 Service-b Service-a11 Service-a1 Service-a ServiceFunction-x1 ServiceFunction-x1 ServiceFunction-x11 ServiceFunction-y ServiceFunction-y1 ServiceFunction-y11 System-x1 System-x1 System-x11 System-y System-y1 System-y11 This is similar to the “yellow brick road” diagram but applied to the JIE at the enterprise level rather than each reification level Unclassified/Pre-decisional/FOUO DRAFT Capabilities Reification Traceability Criteria • superSubtype reification: Capability11 reifies Capabilitiy1 iff: Task i11 Capability11 , WPT Task 1 Capability1 j desiredEffect i11 Capability11 , WPT Task 11 Task 1j i WPT desiredEffect 1 Capability1 j WPT WPT • wholePart reificaiton: desiredEffect 11 desiredEffect 1 i j WPT measureOfDesiredEffect 11 measureOfDesiredEffect 1 i j – Proper wholePart: – Improper wholePart: Condition ix11 Task i11 , WPT Condition 1 jy Task 1j WPT Condition 11 Condition 1jy ix WPT • typeInstance: • overlap: Unclassified/Pre-decisional/FOUO DRAFT Unclassified/Pre-decisional/FOUO DRAFT Questions? 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 24 Unclassified/Pre-decisional/FOUO DRAFT Current Situation CV-1 CV-2 CV-6 CV-7 OV-2 OV-3 OV-4 OV-5a OV-5b OV-6a OV-6b OV-6c SV-1 SV-2 SV-3 SV-4 SV-6 SV-7 SV-10a SV-10b SV-10c SvcV-1 SvcV-2 SvcV-3a SvcV-3b SvcV-4 SvcV-6 SvcV-7 SvcV-10a SvcV-10b SvcV-10c StdV-1 StdV-2 DIV-1 DIV-2 DIV-3 IDT Architectural Artifact POA&M* SSA NNT CDC EOC OOB UC IdAM x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 143 DoDAF views total across IDTs * Source: EXCOM Brief 25 Feb 2013 Above is simplification of Unclassified/Pre-decisional/FOUO DRAFT 25 Unclassified/Pre-decisional/FOUO DRAFT Risks • Large number of views (143) to be developed in a “Stove Pipe” • Possible redundant artifacts in views – Views may become inconsistent • Configuration management of artifacts becomes intractable • No integration between IDTs 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 26 Unclassified/Pre-decisional/FOUO DRAFT JIE Spec Tree As-is JIE ICD Inc. 1 Arch ICD Op Act 1 ICD Op Act 2 ICD Op Act 3 JIEEA Op Act xu Op Act 1 Op Act 2 Op Act 3 JIE RA x JIE RA y JIE RA z Op Act xv IDT TA 1 FoS 1A FoS 1B FoS 1C Op Act xw Op Act yu Op Act yv Op Act yw IDT TA 2 FoS 2A FoS 2B FoS 2C Op Act zu Op Act zv Op Act zw IDT TA 3 FoS 3A FoS 3B FoS 3C A related problem is “building from” views (reports) rather than the whole model (data) 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 27 Unclassified/Pre-decisional/FOUO DRAFT Risk Mitigation # 2: RA/IDT Boundaries RAD CV-1/6 x CV-2 IEA 2.0 UC RA 9 capabilities defined narratively partial based on narratives Narrative, not structured IdAM JIE EA JIE ICD 117 capabilities defined narratively 5 capabilities defined narratively with JCA UJTL tasks cross ref'd Narrative, not structured 5 capabilities cross-ref'd to 3 JCAs Narrative, not structured 51 capabilities aligned to the 56 services OV-2 OV-3 OV-4 x OV-5 x OV-6a x OV-6b OV-6c x SV/SvcV-1/2 x SvcV-1 for 56 services SV/SvcV-4 x SvcV-4 hierarchy only SV/SvcV-10c StdV-1 CDC RA Narrative, not structured CV-3 CV-4 CV-5 CV-7 SV-5a SV/SvcV-5b SV/SvcV-6 SV/SvcV-7 SV/SvcV-10a SV/SvcV-10b JCSFL partial, 51 capabilities defined narratively 3 types of org interaction in progress x for the operation of the UC 5a only, 307 activities defined for the operation of the IE 103 rules defined related to the operation of the IE 5a only many x ~55 rules defined x High-level with ~flows and activities 4 service areas identified 9 services defined x in progress 84 orgs identified 5a only; ~600 activites defined 5a only; ~600 activites defined SV-4 hierarchy only; ~ TBD Net-Centric SFs x x x x ~100 standards identified x x ~25 standards identified StdV-2 DIV-1 DIV-2 DIV-3 At the SoS (EA/RA) level, the interfaces have not been defined sufficiently 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 28 Unclassified/Pre-decisional/FOUO DRAFT 3.1.1 Conduct Computer Network Defense x 3.1.2 Provide Information Assurance x 3.1.3 Manage Threats, Risks, and Vulnerabilities x 3.1.4 Protect Network Boundaries x 3.1.5 Manage Mission Assurance 3.2 x x x x x x x x x x x x x x 3.2.1 Manage Identity Attributes 3.2.2 Provide Authentication Services 3.2.3 Establish Access Policy Mechanisms x 3.2.4 Provide Authorization Services x 3.2.5 Provide Federation x x x x Enable Cross Domain Security x 3.3.1 Identify Domains x 3.3.2 Determine Domain Security x 3.3.3 Implement Cross Domain Solution x 3.3.4 Evaluate CDS Effectiveness x Protect Data, Metadata and Devices x x 3.4.1 Protect All Devices Connected to the Network x x 3.4.2 Protect Data and Metadata x 3.3 3.4 x Use the JIE x Locate and Use Information, Applications and Services x 4.1.1 Execute Enterprise Search & Discovery x 4.1.2 Perform Data Tagging & Exchange x Share Information, Applications & Services x 4.2.1 Publish Information, Applications & Services x 4.2.2 Collaborate 4 4.1 4.2 x x 4.3.1 Identify JIE Training Requirements x 4.3.2 Develop JIE Training Plans x 4.3.3 Evaluate JIE Training Performance x 4.3.4 Execute JIE Training x 5 x x Train for JIE Proficiency 4.3 25 Feb 2013 Perform IdAM IdAM x UC x x OOB x 3 3.1 EOC NNT Protect and Secure the JIE Defend the Enterprise Network JIE EA_Name JIE EA_ID CDC SSA Cont’d Oversee & Govern the JIE Unclassified/Pre-decisional/FOUO DRAFT 29 Unclassified/Pre-decisional/FOUO DRAFT FFP Workflow Examples 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 30 Unclassified/Pre-decisional/FOUO DRAFT Risk Mitigation #4: Shared Architecture Data • Shared use cases / scenarios / vignettes* – EOC might lead many • Master AV-2 from ICD to IDTs and across all rocks, RAs, and IDTs – Probably federated CM * SV/SvcV-10bc flow down’s from EA OV-6bc’s 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 31 Unclassified/Pre-decisional/FOUO DRAFT Proposed Plan Current Plan CV-1 CV-2 CV-6 CV-7 OV-2 OV-3 OV-4 OV-5a OV-5b OV-6a OV-6b OV-6c SV-1 SV-2 SV-3 SV-4 SV-6 SV-7 SV-10a SV-10b SV-10c SvcV-1 SvcV-2 SvcV-3a SvcV-3b SvcV-4 SvcV-6 SvcV-7 SvcV-10a SvcV-10b SvcV-10c StdV-1 StdV-2 DIV-1 DIV-2 DIV-3 Expected Results SSA NNT CDC EOC OOB UC IdAM SSA NNT CDC EOC OOB UC IdAM x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x X X x x X X X x X X X x x X x X x x x x x x X x x x x x X X x x x X X X x X X x x x X X x x x x x x X X x x x x x x x x X X x x x x x X x x x X x x x x x X X x From 143 DoDAF views total across IDTs to 81 with: – Boundaries defined – Metrics defined 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 32 Unclassified/Pre-decisional/FOUO DRAFT Expected Results/Benefits • Can reduce DoDAF views substantially and produce a higher quality and more usable product – From 143 DoDAF views total across IDTs to 81 with: • Boundaries defined • Metrics defined • Redundant artifacts in views reduced through tailoring – Improve consistency • Configuration management of models (data) rather than views (reports) • Boundaries between IDTs definitized • Align and simplify the tiers from EA to RA to IDT • Build from models and data, not views • Practice SoSE and use DoDAF to establish boundaries • Tailor IDT Technical Architecture scope to fit-for-purpose • Shared vignettes and master AV-2 25 Feb 2013 Unclassified/Pre-decisional/FOUO DRAFT 33
© Copyright 2026 Paperzz