BUILDING MOVE ROUTE ASSESSMENT TO BE COMPLETED FOR LOADS EXCEEDING 7.5 METERS IN WIDTH The following is to be completed (by a company representative that has driven the route). Companies may be requested to submit the completed form to Saskatchewan Ministry of Highways and Infrastructure for review and approval prior to the issuance of a permit. The movement of this load will be a major undertaking and will require a detailed study into all aspects of the move. CARRIER MUST CHECK THE ROUTE FOR OBSTRUCTIONS PRIOR TO MOVEMENT. 1. Safety Provide details on actions taken to ensure the safety of the traveling public as well as the crew and the crews of the power line escorts. This includes but not limited to holding a tailgate meeting prior to move; ensuring the driver and crew understand all permit conditions; ensuring the driver maintains a copy of the permit and the permit conditions in the cab and understands all conditions to ensure compliance. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 2. Traffic a) Provide details of how you will accommodate other traffic keeping in mind that the load may be traveling at a slow speed. Identify traffic accommodation plan ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ b) Identify locations along the route that will be used to allow for traffic accommodation. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 3. Signs Some traffic signs may have to be temporarily removed. Provide details on location and clearance of all signs encountered on route and your procedures for ensuring any obstructions will be cleared. List the authorities, with contact information, ensuring proper authorities have been notified and permission is obtained prior to removal or arrangements have been made to move the obstacle. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 1 BUILDING MOVE ROUTE ASSESSMENT 4. Route Segments Document details on legs of the route and location of possible pull outs for emergency situations and storage areas as well as contact information for area load will be stored during the night if the move will take more than one day. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 5. Narrow Bridges There may be numerous bridges along the route which may be narrower than the load. Provision must be made to be able to raise the load to clear the guard rails. Please provide details on location of all bridges and height of obstructions. Document details on height/width of load in comparison to obstruction and how obstruction will be cleared. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 6. Local Authorities and Police when required Each traffic authority along the route must be consulted and permission granted to use their roads. When indicated local enforcement, fire, EMS, etc. MUST be contacted. Provide details of approvals obtained. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 7. Utility Lines All utility companies must be consulted with permission granted to accept the movement of this load. Provide details of approvals obtained. ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ I verify that I have driven the route identified and all of the above information is correct. Company Name: _______________________________________________ Name of Company Representative: _________________________________ Signature of Company Representative: ___________________________________ Date: ___________________________ Comments ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ 2
© Copyright 2025 Paperzz