WIMES 8.10 Page 35 APPENDIX C - DATA SHEET PENSTOCKS, STOPGATES STOPLOGS AND HANDSTOPS PROJECT TITLE (P) PROJECT NUMBER (P) PROJECT LOCATION (P) SUPPLIER (P/S) DOCUMENT REFERENCE (P) REVISION (P) DATE (P) REFERENCE DRAWINGS INCLUDED (Y/N) (P) TAG NO/ASSET CODE (P) * - Indicates Purchaser’s default requirement 2.1 General 1 Equipment Type () (P) Penstock Stopgate Stoplog system Handstop 4.0 PROCESS FLUID DETAILS AND SYSTEM HEADS 4.1 Process Fluid Details 1 2 Type of Process Fluid () (P) Water (unscreened) Water (screened) Waste water (unscreened) Waste water (screened) Unusual Process Fluid Properties (P) 3 High Grit Levels (Y/N) (P) 3.0 OPERATING ENVIRONMENT/SITE DETAILS 1 2 Operating Environment (P) Location () Inland Coastal Inside Outside Other (specify) Ambient temperature Range (°C) Minimum/maximum Ambient Relative Humidity Range (%) Minimum/maximum EMC Environment () Class B - light industrial Class A - Industrial Hazardous Area Classification () None Zone 1 Zone 2 Special Environmental Hazards (P) 3 References For Further Information (P) ISSUE 1 4.2 System Heads 4.2.1 Penstocks 1 2 Maximum Static Head (m) (P) On seating Off seating Operating Head (m) (P) On seating Off seating 4.2.2 Stopgates, Stoplogs and Handstops 1 Maximum Static Head (m) (P) JANUARY 2014 WIMES 8.10 5.0 PERFORMANCE REQUIREMENTS 5.1 General (All Equipment) 1 Equipment Service Life (Years) (P) 5.4 Leakage Rates 5.4.1 Penstocks and Stopgates 2 Expected Leakage Rate (P/S) Data required (Y/N) (P) Leakage rate (l/min.m) (S) Page 36 6.1.2 Weights and Lifting Arrangements 1 1 1 Complete Equipment (kg) (S) Heaviest Maintenance Lift (kg)(S) Heaviest Erection Lift (kg) (S) 6.1.5 Lubrication 2 Capacity/Life of Dispenser (cc/months) (Y/N) (P/S) 6.1.7 Identification Plate and Asset Reference Label 5.5 Operating Function, Frequency and Speed (Penstocks) 1 2 2 3 Operating Function () (P) Isolating Control Expected No. of Operating Cycles per Year (Isolating Duties) (P) Expected No. of Starts per Year (Control Duties) (P) Door Speed (mm/min) (P) 5.6 Life Cycle Costs (Penstocks) 5.6.1 Service Lives and Costs of Components 2 Costs of Components (£) and Time Required to Replace Components (hrs) (S) Component Cost Time Nut Stem Seals (rigid) Seals (resilient) 2 2 Asset Reference Label Required (Y/N) (P) Information Required on Asset Reference Label and Method of Fixing (P) 6.1.9 Information to be Provided 1 Material and Standards Certification Required at Time of Order (Y/N) (P) 6.1.10 & M Manuals 1 Reference for Purchaser’s O & M Manual Specification (P) 6.1.11 Miscellaneous 1 Installation Fixtures and Fittings Required (Y/N) (P) 6.0 DESIGN REQUIREMENTS 6.1 All Equipment 6.1.1 General 1 Equipment Reference (S) ISSUE 1 JANUARY 2014 WIMES 8.10 6.2 Penstocks Page 37 4 6.2.1 General (All Penstock Types) 6.2.1.1 General 5 1 2 3 3 4 Penstock Type () (P/S) On-seating Off-seating Flush invert Rebate invert Weir Mounting Arrangements () (P/S) Channel mounted (rebated) Channel mounted (not rebated) Pipe flange mounted Wall mounted Thimble mounted Channel/Wall Aperture Size (P) Width (mm) Height (mm) Penstock Aperture Size (S) Width (mm) Height (mm) Type of Construction () (P/S) Cast iron Fabricated stainless steel Composite plastic 6.2.1.2 Door and Frame 2 Type of Frame () (P/S) Open top Closed top Operating Nut 1 1 2b 3 Grade of Bronze Required/Provided (P/S) 6.2.2 Cast Iron Penstocks 6.2.2.1 Door and Frame 1 1 Door Material () (P/S) Grey cast iron – grade 250 to BS EN 1561* Other (specify) Frame Material () (P/S) Grey cast iron – grade 250 to BS EN 1561* Other (specify) 6.2.2.2 Wedges 2 3 4 6.2.1.4 Operating Stem and Nut Stem Material () (P/S) Stainless steel no. 1.4401 (AISI grade 316)* Other (specify) Stem Guide Material(s) (P/S) Wedge Arrangements/Positions () (P/S) Side wedges Invert wedges Soffit wedges Claw wedges Wedge Material () (P/S) Grey cast iron – grade 250 to BS EN 1561* Other (specify) Non-Ferrous Facings Required/Provided (Y/N) (P/S) 6.2.2.3 Seals Type () (P) Rising* Non-rising Stem Block Material (P/S) Position Indicator Reqd. (Non-Rising Stems with Pillars) (Y/N) (P) ISSUE 1 1a 1b 1c Side/Soffit Seals () (P/S) Rigid metallic* Resilient elastomeric Invert Seals (Flush Inverts) () (P/S) Rigid metallic Resilient elastomeric* Invert Seals (Rebate Inverts) () (P/S) Rigid metallic Resilient elastomeric JANUARY 2014 WIMES 8.10 Page 38 2 a Seal Materials (P/S) Rigid Metallic Side/Soffit Seals – Grade of Phosphor Bronze Required/Provided b Resilient Elastomeric Seals 2 6.2.3 Fabricated Stainless Steel Penstocks Externally Reinforced Doors Reinforcement Stainless steel no. 1.4301 (AISI grade 304)* Stainless steel no. 1.4401 (AISI grade 316)* Other (specify) Door 6.2.3.1 Door and Frame 1 Door and Frame Material (P/S) Stainless steel no. 1.4301 (AISI grade 304) Stainless steel no. 1.4401 (AISI grade 316) Other (specify) 6.2.3.2 Wedges/Pressure Required/Provided) 1 2 3 Pads (If Required/Provided (Y/N) (P/S) Wedge/Pressure Pad Arrangements/ Positions () (P/S) Side wedges Invert wedges Soffit wedges Wedge/Pressure Pad Materials () (P/S) 3 1 6.2.3.3 Seals 2 Side/Soffit Seals () (P/S) Resilient elastomeric Rigid thermoplastic Seal Materials (P/S) Rigid Thermoplastic Seals 3 1a 6.2.4 Composite Plastic Penstocks 2 1 Type of Door Construction () (P/S) Fabricated Formed Moulded Internally reinforced Externally reinforced ISSUE 1 Pads (If Required/Provided (Y/N) (P/S) Wedge/Pressure Pad Arrangements/ Positions () (P/S) Side wedges Invert wedges Soffit wedges Wedge/Pressure Pad Materials () (P/S) 6.2.4.3 Seals Resilient Elastomeric Seals 6.2.4.1 Door and Frame Frame Material () (P/S) Stainless steel no. 1.4301 (AISI grade 304)* Stainless steel no. 1.4401 (AISI grade 316* Other (specify) 6.2.4.2 Wedges/Pressure Required/Provided) 2 1a Door Materials () (P/S) Internally Reinforced Doors Reinforcement Mild steel* Other (specify) Matrix and Door Skins Side/Soffit Seals () (P/S) Resilient elastomeric Rigid thermoplastic Seal Materials (P/S) Rigid Thermoplastic Seals Resilient Elastomeric Seals JANUARY 2014 WIMES 8.10 6.2.5 Weir Penstocks 2 Stem(s) to be Clear of Process Fluid (Y/N) (P) Page 39 6.5 Handstops 1 6.4 Stoplog Systems 1 2 2 2 4 Mounting Arrangements () (P) Channel mounted (rebated) Channel mounted (non rebated) Wall mounted Channel Aperture Size (P) Width (mm) Height (mm) Stoplog Size (S) Width (mm) Height (mm) Number of Stoplogs Required (S) Stoplog System Component Materials (P/S) Frame 2 2 4 Door Side and Invert Seals Lifting Handle 5 Logs Side Seals 5 6 Mounting Arrangements () (P) Channel mounted (rebated) Channel mounted (non rebated) Wall mounted Channel/Wall Aperture Size (P) Width (mm) Height (mm) Handstop Size (S) Width (mm) Height (mm) Handstop Component Materials (P/S) Frame Door Weight/ Lifting Requirements () (P) One man lift Two man lift Interlog Seals 7.0 OPERATING (PENSTOCKS) Log lifting Points 7.1 General Lifting System Components 1a Lifting System Required (Y/N) (P) Type of Lifting System Required/Provided (P/S) 2 Reference for Purchaser’s Lifting System Specification (P) 3 Storage Rack Required (Y/N) (P) ISSUE 1 Geometry REQUIREMENTS Direction of Penstock Closing/Lowering () (P) Clockwise* Anti-clockwise Method of Penstock Operation () (P) Manual Powered Operating Equipment Mounting Requirements () (P) Directly onto penstock frame Remotely from penstock JANUARY 2014 WIMES 8.10 Page 40 7.2 Manual Operation (Where Required) 7.3.3 Pneumatic Required/Provided) Actuator (Where 7.2.1 General 3 2 3 4 4 6 Gearbox Provided (Y/N) (S) No. of Turns Required to Open/Close Penstock (S) Type of Operating Element Required () (P) Handwheel T-key and stem cap Crank handle Other (specify) T-Key Required (Y/N) (P) Lockable Surface Box Required (For T-key and Stem Cap) (Y/N) (P) 7.2.2 Handwheel (Where Required) 2 Air Pressure Requirements (bar) (S) 7.3.4 Hydraulic Required/Provided) Actuator (Where 3 Type of Hydraulic Oil Required/Provided (P/S 4 Hydraulic Pressure Requirements (bar) (S) 7.4 Operating Equipment Extension System (Where Required) 7.4.1 General 5 Maximum Handwheel Diameter (mm) (600*) (P) Extension System Materials (P/S) Extension Spindle(s) Couplings 7.2.3 Crank Handle (Where Required) Spindle Guides 2 Maximum Crank Handle Length (mm) (300*) (P) Pillar 7.2.4 T-Key and Stem Cap (Where Required) 2 7.4.3 Couplings Maximum T-Key Handle Length (mm) (600*) (P) 2c Gaiters Required (Y/N) (P) 7.2.5 Gearbox (Where Required) 7.4.4 Spindle Guides (Where Required/Provided) 2d IP Rating (P/S) 1b 7.3 Powered Operation (Where Required) 1b 7.3.1 General 1 3 6 Type of Actuator () (P/S) Electric Pneumatic Hydraulic Reference for Purchaser’s Specification (P) Low Friction Liner Reqd/Provided (Y/N) (P/S) Liner Material (P/S 7.4.5 Pillar (Where Required/Provided) 1c Particular Mechanical Position Indicator Reqd/Provided (Y/N) (P/S) Stops Required (Y/N) (P) ISSUE 1 JANUARY 2014 WIMES 8.10 8.0 INSPECTION REQUIREMENTS Page 41 AND TESTING 8.1 General 1b 1d Witness FAT Required (Y/N) (P) Commissioning Testing (Y/N) (P) 8.2 Factory Acceptance Testing (FAT) 1 FAT Schedules to be Submitted For Approval a Minimum of 2 Weeks Before FAT (Y/N) (P) 8.4 Site Acceptance Testing (SAT) 8.4.1 General 1 SAT Schedules to be Submitted For Approval a Minimum of 2 Weeks Before SAT (Y/N) (P) ISSUE 1 JANUARY 2014 WIMES 8.10 Page 42 APPENDIX D – SUPPLIER’S SUPPLEMENTARY DATA SHEET INFORMATION Clause ISSUE 1 Supplementary Information JANUARY 2014
© Copyright 2024 Paperzz