Nicolas Adi Suwiryo, Technical/Innovation Thor Brown, Communication/Innovation Craig Horan, Project Manager/Innovation United States Infrastructure Corporation is America’s largest provider of utility infrastructure locating services Over 3,000 highly-trained utility locating technicians throughout 22 states USIC is the parent corporation of SM&P and CLS Provides contract utility locating services for natural gas, electric, telecommunications, cable TV, water and sewer USIC wants to settle on a single brand of paint USIC uses millions of cans paint annually Wants the paint brand which has the best combination of price, distribution capability, and quality Need to run this paint testing project because: Previous field tests did not compare this specific product type Manufacturers have made some product changes, making previous tests obsolete. Our team will evaluate the quality of the paint brands Run tests on orange water-based Krylon Quick Mark and Rust-Oleum Industrial Choice inverted marking paint brands We will measure 6 variables: longevity of marking visibility of paint resistance to clogging distance painted per can line width speed of paint discharge. Why us? What are the results for? Two distinct areas of interest Visibility/Longevity Quality/ Efficiency Develop Methods to test Paints 6 tests have been designed Possible consideration of Wand ergonomics 3 Visibility/Longevity Tests Longevity Visibility and Fading Line Width 3 Quality/Efficiency Tests Resistance to Clogging Distance Painted per Can Speed of Paint Discharge Applied IE Methods Design of Experiment Economic Analysis Ergonomics Possible Alternatives to be tested Effect of multiple layers of paint Visibility when applied in wet conditions Effect of different climates (Biology lab?) Possible Ergonomic Issue to be addressed Ultimate Goal is to recommend a paint Keep any discussion in terms of X & Y Analyze Results of tests Assign a weighted value to each test Sum the weights Recommend a Brand Need to be thorough and document well Document conditions and weather Take pictures at assigned intervals (48hr + 7days) Prepare cans equally (shaking, mixing, and storing) USIC purchases ~2 million cans per year Of these, ~1 million are the orange Results could have significant economic impact on Krylon or Rust-Oleum Absolutely need to be impartial and THOROUGH Project Costs Week 1 Hours Cost Per Hour Team Time Total Cost $100.00 $0.00 Total Individual Hours $100.00 $0.00 Total Team Meeting Hours $100.00 $0.00 $100.00 $400.00 $200.00 $0.00 Total Plant Visit Hours 4 Consultant Time Account Executive Hours Total Weekly Cost $400.00 Projected vs Actual Cost $35,000.00 $30,000.00 Cost (in dollars) $25,000.00 $20,000.00 $15,000.00 $10,000.00 $5,000.00 $0.00 1 2 3 4 5 6 7 8 9 10 Week Projected Total Actual Total 11 12 13 14 15
© Copyright 2026 Paperzz