Project Resource Plan

Project Resource Plan
Project Name:
Department:
Focus Area:
Product/Process:
Prepared By
Document Owner(s)
Project/Organization Role
Project Closure Report Version Control
Version
Date
Author
Change Description
Note For standard sections of the Project Resource Plan template that have been excluded
from the present document, the section headings have been moved to the Project Resource Plan
Sections Omitted list at the end.
Confidential
265332429
Last printed 7/13/2017 9:28:00 PM
Project Resource Plan
TABLE OF CONTENTS
1
RESOURCE PLAN PURPOSE................................................................................................ 3
2
RESOURCE PLANNING DEFINITION .................................................................................... 3
2.1 Define Project Team Size ................................................................................................. 3
2.2 Define Required Skill Sets ................................................................................................ 3
2.3 Define Non-labor Resources ............................................................................................. 3
2.4 Define Resource Profile .................................................................................................... 4
2.5 Define the Project Team ................................................................................................... 5
2.6 Define Resource Assumptions .......................................................................................... 5
2.7 Define Resource Risks and Mitigations ............................................................................ 5
3
PROJECT CLOSURE REPORT APPROVALS ...................................................................... 7
4
APPENDICES .......................................................................................................................... 8
4.1 Project Resource Plan Sections Omitted .......................................................................... 8
Confidential
Page 2
7/13/2017
Project Resource Plan
1
RESOURCE PLAN PURPOSE
Resource Plan Purpose
[Replace this text with a resource planning purpose statement for your projectspecific needs, or use the following sample.]
The Project Resource Plan provides a record of all resource planning for a project,
including the identification of a team of workers that possess the appropriate skill set,
and a record of the non-labor resources (tools, equipment, process, and so forth)
necessary for project completion.
2
RESOURCE PLANNING DEFINITION
2.1
Define Project Team Size
Define Project Team Size
[Replace this text with a high-level estimate of project team size requirements.]

2.2
[Consider the number and type of tasks to be performed, and the total effort
required to complete them.]
Define Required Skill Sets
Define Required Skill Sets
[Replace this text with a required-skill list, arranged by task, in order to identify
the types of resources required, or modify the following sample table.]
2.3
Deliverable
Resource Type
Source
Estimated Cost
Quantity
Deliverable x
Project Manager
Consultant
TBD
1
Trainer
Internal Staff
Internal
1
Programmer
Internal IT
Internal
3
Define Non-labor Resources
Define Non-labor Resources
Confidential
Page 3
7/13/2017
Project Resource Plan
[Replace this text with a list of non-labor resources required for the project—for
example, workspace, computers, and test equipment.]
2.4
Define Resource Profile
Define Resource Profile
[Replace this text with the project resource profile or the resource staffing plan, or both,
or modify the following sample illustrations.]
 [The resource staffing plan outlines resource availability throughout the project life
cycle.]
 [A detailed plan is required for larger projects, to ensure that resource load
estimates by phase are understood and adequately prepared for.]
Resource Type
Month 1
Month 2
Month 3
Month 4
Project Manager
1
2
1
1
Trainer
1
2
2
3
Programmer
3
5
5
3
Analyst
5
5
3
1
Consultant
2
2
2
2
12
16
13
10
Total
Resource Load Profile
18
16
Resources
14
12
10
8
6
4
2
0
Month 1
Project Manager
Analyst
Confidential
Month 2
Month 3
Project Life Cycle
Trainer
Consultant
Page 4
Month 4
Programmer
Total
7/13/2017
Project Resource Plan
2.5
Define the Project Team
Define the Project Team
[Replace this text with a diagram outlining the project organization, or modify the
following sample diagram.]
Project Mgr
PM Level 4
Operations
Month 1
Tech Lead
PM Level 3
IT
Month 1
Resource Mgr
PM Level 4
HR
Month 1
Project Admin
PM Level 1
Operations
Month 1
Services Mgr
PM Level 4
Service
Month 2
System Mgr
PM Level 4
Operations
Month 1
SMEs
PM Level 5
Operations
Month 1
Design Mgr
PM Level 4
Development
Month 1
Quality Mgr
PM Level 4
Operations
Month 1
Training Lead
PM Level 3
Operations
Month 3
LAN Mgr
PM Level 2
IT
Month 4
Programmer
PM Level 3
Development
Month 1
Schedule Mgr
PM Level 3
Operations
Month 1
Documentation
Lead
PM Level 1
Operations
Month 1
WAN Mgr
PM Level 2
IT
Month 3
Analyst
PM Level 4
Development
Month 1
Database
Admin
PM Level 2
Operations
Month 1
Budget Mgr
PM Level 1
HR
Month 1
2.6
Consultant
PM Level 4
Contract
Month 1
Define Resource Assumptions
Define Resource Assumptions
[Replace this text with a definition of the resource assumptions identified during
resource allocation.]
2.7
Define Resource Risks and Mitigations
Define Resource Risks and Mitigations
[Replace this text with a list of resource risks and mitigations. Mitigations may
include:]

[Add project schedule tasks, along with financial reserves.]

[Add time to tasks for which assigned resources have known skill
deficiencies.]

[Add a percent multiplier to the project schedule for individual resources as
appropriate.]

[Add time and resources for training when no appropriately skilled resource
is available.]
Confidential
Page 5
7/13/2017
Project Resource Plan
Confidential
Page 6
7/13/2017
Project Resource Plan
3
PROJECT CLOSURE REPORT APPROVALS
Prepared By
__________________________________
([Job Title])
Approved By __________________________________
([Job Title])
__________________________________
([Job Title])
__________________________________
([Job Title])
Approval Date __________________________________
Confidential
Page 7
7/13/2017
Project Resource Plan
4
4.1
APPENDICES
Project Resource Plan Sections Omitted
 [Omitted section]
 [Omitted section]