149.4 m 42.1 m D C proposed building proposed building D 7.0 m Alexandra Street DRAFT revisions existing play area 19.9 m junior school proposed building existing building B C proposed building 90.0 m BUILDING LEGEND existing building F E existing play field A proposed science wing B existing senior school C proposed south wing D proposed middle building proposed / existing buildingE 6.0 m extensive interior and exterior modification of existing building proposed building D F Granville Street green roof existing building Level 1 underground A Alexandra Street B modifications at Level 1 underground Granville Street 6.0 m Granville Street Alexandra Street existing building D existing play area proposed building F D West King Edward Avenue Granville Street modifications at existing Level 2 proposed building existing junior school existing auditorium wing existing play area 111 E 8 Avenue 26th Avenue West PHASE 2 26th Avenue West south wing senior school Below Grade roof overhang deck below PHASE 26th Avenue West 3 north wing senior school 6.3 m roof overhang below roof overhang below modifications at existing Levels 1 & 2 E proposed building demolish portions of existing 26th Avenue West PHASE 4 north wing senior school E Alexandra Street Alexandra Street C existing building modifications at existing Level 3 B below roof below middle building C issues proposed / existing building proposed building proposed building E stair A existing play field existing buildingroof 26th Avenue West PHASE 1 F existing building 1.9 m C Granville Street existing building Level 1 underground B roof West King Edward Avenue existing building 1.2 m D A roof below roof below existing building 20.5 m modifications at existing Level 1 proposed building section 2 B C F 6.3 m F deck below roof overhang E existing play field existing building existing play area canopy stair West King Edward Avenue E E proposed building 26th Avenue West PHASE 3 south wing senior school skylight below 37.5 m Alexandra Street existing building outdoor play field below 26th Avenue West elev existing underground Level 1 C existing play area proposed building D building elev West King Edward Avenue existing building B below existing All drawings and related documents are t Architects Inc and may not be reproduced the Architect's permission. This drawing sh calculate areas. Do not scale this drawing checked on site by the contractor and suc responsibility. All work must comply with Building Bylaw and related documents. Dr must be immediately reported to the Arch existing building 59.5 m PHASE 2 middle building F existing building building A proposed F interior renovations at underground roof below field section 2 proposed building demolish existing B E proposed building existing play field West King Edward Avenue existing setback to be confirmed C D Granville Street B existing play area demolish existing Above Grade 90.0 m existing building existing building Granville Street roof below building A proposed 3.5 m 4.0 m EA 26th Avenue West A setback existing play field 29.9 m D proposed building existing building PHASE 1 existing building F Alexandra Street F existing building Granville Street roof overhang below 19.5 m Alexandra Street B existing building A existing play field existing building C existing building 6.9 m demolition West King Edward Avenue existing setback to be confirmed existing building demolish existing roof overhang below existing building A West King Edward Avenue 21.8 m section 1 deck below 6.2 m property line West King Edward Avenue 0.9 m 8.8 m 1.2 m 7.0 m PHASE 4 junior school NOTE: Vancouver BC Canada V5T 1R8 all dimensions rounded t 604.739.3344 to first 604.739.3355 decimal place [email protected] 5.0 CONCLUSION KEY PLAN A B C 7.1 m A science wing of senior school B senior school C south wing of senior school D middle building E junior school F underground auditorium wing G underground parking section 1 5.9 m 33.7 m 2.4 m 62.1 m 1.4 m 149.6 m 6.2 m F E On October 19, 2016 York House School held a second Open House on site to share the initial concepts for the Master Plan, and to gather feedback and comments from the community. The Open House was well attended by 85 members of the community, and a significant amount of feedback was received in support of the plans to revitalize the school to expand the facilities and program offerings. Respondents were in favour of providing opportunities for new students to attend YHS, developing new courses, and increasing the diversity of programs for students.Traffic and parking concerns were a top priority for a small number of participants, who are concerned about the moderate increase in enrolment anticipated as part of the implementation of the Plan. A few individuals suggested underground parking to mitigate traffic and parking issues. A B C D E F D north wing of senior school senior school south wing of senior schoo middle building junior school underground auditorium wi Overall, participants were overwhelmingly in favour of the plans and concepts presented. Feedback and comments received from the Open House will inform the development and refinement of the Master Plan as it continues to evolve. 1.4 m 0.7 m York House York House School 4176 Alexandra Street Master Plan Phasing Rezoning Application | YORK HOUSE SCHOOL 15 December 2016 York House School - Open House #2 Report scale date 1:1000 06 21 project code stat YHS.RZ Mas drawn chec NS MO 11
© Copyright 2026 Paperzz